Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I (I) BASIC INFORMATION S. No. Items Details 1. Name of the Project: Affordable Group Housing Colony 2. Developer Name M/s Maxworth Infrastructures Pvt. Ltd. 3. Serial No. in schedule 8(a) “Building & Construction Projects” 4. Proposed capacity/area/length/tonnage to Particulars Details be handled/command area/lease Total plot area 22,333.55 m2 (5.51875 acres) area/number of wells to be drilled Net plot area 21,216.62 m2 (5.24275 acres) Built Up Area 57,955.39 m2 Permissible: 10,608.31 m2 (50%) Ground coverage Proposed: 4,952.99 m2 (23.34 %) Permissible: Commercial : 1,485.16 m2 (@ 1.75 of commercial plot area) Residential : 45,827.91 m2 (@ 2.25 of residential plot area) FAR Proposed: Commercial : 1,428.90 m2 (@ 1.68 of commercial plot area) Residential : 45,773.13 m2 (@ 2.247 of residential plot area ) 5. New/Expansion/Modernization New 6. Existing capacity/Area etc. Not Applicable 7. Category of project B 8. Does it attract the general condition? If No Yes, please specify 9. Does it attract the specific condition? If No Yes, please specify 10. i) Location of unit Village-Hayatpur, Sec-89, District Gurugram Rect no. 4, Killa no. 22/2/2, 21 ii) Plot, Survey No, Khasra No. Rect no. 7, killa no. 2/2, 3/2, 7/2/2, 8/1/2/10, 8/2/4, 13/1, 13/2, 14/1, 17/2/2, 18/2 iii) Village Hayatpur iv) District Gurugram v) State Haryana 11. Nearest Railway station/Airport along Garhi Harsary Railway Station – 1.83 km, NW 1 M/s. Maxworth Infrastructures Pvt. Ltd. Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I with distance in kms. Gurgaon Railway Station-9.54 Km-NE Indira Gandhi International Airport – 18.39 km, NE 12. Nearest town, City, Distt. Head Quarter Hayatpur village- 1.32 km, SW along with distance in kms. Gurugram -7.31 km, NE 13. Village Panchayat, Zila Parishad, Municipal Corporation, Gurgaon Municipal Corporation, Local A-10, Block A, Sector 34, Gurugram, Haryana body(Complete postal addresses with Pin: 122001 telephone nos. to be given) Phone:18001801817, 14. Name of Applicant M/s Maxworth Infrastructures Pvt. Ltd. 15. Regd. Address 30-31, 1st Floor, MGF Megacity Mall, M.G Road, Gurugram- 122002 16. Address for correspondence(1): M/s Maxworth Infrastructures Pvt. Ltd. 30-31, 1st Floor, MGF Megacity Mall, M.G Road, Gurugram Pin Code 122002 Name Mr. Sushil Kaudinya Designation Director [email protected] E mail Telephone - Mobile 9782074776 Fax No. - 17. Detail of alternative site, if any. Location This is a building construction project for which license of these sites should be shown on a topo- has already been granted by Director Town and sheet. Country Planning. Hence, Not applicable in this case. 18. Interlinked Project Not Applicable 19. Whether separate application for Not Applicable. interlinked project has been submitted 20. If, Yes Date of Submission Not Applicable. 21. If no , reason Not Applicable. 22. Whether proposal involves approval/clearance under: if yes, details of same and status to given No. The unit does not fall in any notified reserved a) Forest (conservation) Act 1980? forest area. No. The unit does not fall in any notified Wild life b) Wild life protection Act 1972? protection area. No. The unit does not fall in any Notified coastal c) CRZ notification 1991? regulation zone. 23. Whether there is any Govt. order/policy Not Applicable relevant/relating site? 2 M/s. Maxworth Infrastructures Pvt. Ltd. Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I 24. Forest land involved (hectares) No, there isn’t any Forest land involved in this project. 25. Whether there is any litigation pending There is no litigation pending against the project and against the project and / or land in which land. is project is proposed to be setup: a) Name of court b) Case No. Therefore, Information required against point a, b & c c) Orders/directions of Court, if any is not applicable. and its relevance with the proposed project. (II) ACTIVITY: 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Details thereof (with approximate quantities/ Confirmation Yes/ No rates, wherever possible) with source of information data 1.1 Permanent or temporary change The site is earmarked for Residential in land use, land cover or development as per Gurgaon-Manesar Master topography including increase plan 2031; hence no change in land-use is in intensity of land use (with Yes envisaged. Also license has already been respect to local land use plan) granted by Director Town and Country Planning vide Licence no. 23 of 2016 dated 22/11/2016. 1.2 Clearance of existing land, There is no structure present on the site, the site vegetation and building? is fully vacant. The existing vegetation at site Yes consists of wild grasses and weeds which shall be cleared at the time of construction. 1.3 Creation of new land uses? The proposed project site is vacant consisting wild Yes grass and weeds only. The land shall be used for the construction of Affordable Group Housing. 1.4 Pre-construction investigations e.g. Soil investigation was carried out and the results bore house, soil testing? Yes were found satisfactory. 1.5 Construction works? The Construction activities will be confined Yes within the project premises; there will be no physical change outside the project boundary. 1.6 Demolition works? Project site is a vacant land. Hence, demolition is No not required. 1.7 Temporary sites used for All the construction activities including stocking construction works or Housing of raw materials will be confined within the No of construction workers? project site only. No temporary shelters for labors are proposed as local labors will be hired from 3 M/s. Maxworth Infrastructures Pvt. Ltd. Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I nearby areas. 1.8 Above ground building, Excavation will be carried out for foundation of structures or Earthworks buildings. The excavated soil will be used in Yes including linear structures, cut backfilling and other area development activities. and fill or excavations 1.9 Underground work including No underground work including mining/ No mining or tunneling? tunneling is required except excavation of earth. 1.10 Reclamation works? No No reclamation work is required. 1.11 Dredging? No No dredging is required. 1.12 Offshore structures? No No offshore structure is required. 1.13 Production and manufacturing No production/manufacturing process is involved processes? No as the proposed project is an Affordable Group Housing Colony. 1.14 Facilities for storage of goods or Raw material will be stored at site in a covered materials? area. Cement will be separately stored. Sand will Yes be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. 1.15 Facilities for treatment or Solid Waste: disposal of solid waste or liquid effluents? Solid wastes which are likely to be generated in project will be domestic in nature. Domestic Waste: Approximately 2,096 kg/day domestic solid waste is estimated to be generated from the project activity; this will be collected from designated locations and segregated into inorganic and organic wastes. The inorganic non- biodegradable wastes will be sold to authorize Yes vendors for recycling and the biodegradable wastes will be treated in OWC. Liquid effluents: During construction phase, sewage will be treated and disposed through septic tanks with soak pits. The wastewater in operation phase will be treated in a 3 STPs having the capacity of 20 KLD, 110 KLD and 220 KLD for pocket A, Pocket B and Pocket C & D respectively and the treated sewage will be reused for flushing, horticulture and rest surplus treated water will be discharged to public sewer. Dewatered/dried sludge generated from the STP plant will be used as 4 M/s. Maxworth Infrastructures Pvt. Ltd. Affordable Group Housing Colony Sector-89, Village- Hayatpur Gurgaon Manesar Urban Complex District- Gurugram, Haryana FORM I manure for green belt development. 1.16 Facilities for long term housing Local labors will be hired from nearby areas of operational workers? during construction phase. So, there will be no No need to create permanent facilities for long-term housing of operational workers. 1.17 New road, rail or sea traffic The site is adjacent to SH26. Only internal roads, during construction of paths will be developed for vehicular movements operation? for transportation of construction material during No construction phase whereas internal tracks and paths will be developed for traffic circulation (to avoid any congestion) during operational phase. 1.18 New road, rail, air waterborne The site is adjacent to SH-15A at a distance of or other transport infrastructure approximately 5.28 km towards North. No including new or altered routes and stations, ports, airport etc? 1.19 Closure or diversion of existing Since the site is adjacent to SH-15 A which has transport routes or infrastructure high traffic density; the diversion or closure of No leading to changes in traffic existing traffic routes is not required. movements? 1.20 New or diverted transmission There will not be any new/diverted transmission lines or pipelines? No line or pipeline around the proposed project. 1.21 Impoundment, damming, No impoundment, damming, culverting, culverting, realignment or other realignment or other changes to the hydrology of No changes to the hydrology of surface watercourses is proposed.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages15 Page
-
File Size-