Program ME

17 ILLINOIS / STATE LINE 2017 SWS Metra Construction Program 2017 STATIONS CROSSING REPLACEMENTS UP Northwest BNSF BNSF 70 Deval – replace six diamond crossovers within the interlocking 1 Berwyn – rebuild stairs 31 Ashland Avenue, LaGrange UP West 2 Clarendon Hills – replace pedestrian 32 Main Street, Downers Grove 71 Add eight miles of third track in two crossing surface Oak Park Avenue, Berwyn 33 segments along the UP West Line 3 Lisle – install A/C in station and ventilation system in the pedestrian tunnel Metra Electric 34 70th Street, Chicago 4 Riverside – rehab station building roof BRIDGES 5 Western Springs – rebuild station platform 35 87th Street, Chicago BNSF 36 91st Street, Chicago Heritage Corridor 72 Chicago – replace bridge clips at locations 37 , Chicago 6 Lockport – replace station furnaces and between Albany Avenue and condensing units 38 Yates Avenue, Chicago 73 Route 59 – replace panels on bridge deck 7 Romeoville – construct new station 39 Union Street, Blue Island Milwaukee West Metra Electric Milwaukee North 74 Elgin – replace a 130-year-old single track 8 27th Street – station repairs and 40 , Fox Lake bridge over the Fox River with a double beautification work track bridge 41 Oakton Street, Morton Grove 9 Calumet – continuation of a $5.5 million 42 Wilson Road, Long Lake Rock Island project that began in 2016 to replace 75 37th Street, Chicago – repair existing bridge platforms, elevator, stairs and other Milwaukee West facilities at the station 76 39th Street, Chicago – repair existing bridge 43 Grand Avenue, Elmwood Park 10 147th Street – station repairs and 76 51st Street, Chicago – remove six bays of 44 Naperville Road, Bartlett beautification work existing steel bridge, repair three bays and 45 Scott Street, Franklin Park construct new concrete access road bridge 11 Harvey – station repairs and beautification work 46 St. Charles Street, Elgin 78 57th Street, Chicago – remove existing bridge and construct new concrete access road bridge 12 Hazel Crest – replace street level depot, Rock Island replace stairways, add elevator and replace 47 99th Street, Chicago UP North or repair other facilities at the station 79 Deering Bridge, Chicago – rehabilitate bridge 48 102nd Street, Chicago 13 Kensington/115th Street – finish station over the rehabilitation and repair work begun in 49 111th Street, Chicago (Beverly Branch) Ravenswood, Chicago – replace bridges 2016 80 50 167th Street, Oak Forest Grace, Irving Park, Berteau, Montrose, 14 McCormick Place – upgrades to platform 51 Wolf Road, Mokena Sunnyside, Wilson, Leland, Lawrence, and waiting areas Winnemac, Foster and Balmoral; Southwest Service complete Ravenswood Station 15 Millennium Station – finish station 52 52nd Avenue, Oak Lawn rehabilitation and repair work begun in UP Northwest 2016 53 , Oak Lawn 81 Barrington – replace bridge deck at milepost 30.5 16 Riverdale – station repairs and 54 135th Street, Orland Park beautification work 55 Wolf Road, Orland Park 17 University Park – station repairs and SIGNAL/ COMMUNICATIONS beautification work UP Northwest Metra Electric 18 West Pullman – finish station 56 Baldwin Road, Inverness rehabilitation and repair work begun in 82 11th Place, Chicago – continue work to 57 Dunton Avenue, Arlington Heights 2016 upgrade signal systems at interlocking 58 Pearson Street, Des Plaines for PTC Milwaukee North Milwaukee North 19 Deerfield – replace station roof, floor and HVAC system TRACK PROJECTS 83 Rondout to Fox Lake – begin installation of new signal system along 17.7-mile segment, 20 Healy – replace and upgrade station facility BNSF including the installation of six new control 21 Golf – replace HVAC system, parking lot 59 Brookfield – platform tie replacement points lights and rehab station railings 60 Chicago–repair curves on tracks east Milwaukee West Glenview – replace HVAC system 22 of Chicago Union Station 84 Elgin – install new interlocking at B-35 in 23 Grayland – add a 68-space parking lot 61 Cicero – replace switches and switch heaters Elgin as part of the Z-100 bridge project 24 Lake Cook Road – platform repairs 62 Fairview Avenue – platform tie replacement Rock Island 25 Lake Forest – replace tactile and extend 63 Hinsdale – platform tie replacement platforms 85 Blue Island – upgrade signal systems at 64 Lisle to Aurora – replace 8,000 ties three road crossings for PTC 26 North Glenview – replace station doors 65 Naperville – replace switches and 86 CP-35.5, New Lenox – continue upgrade Northbrook – replace station roof, 27 switch heaters of signal systems at interlocking for PTC windows, doors, floor and repair concrete around the building 66 Stone Avenue – platform tie replacement 87 CP Mokena – continue upgrade of signal systems at interlocking for PTC UP North Metra Electric 88 CP Vermont Street, Blue Island – upgrade 28 Kenilworth – replace outbound platform 67 121st Street to University Park – signal systems at interlocking for PTC replace 11,000 ties 29 Glencoe – replace station flooring 89 EJ&E, Joliet – continue upgrade of signal Milwaukee West systems at interlocking for PTC UP West 68 Elgin to Schaumburg – replace 10,000 ties SouthWest Service 30 Winfield – platform restoration 69 Franklin Park to Bensenville – in-track welding 90 CP-74th, Chicago – upgrade signal systems at interlocking for PTC