Masan I Barrage of Haryana Uncleanliness in Jama Masjid Area - Delhi 6149

Total Page:16

File Type:pdf, Size:1020Kb

Masan I Barrage of Haryana Uncleanliness in Jama Masjid Area - Delhi 6149 179 Written Answers APRIL 6,1992 Written Answers 180 Masan I Barrage of Haryana Uncleanliness in Jama Masjid Area - Delhi 6149. SHRI RAO RAM SINGH: Will the Minister of W ATER RESOURCES be 6150. SHRI MUMTAZ ANSARI: Will the pleased to state: MinisterofCIVILAVIATION AND TOURISM be pleased to state: (a) whether construction work of Mas- ani Barrage in Rewari district of Haryana has (a) whetherthe Government are aware been completed; that tourists are facing inconvenience due to the unhygenic conditions in the meat and (b) ^ so, the total amount spent so far on fish market adjoining the historic Jama Masjid the project; are of Delhi; (c) whether this barrage has not been (b) if so, whetherthe Government have utilised so far due to non-release of water by taken up the matter with appropriate author­ the Rajasthan Government; and ity in this regard; (d) the steps proposed to be taken by (c) if so, the results thereof; and the Union Government to conclude an agree­ ment to ensure the proper utilisation of the (d) if not, the reasons therefor and the Masani Barrage Water? action Government propose to take in this regard’ THE MINISTER OF WATER RE­ SOURCES (SHRI VIDYACHARAN SHUKLA): (a) The construction of the proj­ THE MINISTER OF CIVIL AVIATION ect is complete except for the erection of the ANDTOURISM (SHRI MADHAVRAOSCIN- gates and gearings. DIA): (a) to (d). The Central Department ot Tourism have not received any complaint (b) Expenditure incurred so far amount regarding inconvenience caused to tourists to Rs. 43.00 crores. visiting Jama Masjid in Delhidueto unhygenic conditions in the adjoing market. (c) No storage has been constructed or contampiated by Rajasthan Government Mispresent Deities in Rims upstream of Masani Barrage envisaging any releases for the Masani Barrage 6151. SHRI RAJESH KUMAR: Will the Minister of INFORMATION AND BROAD­ (d) The Masani barrage project is a part CASTING be pleased to state: of the Integrated Master Plan for Sahibi Basin as prepared by the Central Water (a) whether there has been the ten­ Commission. A Standing Committee on dency of producers. Directors, and actors to Sahibi under the Chairmanship of Member mispresent Deities in their films; (RM) of Central Water Commission has been set up to oversee the implementation of all (b) if so. the action taken in this regard; elements of the integrated Master Plan in consultation with the concerned States and to ensure that regulation of flow at l >ntrol (c) whether any guidelines have been points is carried out in the best interests of all issued to the Central Film Censor Board in the concerned States. this regard;.
Recommended publications
  • Government of India Ground Water Year Book of Haryana State (2015
    CENTRAL GROUND WATER BOARD MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVINATION GOVERNMENT OF INDIA GROUND WATER YEAR BOOK OF HARYANA STATE (2015-2016) North Western Region Chandigarh) September 2016 1 CENTRAL GROUND WATER BOARD MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVINATION GOVERNMENT OF INDIA GROUND WATER YEAR BOOK OF HARYANA STATE 2015-2016 Principal Contributors GROUND WATER DYNAMICS: M. L. Angurala, Scientist- ‘D’ GROUND WATER QUALITY Balinder. P. Singh, Scientist- ‘D’ North Western Region Chandigarh September 2016 2 FOREWORD Central Ground Water Board has been monitoring ground water levels and ground water quality of the country since 1968 to depict the spatial and temporal variation of ground water regime. The changes in water levels and quality are result of the development pattern of the ground water resources for irrigation and drinking water needs. Analyses of water level fluctuations are aimed at observing seasonal, annual and decadal variations. Therefore, the accurate monitoring of the ground water levels and its quality both in time and space are the main pre-requisites for assessment, scientific development and planning of this vital resource. Central Ground Water Board, North Western Region, Chandigarh has established Ground Water Observation Wells (GWOW) in Haryana State for monitoring the water levels. As on 31.03.2015, there were 964 Ground Water Observation Wells which included 481 dug wells and 488 piezometers for monitoring phreatic and deeper aquifers. In order to strengthen the ground water monitoring mechanism for better insight into ground water development scenario, additional ground water observation wells were established and integrated with ground water monitoring database.
    [Show full text]
  • Notice Inviting Bid
    Notice Inviting Bid 1. Introduction: Haryana Forest Development Corporation Ltd. (HFDC) is a Govt. of Haryana Undertaking registered under the companies Act 1956. HFDC is having its registered office at Bays No. 27-28, Sector 4, Panchkula. There are three Chief General Managers and ten General Manager offices are situated at various districts of the state given as under: Sr. Name of offices Telephone Name of GMs offices Telephone No. No. No. 1 PCCF-cum-MD, 0172-2564463 1. General Manager (HQ), Bays No. 27-28, Sector 4, 0172-283620 Panchkula Panchkula 1 Chief General 0171-2551567 1. General Manager, HFDC, Forest Complex, 0171-2551567 Manager, Ambala Ambala City. 2. General Manager, HFDC, Forest Complex, Pipli, 01744-293364 Kurukshetra. 3. General Manager, HFDC, Opposite District Court, 01732-237824 Yamuna Nagar 2 Chief General 0184-2241545 4. General Manager, HFDC, Forest Complex, 0184-2241545 Manager, HFDC, Railway Road, Karnal Forest Complex, 5. General Manager, HFDC, Forest Complex, Mill 01662-259278 Mill Gate, Karnal Gate, Hisar 6. General Manager, HFDC, Forest Complex, MITC 01666-243020 Colony, Sirsa 3 Chief General 0124-2305348 7. General Manager, HFDC, House No. 1098, Prem 01262-253584 Manager, HFDC, Nagar, Old Jail Road, Rohtak Forest Complex, 8. General Manager, HFDC, Forest Complex, Sohna 0124-2305348 Sohna Road, Road, Gurugram Gurugram 9. General Manager, HFDC, Masani Barrage, Near 0124-2305348 Khaliawas, Dharuhera, Rewari HFDC is in the business of tree harvesting, furniture manufacturing, plantation & landscaping works and other works related to forestry and wildlife management. The annual turnover of the Corporation is around 70 crores (Approximately). 2. Scope of work: 1.
    [Show full text]
  • Rewari, Haryana
    PREFACE Flood control Order is the most important aspect of managing flood situation in the district. With the guidance of Revenue & Disaster Management Department, the district administration has made an endeavor to prepare Flood Control Order. This document contains the Flood Vulnerability in the district, flood action plan, list of flood relief equipments available in the district etc. I hope this document shall help the district administration in tackling the flood situation in a systematic and smooth manner. Sh .Yashendra Singh, IAS Deputy Commissioner Rewari, Haryana Flood Control Order-2020 Page 1 CONTENT Sr.no. Chapter name 1 Introduction 1.1 Geographical setting of the District. 1.2 Administrative setup of the District. 1.3 Land use pattern of the District. 1.4 Climate and Rainfall Pattern of the District. 1.5 Detailed map of the District 2 Drainage system 2.1 Drainage system in the District 2.2 Drainage map of the District. 3 Flood Vulnerability in the District 3.1 Flood risk and causes of flood in the District. 3.2 Flood prone area /vulnerability village in the District. 4 Flood Action Plan 4.1 Set-up flood control room a) Activities of Flood Control Room 4.2 Pre-flood Inspection 4.3 Flood Warning system 4.4 Police Control Rooms 4.5 Ring Bund 4.6 Responsibility of various concerned Department Before , During and After Flood 5 Flood relief equipment and trained personnel in the District 5.1 List of flood equipment available within the District 5.2 List of JCB/Dumper available within the District 5.3 List of Home Guards 5.4 List of officials trained in flood Relief camp at Brahm Sarovar 5.5 List of Divers available in the District 6 Important Telephone Number 6.1 District Administration Contact Number.
    [Show full text]
  • Draft Annual Plan 1983-1984
    HARYANA STATE DRAFT ANNUAL PLAN 1983-84 VOL. I (In 4 Volumes) VOL I Brief Memorandum alongwith G .N. Statements I—VI and other Statements VOL. n Sectoral Programmes—Agriculture & Allied Sectors and Co-operation VOL. Ill Sectoral Programmes-—Irrigation and Power, Mustries, Transport Sc Communication Sectors VOL. IV Sectoral Programmes—Social Services, Economic & General Services Sectors PLANNING DEPARTMENT GOVERNMENT OF HARYANA DECEMBER, 1982 HARYANA STATE DRAFT ANNUAL PLAN 1983-1984 (BrirJrrief Memorandum alongwith G. N. and Other Statemenis) PLANNING DEPARTMENT GOVERNMENT OF HARYANA DECEMBER, 1982 iub. Nati; I U»tt, Nation:.! lui. u c of Educatiomal Planning and Aaiinistratton 17-®,SriAurbindc Marti.Ne^Dclhi-110016 DOC. No...3 ..:r. CONTENTS PART—I Pages Introduction and Programme-^wise Write-up 1 to 22 p a r t —II Statements GN—1 to 6 1 to 124 and Other Statements MARYANA STATE DRAFT ANNUAL PLAN-1983-84 1.1 Introduction The approved outlay for Haryana’s Sixth Plan (1980-85) is Rs 1800 crore. An expenditure of Rs. 245.86 crore was incurred during 1980-81 and Rs. 288.63 crore during 1981-82. The approved outaly for 1982-83 is Rs. 319.98 crore. In this outly the provision for Satluj Yamuna Link Canal was only Rs. 8 crore. In December 1981 a decision was taken to complete this canal wilhin two years. Consequently the requirement of funds was worked out and it was found that Rs. 67 crore would be required for this project during 1982 83. An e>:ercise to find additional funds within the over all ceiling of Rs.
    [Show full text]
  • CD-X+RFP+Corri..Pdf
    1 Request for Proposal (RFP) is invited from Consultant/ Joint Venture/ Multi-disciplinary Consortia, Government Organization , Public Sector undertaking, Government Educational Institute and I&FC Empanelled agencies, for Project Management Consultancy (PMC) for the work to rejuvenate drain in holistic manners by using ecologically sensitive sustainable technique like creation of stationary and floating wetlands and in-situ aeration & installation of ozonizer in drains which can reduce BOD load, improve dissolved oxygen levels, reduce bad odour and harmful gas emission from the drains. Further to develop the vacant land by landscaping, developing it for recreation activities such as cycling track, jogging track, Illumination of dark spots of drain by installation of street lighting automated with solar energy/wind energy wherever feasible and Installation of solar panels for generation of solar energy, in respect of drains falls under the jurisdiction of, I&FC Department, for Rejuvenation purpose. Introduction:- The quality of waste water of the drains falling under the Jurisdiction of Civil Division X, I&FC Department here-in-after called as Department, is alarming due to industrial effluent, waste water and septage from the adjoining un-seweredvillages and industrial waste flowing into the drains. BOD of the waste water has been found to vary high at different locations. The fumesof waste water in drains are also contributing tothe air pollution and pollute the sub soil of the area along which it flows. BACK GROUND:- There are 57 major and minor storm waterdrains under the jurisdiction of Irrigation and Flood Control Department in Delhi. Out of the 57 drains following drains fall under the jurisdiction of Civil Division X, I&FC Department for Rejuvenation purpose.
    [Show full text]
  • HARYANA FOREST DEVELOPMENT CORPORATION LTD. (A Government of Haryana Undertaking)
    HARYANA FOREST DEVELOPMENT CORPORATION LTD. (A Government of Haryana Undertaking) RFP DOCUMENT INVITATION OF PROPOSALS FOR IMPROVEMENT, MANAGEMENT AND OPERATION OF NATURE CAMP AT MASANI BARRAGE, REWARI, HARYANA ( GM/HFDC/RWR/02/2018-19) Haryana Forest Development Corporation Ltd. (A Government of Haryana Undertaking) General Manager, Rewari Off Address: Masani Barrage, NH-8 Near Village Khaliawas, P.O. Dharuhera District Rewari-123106, Haryana E-mail: [email protected] Haryana Forest Development Corporation Limited (A Government of Haryana Undertaking) General Manager, Rewari Off Address: Masani Barrage, NH-8 E-mail: [email protected] Near Village Khaliawas, P.O. Dharuhera District Rewari-123106, Haryana No. GM/HFDC/RWR/02/2018-19 Dated: 27.07.2018 PRESS NOTE INVITATION OF PROPOSALS FOR IMPROVEMENT, MANAGEMENT AND OPERATION OF NATURE CAMP AT MASANI BARRAGE, REWARI, HARYANA Technical and Financial proposals are invited on behalf of Haryana Forest Development Corporation Ltd. in separate sealed cover as per terms & conditions from interested parties having experience in the field of running nature camping/ecotourism/adventure/farm tourism for improvement, management and operation of the Nature Camp located at Masani Barrage, District Rewari. The existing site and infrastructure will be made available as and where basis and the shortlisted party/agency will be responsible for improvement, utilization and maintenance of the existing buildings and other infrastructure in sustainable manner per consultation and as per prescribed terms and conditions for a period for 10 years. The proposals shall be submitted on or before 16.08.2018 at 2.00 PM. The proposals will be opened in the office of undersigned on same day at 3.00 PM.
    [Show full text]
  • July Aug 2005
    Dams, Rivers & People VOL 3 ISSUE 6-7 JULY-AUG 2005 Rs 15/- Lead Piece An Example of Excellent Reporting on Environmental issues about Dams FOUR REPORTS BY ARCHANA PHULL FROM HIMACHAL PRADESH Report 1 the contributory factors for increasing the silt levels in Forgotten CAT plan leads to high silt in Sutlej- which SJVNL will definitely study. ? Sutlej Even as high silt levels in Sutlej before and after floods has forced closure in While the hydel companies have so far 1500 MW Nathpa Jhakri Power Project since June 25 been reluctant to release funds against the CAT Plan, incurring losses of Rs 56 crores to the executing the practice with the state government in yester years agency SJVNL and the state government (which has 25 has been to utilize the money for other routine purposes % equity share) so far, much because of environment for general shortage of funds. The forest department degradation along the river—the Catchment Area too has shown extreme laxity in its job. Neither has it Treatment Plan of the project for local environment been pressing for the release of money for conservation, which could have saved the losses to a implementation, nor has evinced any interest in great extent, has been gathering dust in files for long. arranging the required number of saplings for The SJVNL has so far provided only Rs 4.5 crores to compensatory plantation around the rivers and other the state govt against the earmarked fund of Rs 29.75 catchment area. crores under this head since the execution work started Continued to page 2 in early 90s.
    [Show full text]
  • Haryana State Draft Annual Plan 1981 - 82
    HARYANA STATE DRAFT ANNUAL PLAN 1981 - 82 D 311 HARYANA STATE ANNUAL PLAN i9&l-»2 1.1. Introduction ThePlarniing Commission had desired to formulate Sixth Five Year^lan for the period 1980-81 to 19S4-S5. The National Development Council in its 34th meeting haVe also apprbved the Jbasic objec­ tives.a framework-for the Sixth Five Year Plan 1980-85. State Government have formulated Sixth Five Year Plan 1980-85 proposals aggregating to Rs 1943.09 crores. These proposals,have be^n formulated keeping in view the objectives and goals set out by the National Development Council. 1.2, The Planning Commission had earlier agreed to a Annual Plan 1980-81 size of Rs 240.50 crores (at ofl&cers level meeting). Subsequently, however, additional funds fromL.I.C. became available and Haryana’s Share was reckoned at Rs 2.72 crores. Accordingly, the size of Haryana’s Annual l*lan 1980-81 was revised to Rs 243.22 crores (during July, 1980). After the finalization of the plan size of Rs 240.50 crores, State Government had to allow certain additional allocations to take care of the pjessing iieeds. The inescapable additions made by the State Government (up to August, 1980) are : Devefopfnent of Mewat areas (Rs 1.00 crore); share capital to HARCO Bank for conversion of Short Term loan into Medium Term loan (Rs 1.10 crores); share capital to Dairy Development Federation (0.25 crore); upgradation of schools (Rs 0.89 crore); development ofRai Complex for ASIAD Games 1982 (Rs 1.60 crores); Housing (Rs 1.00 crore); share capital to Welfare of Backward Classes & Weaker Sections Njgam (Rs 1.00 crore).
    [Show full text]
  • MOM Karnal HSPCB
    FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT& ENVIRONMENTAL MANAGEMENT PLAN For Construction of New Four/Six-lane National Highway (NH-152D) from Gangheri, district Kurukshetra to Narnaul, district Mahendergarh in the state of Haryana Project Proponent: NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport &Highways, Government of India) Project Consultant SA Infrastructure Consultant Private Limited Environmental Consultant: ENVIRO INFRA SOLUTIONS PVT.LTD. (QCI Certificate No. NABET/EIA/1619/ IA 0018) January 2019 Final EIA/EMP Report for Construction of New Four Lane national Highway (NH-152D) from Gangheri, District - Kurukshetra to Narnaul, District - Mahendergarh in the state of Haryana (Length = 230 km) NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) Table of Contents Section No. Contents Page No. EXECUTIVE SUMMARY i to xi CHAPTER-1: INTRODUCTION 1.1 Project Background 1-1 1.2 Identification of Project and Project Proponent 1-1 1.3 Brief Description of the Project and its Importance to the Country 1-1 1.3.1 Salient features of the project 1-2 1.4 Scope of the EIA/EMP Study (As per TOR) 1-5 1.5 Objectives of the Consultancy Services 1-5 1.6 Policies, Legal and Administrative Framework 1-6 1.7 Structure of the Report 1-10 1.8 TOR approved by MoEF&CC and its Compliance 1-11 CHAPTER-2: PROJECT DESCRIPTION 2.1 Introduction 2-1 2.2 Description of the Project & Brief about the Project 2-1 2.2.1 Need of the Project 2-1 2.2.2 Proposed Pavement & Overlay 2-1 2.2.3 Traffic Control,
    [Show full text]
  • Transforming the Najafgarh Basin a White Paper Based on the Workshop Held on 17Th August, 2017 at Gurgaon Organised by DLF Foundation, INTACH & IWP
    Transforming The Najafgarh Basin A White Paper Based On The Workshop Held On 17th August, 2017 At Gurgaon Organised By DLF Foundation, INTACH & IWP Abstract Water is the prime requirement for the sustainability of urban regions. Large swathes of Gurugram District and NCT Delhi lie in the Najafgarh Basin which is spread across the states of Rajasthan, Haryana and Delhi. The main water course is the Sahibi Nadi, an ephemeral river passing through the famous Najafgarh Jheel, and its tributaries. With the passage of time the basin areas are becoming water stressed and the vast investments in the area likely to become environmentally unsustainable. Several measures, if taken in a timely manner, can help stabilize and even reverse the situation to bring about water sustainability to the basin. This paper provides the larger context, views of various stakeholders and experts and the way ahead. Introduction 0.0 The rapid colonization of the natural landscape , first by agriculture and then b y urban development and infrastructure, comes at the cost of destruction of life giving natural resources, which provide sustainability to human habitat and insurance to the massive investments. Today, we have reached a crossroads in Gurugram and NCT Delhi, where development has outstripped the eco-system services provided by nature. At this juncture mere cessation of further destruction of natural resources is not enough - the time has come to actively restore our natural resources so as to strike a balance between natural resource conservation and development 1.0 Gurugram and NCT Delhi are mostly situated in the Najafgarh Basin which is a sub-basin of the Yamuna River and is spread over states of Rajasthan, Haryana and Delhi.
    [Show full text]
  • Ec`] `W Z Cvu := 7D
    / A- ' &7 &7 7 ,!).,/012 +'5+56 3+%14 '+%012 /8*895G2-@8 62*)8 /8)B ')2-? 6B8522//? - @ ?2?<2-?2/?? /<-5?/2*B-?58?-8 )2 .C2)) / *"+"D,,- $E" F 8 ( ' 33405 (13 ! "$% !& Q%R' "" 672898)/ ( investors and lenders to prevent IL&FS would create liquidity % & defaults. crunch in the financial markets. he Government on "The confidence of the Approving the immediate Tibetan card to its disadvan- TMonday seized control of 2 financial market in the credi- takeover of the IL&FS board by tage. India has barred the entry debt-trapped Infrastructure )- bility of the IL&FS manage- six Government nominees, an of the Karmapa to Rumtek Leasing & Financial Services : ment and the company needs NCLT bench of judges MK monastery, the biggest Ltd (IL&FS), superseding its 6: to be restored," the Finance Shrawat and Ravikumar monastery of the Kagyu sect board with one led by India’s 86 *260 Ministry said. Duraisamy said that the sus- that he heads fearing him to be richest banker Uday Kotak, 6 * The Government, it said, pended directors of IL&FS a Chinese agent. Earlier, he was and vowed to stop further loan had approached the NCLT must henceforth cease to rep- not allowed to even visit defaults. );< after it was convinced that the resent the company anywhere. Sikkim, but the NDA This is only the second - governance and management "After considering the 2898)/ Government had changed the time after Satyam Computer change in IL&FS Group is very Government's case, we are of rules in 2017. Services Ltd that the ) * necessary for saving it from the view that prima facie, this n a major setback to India, The Karmapa and CTA Government has taken control "financial collapse".
    [Show full text]
  • Rajasthan 2016
    State of India’s Rivers For India Rivers Week, 2016 Author Mr. Manu Moudgil India Rivers Week - Rajasthan 2016 Contents 1. Introduction .......................................................................................................................................... 6 1.1 State profile ..................................................................................................................................... 6 1.2 Physiographic features .................................................................................................................... 7 2. Hydrology .............................................................................................................................................. 9 3. River Inter-Linking ............................................................................................................................... 12 4. Groundwater ....................................................................................................................................... 15 5. Pollution Sources:................................................................................................................................ 17 6. Climate Change (Rajasthan State Action Plan for Climate Change) .................................................... 20 7. Suggestion ........................................................................................................................................... 23 8. Luni: The Saline One ...........................................................................................................................
    [Show full text]