Story Contracting to Deliver New Horden Railway Station

Total Page:16

File Type:pdf, Size:1020Kb

Story Contracting to Deliver New Horden Railway Station Story Contracting to deliver new Horden railway station July 17, 2019 Story Contracting has been awarded a Network Rail contract to design and build a new railway station in County Durham. Following a bumper start to 2019 for the civil engineering company’s expanding rail division, Story has secured further contract success, being selected to deliver the new station at Horden, near Peterlee. The new station will improve transport links in the east of the county, providing a boost to the economy and widening employment opportunities for local residents. Martin Smith, Operations Director for Story’s rail division, said: “This project is a fantastic addition to our expanding work bank across the UK and in particular, a key project in the Eastern region, strengthening our growing position and reputation.’’ He added: “We’re delighted to have been chosen by Network Rail and Durham County Council to deliver this vital project which will play a significant role in the regeneration of Horden and the wider area.” Rail industry projections anticipate that more than 70,000 passengers could use the station each year; providing a useful transport link for residents who work in Newcastle, Sunderland, Hartlepool and Teesside. Story will deliver two new 100m+ platforms on the Durham Coast Line, complete with step free access via a footbridge and ramps. The scope will also include associated piling, signalling, track realignment, lighting, CIS, PA system, CCTV, and platform furniture. The new station will open to passengers in the spring of 2020. The contract, valued at over £4million, follows in the footsteps of a succession of multi-million-pound Network Rail contract wins on both the Eastern and North West and Central regions..
Recommended publications
  • Horden Peterlee Station
    Horden Peterlee Station Full Business Case: December 2016 Durham County Council Contents 1 Introduction ................................................................................................................................... 5 1.1 Purpose of the Document ...................................................................................................................... 5 1.2 Introduction ............................................................................................................................................ 5 1.2.1 Current Constraints ....................................................................................................................... 5 1.2.2 Proposed Scheme ........................................................................................................................ 5 1.3 Strategic Need ....................................................................................................................................... 6 1.4 Benefits .................................................................................................................................................. 7 1.5 Timescale for Delivery ........................................................................................................................... 8 1.6 Structure of the Document ..................................................................................................................... 8 2 Strategic Case ..............................................................................................................................
    [Show full text]
  • Agenda Document for North East Joint Transport Committee, 18/06/2019
    Public Document Pack North East Joint Transport Committee Tuesday, 18th June, 2019 at 2.00 pm Meeting to be held in the Reception Room, South Shields Town Hall AGENDA Page No 1. Appointment of Chair and Vice Chair for the Municipal Year 2019/20 2. Apologies for Absence 3. Declarations of Interest Please remember to declare any personal interest where appropriate both verbally and by recording it on the relevant form (to be handed to the Democratic Services Officer). Please also remember to leave the meeting where any personal interest requires this. 4. Minutes of the previous meeting held on 19 March 2019 5 - 10 5. Appointments to Tyne and Wear Sub Committee; JTC Overview and 11 - 20 Scrutiny Committee and JTC Audit Committee, including the Appointment of Chairs and Vice Chairs for the Municipal Year 2019/20 6. Programme of Committee Meetings for the 2019/20 Municipal Year 21 - 26 7. Regional Transport Update 27 - 56 8. Capital Programme Outturn 57 - 68 9. Revenue Budget 2018/19 Outturn 69 - 80 10. Nexus Fleet Replacement Programme 81 - 84 11. Transforming Cities Fund - Tranche 2 Bid 85 - 106 12. Discharge of Transport Functions by Durham County Council 107 - 114 13. Date and Time of Next Meeting Tuesday 16 July 2019 at 2pm, Gateshead Civic Centre. Contact Officer: Emma Reynard Tel: 0191 433 2280 E-mail: [email protected] To All Members 2 Agenda Item 4 1 North East Joint Transport Committee DRAFT MINUTES TO BE APPROVED 19 March 2019 Meeting held Committee Room, Gateshead Civic Centre, Regent Street, Gateshead, NE8 1HH Present: Councillor: M Gannon (Chair) Councillors: N Forbes, C Marshall, G Miller, C Johnson, W Daley and M Walsh 32 APOLOGIES FOR ABSENCE Apologies were received from Mayor Redfern, Councillor Jackson and Helen Golightly.
    [Show full text]
  • Horden Station
    Horden Railway – Transcript https://www.youtube.com/watch?v=xkDsEpj2rdk&feature=youtu.be Upbeat music plays [Text: Horden Railway Station] [Text: Chris Heaton-Harris MP. Minster of State, Department for Transport] Chris Heaton-Harris: Hi there. I’m delighted that Horden Station is opening today, congratulations to everyone involved in delivering this exciting project that I have no doubt will bring fantastic benefits to the people of Horden and the wider region too. People of Horden have been waiting almost sixty years to access rail services since the nearest station was closed under the beaching cuts. But now this vital community will at last be able to benefit from access to rail services that this new station brings. As you all know rail connectivity brings with it new opportunities, boosts the local economy and gives people greater access to jobs and education and I’m extremely proud that Horden Station is the seventh to be built using funding from the governments new stations fund, part of our wider restoring your railway fund. We’re committed to reversing some of the damaging beaching cuts of the past and want to use the power of transport to level up regions like the north east and unlock their economic potential so that everyone in our country can thrive. So, congratulations again to all that have worked so hard to make the opening of this station possible. I’m sorry I’m trapped here in my Westminster office and cannot visit the station today in person, but I look forward to being able to do so in the future.
    [Show full text]
  • Annual Report 2018
    Annual Report 2018 Bishop Line Community Rail Partnership www.bishopline.org Contents Foreword by Chair 4 Partnership Objectives 5 Results 6 Station News 7 Service News 9 Community Rail News 11 Marketing Collateral & Events 12 Media Releases 17 The Coming Year 18 Partnership Members & Funders 19 Foreword by Chair How time flies! Here I am again putting down my thoughts for the 2018 Annual Report. This one however will be my last as I am stepping down as Chair in 2019 as I indicated at the last AGM. I do however hope to continue in some capacity to support the Bishop Line into the future. I am as usual indebted to all who have contributed to making the partnership a success this year - you know who you are. I am particularly grateful for all the hard work done by our Community Rail Officer, Bob Whitehouse, not only this last year but throughout his many years in the job. Again, Bob is also leaving his post in 2019 and I am sure that you will all join with me in wishing him well in whatever he pursues next. I’m sure we’ve not heard the last from Bob..... I would also like to extend my gratitude to Stuart Woods our Secretary for his help, support and friendship. Whilst the rail industry generally and the Northern franchise in particular have gone through turbulent times in 2018 which has been challenging for customers, stakeholders and employees alike, the Bishop Line has been relatively unaffected by the troubles on the rest of the rail network.
    [Show full text]
  • (Public Pack)Agenda Document for Cabinet, 18/01/2017 10:00
    Cabinet Date Wednesday 18 January 2017 Time 10.00 am Venue Main Hall, The Glebe Centre, Durham Place, Murton, Seaham, Co Durham, SR7 9BX Business Part A Items during which the press and public are welcome to attend - members of the public can ask questions with the Chairman's agreement 1. Public Questions 2. Minutes of the meeting held on 14 December 2016 (Pages 3 - 8) 3. Declarations of interest Ordinary Decisions: 4. County Durham Partnership Update - Report of Director of Transformation and Partnerships (Pages 9 - 24) 5. Welfare Reform and Poverty Issues - Joint Report of Director of Transformation and Partnerships and Interim Corporate Director of Children and Young People's Services (Pages 25 - 80) 6. DurhamWorks Programme - Youth Employment Initiative - Joint Report of Interim Corporate Director of Children and Young People's Services and Corporate Director of Regeneration and Local Services (Pages 81 - 88) 7. Children's Services Update - Report of Interim Corporate Director of Children and Young People's Services (Pages 89 - 108) 8. Masterplan Updates - Report of Corporate Director of Regeneration and Local Services (Pages 109 - 186) 9. Such other business as, in the opinion of the Chairman of the meeting, is of sufficient urgency to warrant consideration. 10. Any resolution relating to the exclusion of the public during the discussion of items containing exempt information. Part B Items during which it is considered the meeting will not be open to the public (consideration of exempt or confidential information) 11. Such other business as, in the opinion of the Chairman of the meeting, is of sufficient urgency to warrant consideration.
    [Show full text]
  • APPENDIX 6 PREFERRED OPTIONS CONSULTATION FEEDBACK REPORT County Durham Plan
    APPENDIX 6 PREFERRED OPTIONS CONSULTATION FEEDBACK REPORT County Durham Plan Prefereed Options Consultation Feedback Report Contents 1 Introduction to the Feedback Report 2 2 Vision and Objectives 2 3 How Much Development and Where 6 4 Building a strong competitive economy 13 5 Ensuring the vitality of town centres 14 6 Supporting a prosperous rural economy 15 7 Delivering a wide choice of high quality homes 17 8 Protecting Green Belt land 22 9 Promoting sustainable transport 23 10 Supporting high quality infrastructure 26 11 Requiring good design 30 12 Promoting healthy communities 31 13 Meeting the challenge of climate change, flooding and coastal change 32 14 Conserving and enhancing the natural and historic environment 36 15 Minerals and Waste 46 Preferred Options Consultation Feedback Report County Durham Plan Preferred Options Consultation Feedback Report 1 The purpose of the Preferred Options consultation feedback report is to provide a summary of the representations made in response to the County Durham Plan Preferred Options (June 2018). The council’s response to every representation made is set out in the Preferred Options Statement of Consultation. 2 Consultation on the Preferred Options was undertaken between 22 June 2018 and the 3 August 2018. A total of 3,990 responses were received from 1130 respondents. In addition, social media played a large part of the consultation process with social media messages viewed 603,454 times and generating a total of over 1000 comments, albeit these were not submitted via the formal process. All duly made representations submitted in response to the Preferred Options have been considered and where possible changes have been made when preparing the County Durham Pre-Submission Local Plan.
    [Show full text]
  • Church Fenton to Newcastle Strategic Advice 2020 3 MB
    Church Fenton to Newcastle Strategic Advice What is required to make the rail network between Church Fenton and Newcastle ready for the 2030s and beyond? Continuous Modular Strategic Planning April 2020 02 Contents Part A: Executive Summary 03 Part B: Continuous Modular Strategic Planning 06 Part C: Church Fenton to Newcastle Strategic Context 07 Part D: Demand in the 2030s and Beyond 10 Part E: The Needs of the Future Railway 17 Part F: Accommodating Future Services 19 Part G: Next Steps 29 Church Fenton to Newcastle Strategic Advice April 2020 03 Part A Executive Summary What is required to make the rail network between The combined impact of the many factors listed above Church Fenton and Newcastle ready for the 2030s and is a recommendation for transformational change of beyond? the rail network between Church Fenton and The Church Fenton to Newcastle strategic question Newcastle for the coming decades. CMSP highlights provides a set of recommendations to make sure that the the benefits for both NPR and HS2 Phase 2b in relieving rail network meets the demands of passengers and crowding on trains and improving connections, also freight-users for decades to come. CMSP (Continuous showing that there is a strong case for investment in Modular Strategic Planning – see Part B) considers the the network regardless of delivery of the programmes. needs of the network in a holistic manner, with experts There is now a one-off opportunity to maintain from across the rail industry working with Network Rail to alignment of HS2 and NPR plans with an integrated provide inputs.
    [Show full text]
  • Transport in County Durham
    Transport Ref EHT 006 Why is it important? Transport in County Durham County Durham’s transport network provides a vital role in terms of linking people to jobs, delivering products to market, providing access to key services and keeping our communities connected. Transport statistics are valuable as they help us to understand where transport investment should be targeted. Walking and Cycling Network Local travel options will continue to be promoted through ongoing improvements to the existing local cycle and footpath networks as well as the existing National Cycle Network and other promoted routes. Cycling Super Routes, Primary and Secondary routes which connect our major settlements are being identified in the Cycling Strategy and Action Plan 2017-27, as part of a long-term strategy to improve the cycling network. In order to promote sustainable travel, the Cycle Super Routes are a priority for investment, particularly those within 5 miles of Durham City. Bus Network Buses provide the only form of public transport in most parts of County Durham, with 23.61 million passenger journeys starting at bus stops in County Durham in 2015/16. There is an extensive network of services, with approximately 175 services in the main network plus additional services running only at school times. Over 3,000 bus stops are served. Most settlements have at least 2 buses per hour during Monday to Saturday daytimes, with much higher frequencies in the main towns and along many of the main inter-urban corridors. In the more rural areas, services run every hour or less often. All but the smallest settlements have regular services.
    [Show full text]
  • Peterlee Regeneration Masterplan Regeneration and Economic Development October 2013 Draft 4 Vs7
    Peterlee Regeneration Masterplan Regeneration and Economic Development October 2013 Draft 4 Vs7 (Cabinet) Durham County Council will: Support the development of new homes Encourage new business activity, support for advanced manufacturing and the improvement of the industrial estates Tackle the decline of North East Industrial Estate by encouraging business relocation and reuse for housing Work with the private sector to increase choice in supermarket provision and to encourage the town centre to cope with its changing role. Capitalise on the advantages of the rail link through the area by creating a new station in Horden Draft 3 Vs3 Page 1 of 20 Contents Introduction................................................................................................................................ 3 Map 1 the Town and Surrounding Parishes........................................................ 4 Town Profile, Challenges and Proposals ............................................................................. 4 2. The Town ................................................................................................................... 4 3. Employment .............................................................................................................. 5 4. Housing...................................................................................................................... 8 5. Town Centre and Retail......................................................................................... 12 Map 2: Occupancy in Peterlee town
    [Show full text]
  • Peterlee Masterplan Update Durham County Council December 2016
    Peterlee Masterplan Update Durham County Council December 2016 Peterlee Masterplan Update, December 2016 Context for Masterplan Updates Masterplans are being developed for the majority of the main towns in County Durham. This document for Peterlee provides an update to the 2013 Masterplan. Given the potential impact of the Horden rail station, this proposal is reflected in the Masterplan Update. It provides an update on what has been delivered across Council services in the recent past. The update also sets out key activities for the future including in the town centre. Key Priorities: To support the development of new homes; To support the development of new jobs by encouraging new business activity, including support for advanced manufacturing; To improve existing industrial estates and in particular tackle the decline of North East Industrial Estate by encouraging business relocation and reuse for housing; To work with the private sector to increase choice in supermarket provision and to encourage the town centre to cope with its changing role; To capitalise on the advantages of the rail link through the area by creating a new rail station on the Durham Coast Line at Horden; To improve pedestrian and cycle paths to industrial estates including links to the new rail station on the Durham Coast Line at Horden; and To improve the evening economy within the town centre for residents and visitors. 2 Peterlee Masterplan Update, December 2016 Profile Peterlee is a main town in East Durham. It occupies a strategic location between the North East’s two conurbations and has good transport links to the main towns in both the Tees Valley to the south and Tyne and Wear to the north.
    [Show full text]
  • London North Eastern & East Midlands Route
    London North Eastern & East Midlands Route Route Strategic Plan January 2018 LNE & EM Route Strategic Plan Introduction from the Route Managing Director CP5 has been a challenging time for Network Rail. However as we begin We will do this by ensuring our delivery, whether it be operations, the process of exiting CP5 and preparing for CP6 our LNE & EM Route is maintenance or renewals is both efficient and effective. Efficiency has not creating real momentum towards maximising the transformative had sufficient focus in CP5 and we are changing this now with an initial opportunities that CP6 presents us. We are delivering our maintenance objective for renewals of returning to CP4 levels of efficiency. more efficiently than ever before, train delay minutes attributed to the route and number of performance affecting incidents are lower than they have The Network Rail devolution agenda rightly pushes us towards our ever been and we must continue to improve the safety of our railway as stakeholders and in doing so brings track and train closer together for the the traffic and passenger numbers grow. Our approach to developing benefit of passengers, communities and economies. This allows us to major enhancements such as Trans-Pennine Route Upgrade is being ensure that our investment decisions are focused towards those who applauded by funders and stakeholders, and we have commenced our matter most, and in doing so are better placed to realise the opportunity of once in a generation opportunity to realise a digital railway on ECML and third party investment on our railway. Investing money in and around the Moorgate with all the sustained and transformative cross industry LNE & EM route will become easier, faster and much more customer opportunities it creates.
    [Show full text]
  • County Durham Plan Infrastructure Delivery Plan Including Minor Modifications
    County Durham Plan Infrastructure Delivery Plan including minor modifications 2019 Contents Executive Summary 2 1 Introduction 4 What is the Infrastructure Delivery Plan? 4 The Scope of the Infrastructure Delivery Plan 6 Partnership Working 6 IDP Investment Schedules 7 2 County Durham Plan 7 Proposed Housing Distribution in County Durham 7 Employment Land 10 3 Monitoring Areas 15 Countywide 15 Countywide Physical Infrastructure 15 Countywide Social Infrastructure 26 Countywide Green Infrastructure 35 North Durham 36 North West Durham 41 Durham City 45 Central Durham 55 Mid Durham 59 South Durham 63 South East Durham 69 East Durham 73 West Durham 79 Infrastructure Delivery Plan June 2019 County Durham Plan Infrastructure Delivery Plan June 2019 Executive Summary The County Durham Infrastructure Delivery Plan (IDP) describes County Durham's infrastructure requirements to support the delivery of the County Durham Plan (CDP) until 2035. The IDP has been developed in partnership with providers to identify infrastructure needs, delivery costs, and particularly seeks to identify barriers such as shortfalls in finance relating to infrastructure delivery. The IDP assists partners to make efficient decisions about their own investment programmes and has been developed in co-operation with adjoining local authorities to identify cross boundary issues. The IDP highlights the key developments identified in the CDP, including where future housing and employment land will be located, and identifies those places where additional infrastructure or capacity is needed in the future. Some of the key infrastructure requirements include new sustainable methods of transport, highways improvements, connectivity and utilities coverage across the County, along with a detailed assessment of where and when water sewerage networks will require investment.
    [Show full text]