Stellar Energy Lightstorm Entertainment
P "#$%&' System Profiles Stellar Energy Lightstorm Entertainment Overview DESIGNER: Chris Pettigrew, senior Courtesy Stellar Energy (4) commercial PV designer, Stellar Energy, stellarenergy.com n June 2012, Stellar Energy commis- period based on the facility’s historical sioned a 960 kW roof-mounted PV sys- energy consumption, which included LEAD INSTALLERS: Jim Nash, project I manager, Stellar Energy; Steve Foster, tem that provides clean energy for James the energy used to produce the #rst #lm. project manager, CSI Electrical Con- Cameron’s Lightstorm Entertainment Stellar Energy designed the system, which tractors, csielectric.com production studio. "e Lightstorm team utilizes 3,692 Yingli Solar 260 W modules DATE COMMISSIONED: June 13, 2012 wanted to make a signi#cant statement and three Solectria SGI central inverters, by powering 100% of the #lming and pro- to generate a projected 1,667 MWh annu- INSTALLATION TIME FRAME: duction of the Avatar movie sequels with ally. "e system will allow the #lmmakers 113 days solar energy. Installed at the MBS Media to achieve their goal of producing 100% LOCATION: Manhattan Beach, CA, Campus in Manhattan Beach, California, solar-powered Avatar sequels. 33.9°N the system required close cooperation "e 212,481-square-foot array is 2 SOLAR RESOURCE: 5.6 kWh/m /day between Lightstorm; the property owner, distributed over three buildings. "e ASHRAE DESIGN TEMPERATURES: the Carlyle Group; and the property man- barrel roofs presented a design chal- 78.8°F 2% average high, 39.2°F ager, Raleigh Studios. lenge requiring Stellar Energy to develop extreme minimum Stellar Energy worked with Light- a unique penetrating racking system ARRAY CAPACITY: 960 kWdc storm Entertainment to determine the that fans over the roof surfaces.
[Show full text]