Gujarat Coastline Zone Accretion Erosion length Stable length Total length length (km) (km) (km) (km)

South Gujarat 8.02 146.21 4.73 158.96

Khambhat 79.30 48.38 66.79 194.47

Saurashtra 80.28 178.51 574.57 833.36

Kutchh 130.39 113.33 51.62 295.34

Total 297.99 486.43 697.71 1482.13

Details as extracted from the SAC-CWC (2014) Study 4 Details of Coastal protection works completed and planned.

Completed Planned

Sr.No. District Estimated Length in Amount in Length in Nos. Nos. Amount km. Crore km. in Crore 1 2 3 4 5 6 7 8

1 11 15.73 57.37 2 1.75 35.00

2 12 13.00 80.33 4 8.80 156.00

3 28 24.24 131.93 16 16.02 228.00

4 0 0 0 2 5.00 30.05

5 2 1.03 7.03 - - -

Devbhumi 6 2 0.75 9.12 3 8.80 72.95 Dwarka

7 0 0 0 2 1.39 29.57

TOTAL 54 54.75 285.98 29 41.76 551.578 On Going works (Dist. Wise)

Area No. of Actual Cost Population Benifited District Work Village Length (Mt.) (Rs. In Lacs) Benifited (in Ha.) 1 2 3 4 5 6 7

Valsad 3 10 1417 1276 2700 41.00

Surat ------

Navsari ------Ongoing Works Village Actual Area Sr. Taluka Length Cost (Rs. Population Benifited No Name of Work District (Mt.) In Lacs) Benifited (in Ha.) 1 2 3 4 5 6 7

Protection work at the bank of Bhathi varoli river at village Bhathi Karambele Karambeli, Ta. , Dist. Umargam 1 Valsad Valsad 237 139.42 200 6.0 Construction of earthen Bund at village umarsadi – mangelwad, Ta. , Dist. Umarsadi Valsad (Ch. 1550 mt. to 1920 Pardi 2 mt.) Valsad 470 176.76 1000 10.0 Restoration of coastal protection work at village Udwada udwada, Ta. Pardi, Dist. Valsad Pardi 3 (Ch. 2330 mt. to 3040 Mt.) Valsad 710 959.78 1500 25.0

Total 1417 1275.96 2700 41.0 Task Force Formation of Task Force  Task Force earlier formed vide resolution dtd 2/08/2011 & 14/09/2011 is reformed vide resolution dated 6th August - 2012, for Gujarat Sr.No Name & Designation in concern field. Designation of . Committee.

1 Dr. M.Baba. Trivendrum. Chairman

2 Dr. Ramanamurthy,Head Offshore Structures Div.NIOT ,Chennai Member

3 Dr. sanilkumar,Scientist, NIO, Goa. Member

4 Dr. N.P. Kurian,Director,Centre for Earth Science Studies. Trivendrum. Member

5 Director,Beach Erosion CWC. MOWR, Delhi. Member

6 Shri Mohanlal Sharma .Ex Principal C.C.F. Member

7 Shri Hardik Shah,Director;Forest & Environment Department.. Member

8 Shri Atul Sharma,Environmantal Engineer,Gujarat Maritime Board.Gandhinagar. Member

9 Chief Engineer (S.G.) & Addl. Secretary, N.W.R.W.S. & K. Dept. Gandhinagar. Member

10 Chief Engineer (Sau) & Addl. Secretary, N.W.R.W.S. & K. Deptt. Gandhinagar. Member

11 Dr. M.H. . Chairman,Gujarat Life Science Pvt Ltd. Member

12 Superintending Engineer, Surat Irrigation Circle, Surat. Member Secretary TOR for Task Force: • Data base Generation • Capacity building • Development of both hard and soft solution for erosion • Master plan preparation and shore protection manual for Gujarat coast. • Training Meeting of Task Force • 1 st -- 22-23 May -2014 • 2 nd -- 11- 13 Aug - 2014 • 3 rd -- 8 – 9 Dec - 2014 • 4 th -- 22 - 23 June - 2015 • 5 th -- 10- 11 Dec - 2015 • 6 th -- 10- 11 June - 2016 Decision taken in task force meeting

• maps of shoreline change prepared by different institutes like BISAG, SAC, MoEF and INCOIS are to be tabulated and analyzed to have comprehensive account of coastal erosion in Gujarat. • Considering the high cost of coastal protection and the adverse impacts of some protection measures elsewhere the decisions shall be taken judiciously. Cost reduction in the coastal protection works needs to be addressed by the TF. • to procure all the coastal data relating to Gujarat coast available with the institutes like NIOT, ICMAM, NIO, INCOIS and other agencies like Dept. of Environment and Forests. • Requested Ministry of Earth Sciences to establish monitoring stations on the coast of Gujarat. The data on waves, current, beach profile, tide, sedimentation etc. are to be collected.

• master plan preparation for protection of the Gujarat coast will be done in three stages: the short term, mid-term and long term. • The detailed master plan for the entire state will be the final product of the TF. This will cover not only the eroding stretches, but also all the areas, which are at present unaffected but with a potential to be affected in the future due to developmental activities and climate change. • The existing regulatory systems for mining in the rivers and also along the shoreline, which is prohibited by CRZ, need to be strengthened. • To Finalize modalities and means of short-term and long-term monitoring of the coast proposed by the members. It was decided that this task be given to an external agency with clear ToRs.

• to establish data center node at Surat. • Suggested to purchase a DGPS in consultation with BISAG for better accuracy in the demarcation of the works, both existing and in- progress. • Different methods of protection were tried in Moti Danti, those measures need to be examined in detail to evaluate the successes and failures. • Suggested the training program proposed for the staff in various specialized institutes and training modules being developed for further training in WALMI. • Recommended the purchase of arc view GIS software for data compilation & modeling purposes. BISAG on request agreed to provide necessary support in the procurement, installation and training. • To prepare the master plan a map with proper co-ordinates is required. It was suggested to use the high resolution map prepared by NCSCM, which may be customized with the help of BISAG.

• Decided to proceed with the outsourcing of the following works for which the ToRs will be prepared by TF and the monitoring will be done by it: – Sediment budget study of the rivers of Gujarat – Integrated coastal protection master plan for Valsad – Integrated coastal protection master plan for Surat. • Decided to give top priority for the ToR of ‘Draft Consultancy for Facilitating Preparation of Integrated Coastal Protection and Management (ICPM) Plan for Coast’.  Draft for consultancy for facilitating preparation of integrated coastal protection and management (ICPM) plan for south gujarat Coast is ready .

Coastal Monitering Program Report by IIT, Powai, . Survey Year

Oct-15 Feb-16

Previous Sr. No District Site Name Volume of Sand Volume of Sand Survey Volume of Sand Volume of Sand Deposited or Eroded Deposited or Eroded Eroded or Deposited Eroded or Deposited over the toe of Sea over the toe of Sea in Cub.m in Cub.m Wall in Cub.m Wall in Cub.m

1 Surat Dumas May-14 Oct-15 66093.39 3122.08 -60190.00 -3949.00 Feb-16

2 Navsari Borsi Machhiwad May-14 Oct-15 24804.08 8354.59 37351.00 -2257.00 Feb-16

3 Navsari Dandi Samapore May-14 Oct-15 103396.50 3783.375 -16957.00 2823.00 Feb-16

4 Valsad Nani Danti Moti Danti May-14 946.00 2047.20 28826.00 1832.00 Oct-15 Feb-16

5 Navsari Dholai May-14 Oct-15 -592.515 399.95 1080.00 460.00 Feb-16

6 Valsad Bhadeli- Jagalala May-14 Oct-15 3345.30 -621.00 1721.00 193.00 Feb-16 7 Valsad May-14

Oct-15 134475.00 -509.55 -22440.00 1488.00

Feb-16

8 Valsad Fansa May-14

May-17 10728.41 1669.87 -39147.00 12720.00

Feb-16

9 Valsad Maroli Dandi May-14

Oct-15 -14067.00 -118.50 - -

Feb-16

10 Valsad Maroli Exsisting May-14

Oct-15 -39509.20 -1228.73 -184828.00 -6520.00

Feb-16

11 Valsad Kolak Udwada May-14

Oct-15 -11158.00 -349.37 2933.00 -947.00

Feb-16

12 Valsad Kalai May-14

Oct-15 -86568.20 -2970.50 16846.00 1439.00

Feb-16

THANK YOU Completed Scheme (Dist. Wise)

District No. Length Total Exp. Benifits In mt. Rs in lakhs Villages Population Area in in nos Ha 1 2 3 4 5 6 7

Navsari 7 11510 6881.48 7 31100 1945

Valsad 27 20564 12726.99 16 110000 2670

Surat 6 15655 5307.31 6 118600 1910 Bhavnagar 1 680 -- 1 1500 27 Devbhumi - 2 temples Dwarka 1 540 -- 1 30000 affected

Total 42 48949 24915.78 31 291200 6552 Details of Completed Coastal Protection Work of Gujarat Year of Starting point of work End point of work Length Sr No Name of Work Village Taluka District Constructio Type of Work in Mt Latitude longitude Latitude longitude n Constructing Sea Earth work, 1:3:6 Erosion Wall at concrete, 21° 02' 72° 44' 21° 02' 72° 44' 1 Danti Navsari 1260 2012-13 Vill Danti Geofabric, core 46.46" N 08.27" E 46.46" N 08.27" E Jalalpore with Gabions wall.

Constructing Sea Geofabric, core & Erosion Wall at Dandi - 20° 53' 72° 47' 20° 53' 72° 47' 2 Jalalpore Navsari 1485 2015-16 Heavy Stone in Vill Dandi samapore 12.96" N 49.34" E 12.96" N 49.34" E Armor layer Samapore

Constructing Sea Geofabric, core & Erosion Wall at Borsi 20° 56' 72° 45' 20° 56' 72° 45' 3 Jalalpore Navsari 1875 2015-16 Heavy Stone in Vill Borsi macchiwad 28.71" N 20.56" E 28.71" N 20.56" E Armor layer Machhiwad Constructing Sea Geofabric, core & 20° 20° 72° 50' 72° 50' 4 Erosion Wall at Bhat Navsari 2730 2008-09 Heavy Stone in 46'23.62 " 46'23.62 " 39.57" E 39.57" E Vill Bhat Armor layer N N

Constructing Geofabric, core & Sea Erosion Wall Nani Danti- 2008-09 20° 43' 72° 51' 20° 43' 72° 51' 5 Valsad valsad 2210 Heavy Stone in at Vill Nani Danti - Moti Danti ,2015-16 28.06" N 13.52" E 28.06" N 13.52" E Armor layer Moti Danti

Earth work, Toe Constructing wall, Pitching, C.D. 20° 44' 72° 53' 20° 44' 72° 53' 6 Sea Erosion Wall Dholai Gandevi Navsari 610 2015-16 work and Flap 19.41" N 18.16" E 19.41" N 18.16" E at Vill Dholai Gate Constructing Sea Geofabric, core & Erosion Wall at Bhadeli 20° 38' 72° 53' 20° 38' 72° 53' 7 Valsad valsad 540 2015-16 Heavy Stone in Vill Bhadeli Jagalala 05.12" N 16.53" E 05.12" N 16.53" E Armor layer Jagalala Constructing Sea Erosion Onjal Jalalpor Gabion Type A.S.E. 20° 48' 72° 49' 20° 48' 72° 49' 8 Wall at Vill Navsari 1900 2008-09 Machhiwad e Wall 30.22" N 53.95" E 30.22" N 53.95" E Onjal Machhiwad Constructing Earth work, Toe Sea Erosion wall, Pitching, C.D. 20° 44' 72° 52' 20° 44' 72° 52' 9 Movasa Gandevi Navsari 1650 2012-13 Wall at Vill works and Flap 53.02" N 04.44" E 53.02" N 04.44" E Movasa Gates

Constructing Gabion wall / 2008-09 210 20' 45" 720 39' 55" 210 20' 45" 720 39' 55" 10 Sea Erosion Mor Bhagva Olpad Surat 1800 Earthen Bund with ,2011-12 N E N E Wall at Vill Mor pitching Bhagva Constructing 2008-09 Gabion Wall 720 37’ 210 20 ' 720 37’ 50” 210 20 ' 11 Sea Erosion Dandi Olpad Surat 2690 Wall at Vill ,2010-11 /Earthen Bund 50” N 07” E N 07” E Dandi Constructing Geofabric, core & Sea Erosion Dumas - 20o 5' 59'' 72o 42' 20o 5' 59'' 72o 42' 12 Choryasi Surat 2450 2015-16 Heavy Stone in Wall at Vill Sultanabad N 6.46'' E N 6.46'' E Dumas - Armor layer Sultanabad Constructing Earthen bund with 210 15' 720 38' 08" 210 15' 720 38' 13 Sea Erosion Dabhari Olpad Surat 4215 2010-11 Wall at Vill Pitching 57" N E 57" N 08" E Dabhari Constructing Earthen bund with 210 25' 720 40' 44" 210 25' 48" 720 40' 44" 14 Sea Erosion Nesh Karanj Olpad Surat 4000 2010-11 Wall at Vill Nesh Pitching 48" N E N E karanj Constructing Rubble masonary 210 17' 24" 720 83' 06" 210 17' 24" 720 83' 06" 15 Sea Erosion Budiyaa Choryasi Surat 500 2009-10 Wall at Vill wall N E N E Budiya Constructing Protection Wall at P.P. rope flexible 20˚36'45" 72˚53'22" 16 Village Kosamba, Ta. Kosamba Valsad Valsad 690 2008-09 72˚53'28"E 20˚37'07"N gabion type. N E Dist. Valsad (Ch. 0 to 690 m)

Constructing Protection Wall at P.P. rope flexible 20˚37'20" 72˚53'11" 17 Village Kosamba, Ta. Kosamba Valsad Valsad 750 2010-11 72˚53'18"E 20˚37'43"N gabion. N E Dist. Valsad (Ch. 1100 to 1850 m)

Constructing Protection Wall at 20˚37'07" 72˚53'18" Village Kosamba, Ta. 72˚53'22"E 20˚37'20"N Armour layer of N E 18 Dist. Valsad (Ch. 690 Kosamba Valsad Valsad 890 2012-13 to 1100 m Heavy Stone and 1850 m to 2330 20˚37'43" 72˚53'15" 72˚53'11"E 20˚37'55"N m) N E Constructing Protection Wall at Heavy Stone 1.00 20˚35'25" 72˚53'53" 19 Village Tithal, Ta. Dist. Tithal Valsad Valsad 675 2014-15 72˚53'49"E 20˚35'04"N to 1.50 T N E Valsad (Ch. 785 to 1460 m)

Constructing Protection Wall at Heavy Stone 1.00 20˚36'21" 72˚53'30" 20 Village Tithal, Ta. Dist. Bhagwada Valsad Valsad 455 2014-15 72˚53'33"E 20˚36'36"N to 1.50 T N E Valsad (Ch. 930 to 1385 m)

Constructing Protection Wall at Tithal - Heavy Stone 1.00 20˚35'52" 72˚53'33" 21 Village Bhagdawada, Valsad Valsad 930 2014-15 72˚53'41"E 20˚36'21"N Bhagwada to 1.50 T N E Ta. Dist. Valsad (Ch. 0 to 930 m) Constructing Protection Wall at Village Tithal Magod 20˚35'50" 72˚53'48" Tithal & 72˚53'42"E 20˚35'25"N Dungri, Ta. Dist. Heavy Stone 1.00 N E 22 Magod Valsad Valsad 1025 2014-15 Valsad (Ch. 0 to 785 to 1.50 T m Dungri

and 1500 m to 1740 20˚35'03" 72˚53'51" 72˚53'51"E 20˚34'54"N m) N E

Constructing Protection Wall at P.P. rope flexible 20˚28'04" 72˚51'38" 23 Village Kolak, Ta. Dist. Kolak Pardi Valsad 630 2008-09 72˚51'32"E 20˚28'24"N gabion type. N E Valsad (Ch. 400 to 1030 m)

Constructing Protection Wall at P.P. rope flexible 20˚28'24" 72˚51'30" 24 Village Udwada, Ta. Udwada Pardi Valsad 200 2009-10 72˚51'38"E 20˚28'30"N gabion type. N E Dist. Valsad (Ch. 1030 to 1230 m)

Constructing Protection Wall at Zn +PVC coated 20˚31'50" 72˚53'14" 25 Village Umarsadi, Ta. Umarsadi Pardi Valsad 460 2008-09 72˚53'18"E 20˚31'38"N metal gabion N E Dist. Valsad (Ch. 0 to 460 m)

Constructing Protection Wall at Armour layer 1.0 20˚31'38" 72˚53'14" 26 Village Umarsadi, Ta. Umarsadi Pardi Valsad 325 2011-12 to 1.50 Tone 72˚53'14"E 20˚31'27"N N E Dist. Valsad (Ch. 0 to Stones. 325 m) Constructing Protection Wall at Village Umarsadi Umarsadi Armour layer 20˚31'50 72˚53'18"20˚31'47" 72˚53'44 27 Pardi Valsad 780 2012-13 Machiwad, Ta. Dist. Machiwad of Heavy Stone "N E N "E Valsad (Ch. 0 to 780 m) Constructing Protection Wall at Village Kolak 20˚28'30 72˚51'30"20˚28'29" 72˚51'42 Udwada, Ta. Dist. Kolak Armour layer "N E N "E 28 Pardi Valsad 570 2012-13 Valsad (Ch. 1230 to Udwada of Heavy Stone 1500 m and 2065m to 20˚28'56 72˚51'49"20˚29'04" 72˚51'54 2365 m) "N E N "E Constructing Protection Wall at Heavy Stone 20˚28'47 72˚51'45"20˚29'03" 72˚51'53 29 Village Udwada, Ta. Udwada Pardi Valsad 530 2014-15 1.00 to 1.50 T "N E N "E Dist. Valsad (Ch. 1800 to 2330 m) Constructing Protection Wall at Umarsadi- Earthen bund Village Umarsadi 20˚30'16 72˚53'21"20˚31'04" 72˚53'18 30 Mangelwa Pardi Valsad 1550 2014-15 with 45 cm thk. Mangelwad, Ta. "N E N "E d Panel pitching Dist. Valsad (Ch. 0 to 1550 m) Constructing Protection Wall at Armour layer 20˚29'21 72˚52'07"20˚29'23" 72˚52'08 31 Village Udwada, Ta. Udwada Pardi Valsad 100 2013-14 of Heavy Stone "N E N "E Dist. Valsad (Ch. 3040 to 3140 m) Constructing Protection Wall at Armour layer Fanasa - Umarg 20˚21'02 72˚48'21"20˚21'06" 72˚48'30 32 Village Fansa - Valsad 300 2010-11 1.50 to 2.00 Tatawadi am "N E N "E Tatawadi, Ta. Dist. Tone stone. Valsad

Constructing Zn +PVC coated Protection Wall at Umarg 20˚12'27 72˚45'05"20˚12'35" 72˚45'15 33 Nargol Valsad 484 2009-10 box wire mesh Village Nargol, Ta. am "N E N "E gabion Dist. Valsad

Constructing P.P. rope Protection Wall at Umarg 20˚12'00 72˚44'50"20˚12'07" 72˚44'56 34 Umagam Valsad 285 2008-09 flexible gabion Village Umargam, am "N E N "E type. Ta. Dist. Valsad

Constructing Protection Wall at Village Maroli - Concrete wall 20˚18'01 72˚45'52"20˚17'48" 72˚46'26 Fansa, Ta. Dist. Maroli - Umarg with toe "N E N "E 35 Valsad 2835 2010-11 Valsad (Maroli Fansa am protection of Length - 1933 m) heavy stones.

(Fansa Length 900 20˚20'52 72˚47'15"20˚21'07" 72˚47'40 m) "N E N "E Constructing Protection Wall Armour layer Umarga Umar Valsa 20˚11'2 72˚44'4 20˚11'0 72˚44'3 36 at Village 700 2012-13 of Heavy m gam d 3"N 4"E 2"N 6"E Umargam, Ta. Stone Dist. Valsad Constructin g Protection Wall at Village Maroli- Umarg Heavy Stone 20˚17'0 72˚45'1 20˚17'29 72˚45'1 37 Maroli - Valsad 800 2014-15 Dandi am 0.40 to 0.60 T 3"N 7"E "N 9"E Dandi, Ta. Dist. Valsad (Ch. 0 to 800 m) Constructin g Protection Wall at Village Kalay Kalay Umarg Heavy Stone 20˚22'0 72˚49'1 20˚21'42 72˚49'0 38 Valsad 780 2014-15 (Sea Side), (Seaside) am 0.40 to 0.60 T 3"N 6"E "N 2"E Ta. Dist. Valsad (Ch. 0 to 780 m) Constructin g Protection Wall at Kalay Village Kalay Umarg Heavy Stone 20˚22'0 72˚49'1 20˚21'58 72˚49'3 39 (river Valsad 650 2014-15 (River Side), am 0.20 to 0.40 T 2"N 8"E "N 7"E side) Ta. Dist. Valsad (Ch. 0 to 650 m) Constructin g Protection Wall at Village Umargam Umargam Umarg Heavy Stone 20˚12'0 72˚44'5 20˚12'05 72˚45'0 40 (Varoli Valsad 420 2013-14 (Varoli am 1.00 to 1.50 T 7"N 7"E "N 9"E river) River) , Ta. Dist. Valsad (Ch. 0 to 420 m) Providing Coastal Protection Armour Layer Work to Bhavn 21˚12.4 72˚06.2 21˚12'24 72˚06'3 41 Relia Talaja 680 2012 of Heavy KOMBAT agar 5'54"N 4'70"E .61"N 5.35"E Stone Sea Erosion at Gopnath Temple Providing Coastal Protection Work to Devbh KOMBAT Dwark umi 2.0 T Wt, 22˚14.1 68˚57'4 22˚14.07 68˚57'5 42 Dwarka 540 2011 Sea Erosion a Dwark Tetrapod 8.59"N 0.94"E '74"N 3.89"E at Sangam a Narayan to Gayatri Temple Vulnerable Coastal reaches for inclusion of the proposed Coastal Management Information System (CMIS) for establishing sites for collection of coastal data. Place District Taluko Lenth to Population No.of houses Agricultural Area of land be affected affected land affected eroded (in ha) Sr.n protected (in ha) o. in k.m

1 Umargam Valsad Umargam 2.575 6000 490 52 60

2 Udwada Valsad Pardi 1.4 4900 560 103 -

Nani Danti – 3 Valsad Valsad 7.00 13000 450 600 106 Moti Danti Onjal – 4 Navsari Jalalpore 2.15 8500 1300 450 25 Machhiwad Borsi - 5 Navsari Jalalpore 3.88 6000 1250 210 60 Machhiwad

25 Houses, 1 6 Katpar Bhavnagar Mahuva 0.35 0 17.5 - - Temple

7 Chanch Amreli Rajula 1.50 1250 250 - - Prioritized list of valnerable sites in Gujarat State (Dist. Wise)

Place Lenth to be Population No.of Agricultural land Area of land eroded protected affected houses affected (in ha) (in ha) in k.m affected Sr.no.

1 Navsari 20.72 39100 4990 1775 177

2 Valsad 37.98 109450 12391 2845 661

3 Surat 18.07 58100 1821 1010 85

4 Bhavnagar 1.03 1500 425 44.75 --

Devbhumi - 0.54 30000 2 - Temple - - Dwarka 5

Total 78.34 238150 19627 5674.75 923 Prioritized list of valnerable sites in Gujarat State Place District Taluko Lenth to be Population No.of houses Agricultural land Area of land protected affected affected affected (in ha) eroded (in ha) Sr.n in k.m o.

Nani Danti – 1 Valsad Valsad 7.00 13000 450 600 106 Moti Danti

Borsi - 2 Navsari Jalalpore 3.88 6000 1250 210 60 Machhiwad

Onjal – 3 Navsari Jalalpore 2.15 8500 1300 450 25 Machhiwad 4 Bhat Navsari Gandevi 2.73 4000 190 45 45 Dandi - 5 Navsari Jalalpore 5.74 4100 450 485 70 Samapore 6 Ubharat Navsari Jalalpore 1.80 2500 700 350 22 7 Bhagal Valsad Valsad 2.50 3000 590 915 30 8 Dumas Surat Choriyasi 3.27 25000 321 60 30 9 Mor Bhagva Surat Olpad 3.00 8500 450 200 27 10 Dandi Surat Olpad 3.08 8000 200 150 28 11 Kosamba Valsad Valsad 2.73 15750 1280 125 50 12 Surwada Valsad Valsad 1.08 2500 525 130 60 13 Magod-Dungri Valsad Valsad 1.5 4700 1220 73 60 Prioritized list of valnerable sites in Gujarat State Place District Taluko Lenth to be Population No.of houses Agricultural Area of land protected affected affected land affected eroded (in ha) Sr.n in k.m (in ha) o.

14 Umargam Valsad Umargam 2.575 6000 490 52 60 15 Maroli Valsad Umargam 3.535 3500 270 25 30 16 Tadgam Valsad Umargam 0.85 2000 150 12 25 17 Dehri Valsad Umargam 1.4 3500 250 20 50 18 Nargol Valsad Umargam 1.224 3000 80 20 50 19 Bhagdakhurd Valsad Valsad 0.5 4000 600 25 60 20 Khatalwada Valsad Umargam 1.5 3000 300 20 80 21 Danti Navsari Jalalpore 1.26 4500 500 55 - 22 Dholai Navsari Gandevi 0.89 5000 100 50 - Bhadeli- 23 Valsad Valsad 0.54 6500 76 250 - Jagalala 24 Movasa Navsari Gandevi 1.65 4000 400 80 - 25 Mendhar Navsari Gandevi 0.62 500 100 50 - 26 Nesh Karanj Surat Olpad 4.00 8500 450 200 - 27 Dabhari Surat Olpad 4.22 1100 250 300 - 28 Budiya Surat Choriyasi 0.50 7000 150 100 - 29 Bhagdawada Valsad Valsad 0.455 500 25 25 - 30 Tithal Valsad Valsad 2.35 10000 2000 125 - 31 Umarsadi Valsad Pardi 3.585 13800 2935 200 - 32 Udwada Valsad Pardi 1.4 4900 560 103 - 33 Kolak Valsad Pardi 0.63 5000 100 40 - Prioritized list of valnerable sites in Gujarat State Place District Taluko Lenth to be Population No.of houses Agricultural land Area of land protected affected affected affected (in ha) eroded (in ha) in k.m Sr.no .

34 Kalay Valsad Umargam 1.43 3200 350 65 - 35 Fansa Valsad Umargam 1.2 1600 140 20 - Dwarka Sangam Devbhumi - 36 Narayan at 0.54 30000 2 - Temple - - Dwarka Dwarka

Talaja Gopnath at 400 Houses , 37 Bhavnagar 0.68 1500 27.25 - Relia 1- Temple

Mahuva Bhavani 25 Houses, 38 Temple at Bhavnagar 0.35 0 17.5 - 1 - Temple Katpar

TOTAL 78.34 238150.00 19627 5674.75 968.00