Lake Dartmouth Land and On-Water Management Plan

Total Page:16

File Type:pdf, Size:1020Kb

Lake Dartmouth Land and On-Water Management Plan Lake Dartmouth Land and On-Water Management Plan 1 2016 Lake Dartmouth Land and On-Water Management 2 Lake Dartmouth Land and On-Water Management Plan Contents Executive Summary 4 Objectives of the Plan 5 Context 5 Vision 5 Lake Dartmouth 6 Lake Banimboola Regulating Pondage 6 Scope 6 Land Status 7 Legal Status 7 A Plan for the Management of Lake Dartmouth 8 Plan Implementation 8 Community Awareness and Involvement 8 Recreation and Tourism 10 Water Quality 13 Healthy Ecosystems 14 Appendices 17 Appendix A 17 Appendix B 18 Appendix C 19 Appendix D 26 3 Lake Dartmouth Land and On-Water Management used to regulate releases from the dam into the river Executive Summary downstream. The pondage wall is concrete and incorporates 3 sets of regulating gates, 3 penstocks Lake Dartmouth is located within the and a spillway. It has a hydroelectric power station, which has a maximum capacity of 12.5 MW. Both Mitta Mitta catchment downstream of the regulating pondage and the power station the confluence of the Mitta Mitta and are operated remotely or locally by AGL. Since Dart Rivers, approximately 24 km east construction, access to the pondage foreshore has of Mitta Mitta in north-east Victoria. The been prohibited. main river rises on the slopes of Mount Community interaction is a prominent element Bogong as the Big River which joins associated with the management of GMW water the Cobungra River at Anglers Rest to storages. Planning, management and resourcing of form the Mitta Mitta River. The Big River land and on-water issues has in the past tended to and Mitta Mitta River, from the Big River be reactive rather than proactive, with no integrated overarching plans for the management of land and Bridge on the Omeo Highway to the tail on-water issues. This is currently being addressed waters of Dartmouth Dam, has been through the development of Land and On-Water declared a Heritage River, recognised Management Plans for most GMW storages. Each for a number of values including scenic plan is being developed through an extensive process of engagement with communities to landscapes, canoeing, and significant ensure they have strong community support for flora and fauna. implementation. Lake Dartmouth is the largest capacity dam in The Lake Dartmouth Land and On-Water Victoria. Its primary purpose is for the storage Management Plan aims to identify and protect of water for irrigation, domestic and stock use important values associated with the waterways by in Victoria and New South Wales. The dam outlining priority land and on-water management was constructed by the Victorian Rural Water issues and identifying key actions to be implemented Commission on behalf of the then River Murray over the next five years. Most importantly, this plan Commission. Construction began in 1973 and was aims to increase communication, consistency, completed in 1979. Goulburn Murray Water (GMW) coordination and cooperation between agencies, manages the lake bed and the immediate foreshore stakeholder groups and the community to protect land (50 vertical metres above the high-water mark) the values and attributes of the storages and their under direction of the Murray Darling Basin Authority surrounds. (MDBA). The Dartmouth power station commenced operation in January 1981 and consists of a single The development of this plan has been supported 180 MW hydro-generator. The power station is and informed by a community and stakeholder remotely operated by AGL Hydro and is strictly consultation process, which included community controlled to give precedence to downstream water forums, focus groups and interviews. Ongoing requirements. Whenever possible, releases for stakeholder engagement for the implementation irrigation are made through the power station. The of the plan will be facilitated through GMW in power station is located at the base of the dam wall collaboration with Parks Victoria and Towong Shire. and its maximum permissible flow is 12,000 ML/day. It is a dynamic document and will continue to evolve as the various actions and strategies identified are A small regulating lake, known as Lake Banimboola developed and implemented. It is proposed that the Regulating Pondage, was constructed about six plan will be reviewed every five years by GMW and kilometres downstream of Dartmouth Dam. It is the stakeholders and community. 4 Lake Dartmouth Land and On-Water Management Plan Land and On-water Management Plans take into Objectives of the Plan account the needs and interests of all users of the lake, including adjoining landholders and licensees, Land and On-Water Management Plans are viewed recreational users, local government, government as an integral component of GMW’s water storage agencies and local communities. To this end, management planning portfolio. The plans are a comprehensive community and stakeholder intended to be a key reference document, not only consultation program was an important component for GMW but also for the communities and the many of the development of the plan. stakeholders that interact with these storages. The main objectives of the Lake Dartmouth Land and On-Water Management Plan are to: Context • recognise the diverse range of values and uses associated with the storage, Vision • provide a strategic framework for management The following vision statement describes clear of the storage, long-term outcomes from the prioritisation and • identify important social, economic and implementation of key actions outlined in the plan. environmental issues, and develop a series Stakeholders involved in the development of the plan, of actions to address these issues to be particularly GMW, Towong Shire Council and Parks implemented over the next 1–5 years, Victoria, will play an important role in achieving this vision. • protect the natural and cultural values by obtaining broad-scale agreement between “Lake Dartmouth is the largest capacity dam in agencies on principles relating to sustainable use Victoria and provides a well-maintained place and development of the lake and surrounding for visitors to enjoy the environment and pursue foreshore, and recreational activities without compromising its • protect the long-term quality of the water primary role as a water storage”. resource for local and downstream users. 5 Lake Dartmouth Land and On-Water Management The Dartmouth power station, operated by AGL, is located at the base of the dam wall and can operate unrestricted when water level is between 434 and 483.5 m above sea level. GMW is the waterway manager for the lake and manages it on behalf of the MDBA. Lake Dartmouth is a major tourism asset for Towong Shire and the vast majority of land above the foreshore is part of the Alpine National Park. Lake Banimboola/Dartmouth Regulating Pondage A small regulating lake known as Lake Banimboola Regulating Pondage was constructed six kilometres downstream of Dartmouth Dam. The prime purpose of the pondage is to regulate releases from the dam into the river downstream. Since construction of Lake Dartmouth, access to the pondage foreshore for fishing has been prohibited due to perceived risks concerning the rise and fall of water levels from hydro power generation, exposure to cold water, and risk Lake Dartmouth to infrastructure as a result of increased visitation. In May 2018, a 700m section of the pondage foreshore Lake Dartmouth is the largest capacity storage was opened to land based fishing and the pondage in the River Murray system and has the highest stocked with 20,000 trout to accelerate the fishery’s embankment of any dam in Australia. It is located development (VFA’s Target One Million campaign). downstream of the confluence of the Mitta Mitta and This resulted from the establishment of a multi- Dart Rivers, approximately 24 km east of Mitta Mitta agency Advisory Committee identifying mitigation (95 km from Wodonga, 75km from Tallangatta) in actions to enable land-based recreational fishing on north-east Victoria. The catchment is located entirely the section of the pondage. The regulating pondage within Victoria and has an area of approximately has a hydroelectric power station, which has a 3,600 km², less than 25% of the catchment of Hume maximum capacity of 12.5 MW. Water levels are Reservoir and only about 0.3% of the Basin. Despite managed to meet water discharge responsibilities the catchment’s size, almost 10% of the inflow to and the needs of hydro electricity generation. Water the River Murray system comes from upstream levels therefore vary and are independent of the of Dartmouth Dam. Its primary purpose is for the water levels in Dartmouth Dam. storage of water for irrigation, domestic and stock use, and environmental flows. In dry seasons, the storage supplements releases from Lake Hume and increases supplies to the River Murray system. Scope Lake Dartmouth offers a variety of passive water The geographic scope of this plan is limited to the sports and recreation facilities. It is a favourite lake and the land immediately surrounding the spot for fishing, especially for trout and Macquarie Full Supply Level (FSL). While the plan focuses perch. Camping (with limited facilities) is permitted on the lake and foreshore areas, it also aims to in designated areas around the lake. Boat launching positively influence activities throughout the broader facilities are available for motor boats, however water catchment. Land and On-Water management Plans 6 skiing and house boating are not permitted. Boats do not address water levels in the storage. are required to keep at least 700 metres away from the dam wall (GMW, 2018). Lake Dartmouth Land and On-Water Management Plan Land Status Legal Status GMW manages the lake bed and the immediate The Water Act 1989 outlines the appointment of foreshore land, 50 vertical metres above the high- water storage managers and their functions. As water mark (see Appendix C).
Recommended publications
  • News-1999-December.Pdf
    Member of VtcWalk The News of the MELBOURNE Melbourne Bushwalkers Inc BUSHWALKERS A0000133X DECEMBER 1999 ..:.::_._ ""?· - -:;. - ~- ~ - - --.,_ - Social Scene In this Issue .........~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~- •' .... , .... , ....... , •' ., .... , •' • mw~ Who in the Melboume Bushies (Graeme Thornton) {~ christmas Part~ {~ • Sixtieth Anniwn'saty Celebrations t!. in the Club Rooms (in the big hall) ~~ • Walk Previews forJanuaty f\ Wednesday 15 December 7pm onwards. ,,. ~- ,. • Equipment available for him .. t~ Please bring a plate of food to share and a cup or a glass t~ • Consemmon Fomm f\ ·~ ~- ~- ~- ~- ~- ,., ~- ,., ,.~ ~- ~-- ~~ ~~ ~~ ~~ ...., ...........- •' ...., •' • ., •' f\ .,. .,. .... .. ***************** Photo ComPetition * Wilkie Open House '* Winners of the various sections of * Jan 13, 14& 15 * the Photo comPetition will be i* This is the traditional "Introduction to Wilkie" * announced bY the Club President. weekend but being in January it'll be much more and Presented with i* * · commemorative certificates. as impromptu. E.g. You want a good long walk? We'll do o·· Part of the celebrations at the Club it. Want to do local historical sights? Likewise. Hot 1* ·· Christmas PartY on 15 December . * * weather/awful weather we can accommodate it. Just * from1Pm J '* come! Wilkie is the best thing about the Melbourne * collect. )10. ur sli.des ·. Busbies -what me biased? You've just got to come and ~-and PnntsJ ~re 'o · .............. * experience this wonderful resource. * * Talk to me- Sylvia Ford * ~~aM~~~~~~~~~H*****************'•'' ~' ~' ' ' ~~~~~~ ~ BBQ on the Yarra U ~ Friday 14 January from 5.30/6.00pm ~ ~ At the public BBQs on the Yarra next to the Morrel Bridge n ~ BYO meat, salad, drink, blanket ~ ~ For more details call Fiona on U ~~~~~~~~~~~ Price 60 cents "',,. From the President Who's Who in the Melbourne Bushies Graeme joined the Melbourne Busbies in 1972 and by his own Christmas will soon be upon us and, apart from the admission it was not a partying, there are lots of opportunities to get out in straightforward process.
    [Show full text]
  • Macquarie Perch Refuge Project – Final Report for Lachlan CMA Author: Luke Pearce, Fisheries Conservation Manager, NSW DPI, Albury
    Published by NSW Trade & Investment, Department of Primary Industries First published May 2013 Title: Macquarie Perch Refuge Project – Final Report for Lachlan CMA Author: Luke Pearce, Fisheries Conservation Manager, NSW DPI, Albury. Print: ISBN 978 1 74256 500 2 Web: ISBN: 978 1 74256 501 9 Acknowledgements I thank the Lachlan Catchment Management Authority for providing the funding for the project. I would like to acknowledge the following staff, Fin Martin and Geoff Minchin for their input, assistance, advice and support on this project. The following staff in Fisheries NSW who worked on the project and made it possible; John Pursey, Dean Gilligan, Trevor Daly, Allan Lugg, Sarah Fairfull, Justin Stanger, Tim McGarry, Martin Asmus, Matthew McLellan, Lachie Jess and Antonia Creese. I thank the Recreational Fishing Trust for their ongoing support and funding for the Macquarie Perch captive breeding program; without it there would not be fish to stock into the refuge site. I would also like to acknowledge the Central Acclimatisation Society, in particular Karl Schaerf and Peter Byron for their ongoing support of the project and threatened native fish. TRIM reference: PUB13/61 Jobtrack 12067 © State of New South Wales through the Department of Trade and Investment, Regional Infrastructure and Services, 2013. You may copy, distribute and otherwise freely deal with this publication for any purpose, provided that you attribute the NSW Department of Primary Industries as the owner. Disclaimer: The information contained in this publication is based on knowledge and understanding at the time of writing (May 2013). However, because of advances in knowledge, users are reminded of the need to ensure that information upon which they rely is up to date and to check currency of the information with the appropriate officer of the Department of Primary Industries or the user’s independent adviser.
    [Show full text]
  • Gauging Station Index
    Site Details Flow/Volume Height/Elevation NSW River Basins: Gauging Station Details Other No. of Area Data Data Site ID Sitename Cat Commence Ceased Status Owner Lat Long Datum Start Date End Date Start Date End Date Data Gaugings (km2) (Years) (Years) 1102001 Homestead Creek at Fowlers Gap C 7/08/1972 31/05/2003 Closed DWR 19.9 -31.0848 141.6974 GDA94 07/08/1972 16/12/1995 23.4 01/01/1972 01/01/1996 24 Rn 1102002 Frieslich Creek at Frieslich Dam C 21/10/1976 31/05/2003 Closed DWR 8 -31.0660 141.6690 GDA94 19/03/1977 31/05/2003 26.2 01/01/1977 01/01/2004 27 Rn 1102003 Fowlers Creek at Fowlers Gap C 13/05/1980 31/05/2003 Closed DWR 384 -31.0856 141.7131 GDA94 28/02/1992 07/12/1992 0.8 01/05/1980 01/01/1993 12.7 Basin 201: Tweed River Basin 201001 Oxley River at Eungella A 21/05/1947 Open DWR 213 -28.3537 153.2931 GDA94 03/03/1957 08/11/2010 53.7 30/12/1899 08/11/2010 110.9 Rn 388 201002 Rous River at Boat Harbour No.1 C 27/05/1947 31/07/1957 Closed DWR 124 -28.3151 153.3511 GDA94 01/05/1947 01/04/1957 9.9 48 201003 Tweed River at Braeside C 20/08/1951 31/12/1968 Closed DWR 298 -28.3960 153.3369 GDA94 01/08/1951 01/01/1969 17.4 126 201004 Tweed River at Kunghur C 14/05/1954 2/06/1982 Closed DWR 49 -28.4702 153.2547 GDA94 01/08/1954 01/07/1982 27.9 196 201005 Rous River at Boat Harbour No.3 A 3/04/1957 Open DWR 111 -28.3096 153.3360 GDA94 03/04/1957 08/11/2010 53.6 01/01/1957 01/01/2010 53 261 201006 Oxley River at Tyalgum C 5/05/1969 12/08/1982 Closed DWR 153 -28.3526 153.2245 GDA94 01/06/1969 01/09/1982 13.3 108 201007 Hopping Dick Creek
    [Show full text]
  • DUCK HUNTING in VICTORIA 2020 Background
    DUCK HUNTING IN VICTORIA 2020 Background The Wildlife (Game) Regulations 2012 provide for an annual duck season running from 3rd Saturday in March until the 2nd Monday in June in each year (80 days in 2020) and a 10 bird bag limit. Section 86 of the Wildlife Act 1975 enables the responsible Ministers to vary these arrangements. The Game Management Authority (GMA) is an independent statutory authority responsible for the regulation of game hunting in Victoria. Part of their statutory function is to make recommendations to the relevant Ministers (Agriculture and Environment) in relation to open and closed seasons, bag limits and declaring public and private land open or closed for hunting. A number of factors are reviewed each year to ensure duck hunting remains sustainable, including current and predicted environmental conditions such as habitat extent and duck population distribution, abundance and breeding. This review however, overlooks several reports and assessments which are intended for use in managing game and hunting which would offer a more complete picture of habitat, population, abundance and breeding, we will attempt to summarise some of these in this submission, these include: • 2019-20 Annual Waterfowl Quota Report to the Game Licensing Unit, New South Wales Department of Primary Industries • Assessment of Waterfowl Abundance and Wetland Condition in South- Eastern Australia, South Australian Department for Environment and Water • Victorian Summer waterbird Count, 2019, Arthur Rylah Institute for Environmental Research As a key stakeholder representing 17,8011 members, Field & Game Australia Inc. (FGA) has been invited by GMA to participate in the Stakeholder Meeting and provide information to assist GMA brief the relevant Ministers, FGA thanks GMA for this opportunity.
    [Show full text]
  • World's Major Rivers
    WWWWWWoorrlldd’’ss mmaajjoorr rriivveerrss AAnn IInnttrroodduuccttiioonn ttoo iinntteerrnnaattiioonnaall wwwwwwaatteerr llaawwwwww wwwwwwiitthh ccaassee ssttuuddiieess THIS PAGE INTENTIONALLY LEFT BLANK WWWWWWoorrlldd’’ss mmaajjoorr rriivveerrss An introduction to international water law with case studies Colorado River Commission of Nevada 555 E. Washington Avenue, Suite 3100 Las Vegas, Nevada 89101 Phone: (702) 486-2670 Website: http://crc.nv.gov November 2008 Jacob (Jay) D. Bingham, Chairman Ace I. Robinson, Vice Chairman Andrea Anderson, Commissioner Marybel Batjer, Commissioner Chip Maxfield, Commissioner George F. Ogilvie III, Commissioner Lois Tarkanian, Commissioner George M. Caan, Executive Director Primary Author: Daniel Seligman, Attorney at Law Columbia Research Corp. P.O. Box 99249 Seattle, Washington 98139 (206) 285-1185 Project Editors: McClain Peterson, Project Manager Manager, Natural Resource Division Colorado River Commission of Nevada Sara Price Special Counsel-Consultant Colorado River Commission of Nevada Esther Valle Natural Resource Analyst Colorado River Commission of Nevada Nicole Everett Natural Resource Analyst Colorado River Commission of Nevada THIS PAGE INTENTIONALLY LEFT BLANK World’s Major Rivers ACKNOWLEDGMENTS Daniel Seligman at the Columbia Research Corp. wishes to thank Jacqueline Pruner, attorney at law in Seattle, for her contribution to the section on water law in Canada and her valuable editing assistance throughout the entire document. The staff at the Murray-Darling Basin Commission and Goulburn-Murray Water in Australia provided important information about the Murray-Darling River system, patiently answered the author’s questions, and reviewed the draft text on water trading. Staff at the International Joint Commission in Washington, D.C., and the Prairie Provinces Water Board in Regina, Canada, also offered helpful comments on an earlier draft.
    [Show full text]
  • River Murray Operations | Murray–Darling Basin Authority August 2020
    River Murray Key facts The River Murray is Australia’s longest operations river and flows for more than 2500 kilometres through New South The River Murray flows through New South Wales, Victoria and South Australia. Wales, Victoria and South Australia, sustaining rural towns and communities, supporting Several major rivers join the Murray, including the agricultural production and nourishing many Goulburn, Murrumbidgee unique Australian plants and animals. and Darling, and many smaller rivers and MDBA River Operations is responsible for operating the tributaries on its westward River Murray on behalf of the joint governments of New journey to the sea. South Wales (NSW), Victoria and South Australia. Key water regulation assets under control of the MDBA The Murray–Darling Basin include Dartmouth Dam, Hume Dam, Yarrawonga Weir, Agreement (the Agreement) Torrumbarry Weir, Lake Victoria and the locks and weirs sets out the water sharing from Lock 15 at Euston to Lock 7 at Rufus River. rules across the states. The MDBA determines the volume of water released to meet demands, but does not own any water and can only The main storages in the release water from storage when there are state orders or River Murray are system demands to be met. Dartmouth Dam, Hume Dam, Yarrawonga Weir The physical operation of structures is managed by water and Lake Victoria. authorities in each state. This includes Menindee Lakes on the Darling River, which contributes some water for use in the Murray system, but is managed by the NSW Other major storages Government. Additionally, the MDBA does not operate the connected to the system River Murray downstream of the South Australian border, (but not the responsibility where the South Australian Government take on this role.
    [Show full text]
  • Appendix F. Statement of Heritage Impacts
    Hume Battery Energy Storage System Environmental Impact Statement Appendix F. Statement of Heritage Impacts Hume Battery Energy Storage System Statement of Heritage Impact IA213400_Hume BESS SOHI | Final 28 July 2020 Meridian Energy Australia Statement of Heritage Impact Meridian Energy Australia Statement of Heritage Impact Hume Battery Energy Storage System Project No: IA213400 Document Title: Statement of Heritage Impact Document No.: IA213400_Hume BESS SOHI Revision: Final Date: 28 July 2020 Client Name: Meridian Energy Australia Project Manager: Thomas Muddle Author: Deborah Farina File Name: IA213400 Hume BESS SOHI_Final Jacobs Group (Australia) Pty Limited ABN 37 001 024 095 Level 7, 177 Pacific Highway North Sydney NSW 2060 Australia PO Box 632 North Sydney NSW 2059 Australia T +61 2 9928 2100 F +61 2 9928 2444 www.jacobs.com © Copyright 2019 Jacobs Group (Australia) Pty Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. IA213400_Hume BESS SOHI i Statement of Heritage Impact Contents Executive Summary
    [Show full text]
  • Rivers and Streams Special Investigation Final Recommendations
    LAND CONSERVATION COUNCIL RIVERS AND STREAMS SPECIAL INVESTIGATION FINAL RECOMMENDATIONS June 1991 This text is a facsimile of the former Land Conservation Council’s Rivers and Streams Special Investigation Final Recommendations. It has been edited to incorporate Government decisions on the recommendations made by Order in Council dated 7 July 1992, and subsequent formal amendments. Added text is shown underlined; deleted text is shown struck through. Annotations [in brackets] explain the origins of the changes. MEMBERS OF THE LAND CONSERVATION COUNCIL D.H.F. Scott, B.A. (Chairman) R.W. Campbell, B.Vet.Sc., M.B.A.; Director - Natural Resource Systems, Department of Conservation and Environment (Deputy Chairman) D.M. Calder, M.Sc., Ph.D., M.I.Biol. W.A. Chamley, B.Sc., D.Phil.; Director - Fisheries Management, Department of Conservation and Environment S.M. Ferguson, M.B.E. M.D.A. Gregson, E.D., M.A.F., Aus.I.M.M.; General Manager - Minerals, Department of Manufacturing and Industry Development A.E.K. Hingston, B.Behav.Sc., M.Env.Stud., Cert.Hort. P. Jerome, B.A., Dip.T.R.P., M.A.; Director - Regional Planning, Department of Planning and Housing M.N. Kinsella, B.Ag.Sc., M.Sci., F.A.I.A.S.; Manager - Quarantine and Inspection Services, Department of Agriculture K.J. Langford, B.Eng.(Ag)., Ph.D , General Manager - Rural Water Commission R.D. Malcolmson, M.B.E., B.Sc., F.A.I.M., M.I.P.M.A., M.Inst.P., M.A.I.P. D.S. Saunders, B.Agr.Sc., M.A.I.A.S.; Director - National Parks and Public Land, Department of Conservation and Environment K.J.
    [Show full text]
  • W.T. Trueman August 2007
    Native Fish Australia Technical Report #2 A REVIEW OF ATTEMPTS AT THE ARTIFICIAL PROPAGATION OF THE MACQUARIE PERCH Macquaria australasica WITH RECOMMENDATIONS FOR FUTURE ACTION W.T. Trueman August 2007 Native Fish Australia Technical Report #2 A REVIEW OF ATTEMPTS AT THE ARTIFICIAL PROPAGATION OF THE MACQUARIE PERCH Macquaria australasica WITH RECOMMENDATIONS FOR FUTURE ACTION W.T. Trueman August 2007 Published by: Native Fish Australia (Victoria) Inc PO Box 162 DONCASTER VIC 3108 Australia E-mail: [email protected] Web: http://www.nativefish.asn.au Copyright © 2007 Apart from fair dealing for the purposes of private study, research, criticism or review as permitted under the Copyright Act, no part of this publication may be reproduced by any means without the permission of the author or Native Fish Australia (Victoria) Incorporated. All photos in this report are those of the author unless otherwise acknowledged. Cover Photo: Adult Macquarie perch. (Photo courtesy Stephen Kerris.) Artificial Propagation Of The Macquarie Perch Macquaria australasica W.T.Trueman Table of Contents Table of Contents ................................................................................................................................... i Preface................................................................................................................................................... ii Introduction ............................................................................................................................................2
    [Show full text]
  • National Recovery Plan for the Trout Cod Maccullochella Macquariensis
    National Recovery Plan for the Trout Cod Maccullochella macquariensis Trout Cod Recovery Team Published by the Victorian Government Department of Sustainability and Environment (DSE) Melbourne, 2008. © State of Victoria Department of Sustainability and Environment 2008 This publication is copyright. No part may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government, 8 Nicholson Street, East Melbourne. ISBN 1 74152 410 5 This is a Recovery Plan prepared under the Commonwealth Environment Protection and Biodiversity Conservation Act 1999, with the assistance of funding provided by the Australian Government. This Recovery Plan has been developed with the involvement and cooperation of a range of stakeholders, but individual stakeholders have not necessarily committed to undertaking specific actions. The attainment of objectives and the provision of funds may be subject to budgetary and other constraints affecting the parties involved. Proposed actions may be subject to modification over the life of the plan due to changes in knowledge. Disclaimer This publication may be of assistance to you but the State of Victoria and its employees do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence that may arise from you relying on any information in this publication. An electronic version of this document is available on the Department of the Environment, Water, Heritage and the Arts website www.environment.gov.au For more information contact the DSE Customer Service Centre 136 186 Citation: Trout Cod Recovery Team 2008a.
    [Show full text]
  • The Geology and Prospectivity of the Tallangatta 1:250 000 Sheet
    VIMP Report 10 The geology and prospectivity of the Tallangatta 1:250 000 sheet I.D. Oppy, R.A. Cayley & J. Caluzzi November 1995 Bibliographic reference: OPPY, I.D., CAYLEY R.A. & CALUZZI, J., 1995. The Geology and prospectivity of the Tallangatta 1:250 000 sheet Victorian Initiative for Minerals and Petroleum Report 10. Department of Agriculture, Energy and Minerals. © Crown (State of Victoria) Copyright 1995 Geological Survey of Victoria ISSN 1323 4536 ISBN 0 7306 7980 2 This report may be purchased from: Business Centre, Department of Agriculture, Energy & Minerals, Ground Floor, 115 Victoria Parade, Fitzroy, Victoria 3065 For further technical information contact: General Manager, Geological Survey of Victoria, Department of Agriculture, Energy & Minerals, P O Box 2145, MDC Fitzroy, Victoria 3065 Acknowledgments: The authors wish to acknowledge G. Ellis for formatting the document, R. Buckley, P.J. O'Shea and D.H. Taylor for editing and S. Heeps for cartography I. Oppy wrote chapters 3 and 5, R. Cayley wrote chapter 2 and J. Caluzzi wrote chapter 4. GEOLOGY AND PROSPECTIVITY - TALLANGATTA 1 Contents Abstract 4 1 Introduction 5 2 Geology 7 2.1 Geological history 7 Pre-Ordovician to Early Silurian 7 Early Silurian Benambran deformation and widespread granite intrusion 8 Middle to Late Silurian 9 Late Silurian Bindian deformation 9 Early Devonian rifting and volcanism 10 Middle Devonian Tabberabberan deformation 11 Late Devonian sedimentation and volcanism 11 Early Carboniferous Kanimblan deformation to Present day 11 2.2 Stratigraphy
    [Show full text]
  • Notes on Gippsland Aboriginal Place Names (7)
    Notes on Gippsland Aboriginal Names Peter Gardner 1.The Meaning of the word “Munjie”(1) The meaning of the word "munjie", amongst other things, is mentioned in an article by John O'Rourke (2). This word has been given various attributed meanings including 'fish' by the Aboriginal Protector George Augustus Robinson. But almost certainly the true meaning, as recorded a number of times by Alfred Howitt, is 'place'. Hence Bukkanmunjie, the original name for Buchan, and also mentioned by O'Rourke, is "place of the woman's bag" and not "evil spirit of the jumping water" as O'Rourke claimed. John O'Rourke wrote: "Coming through from New South Wales one passes through 'rapid water' country, falling into Victoria, and it is found that the (word) Munjie occurs very frequently. Some of the New South Wales blackfellows claim Omeo as their territory, and there are lots of Munjies about there - Hiinomunjie, Tongiomunjie, Lumlamunjie, etc. When you came down to the still water the munjies ceased and I claim this finally proves that the name of the blackfellows for 'jumping water' was munjie." (3) O'Rourke continued: "There is another instance in the Mullick Munjie River, which empties into the Buchan. Formerly it was known as Quag Quag Munjie (4). When the blackfellows became acquainted with milk they used also to call it mullick, and this river is a series of steep rapids, the water coming down like an avalanche of snow, so I presume they changed it in mullick, owing to the foam reminding them of milk." (5) Unfortunately O'Rourke has found an elaborate solution for a simple problem.
    [Show full text]