Exeter River Project to Begin in July Supply
Volume XXXVI No. 7 Brentwood, New Hampshire July-August 2012 Exeter River Project to Begin in July supply. The problem looms and we all should be doing whatever we can at whatever level to protect the future This summer, Brentwood will begin work on a of our environment. project to improve storm-water management and restore the buffers along the Exeter River on Haigh Road and Brentwood is stepping up to the challenge as Rowell Road West. Currently, water flows from those best we can, to do our part to protect our little piece of roads into the river and the vegetation is not adequate to the world, in two ways. Firstly, we elected to fund a $2 absorb it, and so it carries sand, silt and nitrogen into the million bond in 2003 to protect open space, which has river. been leveraged to protect over $7 million worth of land, using federal grants, donations and independent trans- The river bank along Rowell Road West, where actions to make up the difference. We are now at the the storm-water drains, is still an attractive spot for point where 25% of our 16 square miles are under ease- recreation, being used for swimming, fishing and ment protection, including 2.5 miles along the Exeter boating, and even skating in favorable winters. This land River. is owned by Carole and Norman Wilson and there is no official landing, so that people using the river make Secondly, we have worked to keep pollutants out of multiple trails through the narrow woodland and shrubs the river by protecting and improving buffers along the to approach the river.
[Show full text]