fiqr- w.fr.fr.-or /at-f-zon qsFq}l?017 ir6, $IKIT giHTE, Grd r{fuq, glNl-q B'090 I tn fr, qBqrFfr fttqr6=66ffi, qIqIq s6 rrn ftY|-{ ssrrr eEr, tqs q-{ aq lqmfl €Rqq, gtrsqT ,fd, +$ ffi-r1ooo2. t1.qtq.rrI, cq \q rdqrg qMq ql0-7 Et-€F15 : ftqio :olcr;r.rft, 2o2l frqq-qto Tqofrofro, T$ ffi t ft-qrfffi-q etoqo wqgil-ozg / zofi ti wkd eneqT d ci-fl.fd rrFda ddq GEq-qoT Hhfr, qa rfu rirrf,q @) qlfu+. q-'I-h

ol-cqr nBa m qri d vre-cr fr t TT6Eq, Bqgffi frEq w gS w o-st or fttT EsT t fu rreEq Hko, soso nqw F={iTUT e}d, o

( SII{CT )

er5 ufoo t Hqr-\rq.fr.0.-or (t\ / at-t-zoz'e+gffi\ / 2017, ilEfuqi-o rfrftfr- Tffis Hfuq, s0s0 tr{E T fr"iTur +d, dcrt\F o} Bq-d B-fir r1Effid qa Rrm-ot.o1.2oz1 d e-q.i t 113qref ifuo I

3ilrsr t,

( qrra r$q ) erg Hfoql

National Mission for Clean Ganga Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020) For the State of

October and November, 2020

Overall status of the State: I. Total Population: Urban Population & Rural Population separately

Urban Population- 4.5 Crore in 2011

Rural Population- 15.51 Crore in 2011

II. Estimated Sewage Generation (MLD): 5500 MLD

III. Details of Sewage Treatment Plant: • Existing no. of STPs and Treatment Capacity (in MLD):

Total No. - 106 (operational + Not operational)

Treatment Capacity - 3370. 87 MLD

• Capacity Utilization of existing STPs: 2630.588 MLD (78.03%) • MLD of sewage being treated through Alternate technology: - • Gap in Treatment Capacity in MLD: 679

• No. of Operational STPs: 101

• No. of Complying STPs: 80

• No. of Non-complying STPs: 19

Details of each existing, under construction and proposed STPs in the State: Annexed as Annexure - I

1

IV. Details of Industrial Pollution: • No. of industries in the State: 11,332

Red- 2058, Orange- 5068, Green - 4206

• No. of water polluting industries in the State: 1648 (Grossly Polluting Industries) • Quantity of effluent generated from the industries in MLD: 850.5 MLD • Quantity of Hazardous Sludge generated from the Industries: 402336.478 MTA • Number of industrial units having ETPs: 1404 • Number of industrial units connected to CETP: 514 (Most of Tannery Unit at Kanpur are presently closed) • Number and total capacity of ETPs (details of existing/ under construction / proposed) • Compliance status of the ETPs: 1078 Units out of 1108 Operational Units Complying • Number and total capacity of CETPs (details of existing/ under construction / proposed) Number of existing CETP- 07 Capacity of CETP – 58.55 MLD No. of Under construction CETP - 03 Capacity of under construction CETP – 26.65 MLD • Status of compliance and operation of the CETPs

Town Location of Existing ETP Whether CETP Status (DPR/ CETP Capacity Complying Proposed, tendering/ under or not if any construction/ ETC etc.)

Ghaziabad Apparel Park 6 MLD Yes - - Tronica City CETP, Phase-I (for textile units), Ghaziabad

Mathura CETP, Industrial 6.25 MLD Yes - Upgradation proposed Area, Site-A, under Namami Gange Mathura Project for ZLD.

Ghaziabad CETP, HPDA, 2.1 MLD Yes - - Pilkhaun, Hapur

Kanpur CETP, UPSIDC 1.5 MLD Yes - - Textile Complex, Rooma, Kanpur

2

(for textile units)

Kanpur CETP Jajmau, 36 MLD Yes - New 20 MLD CETP Kanpur is under construction & to be completed by Dec, 2021

Unnao Banther Industrial 4.5 MLD Yes - DPR Sanctioned by Pollution Control NMCG for Co. CETP, Banther, construction of new Unnao CETP of capacity 4.5 MLD

Unnao Unnao Tanneries 2.15 MLD Yes - DPR Sanctioned by Pollution Control NMCG for Company (CETP) construction of new Site-II, Unnao CETP of capacity 2.15 MLD

Town No. of Industrial Status of ETPs Status of CETPs industries (existing, under discharge construction & proposed) State of 1108 779.639 MLD Installed and Operational As Above U.P. (Operational)

V. Solid Waste Management: • Total number of Urban Local Bodies and their Population Urban Local Bodies- 652 Urban Population – 4.5 Crore • Current Municipal Solid Waste Generation- 14100 TPD approx. • Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc

3

No. of MSW processing facilities- 15 Plants (all are compost plant except one at Agra which is waste to energy Plant) Installed Capacity- 5,395 TPD Utilization of existing MSW processing facilities-

• Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%)

• No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction) S.N Action Points Compliance Status 1. C& D Waste Processing Facilities Noida Facility of 300 MTD to be completed by October, (Sector-81) 2020. Presently facility of 150 MTD is operational. Ghaziabad (Hindon Vihar) Facility of 400 MTD to be completed by Dec 2020. At present Screening Plant is functional. Rapid Railway Project from The National Capital Region Transportation Delhi to Meerut Corporation is installing C & D Waste Management Facility of 150 TPD at Ghaziabad. Expected to be commissioned by September, 2020. Lucknow, Agra, , Funds @ Rs. 1.5 Crore/City released to concerned Kanpur & Prayagraj Municipal Corporation. Expected to be commissioned by December, 2020. Meerut C & D Waste Management Facility is to be developed in 2 years.

• Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source Total no. of wards - 12007 No. of wards having door to door collection service - 12007 (100%) No. of wards practicing segregation at source -

4

• Details of MSW treatment facilities proposed and under construction (no., capacity, and technology):

Existing SWM processing Facilities ( Till 15 Plants with 5,395 TPD July 2020 15 Plants with 5395 TPD) Plants to be made operational by 31.10.2020 02 Plants with 115 TPD ( Jaunpur & Fatehpur) Plants to be made operational by 31.03.2021 07 Plants with 860 TPD (Sambhal, Badaun, (Arbitration complete) Mirzapur, Balia, Rampur, Jhansi & Meerut)

Plants under land dispute to be resolved and 08 Plants with 930 TPD(Bareilly, Firozabad, commissioned Loni, Nazibabad, Bhadohi, Basti, Gorakhpur, Akbarpur)

New plants sanctioned to be completed by 37 Plants with 3,170 TPD March. 2021

➢ It is targeted that all smaller ULBs (approximately 450) that generate less than 10 TPD of solid waste establish composting facility for processing by December, 2020. ➢ IT enabled architecture across the State by December, 2020. ➢ Waste to Energy (WTE) Plants: Lease agreement done in 04 Cites (Shahjahanpur, Moradabad, Muzaffarnagar, Ghaziabad).

• No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.- • No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers- • No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid waste from falling into the rivers- Out of total 504 drains falling into the rivers 87 drains having Bar mesh/ Floating Racks. Status of ULB wise Management of Solid Waste ULB Total MSW Total MSW Existing Utilization Proposed MSW generation in Capacity of the Facilities & being processed MSW TPD existing MSW Completion in TPD facilities facilities Timeline 652 14100 5,395 100% As Above TPD (38.53%)

5

VI. Bio-medical Waste Management: • Total Bio-medical generation: 37.21 MT/Day • No. of Hospitals and Health Care Facilities: 25206

• Status of Treatment Facility/ CBMWTF: ➢ There are 20 Common Biomedical Waste Treatment Facilities (CBWTFs) installed in the State, out of which18 are functional and 01 is under up gradation and 01 is closed by the Board. ➢ Total incineration capacity of 18 functional CBWTFs is 51.2 MT/Day which is adequate to treat the Biomedical Waste generated in the State. ➢ UPPCB regularly inspects the CBWTFs for ensuring treatment of BMW as per the provisions of the BMW Rules, 2016. ➢ 07 CBWTFs were found defaulting in the past and action has been taken against them by UPPCB by imposing Environmental Compensation of Rs. 98.20 Lakhs

VII. Hazardous Waste Management: • Total Hazardous Waste generation: 402336.478 MT/Annum • No. of Industries generating Hazardous waste: 2597 • Treatment Capacity of all TSDFs: - • Avg. Quantity of Hazardous waste reaching the TSDFs and Treated: 402336.478 MT/Annum • Details of on-going or proposed TSDF: One TSDF facility is proposed in , which got Environmental clearance from SEIAA and UPPCB issued Consent to establish.

VIII. Plastic Waste Management: • Total Plastic Waste generation: 254401.8 Ton per Annum • Treatment/ Measures adopted for reduction or management of plastic waste:

➢ Recycling Facilities : In the State 23 Recyclers have been inventoried out of which 16 have obtained registration under Rule 13.

6

Recycling Capacity: Name of Unit Capacity

Ganesha Ecosphere., Kanpur Dehat 81 TPD PET Recycling Ganesha Ecosphare Ltd., Rampur 127 TPD PET Recycling Ultratech Cement, Sonebhadra 300D V.K. Plastic, Ghaziabad 1 PD Other Recyclers (20 No.) 146D Recycling plant 900 TPA (Jhansi) & Waste to Oil 1800 TPA (Mathura) set up. Total recycling infrastructure in U.P. : 693 TPD (81.7 % of the Plastic Waste generated.)

➢ Utilization of Plastic Waste for Road Construction: 100 Tons Plastic Waste used in Lucknow, Kanpur, Meerut and Jhansi. ➢ Plastic Waste disposal in Paper Mills: ➢ Units have done agreement with M/s Ultratech Cement for co-processing of Plastic Waste. Total 635.22 MT Plastic Waste has been disposed as co-processing during year 2020-21. ➢ In Ghaziabad 05 Waste Paper based Paper Units have disposed Plastic Waste 102.65 MT since January, 2020. ➢ In Meerut 04 Waste Paper based Paper Units have disposed Plastic Waste 99.57 MT in the year 2020-21. ➢ In Muzaffarnagar 13 Waste Paper based Paper Units have disposed Plastic Waste 433 MT in the year 2020-21. ➢ Compliance of Rule 9 Extended Producer Responsibility (EPR) : ➢ Producer Responsibility Organization (PRO) are working in the State of U.P. namely GEM Enviro Ltd., Shakti Plastic Ltd., IPCA, Karo Sambhav etc. ➢ 35 EPR plans by Brand Owners and Producers have been submitted to UPPCB in 2019 and till date. ➢ The quantity of waste plastic recycled/ disposed from September, 2019 till date is approx. 25561 Tons. ➢ UPPCB has issued Show Cause Notice under Section 5 of Environment (Protection) Act, 1986 read with Plastic Waste Management Rules, 2016 as amended with 2018 against 353 defaulter Plastic Units. ➢ Prohibition on Plastic Carry Bag and Plastic & Thermocol Cutlery ➢ Notification dated 15.07.2018: Prohibition imposed on use, manufacture, sale, distribution, storage, transport, import or export of disposable plastic carry bags (irrespective of its thickness) as well as cups, glasses, plates, spoons, tumblers etc. made of plastic or thermocol disposable after one-time use.

7

Prohibited Item confiscated 858 MT Fine imposed Rs. 11.88 Cr.

IX. Details of Alternate Treatment Technology being adopted by the State/UT

➢ The State has set up Faecal Sludge and Septage Treatment Plant (FSSTP) in Jhansi and Unnao. ➢ Tender has been also finalized and LoA issued for another 50 FSTP Plants and expected to be completed by 30.09.2021. ➢ The State has proposed to cover all the ULBs by year 2023. Latest Status is enclosed herewith and marked as Annexure No. -II

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on in situ treatment: Total 5500 MLD Sewage generated in 652 ULBs present in Uttar Pradesh. in order to ensure compliance of the orders of Hon’ble Tribunal, the Principal Secretary Urban Development has issued instructions vide Letter No: 142/Nine-9-2019-89J/2001 Dated: 03.02.2020 to the concerned ULBs for taking up the interim measures for treatment of drains till permanent infrastructure for treatment of sewage is created (Letter copy submitted with MPR (June-July 2020).

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: Three tier monitoring mechanism developed and functional as submitted in the previous reports. XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: MoM Dated 02.12.2020 is enclosed herewith and marked as Annexure No. -III XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river: Latest water quality of Drains is enclosed herewith and marked as Annexure No.- IV

XIV. Ground water regulation: Detailed Status submitted in the MPR of Month June- July 2020. XV. Good irrigation practices being adopted by the State: XVI. Rain Water Harvesting: Status submitted in the MPR of Month June- July 2020. XVII. Demarcation of Floodplain and removal of illegal encroachments: The Irrigation and Water Resources Department UP has prepared a plan for Protection and management of Flood Plain Zones (FPZ). The Department has issued notification for

8

Ganga River Segment- B Phase-I (Bijnore to Kanpur) dated 04.09.2020. Latest Status is enclosed herewith and marked as Annexure No.-V.

XVIII. Maintaining minimum e-flow of river: The Irrigation and Water Resources Department UP have prepared a plan for Environmental Flow studies of 06 perennial polluted rivers in the State. E-Flow study of is to be done by MoWR, GoI as it is an inter-state river. Latest Status is enclosed herewith and marked as Annexure No.-V.

XIX. Plantation activities along the rivers: a). Across the State ➢ 22.59 Crore in 2019-20 ➢ 25.87 Crore in 2020-21 b). In Critically Polluted River Stretches ➢ 9.97 Crore in 2019-20 ➢ 10.49 Crore in 2020-21

XX. Development of Biodiversity Park: Status submitted in the MPR of Month June- July 2020. XXI. Reuse of Treated Water: XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: XXIII. Status of Preparation of Action Plan by the 13 Coastal States: NA XXIV. Regulation of Mining Activities in the State/UT: Status submitted in the MPR of month September 2020. XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring A- Action taken against Local Bodies for not complying MSW Rule, 2016 i. Permission sought for prosecution against Nagar Ayukt of Nagar Nigam under section 197 CRPC from Government for 12 Nagar Nigams 1. Gorakhpur 7. G.B.Nagar(Noida) 2. Lucknow, 8. Aligarh 3. Kanpur 9. Meerut

9

4. Moradabad 10. Ghaziabad 5. Varanasi 11. Bareilly 6. Faizabad-Ayodhya 12. Saharanpur ii. Permission sought for prosecution against 27 Executive Officers of Nagar Palika Parishad/Nagar Panchayat under section-197 CRPC 1. Nawabganj (Barabanki) 15. Khekhra (Baghpat) 2. Raebareli 16. Baraut 3. Kannauj 17. Mawana (Meerut) 4. Sherkoat (Bijnor) 18. Sardhana (Meerut) 5. Mainpuri 19. Cantt (Meerut) 6. Saharanpur 20. Hastinapur (Meerut) 7. Ramnagar (Varanasi) 21. Shamli 8. Muzaffarnagar 22. Gangoh (Saharanpur) 9. Hathras 23. Devband (Saharanpur) 10. Kasganj 24. Bhadohi 11. Fatehpur 25. Pratapgarh 12. Chunar (Mirzapur) 26. Khalilabad 13. Mirzapur 27. Nagar Panchayat Maghar 14. Baghpat iii. In compliance of the directions passed by Hon’ble National Green Tribunal OA No.-606/2018 dated 10-01-2020, Uttar Pradesh Pollution Control Board has issued Show Cause Notice dated 07-07-2020 under Section 5 of Environment (Protection) Act, 1986 to Director, Local Bodies Uttar Pradesh for imposition of Environmental Compensation on Urban Local Bodies due to default of Rule 22 Solid Waste Management Rules, 2016. iv. In compliance of the directions passed by Hon’ble National Green Tribunal in OA No.-606/2018 dated 10-01-2020, Uttar Pradesh Pollution Control Board has issued Show Cause Notice dated 07-07-2020 under Section 5 of Environment (Protection) Act, 1986 to Director, Local Bodies Uttar Pradesh for imposition of Environmental Compensation on Urban Local Bodies for not initiating the disposal of Legacy Waste by Remediation.

v. Show cause for imposition of EC of amount Rs. 127.56 Cr. issued to Nagar Nigam, Lucknow, Moradabad, Kanpur, Varanasi, Nagar Palika (Pratapgarh) and M/s

10

Accord Hydro Solid Waste Management Plant, Firozabad.

B. Action against STP and Drains- i. The Board has issued Direction under 33(A) of Water Act to Director Urban local bodies for imposition of amount EC Rs. 5.0 Lac per month/Drain on 289 drains vide letter dated 16.06.2020. Similarly the Board has also issued directions for imposition of EC 24 STPs where work of construction yet not started.

ii. Environmental compensation show cause issued for EC- 36.86 Cr.

iii. Environmental compensation imposed- 2.73 Cr.

C. Action against Industries- i. The Total No. of Industries along the Pollution River stretches (including GPI and small scale miscellaneous Units such as Electroplating)-1699 ii. The Total No. of defaulter Units- 282 iii. Units lying self closed- 126 iv. Closure direction issued Units- 101 v. Prosecution filed against under section 41, 44 Water Act, units- 137 vi. Environmental compensation imposed against Industry- 61.11 Crore vii. Amount recovered- 11.274 Crore

11

Annexure-I Details of each existing STP in the State

Operation Status Estimated Name Sewage Mode of Name of of Generation Latest Analysis report Technolo Name and Installed Utilized receiving Mode of disposal treated river from (pH, TSS, BOD, COD, gy/proce Sl. No. Address of District Capacity Capacity raw sewage of treated sewage sewage in Institution City/Town Faecal Coliform and ss STP STP (MLD) (MLD) (drain/sewer and sludge receiving which s where STP Others) with Date based age network) water body STP is responsible located (in located for O&M MLD) of STP

As per Jal Yamuna Achieving Nigam 10.445 Pollution Report Dt.24.11.20 information Waste Through Drain River MLD STP Control pH =7.7 BOD : 1 Etawah approx. 35 Operational 10.445 10.445 Stabilizat Drain Sludge-In Jharana Nala Yamun near Tixi Unit, UP 30.0 mg / L COD : MLD ion Pond Agriculture a Tempel Jal Nigam, 240.0 mg / L TSS : 91.0 Sewage Agra mg / L generation

Achieving Treated 13.5MLD Nagar Report Dt.24.11.20 Waste sewage STP at Palika pH =7.9 BOD : On Land Sludge-In 2 Etawah Operational 13.5 3.0 Stabilizat Drain On Land is for Mauja Parishad, 30.0 mg / L COD : Agriculture ion Pond irrigati Umrain Etawah 248.0 mg / L TSS : on 100.0 mg / L

As per Jal Kal Vibhag Not Achieving nagar nigam infromation Report Dt. 24.11.20 03 MLD approx -3MLD treated pH = 7.6 3 STP Firozabad Jal Kal Operational 3 3 UASB ------sewage is used by BOD : 31.0 mg /L COD Firozabad horiculture department : 272.0 mg /L TSS : for irrigation of 98.0 mg / L Plantation/ trees Not Achieving 67 MLD Report Dt. 26.11.20 ASP+ Mohammad pH = 7.6 BOD : 4 Firozabad Operational 67 67 exended ------pur, 38.0 mg / L COD : areation Biharipur 256.0 mg / L TSS : 99.0 mg / L

12

Not Achieving Report Dt. 24.11.20 1.6 MLD U.P. Jal pH = 7.6 BOD : Treated sewage is used 5 Etawah ---- Operational 1.6 1.6 SBR ------Saifai Nigam 30.0 mg / L COD : for plantation 256.0 mg / L TSS :89.0 mg / L As per Jal Not Achieving 23 MLD Nigam Report Dt.24.11.20 STP at Nagar information pH = 7.3 BOD : UASB Sewerage 6 Mauja Mainpuri Palika approx. Operational 23.0 10.4 Through Drain Kharja Drain 29.0 mg / L COD : Based Network Odenya, Parishad 10MLD 256.0 mg / L TSS : 99.0 Padaria Sewage mg / L generation

Achieving Report Dt.10.09.20 3.42 MLD pH = 7.5 Near U.P. Jal BOD:22.0mg/L COD: Oxidatio 7 Chitrakoot ----- Operational 3.42 3.42 ------Lowland area Divyang Nigam 115.20 mg /L TSS : 86.0 n Pond kendra mg / L TC: 92000 MPN/100ml FC:43000 MPN/100ml

Achieving Report Dt. 28.11.20 Sajari U.P. Jal pH = 7.63 BOD Sewerage 8 42 MLD, Kanpur 37 MLD Operational 42 10 ASP Disposal Channel River Pandu Nigam :21.0mg / L COD :88.0 network Kanpur mg / L TSS : 47.0 mg / L

Achieving 36 (9 36 (9 36 MLD (9 Report Dt. 23.11.20 MLD MLD MLD CETP U.P. Jal pH = 7.86 BOD : 9 Kanpur Operational CETP + CETP + ASP Irrigation Channel + 27 MLD Nigam 90.0mg / L COD : 240.0 27 MLD 27 MLD STP) mg / L TSS : 96.0 mg / STP) STP) L

Achieving Report Dt. 23.11.20 Bingawan Sewerage U.P. Jal pH = 7.35 BOD 10 210 MLD, Kanpur 198 MLD Operational 210 70 UASB network & Disposal Channel River Pandu Nigam : 28.5mg / L COD : Kanpur Nala Tapping 104.0mg / L TSS : 57.0 mg/l

13

Achieving Report Dt. 27.11.20 Fatehgarh U.P. Jal pH = 8.97 BOD Drain/Sewera 11 2.7 MLD Farrukhabad 20 MLD 2.7 2.0 WSP Irrigation channel Irrigation/river ganga Nigam Operational : 24.0mg / L COD : ge Network STP 104.0mg / L TSS : 56.0 mg/l

Achieving Report Dt. 23.11.20 Jajmau, U.P. Jal pH = 7.86 12 43 MLD Kanpur 167 MLD Operational 43 35 ASP Irrigation Irrigation Channel Nigam BOD : 90.0mg / L COD Kanpur : 240.0 mg / L TSS : 96.0 mg/l

Achieving Report Dt.23.11.20 Jajmau, Sewerage U.P. Jal pH = 8.15 BOD : 13 Kanpur 130 Kanpur 167 MLD Operational 130 100 ASP network & Irrigation Irrigation Channel Nigam 90.0 mg / L COD MLD Nala Tapping :240.0mg / L TSS : 96.0mg/l

Achieving Report Dt. 23.11.20 Jalalpur, U.P. Jal pH = 7.69 Sewerage 14 Kanpur Dehat 10 MLD Operational 13 10 SBR Disposal Channel River Kali (East) Amrapur Nigam BOD : 27.0 mg / L network COD :88.0 mg / L TSS :56.0 mg / L

Achieving Ganga Report Dt. 25.11.20 STP Pollution Drain & Disposed to river pH = 7.34 Bio- 15 Numayadah Prayagraj control 403 MLD Operational 50 50 Sewerage Yamuna through River Yamuna BOD : 23.0mg / L COD tower i unit, U.P. Both drain. Landfill. : 40.0 mg / L TSS : Jal Nigam 29.0mg / L

Achieving Ganga Report Dt.24.11.20 Pollution Drain & Disposed to river STP pH =7.47 BOD Bio- 16 Prayagraj control 403 MLD Operational 10 10 Sewerage Ganga through River Ganga Ponghat : 15.0mg / L COD : tower unit, U.P. Both drain. 34.0mg / L TSS : Jal Nigam 46.0mg / L

14

Achieving Ganga Report Dt.24.11.20 Pollution Drain & Disposed to river pH = 7.12 BOD Bio- 17 STP Kodra Prayagraj control 403 MLD Operational 25 25 Sewerage Ganga through River Ganga :18.0 mg / L COD : 38.0 tower unit, U.P. Both drain. mg / L TSS : 32.0 mg / Jal Nigam L Achieving Ganga Report Dt.24.11.20 Pollution Drain & Disposed to river STP pH = 7.61 BOD 18 Prayagraj control 403 MLD Operational 60 60 UASB Sewerage Ganga through River Ganga Rajapur :21.0mg / L COD : unit, U.P. Both drain. 42.0mg / L TSS : 40.0 Jal Nigam mg / L Achieving Ganga Report Dt 24.11.20 Pollution Drain & Disposed to river STP Salori- pH =7.26 BOD : 19 Prayagraj control 403 MLD Operational 29 29 FAB Sewerage Ganga through River Ganga 1 23.0 mg / L COD : unit, U.P. Both drain. 50.0mg / L TSS :58.0 Jal Nigam mg / L Achieving Ganga Report Dt. 24.11.20 STP Salori- Pollution Drain & Disposed to river pH = 7.39 BOD 20 2 Prayagraj control 403 MLD Operational 14 14 SBR Sewerage Ganga through River Ganga :8.0mg / L COD : 32.0 Expansion unit, U.P. Both drain. mg / L TSS : 42.0 mg / Jal Nigam L

Partially used for Achieving Drain & Ganga Irrigation. Disposed 21 Report Dt.23.11.20 20 20 ASP Sewerage River Yamuna Pollution to RiverYamuna pH = 7.48 BOD Both STP Naini Prayagraj control 403 MLD Operational through drain. :24.0 mg / L COD : unit, U.P. 56.0 mg / L TSS : Jal Nigam Drain & Disposed to 22 51.0mg / L 60 60 ASP Sewerage RiverYamuna River Yamuna Both through drain.

Not Achieving Report Dt. 24.11.20 Bhagwanpu U.P. Jal pH = 7.37 BOD : 23 r STP 9.8 Varanasi Operational 8.0+1.8 8.0+1.8 ASP Network Irrigation/ Manure River Ganga Nigam 30.8 mg / L COD : MLD 158.0 mg / L TSS : 98.0 mg / L Approx. 320MLD Achieving Report Dt. 17.11.20 Dinapur U.P. Jal pH = 7.45 BOD : Drain / Disposal to Ganga/ 24 STP 80 Varanasi Operational 80 80 ASP River Ganga Nigam 28.6 mg / L COD : Network Manure MLD 138.0 mg / L TSS : 78.0 mg / L

15

Achieving Report Dt 24.11.20 Goithaha U.P. Jal pH =7.57 BOD : Chandpur irrigation 25 STP 120 Varanasi Operational 120 120 SBR Network Irrigation / Landfill Nigam 23.6 mg / L COD : canal MLD 132.0 mg / L TSS : 54.0 mg / L Achieving Report Dt. 24.11.20 Dinapur U.P. Jal pH = 7.52 BOD : Drain / Disposal to Ganga/ 26 STP 140 Varanasi Operational 140 140 ASP Varuna Nigam 21.2 mg / L COD : Network Manure MLD 112.0 mg / L TSS : 46.0 mg / L

Not Achieving Report Dt. 24.11.20 DLW STP pH =7.68 BOD : Irrigation (Lohata 27 Varanasi DLW ----- Operational 12 12 ASP Network ----- 12 MLD 32.8 mg / L COD : Form) 172.0 mg / L TSS : 112.0 mg / L

Not Achieving 14 MLD Report Dt.23.11.20 U.P. Jal Sewerage 28 Pakka Mirzapur 17 MLD Operational pH = 7.42 BOD : 14 14 UASB ----- Ganga Nigam network Pokhra 32.8 mg / L COD : 164.0 mg / L TSS : 112.0 mg / L Not Achieving Report Dt. 23.11.20 4 MLD U.P. Jal pH = 8.36 BOD : Sewerage 29 Vindhyacha Mirzapur 2.5 MLD Operational 4 2.5 WSP ----- Ganga Nigam 34.4 mg / L COD : network l 172.0 mg / L TSS : 120.0 mg /L

Achieving S.T.P. (15 Report Dt 24.11.20 MLD), U.P. Jal pH =7.46 BOD : 30 Jharkhandi, Gorakhpur 15 MLD Operational 15 15 ASP Drain Drain Ramgarh Tal Nigam 18.0 mg / L COD : 60.0 Maherwa ki mg / L TSS : 40.0 mg / Bari L

S.T.P. (30MLD) Achieving Opp. Report Dt 24.11.20 Manyavar U.P. Jal pH =7.65 BOD : 31 Gorakhpur 30 MLD Operational 30 30 ASP Drain Drain River Rapti Kanshiram Nigam 16.0 mg / L COD : 40.0 Shahri mg / L TSS : 38.0 mg / Garib Awas L Yojna,

16

Deoria bypass Road

119 MLD Achieving Treated Sewage as per Report Dt.25.11.20 STP, discharge in to information pH = 8.0 BOD Sewage net 32 Mahilpur Saharanpur Jal Kal Operational 38 38 UASB Dhamola river Dhomala river provided by : 20.0 mg / L COD : work Road sludge sale to Nagar 180.0 mg / L TSS : 54.0 farmers Nigam mg/l

Achieving Report Dt. 19.11.20 6.5 MLD pH = 7.88 U.P. Awas Awas vikas BOD : 8.0mg / L COD 33 Lucknow vikas Operational 6.5 6.5 SBR River Gomti Parishad :51.6mg / L TSS : Parishad STP 19.0mg / L TC: 79000 MPN/100ml FC: 33000 MPN/100ml

Achieving Report Dt. 19.11.20 37.5 MLD pH =7.97 BOD : U.P. Awas Awas vikas 12.0 mg / L COD : 72.0 34 Lucknow vikas Operational 37.5 37.5 SBR River Gomti Parishad mg / L TSS : 32.0mg / Parishad STP L TC=70000 MPN/100ml Approx. FC=49000 MPN/100ml 835 MLD Achieving Report Dt. 17.11.20 pH = 7.42 BOD : STP, U.P. Jal USAB 35 Lucknow Operational 26.0 mg / L COD : 345 345 Drain River Gomti Bharwara Nigam Reacter 142.0 mg / L TSS : 46.0mg / L

Gomti River Fertilizer Manure Achieving U.P. Jal Report Dt. 17.11.20 36 Operational FAB STP, Nigam pH = 7.54 BOD : Lucknow 56 56 Technolo Drain River Gomti Daulatganj 17.0mg / L COD : gy 112.0 mg / L TSS : 36.0mg / L U.P. Jal 37 Operational Nigam

17

56 MLD, Not Achieving Trans Report Dt. 24.11.20 Hindon Nagar pH = 7.8 BOD : U.A.S.B. Indirapuram 38 Ghaziabad 56 MLD Operational 56 56 River Hindon (Indirapura Nigam 45.0 mg / L COD : R. Drain m), 200.0 mg / L TSS : Ghaziabad 170.0 mg /L

Achieving 74 MLD, Report Dt. 24.11.20 S.B.R., U.P. Jal pH =7.73 BOD : 39 Ghaziabad 74 MLD Operational 74 74 S.B.R. River Hindon Indirapuram Nigam 11.0 mg / L COD : , Ghaziabad 118.0 mg / L TSS : 40.0 mg / L

Achieving 56 MLD, Report Dt. 24.11.20 Indirapuram pH =7.7 BOD : Indirapuram 40 Ghaziabad GDA 56 MLD Operational 56 56 S.B.R. River Hindon , (GDA), 27.0 mg / L COD : Drain Ghaziabad 121.0 mg / L TSS : 58.0 mg / L

56 MLD, Achieving S.B.R., Report Dt. 24.11.20 Dudahaida pH =8.01 BOD 41 Ghaziabad GDA 56 MLD Operational 56 56 S.B.R. Dasana Drain River Hindon Vijay : 9.0 mg / L COD : 16.0 Nagar, mg / L TSS : 31.0 mg / Ghaziabad L

Achieving 56 MLD, Report Dt.24.11.20 S.B.R., pH = 7.85 BOD 42 Ghaziabad GDA 56 MLD Operational 56 56 S.B.R. ----- River Hindon Morty, : 18.0 mg / L COD : Ghaziabad 66.0 mg / L TSS : 37.0 mg /L

70 MLD, Not Achieving U.A.S.B.R. Report Dt.24.11.20 Dudahaida Nagar pH = 7.8 BOD : 43 Ghaziabad 70 MLD Operational 70 70 UASBR Dasana Drain River Hindon Vijay Nigam 53.0 mg / L COD : Nagar, 159.0 mg / L TSS : Ghaziabad 114.0 mg /L

18

Achieving Report Dt 23.11.20 3 MLD U.P. Jal pH =8.0 44 Ghaziabad ----- Operational 3 3 MBBR Kala Nala Kadrabad drain Pilkhaun Nigam BOD : 19.0 mg / L COD : 50.0 mg / L TSS : 22.0 mg / L

Achieving Report Dt.24.11.20 5 MLD pH =7.5 BOD : 45 Tronica Ghaziabad UPSIDC ----- Operational 5 3 MBR ---- Green belts development 17.0 mg / L COD : City, Loni 165.0 mg / L TSS : 40.0 mg / L

Achieving 56 MLD, Report Dt. 24.11.20 S.B.R. pH = 7.6 BOD : 46 Govindpura Ghaziabad GDA 56 MLD Operational 56 56 SBR Dasana Drain River Hindon 12.0 mg / L COD : 48.0 m, mg / L TSS : 30. 0mg / Ghaziabad L

3 MLD STP 1 KLD Achieving UASB Brijghat expected Report Dt. 23.11.20 U.P. Jal followed Brijghat Sub- Zone, As per pH =7.95 BOD Through pipe into 47 Hapur Nigam 3 1.8 by Sewer line distibutaory of River Garhmukes reported Operational : 14.0 mg / L COD : down streem Ganga (NGRBA) extended Ganga hwar, AEE Jal 47.0 mg / L TSS : aeriation Hapur Nigam 37.0mg /L

7.32 MLD 6 MLD STP as per Achieving UASB Garh Zone, U.P. Jal reported in Report Dt. 23.11.20 followed Naya bans Garawali Garh Sub-distibutaory of 48 Garhmukes Hapur Nigam joint Operational pH =7.9 BOD : 6 3.5 by Sewer line Drain River Ganga hwar, (NGRBA) inspection 16.0 mg / L COD : 38.0 extended Hapur of NBGRA mg / L TSS : 55.0mg /L ariation Cell, CPCB

Achieving Report Dt 09.11.20 78 MLD, U.P. Jal Approx. pH = 7.4 Agriculture 49 Dhadhupura Agra Operational 78 68.41 UASB ----- On Land Nigam 286 MLD BOD : 27.0 mg / L (on land) , Agra COD : 134.0 mg / L TSS : 46.0 mg / L

19

Not Achieving Report Dt 09.11.20 2.25 MLD, U.P. Jal pH = 7.1 BOD : Oxidatio 50 Budi ka Agra Operational 2.25 2.97 ----- River Yamuna River Yamuna Nigam 34.0 mg / L COD : n Pond Nagla, Agra 174.0 mg / L TSS : 75.0 mg / L

Not Achieving Report Dt 09.11.20 10 MLD, U.P. Jal pH = 7.9 BOD Oxidatio 51 Peelakhar, Agra Operational 10 9.74 ----- River Yamuna River Yamuna Nigam : 36.0 mg / L COD : n Pond Agra 160.0 mg / L TSS : 83.0 mg / L

Achieving 12 MLD, Report Dt 09.11.20 Devri Road, U.P. Jal pH = 7.5 BOD : 52 Agra Operational 12 6.35 UASB ----- River Yamuna River Yamuna (Bhimnagri) Nigam 28.0 mg / L COD : , Agra 144.0 mg / L TSS : 47.0 mg / L

Achieving 14 MLD, Report Dt 09.11.20 Jaganpur, U.P. Jal pH =7.4 BOD : Agriculture 53 Agra Operational 14 13.39 UASB ----- On Land Sikandarpur Nigam 30.0 mg / L COD : (on land) , Agra 138.0 mg / L TSS : 65.0 mg / L

Achieving 40 MLD, Report Dt 09.11.20 Sadarban, U.P. Jal pH : 7.3 BOD : 54 Agra Operational 40 18.73 UASB ----- River Yamuna River Yamuna Bichhpuri, Nigam 27.0 mg / L COD : Agra 112.0 mg / L TSS : 47.0 mg / L

Achieving 24 MLD, Report Dt 09.11.20 Dhadhupura U.P. Jal pH = 7.5 BOD : Agriculture 55 Agra Operational 24 18.91 UASB ----- On Land (New), Nigam 28.0 mg / L COD : (on land) Agra 138.0 mg / L TSS : 48.0 mg / L

20

Achieving 36 MLD Report Dt 09.11.20 Sadarwan pH = 7.6 BOD : Land/ Agra 56 Agra ADA Operational 36 36 SBR Land/ (Bichpuri) 26.0 mg / L COD : canal New 120.0 mg / L TSS : 48.0 mg / L

Not Achieving Report Dt 09.11.20 4.50 MLD, pH = 8.8 BOD : 57 Kalindi Agra ADA 4.5 4.5 UASB ----- Karwan River Karwan River Operational 32.0 mg / L COD : Vihar, Agra 144.0 mg / L TSS : 58.0 mg / L

Achieving 03 MLD, Report Dt. 23.11.20 Pandav pH =7.5 BOD : 58 Meerut MDA Operational 3 2.7 ASP River Kali (East) Nagar, 17.0 mg / L COD : Meerut 162.0mg /L TSS : 47.0 mg / L

Achieving 07 MLD, Report Dt.23.11.20 Pallavpura pH =7.5 59 Meerut MDA Operational 7 6.5 ASP River Kali (East) m-1, BOD :18.0 mg / L Meerut COD : 166.0 mg / L TSS : 45.0 mg / L

Achieving 10 MLD, Report Dt. 23.11.20 Lohiya 60 Meerut MDA Operational pH = 7.5 BOD : 10 2 ASP River Kali (East) Nagar, 18.0mg / L COD : 168.0 Meerut mg / L TSS : 46.0mg / L

Achieving Report Dt. 23.11.20 15 MLD, pH = 7.5 BOD 61 Shatabdinag Meerut MDA Operational 15 4.8 ASP River Kali (East) :16.0 mg / L COD : ar, Meerut 156.0 mg / L TSS : 46.0 mg / L

21

Achieving 11 MLD, Report Dt.23.11.20 Pallavpura pH =7.6 BOD : 62 Meerut MDA Operational 11 8 MBBR River Kali (East) m-2, 16.0mg / L COD : Meerut 164.0mg / L TSS : 46.0 mg / L

Achieving Report Dt. 23.11.20 15 MLD, pH = 7.4 BOD : 63 Vedvyaspur Meerut MDA Operational 15 4.5 ASP River Kali (East) 17.0mg / L COD : 160.0 i Meerut mg / L TSS : 46.0 mg / L

Achieving Report Dt. 23.11.20 06 MLD, pH =7.5 BOD : 64 Rakshapura Meerut MDA Operational 6 4.4 ASP River Kali (East) 15.0mg / L COD : m, Meerut 158.0mg / L TSS : 45.0 mg / L

Achieving Report Dt.23.11.20 06 MLD, pH = 7.5 BOD : 65 Shradhapuri Meerut MDA Operational 6 5.5 ASP River Kali (East) 18.0mg / L COD : -1, Meerut 164.0mg / L TSS : 47.0 mg / L Achieving Report Dt. 23.11.20 06 MLD pH = 7.5 BOD 66 Sainik Meerut MDA Operational 6 5.95 UASB River Kali (East) :19.0mg / L COD : Vihar 172.0mg / L TSS : 45.0mg / L

Achieving Report Dt.23.11.20 5 MLD pH = 7.6 BOD : 67 Modipuram Meerut MDA Operational 5 4.9 -- River Kali (East) 17.0mg / L COD : Tiraha 160.0mg / L TSS : 47.0 mg / L

22

Achieving 07 MLD, Report Dt. 23.11.20 Sports pH =7.6 BOD : 68 Goods Meerut MDA Operational 7 4 ASP River Kali (East) 17.0 mg / L COD : Complex, 160.0mg / L TSS : Meerut 45.0mg / L

Achieving 10 MLD, Report Dt.23.11.20 Ganga 69 Meerut MDA Operational pH = 7.4 BOD : 10 3.8 SBR River Kali (East) Nagar, 16.0mg / L COD : 158.0 Meerut mg / L TSS : 47.0mg / L

Achieving 72 MLD Report Dt. 23.11.20 Treated sewage by Garh road U.P. Jal pH = 7.5 Sewerage 70 Meerut 213.67 Operational 72 65 SBR conduit and sludge River Kali (East) (Jagriti Nigam BOD :18.0 mg / L network to pit vihar) COD : 166.0 mg / L TSS : 46.0 mg / L

Achieving 06 MLD, Report Dt.23.11.20 Shradhapuri pH = 7.5 71 Meerut MDA Operational 6 5.6 ASP River Kali (East) - Phase-2, BOD : 15.0mg / L COD Meerut : 156.0 mg /L TSS :47.0mg / L

Achieving Nagar Nagar Report Dt. 22.11.20 Palika Palika Muzaffar pH = 7.3 Oxidatio 72 Parishad, Parishad, 100 MLD Operational 32.5 32.5 Drain ----- River Kali West Nagar BOD :28.0 mg / L n Pond Muzaffarna Muzaffarna COD : 112.0 mg / L gar gar TSS : 48.0 mg / L

Achieving Report Dt. 24.11.20 12 MLD, U.P. Jal pH = 8.24 73 Ayodhya 12 MLD Operational 12 6 UASB River Saryu Ayodhya Nigam BOD :26.0 mg / L COD : 118.0 mg / L TSS : 68.0 mg / L

23

Not Achieving Report Dt.24.11.20 13.59 MLD, Nagar pH = 6.7 BOD : Oxidatio 74 Masani, Mathura Palika 20 MLD Operational 13.59 8 River Yamuna 54.0 mg / L COD : n Pond Mathura Parishad 416.0 mg / L TSS : 156.0 mg / L

Not Achieving 14.5 MLD, Report Dt.24.11.20 Trans- Nagar pH = 6.6 Oxidatio 75 yamuna, Mathura Palika 30 MLD Operational 14.5 7 River Yamuna BOD : 48.0 mg / L n Pond Jamunapar, Parishad COD : 336.0 mg / L Mathura TSS : 152.0 mg / L

08 MLD, Not Achieving STP Near Report Dt.24.11.20 100 Bed U.P. Jal pH = 7.4 BOD USAB 76 Mathura 8.0 MLD Operational 8 7 River Yamuna Hospital Nigam :36.0 mg / L COD Reacter Vrindavan, :240.0 mg / L TSS : Mathura 108.0 mg / L

04 MLD, Not Achieving Vrindavan Report Dt.24.11.20 Nagar Near Pagal pH = 6.8 Oxidatio 77 Mathura Palika 6 MLD Operational 4 3.8 ------River Yamuna Baba BOD : 46.0 mg / L n Pond Parishad Mandir, COD : 352.0 mg / L Mathura TSS : 130.0 mg / L

16 MLD, Not Achieving Trans Report Dt 24.11.20 Yamuna, U.P. Jal pH = 7.3 BOD : USAB 78 Mathura 16 MLD Operational 16 6 River Yamuna Laxmi Nigam 40.0 mg / L COD : Reacter Nagar, 272.0 mg / L TSS : Mathura 106.0 mg / L

24

Not Achieving Report Dt.24.11.20 2.76 MLD Nagar pH =6.9 BOD : Oxidatio 79 Goverdhan Mathura Palika 2.5MLD Operational 2.76 2.76 Drain 42.0 mg / L COD : n Pond STP Parishad 288.0 mg / L TSS : 120.0 mg / L

Achieving Report Dt 23.11.20 33 MLD, Noida pH = 7.63 80 Sector-54, Noida Operational 33 33 SBR River Yamuna Authority BOD :12.0mg / L COD Noida : 108.0 mg / L TSS : 56.0mg / L

Achieving Report Dt 23.11.20 25 MLD, Noida pH = 7.47 BOD : 81 Sector-50, Noida Operational 25 25 SBR River Yamuna Authority 12.0mg / L COD : 104.0 Noida mg / L TSS : 54.0mg / L

Achieving Report Dt 23.11.20 35 MLD, Noida pH = 7.31 82 Sector-123, Noida Operational 35 35 SBR River Hindon Authority BOD : 15.0 mg / L Noida COD :136.0 mg / L TSS : 63.0 mg / L

Achieving Report Dt 23.11.20 50 MLD, Noida pH = 7.41 BOD : 83 Sector-168, Noida Operational 50 50 SBR River Yamuna Authority 19.5 mg / L COD : Noida 152.0 mg / L TSS : 71.0 mg / L

2.0 MLD Achieving Greater Report Dt. 23.11.20 Greater Noida pH =7.18 84 Greater Noida Noida - Operational 2 2 MBBR Drain Drain Hindon Authority BOD : 13.5mg / L Authority STP, Vill- COD :128.0mg / L TSS Badalpur : 59.0 mg / L

25

Achieving Report Dt. 23.11.20 Greater ECO tech - pH = 7.12 BOD : 85 Greater Noida Noida Operational 15 8 SBR - - - 2 13.5mg / L COD : Authority 128.0mg / L TSS : 68.0mg / L

Achieving Report Dt.23.11.20 Greater ECO tech - pH = 7.64 BOD : 86 Greater Noida Noida Operational 20 10 SBR - - - 3 16.5mg / L COD : Authority 144.0mg / L TSS : 91.0mg / L

Achieving 137 MLD, Report Dt.23.11.20 Greater Kasana, pH = 7.52 BOD : 87 Greater Noida Noida Operational 137 50 SBR River Hindon GreaterNoi 12.0mg / L COD : Authority da 116.0mg /L TSS : 59.0 mg /L

Achieving Report Dt 23.11.20 34 MLD, Noida pH =7.55 BOD : 88 Sector -50 Noida Operational 34 34 SBR River Yamuna Authority 13.5 mg / L COD : Noida 166.0 mg / L TSS : 57.0 mg / L

Achieving Report Dt 23.11.20 54 MLD, Noida pH = 7.49 BOD : 89 Sector- 54, Noida - Operational 54 54 SBR River Yamuna Authority 15.0 mg / L COD : Noida 166.0 mg / L TSS : 61.0 mg / L

0.805 MLD, Achieving Ahara Report Dt. 25.11.20 Treated Sewage - Road, U.P. Jal pH = 7.4 Oxidatio By Sever For Irrigation & 90 Bulandhsahar 0.25 MLD Operational 0.805 0.805 For Irrigation Zone-A, Nigam BOD : 20.0 mg / L n Pond Line Sludge- as Manure Anoopshah COD : 216.0 mg / L in Agricultural Field ar TSS :78.0 mg / L

26

1.75 MLD, Achieving Ahara Report Dt. 25.11.20 Treated Sewage - Road, U.P. Jal pH = 7.7 Oxidatio By Sever For Irrigation & 91 Bulandhsahar 0.5 MLD Operational 1.75 1.75 Ganga Zone-B, Nigam BOD : 24.0 mg / L n Pond Line Sludge- as Manure Anoopshah COD : 224.0 mg / L in Agricultural Field ar TSS : 82.0 mg /L

Achieving Report Dt 25.11.20 Treated Sewage - 04 MLD U.P. Jal pH = 7.4 BOD By Sever For Irrigation & 92 Narora Bulandhsahar 2.5 MLD Operational 4 4 SBR For Irrigation Nigam :18.0 mg / L COD : Line Sludge- as Manure (NGRBA) 176.0 mg / L TSS : 71.0 in Agricultural Field mg/L 2.25 MLD, Achieving Narora Narora Report Dt 25.11.20 Treated Sewage - Atomic Atomic pH = 7.5 BOD : By Sever For Irrigation & 93 power Bulandhsahar 0.5 MLD Operational 2.25 2.25 ASP For Irrigation power 18.0 mg / L COD : Line Sludge- as Manure Station Station 168.0 mg / L TSS :64.0 in Agricultural Field Narora mg /L Township Achieving 1.5 MLD Report Dt 25.11.20 Anoopshah U.P. Jal pH = 7.5 BOD : By Sever Treated Sewage- 94 Bulandhsahar 1.25 MLD Operational 1.5 1.5 MBBR For Irrigation ar Zone A Nigam 24.0 mg / L COD : Line For Irrigation (NGRBA) 208.0 mg / L TSS : 66.0 mg / L

Achieving STP, Zone- Report Dt 25.11.20 B U.P. Jal pH = 7.6 BOD : By Sever Treated Sewage- 95 Bulandhsahar 0.75 MLD Operational 1.0 1.0 MBBR River Ganga Anoopshah Nigam 26.0 mg / L COD : Line Ganga River ar 200.0 mg / L TSS : 70.0 mg / L

Achieving Report Dt 23.11.20 24 MLD U.P. Jal pH = 7.5 BOD : 96 Bijnor 14 MLD Operational 24 10 UASB Hemraj Drain Bijnor Nigam 8.0 mg / L COD : 56.0 mg / L TSS : 62.0 mg / L

27

Achieving Report Dt. 23.11.20 58 MLD U.P. Jal pH =7.5 97 Moradabad ----- Operational 58 18 SBR NA NA River Moradabad Nigam BOD : 24.0 mg / L COD : 88.0 mg / L TSS : 40.0 mg / L

Achieving Report Dt.23.11.20 15 MLD U.P. Jal pH =7.1 98 Rampur ----- Operational 15 0.07 UASB NA NA Ramganga River Pehrigaon Nigam BOD : 26.0 mg / L COD : 92.0 mg / L TSS:49.0 mg / L

Achieving Report Dt. 23.11.200 14 MLD U.P. Jal pH =7.0 BOD: 99 Rampur ----- Operational 14 0.11 UASB NA NA Ramganga River Benzirpur Nigam 22.0 mg / L COD :88.0 mg / L TSS : 42.0 mg / L

Achieving Report Dt. 23.11.20 5 MLD U.P. Jal 100 Rampur ----- Operational pH =7.4 BOD: 5 0.003 SBR NA NA Ramganga River Rampur Nigam 8.2 mg / L COD :40.0 mg / L TSS : 7.0 mg / L

Not Achieving Report Dt. 10.11.20 pH = 8.81 BOD Oxidatio :56.0mg/L COD: 256.0 n Pond( 5 MLD U.P. Jal 101 Sultanpur Operational mg/L TSS :110.0 5 5 Ist Pond ------River Gomti Hathia Nala Nigam mg/L of II TC=630000 MPN/100 Phase) ml FC=350000 MPN/100 ml

28

Mode of Mode of Name of disposal Name of receiving river Name and Installed Utilized Technolog of treated Sl. raw sewage catchment Address of District Institutions Operation Status Capacity Capacity y/process treated sewage Remark No. (drain/sewe in which STP responsible (MLD) (MLD) STP based sewage receiving rage STP is for O&M of and water body network) located STP sludge Due to lack of sewage Ramganga Ramganga generation from the 102 Moradabad Moradabad MDA Not Operational 20 NA SBR NA NA River River New MDA Colony near STP. 56 MLD, Ghaziabad S.B.R., Not Operational Dasana 103 Ghaziabad Development 56 56 SBR ----- Hindon Hindon Under Maintenance Bapudham, (24.11.20) Drain Authority Ghaziabad 30 MLD, Sadullabad Not Operational 104 Ghaziabad U.P. Jal Nigam 30 30 MBR ------Hindon Hindon Under Maintenance (Loni), (24.11.20) Ghaziabad The pipe line of 05 MLD STP Jajmau outlet is Sewerage Jajmau under maintenance, and Not Operational network & Irrigation River 105 5 MLD, Kanpur U.P. Jal Nigam 5 5 UASB Irrigation the cleaning of plant is 23.11.2020 Nala Channel Ganga Kanpur being going on. The Tapping STP is under maintenance (23.11.2020) ken river sub sub STP Not Working, Through tributary tributary 4 MLD oxidation Rising Main work is 106 Banda U.P. Jal Nigam Not Operational 4 -- drain/Sewera NIL Yamuna Yamuna Kanwara Road process being taken up under ge Network /Tributary /Tributary Ganga River Ganga AMRUT scheme River

29

Details of under construction STPs in the State

S.No Activity Name & Capacity of Projects/Units Status of Expected Present Stage (Existing and Required) I&D or Commissioning (% Progress) Name Nos. Capacity house dates of projects (MLD) sewer being connection undertaken Under Construction Projects 1 STPs & Ramna 1 50 - Dec-20 90.00% 2 I&D etc. Ramnagar 1 10 - Dec-20 56.00% 3 Mathura 1 30 - Apr-21 74.00% 4 Shuklaganj 1 5 - Oct-21 BEP submitted to IIT Roorkee for vetting 5 Unnao 1 15 - Oct-21 14.00% 6 Kanpur 1 30 - Oct-21 14.00% 7 Naini, 3 72 - Sep-21 25.00% Fafamau, Jhunsi 8 Etawah 1 21 - Jan-21 38.75% 9 Kasganj 1 15 - Jul-21 38.25% 10 Sultanpur 3 17 - Nov-21 10.00% 11 Jaunpur 1 30 - Oct-21 15.50% 12 Chunar 1 0.01 - Dec-20 65.00% 13 Muzaffarnagar 2 54.5 - Feb-22 BEP submitted to IIT Roorkee 14 Budhana 1 10 - Feb-22 for vetting 15 Baghpat 1 14 - Dec-21 12.00% 16 Moradabad 1 25 - Mar-22 Land Issue 17 Lucknow 2 40 - Dec-22 (LOA Issued on 17.09.2020) 18 Bulandshahar 1 40 - Dec-21 72.00% 19 Hapur 1 30 - Mar-22 34.00% 20 Mirzapur 1 7 - Mar-22 45.00% 21 Bareilly 1 35 - Mar-22 45.00% 22 Aligarh 1 45 - May-21 67.00% 23 Rae Bareilly 1 18 - Dec-21 65.00% 24 Etah 1 24 - Dec-20 88.00% 25 Modinagar 1 20 - Dec-20 82.00% 26 Shahjahanpur 1 40 - Dec-22 2.00% 27 Firozabad 1 67 - Dec-20 98.00% 28 Lucknow 1 120 - Dec-20 27.00% 29 Ballia 1 19.6 - Dec-21 80.00% 30 Pratapgarh 1 8.95 - Dec-21 90.00% 31 Jhansi 1 26 - Mar-21 90.00% 32 Kanpur 1 15 - Dec-20 98.00% Total 38 954.06

30

Details of Proposed STPs in the State S.No Activity Name & Capacity of Status of Pending Expected Present Stage Projects/Units Projects Commissionin (% Progress) (Existing and Required) g dates of Name Nos. Capacity projects being (MLD) undertaken Under Tendering Stage

1 STPs & Fatehgarh 2 61.5 Out of approx. 5500 To be Administrative Approval I&D etc. MLD STP capacity completed and Expenditure requirement, the within 24 Sanction (AA&ES) to be available capacity of months after revised. STP by Dec., 2022 the issuance of 2 Ghazipur 1 21 Revised AA&ES issued will be 4821.00 Letter of on 06.05.2020. Bids MLD. There will be Authorization. received and opened on a gap of 679.00 08.09.2020. Technical MLD which will be bid evaluation under met after new process. projects formulation 3 Mirzapur 2 17 and their AA&ES issued on commissioning. Till 28.05.2020. Bids the new STP for received and opened on meeting the gap is 08.09.2020. Technical sanctioned, it is bid evaluation under submitted that State process. Government has 4 Bareilly 4 63 Tender invited. Bids issued Uttar Pradesh document will open on State Septage 14.12.2020. Land issue Management Policy resolved. for the faecal and 5 Agra 13 177.60 septage management AA&ES issued on for the uncovered 06.05.2020. Bid sewer network areas. document sent World Also the Bank by NMCG for Government order approval. 6 Meerut 1 220 has been issued to AA&ES issued on all the Urban Local 06.05.2020. Bid Bodies for insitu document sent World waste waste Bank by NMCG for treatment projects on Approval. all such drainsby 7 Azamgarh 1 8 adopting bio- Land issue remediation process.

Total 24 568.10

31

Annexure-II FSSTP Status

Alternate Treatment Technology being adopted by the State

Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Scanned with CamScanner Annexure-IV Latest Water Quality of Drains

Dissolved Total Coliform BOD (mg/L) Oxygen (MPN/100 SrNo River District Drain Name Sample Date Color (Hazen) (mg/L) mL) TSS COD 1 Ganga Prayagraj Nehru Park Nala 20-10-2020 65 (Hazen) 4.6 40 32000 50 106 2 Ganga Prayagraj Beligaon Drain 21-10-2020 55 (Hazen) 0.5 46 34000 54 96 Unchwagarh Drain No. 50 3 Ganga Prayagraj 2 21-10-2020 60 (Hazen) 0 40000 50 118 Unchwagarhi Drain No. 54 4 Ganga Prayagraj 1 21-10-2020 55 (Hazen) 0 43000 58 104 5 Ganga Prayagraj Old GT Road Nala 20-10-2020 55 (Hazen) 0 53 38000 57 106 Savitry Nagar (New 44 6 Ganga Prayagraj Jhusi) 20-10-2020 50 (Hazen) 0 38000 54 112 Savitry Nagar Bajar 48 7 Ganga Prayagraj (New Jhusi) 20-10-2020 50 (Hazen) 0.6 32000 62 106 8 Ganga Prayagraj Kriya Yogashram 20-10-2020 40 (Hazen) 1.8 36 32000 47 96 Primary School, Ulta 50 9 Ganga Prayagraj Kila 20-10-2020 55 (Hazen) 0 39000 51 110 10 Ganga Prayagraj Lakadiya Nala 20-10-2020 60 (Hazen) 0 54 40000 56 104 Shastri Bridge Nala 50 11 Ganga Prayagraj (Mansahita) 20-10-2020 50 (Hazen) 0.4 38000 64 110 12 Ganga Prayagraj Shivkuti Drain No. 6 21-10-2020 50 (Hazen) 0 49 34000 57 104 13 Ganga Prayagraj Shivkuti Drain No. 5 21-10-2020 55 (Hazen) 0 52 40000 52 118 Shivkuti Drain No. 3 46 14 Ganga Prayagraj (North) 21-10-2020 50 (Hazen) 0 34000 60 102 15 Ganga Prayagraj Shivkuti Drain No. 2 21-10-2020 55 (Hazen) 0 43 32000 62 108 16 Ganga Prayagraj Shivkuti Drain No. 1 21-10-2020 50 (Hazen) 0 41 34000 57 116 17 Ganga Prayagraj Nayapurwa Drain 21-10-2020 55 (Hazen) 0 46 32000 64 102 Muirabad (Ganesh 51 18 Ganga Prayagraj Nagar) Nala 21-10-2020 60 (Hazen) 0 40000 59 114 19 Ganga Prayagraj Indira Awas Nala 21-10-2020 50 (Hazen) 0 43 32000 60 106 20 Ganga Prayagraj Co-Operative Nala 21-10-2020 55 (Hazen) 0 49 52000 59 108 21 Ganga Prayagraj Shantipuram Nala 21-10-2020 55 (Hazen) 0 52 38000 63 118 22 Ganga Prayagraj Basna Nala 21-10-2020 50 (Hazen) 0 50 39000 59 118 23 Ganga Prayagraj Lotey Haren Nala 20-10-2020 55 (Hazen) 0 52 46000 54 120 24 Ganga Prayagraj Sadar Bazar Nala 21-10-2020 40 (Hazen) 0 30 46000 48 128 25 Ganga Prayagraj Tv Tower Nala 21-10-2020 65 (Hazen) 0 28 40000 51 124 26 Ganga Prayagraj A.D.A. Colony Nala 21-10-2020 35 (Hazen) 3 27 43000 56 138 27 Ganga Prayagraj Rajapur Nala 21-10-2020 60 (Hazen) 4 28 43000 60 128 Shankarghat Colony Drain (Near 30 Phaphamau Bridge) - 28 Ganga Prayagraj Tapped 21-10-2020 45 (Hazen) 0.7 40000 59 120 7 small Laxman ghat 84 29 Ganga Kanpur Nagar nala 21-10-2020 60 (Hazen) 0 176 216 7 small Kalwari ghat 72 30 Ganga Kanpur Nagar nala 21-10-2020 60 (Hazen) 0 148 200 7 small Bhramavrat 54 31 Ganga Kanpur Nagar ghat nala 21-10-2020 50 (Hazen) 0 126 144 32 Ganga Kanpur Nagar 7 small Peshwa nala 21-10-2020 40 (Hazen) 0 48 112 136 33 Ganga Kanpur Nagar 7 small Bhunni nala 21-10-2020 50 (Hazen) 0 66 142 176 34 Ganga Kanpur Nagar 7 small Lav-kush nala 21-10-2020 60 (Hazen) 0 102 124 184 35 Ganga Sonbhadra Kashi Ram Awas Drain 19-10-2020 25 (Hazen) 1.1 54 3100000 222 374 36 Ganga Mirzapur Bisundarpur Drain 19-10-2020 25 (Hazen) 1.2 56 3400000 186 368 37 Ganga Mirzapur Hanumanghat Drain 19-10-2020 25 (Hazen) 1.1 54 3400000 182 416 38 Ganga Mirzapur Ggoreshahid Drain 19-10-2020 25 (Hazen) 0.9 62 4900000 226 452 39 Ganga Mirzapur Balaji temple 19-10-2020 25 (Hazen) 1 56 4300000 252 420 62 40 Ganga Mirzapur Irrigation colony Drain 19-10-2020 25 (Hazen) 1 4900000 222 480 41 Ganga Mirzapur Barahmiliah Drain 19-10-2020 25 (Hazen) 0.9 54 3100000 206 376 42 Ganga Mirzapur MorchaGhar Drain 19-10-2020 25 (Hazen) 1 58 3400000 186 412 43 Ganga Mirzapur Chorawa 19-10-2020 25 (Hazen) 1.1 58 4900000 214 446 44 Ganga Mirzapur DiwanGhat new Drain 19-10-2020 25 (Hazen) 1.1 56 3400000 242 392 45 Ganga Mirzapur Balughat Kacha Drain 19-10-2020 25 (Hazen) 1 54 3400000 208 396 46 Ganga Varanasi Assi/Nagavan Drain 20-10-2020 30 (Hazen) 1 58 6300000 268 524 47 Ganga Varanasi Samneghat Drain 20-10-2020 30 (Hazen) 1 54 3400000 208 418 48 Ganga Varanasi Nakkhi Drain 20-10-2020 30 (Hazen) 0.9 58 3400000 218 424 49 Ganga Kanpur Nagar Permiya Nala 20-10-2020 50 (Hazen) 1.6 75 162 208 Soarakh Ghat Muroop 32 50 Ganga Raebareli Nala/(Tikaitganj) 19-10-2020 29 (Hazen) 1.5 160000 86 134 Pathvari Ghat ka 33 51 Ganga Raebareli Nala/(Tikaitganj) 19-10-2020 29 (Hazen) 1.6 160000 90 135 Padva Nala/(Muraibagh) 5.8 52 Ganga Raebareli Shankar Nagar 19-10-2020 26 (Hazen) 6.7 63000 77 29 City Jail Drain (Dakari Light pale 105 53 Ganga Unnao drain) 19-10-2020 (Appearance) 0 122 346.7 Light Grey 73.33 54 Ganga Unnao Taar Nala Babaganj 19-10-2020 (Appearance) 0 90 260 Light Grey 70 55 Ganga Unnao Indira Nagar Drain 19-10-2020 (Appearance) 0 70 240 Light Grey 66.67 56 Ganga Unnao Ganga Vishu Drain 19-10-2020 (Appearance) 0 78 220 Mallahan Tola Nala, 28 57 Ganga Pratapgarh Manikpur 19-10-2020 30 (Hazen) 1.7 120000 75 120 Pakka Nala, Silwara, 33 58 Ganga Pratapgarh Manikpur 19-10-2020 33 (Hazen) 1.7 160000 70 131 59 Ganga Pratapgarh Ganda Nala Raiyapur 19-10-2020 26 (Hazen) 6.9 6 54000 75 28 60 Ganga Pratapgarh Ganda Nala Baraipur 19-10-2020 26 (Hazen) 6.9 6 54000 75 28 Blackish 49 61 Ramganga Bareilly Nakatia 20-10-2020 (Hazen) 1.7 9400000 120 Deveranaiya Nala Blackish 43 62 Ramganga Bareilly (River) (Club) 20-10-2020 (Hazen) 1.2 8400000 96 Blackish 32 63 Ramganga Bareilly Chaubari 20-10-2020 (Hazen) 0.7 1100000 80 64 Ramganga Rampur Rampur Drain 19-10-2020 29 (Hazen) 0.4 92 23000000 349 240 Vivekanand Hospital- Blackish 85 65 Ramganga Moradabad Right 19-10-2020 (Appearance) 0 15000000 397 240 Vivekanand hospital- Blackish 100 66 Ramganga Moradabad left 19-10-2020 (Appearance) 0 13000000 419 256 Blackish 125 67 Ramganga Moradabad TDI City Drain 19-10-2020 (Appearance) 0.2 1700000 504 320 Blackish 125 68 Ramganga Moradabad Prabhat Market 19-10-2020 (Appearance) 0.2 28000000 461 320 Blackish 140 69 Ramganga Moradabad Nawabpura drain -2 19-10-2020 (Appearance) 0.3 31000000 415 384 Blackish 120 70 Ramganga Moradabad Nawabpura drain -1 19-10-2020 (Appearance) 0.2 23000000 405 256 Blackish 140 71 Ramganga Moradabad Moksh Dham Drain 19-10-2020 (Appearance) 0.2 27000000 456 304 Blackish 145 72 Ramganga Moradabad MIT Drain 19-10-2020 (Appearance) 0 15000000 573 400 Blackish 120 73 Ramganga Moradabad Lalbagh Drain 19-10-2020 (Appearance) 0 31000000 432 336 Katghar Railway Blackish 75 74 Ramganga Moradabad Station Drain 19-10-2020 (Appearance) 0 28000000 401 224 Blackish 140 75 Ramganga Moradabad Karula drain 19-10-2020 (Appearance) 0 27000000 379 400 Blackish 135 76 Ramganga Moradabad Jigar Colony 19-10-2020 (Appearance) 0 33000000 456 320 Blackish 175 77 Ramganga Moradabad Jhabbu Ka Nala 19-10-2020 (Appearance) 0.2 28000000 527 496 Blackish 165 78 Ramganga Moradabad Jama Masjid-Left 19-10-2020 (Appearance) 0 23000000 519 320 Jama Masjid Right Blackish 120 79 Ramganga Moradabad Drain 19-10-2020 (Appearance) 0 31000000 443 288 Blackish 120 80 Ramganga Moradabad Ghosiyan 19-10-2020 (Appearance) 0.2 31000000 501 320 Turbid 70 81 Ramganga Moradabad Delhi Road (R) 19-10-2020 (Appearance) 0 700000 31 176 Turbid 75 82 Ramganga Moradabad Delhi Road (L) 19-10-2020 (Appearance) 0.2 500000 48 192 Blackish 115 83 Ramganga Moradabad Daheria/ Dateria Drain 19-10-2020 (Appearance) 0 26000000 415 304 Turbid 70 84 Ramganga Moradabad Chandausi Road (R) 19-10-2020 (Appearance) 0 1500000 41 208 Turbid 90 85 Ramganga Moradabad Chandausi Road (L) 19-10-2020 (Appearance) 0 1300000 32 240 Chakkar Ki Milak Blackish 170 86 Ramganga Moradabad (Mukarampur) 19-10-2020 (Appearance) 0 26000000 483 480 Blackish 80 87 Ramganga Moradabad Barbalan 19-10-2020 (Appearance) 0 27000000 392 240 Blackish 70 88 Ramganga Moradabad Kudaghar Drain 19-10-2020 (Appearance) 0 21000000 441 208 89 Kaali Drain 20-10-2020 35 (Hazen) 0 168 191 360 90 Kaali Hapur Chhoiya Drain 19-10-2020 30 (Hazen) 0 33 260000 102 110 91 Kaali Ghaziabad Kadrabad drain 19-10-2020 30 (Hazen) 0 46 3200000 110 151 92 Kaali Meerut Abu Nala -2 19-10-2020 40 (Hazen) 0 54 130000 1062 296 93 Kaali Meerut Abu Nala-1 19-10-2020 45 (Hazen) 0 62 180000 1110 314 94 Kaali Meerut Odean drain 19-10-2020 45 (Hazen) 0 56 150000 970 304 45 95 Kaali Muzaffarnagar Khatauli Drain 19-10-2020 45 (Hazen) 0 110 120 96 Hindon Shamli Sikka Drain 20-10-2020 55 (Hazen) 0 120 87 260 97 Hindon Shamli Shamli Drain 20-10-2020 60 (Hazen) 0 142 160 316 130 98 Hindon Muzaffarnagar Titawi Drain 19-10-2020 55 (Hazen) 0 110 290

140 99 Hindon Muzaffarnagar Mansurpur Drain 19-10-2020 55 (Hazen) 0 165 360 102 100 Hindon Muzaffarnagar Suzru Village Drain 19-10-2020 50 (Hazen) 0 98 308 90 101 Hindon Muzaffarnagar Shamli Road Drain 19-10-2020 45 (Hazen) 0 68 238

152 102 Hindon Muzaffarnagar Nyajipur Drain 19-10-2020 65 (Hazen) 0 140 388 Nai Basti Khalapar 142 103 Hindon Muzaffarnagar Drain 19-10-2020 65 (Hazen) 0 168 412

120 104 Hindon Muzaffarnagar Laddawala Drain 19-10-2020 50 (Hazen) 0 104 324

124 105 Hindon Muzaffarnagar Krishnapuri Drain 19-10-2020 50 (Hazen) 0 142 320

104 106 Hindon Muzaffarnagar Khadarwala Drain 19-10-2020 55 (Hazen) 0 122 288

232 107 Hindon Muzaffarnagar Dhandhera Drain 19-10-2020 75 (Hazen) 0 176 518 108 Yamuna Prayagraj Main Ghaghar Nala 21-10-2020 45 (Hazen) 0 52 33000 62 110 Dariyabad Jogighat 54 109 Yamuna Prayagraj Drain 19-10-2020 60 (Hazen) 0 46000 46 128 Dariabad Piparghat 62 110 Yamuna Prayagraj Drain 19-10-2020 65 (Hazen) 0 63000 51 138 Dariabad Kakahraghat 60 111 Yamuna Prayagraj Drain 19-10-2020 50 (Hazen) 0 58000 52 152 112 Varuna Varanasi Sarang Pond Drain 19-10-2020 30 (Hazen) 1.1 54 3400000 258 472 113 Varuna Varanasi Nai Basti drain 19-10-2020 30 (Hazen) 0.9 54 3100000 192 402 114 Varuna Varanasi Hukulganj drain 19-10-2020 30 (Hazen) 1 58 6300000 222 458 115 Varuna Varanasi Khajuri colony drain 19-10-2020 30 (Hazen) 1 54 3400000 212 416 116 Varuna Varanasi Central jail drain 19-10-2020 30 (Hazen) 1.1 58 6300000 276 514 117 Varuna Varanasi Chamrotha drain 19-10-2020 30 (Hazen) 1.1 50 3400000 184 362 Banaras drain number- 118 Varuna Varanasi 5 19-10-2020 30 (Hazen) 0.9 58 6300000 264 530 ओ0ए0 सं奍या− 673/2018 से आ楍छादित ससचं ाई विभाग की प्रथम, 饍वितीय एिं ततृ ीय िरीयता िाली 05 नदियⴂ का वििरणः-

Record seasonal Possibility of Timeline Name of River River’s stretch variation Directions Action taken maintaining E-flow in River flow.

Timeline Timeline 1st Priority-04 5 1. Identification of flood plain zone by IIT Delhi has been Detailed survey is being conducted by I.I.T. completed & submitted Delhi.

6 months

it to Chief Yamuna. (Completed) Notification on basis of 1. Identification, the above report is in E-flow study Notification & Saharanpur to Perennial progress. will be carried Hidon Demarcation of flood 50mtr from both banks will be declared as no 9 months Ghaziabad flow 2. Study of E-flow has out by I.I.T. plain zone. construction/ no dovelopment zones. been assigned to IIT Roorkee. 2. E-flow 3 months Roorkee. Work is in (In progress) progress. Demand for Rs. 50.51 Lacs has Demarcation of flood plain will be made at been raised for suitable location by planting a row of suitable 9 months payment to IIT plants through forest department. Roorkee. 50mtr from both banks will be declared as no 3 months construction/ no dovelopment zones. As it’s a non perinial For detailed survey 6 months river, e-flow can not be 1. Identification, maintained as far as Non Mujaffarnagar to Notification & escapes of Upper Ganga Kali River (East) Perennial Gulauthi Demarcation of flood Demarcation of flood plain will be made at Canal is concerned, these flow plain zone. suitable location by planting a row of suitable 9 months escapes are only used for plants through forest department. main canal safety and no surplus water is available. Record seasonal Possibility of Timeline Name of River River’s stretch variation Directions Action taken maintaining E-flow in River flow.

Timeline Timeline 50mtr from both banks will be declared as no At Rameshwar, flood 3 months As it’s a non perinial 1. Identification, plain zone has been construction/ no dovelopment zones. river, e-flow can not be Non Rameshwar to Notification & identified between the For detailed survey 6 months maintained through out Varuna River Perennial Varanasi Demarcation of flood Ghats of both banks. Demarcation of flood plain will be made at the year and no surplus flow plain zone. For remaining length, suitable location by planting a row of suitable 9 months water is available to it is in progress. plants through forest department. augment the flow. Record seasonal Possibility of Timeline Name of River River’s stretch variation Directions Action taken maintaining E-flow in River flow.

Timeline Timeline 100mtr from both banks will be declared as no For identification of construction/ no dovelopment zones till the E-flow in 1. Identification, flood plain zone & E- notification of the above purpose will be 6 months Yamuna River Azgarpur to Etawah Notification & flow, fresh request has Perennial issued by Central Water Commission based on will be studied Yamuna & Shahpur to Demarcation of flood been sent to Yamuna 9 months flow their studies. & decided by Prayagraj plain zone. Basin Authority as per Demarcation of flood plain will be made at Central Water 2. E-flow directions of CWC by suitable location by planting a row of suitable 9 months Commision. Chief Yamuna. plants through forest department. 2nd Priority-00 0 3rd Priority-01 1 50mtr from both banks will be declared as no 3 months As it’s a non perinial 1. Identification, construction/ no dovelopment zones. river, e-flow can not be Non Notification & For detailed survey 6 months maintained through out Gomti Sitapur to Varanasi Perennial It is in progress. Demarcation of flood Demarcation of flood plain will be made at the year and no surplus flow plain zone. suitable location by planting a row of suitable 9 months water is available to plants through forest department. augment the flow. 4th Priority-02 2 (i) Kannauj to Unnao Detailed report of flood plain zone has been E-flow from Kannauj to 3 months presented by special commette in O.A.- Unnao is maintained from Perennial Narora Barrage and Ganga Kannauj to Varanasi 200/2014 to Hon’bl National Green Tribunal. flow Kanpur Barrage as per the Demarcation of flood plain zone will be made directions of Central at suitable location as per Central Water 9 months Water Commision. Commission report will be made by fixing pillars at suitable interval. Record seasonal Possibility of Timeline Name of River River’s stretch variation Directions Action taken maintaining E-flow in River flow.

Timeline Timeline (ii) Unnao to Varanasi 100mtr from both banks will be declared as no devolopment/no construction zone till the E-flow from detailed report of flood plain zone will be 6 months Unnao to prepared by Central Water Commission in Varanasi will Perennial Ganga Kannauj to Varanasi accordance with the orders issued in O.A.- be studied & 9 months flow 200/2014 by Hon’bl National Green Tribunal decided by regarding segment ‘B’- II Phase. Central Water Demarcation of flood plain zone will be made Commision. at suitable location as per Central Water 9 months Commission report will be made by fixing pillars at suitable interval. 50mtr from both banks will be declared as no 3 months construction/ no dovelopment zones. E-flow study Moradabad to Perennial For detailed survey 6 months will be carried Ramganga 9 months Kannauj flow Demarcation of flood plain will be made at out by I.I.T. suitable location by planting a row of suitable 9 months Delhi. plants through forest department. 5th Priority-05 5 100mtr from both banks will be declared as no 3 months construction/ no dovelopment zones. E-flow study Hamirpur to Perennial will be carried Betwa For detailed survey 6 months 9 months Wagpura flow out by I.I.T. Demarcation of flood plain will be made at Delhi. suitable interval as per topographical 9 months condition by stone pillars/ plantation. 100mtr from both banks will be declared as no 3 months construction/ no dovelopment zones. E-flow study Barhalganj to Perennial will be carried Ghaghra For detailed survey 6 months 9 months Deoria flow out by I.I.T. Demarcation of flood plain at suitable location Delhi. by planting a row of suitable plants through 9 months forest department. Record seasonal Possibility of Timeline Name of River River’s stretch variation Directions Action taken maintaining E-flow in River flow.

Timeline Timeline 100mtr from both banks will be declared as no 3 months construction/ no dovelopment zones. E-flow study Domingarh to Perennial will be carried Rapti For detailed survey 6 months 9 months Rajghat flow out by I.I.T. Demarcation of flood plain at suitable location Delhi. by planting a row of suitable plants through 9 months forest department. 50mtr from both banks will be declared as no 3 months As it’s a non perinial construction/ no dovelopment zones. river, e-flow can not be Non For detailed survey 6 months maintained through out Sai Unnao to Jaunpur Perennial Demarcation of flood plain at suitable location the year and no surplus flow by planting a row of suitable plants through 9 months water is available to forest department. augment the flow.

100mtr from both banks will be declared as no 3 months construction/ no dovelopment zones. E-flow study Ayodhya to Perennial will be carried Saryu For detailed survey 6 months 9 months Elafatganj flow out by I.I.T. Demarcation of flood plain will be made at Delhi. suitable interval as per topographical 9 months condition by stone pillars/ plantation.

Notes: 1. No construction/No development zone for River Ganga is decided on the basis of O.A. 200/2014 M.C. Mehta v/s Union of India. 2. For Yamuna & other major rivers, it is also decided on the same principle as 100mtr. 3. For minor rivers and drains, it is decided as 50mtr. 4. E-flow is maintained in river Ganga as per the guidelines of C.W.C. from Kannauj to Unnao as 24 cumec from November to May and 48 cumec from June to October. 5. For Yamuna river, as per Upper Yamuna River Board compulsory Downstream discharge is 10 cumec which is maintained from Okhla Barrage. 6. For non perennial rivers, E-flow can not be maintained through out the year and no surplus water is available to augment the flow in these rivers. 7. There is no surplus water in any canal that can augment, flow in critical polluted reaches. ➢ Maintenance of E-flow for the critically polluted river stretches - o Perennial River Flow : Name of River River Stretch Possibility of maintaining E-flow Timeline Yamuna Azgarpur to Etawah, Shahpur to E-flow will be studied and decided by Central Water 12 Months Prayagraj Commission. Ganga Kannauj to Varanasi E-flow from Kannauj to Unnao is maintained from Narora - Barrage and Kanpur Barrage as per directions of Central Water Commission 24 cumec - Nov. to May 48 cumec - June to Oct. E-flow from Unnao to Varanasi will be studied & decided by 12 Months Central Water Commission.

Ramganga Moradabad to Kannauj E-flow has been decided and notification will be issued with 02 Months in two months. Betwa Hamirpur to Wagpura E-flow study will be carried out by IIT Delhi or other 12 Months agency. Ghaghra Barhalganj to Deoria E-flow has been decided and notification will be issued with 02 Months in two months. Rapti Domingarh to Rajghat E-flow has been decided and notification will be issued with 02 Months in two months. Saryu Ayodhya to Elafatganj E-flow has been decided and notification will be issued with 02 Months in two months. o Non-perennial River Flow : Name of River River Stretch Possibility of maintaining E-flow Kali Nadi East Muzaffarnagar to Gulaothi Varuna Remeshwar to Varanasi Gomti Sitapur to Varanasi As it’s a non perennial river, e-flow cannot be maintained. Hindon Saharanpur to Ghaziabad Sai Unnao to Jaunpur

673 Performa Page : 1

➢ Demarcation of Flood plain boundary : Name of River Stretch Introduce pillars at suitable location in the river flood plain for demarcation of the flood plain River boundary for effective enforcement on eliminating incidence/practices of waste disposal encroachment in the river bed. Activity Timeline Hindon Saharanpur to --- Flood plain zone has been decided CE Yamuna vide office order no. नि-1891/CE.Yamuna/ Ghaziabad NGT/Dt. 29.09.2020. Demarcation of flood plain will be made at suitable location by planting a row of suitable 9 Months plants through Forest Department. Kali East Muzaffarnagar to 50 m from both banks has been declared by CE Ganga vide office order no. --- Gulaothi 6773/CE.Ganga/NGT/Dt. 27.08.2020 as no construction/no development zones. Demarcation of flood plain will be made at suitable location by planting a row of suitable 9 Months plants through Forest Department. Varuna Rameshwar to 50 m from both banks has been declared by CE Sone vide office order no. 7579/Sone/ --- Varanasi 92B-Flood Plain Zone/Varanasi/Dt. 17.12.2020 as no construction/no development zones. Demarcation of flood plain will be made at suitable location by planting a row of suitable 9 Months plants through Forest Department. Yamuna Azgarpur to 100 m from both banks will be declared as no construction/no development zones till the 6 Months Etawah, Shahpur notification of the above purpose is issued by Central Water Commission based on their to Prayagraj studies. Demarcation of flood plain will be made at suitable location by planting a row of suitable 9 Months plants through Forest Department. Gomti Sitapur to 50 m from both banks has been declared by CE Sharda Sahayak vide office order no. --- Varanasi 1522/शा0सहा0(अिु0प्रको0)/NGT/Dt. 03.09.2020 as no construction/no development zones. Demarcation of flood plain will be made at suitable location by planting a row of suitable 9 Months plants through Forest Department. Ganga Kannauj to Notification has been issued on 4th Sep. 2020 by State Government. --- Unnao Demarcation of flood plain zone is under process. 9 Months Ganga Unnao to CWC is carrying out the identification of Flood Plain Zone and it is under process. 6 Months Varanasi Demarcation of flood plain zone will be made at suitable location as per CWC report, will 9 Months be made by fixing pillars at suitable interval.

673 Performa Page : 2

Ramganga Moradabad to 100 m from both banks has been declared by CE Eastern Ganga vide office order no. --- Kannauj 7089/मुअपूग/ं NGT/Dt. 27.08.2020 as no construction/no development zones. Demarcation of flood plain will be made at suitable location by planting a row of suitable 9 Months plants through Forest Department. Betwa Hamirpur to 100 m from both banks will be declared as no construction/no development zones. 3 Months Wagpura For detailed survey 6 Months Demarcation of flood plain will be made at suitable interval as per topographical condition 9 Months by stone pillars/plantation Ghaghra Barhalganj to 100 m from both banks has been declared by CE Gandak vide office order no. --- Deoria 6168/मु0अ0गो0/दििाकं - 11.11.2020 as no construction/no development zones. Demarcation of flood plain will be made at suitable location by planting a row of suitable 9 Months plants through Forest Department. Rapti Domingarh to 100 m from both banks has been declared by CE Gandak vide office order no. --- Rajghat 6169/मु0अ0गो0/दििाकं - 11.11.2020 as no construction/no development zones. Demarcation of flood plain will be made at suitable location by planting a row of suitable 9 Months plants through Forest Department. Sai Unnao to 50 m from both banks has been declared by CE Sharda Sahayak vide office order no. --- Jaunpur 1521/शा0सहा0(अिु0प्रको0)/NGT/Dt. 03.09.2020 as no construction/no development zones. Demarcation of flood plain zone at suitable location by planting a row of suitable plants 9 Months through Forest Department. Saryu Ayodhya to 100 m from both banks has been declared by CE Saryu -1 Ayodhya vide office order no. 762/Dt. --- Elafatganj 30.09.2020 as no construction/no development zones. Demarcation of flood plain will be made at suitable interval as per topographical condition 9 Months by stone pillars/plantation

673 Performa Page : 3

Name and designation of designated officer for ensuring compliance to provisions under statute.

S. Area Designated Officer No. 1 E-flow & Flood S. Area Designated Officer Plain Zone No. 1 E-flow & River River Stretch Nodal Officer Flood Plain Hindon Saharanpur to Ghaziabad Mr. Ramesh Chandra, Chief Engineer Zone Yamuna, Okhla, New Delhi Kali East Muzaffarnagar to Mr.Mahesh Chandra, Chief Engineer Gulaothi Ganga, Meerut Varuna Remeshwar to Varanasi Mr.Shyam Sunder, Chief Engineer Son, Varanasi Yamuna Azgarpur to Etawah, Mr. G.C. Agrawal, Chief Engineer Ram Shahpur to Prayagraj Ganga, Kanpur Gomti Sitapur to Varanasi Mr. A.K. Singh, Chief Engineer Sharda Shayak, Lucknow Ganga Kannauj to Unnao Mr. G.C. Agrawal, Chief Engineer Ram Ganga, Kanpur Ganga Unnao to Varanasi Mr.Shyam Sunder, Chief Engineer Son, Varanasi Ramganga Moradabad to Kannauj Mr. R P Singh, Chief Engineer Eastern ganga, Moradabad. Betwa Hamirpur to Wagpura Mr. Maheshwari Prasad, Chief Engineer Betwa project, Jhansi. Ghaghra Barhalganj to Deoria Mr. Akhilesh Kumar, Chief Engineer 1st, Ayodhya Rapti Domingarh to Rajghat Mr Rakesh Kumar, Chief Engineer Sarayu 2nd, Gonda. Sai Unnao to Jaunpur Mr. A.K. Singh, Chief Engineer Sharda Shayak, Lucknow Saryu Ayodhya to Elafatganj Mr. Akhilesh Kumar, Chief Engineer Sarayu 1st, Ayodhya

673 Performa Page : 4

Notes: 1. No construction/No development zone for River Ganga is decided on the basis of O.A. 200/2014 M.C. Mehta v/s Union of India. 2. For Yamuna & other major rivers, it is also decided on the same principle as 100mtr. 3. For minor rivers and drains, it is decided as 50mtr. 4. E-flow is maintained in river Ganga as per the guidelines of C.W.C. from Kannauj to Unnao as 24 cumec from November to May and 48 Cumec from June to October. 5. For Yamuna river, as per Upper Yamuna River Board compulsory Downstream discharge is 10 cumec which is maintained from Okhla Barrage. 6. For non perennial rivers, E-flow can not be maintained through out the year and no surplus water is available to augment the flow in these rivers.` 7. There is no surplus water in any canal that can augment, flow in critical polluted reaches.

673 Performa Page : 5

Minimum Environmental Flow Requirement, CUSEC

Basin / Location Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual Gomti Basin / Exit 44.56 44.56 44.56 44.56 44.56 44.56 338.11 338.11 338.11 194.15 194.15 44.56 1714.56 Gandak Basin / UP Exit 1.77 1.77 1.77 1.77 1.77 1.77 16.97 16.97 16.97 9.77 9.77 1.77 82.82 Rapti Basin / Exit 23.69 23.69 23.69 23.69 23.69 23.69 238.37 238.37 238.37 132.34 132.34 23.69 1145.61 Ramganga Basin / Exit 28.04 28.04 28.04 28.04 28.04 28.04 181.34 181.34 181.34 56.53 56.53 28.04 853.35 Ghaghra Basin / UP Exit 91.09 91.09 91.09 91.09 91.09 91.09 622.37 622.37 622.37 421.31 421.31 91.09 3347.38 Sone Basin / UP Exit 2.34 2.34 2.34 2.34 2.34 2.34 92.08 92.08 92.08 9.83 9.83 2.34 312.25 Yamuna Basin / Hathnikund 29.85 26.95 29.85 28.89 29.85 28.89 29.85 29.85 28.89 29.85 28.89 29.85 351.47 Barrage D/s Yamuna Basin / New Okhla 30.02 27.11 30.02 29.05 30.02 29.05 30.02 30.02 29.05 30.02 29.05 30.02 353.42 Barrage D/s

673 Performa Page : 6