Alteration/Addition in Motel Building at Village- Satbari, New by M/s Anant Raj Limited.

APPLICATION FOR ENVIRONMENTAL CLEARANCE OF ADDITION AND ALTERATION IN “MOTEL BUILDING”

At Khasra No. 83, 84, 85, 90, 91/1-2, 100/1-2, 101 & 102, Village- Satbari,

Category: 8(a) , Total Built-up Area- 47497.2 m2

DEVELOPER M/s Anant Raj Limited H-65, Connaught Circus, New Delhi-110001 PREPARED BY: M/S PERFACT ENVIRO SOLUTIONS PVT. LTD. (NABET Registered Vide list of accredited consultants organizations/ Rev.77 /10th June, 2019 at S.No.-120) (An ISO 9001:2008 & ISO 14001:2004 Certified Company) 5th Floor, NN Mall, Sector 3, Rohini, New Delhi-110085 Phone: +91-11-49281360 Scanned by CamScanner Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Table of Contents ENCLOSURE 1: FORM-1 & 1A ...... 4 ENCLOSURE 2: CONCEPTUAL PLAN ...... 40

1.1 INTRODUCTION ...... 41 1.2 ACTIVITIES/ AMENITIES ...... 41 1.3 SITE LOCATION ...... 41 1.4 TYPE OF PROJECT ...... 41 1.5 PROJECT DETAILS ...... 42 1.6 POPULATION DETAILS ...... 43 1.7 WATER MANAGEMENT ...... 44 1.8 RAIN WATER COLLECTION DETAILS ...... 45 1.9 POWER REQUIREMENT & BACK-UP ...... 45 1.10 SOLID & HAZARDOUS WASTE MANAGEMENT ...... 45 1.11 PARKING MANAGEMENT ...... 46 1.12 GREEN AREA DEVELOPMENT ...... 46 ENCLOSURE 3: ENVIRONMENT MANAGEMENT PLAN ...... 47

3.1 PROJECT DETAILS ...... 49 3.1.1 AREA DETAILS: ...... 49 3.1.2 POPULATION DETAILS ...... 51 3.1.3 PARKING MANAGEMENT ...... 52 3.1.4 POWER REQUIREMENT AND BACKUP DETAILS ...... 52 3.1.5 WASTE WATER, RAIN WATER AND SOLID WASTE DETAILS ...... 53 3.2 LAND USE AND OWNERSHIP OF THE SITE LAND ...... 53 3.3 LAND USE ...... 53 3.4 LOCATION OF THE PROJECT WITH CONNECTIVITY ...... 54 3.4.1 GEOGRAPHICAL INFORMATION OF SITE ...... 54 3.4.2 TOPOGRAPHICAL MAP ...... 55 3.5 CONNECTIVITY OF THE PROJECT ...... 56 3.6 CENTRALLY PROTECTED MONUMENTS UNDER DELHI CIRCLE ...... 56 3.7 LAYOUT PLAN ...... 61 3.8 WATER MANAGEMENT ...... 61 3.8.1 SOURCE OF WATER ...... 61 3.8.2 PRESENT QUALITY ...... 61 3.8.3 WATER REQUIREMENT ...... 61 3.8.4 DISPOSAL ...... 64 3.9 AIR AND NOISE MANAGEMENT ...... 65 3.9.1 DURING CONSTRUCTION ...... 65 3.9.2 DURING OPERATION...... 65 3.10 ENERGY CONSERVATION MEASURES ...... 65 3.11 ENVIRONMENT MANAGEMENT ...... 65 3.11.1 ENVIRONMENT MANAGEMENT DURING CONSTRUCTION PHASE ...... 66 3.11.1.1 AIR ENVIRONMENT ...... 66 ANNUAL WINDROSE DIAGRAM ...... 66 3.11.1.2 NOISE ENVIRONMENT ...... 67 3.11.1.3 WATER ENVIRONMENT ...... 68 3.11.1.4 SOLID WASTE MANAGEMENT ...... 68

2

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.11.2 ENVIRONMENT MANAGEMENT DURING OPERATION PHASE ...... 69 3.11.2.1 AIR ENVIRONMENT ...... 69 3.11.2.2 NOISE ENVIRONMENT ...... 69 3.11.2.3 WATER MANAGEMENT ...... 71 3.11.2.3.1 WASTE WATER TREATMENT ...... 71 3.11.2.3.2 RAIN WATER HARVESTING ...... 75 3.11.2.4 WASTE MANAGEMENT ...... 78 3.11.2.4.1 MUNICIPAL SOLID WASTE ...... 78 3.11.2.4.2 HAZARDOUS WASTE MANAGEMENT: - ...... 78 3.11.2.5 PLANTATION ...... 79 3.11.3 ANTICIPITATED IMPACT & MITIGATION MEASURES ...... 81 3.11.3.1 DURING CONSTRUCTION PHASE ...... 81 3.11.3.2 DURING OPERATION PHASE ...... 82 3.12 ENVIRONMENT MONITORING PLAN ...... 83 3.13 ENVIRONMENT MANAGEMENT COST ...... 85 3.13.1 CAPITAL COST ...... 85 3.13.2 RECURRING EXPENDITURE ...... 85 3.14 CORPORATE ENVIRONMENT RESPONSIBILITY ...... 86 ENCLOSURE 4. RISK ASSESSMENT ...... 89

4.1 RISK ASSESSMENT ...... 90 4.1.1 HAZARD IDENTIFICATION ...... 90 4.2 DISASTER MANAGEMENT PLAN ...... 92 4.3 SAFETY MEASURES: ...... 93 ENCLOSURE 5. DISCLOSURE OF THE CONSULTANT SHOWING NABET/QCI ACCREDITATION STATUS 95 ENCLOSURE 6. LAND PAPERS ...... 96 ENCLOSURE 7. MERGER DOCUMENT ...... 97 ENCLOSURE 8. SHARING AGREEMENT BETWEEN M/S ANANT RAJ LIMITED AND M/S OCEAN PEARL ...... 98 ENCLOSURE 9. CONSENT TO OPERATE ...... 99 ENCLOSURE 10. FIRE NOC...... 100 ENCLOSURE 11. SITE PLAN ...... 101 ENCLOSURE 12. LANDSCAPE PLAN ...... 102 ENCLOSURE 13. SECTION PLAN ...... 103 ENCLOSURE 14. FIRE FIGHTING PLAN ...... 104 ENCLOSURE 15. ENVIRONMENT MANAGEMENT PLAN...... 105 ENCLOSURE 16. BASEMENT PLAN ...... 106 ENCLOSURE 17. TOPOGRAPHICAL MAP ...... 107

3

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.11.2 ENVIRONMENT MANAGEMENT DURING OPERATION PHASE ...... 69 3.11.2.1 AIR ENVIRONMENT ...... 69 3.11.2.2 NOISE ENVIRONMENT ...... 69 3.11.2.3 WATER MANAGEMENT ...... 71 3.11.2.3.1 WASTE WATER TREATMENT ...... 71 3.11.2.3.2 RAIN WATER HARVESTING ...... 75 3.11.2.4 WASTE MANAGEMENT ...... 78 3.11.2.4.1 MUNICIPAL SOLID WASTE ...... 78 3.11.2.4.2 HAZARDOUS WASTE MANAGEMENT: - ...... 78 3.11.2.5 PLANTATION ...... 79 3.11.3 ANTICIPITATED IMPACT & MITIGATION MEASURES ...... 81 3.11.3.1 DURING CONSTRUCTION PHASE ...... 81 3.11.3.2 DURING OPERATION PHASE ...... 82 3.12 ENVIRONMENT MONITORING PLAN ...... 83 3.13 ENVIRONMENT MANAGEMENT COST ...... 85 3.13.1 CAPITAL COST ...... 85 3.13.2 RECURRING EXPENDITURE ...... 85 3.14 CORPORATE ENVIRONMENT RESPONSIBILITY ...... 86 ENCLOSURE 4. RISK ASSESSMENT ...... 89

4.1 RISK ASSESSMENT ...... 90 4.1.1 HAZARD IDENTIFICATION ...... 90 4.2 DISASTER MANAGEMENT PLAN ...... 92 4.3 SAFETY MEASURES: ...... 93 ENCLOSURE 5. DISCLOSURE OF THE CONSULTANT SHOWING NABET/QCI ACCREDITATION STATUS 95 ENCLOSURE 6. LAND PAPERS ...... 96 ENCLOSURE 7. MERGER DOCUMENT ...... 97 ENCLOSURE 8. SHARING AGREEMENT BETWEEN M/S ANANT RAJ LIMITED AND M/S OCEAN PEARL ...... 98 ENCLOSURE 9. CONSENT TO OPERATE ...... 99 ENCLOSURE 10. FIRE NOC...... 100 ENCLOSURE 11. SITE PLAN ...... 101 ENCLOSURE 12. LANDSCAPE PLAN ...... 102 ENCLOSURE 13. SECTION PLAN ...... 103 ENCLOSURE 14. FIRE FIGHTING PLAN ...... 104 ENCLOSURE 15. ENVIRONMENT MANAGEMENT PLAN...... 105 ENCLOSURE 16. BASEMENT PLAN ...... 106 ENCLOSURE 17. TOPOGRAPHICAL MAP ...... 107 ENCLOSURE 18. TEST REPORT ...... 108

3

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

ENCLOSURE 1: FORM-1 & 1A

4

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

APPENDIX I (See paragraph – 8.9) Form-1 I. Basic Information

S. No. Item Details 1. Name of the project/s Addition and Alteration in “Motel Building” 2. S. No. in the schedule 8 (a) 3. Proposed capacity/ area/length/ Total plot area – 29844.59 m2 (2.98 ha.) tonnage to be handled/ Net Plot area – 25937.011 m2 (2.59 ha.) command area/ lease area/ Total Proposed Built-up area – 47497.2 m2 number of wells to be drilled 4. New/ Expansion/ Modernization New, Since, the Existing Motel building built-up area is less than 20,000 sqm, hence it was not in preview of EIA notification,2006. 5. Existing Capacity/ Area etc. Total plot area (Existing) – 29844.59 m2 (2.98 ha.) Net Plot area (Existing)– 25937.011 m2 Existing Built-up area– 7738.262 m2 6. Category of Project i.e. ‘A’ or ‘B’ ‘B’ Since the tenure of SEAC, Delhi has been completed. Hence, the application is applied to MoEF&CC. 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location Plot/ Survey/ Khasra No. Khasra no. 83, 84, 85, 91/1-2, 100/1-2, 101 & 102 Village Satbari Tehsil District South West State Delhi-110074 10. Nearest railway station/ airport Nearest Railway Station: along with distance in kms. Tuglakabad Railway Station: 11.17 km NEE Nearest Highway: NH -236-2.86 km NNW Nearest Airport: Indira Gandhi International Airport 11.71 km NW 11. Nearest Town, city, District The project is in Delhi city itself. Headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation of Municipal Corporation, Local

5

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s Anant Raj Limited 14. Registered Address H-65, Connaught Circus, New Delhi-110001 15. Address for correspondence: Name Mr. Ajay Pathania Designation DGM (Owner/Partner/CEO) Address H-65, Connaught Circus, New Delhi, Pin Code 110001 E-mail [email protected] Telephone No. 011-4303400, 9810585435 Fax no. 16. Details of Alternative Sites None examined, if any. Location of these sites should be shown on a Toposheet. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Not Applicable Act, 1980? (b) The Wildlife (Protection) Not Applicable Act, 1972? (c) The C.R.Z. Notification, 1991? Not Applicable 22. Whether there is any Not Applicable Government Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the project and/ or land in which the project is propose to be set up? (a) Name of the Court Not applicable (b) Case No. Not applicable (c) Orders/ directions of the Not applicable Court, if any and its

6

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

relevance with the proposed project.

II. Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data 1.1 Permanent or temporary No The land use of the site is for Commercial use. change in land use, land Presently, the project is an operational Motel having cover or topography built-up area 7738.262 sqm. So, there is no further including increase in change in land use and land cover. intensity of land use (with Alteration will be done in existing building and one respect to local land use Additional block will be constructed in open area plan) available in the land. 1.2 Clearance of existing land, Yes Green area is already being developed in existing plot. vegetation and buildings? So, to develop additional block, clearance of existing shrubs, lawn and one small temporary structure will be required.

No, tree will be cut, only transplantation will be done if required, after getting prior permission from concern department. 1.3 Creation of new land uses? No No creation of new land use.

1.4 Pre-construction Yes Pre-construction Geo-technical investigation has investigations e.g. bore already been done. houses, soil testing? 1.5 Construction works? Yes Construction will be done as per approved building plans & applicable by-laws. 1.6 Demolition works? Yes Only demolition of existing temporary structure being used for marriage purpose will be removed to construct new block. 1.7 Temporary sites used for No Workers during construction phase shall be hired from construction works or nearby areas and hence no housing provisions shall be housing of construction made. Only temporary shelters will be provided. workers? 1.8 Above ground buildings, Yes Above ground, the building shall be elevated up to structures or earthworks maximum height of 15.6 m and approx. 65000 m3 of soil including linear structures, excavation will be done for foundation and 3 levels of cut and fill or excavations basement. Out of which, top soil shall be preserved for landscaping purposes and remaining soil shall be reused for backfilling purposes and road construction etc.

7

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

1.9 Underground works No Since, it is a building construction project. Hence no including mining or underground works will be required except for tunneling? excavation of soil for foundation and 3 levels of basement. 1.10 Reclamation works? No No reclamation work will be done 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and No It is a building construction project; hence no manufacturing processes? production or manufacturing processes shall be carried out. 1.14 Facilities for storage of Yes During Construction Phase: goods or materials?  Separate raw material yards shall be made within the project site.  Cement shall be separately stored under cover in bales.  Sand shall be stacked nearby under tarpaulin cover.  Bricks and steel shall be laid in open.  The raw material yard shall be located within the project site.

During Operation Phase: Since, the project is Motel Building, storage of products like eatables, towels, toiletries etc. shall be done within the building. 1.15 Facilities for treatment or Yes During Construction phase: disposal of solid waste or Total 150 laborers shall be hired during the construction liquid effluents? phase and hence, 23 kg/day of solid waste shall be generated which will be disposed off at nearby Municipal Solid Waste Disposal Site. Mobile toilets shall be provided at site for labors which shall be regularly cleaned. Approx. 7 KLD of waste water will be generated from labors which will be disposed off to septic tanks which will be cleaned regularly.

During Operation Phase: In Existing Complex, Total Solid Waste generation is 114 kg/day (41 TPA) from the complex. Out of which, 68 kg/day (25 TPA) of biodegradable waste is being converted to Compost using 1 no of Organic Waste Convertor and 46 kg/day (16 TPA) of recyclable waste is being sent to approved recycler.

At present, peak waste water generation from the complex is 34 KLD which is being treated in Sewage Treatment Plant of capacity 35 KLD.

8

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Total after Addition/Alteration, The total solid waste generation will be 1546 kg/day (564 tons/annum) from the complex. Out of which, 928 kg/day (339 tons/annum) of biodegradable waste shall be treated in- house in Organic Waste Convertor and converted to manure. 309 kg/day (113 tons/annum) of recyclable waste and 309 kg/day (113 tons/annum) of plastic waste shall be given approved recycler. Sewage Treatment Plant of Capacity 300 KLD shall be installed for treatment of 242 KLD of domestic waste water generated. Also, effluent treatment plant of capacity 25 KLD shall be installed for treating 18 KLD of laundry waste water. Details of Water Management & Solid Waste Management are given in Environment Management Plan. 1.16 Facilities for long term No During Construction phase: housing of operational The workers during construction phase shall be hired workers? from nearby areas and hence no provision of long-term housing shall be made. Only temporary shelters shall be provided. During Operation Phase: Existing Phase, Since, the existing complex is Motel Building with 47 number of hotel room, 25 no. of staff has been hired from nearby area and no separate housing has been provided. Total after Addition/Alteration, As the proposed project is Motel Building, approx. 215 staff shall be hired from nearby area. Hence, separate housing shall not be provided. 1.17 New road, rail or sea traffic No No new road, rail or sea traffic shall be proposed. during construction or Transportation facilities (Two or three wheelers, Public operation? Transport etc.) shall be used during construction phase and same will be used in operation phase. 1.18 New road, rail, air, No No new road, rail, or sea traffic will be proposed. waterborne or other The transportation infrastructure already existing near transport infrastructure site are as follows: including new or altered routes and stations, ports, Nearest Railway Station: airports etc.? Tuglakabad Railway Station: 11.17 km NEE

Nearest Highway: NH -236-2.86 km NNW

Nearest Airport: Indira Gandhi International Airport 11.71 km NW

9

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

1.19 Closure or diversion of No No closure or diversion of existing transport routes or existing transport routes or infrastructure leading to changes in traffic movements infrastructure leading to will be made. changes in traffic movements? 1.20 New or diverted No No such closure or diversion of transmission lines is transmission lines or required. pipelines? 1.21 Impoundment, damming, No No impoundment, damming, culverting, realignment or culverting, realignment or other changes to the hydrology of surface water courses other changes to the will be required. hydrology of watercourses or aquifers? 1.22 Stream crossings? No No stream crossing is proposed for the proposed project. 1.23 Abstraction or transfers of No No abstraction or transfer of water from ground or water from ground or surface will be done. surface waters? During Construction phase: - Treated water of nearby STP shall be taken from tanker suppliers. During Operation phase: - The ultimate source of water will be Delhi Jal Board. 1.24 Changes in water bodies or No There will be no change in water bodies or the land the land surface affecting surface effective drainage or run-off. drainage or run-off? 1.25 Transport of personnel or Yes During Construction phase: materials for construction, Materials during construction phase shall be operation or transported by trucks, tractors, trolley etc. decommissioning? During Operation Phase: Car, two/three-wheeler, public transport, etc. will be used. 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment?

10

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

1.28 Influx of people to an area in No During Construction phase: either temporarily or Temporary influx of people in the form of labors will be permanently? there. Approx. 150 no. of local labors shall be employed. During Operation Phase: In Existing Phase, At present the Influx of population is 569 (guests in hotel -94 no, staff- 25 no, hotel visitors - 50 & visitors in banquet - 400 no) Total After Addition/Alteration, Total 9793 number of people is envisaged in the project (Guest – 258, Staff – 215 and visitors – 9320) 1.29 Introduction of alien No Not Applicable species? 1.30 Loss of native species or No Not applicable genetic diversity? 1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S. No. Information/checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data 2.1 Land especially undeveloped No The land is an already developed land with a Motel or agricultural land (ha) building on which further addition/alteration will be commenced. 2.2 Water (expected source & Yes During Construction phase:

competing users) unit: KLD Water during construction phase will be sourced from tanker water suppliers supplying treated water from nearby STP. During Operation Phase:

In Existing Complex, The ultimate source of water is Delhi Jal Board. Total water requirement of the existing motel building is 72 KLD out of which, 40 KLD is Fresh Water which is being

sourced from Tanker Supply. Rest of the water requirement for 32 KLD is being fulfilled by treated water generated from inhouse STP. Total after Addition/Alteration, Hne The ultimate source of water will be through Delhi Jal Board. Total water requirement of the project will be

11

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

395 KLD out of which 165 KLD will be Fresh water requirement. Rest of the 230 KLD water requirement will be fulfilled by inhouse STP treated water. Detailed Water Management & Water Balance are given in Environment Management Plan. 2.3 Minerals (MT) No Not applicable 2.4 Construction material – Yes The major materials required for construction of the stone, aggregates, sand / soil project will be steel, tiles, glass, cement, agate, bricks, (expected source – MT) flooring tiles / stones, sanitary and hardware items, electrical fittings, etc. 2.5 Forests and timber (source – Yes Plywood for doors & windows shall be used which shall MT) be procured from local market. 2.6 Energy including electricity Yes Source of Electricity – BSES and fuels (source, competing Total Electrical load – 3500 KVA users) Unit: fuel (MT), D.G. sets for power back up- energy (MW) Existing- 1×750 kVA & 1×500 kVA Proposed- 2 x 1010 KVA Total after Addition/Alteration- 2 x 1010 KVA, 1×750 kVA & 1×500 kVA 2.7 Any other natural resources No Not applicable (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, No No storage of hazardous substances (as per which are hazardous (as per Manufacture, Storage and Import of Hazardous MSIHC rules) to human health Chemical Rules, 1989) shall be done. or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No Suitable drainage and waste management measures disease or affect disease shall be adopted which shall restrict the stagnation vectors (e.g. insect or water of water or accumulation of water. This will borne diseases) effectively restrict the reproduction and growth of disease vectors.

12

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.3 Affect the welfare of people Yes During Construction phase: e.g. by changing living Employment opportunities provided due to the conditions? project will led to better quality of life & will also set a standard for future developments in the area. Moreover, this project will provide employment to about 150 no. of local labors during construction phase. During Operation Phase: As the proposed project will be Motel Building, there will be several services required which generates direct & indirect employment for the people of nearby area. 3.4 Vulnerable groups of people No No vulnerable group of people will be affected by who could be affected by the the project. project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes No None

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data

4.1 Spoil, overburden or mine No Not applicable wastes.

4.2 Municipal waste (domestic Yes During Construction phase: and or commercial wastes) Solid waste generated during construction phase will be 23 kg/day which will be disposed off at nearby Municipal Solid Waste Disposal Site. During Operation Phase: In Existing Complex, Total Solid Waste generation is 114 kg/day (41 TPA) from the complex. Out of which, 68 kg/day (25 TPA) of biodegradable waste is being converted to Compost using 1 no of Organic Waste Convertor and 46 kg/day (16 TPA) of recyclable waste is being sent to approved recycler

At present, peak waste water generation from the complex is 34 KLD which is being treated in Sewage Treatment Plant of capacity 35 KLD.

13

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Total after Addition/Alteration, The total solid waste generation will be 1546 kg/day (564 tons/annum) from the complex. Out of which, 928 kg/day (339 tons/annum) of biodegradable waste shall be treated in- house in Organic Waste Convertor and converted to manure. 309 kg/day (113 tons/annum) of recyclable waste and 309 kg/day (113 tons/annum) of plastic waste shall be given approved recycler.

Detailed Solid Waste Management is given in Environment Management Plan.

4.3 Hazardous wastes (as per Yes During Construction phase: Hazardous Waste Used oil whenever generated from the DG sets will be Management Rules) kept in a leak proof container in an isolated area and given to approved recycler. During Operation Phase: In Existing Phase: Used oil from diesel generators is being generated which is carefully stored in HDPE drums in isolated covered facility. The used oil is being sold to vendors authorized by Central Pollution Control Board for the treatment of the same. Suitable care is being taken so that spills / leaks of used oil from storage could be avoided. The same shall be followed after addition/alteration of the complex. 4.4 Other industrial process No Not Applicable wastes 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge Yes In Existing Complex, from effluent treatment About 2 kg/day dried sludge is being generated from Existing STP and it is being used as manure in green areas. Total after Addition/Alteration, About 17 kg/day of dried sludge shall be generated from STP during operation phase and this sludge will be used as manure in green areas. The unused sludge will be given to farmers or nursery. 4.7 Construction or demolition Yes Construction waste shall be used for flooring & Back wastes filling in roads etc. 4.8 Redundant machinery or No Not applicable equipment

14

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

4.9 Contaminated soils or other No Not applicable materials. 4.10 Agricultural wastes No Not applicable

4.11 Other solid wastes Yes During Construction phase:

No E-waste & Battery waste shall be generated. During Operation Phase:

About 2-3 kg/month of E-waste is being generated which is being given to approved recycler of SPCB. Same shall be followed after addition/alteration also.

Battery waste will be generated from inverters, UPS and will be treated as per Batteries (Management & Handling Rules, 2001).

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data

5.1 Emissions from Yes During Construction phase: combustion of fossil fuels Acoustically enclosed DG set of capacity 1×125 kVA will be from stationary or mobile installed with adequate stack height. sources During Operation Phase: Existing Phase, The only source of emission is from combustion of fuel in DG sets of 1×500 kVA and 1×750 kVA. Hence, to avoid the emissions, the DG Sets are being kept enclosed in DG Rooms on surface. Stack height of 16m above roof level for each D.G. sets has already been provided to reduce the air emissions, meeting all the norms prescribed by CPCB. Total after Addition/Alteration, The only source of emission will be from combustion of fuel from DG sets of 1×750 kVA, 1 x 500 KVA & 2 x 1010 KVA Hence, to avoid the emissions, the DG sets shall be kept in basement. Stack height of 30 m above surface will be provided to reduce the air emissions, meeting all the norms prescribed by CPCB. 5.2 Emissions from production No Not applicable processes

15

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

5.3 Emissions from materials Yes Dust will be generated during construction, from the handling including storage movement of transport vehicles & other construction or transport activities. The effect will be restricted to construction phase only. Water sprinklers will be used for dust suppression. Material will be stored under Tarpaulin cover. 5.4 Emissions from Yes Dust & emissions are likely to be generated during construction activities construction activities which will be reduced by sprinkling including plant and of water in a specific time interval & timely maintenance equipment schedule for machinery. Also, wind breakers shall be provided and the machines will be shut down during idle period. 5.5 Dust or odors from Yes During loading & unloading of construction material dust handling of materials is likely to be generated during construction phase. Water including construction will be sprinkled and tarpaulin cover will be provided over materials, sewage and stored raw material to reduce dust emission. waste Mobile Toilets during construction phase will be provided & waste water will be disposed off in septic tank which will be cleaned regularly. 5.6 Emissions from No Not applicable. incineration of waste. 5.7 Emissions from burning of No Open burning of biomass/ other material will be waste in open air (e.g. slash prohibited. materials, construction debris). 5.8 Emissions from any other No None sources.

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data with source of information data 6.1 From operation of Yes During Construction phase: equipment e.g. engines, The equipment such as mixer machines, bulldozers, ventilation plant, crushers cranes, compactors & excavators will be used which will be of highest standard of reputed make and adhere to international standards. Hence an insignificant impact due to construction machinery is envisaged. Apart from this, the construction activities will be restricted to daytime only and timely maintenance of machinery will be ensured. During Operation Phase:

16

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Source of noise in the existing building is from D.G. Sets of capacity 1×500 kVA and 1×750 kVA. The D.G. Sets have been kept in acoustically enclosed at surface with anti-vibration pads. DG sets are being used during Power failure only. They may generate noise level maximum up to 75 dB (A). The same shall be followed for proposed DG sets of 2 x 1010 KVA. 6.2 From industrial or similar No Not applicable processes 6.3 From construction or Yes Due to the various activities, there will be short-term demolition noise impacts in the immediate vicinity of the project site. These will be restricted to day time only. It has been estimated that during the construction period the average noise level is 80-100 dB (A) during peak construction hours. However, embankment shall be done to further prevent the noise pollution. 6.4 From blasting or piling No No blasting or piling will be done. 6.5 From construction or Yes Some amount of noise (70 – 75 dB (A)) will be generated operational traffic from vehicular movement in the construction and operational phase. Plantation around the boundary wall is already there to reduce noise from traffic. 6.6 From lighting or cooling Yes HVAC will be installed systems 6.7 From any other sources No None

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. No Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 7.1 From handling, storage, use No No hazardous material shall be stored or utilized the or spillage of hazardous project. materials 7.2 From discharge of sewage or Yes In Existing Complex, other effluents to water or the STP of 35 KLD has been installed for treatment of 33 land (expected mode and KLD waste water. 32 KLD of treated water is being place of discharge) used for flushing, gardening and cooling purposes. It is a Zero-Liquid Discharge Complex. Total after Addition/Alteration, STP of 300 KLD shall be installed for treatment of 242 KLD of waste water. Waste water from laundry shall

17

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

be treated in Effluent Treatment Plant of capacity 25 KLD. Treated water generated from ETP shall be discharged to the sewer line.

7.3 By deposition of pollutants No None emitted to air into the land or into water 7.4 From any other sources No None 7.5 Is there a risk of long-term No None buildup of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment.

S. No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data

8.1 From explosions, spillages, Yes All appropriate measures will be taken during fires etc. from storage, construction phase. handling, use or production Proper fire-fighting system has already been provided of hazardous substances in existing part. Same shall be followed for the part where addition /alteration is proposed. 8.2 From any other causes Yes During Construction Phase: All the labours will be provided with suitable personal protective equipment (PPE) as required under the health & safety norms. Training and awareness about the safety norms are provided to all supervisors and labors involved in construction activity. 8.3 Could the project be Yes The area under study falls in Seismic Zone-IV, affected by natural disasters according to the Indian Standard Seismic Zoning Map. causing environmental Suitable seismic coefficients in horizontal and vertical damage (e.g. floods, directions respectively, will be adopted while earthquakes, landslides, designing the structure. cloudburst etc.)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

S. No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data

18

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

9.1 Lead to development of supporting cities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, No Not Applicable power supply, waste or waste water treatment, etc.) • Housing development No Not Applicable • Extractive industries No Not Applicable • Supply industries No Not Applicable • Other No Not Applicable 9.2 Lead to after-use of the site, which No Not Applicable could have an impact on the environment 9.3 Set a precedent for later Yes It will attract people to develop organized developments infrastructure & planned development in the area. 9.4 Have cumulative effects due to No No impact proximity to other existing or planned projects with similar effects

III. Environmental Sensitivity

S. No Areas Name/ Aerial distance (within 15 Identity km.) from proposed project location boundary 1 Areas protected under Asola Wild Life Sanctuary 1.93 km NEE international conventions, Okhla Bird Sanctuary 14.64 km NE national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important Water sources or other or sensitive for ecological waterbodies reasons - Wetlands, Sharpur Nala 2.54 km SSW watercourses or other Shamshi Talab 3.80 km NNW water bodies, coastal Neela Hauz 5.51 km NNW zone, biospheres, Bhuriya Nala 5.83 km SEE mountains, forests Rohar Nala 6.15 km S Li Nala 6.87 km SSW Tank 8.27 km NNE Kaunsat Nala 8.53 km SSW Jauhar Nala 8.94 km SSE

19

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Lake Pea Cock 9.16 km E Suarj Kund 9.26 km NEE Drain near Okhla Phase-II 10.01 km NE Bhawar O Nala 10.25 km SW Barkhal Lake 10.51 km SE Pond near Shyamnagar 10.50 km NE Yamuna River 13.99 km NE

Forest Rajokari Protective Forest 6.23 km NW City Protective 7.30 km NE Forest 3 Areas used by protected, Asola Wild Life Sancutary 1.93 km NEE important or sensitive Okhla Bird Sancutary 14.64 km NE species of flora or fauna for breeding, nesting, 4 Inland,foraging, coastal, resting, marine over or None None undergroundwintering, migration waters 5 State, National boundaries Haryana Boundary 6.14 km SSW

6 Routes or facilities used by Roads the public for access to NH -236 2.86 km NNW recreation or other tourist, NH-8 9.09 km NW pilgrim areas NH-2 11.44 km NEE NH-24 14.76 km NNE

Railway Station Tuglakabad Railway Station 11.17 km NEE Old Railway Station 13.86 km SE

Airport IGI Airport Delhi 11.71 km NW Safdarjung Air Port 11.75 km NNE 7 Defence installations Arjangarh Air Force Station 5.55 km W

8 Densely populated or Chandan Hula 0.90 km SSW built-up area 9 Areas occupied by Hospital sensitive man-made land Hospital near Sat Bari 0.76 km NEE uses (hospitals, schools, Poultary Farm places of worship, Hospital near Fatehpur Beri 1.94 km SSW community facilities) Hospital near Maidan Garhi 2.42 km NNE

Post Office Post Office near Sat Bari 0.34 km NE

20

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Post Office near Fatehpur 2.21 km SSW Beri Post Office near Maidan 2.50 km NNE Garhi

Place of Worship Temple near Sat Bari 0.44 km NNW Mosque near Sat Bari 0.47 km NNE Temple near Rajpur Khurd 1.64 km NNE

School SDMC School, Sat Bari Made 0.47 km N Easy Pre School, Chattarpur 0.61 km NNE Mandir Road,Sat Bari Asian Modern Public School, 2.09 km SE A-77, Kharak, Sat Bari

Bank Axis Bank ATM, NO. K-40, Sat 0.35 km NNE Bari Corporation Bank,Plot No.- 0.36 km NNE 6,Khasra No.431, Chattarpur Bhatti Road, Sat Bari ICICI Bank, Opp. Tivoli 1.83 km NNW Garden, Chattarpur, New Delhi 10. Areas containing - - important, high quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to Okhla Critically Polluted Area 10.56 km NE pollution or environmental damage. (Those where existing legal environmental standards are exceeded)

21

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

12 Areas susceptible to Area falls in seismic zone IV. natural hazard which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

22

22 Scanned by CamScanner Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

FORM-1 A (only for construction projects listed under item 8 of the Schedule)

1. LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

1.1 Will the existing land-use get The proposed project is Addition/Alteration of existing significantly altered from the project Motel Building located at Khasra No. 83, 84, 85, 90, that is not consistent with the 91/1-2, 100/1-2, 101 & 102, Village- Satbari, New surroundings? (Proposed land-use Delhi. must conform to the approved Master Presently, the land is an existing Motel building which Plan / Development Plan of the area. is operational too. Land use confirms the Master Plan Change of land-use if any and the of the area. Hence, there will not further change in statutory approval from the Land Use. competent authority be submitted). Attach Maps of I. Site location The site location shown on Google Map is enclosed in Environment Management Plan. II. Surrounding features of the proposed site (within 500 Map showing vicinity around the site is enclosed in meters) Environment Management Plan. III. The site (indicating levels & contours) to appropriate scales. If Site plan is enclosed in Environment Management not available attach only Plan. conceptual plans. 1.2 List out all the major project requirements in terms of the Land area Total Plot area - 29844.59 m2 (2.98 ha.) Area under Road widening- 3907.579m2 Net Plot Area- 25937.011 m2 (2.59 ha.)

Built up area Total built-up area (after addition/alteration) – 47497.2 m2 Water consumption 395 KLD (after addition/alteration) Power requirement 3500 KVA Connectivity Nearest Railway Station: Tuglakabad Railway Station-11.17 km NEE Nearest Highway: NH -236-2.86 km NNW Nearest Airport: IGI Airport Delhi-11.71 km NW

Banquet Hall, Commercial Complex, Hotel, Community facilities Restaurant, Meeting Room, Spa, Motel Total Parking Required- 754 ECS Parking needs etc. Total Parking Provision- 758 ECS

23

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

1.3 What are the likely impacts of the The entire project influenced area shall be developed proposed activity on the existing as per the provision of Master Plan of Delhi, thus no facilities adjacent to the proposed induced development shall be foreseen due to the site? proposed project. (Such as open spaces, community Construction phase as well as operation Phase of the facilities, details of the existing land- project, will generate direct and indirect employment use, and disturbance to the local opportunities for a large section of society. The ecology). employment will have positive impact thereby increasing the quality of life. 1.4 Will there be any significant land Yes, there will be disturbance due to excavation of disturbance resulting in erosion, basements. However, care will be taken so that no subsidence & instability? erosion, subsidence & instability take place. (Details of soil type, slope analysis, Soil Type: Silt Loam vulnerability to subsidence, seismicity Slope Analysis: etc. may be given). The project area possesses fairly plain terrain. Erosion / Subsidence: Proper greening & paving of area will not cause any soil erosion problem and subsidence. Seismicity: The area under study falls in Seismic Zone-IV according to the Indian Standard Seismic Map. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structure. 1.5 Will the proposal involve alteration of Natural contour has already been changed. Artificial natural drainage systems? contour will be provided in the project site. (Give details on a contour map showing the natural drainage near the proposed project site) 1.6 What are the quantities of earthwork During construction phase, 65000 m3 shall be involved in the construction activity excavated for 3 levels of basement and foundation. cutting, filling, reclamation etc. Top soil shall be preserved for landscaping purposes (Give details of the quantities of and remaining soil shall be reused for backfilling earthwork involved, transport of fill purposes and road construction etc. materials from outside the site etc.)

24

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

1.7 Give details regarding water supply, Water Supply: During Construction stage, water waste handling etc. during the will be sourced through treated water from nearby construction period. STP. Waste Generation / Handling: Soil excavated shall be reused for backfilling and the fertile top soil is reused for horticultural purpose. Spillage of oil from the machinery or cement residual from concrete mixer plants shall be properly collected and reused in construction site. For construction labor, proper sanitary facilities & wash areas shall be constructed and good hygienic conditions will be maintained. 1.8 Will the low-lying areas & wetlands get No low lying and wetlands area are present in and altered? around the project site. (Provide details of how low lying and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris & waste The construction waste generated from the project is during construction cause health common in nature and will not cause any health hazard? (Give quantities of various hazard to associate and nearby population. The types of wastes generated during construction debris will be used for land leveling/back construction including the filling. Waste concrete will be reused as aggregate in construction labor and the means of construction process. disposal) Mobile toilets & drinking water for construction labor shall be provided. The sewage and waste water generated shall be disposed off to septic tank which will be cleaned regularly.

2. WATER ENVIRONMENT

2.1 Give the total quantity of water At present, total water requirement is 72 KLD, out of requirement for the proposed project which fresh water requirement is 40 KLD which is with the breakup of requirements for being met by tanker supply, remaining 32 KLD is being various uses. met by inhouse treated water. How will the water requirement meet? The total quantity of water requirement after State the sources & quantities and addition/alteration shall be 395 KLD & fresh water furnish a water balance statement. requirement shall be 165 KLD which will be sourced through Delhi Jal Board. Domestic : 145 KLD Flushing : 116 KLD Gardening : 6 KLD Cooling : 108 KLD Laundry : 20 KLD

Total Water Requirement: 395 KLD Total Waste Water Discharge: 242 KLD STP Capacity: 300 KLD

25

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

18 KLD of waste water will be generated from Laundry, which will be treated in ETP of 25 KLD 2.2 What is the capacity (dependable flow or Delhi Jal Board will supply fresh water to the complex yield) of the proposed source of water? and it is a dependable source of water. 2.3 What is the quality of water required, in In case Delhi Jal Board is not made or the supply made case, the supply is not from a municipal is inadequate then the water shall be arranged source? (Provide physical, chemical, through tankers complying IS0:10500 (Indian Drinking biological characteristics with class of Water Standards) water quality) 2.4 How much of the water requirement can In Existing project, 32 KLD is being met from STP be met from the recycling of treated water, which is 45% of total water requirement. wastewater? After addition/alteration, the total treated water of (Give the details of quantities, sources 230 KLD will be reused in flushing, gardening and and usage) cooling purposes within the project premises. 58.22 % of total water requirement will be met by recycled water. 2.5 Will there be diversion of water from There will not be any substantial effect on water other users? demand of this region as the development will be as (Please assess the impacts of the project per the development plan. on other existing uses and quantities of consumption) 2.6 What is the incremental pollution load In Existing Building, the waste water generation is from wastewater generated from the approx. 33 KLD, which is being treated in STP. All the proposed activity? treated water is being used in the project. (Give details of the quantities and After addition/alteration. the total waste water composition of wastewater generated generated from the complex will be 242 KLD which from the proposed activity) will be treated in S.T.P of capacity of 300 KLD. Waste water of 18 KLD from laundry shall be treated in Effluent Treatment Plant of capacity 25 KLD. 230 KLD of treated water will be generated from the STP which will be reused for flushing, gardening and cooling purposes. 100% of treated water from STP will be recycled for use. 2.7 Give details of the water requirements The rain water from terraces and other open area will met from water harvesting? Furnish be collected in 5 (exiting-1 & proposed-4) no of Rain details of the facilities created. Water Harvesting pits. The details of Rain Water Harvesting Pits are given in Environment Management Plan. 2.8 What would be the impact of the land Total 5 (exiting-1 & proposed-4) no. of Rain Water use changes occurring due to the Harvesting Pits will be installed in the complex. The proposed project on the runoff rain water will be properly collected and will be characteristics (quantitative as well as treated & reused used to recharge the ground. qualitative) of the area in the post construction phase on a long-term basis?

26

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Would it aggravate the problems of No, it will not aggravate the problem of flooding or flooding or water logging in any way? water logging in any way, rather will reduce the same.

2.9 What are the impacts of the proposal on No ground water extraction at the site. the ground water? (Will there be tapping of ground water; However, ground water recharging is proposed give the details of ground water table, through 5 (exiting-1 & proposed-4) no. of rain water recharging capacity, and approvals harvesting pits so, there will be positive impact on obtained from competent authority, if ground water level. any) 2.10 What precautions/measures are taken During the construction phase, runoff from the to prevent the run-off from construction construction site will not be allowed into the activities polluting land & aquifers? roadside. It shall be collected in a tank & after pre- (Give details of quantities and the treatment it will be reused for sprinkling, etc. measures taken to avoid the adverse impacts) 2.11 How is the storm water from within the Adequate measures shall be taken to channelize such site managed? storm water and the same shall be collected in 5 (State the provisions made to avoid (exiting-1 & proposed-4) rain water collection pits. flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) 2.12 Will the deployment of construction Mobile toilets will be provided for laborers during laborers particularly in the peak period construction period. The waste shall be disposed off lead to unsanitary conditions around the to septic tank which will be cleaned regularly. project site (Justify with proper Washing area will be cleaned and hygienic conditions explanation) shall be maintained. 2.13 What on-site facilities are provided for Waste water from labors will be discharged into septic the collection, treatment & safe disposal tank which will be cleaned regularly. of sewage? In Existing Complex, (Give details of the quantities of 33 KLD of waste water is being treated in in-house STP wastewater generation, treatment of capacity 35 KLD. 32 KLD of treated water generated capacities with technology & facilities from STP is being reused for flushing, gardening and for recycling and disposal) cooling purposes. It is a Zero- Liquid Discharge Complex. Total after Addition/Alteration, 242 KLD of waste water will be treated in in-house STP of capacity of 300 KLD. 18 KLD waste water from laundry shall be treated in Effluent Treatment Plant of capacity 25 KLD. 230 KLD of the treated water will be generated from the STP which will be reused for flushing, gardening and cooling purposes. 100% of treated water from STP will be reused. Treated water from ETP will be discharge to the sewer line.

27

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

2.14 Give details of dual plumbing system if Dual Plumbing line has already been provided in the treated waste used is used for flushing of existing complex. Same shall be followed after toilets or any other use. addition & alteration also.

3. VEGETATION: -

3.1 Is there any threat of the project to the Core Zone: Green area is already being developed in biodiversity? existing plot. So, to develop additional block, (Give a description of the local clearance of existing shrubs and lawn will be done. ecosystem with its unique features, if any) No, tree will be cut, only transplantation will be done if required, after getting prior permission from concern department. All the measures will be adopted to conserve existing trees available at site. Species Planted: Azadirachta indica Neem Morus alba Shahtoot Eucalyptus globulus Eucalyptus Ficus benjamina Weeping fig Plumeria alba Champa Ficus benghalensis Banyan Tree Cycas revoluta Sago palm Grevillea robusta Silver oak Delonix regia Gulmohar Pinus roxburghii Pine tree Roystonea regia Royal Plam Saraca asoca Ashoka tree Callistemon viminalis Weeping bottlebrush

Buffer Zone: The dominant species present in the Buffer Zone around the project site are Babool (Acacia nilotica), Neem (Azadirachta indica), Gulmohar (Delonix regia), Safeda (Eucalyptus), Carrot grass (Parthenium sp.), Amaltas (Cassia tora), Dhatura (Datura sp.), Arandi (Ricinus communis), Ber (Zyziphus sp.), Bougainvellia, Peepal (Ficus religiosa), sheesham (Dalbergia sissoo), bottle palm, bottle bush, etc. 3.2 Will the construction involve extensive To develop additional block, clearance of existing clearing or modification of vegetation? shrubs and lawn will be done. (Provide a detailed account of the trees & vegetation affected by the project)

28

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

No, tree will be cut, only transplantation will be done if required, after getting prior permission from concern department.

3.3 What are the measures proposed to be There will not be any kind of impact of this project on taken to minimize the likely impacts on site features. important site features? The shelter belt for the proposed project shall be (Give details of proposal for tree planned to provide a clean, healthy and beautiful plantation, landscaping, creation of green environment for the people to live in within the water bodies etc. along with a layout proposed project site. plan to an appropriate scale) To minimize the impact, the provision of Green area of 5187.40 m2 area (20.00 % of net plot area) with lawns, ornamental plants will be provided at the site.

4. FAUNA

4.1 Is there likely to be any displacement Core Zone: Presently, the land is an already existing of fauna- both terrestrial and aquatic project which is operational. Hence, there will not be any or creation of barriers for their faunal diversity present on the project site. movement? Provide the details. However, there will be only borrowing animals but it is not a habitant of local fauna.

Buffer Zone: Asola Wildlife Sanctuary is location at a distance of 1.93 Km NEE from project site. However, NBWL clearance is not required as the ESZ boundary of the Asola Wildlife Sanctuary where construction activity is prohibited is 1 km. Since the area is a partly developed area, hence no impact is envisaged on fauna of this area. 4.2 Any direct or indirect impacts on the Few Avifauna such as Crow, Myna, pigeon etc. exist at avifauna of the area? Provide details. site as proper landscaping has been done at the site to provide a clean, healthy and beautiful green environment for the population. Common native variety of trees and ornamental flowering species have been planted in the green space which attracts avifauna. After Addition/Alteration, Green area of 5187.40 m2 will be develop. Hence will have direct positive impact on the local avifauna & this will provide shelter to local birds. 4.3 Prescribe measures such as corridors, Not applicable fish ladders etc. to mitigate adverse impacts on fauna.

29

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

5. AIR ENVIRONMENT

5.1 Will the project increase atmospheric The traffic will increase due to operation of complex. concentration of gases & result in heat Increased traffic generation of vehicles due to project islands? will not cause significant increase in atmospheric concentration of gases and do not result in heat island formation. Tree plantation in the complex will be provided such that the impact of air pollution shall be minimized. Background air quality with increment load (Give details of background air quality is given in Annexure. levels with predicted values based on Presently, DG Sets of capacity 1×500 kVA and 1×750 dispersion models considering the kVA has been installed which are being used during increased traffic generation as a result power cut only. After addition/alteration, DG set of of the proposed constructions) 1×750 kVA, 1×500 kVA & 2 x 1010 KVA will be installed for power backup and will be used during power cut only. Ventilation system shall be provided in STP room. 5.2 What are the impacts on generation of During construction phase sprinkling will be done dust, smoke, odorous fumes or other which will reduce the dust generation. Smoke will be hazardous gases? Give details in generated from the operation of DG sets. Proper relation to all the meteorological emission standards will be maintained as per CPCB parameters. guidelines. Ventilation system has also been provided in STP room. 5.3 Will the proposal create shortage of The optimum parking provision will be proposed parking space for vehicles? Furnish within the site in Basement and Surface Parking. details of the present level of The parking provision of complex will be 758 ECS. transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site. 5.4 Provide details of the movement Maximum capacity of parking shall be provided in patterns with internal roads, bicycle basements and a proper route shall be provided for tracks, pedestrian pathways, the traffic movement as well as pedestrian movement. footpaths etc., with areas under each category.

30

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

5.5 Will there be significant increase in During construction, noise barriers shall be installed to traffic noise & vibrations? Give details reduce traffic noise & vibration and during operation of the sources and the measures Shelter belt development has been done within the proposed for mitigation of the above. complex to mitigate the traffic noise. Proper care will be taken during design that there will not be any increase in traffic noise by providing two-way traffic movement, hence no honking zone within the complex will be maintained. The foundation will be made very hard and paved with rubber flooring to minimize the vibration, also all other measures will be adopted during designing that there will not be any causes of vibrations during the traffic density. 5.6 What will be the impact of DG sets & There would be slight impact of DG sets on noise other equipment on noise levels & levels, vibration and in ambient air quality around the vibration in & ambient air quality project site. around the project site? Provide 1. All the existing DG sets are being kept in details. acoustically treated room and same shall be done with proposed DG set. 2. Stack height as per C.P.C.B. norms to reduce the impact on air quality around the project site will be provided. 3. The noise from DG sets will meet the desired standard as per C.P.C.B. guidelines. Low Sulphur fuel will be used to run these DG sets. 4. Existing DG sets are provided with vibration pads. Same shall be provided for proposed DG sets. 6. AESTHETICS

6.1 Will the proposed constructions in Construction of the Motel Building will increase the any way result in the obstruction of a beauty of the area by having proper landscaping. view, scenic amenity or landscapes? Are these considerations considered Yes, all considerations shall be taken by the by the proponents? proponents. 6.2 Will there be any adverse impacts All measures shall be taken to prevent harm to existing from new constructions on the buildings due to construction of the complex. existing structures? What are the All measures to control air pollution & Noise & considerations considered? vibrations will be considered.

31

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

6.3 Whether there are any local There are no typical urban form & urban design considerations of urban form & urban influencing the design criteria. design influencing the design criteria? They may be explicitly spelt out. Are there any anthropological or There are no anthropological. However, there are archaeological sites or artifacts following archaeological sites within 4 km site. nearby? Hauz Shamsi -3.80 km NNW Shamsi Tallab - 3.82 km NNW - 3.86 km NNW Mandi Mosque- 3.92 km N List of archaeological sites is given in Environment management plan.

State if any other significant features There are no artefacts situated near the site. in the vicinity of the proposed site All significant features shall be considered. have been considered. 7. SOCIO-ECONOMIC ASPECTS

7.1 Will the proposal result in any The proposed project is a Motel Building & thus there will changes to the demographic be influx of population in the form of Guests, Staffs & structure of local population? visitors. Thus, there will be some change in the Provide the details. demographic structure of the area.

32

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

7.2 Give details of the existing social The proposed project falls within Delhi city which has all infrastructure around the the social infrastructure facilities in the form of education proposed project. health & work centers etc. Hospital Hospital near Sat Bari Poultry Farm 0.76 km NEE Hospital near Fatehpur Beri 1.94 km SSW Hospital near Maidan Garhi 2.42 km NNE

Post Office Post Office near Sat Bari 0.34 km NE Post Office near Fatehpur Beri 2.21 km SSW Post Office near Maidan Garhi 2.50 km NNE

Place of Worship Temple near Sat Bari 0.44 km NNW Mosque near Sat Bari 0.47 km NNE Temple near Rajpur Khurd 1.64 km NNE

School SDMC School, Sat Bari 0.47 km N Made Easy Pre School,Chattarpur 0.61 km NNE Mandir Road,Sat Bari Asian Modern Public School, A-77, 2.09 km SE Kharak, Sat Bari

Bank Axis Bank ATM, NO.K-40, Sat Bari 0.35 km NNE Corporation Bank,Plot No.-6,Khasra 0.36 km NNE No.431, Chattarpur Bhatti Road, Sat Bari ICICI Bank, Opp Tivoli 1.83 km NNW Garden,Chattarpur, New Delhi

7.3 Will the project cause adverse The proposed complex will be constructed within the effects on local communities, designated site as per the defined building by-laws of disturbance to sacred sites or government authority. There are following sacred sites or other cultural values? What are cultural heritage sites within vicinity of proposed project-: the safeguards proposed? Hauz Shamsi -3.80 km NNW Shamsi Tallab - 3.82 km NNW Jahaz Mahal - 3.86 km NNW Mandi Mosque- 3.92 km N List of archaeological sites is given in Environment management plan. Proper measures shall be taken so that no adverse impacts are envisaged on the nearby sacred site or cultural heritage sites of the project.

33

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

8. BUILDING MATERIALS

8.1 May involve the use of building The major materials required for construction of the materials with high-embodied project will be steel, cement, bricks, flooring tiles/ energy. stones, sanitary and hardware items, electrical fittings, etc. which will be bought predominantly from local market. Are the construction materials Energy efficient building material will be used. produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency 8.2 Transport and handling of materials Yes, transportation and handling of material will result in during construction may result in air & noise pollution; however, will be minimized by pollution, noise & public nuisance. covering material by the tarpaulin and ensuring PUC What measures are taken to certificate of vehicles and good condition silencers. minimize the impacts? 8.3 Are recycled materials used in roads The debris of construction material will be used in and structures? backfilling, roads etc. State the extent of savings achieved? 8.4 Give details of the methods of During Operation Phase: collection, segregation & disposal Type of waste Method of Quantity of waste of the garbage generated during Disposal the operation phases of the project. Existing Total after Addition/ Alteration Biodegradable Organic 68 928 kg/day Waste kg/day (339 TPA) Convertor (25 TPA) converted to manure. Recyclable Given to 23 309 kg/day approved kg/day (8 (113 TPA) recycler. TPA) Plastic Given to 23 309 kg/day approved kg/day (8 (113 TPA) recycler. TPA)

34

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Total 114 1546 kg/day kg/day (41 TPA) (565 TPA)

Detail are given in Environment Management Plan.

9. ENERGY CONSERVATION

9.1 Give details of the power Power Requirement 3500 KVA requirements, source of supply, Source of Power: BSES backup source etc. Back-up Source: 1×750 kVA, 1×500 kVA & 2 x 1010 KVA What is the energy consumption Existing Phase, assumed per square foot of built- Power backup is provided by using DG Sets of 1×500 kVA up area? and 1×750 kVA which are being used only during the time How have you tried to minimize of power failure. Fuel Consumption of DG sets has been energy consumption? calculated to be 14.4 KL/annum of Low Sulphur Diesel. As per the latest C.P.C.B. norms, D.G. Sets have been installed in acoustic enclosure and silencer. Total After Addition/Alteration, Power back up is proposed by using D.G. Sets of 2 x 1010 KVA (Total: 1×750 kVA, 1×500 kVA & 2 x 1010 KVA). During power failure D.G. Sets will start automatically. Fuel consumption for DG Sets has been calculated to be 0.384 kL/annum of Low Sulphur Diesel. As per the latest C.P.C.B. norms, D.G. Sets will be installed in acoustic enclosure and silencer. LED, energy efficient motors and pumps shall be used to conserve the electrical energy & to minimize the consumption of non-renewable fuel. 9.2 What type of and capacity of power DG Sets as power backup : back-up do you plan to provide? Existing- 1×500 kVA and 1×750 kVA Proposed- 2 x 1010 KVA Total after Addition/Alteration- 2 x 1010 KVA, 1×500 kVA and 1×750 kVA Fuel: Ultra Low-Sulphur diesel. 9.3 What are the characteristics of the Double Reflective glass will be used in proposed part of the glass you plan to use? Motel building. Provide specifications of its characteristics related to both

35

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

short wave and long wave radiation?

9.4 What passive solar architectural In proposed Building: Building design and envelope will be features are being used in the optimized through selection of appropriate wall and roof building? construction and through adoption of solar measures. Illustrate the applications made in the proposed project. 9.5 Does the layout of streets & Yes, the layouts of buildings will be designed to maximize buildings maximize the potential the potential for use of solar lighting per day devices. for solar energy devices? Have you considered the use of Yes, solar lights shall be used for street lighting & common street lighting, emergency lighting areas. and solar hot water systems for use in the building? Substantiate with details. 9.6. Is shading effectively used to Solar Measures shall be adopted to provide shading reduce cooling/heating loads? devices for windows and roof which would effectively What principles have been used to reduce heating up of building envelope. Louvers and maximize the shading of Walls on sunshades will be used around windows in order to protect the East and the West and the from direct sunlight. Roof? How much energy saving has been affected? 9.7 Do the structures use energy- Suitable energy optimization will be adopted during the efficient space conditioning, calculation of energy load of the proposed project. The lighting and mechanical systems? space heating load will be minimized using solar structure Provide technical details. and suitable buildings envelop material. Uses of incandescent lamp and halogen lamps have been avoided and energy efficient LEDs shall be used for all common area. Provide details of the transformers The diesel generator sets shall be automatically controlled and motor efficiencies, lighting to optimize their usage based on the actual load intensity and air-conditioning load requirements at any time. Space conditioning will be assumptions? provided as per norms of National Building Code – Part 8; Building Services Section 3–Mechanical Ventilation. Lighting intensity will be done as per the National Building Code Guidelines. Are you using CFC and HCFC free CFC and HCFC free chillers will be used. chillers? Provide specifications

36

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

9.8 What are the likely effects of the No significant effect will be envisaged on the surrounding building activity in altering the environment of project. Increased traffic generation and micro-climates? use of diesel generators sets in the project will not cause Provide a self-assessment on the significant increase in atmospheric concentration of gases likely impacts of the proposed and will not result in heat island formation. construction on creation of heat island & inversion effects? 9.9 What are the thermal characteristics of the building S. No BUILDING ‘R’ Values ‘U’ Values envelope? (a) roof; (b) external MATERIAL (in Sq m. Deg (in Watts/ walls; and (c) fenestration? PROPOSED C/ Watts) Sq m. Deg WITH U & R C) Give details of the material used VALUES and the U-values or the R values of the individual components. 1. Wall 5.00 0.20 (Outside Air resistance, Stone Cladding, Air Gap (55 M), Insulation Mineral Wool, Gypsum Board, Internal Air Resistance). 2. Roof 3.53 0.28 (Outside air resistance, 150 mm concrete slab, 75 mm PUF insulation and internal air resistance)

Double Reflective Glass will be used for proposed part of the Motel Building.

9.10 What precautions & safety Old Structure building has been designed as per old NBC measures are proposed against fire norms. Fire NOC also taken from fire department hazards? Furnish details of In New Building: The basic system of Fire Fighting will be emergency plans. designed as per the provisions of the National Building Code 2016-: Fire Safety: The building materials shall be of appropriate fire resistance standards. Further, design shall include provisions for the following:

37

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

 The electrical systems shall be provided with automatic circuit breakers activated by the rise of current as well as activated by over current.  Fire detection system.  Fire alarm system at appropriate places.  Means of escape  Access for fireman  Adequate fire-fighting requirement shall be taken into account while designing the electrical distribution system.  Emergency Lighting: The emergency lights operated on battery power shall be provided at appropriate locations such as corridors, common area, staircase, exit and entrance doors, parking etc. 9.11 If you are using glass as wall Yes, we are using glass in our structure. material provides details and Detailed characteristics is given in ECBC report. specifications including emissive and thermal characteristics. 9.12 What is the rate of air infiltration All the window and door will be airtight quality; hence we into the building? don’t foresee any air infiltration. Provide details of how you are mitigating the effects of infiltration. 9.13 To what extent the non- Solar energy measures will be used inside the Motel conventional energy technologies Building. are utilized in the overall energy consumption? Provide details of the renewable energy technologies used.

38

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

10. ENVIRONMENT MANAGEMENT PLAN

10.1 The Environment Management Plan would Environment Management Plan is given in as consist of all mitigation measures for each Enclosure -3 item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.

39

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

ENCLOSURE 2: CONCEPTUAL PLAN

40

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

CONCEPTUAL PLAN

1.1 Introduction The proposed project is “Addition/Alteration in Motel Building” located at Khasra No. 83, 84, 85, 90, 91/1-2, 100/1-2, 101 & 102, Village- Satbari, New Delhi. The project will be developed by M/s Anant Raj Limited. The land was purchased by M/s Kalinga Meadows Limited which later on merged with M/s Anant Raj Limited. The project is an operational Motel, having built-up area 7738.262 sqm. Since, the Existing Motel building built-up area was less than 20,000 sqm, hence it was not in preview of EIA notification,2006. Project have valid CTO vide Consent order no. DPCC/CMC/2016/37346. Now, alternation in existing building and addition of new block has been proposed in the existing plot area of 29844.59 m2. After alternation and addition, built-up area of project will increase from 7738.262 m2 to 47497.2 m2 Since the built-up area of the project is less than 1,50,000 m2. Hence, it falls under Activity 8 (a), Category ‘B’ of Schedule of EIA Notification, 2006 and its amendments. 1.2 Activities/ Amenities Activities proposed in the project after addition/alteration will be the following-: S. No. Activities Number 1. Hotel Room 129 2. Commercial Complex 1 3. Banquet Hall 3 4. Spa 1 5. Meeting Room 1 6. Restaurant 1 1.3 Site Location The proposed project located at Khasra No. 83, 84, 85, 90, 91/1-2, 100/1-2, 101 & 102, Village- Satbari, New Delhi. The location of site is given in Environment Management Plan. 1.4 Type of Project The proposed project is Addition/Alteration of Existing Motel Building to be developed built-up area 47497.2 m2. Hence, it falls under category B, Activity 8(a) of Schedule of EIA notification, 2006 and its amendments.

41

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

1.5 Project Details

Project details are given in Table 1.

Table 1: Project Details

Details

Particulars Units Total after Existing Additional Addition Proposed Rs. Project Cost - - 126 Crore Plot Area m2 29844.59 - 29844.59 2 Area under road widening m 3907.579 - 3907.579 2 Net plot Area m 25937.011 - 25937.011 Ground Coverage (Permissible) m2 (40% of net plot area) 10374.804 Ground Coverage 2 (Achieved/Proposed) m 3473.718 6864.085 10337.803 (39.86% of net plot area) FAR AREA FAR Permissible 2 m 45389.77 (1.75 of net plot area) m2 FAR Achieved/Proposed (A) 3491.88 23194.88 26686.76 Permissible commercial (20% of 2 m - 5337.32 5337.32 achieved FAR) Proposed commercial (19.99% 2 m - 4859.49 4859.49 of achieved FAR) 2 Permissible Atrium m - 2593.7 2593.7 2 Proposed Atrium m - 312.1 312.1 NON-FAR AREA 2 Basement-1 m 4246.382 7859.194 12105.576 2 Basement-2 m - 4252.454 4252.454 2 Basement-3 m - 4140.326 4140.326 2 Total Basement area –(B) m 4246.382 16251.974 20498.356

Built-up Area (FAR + Non-FAR) 2 m 7738.262 39759.0 47497.2 (A + B) Green Area 2 m 5187.40 (20.00 % of Net Plot Area) No of Towers No. 1 1 2

42

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Maximum No. of Floors No. G+1 G+3 G+3 Max. height of building No. - - 15.6 No. of Basement No. 1 3 3 SERVICE DETAILS No. of Rooms in Hotel No. 47 82 129 No. of Banquets No. 2 1 3 Total Population No. 569 9224 9793 Total Power load kVA - - 3600 KVA 1×750 KVA, 1×500 1×750 KVA, DG sets kVA 2 x 1010 KVA KVA & 2 x 1010 1×500 KVA KVA Rain water Harvesting pits No. 1 4 5 Total Water Requirement KLD 72 323 395 Fresh Water requirement KLD 40 125 165 Treated Water Reuse KLD 32 198 230 Waste Water Discharge KLD 33 209 242 Sewage Treatment Plant KLD 35 265 300 Capacity Effluent Treatment Plant KLD - 25 25 Capacity Total Solid Waste Generation kg/day 114 1432 1546 Parking Required ECS 58 696 754 Parking Provision ECS - - 758 1.6 Population Details During Construction phase-: 150 no. of labours shall be employed for the construction of the project.

During Operation Phase-: The total population of the project after alternation/addition has been estimated to be 9793 persons including Guests, Staff and Visitors (Motel Building, Banquet hall, Restaurant and Commercial Building).

The population details are given in Table below-:

43

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Table 2- Population Details

POPULATION Total after Particulars Unit Existing Proposed Addition/Alteration Commercial Staff No. 0 90 90 Visitors No. 0 720 720 Total Commercial No. 0 810 810 population Hotel Guest in Hotel No. 94 164 258

Staff No. 25 0 25

Visitors No. 50 50 100

Total Hotel population No. 169 214 383 Banquet Hall No. 0 Staff 100 100 No. 400 Visitors 7600 8000 No. 400 Population of Banquet 7700 8100 No. 0 Visitors (Restaurant) 500 500 Total Population of No. 569 9224 9793 Complex 1.7 Water Management During construction phase, Approx. 12 KLD of water will be required which will be arranged on temporary basis through the tankers. 7 KLD or water will be required for domestic purposes while 5 KLD of water will be used for construction purposes. The waste water generated during construction phase will be 6 KLD sewage which will be discharged into septic tank via soak pit which will be cleaned regularly. During operation phase, In the Existing Complex, the total water requirement of the project is 72 KLD. Out of which, the fresh water requirement is 40 KLD, which is being met by Tanker supply. The waste water generated in the complex is 33 KLD which is being treated in Sewage Treatment Plant of capacity 35 KLD. 32 KLD of treated water is being reused for flushing, gardening and cooling purposes. It is a Zero-Liquid Discharge Complex. After Addition/Alteration, the total water requirement of the project will be 395 KLD, out of which, fresh water requirement will be 144 KLD which will be met by Delhi Jal Board. The waste water generated in the complex will be 242 KLD which shall be treated in STP of capacity 300 KLD

44

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited. based on MBR Technology. Waste water of 18 KLD from laundry shall be treated in Effluent Treatment Plant of capacity 25 KLD. Treated water generated from ETP shall be discharged to the sewer line. The total water management has been given in the Environment Management Plan. 1.8 Rain water collection Details To recharge the ground water, total 5 no. (1-existing & 4- Proposed) rain water harvesting pits shall be provided within the project area. Details are given in Environment Management Plan. 1.9 Power Requirement & Back-up Power requirement during Construction Phase will be met by DG set of 1×125 kVA which shall be used for construction works. Total Power Requirement after Addition/Alteration will be 3500 KVA which will be sourced through BSES Rajdhani Power Limited. In case of power failure, power backup will be provided through DG sets of 2 x 1010 KVA, 1 x 750 KVA & 1 x 500 KVA. The DG sets will be kept in acoustically treated room in Basement. 1.10 Solid & Hazardous Waste Management During Construction Phase- Solid and Hazardous waste generation will be approx. 23 kg/day of waste from labourers. Approx. 65000 m3 excavated soil shall be generated due to excavation for 3 levels of basements & foundation. Out of which top soil shall be stored at a designated area and will be initially stacked and covered with tarpaulin for settling then will be used for landscaping purposes while remaining excavated soil shall be properly stacked under tarpaulin cover and will be reused for back filling purpose and road construction, etc During operation phase- In Existing Phase, Total Solid Waste generation is 114 kg/day (42 tons/annum) out of which 68 kg/day (25 tons/annum) biodegradable waste is being treated in Organic Waste convertor while 46 kg/day (16 tons/annum) recyclable waste is being given to approved recycler. Total After Addition/Alteration, Total Solid Waste generation will be 1546 kg/day (564 tons/annum) out of which 928 kg/day (339 tons/annum) biodegradable waste will be treated in Organic Waste convertor while 309 kg/day (113 tons/annum) recyclable waste and 309 kg/day (113 tons/annum) plastic waste will be given to approved recycler. 32 ltr /month (0.384 kL/annum) used oil shall be generated and 2-3 kg/ Month (0.024-0.36 tons/annum) E-waste will be generated.

Battery waste shall be generated mainly from inverters & UPS.

Details are given in Environment Management Plan.

45

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

1.11 Parking Management During construction phase- Proper parking provisions of trucks and other construction vehicles shall be made. Proper spaces for loading and unloading shall be defined. During operation phase- Total parking requirement for the project will be 754 ECS. Parking Provision for the Project will be 758 ECS which shall be provide in Basements and on Surface.

Details are given in Environment Management Plan. 1.12 Green Area Development Green area is already being developed in existing plot. So, to develop additional block, clearance of existing shrubs, lawn and one small temporary structure will be required. No, tree will be cut, only transplantation will be done if required, after getting prior permission from concern department.

After Alteration/addition, Green Area of 5187.40 m2 (i.e. 20.00 % of net total plot area) will be develop.

.

46

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

ENCLOSURE 3: ENVIRONMENT MANAGEMENT PLAN

47

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

ENVIRONMENT MANAGEMENT PLAN OF ADDITION AND ALTERATION IN “MOTEL BUILDING”

At Khasra No. 83, 84, 85, 90, 91/1-2, 100/1-2, 101 & 102, Village- Satbari, New Delhi

Category: 8(a), Total Built-up Area- 47497.2 m2

DEVELOPER M/s Anant Raj Limited H-65, Connaught Circus, New Delhi-110001 PREPARED BY: M/S PERFACT ENVIRO SOLUTIONS PVT. LTD. (NABET Registered Vide list of accredited consultants organizations/ Rev.77 /10th June, 2019 at S.No.-120) (An ISO 9001:2008 & ISO 14001:2004 Certified Company) 5th Floor, NN Mall, Sector 3, Rohini, New Delhi-110085 Phone: +91-11-49281360

48

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.1 PROJECT DETAILS The proposed project is “Addition/Alteration in Motel Building” located at Khasra No. 83, 84, 85, 90, 91/1-2, 100/1-2, 101 & 102, Village- Satbari, New Delhi. The project will be developed by M/s Anant Raj Limited. The land was purchased by M/s Kalinga Meadows Limited which later on merged with M/s Anant Raj Limited. The project is an operational Motel, having built-up area 7738.262 sqm. Since, the Existing Motel building built-up area was less than 20,000 sqm, hence it was not in preview of EIA notification,2006. Project have valid CTO vide Consent order no. DPCC/CMC/2016/37346.

Now, alternation in existing building and addition of new block has been proposed in the existing plot area of 29844.59 m2. After alternation and addition, built-up area of project will increase from 7738.262 m2 to 47497.2 m2 Since the built-up area of the project is less than 1,50,000 m2. Hence, it falls under Activity 8 (a), Category ‘B’ of Schedule of EIA Notification, 2006 and its amendments. Activities proposed in the project after addition/alteration will be the following-: S. No. Activities Number 1. Hotel Room 129 2. Commercial Complex 1 3. Banquet Hall 3 4. Spa 1 5. Meeting Room 1 6. Restaurant 1 3.1.1 Area Details: The total plot area of the project will be 29844.59 m2 out of which, 3907.579 m2 area is reserved under Road widening. Hence, the net plot area of the project is 25937.011 m2. 10337.803 m2 shall be utilised as Ground Coverage. The total FAR Area of the project will be 26686.76 m2. The Non-FAR Area including the basement area of the project will be 20498.356 m2. Hence, the total built-up area of the project will be 47497.2 m2. Maximum number of floors will be G+3.The maximum height of the building will be 15.6 m. The total cost of the project will be Rs. 126 Crores. Table 3: Detailed project information Details

Particulars Units Total after Existing Additional Addition Proposed Rs. Project Cost - - 126 Crore Plot Area m2 29844.59 - 29844.59 2 Area under road widening m 3907.579 - 3907.579

49

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

2 Net plot Area m 25937.011 - 25937.011 Ground Coverage (Permissible) m2 (40% of net plot area) 10374.804 Ground Coverage 2 (Achieved/Proposed) m 3473.718 6864.085 10337.803 (39.86% of net plot area) FAR AREA FAR Permissible 2 m 45389.77 (1.75 of net plot area) m2 FAR Achieved/Proposed (A) 3491.88 23194.88 26686.76 Permissible commercial (20% of 2 m - 5337.32 5337.32 achieved FAR) Proposed commercial (19.99% 2 m - 4859.49 4859.49 of achieved FAR) 2 Permissible Atrium m - 2593.7 2593.7 2 Proposed Atrium m - 312.1 312.1 NON-FAR AREA 2 Basement-1 m 4246.382 7859.194 12105.576 2 Basement-2 m - 4252.454 4252.454 2 Basement-3 m - 4140.326 4140.326 2 Total Basement area –(B) m 4246.382 16251.974 20498.356

Built-up Area (FAR + Non-FAR) 2 m 7738.262 39759.0 47497.2 (A + B) Green Area 2 m 5187.40 (20.00 % of Net Plot Area) No of Towers No. 1 1 2 Maximum No. of Floors No. G+1 G+3 G+3 Max. height of building No. - - 15.6 No. of Basement No. 1 3 3 SERVICE DETAILS No. of Rooms in Hotel No. 47 82 129 No. of Banquets No. 2 1 3 Total Population No. 569 9224 9793 Total Power load kVA - - 3500 KVA 2 x 1010 KVA, 1x 1×750 KVA, DG sets kVA 2 x 1010 KVA 750 KV & 1 x 500 1×500 KVA KVA

50

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Rain water Harvesting pits No. 1 4 5 Total Water Requirement KLD 72 323 395 Fresh Water requirement KLD 40 125 165 Treated Water Reuse KLD 33 197 230 Waste Water Discharge KLD 33 209 242 Sewage Treatment Plant KLD 35 265 300 Capacity Effluent Treatment Plant KLD - 25 25 Capacity Total Solid Waste Generation kg/day 114 1432 1546 Parking Required ECS 58 696 754 Parking Provision ECS - - 758 3.1.2 Population Details During Construction phase-: 150 no. of labours shall be employed for the construction of the project.

During Operation Phase-: The total population of the project after alternation/addition has been estimated to be 9793 persons including Guests, Staff and Visitors (Motel Building, Banquet hall, Restaurant and Commercial Building).

The population details are given in Table below-:

Table 4- Population Details POPULATION Total after Particulars Unit Existing Proposed Addition/Alteration Commercial Staff No. 0 90 90 Visitors No. 0 720 720 Total Commercial No. 0 810 810 population Hotel Guest in Hotel No. 94 164 258

Staff No. 25 0 25

Visitors No. 50 50 100

Total Hotel population No. 169 214 383 Banquet Hall No. 0 Staff 100 100 No. 400 Visitors 7600 8000

51

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

No. 400 Population of Banquet 7700 8100 No. 0 Visitors (Restaurant) 500 500 Total Population of No. 569 9224 9793 Complex 3.1.3 PARKING MANAGEMENT Parking Required:

Table 5: Parking Requirement Details Parking Requirement Particulars Factor Calculation Parking Required (in ECS) Existing Parking Existing FAR @1.67 3492/ 100 58 Required ECS/100 m2 Proposed Parking Proposed FAR @3 696 Required ECS/100 m2 23194.71/100 Total Parking Required 754 ECS Parking Provision:

Table 6: Parking provision details Particulars Basement Area Service Area Parking Area Factor Parking (in m2) (in m2) (in m2) Provided (in ECS) First Basement 12105.576 3600 8505.576 32 266 Second Basement 4252.454 755.122 3497.332 16 219 Third Basement 4140.326 630.875 3509.451 16 219 Surface Parking 1240.11 23 54 Total Parking Provision 758 ECS

3.1.4 Power Requirement and Backup Details During Construction Phase-: DG sets of 1×125 kVA will be used for construction works.

During Operation Phase-:

Total after Addition/Alteration-: The total power requirement of the project will be 3500 KVA which will be met by BSES. In case of failure, power backup will be provided through DG sets of 2 x 1010 KVA, 1x 750 KVA & 1 x 500 KVA. Stack height of 30m above surface shall be maintained.

Table 7- Electric Details

Power Source BSES Rajdhani Power Limited

Total Power Load 3500 KVA

52

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

No. of DG Sets 2 x 1010 KVA, 1x 750 KV & 1 x 500 KVA

3.1.5 Waste Water, Rain Water and Solid Waste Details Table 8- Waste Water, Rain Water and Solid Waste Details

Description Unit Details Existing Additional Total after Proposed Addition/Alteration Total Solid Waste kg/day 114 1432 1546 Generation Total Biodegradable kg/day 68 860 928 Waste Generation Total Water KLD 72 323 395 Requirement Total Fresh Water KLD 40 125 165 Requirement Total Treated Water KLD 32 198 230 Reuse Total Waste Water KLD 33 209 242 Discharge Sewage Treatment KLD 35 265 300 Plant Capacity Rain Water No. 01 04 05 Harvesting pits 3.2 Land Use and Ownership of the site land The land has been purchased by M/s Kalinga Meadows Limited. The M/s Kalinga Meadows Limited has now merged with M/s Anant Raj Limited. The proposed project will now be developed by M/s Anant Raj Limited. The project is an operational project. The land use of the project conforms to the Master plan of Delhi. Hence, there will be no change in land use. The landcover of the project has already been changed to Motel building. 3.3 Land Use The land use after Addition/Alteration at the site is given below in Table 10. Land Use after Addition/Alteration

Land use Area (m2) Percentage (%) Ground Coverage 10337.803 39.85 Green Area 5187.40 20.00 Surface Parking 1240.11 4.79 Open and Road Area 9171.70 35.36 Net Plot Area 25937.01 m2 100%

53

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Landuse (After Addition/Alteration)

Ground Coverage 35.36% 39.85% Green Area Surface Parking Open and Road Area 20% 4.79%

Figure 2: Land use (After Addition/Alteration) 3.4 Location of the project with connectivity 3.4.1 Geographical Information of Site Table 11: Geographical information of project site Latitude Longitude Elevation 28°28'45.43"N 77°11'5.25"E 262 m

Location map is shown in Figure 3.

Figure 3: Project site location

54

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.4.2 Topographical Map

55

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.5 Connectivity of the Project Table-12 – Details of Connectivity around the Project Site S. No. Accessibility Description Distance & Direction

1. Highway/ Road NH -236 2.86 km NNW NH-8 9.09 km NW NH-2 11.44 km NEE NH-24 14.76 km NNE 2. Railway Station Tuglakabad Railway Station 11.17 km NEE Old Faridabad Railway Station 13.86 km SE

3. Metro Station 3.15 km NW Saket 4.83 km NE Malviya Nagar 5.63 km NE 4. Airport IGI Airport Delhi 11.71 km NW Safdarjung Air Port 11.75 km NNE 3.6 Centrally Protected Monuments under Delhi Circle Name of Monument Locality District Distance & Direction HauzShamsi, with central red stone Mehrauli South 3.80 Km NNW pavilion situated at Mehrauli in field Nos. 1574-81, 1588-97, 1614, 1623 & 1624, owner Government Mosque known by the name of Mehrauli Village South 3.82 Km NNW ShamsiTallab together with both platform entrance gates. Jahaz Mahal in Mehrauli Mehrauli Village South 3.86 Km NNW Mandi Mosque Lado Sarai Village South 3.92 Km N Tomb and Mosque of Mehrauli South 4.44 Km N MaulanaJamaliKamali Area between Balban Khan's Tomb Lado Sarai South 4.44 Km NNE &JamliKamali Moti Masjid Mehrauli Village South 4.45 Km NNW Old Palace of Bahadur Shah II alias Lal Mehrauli Village South 4.47 Km NNW Mahal in Mehrauli Rajon-ki-Bain with Mosque and Chatri Lado Sarai Village South 4.54 Km N Old Baoli known as Diving Wall in Mehrauli South 4.57 Km N Mouza locally known as (Gandak-ki- baoli), Mehrauli Unknown tomb said to be of Azim Lado Sarai Village South 4.70 Km NNE Khan Badaun Gates, Lado Sarai Village South 4.73 Km NNE Tomb of Adham Khan (Rest House) Mehrauli South 4.85 Km N

56

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

The Qutab Archaeological area as now Mehrauli Village South 4.98 Km N fenced in, including the Mosque, Iron Pillar, Minar of Qutbud-din, unfinished Minar, all colonnades, screen arches, tomb of Altamash, college, buildings of Alaud-Din, Tomb of Imam Zamin and all carved stones in the above area with gardens, paths and water channels, and all gateways including the Alai-Darwaza , also all graves in the above area Iron Pillar, Hindu remains Mehrauli (Qutb South 5.01 Km NNE Complex) Ramp and gateways of Rai Pithora's Adchini South 5.57 Km N Fort, Adchini Walls of Lal Kot and Rai Pithora's fort Mehrauli South 5.69 Km N from Sohan Gate to Adham Khan's tomb including the ditch where there is an outer wall Khirkee Masjid Khirki Village near South 6.59 Km NNE Malviya Nagar -III –216 Khirki Village near South 6.79 Km NNE Malviya Nagar Tomb of Usuf-Quttal situated at Khirki Khirki Village near South 6.79 Km NNE Malviya Nagar Begumpuri Masjid Begumpur South 6.87 Km NNE Bastion, where a wall of Jahan panah Adchini South 7.02 Km NNE meets the wall of Rai Pithora’s fort, Adchini Bijay Mandal, neighbouring domes, Malviya Nagar South 7.03 Km NNE buildings and dalan to north of Begumpur Wall of Rai Pithora's Fort and Jahan Hauz Rani Village South 7.03 Km NNE panah at the point where they meet together Group of monuments at Sarai Shahji Malviya Nagar South 7.12 Km NNE Lal Gumbad, Chirag Delhi Chirag Delhi South 7.19 Km NNE Tomb of Sheikh Kaburuddin also Malviya Nagar South 7.20 Km NNE known as RakabwalaGumbad in field no.84 min. situated at sarai Shah 31 property of ThoksShahpur and Adhehini Tomb of MalikpurKothi South 7.43 Km NW opposite Vasant Kunj Tomb of Bahlol Lodi Chirag Delhi South 7.61 Km NNE

57

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Internal buildings of:Siri ShahpurJat Village South 7.77 Km NNE Mohammadiwali-Kh. No. 14 ShahpurJat MakhdumkiKh. No. 255 ShahpurJat Thana walaShahpurJat ChorMinar No. 289 Vol III HauzKhas South 7.78 Km NNE Idgah of Kharehra HauzKhas Enclave South 7.87 Km NNE Tomb of GhiyasuddinTughlakabad. Tughlaqabad South 7.97 Km NEE walls and bastions, gates and cause East way including the tomb of Dad Khan TohfewalaGumbad Humayunpur South 8.09 Km NNE Village (HauzKhas), ShahpurJat Walls, gateways bastions and internal Tughlaqabad South 8.16 Km NEE buildings of both inner and outer East citadels of Tughlakabad Fort HauzKhas:- Group of Building at HauzKhas South 8.18 Km NNE HauzKhas consisting of the following i. The tomb of Ferozshah ii. Domed Building to the west of No.1 iii. Dalan between 1&2 iv. Domed Building & its court to the south of No. 3, v. Dalans and all ruined Buildings to the north of no. 1 and existing upto No.10 vi. Five Chhatris to the East of No. 1& No.5 vii. Old Gate to the north of No.6 viii. Three Chhatris to the north-west of No.7 ix. Ruined courtyard and its Dalans with the Domed building to the north- west to the No.8 x. Old wall running east from No.4 xi. 2.23 Acres of land surrounding the above monuments and bouded on the North by house of Chhange and Mehra Chand sons of Hansram and house of Udairam, son of Kushla South Ghairmumkan Rasta East By village site belonging to village community. Others West By field no. 185 & 186. Nai-ka-kot in Tughlaqabad Tughlaqabad South 8.22 Km NEE East Bara Khamba-285 HauzKhas South 8.26 Km NNE Sakri Gumti-284 HauzKhas Enclave South 8.30 Km NNE near Green Park ChotiGumti HauzKhas South 8.32 Km NNE

58

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Bandi or PotikaGumbad III-280 HauzKhas South 8.35 Km NNE Biwi or Dadi-ka-Gumbad-281 HauzKhas South 8.35 Km NNE Walls, gate and bastions of Adilabad Tughlaqabad South 8.40 Km NEE (Mohammadabad) and causeway East leading there to from Tughlakabad. Nili Mosque HauzKhas Enclave South 8.44 Km NNE Ruined line of walls, bastions & ShahpurJat Village South 8.44 Km NNE gateways of siriKh. No. 88, 265 &447 pf village ShahpurJat Bagh-i-AlamGumbad with a Mosque Humayunpur South 8.57 Km NNE Village (HauzKhas) Biran-Ka-Gumbad-282 HauzKhas South 8.57 Km NNE Kali Gumti HauzKhas South 8.63 Km NNE Munda Gumbad, Munirka Munirka South 9.09 Km N Baoli, Munirka Munirka South 9.25 Km NNW Wazir Pur-ki-Gumbad, Munirka 312 Munirka South 9.31 km NNW Tin BurjiWalaGumbad, MommadPur Mohammad Pur South 9.60 Km N Village Village Moth-ki-Masjid Behind South South 9.68 Km NNE Extension-II Tomb of Bhura Khan KotlaMubrakpur South 10.80 Km Village NNE Mosque attached to Mubarak shah KotlaMubrakpur South 10.85 Km Tomb Village NNE Tombs of Chote Khan, Mubarakpur, KotlaMubrakpur South 10.86 Km Kotla Village NNE Tombs of Bade-Khan, and KotlaMubrakpur South 10.87 Km MubarakpurKotla, Kotla Village NNE Tomb of Mubarik Shah in Mubarikpur, KotlaMubrakpur South 10.91 Km Kotla Village NNE Ashokan Rock Edict at Bahapur East of Kailash South 11.05 Km N East Bara Pulah bridge near Nizammudin Nizamuddin South 13.27 Km East NNE Tomb of Khan-i-Khana Nizamuddin South 13.42 Km East NNE The Grave of Jahanara Begum Nizamuddin South 13.48 Km East NNE Tomb of Amir Khusro Nizamuddin South 13.49 Km East NNE Tomb of NizamuddinOlia Nizamuddin South 13.50 Km East NNE The ChausathKhamba and tomb of Nizamuddin South 13.53 Km Mirza Aziz Kokaltash East NNE

59

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

The Grave of Mirza Jahangir Nizamuddin South 13.54 Km East NNE Tomb of Tagah or Atgah Khan Nizamuddin South 13.54 Km East NNE Mazar of Mirza Ghalib Nizamuddin South 13.55 Km East NNE Baoli Nizamuddin South Eas 13.56 Km NNE Bara Khamba outside north entrance Nizamuddin South 13.64 Km to shrine East NNE Arab Sarai Near Humayun’s South 13.65 Km Tomb East NNE Remaining Gateways of Arab Sarai and Near Humayun’s South 13.65 Km of Abadi-Bagh-Buhalima Tomb East NNE The NilaChhatri or SubazBurj, once Nizamuddin South 13.76 Km used as a Police Station at Nizam-ud- East NNE Din. The with its Nizamuddin South 13.77 Km surrounding enclosure walls and East NNE turret, garden, gateways and mosque. The Gate way of Arab Sarai facing Near Humayun’s South 13.78 Km North towards PuranaQila Tomb East NNE The Gate way of Arab Sarai facing East Near Humayun’s South 13.78 Km towards the tomb of Humayun Tomb East NNE The Tomb of Afsah-wala immediately Nizamuddin South 13.87 Km near and to the south of Afsah-wala-ki- East NNE Masjid The Afsah-wala-ki-Masjid situated Nizamuddin South 13.89 Km outside the west gate of Humayun's East NNE tomb with its dalans and paved court. NilaGumbaz outside the south corner Nizamuddin South 14.03 Km of the enclosure of Humayun's tomb. East NNE Humayun's tomb, its platforms, Nizamuddin South 14.06 Km garden, enclosure walls and gateways East NNE Khasra No. 258 bounded on the east by Khasra No.180&181&244 of Miri Singh and on west by Kh. No. 268&253 on the north by Khasra No. 266, on the south by Kh No. 245 of Miri Singh &Kh. No. 248 & 249 of SayyedMohummad SunderwalaBurj Near Humayun’s South 14.13 Km Tomb East NNE Sunderwala Mahal Near Humayun’s South 14.18 Km Tomb East NNE Tomb of Mirza Muzaffer, Nizamuddin South 14.23 Km ChotaBatasha East NNE

60

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

LakharwalGumbad (Tomb) Near Humayun’s South 14.27 Km Tomb East NNE Tomb of Mirza Muzaffer, Bara Batasha Nizamuddin South 14.32 Km East NNE

3.7 Layout Plan

N

Figure 1 Layout Plan 3.8 Water Management 3.8.1 Source of Water The water will be resourced through Delhi Jal Board. 3.8.2 Present Quality The present quality of Surface Water of nearby drain has been accessed. 3.8.3 Water Requirement During construction phase- Treated water will be arranged on temporary basis through the tankers water supply. For construction activities, water will be sourced through nearby STP/tanker water supplier and will be retreated on site before use. Drinking water will be sourced through the tankers.

Total water requirement during the construction phase will be 12 KLD out of which 7 KLD will be required for domestic purposes and 5 KLD will be used for construction purposes.

During operation phase-: Water requirement will be met through Delhi Jal Board.

61

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Water Management (Existing Phase)

Particulars Factor Waste Requirement Domestic Flushing Discharge Population (in KLD) (in KLD) (in KLD) (in KLD) Guest in Hotel 94 320 30 21 9 Staff 25 45 1 0.5 0.5 Visitors 50 15 1 0.5 0.5 Banquet Visitors 400 15 6 2 4 Total water requirement 38 24 14 Waste water 19 14 33 Cooling 30 0 Gardening 4 0 Total water 569 72 KLD 33 KLD

Water Balance:

Figure 2 Water Balance (Existing Phase)

62

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Water Management (Total after Addition/Alteration of the Complex):

Table 8: Water Requirement (Total after Addition/Alteration)-: Water Waste Requireme Domestic Flushing Discharge Particulars Population Factor nt (in KLD) (in KLD) (in KLD) (in KLD) Domestic Guest in Hotel 258 320 83 68 15 Staff 215 45 10 5 5 Visitors (Banquet, 8820 Commercial, Hotel) 15 133 45 88 Restaurant Visitor 500 70 35 27 8 Domestic Water demand 261 145 116 Waste water 116 116 232 Gardening 6 0 Cooling 108 10 Laundry 20 18 Total Water Requirement 395 260

63

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Water Balance:

Figure 3 Water Balance (Total after Addition/Alteration) 3.8.4 Disposal

In Existing Complex, The waste water generated from the complex is 33 KLD which is being treated in Sewage Treatment Plant of capacity 35 KLD. Treated water of 32 KLD is completely being reused in flushing, gardening and cooling purposes. It is Zero-Liquid Discharge Complex.

Total After Addition/Alteration, The waste water generated from the complex will be 242 KLD which shall be treated in Sewage Treatment Plant of capacity 300 KLD based on MBBR technology. Waste water from laundry shall be treated in Effluent Treatment Plant of capacity 30 KLD. 18 KLD of Treated water generated from ETP shall be discharge to sewer line. 230 KLD of treated water generated from STP shall be reused in flushing, gardening and Cooling purposes.

64

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.9 Air and Noise Management 3.9.1 During Construction DG sets of 1×125 kVA shall be used for Power supply during the construction phase. 3.9.2 During Operation During operation phase 3500 KVA of power load from BSES shall be supplied to the project. Power backup shall be provided by DG sets of capacity 2x1010 KVA, 1x750 KV & 1 x 500 KVA (Existing- 1×500 kVA,1×750 kVA and Proposed- 2 x 1010 KVA) 3.10 Energy Conservation Measures Following are the measures to be adopted to conserve the energy: i. Day light provision shall be made by using openable windows (use of sunlight in lieu of conventional power). ii. We are proposing LED lights only for common areas like corridors, lift, and lobby. iii. Transformers will be having efficiencies as per ECBC Norms. iv. For HVAC Water Cooled Chillers with centrifugal machines will be installed. Chiller pumps with Variable Frequency Drive (VFD). Chillers and Secondary pumps with VFD. Primary & Condenser pump will be with fixed speed. v. These bring in an advantage of diversified occupancy & operations.

Solar Measures: vi. External street lighting shall be provided by standalone solar panel. vii. Solar Water Heater will be used to meet hot water requirement of the project. viii. The layouts of buildings will be designed to maximize the potential for use of solar lighting per day devices. ix. The space heating load will be minimized using solar structure and suitable buildings envelop material. x. Uses of incandescent lamp and halogen lamps shall be avoided and energy efficient LEDs shall be used for all common area. 3.11 Environment Management The Environment Management Plan (EMP) is a site-specific plan developed to ensure that the project is implemented in an environmentally sustainable manner where all stakeholders including the project proponents, contractors and subcontractors, including consultants, understand the potential environmental risks arising from the proposed project and take appropriate actions to properly manage that risk. Adequate environmental management measures need to be incorporated during the entire planning, construction and operating stages of the project to minimize any adverse environmental impact and assure sustainable development of the area.

65

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

The EMP presented below should be followed and regular monitoring of relevant parameters as stated in post project-monitoring schedule shall be carried out. The EMP is to be proactive in nature and will be upgraded if new facilities or modification of existing facilities, with environmental concerns, come up at a later stage. 3.11.1 Environment Management During Construction Phase 3.11.1.1 AIR ENVIRONMENT INDIAN METEROOGICAL DATA

Indian Meteorological Data conditions of the Project area can be summarised in the table below-:

S.no. Particulars Unit Details

1. Temperature ˚C 21.1-29.3

2. Relative Humidity % 43

3. Annual Rainfall mm 698

4. Wind Direction - North East to South West

5. Predominant Wind Direction - East to West

Annual Windrose Diagram The Windrose Diagram of Annual AVERAGE (2002-2013) is given in figure below-:

Figure 4 Annual Windrose Diagram (Source- IMD, Safdarjung) Air quality around the project will be adversely impacted during the construction stage. Various construction activities especially related to lose material likely to cause generation of dust that adversely impacts the air quality of the surrounding area of the project site. To minimize such impact, following measures will be taken:

66

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

• Dust mitigation measures shall be taken as per Environment (Protection) Amendment Rules, 2018. • Metallic Roads leading to or at construction sites shall be paved and blacktopped. • No excavation of soil shall be carried out without prior barricading of the project site & other adequate dust mitigation measures in place. • No loose soil or sand or Construction & Demolition Waste or any other construction material that causes dust shall be left uncovered. • Wind-breaker around the project site shall be provided. • Water sprinkling system shall be put in place using spraying Nozzles. • Sprinkling shall be done every hour by fixed sprinkling system. • Proper barricading up to 10 m or 1/3rd of building height shall be provided. • Grinding and cutting of building materials in open area shall be prohibited. • Construction and Demolition waste shall be stored only within earmarked area and road side storage of construction material and waste shall be prohibited. • Only covered vehicles carrying construction material and waste shall be permitted inside the complex. • Construction and Demolition Waste processing and disposal site shall be identified and required dust mitigation measures be notified at the site. • DG sets shall be installed acoustically enclosed with adequate stack heights.

Tankers will be used for supply of construction water. Maximum Ground Level

Concentration of PM10 due movement of tankers and operation of DG Set shall be maintained. Detailed AAQ report is discussed in Dispersion report enclosed in Enclosures. Sprinkling will be done at the source of dust anticipated. 3.11.1.2 Noise Environment During the construction stage, expected noise levels will be in the range of 80-100 dB(A), which will decrease with increase in distance. Hence all the construction activities shall be carried out during the daytime. Due to the construction activities undertaken for the project, there will be some noise generation due to the movement of vehicles carrying construction materials and as this will be only a temporary phenomenon, it shall be managed by properly regulating the movement of vehicular traffic so that the ambient noise quality will not be adversely affected. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating the plant and machinery emitting high noise levels. Operation of such plant or machinery shall be strictly prohibited during night hours. Careful planning of machinery operation and scheduling of operations shall be taken to minimize such impact. Furthermore, following measures shall also be adopted:

67

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

• All the machinery and equipment shall be regularly maintained to reduce the noise level. • DG sets of capacity 125 kVA shall be installed acoustically enclosed. • Noise barriers shall be installed to reduce traffic noise & vibrations. • Plantation shall be developed along the periphery of the site. 3.11.1.3 Water Environment During the construction of the proposed project, the services required like water supply and sewage facilities shall be arranged on a temporary basis and the same shall be maintained without any adverse impact on the environment. Following are the measures required to manage the water environment at site: • 12 KLD of water will be required for domestic use and construction purposes. Water shall be taken from STP treated water of nearby area for construction purpose and water supplied through Tankers for domestic use. • Mobile toilets for construction labours shall be provided. • 6 KLD of the sewage and waste water generated shall be discharged into septic tank which will be cleaned regularly. • Runoff from the construction site shall not be allowed to stand (water logging) or enter into the roadside or nearby drain. Adequate measures shall be taken to collect such run off and either are reused or disposed off at the designated construction waste disposal location. 3.11.1.4 Solid Waste Management Out of total basement area, 65000 m3 shall be excavated for 3 level of basement and foundation. Out of which, 4475 m3 of top soil shall be stored at designated area and will be initially stacked and covered with tarpaulin for settling then will be used for landscaping purposes. Remaining excavated soil shall be properly stacked under tarpaulin cover and will be reused for backfilling purpose and road construction etc.

As soon as proposed green area will be ready the top soil will be transferred and seeding will be done with regular sprinkling.

Construction debris like Concrete will be recycled and will be used in lean concrete, brick work wastage will be used waterproofing for terrace, toilets etc. Tiles will be used in creating pathways in the landscape area etc. Recyclable water like aluminium, steel, wood pieces, cement bags, plastic containers, cartons, glass etc. will be sold to recyclers.

Approximately, 23 kg/day of Municipal solid waste shall be generated from temporary labours which shall be disposed off at Municipal Landfill site.

Used oil whenever generated from the DG sets shall be kept in a secured place and in leak prof container and shall be sent to approved recycler.

68

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.11.2 Environment Management during Operation Phase 3.11.2.1 AIR ENVIRONMENT DG set of 1×500 kVA,1×750 kVA has already been installed and 2x 1010 KVA DG Sets after addition will be installed as power backup for emergency use during power failure. Hence, to avoid the emissions, the DG sets shall be kept in acoustically treated room in Basement. Stack height of 6 m above roof level for each D.G. sets shall be provided to reduce the air emissions, meeting all the norms prescribed by CPCB. Table 11: DG set & stack Height

D. G. Set. Capacity No Stack Height 500 kVA 1 Combined Stack of 30 m above 750 kVA 1 surface 1010 KVA 2

As per the specifications from D.G. Set manufacturer following emissions shall be maintained, as given in Table 10.

Table 12: DG Set emission standards D.G Sets No. PM NOx HC CO mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3 500 kVA 1 0.3 9.2 1.3 3.5

750 kVA 1 0.3 9.2 1.3 3.5

D.G Sets No. PM (mg/Nm3) NOx (mg/Nm3) HC (mg/Nm3) CO (mg/Nm3)

1010 kVA 2 75 887.5 100 150

3.11.2.2 NOISE ENVIRONMENT The main sources of the noise pollution will be D.G sets. of 3500 kVA (Existing- 1×500 kVA,1×750 kVA and Proposed- 2 x1010 KVA) will be installed in the project. Existing DG sets are acoustically enclosed and meet the norms prescribed by CPCB. Proposed DG Sets will also be kept acoustically enclosed. Planting of the trees at the boundary of the project help in reducing the level of the noise within the project. The same shall be followed for further addition /alteration in the complex. Location of DG sets: Basement

69

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Insulation of air inlet and outlet points

The sound travels along with air therefore it is necessary to control the travelling sound with the help of insulated ducts [2” glass wool pads and perforated sheets] and louvers at inlet and outlet air points. The ducts have S-type shape to prevent any direct escape of noise Insulated service door The maintenance and servicing of D.G. set is done using a suitable service door of 5’ x 7’ size. The door is made of MS sheet and frames fully insulated with 3” thick glass wool pad followed by perforated aluminium sheets.

Figure 5: Anti-Vibration Pads

70

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.11.2.3 WATER MANAGEMENT In Existing Complex, At present, the total water requirement of the complex is 72 KLD out of which fresh water requirement is 40 KLD which is being met by Tanker Supply, remaining 32 KLD is being met by treated water from in house STP of 35 KLD. Treated water of 32 KLD is being reused completely in flushing, gardening and cooling purposes. After proposed addition in Complex, Total water requirement after addition/alteration has been estimated to be 395 KLD out of which fresh water requirement shall be 165 KLD which will be met by Delhi Jal Board. Rest of the 230 KLD water requirement will be fulfilled by treated water from STP of capacity 300 KLD. Waste water from laundry shall be treated in Effluent Treatment Plant of capacity 25 KLD. The total treated water of 230 KLD shall be used mainly for Flushing, Gardening and Cooling purposes. 3.11.2.3.1 Waste Water Treatment SCHEME OF SEWAGE TREATMENT PLANT:

The STP shall be based on Moving Bed Bio-Reactor (MBBR) technology.

Table 13: Raw Sewage Characteristics Flow m3 / day 242 KLD

pH - 7.5 – 8.0 BOD mg / l 200 - 250 COD mg / l 300 - 400 TSS mg / l 100

The Sewage Treatment Plant (STP) shall treat the sewage & treated water of the STP will be reused for Flushing, Gardening & Misc. purposes.

Table 14: Treated Sewage Characteristics pH - 6.5-9.0 BOD mg / l <10 COD mg / l <50 TSS mg / l <50 Oil & Grease Mg/ l <10

TREATMENT PROCESS:

It is proposed to treat the complete wastewater in a scientific manner through a properly planned treatment plant. The objective is to stabilize the decomposable organic matters present in sewage so as to get an effluent and sludge having characteristics which are within safe limits. To have an efficient treatment system, this aeration system is proposed consisting of MBBR Technology. The sewerage treatment

71

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited. plant can be constructed in such a way that it becomes viable by providing Treated water for reuse and sludge that can be used as for manure for further use.

Different Components of the Plant

In the proposed treatment scheme, the following component unit shall be provided:

➢ Screen chamber ➢ Bar screen /Grit chamber within effluent collection sump. ➢ Submersible type raw effluent re-lift pumps ➢ Equalization tank ➢ MBBR tank/ Aeration tank ➢ Tube settler ➢ Clarified Water, Filtered Water & Soft Water Storage Tanks ➢ Filter feed pump ➢ Tertiary Treatment Units (Filtration, U.V treatment) ➢ Treated Water Supply Pumps ➢ Sludge return pump ➢ Sludge holding tank ➢ Centrifuge for solid waste management ➢ Sludge loading pumps ➢ Sludge drying beds, Centrifuge/Filter Press

PROCESS DESCRIPTION a) Raw sewage from main sewer line shall be collected through gravity pipes into the screen chamber. This manually cleaned screen shall be provided to remove floating and big size particles which may otherwise choke the pumps and pipe lines. b) After screening, the waste water will be allowed to pass through a grit chamber to remove the grit material. The screens and grit chambers shall be accessible so that they may be manually cleaned from time to time. c) The screened waste water from the Grit chamber shall then pass into the equalization tank to homogenize the waste water quality and also even out flow fluctuations and feed waste water of uniform quality at constant rate to subsequent treatment units.

72

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited. d) Air mixing shall be provided to mix the contents of the equalization tank. A coarse bubble aeration grid should be provided to mix the contents of the equalization tank and also to avoid septic conditions in the tank. From the equalization tank the wastewater will be pumped into an MBBR Tank. e) The MBBR process uses small plastic carrier elements to provide growth sites for bacteria attachment in a suspended growth medium. The carrier elements shall allow a higher biomass concentration to be maintained in the reactor. This shall increase the biological treatment capacity for the given reactor volume. f) The carrier elements shall be continuously kept in suspension by the aeration system. The agitation pattern in the reactor shall be designed to provide an upward movement of the carriers across the surface of the retention screen which creates a scrubbing effect to prevent clogging. Combination of fine & coarse bubbles may be provided to provide oxygen as per detailing. g) From the MBBR tank mixed liquor shall flow by gravity into the Tube settler. The solids will settle in the tank. The sludge that settles down shall be transferred to sludge holding tank via sludge loading pumps, with provision of sludge return to the bioreactor if necessary. h) From the tube settler, treated wastewater will be fed by means of filter/softener feed pump sets to pass through dual media filters, activated carbon filters and softeners and stored in the filtered water and soft water storage tanks. The activated carbon filters shall ensure removal of all coloration and odours present in the treated effluent. i) The filtered, clean and odourless water from filtered water tank is then fed through a variable frequency drive hydro-pneumatic system to the external treated effluent rings as per the master plan, from where connections are taken to the garden hydrant system and to each unit for flushing water as per detailing. j) Excess sludge from the tube settler will be taken periodically into sludge holding tank. In this tank sludge will be aerated for self-stabilization. Air will be shut off periodically and superannuate water will be transferred to the aeration tank creating stabilized sludge. The final sludge shall be de-watered through a

73

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

centrifuge mechanism. Sludge loading arrangements shall also be provided for direct disposal of sludge to sludge tankers / trolleys.

LEGENDS MBBR STP TECHNOLOGY Mark Descriptions

Air Line

Sludge Line

Effluent line SLUDGE HOLDING FILTER Air Blowers TANK PRESS FINAL DISPOSAL TO Air Diffusers EQUALIZATION TANK Butter Fly Valv

Non Return Valv

INCOMIN Pump G SEWAGE BAR SCREEN BAFFLE WALL UV TREATED WATER USED OIL & TREATED CLEAR GREASE EQUALIZATION MBBR-1 MBBR-2 WATER TUBE WATER TANK TANK SETTLER TANK MGF ACF

Figure 7: Hydraulic Flow Diagram of STP based on MBBR Technology

SCHEME OF EFFLUENT TREATEMENT PLANT Approx. 18 KLD effluents will be generated from the laboratory and laundry which will be treated in the ETP of 25 KLD. The raw sewage characteristics from the laboratory will be as given in Table & characteristics of treated water from ETP will be as given in Table

Details of ETP are given as follows: The wastewater firstly passes through the oil and grease tank to remove excess oil from the wastewater. The waste water after removal of oil and grease will collected in equalization tank to holding the wastewater for some pre-determined time in a continuously mixed basin to produce a uniform wastewater. The wastewater then subjected to Flocculation tank. In a flocculation tank, the water is stirred or otherwise moved around so that the particles move around, bump into other particles. Chemicals (most commonly "alum"/ polyelectrolyte) are often added to the water going into a flocculation tank to help aid particle formation. The next step in the process is to separate the solid sludge with the wastewater hence the wastewater will be transfer to Tube settlers which capture the settleable fine floc that escapes the clarification zone beneath the tube settlers and allows the larger floc to travel to the tank bottom in a more settleable form. The tube settler’s channel collects solids into

74

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited. a compact mass which promotes the solids to slide down the tube channel to sludge drying beds and the water content will be goes into the carbon filter to remove contaminants and impurities, utilizing chemical adsorption. Finally, the water will be supplies to the Multistage Evaporator to evaporate the wastewater.

Schematic diagram of ETP is given below:

To Sewer Line

3.11.2.3.2 Rain Water Harvesting The main source of ground water recharging in the study area is rainwater, which infiltrates into the ground through various lithological units present in the study area. In the complex total 5 no. (1- Existing & 4-Proposed) of Rainwater Harvesting pits will be there. The runoff from the rooftop and storm water shall go to the recharge pits.  Scheme for Ground Water Recharging The rainwater is diverted from the rooftop using rain water pipes to the surface / underground drainage network. The entire campus is sub divided for recharging structures. The rainwater is diverted into the desilting tank to remove inorganic impurities and the outflow of the desilting tank is taken into the recharge well.  Desilting Tank The desilting tanks are used to remove silt and other floating impurities from rainwater. Desilting tank is like an ordinary container having provision for the inflow, outflow and overflow. Apart from removing silt it holds the excess amount of water till it is soaked up by the recharge structure. The bottom of tank will have unpaved surface (layers of coarse sand) to allow standing water to percolate into the soil. The rainwater collected in these desilting chambers shall be utilized for horticulture.  Recharge well The recharge well consists of percolation pits with boreholes in the middle of the pit. UPVC pipe perforated will be lowered in the middle of the boreholes and the pit will be filled with gravel and pebbles in three layers consisting of boulders, gravel and

75

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited. coarse sand. The mouth of the UPVC pipe shall be protected to avoid silt getting into it. The depth of the bore will depend on the soil condition/water strata. The schematic diagram is enclosed. It should be therefore concluded that there is no significant impact on surface water quality & hydrology of the area. The proposed rainwater-harvesting scheme will stabilize the groundwater table in the area. RAIN WATER HARVESTING CALCULATIONS: -

Soil Quality Silt Loam Infiltration Rate 9 mm/hr Annual Rainfall 698 mm Peak Hourly Rainfall 90 mm/hr Ground Water Level 2.4-53.17 m bgl (As per CGWB report) No. of Rainwater Harvesting Pits 5 (1- Existing & 4- Proposed) Size of Pits Diameter-5 m, Depth- 5.7 m

Table 2: Detailed calculation of rain water harvesting calculation Designated Total volume of Harvesting basis depth water available S. Catchment Factor/ in mm for Type of surface for Rain water No. area (m2) Collection recharge harvesting Efficiency tank in 20 (in m3) min 1 Roof top area 10337.803 0.9 30 279 Paved surface, Roads & other built 2 up area (including Surface Parking) 10411.81 0.8 30 250 Lawns, Garden & 3 all other Open area 5187.40 0.15 30 23 Grand Total 25937.011 m2 552 m3

76

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

RWH Pit Diagram: -

Figure 6 Rain Water Harvesting Pit Diagram

77

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.11.2.4 WASTE MANAGEMENT 3.11.2.4.1 Municipal Solid Waste The solid waste categories and disposal method detail is shown is given in Table 17:

Table 17: Municipal Waste Management

Type of Waste Colours Category Disposal Total Waste of Bins Method Existing Proposed Total after Addition Bio Green Organic Treated in 68 kg/day 860 kg/day 928 kg/day Degradable waste organic waste (25 TPA) (314 TPA) (339 TPA) converter and converted to manure Non- Blue Recyclable Recycler 23 kg/day 286 kg/day 309 kg/day Biodegradable (8 TPA) (105 TPA) (113 TPA) Plastic Blue Recyclable Recycler 23 kg/day 286 kg/day 309 kg/day (8 TPA) (105 TPA) (113 TPA) Total 114 kg/day 1432 kg/day 1546 kg/day (41 TPA) (524 TPA) (565 TPA)

DETAILS OF ORGANIC WASTE CONVERTER

Tentative details of the Organic Waste Converter are as follows:

Model No. No. of OWC Biodegradable Capacity Power Dimension (L x Waste provision Waste per Batch W x H) Reduction RN-1000 1 No. 928 kg/day 1000 23 kW 3.65 m x 1.70 m 90% Kg/day x 2.59 m

Source: - http://reddonatura.com/product-rn125.html

• No. of organic waste converter = 1 No. • Space for organic waste converter = 16.07 m2 • Area provided for storage and management of solid waste = 50 m2

3.11.2.4.2 Hazardous Waste Management: - Hazardous waste is a waste with properties that make it dangerous or potentially harmful to human health or the environment. The universe of hazardous wastes is large and diverse. Hazardous wastes can be liquids, solids, contained gases, or sludge. They can be the by-products of manufacturing processes or simply discarded

78

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited. commercial products, like cleaning fluids or pesticides. All hazardous wastes are required to be treated and disposed off in the prescribed manner.

The main objective is to promote safe management and use of hazardous substances including hazardous chemicals and hazardous wastes, in order to avoid damage to health and environment.

Table 3: Hazardous & E-Waste Management Total Waste Type of Proposed Total after Disposal Method Waste Existing Addition/ Alteration Used oil shall be given to 0.144 0.24 0.384 kL/annum Approved vendor Hazardous & kL/annum Kl/annum Used Oil other waste (Management & Handling) Rules, 2016 E-Waste (Management & - 0.024 TPA E-waste - Handling) Rules, 2016

Battery waste will be generated from inverters & UPS, which shall be treated as per the Batteries (Management & Handling) Rules, 2001. 3.11.2.5 PLANTATION Green belt planning will be done with ecological perspectives for the project taking into consideration and availability of space and other aspects. This will help in increasing the aesthetic effect of the environment. Since tree trunks are devoid of foliage, scrub should form there to give coverage to the trunks. The trees maintain the regional ecological balance and conform to soil and hydrological conditions. Indigenous species would be preferred. Green area is already being developed in existing plot. So, to develop additional block, clearance of existing shrubs, lawn and one small temporary structure will be required. No, tree will be cut, only transplantation will be done if required, after getting prior permission from concern department.

After Alteration/addition, Green Area of 5187.40 m2 (i.e. 20.00 % of net total plot area) will be develop.

The trees planted are of adequate height and the same shall be maintained for proposed addition. Few trees exist at site boundary which shall be retained. Total No. of trees required = Total Net plot area/80

= 25937.011/80

79

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

= 324.2 (say 325) Total no. of trees to be proposed = 330

Table 4Table \* ARABIC 4 : Total no. of Species Exist and proposed

Existing species S.No Botanical Name Common Name 1 Azadirachta indica Neem 2 Morus alba Shahtoot 3 Eucalyptus globulus Eucalyptus 4 Ficus benjamina Weeping fig 5 Plumeria alba Champa 6 Ficus benghalensis Banyan Tree 7 Cycas revoluta Sago palm 8 Grevillea robusta Silver oak 9 Delonix regia Gulmohar 10 Pinus roxburghii Pine tree 11 Roystonea regia Royal Plam 12 Saraca asoca Ashoka tree 13 Callistemon viminalis Weeping bottlebrush

List of Proposed species of Shrubs

S. No. Scientific Name Common Name 1 Hamelia patens Firebush 2 Nerium olender Kaner 3 Cycas revoluta Sago palm 4 Gardenia jasminoides Cape jasmine 5 Plumeria rubra Frangipani 6 Thuja occidentalis Arborvitae

LANDSCAPE PLAN

N

80

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.11.3 ANTICIPITATED IMPACT & MITIGATION MEASURES 3.11.3.1 DURING CONSTRUCTION PHASE S. No. Description Impacts Mitigation Measures

1. Air & Noise  Dust will be generated due to  Water sprinkling shall be done to Environment Site clearance and emissions reduce the dust during construction may be generated due to of buildings. vehicles, DG sets and  D.G. set of 1×125 kVA shall be machinery/equipment etc. provided with adequate stack height  Loading and unloading of to avoid emissions. construction materials like,  Trees are already planted along the cement, sand, stones, bricks, boundary wall. etc. will result in dust generation.  Procurement and transport of construction materials such as sand, cement etc. will also result in dust generation. 2. Water  Soil runoff from the site leading  During construction phase, water Environment to off – site contamination will be provided from the nearby (Particularly during rainy STP/tanker water supplier. season).  The rain water from the  Improper disposal of construction site shall be collected, construction debris leading to treated & reused for sprinkling. off-site contamination of water  Approx. 6 KLD of sewage from resources. labours shall be discharged into  Disposal of domestic waste septic tank which will be cleaned water from temporary labour regularly. rest rooms.  Spillage of oil and grease from the vehicle and waste water stream generated from on-site activities.

81

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3. Solid Waste  The waste from labour rest  Approx. 23 kg/day of municipal solid rooms/sheds would be mainly waste shall be generated from 150 household domestic waste labours which shall be disposed off  The solid waste generated in MSW site. during construction phase used  Used oil whenever generated from oil from DG sets. the DG sets shall be kept in an isolated area and in leak proof container and sent to approve recycler. 4. C&D waste  Generation of C&D Waste from  Majorly C&D waste will be used for demolition and Construction backfill and road construction. Excess, C&D waste will be disposed to C&D waste facility site. 3.11.3.2 DURING OPERATION PHASE S. No. Description Impacts Mitigation Measures

1. Air & Noise  Running of DG sets of  DG sets shall be provided with Environment capacities 1×500 kVA,1×750 stack height of 30 m above the kVA, 2 x 1010 KVA during surface. power failure will result into air emissions. 2. Water  During the operation phase  Fresh water requirement shall be Environment abstraction of ground water is reduced to 230 KLD by inhouse STP not proposed for project. Fresh treated water. water requirement of 165 KLD  All sewerage treated water will be shall be met by municipal reused within the project site. Only supply of Delhi Jal Board. treated water from ETP will be  In the propose project, total discharge to the sewer line. water will be used for domestic  Rain water shall be recharged into use, flushing, Cooling, and the ground water by 5 rain water gardening purposes etc. harvesting pits. Therefore, wastewater discharge of 242 KLD will be liquid waste and sewage and shall be treated in STP of 300 KLD and laundry waste of 18 KLD in ETP. 230 KLD of treated water shall be reused in Flushing, Cooling and gardening purposes.

82

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3. Solid Waste  Bio-degradable and recyclable  Bio-degradable waste of 928 waste from households’ Kg/day (339 TPA) shall be disposed activities. in Organic waste convertor.  Used oil from DG sets and e-  Plastic waste of 309 Kg/day (113 waste. TPA) and Recyclable waste of 309  E- waste & battery waste Kg/day (113 TPA) will be given to generation. approved recycler.  Used oil of 0.384 Kl/annum will be generated from the DG sets which shall be kept in an isolated area and in leak proof container and shall be given to authorised recycler.  The generated E-waste of 0.024- 0.036 tons/annum shall be given to Authorized vendor.  Battery waste shall be treated as per the Batteries (Handling & Management) Rules, 2001. 3.12 ENVIRONMENT MONITORING PLAN During Construction

Sr. No. Type of Monitoring Frequency of Parameter Location Monitoring 1 Ambient Air Quality Six Monthly Particulate Matter (PM 2.5) Two Locations in Particulate Matter (PM 10) and around the Sulphur Dioxide (SO2) project site Nitrogen Oxides (NOx) 2 Stack Monitoring Six Monthly Particulate Matter, Sulphur DG sets of Dioxide (SO2), Nitrogen capacity 125 kVA Oxides (NOx) installed for construction purposes 3 Water Quality Six Monthly All parameters mentioned One drinking Monitoring for in IS:10500 water sample drinking water 4 Water Quality Six Monthly All parameters mentioned One construction Monitoring for in IS:456 water sample Construction purpose 5 Noise Level Six Monthly Day and Night noise level Two locations Monitoring

83

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

6 Soil Quality Six Monthly All parameters to check soil Two Locations in Monitoring Fertility and around the project site 7 Monitoring of Six Monthly _ _ waste generation and other pollution control aspects

During Operation Phase

Sr. No. Type of Monitoring Frequency Parameter Location of Monitoring 1 Ambient Air Quality Six Monthly Particulate Matter (PM 2.5), Two Locations in Particulate Matter (PM 10), and around the Sulphur Dioxide (SO2), project site Nitrogen Oxides (NOx) 2 Stack Monitoring Six Monthly Particulate Matter, Sulphur DG sets (1 x 500 Dioxide (SO2), Nitrogen KVA, 1 x 750 KVA Oxides (NOx) & 2 x 1010 KVA) installed for backup purposes 3 Water Quality Six Monthly All parameters mentioned in One drinking Monitoring for IS:10500 water sample drinking water 4 Sewage Treatment Six Monthly BOD, COD, TSS, Oil and Grease Inlet and Outlet of Plant Monitoring and pH STP 5 Effluent Treatment Six Monthly BOD, COD, TSS, Oil and Grease Inlet and Outlet of Plant Monitoring and pH STP 5 Ambient Noise Six Monthly Day and Night noise level Two locations Level Monitoring 6 DG Set Room Noise Six Monthly Inside and Outside of DG Set One Locations Monitoring Enclosure 7 Soil Quality Six Monthly All parameters to check soil Two Locations in Monitoring Fertility and around the project site 8 Monitoring of Six Monthly _ _ Waste Generation and other pollution control aspects

84

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.13 Environment Management Cost 3.13.1 Capital Cost S No. Description Total Coast (In Lacs) 01. Landscaping 20

02. Sewage Treatment plant 70

03. DG Stack & Acoustic Treatment 4

04. Solid Waste Management 25

05. Rainwater Harvesting 15

06. Miscellaneous 5

Total 139 lacs

3.13.2 Recurring Expenditure

S No. Description Total Coast (In Lacs/ year) 01. Landscaping 2.0

02. Water Management 7.0

03. Air Management 0.4

04. Environment Management 2.0

05. Solid Waste Management 1.0

06. Miscellaneous 1.0

Total 13.4 lacs/year

85

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

3.14 Corporate Environment Responsibility As per CER office memorandum of MOEF dated 1.5.2018, the project cost for project is Rs 126 Cr, hence the project has to spend 1.5 % of the cost of the project (Rs 1.89 Cr.) on CER activities.

As per the Office Memorandum some of the activities which can be carried out in CER, are infrastructure creation for drinking water supply, sanitation, health, education, skill development, roads, cross drains, electrification including solar power, solid waste management facilities, scientific support and awareness to local farmers to increase yield of crop and fodder, rain water harvesting, soil moisture conservation works, avenue plantation, plantation in community areas, etc.).

The following CER activities will be proposed around the project-

86

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Activity Provision Village 1st year 2nd year 3rd year 4th year 5th year Total (Lakhs) (Lakhs) (Lakhs) (Lakhs) (Lakhs) Cost (lakhs) 1 Waste Providing coloured dust bins and 4 Fatehpur Beri, Maidan 18 18 18 2 2 58 Management organic waste converters and collection Garhi, Sultanpur, of segregated waste and their Chatterpur village disposable, maintenance for the next 4 year. 2 Drinking Drinking water by providing 4 Rajpurkhurd, Fatehpur 3 3 1.5 1.5 1.5 10.5 water supply community water coolers in 4 villages. Beri, Maidan Garhi, & Sanitation Providing 4 toilets (Girls & Boys) facility Sultanpur village in government schools and 4 common community toilets in 4 villages and their maintenance for the next five year 3 Skill To Providing imparting capacity building Fatehpur Beri, Sultanpur, 7 7 4 2.5 2.5 23 Development training in stitching, computer based and Chatterpur village programmes, beautician course, hospitality management course etc. especially among women, elderly and the differently abled in 3 villages 4 Solar Power Providing off-grid interactive solar Rajpurkhurd, Fatehpur 10 8 3 2.5 2 25.5 provision lanterns, Solar home systems and Beri, Maidan Garhi, decentralised renewable energy with Sultanpur village providing sustainable and affordable electricity to 4 areas Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

5 Education Providing scholarship to deserving and Rajpurkhurd, Fatehpur 12 12 7 5 5 41 (scholarship, needy for underprivileged children of Beri, Sultanpur, Chatterpur Material and labour, drivers, vegetable vendors etc village Academic with material support in the form of support) school uniform, school bag, shoes etc. and academic support in the form of Tuition classes after school in 4 villages 6 Healthcare Providing healthcare to poor or Fatehpur Beri, Maidan 8 8 5 5 5 31 support marginalised communities in the form of Garhi, Sultanpur, monthly medical camps, working on Rajpurkhurd, Chatterpur maternal and child care (pardiatric), village child heart surgery, cancer treatment and increase awareness on these diseases. Total 58 56 38.5 18.5 18 189

88

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

ENCLOSURE 4. RISK ASSESSMENT

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

4.1 RISK ASSESSMENT

Risk is a potential that a chosen action or activity will lead to a loss of human or property.

Risk assessment is a step for Risk Management. Risk assessment is determination of qualitative and quantitative value of risk related a situation or hazard. Hazard is a situation that poses a level of threat to life health or environment. Risk assessment involves the following: • Hazard Identification • Vulnerability Analysis • Risk Analysis • Emergency Preparedness Plan

4.1.1 HAZARD IDENTIFICATION

The project is a Motel and Commercial complex and there may be following types of hazards: 4.1.1.1 Natural hazard: Earthquake Flooding 4.1.1.2 Manmade hazard: Health Injuries Fire & explosion Electrical Mechanical Radiation Thermal Chemical 4.1.2 VULNERABILITY ANALYSES This is a Motel and Commercial complex hence Motel guests, staff & visitors are vulnerable to risks. 4.1.3 RISK ANALYSES

90

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

The risk is likelihood of harmful effect big or small due to hazard, together with severity of harm suffered. Risk also depends on number of people exposed to hazard. Risk analysis provides severity of harm from particular type of hazard. 4.1.3.1 Earthquake: The project is located at seismic zone IV where earthquake can occur from 4.0-7.0 Richter scale. 4.1.3.2 Flooding: The project site is located in an area where no natural river or drainage exists. However, flooding can occur due to excess rain. 4.1.3.3 Health Injuries 1. Safety nets will be provided at appropriate level and various shafts/ openings will be kept covered to prevent falls, slips, trips etc. 2. Necessary safety belts, helmets and eye-masks as required will be enforced at site. 3. Adequate guardrails will be provided to the staircases and common areas. 4. Adequate guardrails/ fences will be provided around the water storage spaces to prevent drowning accidents. 5. Adequate protection/ fence will be provided around the excavated areas. 6. The machinery and the equipments will be regularly tested and maintained with the specific emphasis against accidents failures. 7. The deployed Safety officers will ensure that the personnel/ labor will be kept at a safe distance from working machinery to avoid accidents/ injuries due to toxic gases/ chemical/ noise. 8. Moving parts of various parts of machineries/ equipments will be properly guarded. 9. Rest rooms and first aid facilities will be made available for the workers. 4.1.3.4 Fire & Explosion: Since it is a Shopping Complex, fire can occur due to electrical spark or gas leakage from kitchens. Fire is mainly caused in due to carelessness, short circuits, and malfunctioning of gas regulator, tube, and such related products. 4.1.3.5 Electrical: The electrical current can pass to the floor & metals due to inadequate insulation or accidently. 4.1.3.6 Mechanical: The mechanical fault that can cause the risk & hazard include the elevators.

91

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

4.1.3.7 Radiation: Due to use of wireless equipments there may be electromagnetic radiation. 4.1.3.8 Thermal: Thermal heat can be generated from the D.G sets and the vehicles in the colony. 4.1.3.9 Chemical: Chemical use in the Shopping complex limited to cleaning agents & medicines. 4.2 Disaster Management Plan Disaster Management provides the opportunity to plan, prepare and when needed enables a rational response in case of disasters/ mass casualty incidents (MCI). Disasters and mass casualties can cause great confusion and inefficiency in the hospitals. They can overwhelm the complex resources, staffs, space and or supplies. Lack of any tangible plan to fall back upon in times of disaster leads to a situation where there are many sources of command, many leaders, and no concerted effort to solve the problem. An internal risk management authority is formed which may undertake periodic evaluation of safety precautions to be followed by each department for hazard recognition with the following steps: Building will be undertaken on a periodical basis to identify the measures taken to prevent/reduce the impact of the potential hazards. All peoples will be encouraged to routinely assess all activities to identify potential hazards. To make the proceedings easier, the all the persons will embark upon disaster planning using a phase plan. The building emergency planning is divided into three phases: 4.2.1 Pre-disaster phase Planning: Risk assessment and planning for preparedness will be done, the building plans will be formulated and then discussed in a suitable forum for approval. The disaster manual: The building disaster plan shall be written down in a document form and copies of the same should be available in all the areas of the building. Education and training: Regular training by suitable drills shall be undertaken in this phase. 4.2.2 Disaster Phase Phase of activation: Alter and notification of emergency. Activation of the chain of command in the building.

92

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Operational phase: This is the phase in which the actual tackling of mass casualties will be performed according to the disaster/emergency plan. Phase of deactivation: When the administration/ command of the building will be satisfied that the influx of mass casualty victims is not continuing to overwhelm the building facilities. 4.2.3 Post Disaster Phase This is an important phase of disaster planning where the activities of the disaster/ emergency phase will be discussed and the inadequacies will be noted for future improvements. 4.3 SAFETY MEASURES: Management provides the opportunity to plan, prepare and when needed enables a rational response in case of disasters/ mass casualty incidents (MCI). Disasters and mass casualties can cause great confusion and inefficiency in the hospitals. They can overwhelm the Commercial resources, staffs, space and or supplies. Lack of any tangible plan to fall back upon in times of disaster leads to a situation where there are many sources of command, many leaders, and no concerted effort to solve the problem. An internal risk management authority is formed which may undertake periodic evaluation of safety precautions to be followed by each department for hazard recognition with the following steps: Building will be undertaken on a periodical basis to identify the measures taken to prevent/reduce the impact of the potential hazards. All peoples will be encouraged to routinely assess all activities to identify potential hazards. To make the proceedings easier, the all the persons will embark upon disaster planning using a phase plan. The building emergency planning is divided into three phases: 4.3.1 Pre-disaster phase Planning: Risk assessment and planning for preparedness will be done, the building plans will be formulated and then discussed in a suitable forum for approval. The disaster manual: The building disaster plan shall be written down in a document form and copies of the same should be available in all the areas of the building. Education and training: Regular training by suitable drills shall be undertaken in this phase. 4.3.2 Disaster Phase Phase of activation: Alter and notification of emergency.

93

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

Activation of the chain of command in the building. Operational phase: This is the phase in which the actual tackling of mass casualties will be performed according to the disaster/emergency plan. Phase of deactivation: When the administration/ command of the building will be satisfied that the influx of mass casualty victims is not continuing to overwhelm the building facilities. 4.3.3 Post Disaster Phase This is an important phase of disaster planning where the activities of the disaster/ emergency phase will be discussed and the inadequacies will be noted for future improvements.

94

Alteration/Addition in Motel Building at Village- Satbari, New Delhi by M/s Anant Raj Limited.

ENCLOSURE 5. Disclosure of the consultant showing NABET/QCI Accreditation Status