Affordable Group Housing Colony Sector-89, Village- Hayatpur Urban Complex District- Gurugram, FORM I

(I) BASIC INFORMATION

S. No. Items Details 1. Name of the Project: Affordable Group Housing Colony 2. Developer Name M/s Maxworth Infrastructures Pvt. Ltd. 3. Serial No. in schedule 8(a) “Building & Construction Projects” 4. Proposed capacity/area/length/tonnage to Particulars Details be handled/command area/lease Total plot area 22,333.55 m2 (5.51875 acres) area/number of wells to be drilled Net plot area 21,216.62 m2 (5.24275 acres)

Built Up Area 57,955.39 m2 Permissible: 10,608.31 m2 (50%) Ground coverage Proposed: 4,952.99 m2 (23.34 %) Permissible:  Commercial : 1,485.16 m2 (@ 1.75 of commercial plot area)  Residential : 45,827.91 m2 (@ 2.25 of residential plot area) FAR Proposed:  Commercial : 1,428.90 m2 (@ 1.68 of commercial plot area)  Residential : 45,773.13 m2 (@ 2.247 of residential plot area ) 5. New/Expansion/Modernization New 6. Existing capacity/Area etc. Not Applicable 7. Category of project B 8. Does it attract the general condition? If No Yes, please specify 9. Does it attract the specific condition? If No Yes, please specify 10. i) Location of unit Village-Hayatpur, Sec-89, District Gurugram Rect no. 4, Killa no. 22/2/2, 21 ii) Plot, Survey No, Khasra No. Rect no. 7, killa no. 2/2, 3/2, 7/2/2, 8/1/2/10, 8/2/4, 13/1, 13/2, 14/1, 17/2/2, 18/2

iii) Village Hayatpur iv) District Gurugram v) State Haryana 11. Nearest Railway station/Airport along Garhi Harsary Railway Station – 1.83 km, NW

1 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

with distance in kms. Gurgaon Railway Station-9.54 Km-NE Indira Gandhi International Airport – 18.39 km, NE 12. Nearest town, City, Distt. Head Quarter Hayatpur village- 1.32 km, SW along with distance in kms. Gurugram -7.31 km, NE 13. Village Panchayat, Zila Parishad, Municipal Corporation, Gurgaon Municipal Corporation, Local A-10, Block A, Sector 34, Gurugram, Haryana body(Complete postal addresses with Pin: 122001 telephone nos. to be given) Phone:18001801817, 14. Name of Applicant M/s Maxworth Infrastructures Pvt. Ltd. 15. Regd. Address 30-31, 1st Floor, MGF Megacity Mall, M.G Road, Gurugram- 122002 16. Address for correspondence(1): M/s Maxworth Infrastructures Pvt. Ltd. 30-31, 1st Floor, MGF Megacity Mall, M.G Road, Gurugram Pin Code 122002

Name Mr. Sushil Kaudinya Designation Director

[email protected] E mail Telephone - Mobile 9782074776 Fax No. - 17. Detail of alternative site, if any. Location This is a building construction project for which license of these sites should be shown on a topo- has already been granted by Director Town and sheet. Country Planning. Hence, Not applicable in this case. 18. Interlinked Project Not Applicable 19. Whether separate application for Not Applicable. interlinked project has been submitted 20. If, Yes Date of Submission Not Applicable. 21. If no , reason Not Applicable. 22. Whether proposal involves approval/clearance under: if yes, details of same and status to given No. The unit does not fall in any notified reserved a) Forest (conservation) Act 1980? forest area. No. The unit does not fall in any notified Wild life b) Wild life protection Act 1972? protection area. No. The unit does not fall in any Notified coastal c) CRZ notification 1991? regulation zone. 23. Whether there is any Govt. order/policy Not Applicable relevant/relating site?

2 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

24. Forest land involved (hectares) No, there isn’t any Forest land involved in this project. 25. Whether there is any litigation pending There is no litigation pending against the project and against the project and / or land in which land. is project is proposed to be setup: a) Name of court b) Case No. Therefore, Information required against point a, b & c c) Orders/directions of Court, if any is not applicable. and its relevance with the proposed project. (II) ACTIVITY:

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. No. Information/Checklist Details thereof (with approximate quantities/ Confirmation Yes/ No rates, wherever possible) with source of information data 1.1 Permanent or temporary change The site is earmarked for Residential in land use, land cover or development as per Gurgaon-Manesar Master topography including increase plan 2031; hence no change in land-use is in intensity of land use (with Yes envisaged. Also license has already been respect to local land use plan) granted by Director Town and Country Planning vide Licence no. 23 of 2016 dated 22/11/2016. 1.2 Clearance of existing land, There is no structure present on the site, the site vegetation and building? is fully vacant. The existing vegetation at site Yes consists of wild grasses and weeds which shall be cleared at the time of construction. 1.3 Creation of new land uses? The proposed project site is vacant consisting wild Yes grass and weeds only. The land shall be used for the construction of Affordable Group Housing. 1.4 Pre-construction investigations e.g. Soil investigation was carried out and the results bore house, soil testing? Yes were found satisfactory. 1.5 Construction works? The Construction activities will be confined Yes within the project premises; there will be no physical change outside the project boundary. 1.6 Demolition works? Project site is a vacant land. Hence, demolition is No not required. 1.7 Temporary sites used for All the construction activities including stocking construction works or Housing of raw materials will be confined within the No of construction workers? project site only. No temporary shelters for labors are proposed as local labors will be hired from

3 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

nearby areas. 1.8 Above ground building, Excavation will be carried out for foundation of structures or Earthworks buildings. The excavated soil will be used in Yes including linear structures, cut backfilling and other area development activities. and fill or excavations 1.9 Underground work including No underground work including mining/ No mining or tunneling? tunneling is required except excavation of earth. 1.10 Reclamation works? No No reclamation work is required. 1.11 Dredging? No No dredging is required. 1.12 Offshore structures? No No offshore structure is required. 1.13 Production and manufacturing No production/manufacturing process is involved processes? No as the proposed project is an Affordable Group Housing Colony. 1.14 Facilities for storage of goods or Raw material will be stored at site in a covered materials? area. Cement will be separately stored. Sand will Yes be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. 1.15 Facilities for treatment or Solid Waste: disposal of solid waste or liquid effluents? Solid wastes which are likely to be generated in project will be domestic in nature.

Domestic Waste: Approximately 2,096 kg/day domestic solid waste is estimated to be generated from the project activity; this will be collected from designated locations and segregated into inorganic and organic wastes. The inorganic non- biodegradable wastes will be sold to authorize Yes vendors for recycling and the biodegradable wastes will be treated in OWC.

Liquid effluents: During construction phase, sewage will be treated and disposed through septic tanks with soak pits. The wastewater in operation phase will be treated in a 3 STPs having the capacity of 20 KLD, 110 KLD and 220 KLD for pocket A, Pocket B and Pocket C & D respectively and the treated sewage will be reused for flushing, horticulture and rest surplus treated water will be discharged to public sewer. Dewatered/dried sludge generated from the STP plant will be used as

4 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

manure for green belt development. 1.16 Facilities for long term housing Local labors will be hired from nearby areas of operational workers? during construction phase. So, there will be no No need to create permanent facilities for long-term housing of operational workers. 1.17 New road, rail or sea traffic The site is adjacent to SH26. Only internal roads, during construction of paths will be developed for vehicular movements operation? for transportation of construction material during No construction phase whereas internal tracks and paths will be developed for traffic circulation (to avoid any congestion) during operational phase. 1.18 New road, rail, air waterborne The site is adjacent to SH-15A at a distance of or other transport infrastructure approximately 5.28 km towards North. No including new or altered routes and stations, ports, airport etc? 1.19 Closure or diversion of existing Since the site is adjacent to SH-15 A which has transport routes or infrastructure high traffic density; the diversion or closure of No leading to changes in traffic existing traffic routes is not required. movements? 1.20 New or diverted transmission There will not be any new/diverted transmission lines or pipelines? No line or pipeline around the proposed project. 1.21 Impoundment, damming, No impoundment, damming, culverting, culverting, realignment or other realignment or other changes to the hydrology of No changes to the hydrology of surface watercourses is proposed. watercourses or aquifers? 1.22 Stream crossings? No There is no stream running across the site. 1.23 Abstraction or transfers of water Total water requirement of proposed project will from ground or surface waters? be 369 KLD, which includes 259 KLD for fresh water requirement & 110 KLD for recycled water requirement. No During construction phase, water demand will be fulfilled by STP treated water. During operation phase, water will be supplied through HUDA. 1.24 Changes in water bodies or the Runoff will increase due to increased paved land surface affecting drainage surface. However, increased runoff will be No or run-off? managed by well-designed rainwater harvesting system and storm water management plan. 1.25 Transport of personnel or Transport of personnel / material during materials for construction, construction and operation phase are envisaged. operation or Yes Road network for smooth flow of traffic and decommissioning? adequate parking space will be provided for operational phase.

5 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

During operational phase, total parking provided will be 403 ECS or 807 nos. of two wheelers. 1.26 Long-term dismantling or No Long term dismantling or decommissioning or decommissioning or No restoration work will be involved. restoration works? 1.27 Ongoing activity during No decommissioning activity is involved, Hence, decommissioning which could no impact on the environment by the proposed No have an impact on the project is supposed. environment? 1.28 Influx of people to an area in All the workers will come from nearby areas. either temporarily or Hence, minor influx of people is expected in the permanently? area. Local labors will be hired temporarily No during the construction phase and during operation phase approx. 4,770 persons will be involved in the entire project. The landscaping will be carried out with mainly 1.29 Introduction of alien species? No local species with a few ornamental varieties of flora that are well suited to the local conditions. Loss of native species or genetic There will be no significant impact on the native 1.30 No diversity? species or genetic diversity.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Details thereof (with approximate quantities/ Information/Checklist S. No. Yes/No rates, wherever possible) with source of confirmation information data Proposed site is having wild grasses which shall be cleared and Affordable Group Housing Colony Land especially undeveloped or 2.1 No shall be constructed on vacant land. Local and agricultural land (ha) indigenous plant species shall also be planted at proposed project site. Total water requirement for the proposed project Water (expected source & will be 369 KLD which include 259 KLD for fresh 2.2 Yes competing users) unit: KLD water requirement and 110 KLD for recycled/treated water requirement. Minerals such as sand and aggregates will be 2.3 Minerals (MT) Yes required during the construction phase. Construction material – stone, All materials for construction will be arranged 2.4 aggregates, and/soil (expected Yes through selected suppliers. source – MT) Forests and timber (source – 2.5 Yes Timber will be provided by selected suppliers. MT)

6 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

Energy including electricity The total demand load is estimated 3000 KW. and fuels (source, competing Power will be supplied by DHBVN. Power backup 2.6 Yes users) Unit: fuel (MT), energy for the proposed project will be through 1 number of (MW) DG sets of capacity 500 kVA Any other natural resources No other natural resource will be involved in the 2.7 No (use appropriate standard units) project except the mentioned above.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. No. Information/Checklist Yes/No Details thereof (with approximate quantities/ confirmation rates, wherever possible) with source of information data 3.1 Use of substance or Yes The proposed project is an Affordable Group materials, which are Housing colony. Hence, No storage of hazardous hazardous (as per MSIHC chemicals (as per MSIHC Rules) will be done rules) to human health or the expect diesel. Diesel is required to run standby D.G. environment (flora, fauna sets, for which the stored quantity of diesel will be and water supplies) below the threshold limit as specified in the MSIHC rules. Necessary permission will be obtained from the Explosives Department, if required. 3.2 Changes in occurrence of No Suitable drainage and waste management measures disease or affect disease will be adopted in construction and operational vectors (e.g. insect or water phase, which will restrict the stagnation of water or borne diseases) accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. 3.3 Affect the welfare of people Yes Socio-economic standard of people will improve e.g. by changing living due to increased employment opportunities conditions? provided by this project. This will lead to better quality of life and will also set a standard for future developments in the area. 3.4 Vulnerable groups of people No No effect is envisaged due to this project. who could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes No No other causes are involved except the mentioned above.

7 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S. No. Information/Checklist Yes/No Details thereof (with approximate quantities/ confirmation rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No No such spoil, overburden or mine wastes will be wastes generated as this an Affordable Group housing project. 4.2 Municipal waste (domestic Yes Solid wastes likely to be generated in project are and or commercial wastes) of domestic nature. Total solid wastes 2,096 kg /day will be collected from designated location and segregated into inorganic and organic wastes. The inorganic non- biodegradable wastes will be sold to vendors for recycling and the organic biodegradable wastes (waste vegetables, foods etc.) will be converted in to manure and will be utilized for horticulture activities. The mechanism of sludge drying will be centrifugation and the dewatered/ dried sludge from STP will be converted to cakes and will be used as manures in horticulture. 4.3 Hazardous wastes (as per Yes Spent oil from DG sets will be stored in HDPE Hazardous Waste drums in isolated covered facility. Suitable care will Management Rules) be taken so that spills/leaks of spent oil from storage could be avoided. This used oil will be sold to recyclers authorized by HSPCB. 4.4 Other industrial process No Not applicable as this is an Affordable Group wastes Housing. 4.5 Surplus product No Not applicable as this is an Affordable Group Housing. 4.6 Sewage sludge or other Yes Sludge generated from the STP plant will be dried sludge from effluent and later will be used as manure for green belt treatment development. 4.7 Construction or demolition Yes Construction waste generation will be limited to wastes the construction phase only and limited to project site only. These will be reused for backfilling after manual segregation. Unusable and excess construction debris will be disposed at designated places in tune with the local norms. These wastes will be used for road development activities also. 4.8 Redundant machinery or No No Redundant machinery or equipment is

8 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

equipment involved. Contaminated soils or other No Contaminated soils or other materials are 4.9 No materials involved. 4.10 Agricultural wastes No No agricultural wastes will be generated. 4.11 Other solid wastes No Not applicable as this is an Affordable Group Housing Project.

5. Release for pollutants or any hazardous, toxic or noxious substances to air (Kg/hr).

S. No. Information/Checklist Yes/No Details thereof (with approximate quantities/ confirmation rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes The project does not envisage any major air fossil fuels from stationary or pollution sources except operation of DG sets mobile sources during power failure and vehicular traffic. The emission from stationary sources (D.G. sets) has been predicated. The DG stacks of adequate height (as per CPCB norms) will be provided to disperse the pollutant generated from D.G. sets and D.G room will be provided with proper acoustic enclosure. The pollution generated from the vehicular movement will be checked by maintenance & regular checkup of vehicles. Local native plants will be used in tree plantation all around the project site and road side to reduce the impact of pollution. 5.2 Emissions from production No Not applicable, as this is a building construction processes project.

5.3 Emissions from materials Yes Small quantities of fugitive emissions are handling including storage or envisaged during transport and handling of transport construction materials. Such emissions will be temporary and controlled by the use of water sprinkling and other viable techniques like covering of loose material. 5.4 Emissions from construction Yes This will be restricted to the construction phase and activities including plant and the construction site only. Suitable preventive equipment measures will be taken to suppress the dust emission. 5.5 Dust or odors from handling of Yes Dust is anticipated during loading and unloading of materials including construction material and excavation of upper earth construction materials, sewage surface. These will however be temporary in

9 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

and waste nature, which will be controlled by water sprinkling. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission. 5.6 Emissions from incineration of No Not applicable, as this is an Affordable Group wastes Housing Colony and there will not be any incineration waste involved in this project. 5.7 Emissions from burning of No Not applicable. Open burning of biomass/other waste in open air (e.g. slash material will be prohibited on site. materials, construction debris) 5.8 Emissions from any other No Not Applicable sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate quantities/ Information/Checklist S. No. Yes/No rates, wherever possible) with source of confirmation information data 6.1 From operation of equipment The machinery to be used for construction will be e.g. engines, ventilation plant, Yes of high standard. These standards itself take care

crushers of noise control/vibration control and air emission control. Hence, insignificant impacts due to construction machinery are envisaged. Apart from this, the construction activities will be restricted to day time only.

During the operation phase of the project, the noise emission shall be caused only due to DG sets installed for backup power supply. As the DG sets will be placed in an acoustic enclosure, hence the noise generated shall meet the ambient standard as

per CPCB norms. 6.2 From industrial or similar No No industrial processes will be carried out in the processes proposed project expect due to running of various construction equipment /machinery & D.G. Sets during the project. Proper maintenance of machineries will reduce the generation of noise and vibration. All the workers will be equipped with PPE’s during construction phase and D.G. sets will be installed in acoustic enclosures with proper padding system to reduce vibration impact.

10 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

Due to various construction activities, there will From construction or 6.3 be short-term noise impacts in the immediate demolition Yes vicinity of the project site. The construction

activities will include the following noise

generating activities:

 Concreting, mixing & operation of DG sets.

 Construction plant and heavy vehicle movement. 6.4 From blasting or piling No No blasting or mechanized piling will be done. From construction or Some noise will be generated from vehicular operational traffic movement in the construction. Every possible provision will be taken up to avoid/minimize traffic chaos. Same will be taken in operational phase. During construction phase noise is generated due 6.5 Yes to excavation machineries, movement of heavy

vehicles like trucks. In operational phase major

source of noise is D.G. set which will operate in

case of power failure. Increase in noise and vibration due to traffic of project site will be marginal. Hence noise and vibration due to traffic is not anticipated on the project site. This will be minimized by plantation along the roadside. 6.6 From lighting or cooling No Not applicable. systems 6.7 From any other sources There will be no other sources for noise & No vibration generation except the mentioned above.

7. Risks of contamination of land or water from releases of pollutants into the ground of into sewers, surface waters, groundwater, coastal waters or the sea:

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/ rates, wherever possible) with source of information data 7.1 From handling, storage, use No The used oil from DG sets will be carefully stored or spillage of hazardous in HDPE drums and periodically sold to materials authorized recyclers. All precautions will be taken to avoid spillage from storage as per The Hazardous Wastes (Management & Handling) Rules, 1989 & as amended. 7.2 From discharge of sewage or No There will be no discharge of untreated sewage on other effluents to water or the land or into water bodies. Adequate treatment of

11 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

land (expected mode and sewage will be carried out in a 3 STPs having the place of discharge) capacity of 20, 110 and 220 KLD within the project premises. Treated sewage will be re-used for flushing; landscaping and rest surplus treated water will be discharged to public sewer. 7.3 By deposition of pollutants No The DG Sets will be provided with stacks of emitted to air into the land or adequate height. Hence dispersion will be into water achieved which will further avoid deposition of pollutants in significant concentrations at any single location. 7.4 From any other sources No No other sources are involved except the mentioned above. 7.5 Is there a risk of long term No Likelihood of such an event is not foreseen till buildup of pollutants in the now in the area and suitable measures will be environment from these adopted to control and reduce emission, so that sources? there will be no such risk in the coming future.

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/ rates, wherever possible) with source of information data 8.1 From explosions, spillages, Yes This is an Affordable group housing colony and fires etc from storage, does not involve major hazardous construction handling, use or production activity. Hence chances of explosions, spillages, of hazardous substances fires etc. are minimal. During construction, suitable personal protective equipment will be provided to all construction workers as required under the health & safety norms. Awareness & Training about safety norms will be provided to all the supervisor and construction workers involved in construction activities. No major hazardous waste will be stored within project site. No industrial or process activity will be involved in this project hence chances of chemical hazards and accidents will be minimal. However, suitable firefighting measures will be taken to reduce chances of fire-accidents. 8.2 From any other causes No No other causes are involved except the mentioned above. 8.3 Could the project be affected No The project falls under seismic active Zone IV

12 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

by natural disasters causing according to the Indian Standard Seismic Zoning environmental damage (e.g. Map. floods, earthquakes, Suitable seismic coefficient will be adopted in landslides, cloudburst etc)? horizontal and vertical direction respectively while designing the structure. There is no possibility of flood as per records available on the proposed project site.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/ rates, wherever possible) with source of information data 9.1 Lead to development of Yes The proposed project is for Residential use; it supporting facilities, may lead to development of supporting services ancillary development or and infrastructure in and around the area. development stimulated by the project which could have impact on the environment e.g. The project will have positive impact on the  Supporting Yes ancillary infrastructure like road, markets, public infrastructure health, amenities, conveyance facilities etc. (roads, power supply, waster or wastewater treatment, etc.)  housing The project proposed is an Affordable Group development Yes Housing Colony only.  extractive No Not applicable industries  supply industries No Not applicable  other No Not applicable 9.2 Lead to after-use of the site, No Not applicable which could have an impact on the environment. 9.3 Set a precedent for later No Not applicable developments 9.4 Have cumulative effects due No Not Applicable to proximity to other existing or planned projects with similar effects

13 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

(III) ENVIRONMENTAL SENSITIVITY

S. No. Information/Checklist Name/Identity Aerial distance (within confirmation 15km.) Proposed project location boundary 1. Areas protected under Not Applicable No such area located within 15 international conventions, km of the project location. national or local legislation for their ecological, landscape, cultural or other related value. 2. Areas which are important or Gata or Badshahpur 3.55 km towards NW sensitive for ecological reasons River – Wetlands, watercourses or Sultanpur Pakshi Vihar 5.83 km towards NW other water bodies, coastal zone, biospheres, mountains & forests 3. Areas used by protected, Sultanpur Pakshi Vihar 5.83 km towards NW important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. 4. Inland, coastal, marine or Not Applicable No such area located within 15 underground waters. km of the project location. 5. State, National boundaries Delhi- Haryana State Approx. 8.80 km towards North Boundary

6. Routes or facilities used by the SH-15A 5.28 km towards North public for access to recreation NH-8 5.28 km towards SE or other tourist, pilgrim areas. SH-26 3.73 km towards WSW 7. Defense installations Not Applicable Not Applicable 8. Densely populated or built-up Hayatpur village 1.32 km towards SW area IMT Manesar 5.53 km towards SSW

14 M/s. Maxworth Infrastructures Pvt. Ltd.

Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I

9. Areas occupied by sensitive Yes Hospital – Sunrise, 6.85 km manmade land uses (hospitals, (ENE) schools, places of worship, ESIC Hospital, Gurgram, 7.31 community facilities) km (NE)

School- Indus Valley Public School , 2.71 km (ENE) Govt. High School Haytapur,1.32 km (SW)

Temple – Arya Samaj Mandir, 8.15 km (ENE) Mudha Mata Mandir,8.38 KM (ENE) 10. Areas containing important, No Not Applicable high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11. Areas already subjected to Not Applicable There are no areas which are pollution or environmental subjected to pollution or damage. (Those where existing environmental damage. All legal environmental standards parameters of Air, Water and are exceeded) Noise etc. will be maintained within permissible limit specified by SPCB/CPCB with proper mitigation measures. 12. Areas susceptible to natural Not Applicable The site falls under the zone IV hazard which could cause the as per the Seismic Zone Map of project to present environmental . Suitable seismic problems (earthquakes, coefficients in horizontal and subsidence, landslides, erosion, vertical directions respectively, flooding or extreme or adverse will be adopted while designing climatic conditions) the structures to mitigate the seismic impacts. There are no possibilities of proposed project site getting flooded as per records available.

(IV) TERMS OF REFERENCES: Not Applicable

******

15 M/s. Maxworth Infrastructures Pvt. Ltd.