List of Applicants Considered by the 482Nd Council Meeting on 11Th February, 2020 Under the Various Categories
Total Page:16
File Type:pdf, Size:1020Kb
List of Applicants considered by the 482nd Council Meeting on 11th February, 2020 under the Various Categories CORPORATE SN Name Category Technical Report Title Action 1. Ms. Magumba Beatrice Corporate Admitted Under Mutual Recognition Elected 2. Mr. Olaro Oscar Corporate Design and Implementation of a Elected Biomass Dryer that uses Maize Cob and Farm waste as a fuel 3. Mr. Kabuusu Ronald Corporate Improvement of air conditioning in VIP Elected Tonny departure lounge at Entebbe International Airport 4. Mr. Tumwine Paul Corporate Design review and construction Elected supervision of hydraulic intake emergency gates for Isimba HPP 5. Mr. Kwitonda Angelo Corporate Design, Construction Supervion and Elected Operation of the Wabigalo- Kibuli Sewerage System 6 Lugolobi Thaddeus Corporate Design Review and Construction Elected Supervision of an Administration Block 1 at Nakawa Vocational Training Institute, Nakawa Division- Kampala 7. Ms. Ongodia Joan Evelyn Corporate Geotechnical Engineering Design of a Elected Tailrace Tunnel Lining and Construction Supervision for Karuma (600MW) Hydro Power Project in Uganda 8. Mr. Mutebi Joseph Corporate 1. Construction Supervision of Eventre, Elected Ssemanobe Uzurugo Box Culverts and Ure, Daca Bridges along Arua-Wandi-Yumbe Road AND 2. Detailed Design of a Steel- Concrete Composite Deck for Mpanga6 Bridge along Kamwenge-Kabambiro Road 9. Mr. Ojambo Lawrence Corporate Design and construction supervision for Elected the 30%sectional completion (40+000- 57+080) along the rehabilitation of Hima- Katungulu road 10 Mr. Katerega Johnson Corporate Design and Construction Supervision of Elected Kakooge Town Water Supply 11. Mr. Ssekubunga Isaac Corporate Design review and construction Elected supervision for the 30% sectional 2 completion (KM 0+000 13+500) along the Bumbobi- Lwakhakha road (44.5KM) 12 Mr. Odul Stephenson Corporate Geometric Design Review and Elected Construction Supervision for the Upgrading of Kanoni-Sembabule-Villa Maria Road 13 Ms. Auma Elizabeth Corporate Design and documentation of the Elected electrical installation works for the proposed hotel development on plot 84, Luthuli avenue, Bugolobi AND The construction supervision of the electrical installation works for the commercial development on plot 4, Kyadondo road, Nakasero 14 Mr. Akampurira Onesmus Corporate Design Review, Construction and Elected Commissioning Isimba Hydro Power Project 50.4MW Hydro Generator (Stator and Rotor) 15 Mr. Sekitene Ronald Corporate Kiira Hydro Power Plant Excitation Elected (UNITRO R 6080) System Upgrade 3 16 Mr. Semazzi Zaake Corporate Design and installation of an earthing Elected Wilfred system for Soroti fruit factory 17 Mr. Mwesige Andrew Corporate Specification, Istallation, Commissioning Elected Mulindwa and operation of a VHF radio communication system for enhancement of grounds to grounds and ground to air communication for air traffic control services at Entebbe International Airport 18 Wamala Julius Design Review and Supervision of Elected Namusanga Refurbishment, Installation, Testing and Commissioning of the generators for te 3.5MW Nyagak 1 Hydro Power project PROVISIONAL CORPORATE SN Name Category Technical Report Title 1 Mr. Musinguzi George Provisional Detailed design of Kyabakara Gravity Elected Tinda Corporate Flow Scheme and construction supervision of Munyonyi Gravity Flow 4 Scheme in Rubirizi District 2 Mr. Katabira Kyambadde Provisional Design and Installation of a remote Elected Valentine Corporate control and monitoring system at Mbarara North 132/33kV transmission substation 3 Mr. Kizito Samuel Provisional Planning, design and implementation of Elected Corporate capacitor banks along Jinja industrial- Iganga 33kV feeder 4 Ms. Namazzi Rosette Lule Provisional Voltage stability improvement at the Elected Corporate Ziroobwe NWSC borehole station for improved water supply reliability and reduced motor failure 5 Mr. Ahurra Julius Provisional Design of Masindi bypass road (3.5km) Elected Corporate and construction supervision of Kasingo- Buhimba road section (10km) 6 Mr. Jjuuko Samuel Provisional Detailed geotechnical investigation and Elected Corporate foundation design for the design review of Busega- Mpigi expressway (23.7KM) AND Construction supervision of low volume sealed roads (LVSRS) within UNS-Sacco satellite village at Kasanje 5 Wakiso district 7 Mr. Byakagaba Bernard Provisional Design and construction supervision of Elected Corporate Pabbo- Unyama- Ajulu gravel road section (0+000km TO 10+000KM) IN Gulu District, Northern Uganda 8 Mr. Mbayo David Godfrey Provisional Design review and supervision for the Elected Corporate rehabilitation and expansion of Kayunga hospital main hospital building 9 Mr. Edhaya David Provisional Design of Bukoova piped water scheme Elected Corporate in Luuka district AND Construction supervision of borehole drilling in Kaliro district for the FY 2018/2019 10 Mr. Waibale Aggrey Frank Provisional Design Review, Supervision and Elected Corporate Construction of Retaining Wall for Residential Complex Fort Portal Municipality 11 Ms. Namugerwa Prisilla Provisional Improving compliance of sectrum users Elected Ritah Corporate to 95% in the financial year Juky 2015 to June 2016 6 12 Mr. Kamya Nathan Provisional Design of a cross drainage structure at Elected Corporate Akago river crossing (km 7+705) along the Olwiyo- Gulu road AND Construction supervision of the rehabilitation/widening of a section (KM 0+000 to KM 11+125) of the 70.3KM Olwiyo - Gulu road 13 Mr. Kasozi James Tondo Provisional Design and Construction supervision of Elected Corporate Windmill- powered watering systems in Karamoja 14 Mr. Ssenteza Yusuf Provisional Design and Construction supervision of Elected Corporate medium voltage power line and transformer injection for Nakigala village 15 Mr. Waako Rogers Provisional Design and construction supervision of Elected Lastone Corporate Mayuge water supply system 16 Ms. Namuyiga Irene Provisional Engineering design and supervision of Elected Elizabeth Corporate Mackay (1.6km) in Lubaga division Kampala 17 Mr. Ssempebwa John Paul Provisional Design and mechanical installation of an Elected automobile workshop at Petro Bombo 7 Corporate road fuel station 18 Mr. Odongo Charles Provisional Rehabilitation of Alex Ssebowa road Elected Corporate (0.97km) and Katwe road (1.1km) in Masaka Municipality 19 Mr. Okiror Richard Provisional Design and construction supervision of Elected Corporate low cost sealing of Mukura- Ngora (1.0km) road, section (ch: 1+850 to 2+850) 20 Mr. Woro Fredrick Provisional Design review and Construction on 4 Elected Corporate (Four) building complexes for Gulu University 21 Mr. Echeda Robert Provisional Design and implementation of quality of Elected Corporate service monitoring and evaluation system 22 Ms. Ahabyona Manyiraho Provisional Design and construction supervision of Elected Evelyn Corporate Nyabikoni bridge project 23 Ms. Nakombe Dinah Provisional Design and Construction supervision of Corporate drainage improvement of works at Kiko swamp crossing along Kaitabalwa- Busota road ( from KM 43+ 00 to KM 8 46+188) in Kamuli District GRADUATE 1 Ms. Kezabu Haethre Graduate Elected Karen 2 Ms. Nayiga Zainah Graduate Elected 3 Mr. Kaweesi Dennis Graduate Elected 4 Mr. Okello Joseph Moses Graduate Elected 5 Ms. Nsekanabo Lydia Graduate Elected 6 Ms. Kirabo Rosemary Graduate Elected 7 Mr. Karwani Davis Graduate Elected 8 Mr. Ssemuyaba Samson Graduate Elected Stephen 9 Mr. Wangira Daniel Owori Graduate Elected 10 Ms. Emily Kogere Kihika Graduate Elected 11 Ms. Musiime Joselyn Graduate Elected 9 12 Mr. Ochaya Alfred Graduate Elected 13 Mr. Lubwama Andrew Graduate Elected 14 Mr. Wenka Ezra Graduate Elected 15 Mr. Muhumuza Keneth Graduate Elected 16 Mr. Okello Emmanuel Graduate Elected 17 Mr. Tumushabe Benson Graduate Elected 18 Mr. Loiki John Mark Graduate Elected 19 Mr. Mwesigwa Ronald Graduate Elected 20 Mr. Osende Paul Graduate Elected 21 Ms. Babirye Racheal Linda Graduate Elected 22 Ms. Kyampansiima Graduate Elected Kiconco 23 Mr. Orech Odongo Jimmy Graduate Elected 24 Mr. Zirimenya Nicholas Graduate Elected 25 Mr. Lukwago Peter Graduate Elected 10 26 Mr. Luswata Elvis Graduate Elected 27 Mr. Mulooki Eliot Graduate Elected 28 Ms. Atim Beatrice Graduate Elected 29 Mr. Turyaremera Silver Graduate Elected TECHNOLOGIST 1 Mr. Kato Michael Kenneth Technologist Elected 2 Mr. Tumuramye Vallence Technologist Elected 3 Mr. Mukuru Gerald Technologist Elected 4 Mr. Nuwagira Davance Technologist Elected 5 Mr. Mulongo Bernard Technologist Elected TECHNICIANS 1 Mr. Kasagga Lawrence Technician Elected 2 Mr. Nsubuga Daniel Technician Elected 3 Mr. Atukunda Eusterce Technician Elected 4 Mr. Obua Samuel Technician Elected 11 5 Mr. Arineitwe Michael Technician Elected 6 Mr. Kyomukama Daniel Technician Elected 7 Mr. Rutukura Amon Technician Elected 8 Mr. Sebuziba Paul Technician Elected 9 Mr. Begumanya Godfrey Technician Elected Beteise 10 Mr. Kongo Amuza Technician Elected STUDENT INSTITUTION 1 Mr. Happy Kyagala Student Kyambogo University Elected Michael 2 Mr. Baguma Julius Student Kyambogo University Elected 3 Mr. Amumpeire Samwel Student Kabale University Elected 4 Mr. Kyeswa Joel Student Kabale University Elected 5 Mr. Twongyeirwe Student Kabale University Elected Abraham 6 Mr. Ashaba Antony Student Kabale University Elected 12 7 Ms. Nanddudu Enid Student Kabale University Elected 8 Mr. Bainomugisha Jonan Student Kabale University Elected 9 Mr. Habert Yokana Student Kabale University Elected Atamusange 10 Mr. Nasasira Ezra Student