Pre-Feasibility Report
Total Page:16
File Type:pdf, Size:1020Kb
PRE-FEASIBILITY REPORT Development of Green Field Airport at Dagadarthi, District-Kurnool, Andhra Pradesh Project Proponent: BHOGAPURAM INTERNATIONAL AIRPORT CORPORATION LTD Environment Consultant: Greencindia Consulting Private Limited, NCR, Ghaziabad, UP (NABET/EIA/1013/034) I Pre-Feasibility Report For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh Table of Content ES Executive Summary Chapter 1 INTRODUCTION 1.1 Background 1-1 1.2 Project proponent 1-2 1.3 Airport sector profile 1-2 1.4 Air connectivity pattern 1-5 1.5 Need of the project 1-6 1.6 Structure of the report 1-9 1.7 Employment generation 1-9 Chapter 2 PROJECT DESCRIPTION 2.1 Introduction 2-1 2.2 Type of project 2-1 2.3 Location & linkages 2-1 2.4 Site selection & Alternatives 2-2 2.5 Project Magnitude 2-3 2.6 Description of the proposed project 2-3 2.7 Construction Material 2-4 2.8 Resource Optimization 2-4 2.8.1 Water Saving Practices and Reduction 2-4 2.8.2 Water Use Reduction 2-7 2.8.3 Water Conservation in Construction 2-8 2.8.4 Water Conservation in Landscaping 2-8 2.9 Water requirement & supply 2-10 2.9.1 Water source & demand 2-10 2.9.2 Water storage 2-11 2.9.3 Water distribution 2-11 2.10 Wastewater generation and treatment 2-11 2.11 Storm water drainage 2-13 PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD II Pre-Feasibility Report For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh 2.12 Power requirement & supply 2-13 2.13 Solid Waste management 2-13 2.14 Fire safety 2-14 2.14.1 Fire Suppression 2-14 2.14.2 Fire Reserves 2-14 2.14.3 Pumping Arrangement 2-15 2.14.4 Fire Fighting Fitments 2-15 2.15 Air Conditioning System 2-15 2.15.1 Outside Ambient Conditions 2-15 2.15.2 Inside Design Condition 2-15 2.15.3 Design parameters 2-16 Chapter 3 SITE ANALYSIS 3.1 Introduction 3-1 3.2 Location & connectivity 3-1 3.3 Physiography 3-1 3.4 Hydrogeology 3-1 3.5 Ground water status 3-3 3.6 Land ownership 3-3 3.7 Topography 3-3 3.8 Existing land use pattern 3-4 3.9 Existing infrastructure 3-4 3.10 Geology & soil 3-4 3.11 Meteorology & climatology 3-5 3.11.1 Water use reduction 3-5 3.11.2 Climatic Condition (30-years IMD Data) 3-5 3.12 Seismicity 3-8 3.13 Wind hazard 3-9 3.14 Social infrastructure 3-9 Chapter 4 PLANNING CONSIDERATION 4.1 Introduction 4-1 PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD III Pre-Feasibility Report For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh 4.2 Planning concept 4-1 4.2.1 Airside planning 4-1 4.2.2 Runway orientation 4-2 4.2.3 Runway length 4-3 4.3 Runway strips and safety areas 4-4 4.4 Runway geometry 4-5 4.5 Obstacle limitation study 4-5 4.5.1 Obstacle limitations surfaces 4-5 4.5.2 Obstacle Removals and Marking 4-7 4.6 Taxiways and apron 4-7 4.7 Isolation bay 4-8 4.8 Pavement 4-8 4.9 Air traffic control tower (ATC) 4-8 4.9.1 Height of control tower 4-9 4.10 Airside roads 4-9 4.11 Communication navigation surveillance & air traffic management 4-9 4.11.1 Proposed facilities for Phase– I 4-9 4.11.2 Communication 4-10 4.11.3 Navigation 4-10 4.11.4 Surveillance 4-10 4.11.5 Visual aids 4-10 4.11.6 Airfield lighting 4-10 4.11.7 Meteorological systems 4-11 4.12 Assessment of infrastructure demand 4-11 4.12.1 Water requirement & supply 4-11 4.12.2 Wastewater management 4-11 4.12.3 Solid waste management 4-11 4.12.4 Parking 4-11 4.13 Support amenities 4-11 4.14 Summarized project facilities & area details 4-12 PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD IV Pre-Feasibility Report For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh Chapter 5 PROJECT INFRASTRUCTURE 5.1 Introduction 5-1 5.2 Airside infrastructure 5-2 5.2.1 Airport location 5-2 5.2.2 Runway orientation 5-4 5.2.3 Runway length 5-4 5.3 Runway strips and safety areas 5-5 5.4 Runway geometry 5-5 5.4.1 Runway operation 5-6 5.5 Taxiways and apron 5-6 5.6 Isolation bay 5-6 5.7 Pavement 5-6 5.8 Airside roads 5-7 5.9 Air traffic control tower (ATC) 5-7 5.10 Communication navigation surveillance 5-7 5.10.1 Proposed facilities for Phase– I 5-7 5.10.2 Meteorological systems 5-8 5.11 Assessment of infrastructure demand 5-8 5.11.1 Water requirement & supply 5-8 5.11.2 Wastewater management 5-8 5.11.3 Solid waste management 5-8 5.11.4 Parking 5-8 Chapter 6 REHABILITATION & RESETTLEMENT PLAN 6.1 Introduction 6-1 Chapter 7 PROJECT SCHEDULE & COST ESTIMATE 7.1 Introduction 7-1 7.2 Quantities 7-1 7.3 Rates 7-1 7.4 Contingencies 7-1 7.5 Works tax 7-2 PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD V Pre-Feasibility Report For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh 7.6 Labour cess 7-2 7.7 Service tax on construction cost 7-2 7.8 Project management costs 7-2 7.9 Price escalation / variation 7-2 7.10 Costs not included 7-2 7.11 Financial Analysis 7-2 Chapter 8 FINAL RECOMMENDATIONS 8.1 Introduction 8-1 PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD VI Pre-Feasibility Report For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh List of Tables Table No. Table Name Page E 1 Site Location & Accessibility E-1 1.1 Passenger Traffic in millions at airports in AP 1-3 1.2 Domestic Cargo Traffic (in tonnes) at airports in AP 1-4 1.3 List of airports planned to be developed under Greenfield Airport Policy 1-4 1.4 Passenger Handeled at Major in india (in millions) 1-4 1.5 City Wise Daily Passenger Traffic Projection from Nellore (Incoming + Outgoing) 1-7 1.6 Peak hour Passenger Forecast for 30 years from Nellore Airport 1-7 1.7 Daily Cargo Movement Forecast at proposed Nellore Airport for 30 years 1-8 1.8 Peak hour Cargo Potential in Tonnes 1-8 2.1 Site location & Accessibility 2-1 2.2 Construction Material Details 2-4 2.3 Standards for Drinking Water as per BSI 2-6 2.4 Standards for Drinking Water as per CPCB 2-6 2.5 Estimation of Domestic Use Water Reduction 2-8 2.6 Estimates Saving in Water 2-10 2.7 Water Estimation 2-10 2.8 SBT Output Water Quality 2-12 2.9 Detail Input conditions 2-15 2.10 Ducting Pattern 2-16 3.1 Climatological data on IMD Nellore 3-5 3.2 Social Infrastructure in Villages of Proposed Project 3-9 4.1 Site location & Accessibility 4-2 4.2 Wind Direction 4-2 4.3 Runway length calculation 4-3 4.4 Runway Dimensions 4-4 4.5 Airfield Pavement Profile 4-5 4.6 Obstacles Limitation on Data 4-7 4.7 Taxiway Dimension 4-8 4.8 Apron Dimension 4-8 4.9 Isolation Bay Dimension 4-8 4.10 Summarized facilities at proposed Airport 4-12 5.1 Site location & Accessibility 5-3 5.2 Wind Direction 5-4 5.3 Runway Length Calculations 5-4 PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD VII Pre-Feasibility Report For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh 5.4 Airfield Pavement Profile 5-5 5.5 Taxiway Dimension 5-6 5.6 Apron Dimension 5-6 5.7 Isolation Bay Dimension 5-6 7.1 CAPEX for the project 7-3 7.2 Expenditure Statement of the Airport 7-4 7.3 Income Statement of the Airport 7-5 7.4 Estimates of Phase-I 7-6 PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD VIII Pre-Feasibility Report For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh List of Figures Fig No. Figure Name Page E-1 Site Location on district map E-1 1.1 Proposed Airports in Andhra Pradesh 1-2 1.2 Air Connectivity Pattern in India 1-6 2.1 Location Map 2-1 2.2 Map Showing Co-ordinates of Project Site 2-1 2.3 Typical Layout of Soil Bio-Fertilizer 2-11 2.4 Schematic Treatment Process 2-13 3.1 Hill on 09 End- an obstruction in approach 3-4 3.2 Wind Rose Diagrams 3-7 3.3 Study Area Map 3-9 4.1 Wind Rose Diagrams 4-3 4.3 Site Photographs 4-6 7.1 Time Schedule for Airport Development 7-1 Annex Annex I Annex II PROJECT PROPONENT PROJECT CONSULTANT ENVIRONMENT CONSULTANT BHOGAPURAM INTERNATIONAL AIRPORT RITES LIMITED GREENCINDIA CONSULTING PRIVATE LIMITED CORPORATION LTD (BIACL) (AIRPORT DIVISION) NCR, GHAZIABAD Executive Summary Executive Summary ES For Development of Green Field Airport at Dagadarthi, District-Nellore, Andhra Pradesh E.