INDIAN BUREAU of MINES Bangalore Regional Office
Total Page:16
File Type:pdf, Size:1020Kb
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office Mine file No : KNT/RCH/G-4/BNG Mine code : 27KAR16004 (i) Name of the Inspecting : P005( ) C.PARAMESHWARAN Officer and ID No. (ii) Designation : Deputy Controller Mines (iii) Accompaning mine : Official with Designation (iv) Date of Inspection : 27/07/2015 (v) Prev.inspection date : 03/09/2014 PART-I : GENERAL INFORMATION 1. (a) Mine Name : HIRABUDDINI (b) Registration NO. : (c) Category : A Fully Mechanised (d) Type of Working : Underground (e) Postal address State : KARNATAKA District : RAICHUR Village : HIRA Taluka : MANVI Post office : HIRA Pin Code : FAX No. : 08537-275054 E-mail : [email protected] & hgmlsrmhr Phone : 08537-275034 (f) Police Station : Sirivara (g) First opening date : 01/01/1997 (h) Weekly day of rest : SUN 2. Address for : HUTTI GOLD MINES COMPANY LTD correspondance Village-Hira Buddinni; Post-Heera, Tq-Manvi Dist-RAICHUR, Karnataka -584 129 3. (a) Lease Number : KAR1493 (b) Lease area : 21.58 (c) Period of lease : 20 (d) Date of Expiry : 28/03/2028 4. Mineral worked : GOLD Main PAGE : 2 5. Name and Address of the Lessee : HUTTI GOLD MINES COMPANY LTD At & Po- Hutti Tq-Lingsugur 584 115 RAICHUR KARNATAKA Phone:08537-275025 FAX :08537-275054 Owner : HUTTI GOLD MINES COMPANY LTD Shri A.K.Monnappa, IAS, MD 3rd Floor, KHB Shopping Complex, National Games Village, Koramangala BANGALORE KARNATAKA Phone: 080-25710501, 2 FAX : Agent : PRAKASH At & Po- HUTTI Tq-Lingsugur RAICHUR KARNATAKA Phone: 08537-275034 FAX : 08537-275054 Geologist Name : PRABHU M,Full Time Qualification : M.Sc. Applied Geology Appointment/ : 05/05/2010 Termination date Manager Name : APSAR MIYA Qualification : Dipl. in Mining and first class Appointment/ : 01/05/2012 Termination date 6. Date of approval of Mining : Mining Scheme rule 12 MCDR1988 22/02/2013 Plan/Scheme of Mining PAGE : 3 PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS Exploration : Sl.No. Item Proposals Actual work Remarks 1a Backlog of DURING THE The proposed work is not Not followed as previous year YEAR 2014-15, undertaken in the per the proposals. 200M DD holes proposed years as it was from U/G & reported on the day of 500m from inspection and also surface , the observed through annual location is returns.( However, as 120m towards per the MCDR inspection north of BH data, during the year No. HG-18 13-14, 2323.8m drilling along section has been undertaken on line, angle the surface. But nothing 55 degree and in the year 2014-15. in 2015-16 500m in surface DD holes , location 120m towards north of BH No. HG- 19 along section line, angle 52 degree. ( In u/g, for 2014-15, location=Ms/I IIL/DE/X-cut towards north. PBH-4 & 5 , 100m each. PAGE : 4 1b Exploration over DURING THE It is reported in the As per the lease area for YEAR 2014-15, data sheet submitted for proposals to drill geological axis 1 200M DD holes the inspection of the both in or 2 from U/G & mines, that 2323.8m underground & 500m from drilling undertaken and surface were not surface , the not in underground. carried out. location is 120m towards north of BH No. HG-18 along section line, angle 55 degree and in 2015-16 500m in surface DD holes , location 120m towards north of BH No. HG- 19 along section line, angle 52 degree. ( In u/g, for 2014-15, location=Ms/I IIL/DE/X-cut towards north. PBH-4 & 5 , 100m each. 1c Exploration M/s Hutti M/s DBM, Hutti Agencies and Gold Mines Expenditure in Ltd. lakh rupees during the year 1d Balance area to with the Ore reserve Estimation With the existing be explored to existing main as on 01-04-2015 - development & also bring Geological shaft & west 5,02,191 T @ 4.12 g/t. based on the axis in 1 or 2 shaft, it is future planned to developments, develop the balance area may exploratory be bring to axis 1 mine up to & 2. 8th level in another 5 years. PAGE : 5 1e Balance reserve In the Ore reserve Estimation As per the as on 01/04/20 approved as on 01-04-2015 - approved document document as 5,02,191 T @ 4.12 g/t & after carrying on 1/4/2011. out exploration in 8,06,202 surface during 13- tonnes at 14 , reserves were 4.21g/t. updated as on under 111 1/4/2015. category. 1f General remarks The on lode This exploratory mine Based, on the mine of inspecting exploratory development gave development officers on mine sufficient technical information ore geology, development, information on geometry reserves exploration etc raise and of the ore body to plan estimation were winze carried for the stoping works. carried out. out. Based, on the mining feasibility information, stope preparation were carried out as per the approval of IBM, DGMS & NIRM. Development : Sl.No. Item Propasals Actual work Remarks 2a Location of The waste rock The mine is in operation The mine has not development development in the 5th year of the 5 achived the w.r.t.lease area from 6th level years proposals. It is desired and to 10th level reported that the mine targetted from 2011-12 has produced productions. to 2015-16. 24434 Tons of gold ore The drives and from the mine. cross cuts from same level(2014-15 Development 135 Mtrs. Sub- level Development 150 Mtrs. Ore from development - 7125T Stope production - 57999 T Total = 64724 T . 2b Separate benches NA, since this NA, since this u/g mine. NA, since this u/g in topsoil, u/g mine. mine. overburden and minerals (Rule 15) PAGE : 6 2c Stripping ratio Not applicable Not applicable in Not applicable in or ore to OB in underground underground mine. underground mine. ratio mine. 2d Quantity of nil nil nil topsoil generation in m3 2e Quantity of Nil Nil NIl overburden generation in m3 2f General remarks Systematic Systematic underground yes, Systematic of inspecting underground working. underground officers on working. working. development of pit w.r.t. type of deposit etc Exploitation: Sl.No. Item Propasals Actual work Remarks 3a Number of pit Not The mine is proposed to Yes, the mine is proposed for applicable. work through underground working through production levels, cross cuts, sub shafts, winzes and levels, shafts and levels and winzes and also through stoping. stopings. 3b Quantity of ROM Development - 24434 T Th above mineral 7125 T ,Stope production achived production - 57599 T , from the drives proposed Total = 64724 and the stopes. T 3c Recovery of All the ROM Yes, all the ROM will be Yes , same is sailable/usable will be used used for processing to followed. mineral from ROM for processing extract the gold ore production to extract the metal. gold ore metal. 3d Quantity of waste rock 3800 tonnes of waste The waste rock mineral reject developement & rock produced, besides, excavated from the generation generation in 25513 tonnes & 23961 mine were used for the form of tonnes of mill tailings road construction, rejects for were stacked in the for other the period surface dumps. miscellaneous 2011-12 to purposes. 2015-16 to the tune of 8830 tonnes. 3e Grade of mineral Not declared NA NA. rejects the mineral generation and threshhold threshold value value. declared. PAGE : 7 3f Quantity of sub Not proposed same as above. No proposals & grade mineral in the even of low grade generation. approved if any will be document. processed and gold metal will be extracted. 3g Grade of sub NA NA NA grade mineral generation 3h Manual / mechanical as above Mechanical means Mechanised method. and at times method adopted manual. for segregating from ROM 3i Any analysis or Not proposed. NA NA beneficiation study proposed and carried out for sub grade mineral and rejects. 3j Provision of Yes proposal yes, the above proposal All the drilling & drilling and in drilling & are being followed in blasting blasting in blasting in the u/g mine activities. activities are mineral benches drives, cross being used in cuts, sub underground level, winze, activities. shafts and in stopes for breaking and extraction mineral and waste and not in benches, since it is a u/g mine. 3k Provision of Not in mineral Yes, different Depends on the mining benches, but underground machineries size and place of machineries in in underground are put to use in u/g the locations, mineral benches workings as workings, like jack machines are described in hammers for drives and deployed other paras. short heights, simmba accordingly. drills for stoping purposes. deep holes drilling machines are deployed wherever required. 3l Whether height The proposal The work is mainly in Yes, different of benches in are drawn for underground and related activities are in overburden and underground activities. progress as per mineral suitable mining & other the u/g related for method of developement work. mining proposed activites. in MP/SOM PAGE : 8 3m Total area The total area No activities are on the Main work is for covered under used for u/g surface for excavations, infrastructures. excavation/pits and surface except some supporting Some on dumping activiities. work and other mill taings, and presently it infrastructures only and other plantations. is 14.50 ha some plantations. area under use. 3n Ore to OB ratio Not declared execept cut off grade of No Ore to OB ratio for the pit/mine for u/g mines 1g/t, no stripping ratio for the mine/ during the year. declared. given in the approved document. 3o Total area put 22.18 ha within the proposed yes within the in use under area.