Environmental and Social Impact Assessment of 200 MW Wind Project at Village Aspari, District Kurnool, Andhra Pradesh
Total Page:16
File Type:pdf, Size:1020Kb
Draft Environmental and Social Impact Assessment Project Number: 49241-001 April 2016 Environmental and Social Impact Assessment of 200 MW Wind Project at Village Aspari, District Kurnool, Andhra Pradesh Mytrah Wind and Solar Power Development Project (India) Prepared by Voyants Solutions Pvt. Ltd. for the Asian Development Bank. The report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environmental and Social Impact Assessment Study of 200 MW Wind Farm at Village Aspari, District- Kurnool in the State of Andhra Pradesh FINAL ESIA REPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT April 2016 IND: Environmental and Social Impact Assessment of 200 MW Wind Project in village Aspari, District Kurnool, Andhra Pradesh Prepared by Voyants Solutions Pvt. Ltd. for the Asian Development Bank. {GUR_EMS_1437 Final Environmental and Social Impact Assessment_11042016 originally posted in April, 2016 available on {http://www.adb.org/Projects/ Ind: Environmental and Social Impact Assessment of 200 MW Wind Farm Project in village Aspari, district Kurnool, Andhra Pradesh.} Environmental and Social Impact Assessment Study of 200 MW Wind Farm at Village Aspari, District- Kurnool in the State of Andhra Pradesh FINAL ESIA REPORT CURRENCY EQUIVALENTS (AS OF 01.03.2016 @ OANDA.COM) {The date of the currency equivalents must be within 2 months from the date on the cover.} CURRENCY UNIT – INR $1.00 = 68.616 Page | ii Environmental and Social Impact Assessment Study of 200 MW Wind Farm at Village Aspari, District- Kurnool in the State of Andhra Pradesh FINAL ESIA REPORT ABBREVIATIONS ADB Asian Development Bank APPCB Andhra Pradesh Pollution Control Board BOD Biological Oxygen Demand BPA Business Partnership Agreement BPL Below Poverty Line CEA Central Electricity Authority CHC Community Health Centre CPCB Central Pollution Control Board CSR Corporate Social Responsibility CTE Consent to Establish CTO Consent to Operate DISH Directorate of Industrial Safety and Health EAC Expert Appraisal Committee EHS Environment, Health and Safety EPC Engineering Procurement and Construction ESIA Environmental and Social Impact Assessment ESMP Environmental and Social Management Plan ESZ Ecologically Sensitive Zone FGD Focus Group Discussions GRM Grievance Redressal Mechanism IFC International Finance Corporation IMD Indian Meteorological Department IPP Independent Power Producer MEIL Mytrah Energy (India) Limited MEL Mytrah Energy Limited MoEF & CC Ministry of Environment, Forests & Climate Change MSL Mean Sea Level MVTPL Mytrah Vayu (Tungabhadra) Private Limited NAAQS National Ambient Air Quality Standards NABL National Accreditation Board for Testing and Calibration Laboratories NOC No Objection Certificate O&M Operation and Maintenance OBC Other Backward Caste PHC Primary Health Centre PS Performance Standard RTFCTLARR Right to Fair Compensation and Transparency in Land Acquisition and Rehabilitation & Resettlement SC Scheduled Caste SCADA Supervisory Control and Data Acquisition SEIAA State Environment Impact Assessment Authority SEMS Social and Environmental Management System SPS Safeguard Policy Statement SPV Special Purpose Vehicle Page | iii Environmental and Social Impact Assessment Study of 200 MW Wind Farm at Village Aspari, District- Kurnool in the State of Andhra Pradesh FINAL ESIA REPORT ST Scheduled Tribe TDS Total Dissolved Solid VSPL Voyants Solutions Pvt. Ltd. WPR Work Participation Ratio WTG Wind Turbine Generator Page | iv Environmental and Social Impact Assessment Study of 200 MW Wind Farm at Village Aspari, District- Kurnool in the State of Andhra Pradesh FINAL ESIA REPORT NOTES (i) The fiscal year 2015-16 of the Government of India ends on March 31, 2016. (ii) In this report, "$" refers to US dollars. This environmental and social impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Page | v Environmental and Social Impact Assessment Study of 200 MW Wind Farm at Village Aspari, District- Kurnool in the State of Andhra Pradesh FINAL ESIA REPORT TABLE OF CONTENTS 0 EXECUTIVE SUMMARY .............................................................................................................. 1 0.1 INTRODUCTION............................................................................................................................................... 1 0.2 OBJECTIVES ....................................................................................................................................................... 1 0.3 ESIA PROCESS AND METHODOLOGY ..................................................................................................... 2 0.4 SITE SETTING ................................................................................................................................................... 2 0.5 CURRENT STATUS .......................................................................................................................................... 3 0.6 POWER EVACUATION SCHEME ................................................................................................................ 3 0.7 PROJECT DEVELOPMENT ........................................................................................................................... 3 0.8 CLIMATE CHANGE IMPACT ASSESSMENT........................................................................................... 3 0.9 BASELINE SCENARIO, IMPACT AND MANAGEMENT ...................................................................... 4 0.10 IMPACTS AND MANAGEMENT .................................................................................................................. 8 0.11 ANALYSIS OF ALTERNATIVES ............................................................................................................... 13 0.12 INFORMATION DISCLOSOURE, CONSULTATION AND PARTICIPATION ............................. 14 0.13 CONCLUSION ................................................................................................................................................. 14 1 INTRODUCTION ........................................................................................................................ 15 1.1 PROJECT PROPONENT .............................................................................................................................. 15 1.2 PROJECT BACKGROUND ........................................................................................................................... 16 1.3 PURPOSE AND SCOPE OF ESIA .............................................................................................................. 16 1.4 OBJECTIVES .................................................................................................................................................... 17 1.5 APPROACH AND METHODOLOGY ........................................................................................................ 17 1.6 LIMITATIONS OF THE ESIA STUDY...................................................................................................... 18 1.7 REPORT STRUCTURE ................................................................................................................................. 18 2 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK ............................................... 20 2.1 INTRODUCTION............................................................................................................................................ 20 2.2 NATIONAL REGULATIONS ....................................................................................................................... 20 2.3 NATIONAL ENVIRONMENTAL POLICY 2006 ................................................................................... 20 2.4 NATIONAL ELECTRICITY POLICY 2005 ............................................................................................. 21 2.5 ANDHRA PRADESH WIND ENERGY POLICY, 2015........................................................................ 21 2.6 APPLICABLE ENVIRONMENTAL STANDARDS ................................................................................ 39 2.7 INTERNATION SAFEGUARD REQUIREMENTS ................................................................................ 43 2.8 PROJECT CATEGORIZATION ................................................................................................................... 54 3 DESCRIPTION OF THE PROJECT ......................................................................................... 57 3.1 PROJECT LOCATION ..................................................................................................................................