PRE-FEASIBILITY REPORT

Development of Green Field Airport at , District-Kurnool,

Project Proponent: BHOGAPURAM INTERNATIONAL AIRPORT CORPORATION LTD

Environment Consultant: Greencindia Consulting Private Limited,  NCR, Ghaziabad, UP (NABET/EIA/1013/034) Pre-Feasibility Report I For Development of Green Field Airport at Dagadarthi, District-, Andhra Pradesh

Table of Content

ES Executive Summary Chapter 1 INTRODUCTION 1.1 Background 1-1 1.2 Project proponent 1-2 1.3 Airport sector profile 1-2 1.4 Air connectivity pattern 1-5 1.5 Need of the project 1-6 1.6 Structure of the report 1-9 1.7 Employment generation 1-9 Chapter 2 PROJECT DESCRIPTION 2.1 Introduction 2-1 2.2 Type of project 2-1 2.3 Location & linkages 2-1 2.4 Site selection & Alternatives 2-2 2.5 Project Magnitude 2-3 2.6 Description of the proposed project 2-3 2.7 Construction Material 2-4 2.8 Resource Optimization 2-4 2.8.1 Water Saving Practices and Reduction 2-4 2.8.2 Water Use Reduction 2-7 2.8.3 Water Conservation in Construction 2-8 2.8.4 Water Conservation in Landscaping 2-8 2.9 Water requirement & supply 2-10 2.9.1 Water source & demand 2-10 2.9.2 Water storage 2-11 2.9.3 Water distribution 2-11 2.10 Wastewater generation and treatment 2-11 2.11 Storm water drainage 2-13

PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD

Pre-Feasibility Report II For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh

2.12 Power requirement & supply 2-13 2.13 Solid Waste management 2-13 2.14 Fire safety 2-14 2.14.1 Fire Suppression 2-14 2.14.2 Fire Reserves 2-14 2.14.3 Pumping Arrangement 2-15 2.14.4 Fire Fighting Fitments 2-15 2.15 Air Conditioning System 2-15 2.15.1 Outside Ambient Conditions 2-15 2.15.2 Inside Design Condition 2-15 2.15.3 Design parameters 2-16 Chapter 3 SITE ANALYSIS 3.1 Introduction 3-1 3.2 Location & connectivity 3-1 3.3 Physiography 3-1 3.4 Hydrogeology 3-1 3.5 Ground water status 3-3 3.6 Land ownership 3-3 3.7 Topography 3-3 3.8 Existing land use pattern 3-4 3.9 Existing infrastructure 3-4 3.10 Geology & soil 3-4 3.11 Meteorology & climatology 3-5 3.11.1 Water use reduction 3-5 3.11.2 Climatic Condition (30-years IMD Data) 3-5 3.12 Seismicity 3-8 3.13 Wind hazard 3-9 3.14 Social infrastructure 3-9 Chapter 4 PLANNING CONSIDERATION 4.1 Introduction 4-1

PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD

Pre-Feasibility Report III For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh

4.2 Planning concept 4-1 4.2.1 Airside planning 4-1 4.2.2 Runway orientation 4-2 4.2.3 Runway length 4-3 4.3 Runway strips and safety areas 4-4 4.4 Runway geometry 4-5 4.5 Obstacle limitation study 4-5 4.5.1 Obstacle limitations surfaces 4-5 4.5.2 Obstacle Removals and Marking 4-7 4.6 Taxiways and apron 4-7 4.7 Isolation bay 4-8 4.8 Pavement 4-8 4.9 Air traffic control tower (ATC) 4-8 4.9.1 Height of control tower 4-9 4.10 Airside roads 4-9 4.11 Communication navigation surveillance & air traffic management 4-9 4.11.1 Proposed facilities for Phase– I 4-9 4.11.2 Communication 4-10 4.11.3 Navigation 4-10 4.11.4 Surveillance 4-10 4.11.5 Visual aids 4-10 4.11.6 Airfield lighting 4-10 4.11.7 Meteorological systems 4-11 4.12 Assessment of infrastructure demand 4-11 4.12.1 Water requirement & supply 4-11 4.12.2 Wastewater management 4-11 4.12.3 Solid waste management 4-11 4.12.4 Parking 4-11 4.13 Support amenities 4-11 4.14 Summarized project facilities & area details 4-12

PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES