Draft Water Assessment and Water Body Report

Total Page:16

File Type:pdf, Size:1020Kb

Draft Water Assessment and Water Body Report Barlow Solar Energy Centre Water Assessment and Water Body Report FINAL DRAFT REPORT Prepared for: Barlow Energy Centre Limited Partnership 53 Jarvis Street, Suite 300 Toronto, Ontario M5C 2H2 Prepared by: Stantec Consulting Ltd 70 Southgate Drive, Unit 1 Guelph ON N1G 4P5 File No. 160950879 January 17, 2017 Sign-off Sheet This document entitled Barlow Solar Energy Centre Water Assessment and Water Body Report was prepared by Stantec Consulting Ltd. (“Stantec”) for the account of Barlow Energy Centre Limited Partnership (the “Client”). In connection with the Client’s application for a Renewable Energy Approval, this document may be reviewed and used by the following entities in the normal course of their review and approval process: (a) the MOECC; (b) the MNRF; (c) the MTCS; and (d) the Environmental Review Tribunal. Except as set forth in (a) through (d) above, any reliance on this document by any third party is strictly prohibited. The material in it reflects Stantec’s professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. In preparing the document, Stantec did not verify information supplied to it by others, unless otherwise stated therein. Any use which a third party makes of this document is the responsibility of such third party. Such third party agrees that Stantec shall not be responsible for costs or damages of any kind, if any, suffered by it or any other third party as a result of decisions made or actions taken based on this document. Prepared by (signature) Mark Pomeroy, B.Sc. Fisheries Biologist Prepared by (signature) Nancy Harttrup, B.Sc. Senior Fisheries Biologist Reviewed by (signature) Kathleen Todd, M.Sc. Senior Aquatic Ecologist BARLOW SOLAR ENERGY CENTRE WATER ASSESSMENT AND WATER BODY REPORT Table of Contents ABBREVIATIONS ......................................................................................................................... I 1.0 INTRODUCTION ...........................................................................................................1.1 1.1 STUDY AREA AND PROJECT LOCATION ...................................................................... 1.1 1.2 REPORT REQUIREMENTS ................................................................................................. 1.2 2.0 WATER ASSESSMENT ....................................................................................................2.1 2.1 DEFINITION OF A WATER BODY .................................................................................... 2.1 2.2 METHODS ........................................................................................................................ 2.1 2.2.1 Records Review ........................................................................................... 2.1 2.2.2 Site Investigations ........................................................................................ 2.2 2.2.3 Qualifications ............................................................................................... 2.2 2.3 RESULTS ............................................................................................................................ 2.3 2.3.1 Mapped Features ........................................................................................ 2.3 2.3.2 Additional Water Bodies ............................................................................. 2.4 2.3.3 Summary ....................................................................................................... 2.4 3.0 EXISTING CONDITIONS AND PREDICTED IMPACTS ....................................................3.1 3.1 EXISTING CONDITIONS ................................................................................................... 3.1 3.2 PREDICTED IMPACTS ...................................................................................................... 3.2 3.3 ADDITIONAL APPROVALS.............................................................................................. 3.9 4.0 POTENTIAL IMPACTS ....................................................................................................4.1 4.1 GENERAL CONSTRUCTION-RELATED IMPACTS ........................................................... 4.1 4.2 CULVERTS AND ACCESS ROADS .................................................................................. 4.1 4.3 ELECTRICAL LINES ........................................................................................................... 4.1 4.3.1 Overhead ..................................................................................................... 4.1 4.3.2 Underground ................................................................................................ 4.2 5.0 STANDARD MITIGATION MEASURES FOR WORKING NEAR WATER ...........................5.1 5.1 GENERAL MITIGATION MEASURES ................................................................................ 5.1 5.2 NEW CULVERT CROSSINGS ........................................................................................... 5.2 5.2.1 Design ............................................................................................................ 5.2 5.2.2 Construction ................................................................................................. 5.2 5.3 ELECTRICAL LINES ........................................................................................................... 5.3 5.3.1 Overhead ..................................................................................................... 5.3 5.3.2 Underground ................................................................................................ 5.4 6.0 CONCLUSIONS ............................................................................................................6.1 7.0 REFERENCES .................................................................................................................7.1 BARLOW SOLAR ENERGY CENTRE WATER ASSESSMENT AND WATER BODY REPORT LIST OF TABLES Table 1.1: Water Assessment Report and Water Body Report Requirements for O. Reg. 359/09 ................................................................................................... 1.3 Table 2.1: Water Body Assessment Summary; Barlow Solar Energy Centre ................ 2.7 Table 2.2: Summary of Water Bodies and Project Components; Barlow Solar Energy Centre .................................................................................................... 2.7 Table 3.1: Summary of Water Body Characteristics within the 120 m Zone of Investigation for the Barlow Solar Energy Centre.......................................... 3.3 LIST OF APPENDICES APPENDIX A: FIGURES Figure 1: Site Location Figure 2: Background Information Figure 3: Site Investigation Stations and Results APPENDIX B: PHOTOGRAPHIC RECORD APPENDIX C: FIELD NOTES APPENDIX D: CURRICULA VITAE BARLOW SOLAR ENERGY CENTRE WATER ASSESSMENT AND WATER BODY REPORT Abbreviations APRD Approval and Permitting Requirements Document CRA Commercial, Recreational or Aboriginal DFO Fisheries and Oceans Canada ECCC Environment and Climate Change Canada ha hectare(s) HWM High Water Mark Hydro One Hydro One Networks Inc. km kilometre kV kilovolt LIO Land Information Ontario MW megawatt MOECC Ministry of the Environment and Climate Change MNRF Ministry of Natural Resources and Forestry NHA Natural Heritage Assessment O. Reg. Ontario Regulation REA Renewable Energy Approval RRCA Raisin Region Conservation Authority Stantec Stantec Consulting Ltd. ZOI Zone of Investigation i BARLOW SOLAR ENERGY CENTRE WATER ASSESSMENT AND WATER BODY REPORT Introduction January 17, 2017 1.0 INTRODUCTION Barlow Energy Centre Limited Partnership (the Proponent), is proposing the development of a 10 megawatt alternating current (MWac) solar energy generating facility, known as the Barlow Solar Energy Centre (the Project) approximately 10 kilometres (km) west of the city of Cornwall in the Township of South Stormont, United Counties of Stormont, Dundas and Glengarry, Ontario. The Point of Common Coupling will be located adjacent to the Project Location, in the City of Cornwall, Ontario. A map showing the location of the Project is provided in Figure 1, Appendix A. The Project will require a Renewable Energy Approval (REA) as per Ontario Regulation (O. Reg.) 359/09, under Part V.0.1 of the Environmental Protection Act (MOECC 2009, amended 2016). The Proponent is proposing to develop, construct and operate the Project on 38 hectares (ha; 94 acres) of land in response to the Government of Ontario’s Large Renewable Procurement (LRP) initiative to promote the development of renewable electricity in the province. The Proponent has retained Stantec to prepare a REA application, as required under O. Reg. 359/09. The proposed solar PV distribution grid connected system would be considered a Class 3 Solar Facility under O. Reg. 359/09, s. 4. 1.1 STUDY AREA AND PROJECT LOCATION The Project is located in the Township of South Stormont within the United Counties of Stormont, Dundas and Glengarry. The Point of Common Coupling is located on the boundary of the City of Cornwall and Township of South Stormont. The Project is being proposed on up to two parcels of privately-owned land, totaling approximately 38 ha on the north side of Cornwall Centre Road, west of Power Dam Drive.
Recommended publications
  • Water. Interaction in the Raisin River Watershed, Near Cornwall, Ontario
    -.. Groundwater Surface-Water. Interaction in the Raisin River Watershed, near Cornwall, Ontario by Sandra Porter Thesis submitted to the School of Graduate Studies and Research for the Degree of Master's of Science in Earth Sciences Ottawa-Carleton Geoscience Centre and University of Ottawa Ottawa, Ontario, Canada Sandra Porter O (1996) Abstract The interaction of groundwater with surface water is an integral part of the hydrologic cycle. Recognition of this relationship is pertinent when assessing the components of an ecosystem, or while examining factors such as water quality or quantity in a watershed. A field study was conducted in 1994 and 1995 to understand the interaction of groundwater and surface water in the Raisin River watershed, near Cornwall, Ontario. A number of variables were examined to describe the regional groundwater system and to determine the magnitude of the groundwater contribution to the river. The Raisin River lies within an agricultural region which relies heavily on groundwater use. The regional groundwater supply is predominantly from a limestone aquifer underlying various surficial deposits (primarily glacial till). Groundwater movement appears to be in a southeasterly direction, towards the St. ~awrenceRiver. Seepage meters, mini-piezometers, and a falling head permeameter were used to i) measure the flux of groundwater into (positive seepage) or out (negative seepage) of the Raisin River, and ii) measure the hydraulic conductivity of the Raisin River sediments. Measurements were made at thirteen sites within the watershed. To identify the source of groundwater and study processes of streamflow generation during storm runoff, surface water, groundwater, and rainwater samples were collected for environmental isotopes (oxygen-18 and deuterium).
    [Show full text]
  • Raisin River Heritage Centre Architectural Analysis & Updated Report
    Raisin River Heritage Centre Architectural Analysis & Updated Report Project Number: 209-00187-00 DATE December 7, 2020 TABLE OF CONTENTS INTRODUCTION ........................................................................................................ 1 PART ONE REVIEW & VALIDATE THE PREVIOUSLY SUBMITTED REPORT FROM WSP ..................................................................................................................... 3 PART TWO CONDUCT AN EXTERIOR SURVEY & IDENTIFY BUILDING DIMENSIONS ..................................................................................................................... 6 PART THREE REVIEW AND UPDATE BUDGET COSTING DATED OCTOBER 4, 2017 BY WSP TO 2020 DOLLARS ...................................................................... 7 PART FOUR CLASS ‘E’ CONSTRUCTION COST ESTIMATE FOR CONVERSION OF EXISTING BUILDING TO ARCHIVE LEVEL FACILITY ................................. 8 PART FIVE RECOMMENDATIONS ............................................................................ 9 PART SIX FIGURES .................................................................................................. 10 PART SEVEN PHOTOGRAPHS ................................................................................ 11 A|49 Raisin River Heritage Centre 1 Architectural Analysis & Updated Report INTRODUCTION Architecture 49 Inc. (A49) were commissioned by the Township of South Stormont to conduct an inspection and prepare an architectural condition assessment of the Raisin River Heritage Centre (RRHC) based
    [Show full text]
  • EOWRMS Final Report
    CH2M HILL Canada Limited 1101 Prince of Wales Drive, Suite 330 Ottawa, ON K2C 3W7 Canada Tel 613.723.8700 Fax 613.723.7489 March 30, 2001 118956/118957/118958 EOWRMS Steering Committees and Technical Advisory Group Subject: Final Report Phases 1B, 2, and 3 Eastern Ontario Water Resources Management Study Dear Committee Members: On behalf of our Consultant Team, it is with pleasure that we submit the final report for Phases 1B, 2, and 3 of the Eastern Ontario Water Resources Management Study (EOWRMS). The report presents the characterization of regional water resources, land resources, and servicing infrastructure, which is a significant milestone for the long-term management of these resources. Comprehensive data has been compiled, analyzed, and presented to highlight the significance of this information relative to the EOWRMS objectives. Assimilating the results of such diverse and thorough analyses into a comprehensive report that outlines regional water resources management action plans has been a challenging but valuable undertaking. The action plans will help communities make sound decisions on where growth and settlement can be supported by safe water resources and what infra- structure may be needed to resolve concerns with water quality and quantity. The next major step will be the implementation of these action plans through an Eastern Ontario Water Resources Management Strategy. We believe that the future prosperity of Eastern Ontario will in part depend on the timely and successful implementation of this strategy. It has been our pleasure to work with each of you on this exciting and challenging study. Your guidance and leadership have contributed significantly to the study's success.
    [Show full text]
  • Watershed Characterization Report
    Source Protection Watershed Characterization Report Prepared by: April 30, 2008 Raisin-South Nation Source Protection Region Watershed Characterization Report Table of Contents 1 Introduction to the Source Protection Region ........................................................................................... 1 1.1 Overview ............................................................................................................................................. 1 1.1.1 Report Organization ..................................................................................................................... 1 1.2 The Raisin-South Nation Source Protection Region ............................................................................ 2 1.2.1 Conservation Authority Collaboration in Eastern Ontario ........................................................... 4 1.2.2 Raisin Region Conservation Authority ......................................................................................... 6 1.2.3 South Nation Conservation Authority .......................................................................................... 7 1.2.4 Extended Source Protection Areas .............................................................................................. 8 1.3 Water Resource Studies ...................................................................................................................... 9 1.3.1 Eastern Ontario Water Resources Management Study (2001) ................................................. 10 1.3.2 Eastern
    [Show full text]
  • Stage 2 Archaeological Assessment for The
    STAGE 2 ARCHAEOLOGICAL ASSESSMENT FOR THE PROPOSED NORTH GLENGARRY REGIONAL WATER SUPPLY PROJECT CLASS EA VARIOUS LOTS GEOGRAPHIC TOWNSHIPS OF KENYON AND CHARLOTTENBURG FORMER COUNTY OF GLENGARRY AND GEOGRAPHIC TOWNSHIP OF CORNWALL FORMER COUNTY OF STORMONT NOW IN THE TOWNSHIPS OF NORTH AND SOUTH GLENGARRY CURRENT UNITED COUNTIES OF STORMONT, DUNDAS AND GLENGARRY PAST RECOVERY ARCHAEOLOGICAL SERVICES STAGE 2 ARCHAEOLOGICAL ASSESSMENT FOR THE NORTH GLENGARRY REGIONAL WATER SUPPLY PROJECT CLASS EA, VARIOUS LOTS, GEO. TOWNSHIPS OF KENYON AND CHARLOTTENBURG, FORMER COUNTY OF GLENGARRY, AND GEO. TOWNSHIP OF CORNWALL, FORMER COUNTY OF STORMONT, NOW IN THE TOWNSHIPS OF NORTH AND SOUTH GLENGARRY, CURRENT UNITED COUNTIES OF S, D & G Prepared for: Andre Bourque, P. Eng. Project Manager with CH2M HILL Canada Limited 1011 Prince of Wales Drive, Suite 330 Ottawa, Ontario K2C 3W7 Phone: (613) 723-0233 ext.73106 Fax: (613) 723-7489 E-mail: [email protected] Re: Municipal Class Environmental Assessment, Schedule C (Phase 5) Prepared by: Daniel Goss, B.A. Past Recovery Archaeological Services 4534 Bolingbroke Road, R.R. #3 Maberly, Ontario K0H 2B0 Phone/Fax: 613-268-2426 E-mail: [email protected] PRAS Project No.: PR12-28 Licensee: Jeff Earl, Licence P031 Principal Past Recovery Archaeological Services P.I.F. No.: P031-071-2012 Date: January 25th, 2013 Original report Stage 2 Archaeological Assessment North Glengarry Regional Water Supply EA Past Recovery Archaeological Services ACKNOWLEDGMENTS Property permission and logistical support was provided by Mr. Andre Bourque, P. Eng., Project Manager with CH2M HILL Canada Limited. Mr. Curtis Lazore, Researcher, Aboriginal Rights and Research Office, Mohawk Council of Akwesasne, provided valuable input regarding First Nations concerns related to archaeological resources within the study areas.
    [Show full text]
  • Assessment of the Beach Closing and Recreation Water Quality Impaired Beneficial Use for the St
    Assessment of the Beach Closing and Recreation Water Quality Impaired Beneficial Use for the St. Lawrence River (Cornwall) Area of Concern Final Report Provided to Ontario Ministry of the Environment In support of the St. Lawrence River (Cornwall) Remedial Action Plan Prepared by the St. Lawrence River Institute of Environmental Sciences Assessment of the Beach Closing and Recreation Water Quality Impaired Beneficial Use for the St. Lawrence River (Cornwall) Area of Concern. Report prepared for the Ontario Ministry of the Environment, Eastern Region, Kingston, ON, in support of the St. Lawrence River (Cornwall) Remedial Action Plan and the Canada- Ontario Agreement. Prepared by Jeff Ridal, PhD and Andrew Bramburger, PhD St. Lawrence River Institute of Environmental Sciences 2 St. Lawrence Drive Cornwall, ON Mar 31, 2012 Introduction High bacteria levels in the St. Lawrence River have had an impact on the use of the river for water contact sports, including swimming, at a number of public beaches and recreation water quality sites within the Area of Concern. Thirty-five of these locations were monitored for faecal coliforms and/or E. coli concentrations in 2003 and it was determined that the criterion for E. Coli in recreational water had not been met in the Area of Concern, although conditions in general appear to have improved since the 1980s. “Faecal Bacteria Concentrations in the St. Lawrence River (Cornwall) Area of Concern” prepared by Heather Moore and Jeff Ridal with the St. Lawrence River Institute of Environmental Sciences in March, 2004, provided a detailed analysis at the sampling sites including Westley’s Point, Glengarry Park and areas on Cornwall Island where exceedences are most pronounced.
    [Show full text]