भारत सरकार Government of के ीय िवुत ािधकरण Central Electricity Authority दिण ेीय िवुत सिमित Southern Regional Power Committee 29, रेस कोस ास रोड 29, Race Course Cross Road BENGALURU- 560 009 बगलु :-560 009 Phone : 080 -2228 2516 ; FAX : 080-2225 9343; e-mail: [email protected]; web site: www.srpc.kar.nic.in

No. SRPC/SE-I/2021/ दनांक/ Dated: 09th February, 2021

सेवाम/ To

ेषती सचू ी के अनसु ार / As per the mailing list

Subject: Record Notes of 6th Meeting of Nodal Officers for SEM data Coordination held on 04.02.2021 through Webex VC -Reg.

महोदय/महोदया/ Sir/ Madam,

Enclosed, please find the Record Notes of Sixth Meeting of Nodal officers for SEM coordination held on 04.02.2021 through VC for your kind perusal and necessary action please. The same is also available at SRPC website (www.srpc.kar.nic.in)

भवदीय/Yours faithfully,

(मेका रामकृ ण/MEKA RAMAKRISHNA) अधीण अिभयता(वा)/Superintending Engineer (C)

Mailing List: 1 Shri Bhanu Prasad E.E APTRANSCO [email protected] 2 Ms Rashmi A.E.E KPTCL [email protected] 3 Ms Ani Job E.E KSEBL [email protected] 4 Shri Murugavelan A.E.E TANTRANSCO [email protected] 5 Ms Khaisar Begam A.D.E TSTRANSCO de.ebc1@tstransco 6 Shri Shamjith J.E Puducherry [email protected] 7 Shri Amarendra Reddy D.G.M NTPC-Ramagundam [email protected] 8 Shri J.C.Patra M NTPC- Talcher [email protected] 9 Shri Sunil.P E NTPC- Kudgi [email protected] 10 Shri Mohan S.M NTPC- NP Kunta [email protected] 11 Shri Suresh Babu D.G.M NTPC-Simhadri [email protected] 12 Shri Manimaran D.G M NLC TPS-II [email protected] 13 Shri Raja C.M NLC TPS EXP 1 [email protected] 14 Shri Durai Kannan D.G.M NLC TPS EXP 2 [email protected] 15 Ms Payal E.E NNTPS [email protected] 16 Ms Jaykumae E.E NTPL [email protected] 17 Shri Mishrav S.O.D NPCIL-MAPS [email protected] 18 Shri Kiran D.M.E NPCIL-KGS [email protected] 19 Shri Ramesh Babu D.M.E NPCIL-KKNPP [email protected] 20 Shri Puhalendhi S.O.D BHAVINI [email protected] 21 Shri M.B. Rao D.G.M PGCIL-SR1 [email protected] 22 Shri K.N. PRASAD C.M PGCIL-SR2 [email protected] 23 Shri T.K. Parida Talcher HVDC [email protected] 24 Shri Murthy D.M.E CEPL [email protected] 25 Shri Prabhakar D. M.E IL&FS [email protected] 26 Shri Ramachandra D.G.M LANCO -LKPL [email protected] 27 Shri Perumal S.M SEIL [email protected] 28 Shri Seshagiri G.M MEL [email protected] 29 Shri John S.E SGPL [email protected] 30 Shri Ayyappan S.E MYTRAH [email protected] 31 Shri Aditya A.M GIREL [email protected] 32 Shri Bala S.M ORANGE [email protected] 33 Shri Ankush Dhane P.H BETAM [email protected] 34 Shri Jack Fernandes S.S.E Goa [email protected]

Copy for Kind information to: 1. CE (Comml.), APPCC, Vijayawada. 2. CGM (RA&PP), APEPDCL, Visakapatnam 3. CA, SLDC-TBC, KPTCL, Bengaluru. 4. SE, SLDC, KPTCL, Bengaluru. 5. Dy. GM (Finance), KPCL, Bengaluru. 6. Additional Director (Projects), PCKL, Bengaluru. 7. CE (Tr.& SO), SLDC, KSEBL, Kalamassery. 8. EE (LD), SLDC, KSEBL, Kalamassery. 9. SE (LD & GO), TANTRANSCO, Chennai. 10. EE (Grid), TANTRANSCO, Chennai. 11. CE (Regulatory Cell), TANGEDCO, Chennai 12. CE (Comml.), TSPCC, 13. CGM(Comml), TSSPDCL, Hyderabad 14. EE ( S.C.C)., Electricity Department, Puducherry. 15. GM (Comml.), CC, NTPC, New Delhi. 16. GM (Comml.), SR-HQ, NTPC, Secunderabad 17. GM (Comml.), Corporate Office, NLCIL, Neyveli. 18. Station Director, MAPS, Kalpakkam. 19. Station Director, KGS, Kaiga. 20. Station Director, KKNPP, Kudanakulam 21. AGM (Comml.), NTECL, Vallur STPS. 22. Dy.GM, NTPL,Tuticorin 23. Sr.VP (Business Development), UPCL, Bengaluru 24. Deputy General Manager, JSWEL, Bengaluru. 25. Mr. Asan Mohammed ,CEPL, Chennai 26. GM- Power Sale, IL&FS TNPCL, Chennai 27. VP (Comml.), HNPCL, Mumbai 28. GM, Sembcorp Energy India Limited, SPSR Nellore 29. Director(Comml.), PTC India Limited, New Delhi 30. GM (Comml.), SRTS-I, PGCIL, Secunderabad 31. GM (Comml.), SRTS-II, PGCIL, Bengaluru 32. Head of Finance, SRLDC, POSOCO, Bengaluru 33. Head of MO, SRLDC, POSOCO, Bengaluru 34. Director, GM Division, CEA, New Delhi. 35 Director, NPC Division, CEA, New Delhi. Southern Regional Power Committee Bengaluru

Record Notes of the 6th Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021(Through VC) Introduction: A meeting through video conferencing (VC) was held on 04.02.2021 to discuss the issues related to SEMs installed in SR. The list of Participants is at Annexure-I. There was no representation from Andhra Pradesh and Wind SPDs connected at Tuticorin. Shri A Balan, MS (SRPC) welcomed the Nodal Officers and other participants to the meeting. He informed that this meeting is convened to deliberate the various SEM issues raised by SRLDC in the region and to update the status of action taken by the entities/nodal officers on the recommendations/decisions of the earlier meetings. Few SEM related issues are yet unresolved and hoped that those can be resolved in the meeting. He requested the cooperation of all the participants for fruitful deliberation to address the SEM/commercial issues. He informed that the Draft Technical Specifications (TS) of AMR scheme furnished by CEA have been circulated among the SR constituents for their view/comments. He requested the entities to furnish their comments, if any, in order to incorporate the same in TS after deliberations in the AMR Joint Committee meetings. Superintending Engineer (Commercial), SRPC took up the agenda for deliberation. 1. Faulty SEMs The following faulty SEMs needs to be replaced immediately:

SEM No/ Utility/State Station Location ID Feeder Name TN Arni NP-7307-A/ TA-52 230KV BHAVNI Line 1 TN Arni NP-7308-A/ TA-53 230KV BHAVNI Line 2 a. TANTRANSCO informed that the tendering for two SEMs at Arni was under progress and is expected to complete the installation within a month’s time. b. TANTRANSCO was requested expedite the procurement process and to install the two meters within a month. 2. Under Recording SEMs The following SEMs of Goa are under recording and needs to be rectified immediately:

Station Name SEM No/Location ID Feeder Name Xeldem NP-5511-A/GP-02 220KV Ambewadi line at Xeldem a. Goa SLDC informed that PT on Y-phase of 220kV Ambewadi-Xeldom Line was failed on 19.10.2020 at Xeldem SS. Faulty PT was replaced on 24.10.2020 by Goa Electricity Department (GED), however the new PT has not been connected till date. New PT can be commissioned after joint inspection of KPTCL & Goa only. The payment towards inspection and testing charges were paid on 28th October 2020. Goa SLDC had requested CE (P&C), KPTCL for concurrence and for a date for joint inspection to connect the PT through various correspondences. However, no communication has been received from KPTCL till date.

th Record Notes for 6 Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021 Page 1 b. SRPC/SRLDC expressed concern on the delay of commissioning of the new PT at Xeldem end and requested KPTCL/Nodal Officer of to communicate the issue to the concerned wing of KPTCL for early commissioning of the PT at Xeldem end. 3. Time Drift All entities are requested to correct the time drift to less than 40 seconds. The list of SEMs having time drift is given at Annexure-II. The following are the SEMs having time drift more than 5 Minutes and needs to be corrected immediately:

Station Line SEM .No/ Location ID Time Drift

TELANGANA Suryapeta(400kV) 400kV Kamavarapukota Line-1 NP-3193-A/ GS-68 00:06:40 Suryapeta(400kV) 400kV VTPS Line 2 NP-3087-A/ GS-70 00:06:10 Suryapeta(400kV) 400kV VTPS Line 1 NP-3088-A/ GK-30 00:05:55 Malkaram 400kv Ramagundam Line NP-7820-A/ AM-22 00:05:03 KARNATAKA Nelamangala 400kV Mysore Line 2 NP-2483-A/ CN-18 00:19:08 Guttur 400kV Side Of ICT 2 NP-4114-A/ CG-03 00:17:22 Guttur 220kV Side Of ICT 1 NP-4062-A/ CG-02 00:13:32 Guttur 220kV Side Of ICT 2 NP-5688-A/ CG-04 00:11:54 Guttur 400kVMunirabad Line NP-5690-A/ CG-15 00:09:24 Nelamangala 400kV Mysore Line 1 NP-2482-A/ CN-17 00:08:54 Kodasalli 220kV Kaiga Line SA-0173-A/ CK-42 00:08:48 Nelamangala 400kV Mysore Line 1 NP-2482-A/ CN-17 00:08:16 Nelamangala 400kV Yelahanka Line 2 NP-4053-A/ CN-19 00:07:19 Nelamangala 400kV Yelahanka Line 2 NP-4053-A/ CN-19 00:07:18 Nelamangala 400kV Hiriyur Line 2 NP-4052-A/ CN-15 00:07:02 Nelamangala 400kV Hiriyur Line 2 NP-4052-A/ CN-15 00:07:01 Nelamangala 400kV Yelahanka Line 2 NP-4053-A/ CN-19 00:06:36 Nelamangala 400kV Hiriyur Line 2 NP-4052-A/ CN-15 00:06:19 BTPS 400kv Hiriyur Line2 LT-0696-A/ CB-04 00:05:45 Nelamangala 400kV Mysore Line 1 NP-2482-A/ CN-17 00:05:33 Kadra 220kV Kaiga Line SA-0175-A/ CK-41 00:05:31 Nelamangala 400kV Bidadi Line 1 NP-4055-A/ CN-11 00:05:17 TAMIL NADU Pudur 230kV Kudankulam Line NP-5131-A/ TP-15 00:07:02 Pudur 230kV Kudankulam Line NP-5131-A/ TP-15 00:06:57 Pudur 230kV Kudankulam Line NP-5131-A/ TP-15 00:06:54 Echur 230kV Maps Line NP-6174-A/ TE-01 00:06:06 Echur 230kV Maps Line NP-6174-A/TE-01 00:06:04 Echur 230kV Maps Line NP-6174-A/TE-01 00:06:02 GOA Xeldem 220kV Ambewadi Line NP-5511-A/ GP-02 00:22:54 BHAVINI BHAVINI 230kV Kancheepuram Line 2 NP-7295-A/ BV-23 00:29:55

th Record Notes for 6 Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021 Page 2 BHAVINI 230kV Siruseri Line 1 NP-7303-A/ BV-17 00:29:54 BHAVINI 230kV Siruseri Line 1 NP-7304-A/ BV-17 00:29:30 BHAVINI 230kV Side Of GT 1 NP-7299-A/ BV-01 00:29:25 BHAVINI 230kV Side Of ST1 NP-7298-A/ BV-02 00:27:36 BHAVINI 230kV Side Of GST NP-7311-A/ BV-03 00:27:32 BHAVINI 230kV Kancheepuram Line 1 NP-7297-A/ BV-21 00:24:55 BHAVINI 230kV Arni Line 2 NP-7290-A/ BV-15 00:23:36 BHAVINI 230kV Siruseri Line 2 NP-7302-A/ BV-19 00:20:42 BHAVINI 230kV Arni Line 1 NP-7293-A/ BV-13 00:17:51 PGCIL SR-I Khammam 400kV N’Sagar LINE 2 NP-3132-A/ AK-09 02:00:04 Khammam 220 kV Side of Khammam ICT 3 NP-9294-A/ AK-06 01:59:36 Munirabad 220kV side of ICT 2 NP-5384-A/ CM-04 00:09:40 PGCIL SR-II Nagapattinam 400KV NLC EXP-1 Line NP-9636-A/ TN-01 00:06:20 a. TSTRANSCO informed that the time drift of 3 meters at Suryapeta (Secure make) has been corrected on 03.02.2021. For the SEM at Malkaram Substation (L&T make), time drift correction of one minute per week is being carried out. One minute time drift correction has been done this week and would be corrected further in the coming weeks. b. KPTCL informed that the meters at Nelamangala are of old version of Secure make and not being serviced by OEM. M/s Secure had informed the time drift of that version could not corrected. Hence, they are planning to replace the meters at Nelamangala and requested SRLDC to share the technical specification of SEM in order to initiate the procurement process. c. SRLDC expressed concern on enormous time drift of SEMs at Nelamangala. The time drift of SEMs at Nelamangala is long pending and accounting errors may arise. SRLDC informed that the technical specifications of SEMs are available (Hand book of SEMs in SR) at SRLDC website. d. KPTCL informed that they are experiencing poor response from OEMs for procurement of few numbers of meters. Also they have apprehension that the meters would be replaced again if the new technical specifications of SEMs come into effect. e. SRPC requested KPTCL to adhere the prevailing Regulations and resolve the SEM time drift issues at Nelamangala, Guttur, Kodasalli, Kadra & BTPS at the earliest. f. KPTCL agreed that the time drift correction at Nelamangala, Guttur, Kodasalli, Kadra & BTPS would be carried out at the earliest. Also agreed for the replacement of the SEMs wherever time drift correction is not possible. g. TANTRANSCO informed that all the stations were able correct the time drifts except for Echur & Pudur stations. They had contacted the M/s L&T for support. M/s L&T is asking to provide the username and password. TANTRANSCO requested any other procedure for time drift corrections. h. SRLDC informed that time drift correction can be done without any username and password. By using ‘Advance’ & ‘Retard’ buttons, time drift of 1 Min/week can be corrected. The same

th Record Notes for 6 Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021 Page 3 procedure is followed by TSTRANSCO. TANTRANSCO may seek the help of nodal officer of TSTRANSCO for further guidance in this regard. i. Goa informed that they had tried to resolve the time drift issue of the meter installed at Xeldem but unable to fix it. Hence, Goa had approached PGCIL to resolve it and expected to rectify within 2 or 3 days. j. BHAVINI informed that 6 Nos. of faulty SEMs were reported in the month of March 2020. They had approached the OEM (M/s L&T) for repairing those SEMs, got it repaired by M/s L&T after lot of pursuance and put in service in October 2020. BHAVINI had requested M/s L&T that time itself for servicing/ time drift correction balance 12 meters. M/s L&T had informed that 6 No. of SEMs were faulty due to memory corruption. Balance meters may go out of service if they are attempted to service/time drift correction as they are of old version. M/s L&T had recommended to replace the SEMs with new ones. As per the OEM’s suggestion, they are not able to attempt for time drift correction. Their management is not agreeing for the OEM as recommendation i.e. replacement of SEMs in bulk. Since M/s L&T was not accepting to service the meters, BHAVINI requested SRLDC/PGCIL to recommend M/s L&T for correcting the time drift of SEMs. k. SRLDC informed that earlier 6 no. of SEMs were failed and BHAVINI was not able to download the data. Hence, SRLDC had requested to replace the meters. However, BHAVINI had stated that SEMs had been repaired by M/s L&T. l. SRPC stated that it is the responsibility of BHAVINI to keep the time drift errors within the permissible limits as specified by SRLDC. BHAVINI was requested to take up again with the OEM for time drift corrections at the earliest. In case time drift correction cannot be done, the recommendation of the OEM may be followed in this regard in order to keep the time drift errors within the permissible limits. It was clarified that as per Central Electricity Authority (Installation and Operation of Meters) Regulations, the operation, testing and maintenance of all types of meters shall be carried out by the generating company. SRPC requested SRLDC to take up the prolonged issue of substantial time drift errors at BHAVINI with the Station Director, BHAVINI as recommended in the 5th SEM Nodal Officers meeting held on 22.07.2020. SRLDC agreed to take up with Station Director, BHAVINI. m. SRLDC apprised that few SEMs at Kaiga GS & MAPS have time drift more than 5 minutes. n. Kaiga GS informed that they were facing some issues with DCD, hence unable to adjust the time drift. o. SRPC/SRLDC stated that there are also other ways of adjusting the time drift, hence requested Kaiga GS to contact the OEM instead of depending on DCD for time correction. p. MAPS informed that they would correct the time drift of SEM on Acharapakkam Line in few days. q. PGCIL, SR-I informed that there may be typo error while uploading the statement for Khammam & Munirabad SS and would revert back after checking. Subsequently, PGCIL SR- I vide email dated 05.02.2021 has informed that they had verified the time drift at Khammam & Munirabad SS and it was less than 1 Minute.

th Record Notes for 6 Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021 Page 4 SRLDC highlighted that huge time drift of around 17 minutes has been observed at 400 kV side of Vemagiri ICT and requested PGCIL, SR-I to correct immediately. r. PGCIL, SR-II informed that the meter at Nagapattinam SS would be replaced within 1 - 2 days. s. NTPC, Kudgi stated that earlier permissible limit for time drift was 2 Minutes. Time drift correction of 1 minute/week was possible only through DCD. Now through different applications, time of the meter may be made equal to GPS time without any restriction. NTPC Kudgi requested SRLDC to update the Handbook of SEMs regarding the procedures of time drift correction and permissible time drift limit to be maintained. t. SRPC informed all the entities that in the Record Notes of 5th Nodal Officers meeting held on 22.07.2020(Available at SRPC website), details of State wise L&T and Secure meters Engineers are given and they may be contacted for guidance on SEM issues. 4. SEM Reverse Polarity Reverse polarity of SEMs needs to be corrected within a week from the receipt of information. The following SEMs are with reverse polarity:

Station Line Meter No./Location ANDHRA PRADESH Ragulapadu 220kV Alipur Line NP-5399-A/ AR-01 WIND Orange Sironj 230kV Tuticorin GIS Line-1 SA-0015-A/WT-06 MYTRAH 230kV Tuticorin GIS Line-2 SA-0016-A/WT-09 BETAM 230kV Tuticorin GIS Line-1 LT-0565-A/WT-12 a. It was noted that in the 5th SEM Nodal Officers meeting (22.07.2020), APTRANSCO & KPTCL had agreed to carry out joint verification and to furnish the joint verification report to SRLDC. b. KPTCL informed that joint verification had been carried out and copy of the joint certification would be shared to SRLDC and SRPC. Polarity of SEM at KPTCL end is correct and the SEM at Ragulapadu (APTRANSCO end) was having reverse polarity. c. SRPC requested APTRANSCO to correct the reverse polarity of the SEM at Ragulapadu. d. Since there is no participation from Wind developers, SRPC requested SRLDC to take up the issues with the nodal officers of WPDs to resolve the issues of reverse polarity. 5. Non Receipt of SEM Data

Station Feeder Name Meter No./Location ANDHRA PRADESH VTPS-IV 400KV Nellore Line at VTPS NP-5382- A/AV-51 Since there is no participation from Andhra Pradesh, SRPC requested SRLDC to take up the issue with the nodal officer of Andhra Pradesh for resolution. 6. Non receipt of Time Drift Statements Time drift statement needed to be uploaded by 1200 hrs of first Monday of every month to

th Record Notes for 6 Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021 Page 5 SRLDC website>Commercial>SEMTimedrift. The following Stations are not updating their Time Drift Statement regularly.

State Stations Andhra Pradesh Nagarjunsagar RC, Hindupur, Lower Sileru, Upper Sileru, Kakinada, Nellore(AP),Chittor, Pidugurala, Tangeda, VTPS, Kalapaka, Uravakonda,Boopalapally,Donkarai,KCPCements,Vemagiri. Telangana Kodada, Narketpalli, Chalakurthy, Tandur, Wadapalli, Nagarjunsagar Tamil Nadu Gummudipoondi,Alamathy,Thiruvalem,Kuzhithurai,Kanchipuram, STCMS, SV Chatram, SP Koil, NCTPS, Arni, Mettur, Kamuthi, Kayathar. PGCIL SR-I Srikakulam, Gazuwaka& HVDC, Nellore PS, Kudgi,Kadapa, Vijayawada, Talcher HVDC PGCIL SR-II Narendra, Tuticorin PS, Puducherry, Trichur, Kolar& HVDC, Thiruvalem, Tirunelveli, Pugalur& HVDC, Ulundurpet, Sriperumbudur ,Salem, Kozhikode, Somanahalli, Madhugiri, Hosur a. TSTRANSCO informed that the time drift statements for all the Stations have been uploaded this week and ensured that uploading of Time Drift statement for all the stations would be done on regular basis. b. TANTRANSCO informed that correspondence from higher level has been sent to the respective Stations to upload the Time Drift statements in time. By next week onwards, all the statements would be uploaded on regular basis. There were some uploading issues being faced by the Thiruvalam SS. c. SRLDC informed that entities may contact SRLDC regarding any IT issues while uploading the time drift statements. d. PGCIL, SR-I informed that they would instruct all these stations to upload the statement regularly without fail. e. PGCIL, SR-II informed that Time drift statements for 11 stations have already been uploaded on 03.02.2021. Tumkur and Karur Station were yet to be uploaded. SEMs at Nagapattinam have some issues and would be replaced in few days. f. SRPC/SRLDC requested all the entities to upload the time drift statements by 1200 hrs of first Monday of every month at SRLDC website. 7. SEMs yet to be installed SEMs at following locations have to be installed as per CEA metering regulations: State/CGS Location Karnataka  Talaguppa end meter of Hassan-Talaguppaline  Nelamangala end meter of Hassan-Nelamangala line  UPCL end meter of Hassan-UPCL1&2 NTPL  Both HV side and LV side of ICTs at NTPL

a. SRLDC pointed out that the SEM data from Talaguppa, Nelamangala & UPCL ends were not as per the ABT complied meter data format. b. It was noted that SEMs at these locations are standby and are non-ABT complied. In case of failure of main SEMs, there would be accounting issues due to non-availability of SEM data. KPTCL was requested to replace the SEMs at Talaguppa, Nelamangala & UPCL with ABT

th Record Notes for 6 Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021 Page 6 Meters at the earliest. c. KPTCL informed that the SEM data of the above locations have been furnishing to SRLDC on regular basis. No such issues have been raised by SRLDC in any meetings for about one and half years. However, the issue would be addressed and the meters would be replaced with ABT complied SEMs at Talaguppa, Nelamangala & UPCL ends. d. NTPL informed that they were planning to replace all 30 meters including HV side and LV side of ICTs with ABT complied meters and procurement process has been initiated recently & under progress. Installation of SEMs would be completed within 5 to 6 months. On a query from NTPL, it was clarified that certification from CTU is required for the SEMs installed/replaced at CGS/ISGS. e. On a query from SRLDC regarding SEM installation at GT-1, NTPC Kudgi informed that meter at GT-1 would be replaced on next available shut down. NTPC Kudgi also informed that the cost of the SEMs has become four to five fold than earlier on account of design of new version 5 Min meters and non-availability of older version SEMs. 8. Pending recommendations of the 3rd meeting of Nodal Officers for SEM Data Coordination In the 3rdmeeting of Nodal Officers for SEM data coordination held on 5th August 2016 installation of SEMs by TSTRANSCO on Bonakaalu- Chillakallu lines 1&2 had been recommended. In the 46th meeting of Commercial Sub-Committee held on 03.12.2020, TSTRANSCO had informed that SEM at one circuit of Bonakaalu - Chillakallu line has been installed on 26.11.2020. SEM on other circuit would be installed by 07.12.2020. In the meeting, TSTRANSCO informed that the SEM on Line-2 had been installed on 11.12.2020. 9. Database of SEMs and Calibration of SEMs 9.1 In the previous Nodal officers meetings the following had been noted: a) The utilities to maintain the data base of SEMs within their jurisdiction and should have the factory test report and calibration date etc. b) In case of any configuration change /SEM change the same has to be reported to SRLDC and SRPC Secretariat to have the correct Accounting of Energy. c) All Utilities may furnish action plan regarding calibration of the SEMs. d) The factory test report and subsequent calibration reports shall be available with respective site and softcopy of the test certificate and database regarding SEMs and its calibration shall be furnished to SRLDC and SRPC secretariat. 9.2 In the 5th Nodal Officers meeting (22.07.2020), the status update was noted as below: a) PGCIL, SR-II: Calibration of SEMs in their scope was completed during December 2019. b) PGCIL, SR-I: Calibration was under progress and would be completed by the end of October 2020.

th Record Notes for 6 Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021 Page 7 PGCIL SR-II and SR-I were requested to furnish the gist of findings of SEM Calibration to SRLDC and SRPC. PGCIL had agreed to furnish the same. c) APTRANSCO: Action plan would be finalized shortly. d) KPTCL: SEMs which are due for calibration would be identified and action for calibration would be initiated. e) KSEBL: Action plan would be finalized at the earliest. f) TANTRANSCO: May approach PGCIL for the procedure to be followed for calibration of SEMs and accordingly the schedule for calibration would be planned. g) TSTRANSCO: Agency for carrying out calibration would be identified and process would be initiated within 4 or 5 months. h) NTPC: Calibration of the SEMs which were due for calibration had been carried out. However, action plan for calibration of the SEM would be finalized. 9.3 The following have been updated in the meeting: a) PGCIL SR-II: Report has been forwarded to SRLDC on 03.02.2020. 350 No. of SEMs had been calibrated, out of which for 5 meters had errors more than the limits prescribed in IS. Those meters had been replaced as per the findings of the report. Issues with KKNPP Meter (400 kV side of ICT No. 1) had been reported to KKNPP to do the needful. b) PGCIL SR-I: Detailed calibration report had been furnished to SRLDC. SRLDC confirmed the receipt of the same. c) KPTCL: Work is under process and would be expedited. d) KSEBL: Vide letter dated 02.02.2021(Annexure-III) has furnished the action plan for testing the SEM Meters of KSEBL at Meter Testing Laboratory of KSEBL, TMR Division, Angamaly, which is a NABL accredited laboratory for testing of Energy meters. e) TANTRANSO: Works would be completed within few months. f) TSTRANSCO: An agency has been finalized and will communicate the action plan within a month’s time. g) MEPL: Calibration of SEMs is being carried out through M/s. Yadav Instrumentation( P) Ltd. on 04.02.2021 & 05.02.2021. Calibration reports would be shared to SRLDC/ SRPC subsequently. h) APTRANSCO, KPTCL, TANTRANSCO, TSTRANSCO, PED, CGS/ISGS, IPPs/MPPs were requested to expedite the finalization of the action plan for calibration of SEMs and furnish the same to SRLDC/SRPC. The findings/report of calibration also needed to be furnished to SRLDC/SRPC. 10. Spare SEMs and DCDs All the utilities to maintain spare SEMs at least 10% of the total SEMs installed under their jurisdiction and sufficient number of spare DCDs etc. The Nodal officers noted the above.

th Record Notes for 6 Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021 Page 8 11. Certification of SEMs by PGCIL/CTU In the 39th meeting of Commercial Sub-Committee, it was decided that the meters used for apportioning the actual injection of ISTS power among regional entities may be certified by PGCIL/CTU (on payment basis). The following procedure to be followed in respect of certification of SEMs by PGCIL/CTU: i. User to approach PGCIL/CTU (SPDs/WPDs through SPPD/WPPD) for certification of SEMs. ii. User to approach Buyer (SPDs/WPDs through SPPD/WPPD) for witnessing the certification of SEMs. iii. Certification by PGCIL/CTU to be performed in the presence of User (SPD, SPPD, WPPD) and Buyer iv. User/SPD/SPPD/WPPD to submit the certification report (as per the format) to SRLDC and SRPC Secretariat. a) In the meeting, on a query from NTPC Kudgi and NTPL, SRLDC clarified that certification from CTU is required to be taken for the SEMs installed/replaced at CGS/ISGS. b) The Nodal officers noted the above. 12. General requirements from Nodal officers i. Ensure the SEM data uploaded including raw data (DAT) and converted data (NPC) are correct in all respects and take necessary steps for the same. The data should be uploaded every week by 1700 hrs of Monday. ii. Ensure that time drift statement is uploaded by 1200 hrs of first Monday of every month. iii. Ensure that SEMs under their jurisdiction have time drift less than 40 seconds. iv. Ensure that reverse polarity, if any, is corrected within a week from the receipt of information. v. Coordination with the OEMs so as to ensure that field stations under jurisdiction have up-to-date access with the meter conversion software. vi. Coordination with CTU to ensure faulty SEM is replaced, and/or any other issues in the purview of CTU. vii. In case of any configuration change /SEM change the same needed to be reported to SRLDC and SRPC Secretariat for proper accounting of energy. viii. Responsible for coordinating with SRLDC metering Group in case of any change in injection/drawal formula. x. Maintain sufficient spare SEMs and ancillary equipment such as DCDs etc. The Nodal officers noted the above. ***

th Record Notes for 6 Meeting of Nodal Officers for SEM Data Coordination held on 04.02.2021 Page 9 Annexure-I (Page 1 of 2)

List of Participants for 6th Meeting of Nodal Officers for SEM data Coordination (held on 04.02.2021 through Video Conference)

TSPCC / TSTRANSCO

01 Shri. Subramanyam Divisional Engineer 02 Shri Karthik Asst. Engineer

KSEBL

01 Ms. Annie Job E J Executive. Engineer(LD-II) 02 Ms. Maria Sheena.M.X Assistant Executive Engineer

KPTCL / PCKL

01 Ms. Rashmi 02 Ms. Meena Kumari

TANTRANSCO

01 Shri. P.Murugavelan AEE / Grid

GOA

01 Shri Jack Fernandes Assistant Engineer

HVDC Talcher

01 Shri Pratap Sahoo

NPCIL

01 Shri. D.Venkata Ramana Rao SO/G,Technical Services, MAPS 02 Shri Tejashwara Rao Kaiga 03 Shri Ramesh Babu KKNPP

NTPC

01 Shri K. Suresh Babu DGM 02 Shri P. Sunil DGM (EMD)

NLC

01 Shri A.Manimaran ADGM/Elec (NLC_TPS2) 02 Shri N.Duraikannan GM/Elec (NLC_TPS2EXPN) 03 Shri S. Karthikeyan DCE/Elec (NLC_TPS2EXPN) Annexure-I (Page 2 of 2)

NTPL

01 Shri Jayakumar K.R Additional Deputy General Manager

MEPL

01 Shri Sheshagiri Rao GM (Electrical & Regulatory Affairs)

SGPL

01 Shri Candida John Senior Engineer

HNPCL

01 Shri C. Ramakrishna

POWERGRID

01 Shri K. Nageshwara Prasad CM (SR-II) 02 Shri K B Shashidaran SR-II

POSOCO, SRLDC

01 Shri T. Srinivas GM 02 Shri. K. Suresh Kumar CM 03 Shri Hirak Roy Manager 04 Shri B V RamKumar Dy. Manager

SRPC

01 Shri A. Balan MS 02 Shri M. Ramakrishna SE (C) 03 Shri. A.C Suresh EE (C) 04 Ms. Anusha Das J. EE (C) 05 Shri. M. V. Subba Reddy AEE (C)

Annexure-II (Page 1 of 2)

station_name Meter_no gps meter_drift meter_difference dateofchecking dateofupload correction_neededremarks utility_namemeter_statusdescription AMBEWADI NP-5600-A 10:56:17 11:21:57 00:25:40 05-02-2021 05-02-2021 NO KPTCL FAST 220kV XELDEM LINE AT AMBEWADI AMBEWADI NP-5598-A 10:56:17 11:14:38 00:18:21 05-02-2021 05-02-2021 NO KPTCL FAST 220KV PONDA LINE AT AMBEWADI(PRESENTLY CONNECTED TO XELDEM) BELLARY PS SA-0101-A 15:09:13 15:13:55 00:04:42 01-02-2021 01-02-2021 NO Slftware notKPTCL available FAST 400KV PAVAGADA LINE-1 AT BELLARY PS(BPS) BELLARY PS SA-0210-A 15:03:11 15:05:56 00:02:45 01-02-2021 01-02-2021 NO Slftware notKPTCL available FAST 400KV PAVAGADA LINE-2 AT BELLARY PS(BPS) BETAM LT-0578-A 08:09:08 07:59:57 00:09:11 01-02-2021 06-02-2021 NO Wind - (TuticorinSLOW GIS ) 33KV FEEDER 1 CHECK AT BETAM 230KV BETAM LT-0839-A 08:09:08 08:00:06 00:09:02 01-02-2021 06-02-2021 NO Wind - (TuticorinSLOW GIS ) 33KV FEEDER 1 AT BETAM 230KV BETAM LT-0565-A 08:05:25 08:01:11 00:04:14 01-02-2021 06-02-2021 NO Wind - (TuticorinSLOW GIS ) 230KV TUTICORIN GIS LINE-1 AT BETAM BETAM LT-0584-A 08:21:17 08:17:22 00:03:55 01-02-2021 06-02-2021 NO Wind - (TuticorinSLOW GIS ) 33KV FEEDER 2 CHECK AT BETAM 230KV BHAVINI NP-7295-A 16:22:37 16:52:49 00:30:12 01-02-2021 01-02-2021 No nan NPC FAST 230KV KANCHEEPURAM LINE 2 AT BHAVNI BHAVINI NP-7303-A 16:24:04 16:54:15 00:30:11 01-02-2021 01-02-2021 No nan NPC FAST 230KV SIRUSERI LINE 1 AT BHAVNI BHAVINI NP-7304-A 16:24:07 16:53:53 00:29:46 01-02-2021 01-02-2021 No nan NPC FAST 230KV SIRUSERI LINE 1 AT BHAVNI BHAVINI NP-7299-A 16:29:00 16:58:40 00:29:40 01-02-2021 01-02-2021 No nan NPC FAST 230kV side of GT 1 AT BHAVNI BHAVINI NP-7298-A 16:24:48 16:52:40 00:27:52 01-02-2021 01-02-2021 No nan NPC FAST 230KV SIDE OF ST 1 AT BHAVNI BHAVINI NP-7311-A 16:24:15 16:52:03 00:27:48 01-02-2021 01-02-2021 No nan NPC FAST 230kV side of GST AT BHAVNI BHAVINI NP-7297-A 16:22:45 16:47:55 00:25:10 01-02-2021 01-02-2021 No nan NPC FAST 230KV KANCHEEPURAM LINE 1 AT BHAVNI BHAVINI NP-7290-A 16:22:07 16:45:59 00:23:52 01-02-2021 01-02-2021 No nan NPC FAST 230KV ARNI LINE 2 AT BHAVNI BHAVINI NP-7302-A 16:23:01 16:43:56 00:20:55 01-02-2021 01-02-2021 No nan NPC FAST 230KV SIRUSERI LINE 2 AT BHAVNI BHAVINI NP-7293-A 16:22:28 16:40:32 00:18:04 01-02-2021 01-02-2021 No nan NPC FAST 230KV ARNI LINE 1 AT BHAVNI BHAVINI NP-7310-A 16:24:10 16:28:57 00:04:47 01-02-2021 01-02-2021 No nan NPC FAST 230kV side of GST AT BHAVNI BHAVINI LT-0396-A 16:22:54 16:20:43 00:02:11 01-02-2021 01-02-2021 No nan NPC SLOW 230KV SIRUSERI LINE 2 AT BHAVNI BIDADI NP-8344-A 10:12:50 10:14:18 00:01:28 01-02-2021 01-02-2021 NO POWERGRIDFAST 400KV NELEMANGALA LINE 2 AT BIDADI BTPS LT-0696-A 16:05:00 15:59:30 00:05:30 01-02-2021 04-02-2021 NO KPTCL SLOW 400KV HIRIYUR LINE2 AT BTPS BTPS NP-5500-A 15:00:00 15:04:15 00:04:15 01-02-2021 04-02-2021 NO KPTCL FAST 400KV JSW LINE AT BTPS BTPS NP-6165-A 15:00:00 15:03:10 00:03:10 01-02-2021 04-02-2021 NO KPTCL FAST 400KV YTPS LINE AT BTPS COASTAL ENERGEN LT-0163-A 09:57:00 09:58:30 00:01:30 01-02-2021 02-02-2021 YES IPP FAST 400KV SIDE OF GT 2 AT CE CPETA NP-9729-A 10:22:00 10:19:30 00:02:30 01-02-2021 01-02-2021 NO nan POWERGRIDSLOW 400KV SATTENAPALLY-1 LINE AT CPETA DHARMAPURI SA-0240-A 15:07:00 15:10:07 00:03:07 01-02-2021 01-02-2021 YES RETARD DONEPOWERGRIDFAST 400KV SOMANAHALLI LINE 1 AT DHARMAPURI DHARMAPURI SA-0196-A 15:15:00 15:17:56 00:02:56 01-02-2021 01-02-2021 YES RETARD DONEPOWERGRIDFAST 400KV TUMKUR(MADHUGIRI) LINE 2 AT DHARMAPURI DHARMAPURI SA-0215-A 14:57:00 14:58:53 00:01:53 01-02-2021 01-02-2021 YES RETARD DONEPOWERGRIDFAST 400KV TUTICORIN PS LINE 1 AT DHARMAPURI DINDI NP-3090-A 12:51:49 12:56:42 00:04:53 01-02-2021 02-02-2021 NO TELENGANAFAST 220KV SRISAILAM LINE 2 AT DINDI ECHUR NP-6174-A 09:56:48 09:50:40 00:06:08 08-02-2021 08-02-2021 NO TANTRANSCOSLOW 230KV MAPS LINE AT ECHUR ECHUR NP-6174-A 10:13:06 10:07:04 00:06:02 01-02-2021 01-02-2021 NO TANTRANSCOSLOW 230KV MAPS LINE AT ECHUR EDAMON NP-5576-A 10:17:00 10:18:00 00:01:00 01-02-2021 01-02-2021 YES FAST KSEB FAST 220KV TIRUNELVELI LINE 2 AT EDAMON GIREL NP-3287-A 11:07:12 11:04:10 00:03:02 01-02-2021 01-02-2021 YES Wind - (TuticorinSLOW GIS ) 230KV TUTICORIN GIS LINE-1 AT GIREL GOOTY NP-3218-A 11:30:15 11:32:40 00:02:25 01-02-2021 01-02-2021 YES nan POWERGRIDFAST 400KV NELLORE PS (NPS) LINE AT GOOTY GOOTY NP-6038-A 11:26:04 11:28:00 00:01:56 01-02-2021 01-02-2021 YES nan POWERGRIDFAST 220kV side of ICT 2 AT GOOTY GOOTY NP-5393-A 11:27:06 11:29:00 00:01:54 01-02-2021 01-02-2021 YES nan POWERGRIDFAST 400KV RAICHUR LINE 1 AT GOOTY GOOTY NP-3219-A 11:30:45 11:32:30 00:01:45 01-02-2021 01-02-2021 YES nan POWERGRIDFAST 400KV NELLORE PS (NPS) LINE-2 AT GOOTY GOOTY NP-3215-A 11:23:51 11:25:30 00:01:39 01-02-2021 01-02-2021 YES nan POWERGRIDFAST 400KV KURNOOL(PG) LINE AT GOOTY GOOTY NP-3108-A 11:28:23 11:29:50 00:01:27 01-02-2021 01-02-2021 YES nan POWERGRIDFAST 400KV PAVAGADA LINE 2 AT GOOTY GOOTY NP-3107-A 11:28:00 11:29:20 00:01:20 01-02-2021 01-02-2021 YES nan POWERGRIDFAST 400KV PAVAGADA LINE 1 AT GOOTY GUTTUR NP-5688-A 11:20:10 11:39:08 00:18:58 04-02-2021 04-02-2021 NO KPTCL FAST 220KV SIDE OF ICT 2 AT GUTTUR GUTTUR NP-4062-A 11:19:40 11:34:26 00:14:46 04-02-2021 04-02-2021 NO KPTCL FAST 220kV side of ICT 1 AT GUTTUR GUTTUR NP-4114-A 11:17:10 11:05:12 00:11:58 04-02-2021 04-02-2021 NO KPTCL SLOW 400KV SIDE OF ICT 2 AT GUTTUR GUTTUR NP-5690-A 11:17:55 11:27:33 00:09:38 04-02-2021 04-02-2021 NO KPTCL FAST 400kV MUNIRABAD LINE AT GUTTUR GUTTUR SA-0171-A 11:19:20 11:24:48 00:05:28 04-02-2021 04-02-2021 NO KPTCL FAST 400KV HIRIYUR LINE 1 AT GUTTUR GUTTUR SA-0177-A 11:15:30 11:19:16 00:03:46 04-02-2021 04-02-2021 NO KPTCL FAST 400KV NARENDRA LINE 1 AT GUTTUR GUTTUR SA-0180-A 11:17:48 11:21:08 00:03:20 04-02-2021 04-02-2021 NO KPTCL FAST 400KV KAIGA LINE 2 AT GUTTUR GUTTUR SA-0179-A 11:17:32 11:15:33 00:01:59 04-02-2021 04-02-2021 NO KPTCL SLOW 400KV KAIGA LINE 1 AT GUTTUR GUTTUR NP-4061-A 11:18:20 11:19:34 00:01:14 04-02-2021 04-02-2021 NO KPTCL FAST 400KV JSW LINE AT GUTTUR HOODY SA-0221-A 11:32:08 11:35:26 00:03:18 01-02-2021 01-02-2021 NO KPTCL FAST 400KV KOLAR LINE-2 AT HOODY HOODY SA-0226-A 11:38:00 11:40:59 00:02:59 01-02-2021 01-02-2021 NO KPTCL FAST 400KV KOLAR LINE-1 AT HOODY HOODY SA-0106-A 11:32:54 11:30:00 00:02:54 01-02-2021 01-02-2021 NO KPTCL SLOW 400KV YALAHANKA LINE-2 AT HOODY IL&FS NP-3264-A 08:06:03 08:10:10 00:04:07 01-02-2021 01-02-2021 NO IPP FAST 400KV NAGAPATTINAM LINE -2 AT ILFS IL&FS NP-3262-A 08:05:25 08:09:10 00:03:45 01-02-2021 01-02-2021 NO IPP FAST 400KV NAGAPATTINAM LINE -2 LINE AT ILFS IL&FS NP-3261-A 08:04:23 08:07:40 00:03:17 01-02-2021 01-02-2021 NO IPP FAST 400KV NAGAPATTINAM LINE -1 AT ILFS IL&FS NP-3263-A 08:05:01 08:07:50 00:02:49 01-02-2021 01-02-2021 NO IPP FAST 400KV NAGAPATTINAM LINE -1 AT ILFS IL&FS NP-3267-A 08:06:56 08:04:50 00:02:06 01-02-2021 01-02-2021 NO IPP SLOW 400KV SIDE OF SBT AT ILFS IL&FS NP-3268-A 08:07:57 08:06:00 00:01:57 01-02-2021 01-02-2021 NO IPP SLOW 400KV SIDE OF GT-1 AT ILFS KADRA SA-0175-A 11:10:30 11:16:15 00:05:45 04-02-2021 04-02-2021 NO KPTCL FAST 220KV KAIGA LINE AT KADRA KAIGA U12 NP-7810-A 20:01:35 20:09:10 00:07:35 31-01-2021 03-02-2021 NO NOT DONE ASNPC DCD IS NOTFAST AVAILABLE220kV KADRA LINE AT KAIGA KAIGA U34 NP-7813-A 20:15:52 20:24:21 00:08:29 31-01-2021 03-02-2021 NO NOT DONE ASNPC DCD IS NOTFAST AVAILABLE400KV GUTTUR LINE 1 AT KAIGA KAIGA U34 NP-7814-A 20:12:36 20:20:21 00:07:45 31-01-2021 03-02-2021 NO NOT DONE ASNPC DCD IS NOTFAST AVAILABLE400kV side of GT 3 AT KAIGA KAIGA U34 NP-7352-A 20:17:13 20:24:51 00:07:38 31-01-2021 03-02-2021 NO NOT DONE ASNPC DCD IS NOTFAST AVAILABLE400KV GUTTUR LINE 2 AT KAIGA KAIGA U34 NP-7351-A 20:12:57 20:20:21 00:07:24 31-01-2021 03-02-2021 NO NOT DONE ASNPC DCD IS NOTFAST AVAILABLE400kV side of GT 4 AT KAIGA KAIGA U34 NP-7353-A 20:13:13 20:20:09 00:06:56 31-01-2021 03-02-2021 NO NOT DONE ASNPC DCD IS NOTFAST AVAILABLE400kV side of GT 4 AT KAIGA KAIGA U34 NP-7812-A 20:13:27 20:20:21 00:06:54 31-01-2021 03-02-2021 NO NOT DONE ASNPC DCD IS NOTFAST AVAILABLE220kV side of SUT 3 at KAIGA KAIGA U34 NP-7811-A 20:12:00 20:18:45 00:06:45 31-01-2021 03-02-2021 NO NOT DONE ASNPC DCD IS NOTFAST AVAILABLE400kV side of GT 3 AT KAIGA KARAIKUDI NP-1495-A 11:33:30 11:32:15 00:01:15 01-02-2021 01-02-2021 yes advanced POWERGRIDSLOW 400kV side of ICT 2 AT KARAIKUDI KARAIKUDI NP-5592-A 11:52:00 11:53:03 00:01:03 01-02-2021 01-02-2021 Yes retarded POWERGRIDFAST 400kV TRICHY LINE AT KARAIKUDI KODASALLI SA-0173-A 10:00:00 10:11:13 00:11:13 01-02-2021 01-02-2021 NO KPTCL FAST 220KV KAIGA LINE AT KODASALLI KONAJE LT-0673-A 09:44:17 09:43:15 00:01:02 01-02-2021 01-02-2021 YES KPTCL SLOW 110kV MANJESWARAM LINE AT KONAJE KUDANKULAM NPP NP-5632-A 06:52:00 06:53:01 00:01:01 01-02-2021 01-02-2021 NO NILL NPC FAST 400KV TIRNELVELI LINE AT KKNPP KURNOOL 765kV NP-9764-A 16:38:50 16:36:15 00:02:35 02-02-2021 03-02-2021 YES POWERGRIDSLOW 765KV MAHESHWARAM LINE-2 AT KURNOOL KURNOOL 765kV NP-3070-A 10:13:40 10:15:31 00:01:51 02-02-2021 03-02-2021 YES POWERGRIDFAST 400KV GOOTY LINE AT PGCIL KURNOOL 765kV NP-3151-A 14:10:04 14:11:30 00:01:26 02-02-2021 03-02-2021 YES POWERGRIDFAST 765KV NPS LINE 1 AT KURNOOL KURNOOL 765kV NP-3167-A 10:01:08 10:00:00 00:01:08 02-02-2021 03-02-2021 YES POWERGRIDSLOW 440V SIDE OF STATION TRANSFORMER AT KURNOOL MALKARAM NP-7820-A 13:18:00 13:23:07 00:05:07 01-02-2021 01-02-2021 NO TELENGANAFAST 400kV RAMAGUNDAM LINE AT MALKARAM MALKARAM NP-6163-A 13:34:00 13:37:25 00:03:25 01-02-2021 01-02-2021 NO TELENGANAFAST 400kV HYDERABAD LINE AT MALKARAM MAPS NP-4023-A 12:30:29 12:24:55 00:05:34 02-02-2021 02-02-2021 NO SLOW NPC SLOW 220KV ACHARAPAKKAM LINE AT MAPS MAPS NP-4027-A 12:32:50 12:36:40 00:03:50 02-02-2021 02-02-2021 NO FAST NPC FAST 220KV ACHARAPAKKAM LINE AT MAPS MAPS NP-4022-A 12:29:40 12:26:57 00:02:43 02-02-2021 02-02-2021 NO SLOW NPC SLOW 220KV ECHUR LINE AT MAPS MAPS NP-4025-A 12:31:15 12:33:25 00:02:10 02-02-2021 02-02-2021 NO FAST NPC FAST 220KV SP KOIL LINE 2 AT MAPS MAPS NP-4020-A 12:28:51 12:30:15 00:01:24 02-02-2021 02-02-2021 NO FAST NPC FAST 220KV SP KOIL LINE 1 AT MAPS MAPS NP-4024-A 12:30:50 12:32:13 00:01:23 02-02-2021 02-02-2021 NO FAST NPC FAST 220KV SP KOIL LINE 1 AT MAPS MEPL NP-7236-A 15:14:24 15:15:28 00:01:04 02-02-2021 02-02-2021 YES time retardedIPP now 15:15:11FAST 400KV SEL INTERCONNECTOR AT MEPL NAGAPATTINAM NP-9636-A 10:39:20 10:32:52 00:06:28 02-02-2021 03-02-2021 NO POWERGRIDSLOW 400KV NLC EXP-1 LINE AT NAGAPATTINAM NAGAPATTINAM NP-8322-A 10:35:17 10:39:00 00:03:43 02-02-2021 03-02-2021 NO POWERGRIDFAST 400KV TRICHY LINE 2 AT NAGAPATTINAM NARENDRA NP-7652-A 12:39:56 12:28:40 00:11:16 03-02-2021 03-02-2021 NO Issue with L&TPOWERGRID SEMs SLOW 220kV side of ICT 2 AT NARENDRA NARENDRA NP-7650-A 12:34:23 12:27:24 00:06:59 03-02-2021 03-02-2021 NO Issue with L&TPOWERGRID SEMs SLOW 400kV side of ICT 2 AT NARENDRA NARENDRA NP-5661-A 12:39:23 12:34:18 00:05:05 03-02-2021 03-02-2021 NO Issue with L&TPOWERGRID SEMs SLOW 400KV GUTTUR LINE 1 AT NARENDRA NARENDRA NP-7354-A 12:30:11 12:25:10 00:05:01 03-02-2021 03-02-2021 NO Issue with L&TPOWERGRID SEMs SLOW 400KV KAIGA LINE 1 AT NARENDRA NARENDRA NP-5662-A 12:34:06 12:30:52 00:03:14 03-02-2021 03-02-2021 NO Issue with L&TPOWERGRID SEMs SLOW 400KV GUTTUR LINE 2 AT NARENDRA NARENDRA SA-0039-A 12:31:21 12:29:50 00:01:31 03-02-2021 03-02-2021 YES Done POWERGRIDSLOW 400KV KUDGI(PG) LINE-1 AT NARENDRA NELAMANGALA NP-2482-A 13:23:37 13:31:58 00:08:21 01-02-2021 01-02-2021 NO KPTCL FAST 400KV MYSORE LINE 1 AT NELAMANGALA NELAMANGALA NP-4053-A 09:25:14 09:17:53 00:07:21 01-02-2021 01-02-2021 NO KPTCL SLOW 400KV YELAHANKA LINE 2 AT NELAMANGALA NELAMANGALA NP-4052-A 09:25:57 09:18:51 00:07:06 01-02-2021 01-02-2021 NO KPTCL SLOW 400KV HIRIYUR LINE 2 AT NELAMANGALA NELAMANGALA NP-4113-A 12:17:16 12:13:39 00:03:37 01-02-2021 01-02-2021 NO KPTCL SLOW 400kV GOOTY LINE AT NELAMANGALA NELAMANGALA NP-4055-A 13:27:59 13:25:17 00:02:42 01-02-2021 01-02-2021 NO KPTCL SLOW 400KV BIDADI LINE 1 AT NELAMANGALA NELAMANGALA NP-2492-A 09:26:23 09:29:03 00:02:40 01-02-2021 01-02-2021 NO KPTCL FAST 400KV HIRIYUR LINE 1 AT NELAMANGALA NELAMANGALA NP-2493-A 09:25:48 09:28:24 00:02:36 01-02-2021 01-02-2021 NO KPTCL FAST 400KV HOODY LINE 1 AT NELAMANGALA NELAMANGALA SA-0121-A 12:34:36 12:36:09 00:01:33 01-02-2021 01-02-2021 NO KPTCL FAST 400KV BIDADI LINE-2 AT NELAMANGALA NELLORE NP-7214-A 15:20:10 15:21:23 00:01:13 01-02-2021 01-02-2021 YES Retarded POWERGRIDFAST 400KV NELLORE (PG) INTERCONNECTOR 1 AT NELLORE (AP) NELLORE NP-7228-A 16:02:20 16:03:26 00:01:06 01-02-2021 01-02-2021 YES Retarded POWERGRIDFAST 400KV NPS LINE 1 AT NELLORE NLC(TN) NP-3306-A 09:07:50 09:09:00 00:01:10 01-02-2021 01-02-2021 NO TANTRANSCOFAST 400KV NNTPP LINE 1 AT NLC(TN) NSAGAR NP-3135-A 11:16:35 11:17:44 00:01:09 01-02-2021 01-02-2021 YES RETARDED POWERGRIDFAST 400KV KHAMMAM LINE 2 AT N'SAGAR NTPL1 NP-8326-A 10:14:17 10:40:10 00:25:53 01-02-2021 01-02-2021 NO No correctionISGS provided.OneFAST correction400KV was TUTICORIN carried out PS mid LINE of 1the AT month NTPL PANOOR KS-0001-A 08:10:00 08:07:52 00:02:08 01-02-2021 05-02-2021 NO slow KSEB SLOW MAHE LINE-1 AT PANOOR PARASALA LT-0367-A 07:32:44 07:42:48 00:10:04 08-02-2021 08-02-2021 NO KSEB FAST 110KV KUZHITHURAI LINE AT PARASALA PAVAGADA KSPDCL LT-0909-A 11:37:10 11:29:28 00:07:42 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV KSS-4(PAVAGADA SOLAR PP) LINE 6 AT TATA BLOCK 18 - STANDBY PAVAGADA KSPDCL LT-0907-A 11:45:06 11:39:27 00:05:39 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV KSS-4(PAVAGADA SOLAR PP) LINE 8 AT TATA BLOCK 17 - STANDBY PAVAGADA KSPDCL LT-0906-A 11:47:21 11:42:04 00:05:17 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV KSS-4(PAVAGADA SOLAR PP) LINE 7 AT TATA BLOCK 17 - STANDBY PAVAGADA KSPDCL LT-0708-A 07:20:46 07:15:47 00:04:59 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV TATA BLOCK 19 LINE 7 AT KSS-3(PAVAGADA SOLAR PP) - MAIN PAVAGADA KSPDCL LT-0710-A 07:20:04 07:15:51 00:04:13 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV TATA BLOCK 19 LINE 8 AT KSS-3(PAVAGADA SOLAR PP) - MAIN PAVAGADA KSPDCL LT-0726-A 08:11:46 08:07:52 00:03:54 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV TATA BLOCK 21 LINE 4 AT KSS-4(PAVAGADA SOLAR PP) - CHECK PAVAGADA KSPDCL LT-0711-A 07:19:59 07:16:19 00:03:40 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV TATA BLOCK 19 LINE 8 AT KSS-3(PAVAGADA SOLAR PP) - CHECK PAVAGADA KSPDCL LT-0699-A 08:09:45 08:06:17 00:03:28 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV TATA BLOCK 17 LINE 7 AT KSS-4(PAVAGADA SOLAR PP) - MAIN PAVAGADA KSPDCL LT-0734-A 08:07:49 08:04:46 00:03:03 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV TATA BLOCK 15 LINE 10 AT KSS-4(PAVAGADA SOLAR PP) - CHECK PAVAGADA KSPDCL LT-0900-A 10:10:21 10:07:30 00:02:51 01-02-2021 05-02-2021 YES nan SOLAR SLOW 66KV TATA BLOCK 34 LINE 9 AT KSS-7(PAVAGADA SOLAR PP) - MAIN PAVAGADA KSPDCL LT-0733-A 08:07:43 08:05:06 00:02:37 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV TATA BLOCK 15 LINE 10 AT KSS-4(PAVAGADA SOLAR PP) - MAIN PAVAGADA KSPDCL LT-0910-A 11:14:01 11:12:00 00:02:01 01-02-2021 05-02-2021 YES nan SOLAR SLOW 66KV TATA BLOCK 34 LINE 10 AT KSS-7(PAVAGADA SOLAR PP) - CHECK PAVAGADA KSPDCL NP-9901-A 16:43:00 16:41:00 00:02:00 01-02-2021 01-02-2021 YES SOLAR SLOW 66KV KSS-8(PAVAGADA SOLAR PP) LINE 10 AT ACME KURU BLOCK 37 - STANDBY PAVAGADA KSPDCL LT-0816-A 10:02:01 10:00:11 00:01:50 01-02-2021 05-02-2021 YES nan SOLAR SLOW 66KV TATA BLOCK 27 LINE 7 AT KSS-6(PAVAGADA SOLAR PP) - CHECK PAVAGADA KSPDCL LT-0657-A 08:11:01 08:12:48 00:01:47 01-02-2021 05-02-2021 YES nan SOLAR FAST 33KV TATA BLOCK 18 LINE 5 AT KSS-4(PAVAGADA SOLAR PP) - CHECK PAVAGADA KSPDCL LT-0912-A 11:10:35 11:08:53 00:01:42 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV KSS-4(PAVAGADA SOLAR PP) LINE 3 AT TATA BLOCK 21 - STANDBY PAVAGADA KSPDCL LT-0895-A 07:57:08 07:55:30 00:01:38 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV KSS-4(PAVAGADA SOLAR PP) LINE 9 AT TATA BLOCK 15 - STANDBY PAVAGADA KSPDCL LT-0709-A 07:21:33 07:20:04 00:01:29 01-02-2021 05-02-2021 YES nan SOLAR SLOW 33KV TATA BLOCK 19 LINE 7 AT KSS-3(PAVAGADA SOLAR PP) - CHECK PAVAGADA KSPDCL LT-0787-A 07:55:38 07:56:55 00:01:17 01-02-2021 01-02-2021 YES SOLAR FAST 66KV AVAADA BLOCK 39 LINE 4 AT KSS-8(PAVAGADA SOLAR PP) - MAIN PAVAGADA KSPDCL LT-0842-A 07:49:32 07:48:20 00:01:12 01-02-2021 01-02-2021 YES SOLAR SLOW 33KV KSS-2(PAVAGADA SOLAR PP) LINE 9 AT AVAADA BLOCK 7 - STANDBY PONDA NP-5506-A 10:29:00 10:52:21 00:23:21 01-02-2021 01-02-2021 NO GOA FAST 220KV AMBEVADI LINE AT PONDA PUDUR NP-5131-A 09:44:07 09:51:15 00:07:08 01-02-2021 01-02-2021 NO TANTRANSCOFAST 230KV KUDANKULAM LINE AT PUDUR PUGALUR NP-5554-A 16:44:45 16:46:10 00:01:25 01-02-2021 03-02-2021 Yes SEM Time retardedPOWERGRIDFAST 230KV SIDE OF ICT 2 AT PUGULUR pulichintala NP-3083-A 12:08:44 12:13:39 00:04:55 01-02-2021 02-02-2021 NO Fast TELENGANAFAST 220KV CHILLAKALLU LINE 2 AT PULICHINTALA Annexure-II (Page 2 of 2)

RAMPURAM NP-3045-A 15:41:55 15:44:04 00:02:09 02-02-2021 02-02-2021 YES TELENGANAFAST 132kV CHILLAKALLU LINE at RAMPURAM RTPS NP-5504-A 11:27:46 11:26:10 00:01:36 01-02-2021 01-02-2021 YES KPTCL SLOW 400KV RAICHUR (PG) 2 LINE AT RTPS RTPS NP-5534-A 11:25:32 11:26:39 00:01:07 01-02-2021 01-02-2021 YES KPTCL FAST 400KV YTPS LINE AT RTPS SEDAM NP-5391-A 12:30:00 12:26:08 00:03:52 01-02-2021 01-02-2021 NO KPTCL SLOW 220kV TANDUR LINE AT SEDAM SGPL (NCC PPL) NP-3298-A 10:58:25 10:56:37 00:01:48 01-02-2021 01-02-2021 YES Time AdvancedSGPL (NCC PPL)SLOW 400KV NPS LINE 1 AT SGPL (NCC) SGPL (NCC PPL) NP-3112-A 10:57:49 10:58:54 00:01:05 01-02-2021 01-02-2021 YES Time RetardedSGPL (NCC PPL)FAST 400KV NPS LINE 1 AT SGPL (NCC) SHOLINGANALLUR SA-0252-A 12:42:06 12:43:52 00:01:46 01-02-2021 03-02-2021 NO TANTRANSCOFAST 400 KV KALAVINTHAPATTU LINE 2 AT SHOLINGANALLUR SOMANAHALLI SA-0129-A 16:55:54 16:57:16 00:01:22 03-02-2021 03-02-2021 YES retarded POWERGRIDFAST 400KV SIDE OF ICT-3 AT SOMANAHALLI SRISAILEM LB NP-3038-A 10:01:19 10:06:45 00:05:26 01-02-2021 01-02-2021 YES TIME DRIFT TELENGANACORRECTEDFAST AND SET EQUAL400KV TO SATTENAPALLI GPS TIME LINE 1 AT SRISAILAM LB SRISAILEM LB NP-3037-A 10:00:17 10:05:42 00:05:25 01-02-2021 01-02-2021 YES TIME DRIFT TELENGANACORRECTEDFAST AND SET EQUAL400kV TO KURNOOL GPS TIME LINE at Srisailam LB SRISAILEM LB NP-3039-A 10:01:43 10:07:04 00:05:21 01-02-2021 01-02-2021 YES TIME DRIFT TELENGANACORRECTEDFAST AND SET EQUAL400KV TO SATTENAPALLI GPS TIME LINE 2 AT SRISAILAM LB SURYAPETA(220kV) NP-3194-A 09:45:07 09:47:25 00:02:18 01-02-2021 02-02-2021 NO Fast TELENGANAFAST 220KV CHILLAKALLU LINE-1 AT SURYAPETA SURYAPETA(400kV) NP-3088-A 09:31:30 09:38:05 00:06:35 01-02-2021 01-02-2021 NO TELENGANAFAST 400KV VTPS LINE 1 AT SURYAPETA SURYAPETA(400kV) NP-3193-A 09:40:14 09:46:30 00:06:16 01-02-2021 01-02-2021 NO TELENGANAFAST 400KV KAMAVARAPUKOTA LINE-1 AT SURYAPETA SURYAPETA(400kV) NP-3087-A 09:36:34 09:42:48 00:06:14 01-02-2021 01-02-2021 NO TELENGANAFAST 400KV VTPS LINE 2 AT SURYAPETA SURYAPETA(400kV) NP-3192-A 09:40:03 09:37:46 00:02:17 01-02-2021 01-02-2021 NO TELENGANASLOW 400KV KAMAVARAPUKOTA LINE-2 AT SURYAPETA TUTICORIN PS NP-9641-A 10:13:18 10:11:46 00:01:32 01-02-2021 03-02-2021 YES SLOW POWERGRIDSLOW 400KV NTPL LINE -1 AT TUPS VEMAGIRI(PG) NP-9356-A 12:03:00 12:20:02 00:17:02 02-02-2021 02-02-2021 Yes nan POWERGRIDFAST 400KV SIDE OF ICT-2 AT VEMAGIRI VEMAGIRI(PG) NP-9349-A 12:16:30 12:14:35 00:01:55 02-02-2021 02-02-2021 No nan POWERGRIDSLOW 400 KV VEMAGIRI APTRANSCO LINE 1 AT VEMAGIRI (PG) VEMAGIRI(PG) NP-9357-A 09:29:00 09:30:44 00:01:44 02-02-2021 02-02-2021 No nan POWERGRIDFAST 33KV SIDE OF TERTIARY OF ICT-1 AT VEMAGIRI(PG) VEMAGIRI(PG) NP-9358-A 12:03:00 12:01:23 00:01:37 02-02-2021 02-02-2021 Yes nan POWERGRIDSLOW 765KV SRIKAKULAM LINE-1 AT VEMAGIRI VEMAGIRI(PG) NP-9313-A 10:49:00 10:47:39 00:01:21 02-02-2021 02-02-2021 Yes nan POWERGRIDSLOW 765KV CPETA LINE-2 AT VEMAGIRI(PG) VEMAGIRI(PG) NP-9310-A 12:01:00 11:59:44 00:01:16 02-02-2021 02-02-2021 Yes nan POWERGRIDSLOW 400KV VIJAYAWADA LINE AT VEMAGIRI(PG) VEMAGIRI(PG) NP-9378-A 10:54:00 10:52:49 00:01:11 02-02-2021 02-02-2021 Yes nan POWERGRIDSLOW 765KV SIDE OF 765/400KV ICT-1 AT VEMAGIRI XELDEM NP-5511-A 11:47:59 12:10:53 00:22:54 08-02-2021 08-02-2021 NO GOA FAST 220KV AMBEVADI LINE AT XELDEM XELDEM NP-5511-A 10:50:38 11:13:31 00:22:53 01-02-2021 01-02-2021 NO GOA FAST 220KV AMBEVADI LINE AT XELDEM Annexure-III (Page 1 of 1)

KERALA STATE ELECTRICITY BOARD LTD. (Incorporated under the lndian Companies Act,1,956) Office of the Chief Engineer(Transmission System Operation) -t F LD Centre, H.M.T.Colony P.O., Kalamassery 683 503. I }*\,6++a t l-,.s.J - , \_-/'d+y 49 Fax : 0484 2555950 ' YEAS$ Or Phone: 0484 25559 65,2543850,9 6019100 CE!EtsRATISg THE HAHAIfiA Email:[email protected],[email protected] _- W.b rit.' r"rr*. Gn. i-n, C IN : U40 1 00KL2 0 1 1 S G C02f42 4

No CESO/EELD2I AEE3 lSEl/ll202O-21 I Xg b',l ?"u. .02.2021

To

The Member Secretary SRPC,

Sir,

Sub: - Testing of SEM Meters of KSEBL - reg.

Ref:-:- 1. Record Notes of the Fifth Meeting of Nodal Officers for SEM Data Coordination held on 22.07.2020.

2. Agenda for 6'h Meeting of Nodal Officers for SEM data Coordination to

be held on04.02.2021. In the 5th Meeting of Nodal Officers for SEM Data Coordination held on22.01.2020, it was instructed to calibrate the SEMs by NABL accredited laboratory and to fumish action plan regarding calibration of the SEMs to SRPC secretariat. The same is added in the Agenda item for6'h Meeting of Nodal Officers for SEM data Coordination to be held on04.02.2021. The action plan for testing the SEM Meters of KSEBL at Meter testing Laboratory of

KSEBL, TMR Division, Angamaly, which is a NABL accredited laboratory for testing of Energy

Meters as follows. Meter Location No. of Meters Testing Schedule

I Edamon 2 Between l" to 6fr of March 2021

2. Moolamattom 1 Between 296to 3l'tof March2021

3. Parassala 1 Between 126 to 176 of April 2021

4. Moozhiyar 1 Between 266 to 30ft of April 2021

5. Kanivambetta 1 Between 1Oft to 15tr of May 2021

6. Panoor 2 Between 24n to29^ of May 2021

7. Manjeswaram 1 Between 7* to 1ltr of June 2021

Yours faithfully,

Chief Operation)

Registered Office: VydyuthiBhavanam, Pattom, Thiruvananthapuram - -/\u?/r