(DMB) Ministry of Food and Disaster Management

Total Page:16

File Type:pdf, Size:1020Kb

(DMB) Ministry of Food and Disaster Management Disaster Management Information Centre Disaster Management Bureau (DMB) Ministry of Food and Disaster Management Disaster Management and Relief Bhaban (6th Floor) 92-93 Mohakhali C/A, Dhaka-1212, Bangladesh Phone: +88-02-9890937, Fax: +88-02-9890854 Email:[email protected],H [email protected] Web:http://www.cdmp.org.bd,H www.dmb.gov.bd Emergency Summary of Cyclonic Storm “AILA” Title: Emergency Bangladesh Location: 20°22'N-26°36'N, 87°48'E-92°41'E, Covering From: THU-04-JUN-2009:1600 Period: To: SAT-06-JUN-2009:1600 Transmission Date/Time: SAT-06-JUN-2009:1630 Prepared by: DMIC, DMB Summary of Cyclonic Storm “AILA” Current Situation Relief efforts are continuing in all affected districts with some Total Death: 180 early recovery, particularly in those districts not affected by water inundation, underway. Restoring water supplies in these People Injured: 7103 areas remains a priority. Work is continuing with the temporary repairs to embankments with the government announcing that Family Affected: 8,60,200 the AFD will be deployed to undertake major reconstruction in People Affected: 48,25,954 the coming days. As was alluded to previously, the extent of inundation in areas of Khulna and Satkhira districts is severe Houses Damaged: 6,09,592 with long term livelihood challenges ahead particularly in the Crops Damaged: 3,18,140 acre shrimp industry where major losses have occurred and also in the agriculture sector where the longer term impact of saline intrusion in regard to land use will not be known for some time. Many boatloads of people have been observed leaving the water logged areas of Dacope in Khulna District and head towards Khulna and other townships. This may only be a temporary situation however the likelihood of more people transitioning out of the affected areas is considered high, particularly if inundation cannot be reversed. While the current effort remains on immediate relief and medical assistance the future focus must soon shift to addressing the mid to longer term habitat and livelihood challenges caused by the extensive inundation and imminent flood season. The Disaster Management Information Centre is the information hub of the Ministry of Food and Disaster Management for risk reduction, hazard early warnings and emergency response and recovery activities Page 1 of 14 Different Organization’s Response Rupantar Rupantar supporting Aila victims through dry food and non-food items distribution. Cash for work started for employment creation of victims and cleaning public space. Safe drinking water supply & sanitation support to the people and also providing psychosocial support to the children with food. The activities undertaken by the USAID, SDC & OXFAM-GB funded so far by Rupantar are summarized below: Status No. of families or Districts Upazila Union Distributed Underway persons supporte d Emergency latrine-25 Chira- 2 kg per family Nos. Molasses 0.5 Kg per family Jeri cans -1000 pcs. Water trucking 5,000 liter per North Dewatering pond-5 day 1900 Bedkashi Soap 2/Pcs –1400 HH Jerry can – 200 pcs families Sanitary cloths- Environmental cleaning 1400HH through Cash for Work for Tube-well raising –25 1400 persons Plastic sheet-250HH Chira- 2 kg per family Emergency latrine-25 Molasses 0.5 Kg per family Nos. Water trucking 5,000 liter per Jeri cans -1000 pcs. day Dewatering pond-20 Koira Jerry can – 200 pcs Soap 2/Pcs –700 HH 1050 Water treatment plant Sanitary cloths-700HH families Tube wells – 7 Nos. Water Purify Powder- Environmental cleaning 48000 pcs. through Cash for Work for ORS -6000 pcs Koira 700 persons Belicing Powder-23 Chira- 2 kg per family Emergency latrine-25 Molasses 0.5 Kg per family Nos. Khulna Water trucking 5,000 liter per Jeri cans -1000 pcs. day South Dewatering pond-5 Jerry can – 200 pcs 1900 Bedkashi Soap 2/Pcs –1400 HH Psychosocial Support for 300 families Sanitary cloths- Children 1400HH Environmental cleaning Tube-well raising –50 through Cash for Work for Plastic sheet-250HH 1400 persons Chira- 2 kg per family Emergency latrine-25 Molasses 0.5 Kg per family Nos. Water trucking 5,000 liter per Moheswa Jeri cans -1000 pcs. 1000 day ripur Dewatering pond-5 families Environmental cleaning Soap 2/Pcs –500 HH through Cash for Work for Sanitary cloths-500HH 500 persons Emergen Water Purify Powder- Water Purify Powder- cy 100,080 pcs. (417 Box) 76,800 pcs. Medical Water Purify Powder-2160 ORS -980 pcs Khulna Team of pcs. (9 Box) Hellogen Tablet- - Khulna 12,150 pcs district & Khulna The Disaster Management Information Centre is the information hub of the Ministry of Food and Disaster Management for risk reduction, hazard early warnings and emergency response and recovery activities Page 2 of 14 Status No. of families or Districts Upazila Union Distributed Underway persons supporte d Club Chira-2kg per family ORS -4000 pcs Molasses 0.5 Kg per families Sutarkhal WPT- 4,000 325 i Alum- 2 Bags families Blessing Powder-2 Drum Dacope ORS- 500 packs Water trucking –8,000 liter per day-7 days Chira-2kg per family - Kamarkh Molasses 0.5 Kg per 325 ola families families ORS- 500 packs Lata Chira-2kg per family - 450 Molasses 0.5 Kg per family families Paikgacha Chira-2kg per family - 400 Daluti Molasses 0.5 Kg per family families Chira-2kg per family - Molasses 0.5 Kg per family Water trucking –8,000 liter Gabura per day-7day 650 ORS- 4,000 packs families Shyamnagar Food & water, Psychosocial & Medical Support for 300 Children Munshig Chira-2kg per family - 500 Satkhira anj Molasses 0.5 Kg per family families Emergen cy Medical Water Purify Powder- Team of 100,080 pcs. (417 Box) Satkhira - - Baterhat Water Purify Powder-4800 district & pcs. (20Box) Local NGO Chira-2kg per family - 500 Chilla Molasses 0.5 Kg per family families Mongla Sundarb Chira-2kg per family - 500 an Molasses 0.5 Kg per family families Mallikerb Chira-2kg per family - 500 er Molasses 0.5 Kg per family families Rampal Chira-2kg per family - 500 Banstali Molasses 0.5 Kg per family families Bagerhat Chira-2kg per family - 500 Rayenda Molasses 0.5 Kg per family families Chira-2kg per family Belicing Powder-2 Molasses 0.5 Kg per family Drum 500 Saronkhola Food & water, Psychosocial Southkha families & Medical Support for 300 li and 300 Children children ORS-5,000 Alum- 6 Bags The Disaster Management Information Centre is the information hub of the Ministry of Food and Disaster Management for risk reduction, hazard early warnings and emergency response and recovery activities Page 3 of 14 Status No. of families or Districts Upazila Union Distributed Underway persons supporte d Blessing Powder-2 Drum Cash for Work-100 people per day -10 days Pond dewatering & Nishanba 4100 - Cleaning- 3 ponds ria families Constriction PSF- 2nos. Belicing Powder-3 Drum Cash for Work-100 people per day -10 days Pond dewatering & Morrelga 3100 Morrelganj - Cleaning- 3 ponds nj Sadar families Constriction PSF-1 nos. Bagerhat Belicing Powder-2 Drum Cash for Work-100 people per day -10 days Pond dewatering & 5600 Khaulia - Cleaning- 4 ponds families Constriction PSF-2 nos. Belicing Powder-3 Drum Emergen cy Medical Water Purify Powder- Bagerhat - - Team of 100,080 pcs. (417 Box) Baterhat district [Data Date: 04th June, 2009] Gonoshasthaya Kendra In response to Cyclone Aila, Gonoshasthaya Kendra (GK) has deployed 2 Medical Teams with Veolia Water Treatment Unit to ensure 40,000 litre safe water at Shem Nagar of Shatkhira, the most Aila affected district. It took 3 days to find suitable place to install Veolia Water Treatment Unit. They are working with close collaboration with Upazilla Nirbahi Officer and Armed forces. GK also strengthen its ongoing programme located in cyclone SIDR activities by deploying 2 Medical Teams at Shoronkhola of Bagerhat district and two medical teams at Charfassion of Bhola Districts. One is working at Kukri Mukri and another one is at Char Monika and Laxi Char of Char Fassion. GK also sent another LMS Water Treatment Unit at Mongla with 2 more medical teams. They have reported to Upazilla Health Administrator. Every where GK is working in close coordination with Upazilla Nirbahi Officer and Health Administration. [Data Date: 05th June, 2009] The Disaster Management Information Centre is the information hub of the Ministry of Food and Disaster Management for risk reduction, hazard early warnings and emergency response and recovery activities Page 4 of 14 Action Aid Donor/ Impleme Relief Item or Family Package Responding Funding nting Last No. of Description Total Tentative Agency Source Partner Reporting Intervention Location Targeted Quantity Distribution Families Item Item Item Item Item of Relief Item Start End Remark 1 2 3 4 5 Date Date/ s Date District Upazila Union status 175 Drinki Puff Mola Sem Can 9-10 litre water, 50- 28/05/ 28/05 Distributi Ullasi ng ed sses olina dle 60 WPT, 5 packet 09 /09 on done Unayan water rice and and ORS, 5kg puffed Sangstha Bauja , suga light rice, 2 kg and in WPT r er molasses, 1kg Jagrata Bania and sugar, 1kg ActionAid ActionAid Juba shant ORS semolina, 6 piece Bangladesh Bangladesh Sangstha 4-Jun Khulna Dacope a candle and 1 lighter 614 do do do do do do 29/05/ 29/05 do Sutor 09 /09 khola 120 do do do do do 10 litre water, 50 3-Jun 3-Jun do WPT, 5 packet ORS, 5kg puffed rice, 2 kg molasses, 1kg sugar, 1kg semolina, 6 piece Sutor candle and 1 lighter do 4-Jun khola 111 do do do do do 9-10 litre water, 29/05/ 29/05 do 50-60 WPT, 5 09 /09 packet ORS, 5kg puffed rice, 2 kg molasses, 1kg sugar, 1kg semolina, 6 piece Kama candle and 1 do 4-Jun rkhali lighter The Disaster Management Information Centre is the information hub of the Ministry of Food and Disaster Management for risk reduction, hazard early warnings and emergency response and recovery activities Page 5 of 14 Donor/ Impleme Relief Item or Family Package Responding Funding nting Last No.
Recommended publications
  • 74D4c4a50377e9fec12575c3
    Disaster Management Information Centre Disaster Management Bureau (DMB) Ministry of Food and Disaster Management Disaster Management and Relief Bhaban (6th Floor) 92-93 Mohakhali C/A, Dhaka-1212, Bangladesh Phone: +88-02-9890937, Fax: +88-02-9890854 Email:[email protected],H [email protected] Web:http://www.cdmp.org.bd,H www.dmb.gov.bd Emergency Summary of Cyclonic Storm “AILA” Title: Emergency Bangladesh Location: 20°22'N-26°36'N, 87°48'E-92°41'E, Covering From: TUE-26-MAY-2009:2130 Period: To: TUE-27-MAY-2009:1400 Transmission Date/Time: TUE-27-MAY-2009:1600 Prepared by: DMIC, DMB Summary of Cyclonic Storm “AILA” Current Situation Maritime ports of Chittagong, Cox’s Bazar and Mongla have been advised to lower signal. Total 14 districts were affected by the cyclone. 100 persons reported dead. Many areas of the affected districts were inundated and houses, roads and embankments were damaged. Detailed damage information collection is in progress. Government and other organization have started their relief and rehabilitation operations immediately just after the cyclone crossed over. Actions Taken • A total of BDT 1200000 G.R. Cash has been allocated to the “AILA” affected districts Bhola, Pirojpur, Barguna, Jhalokathi, Bagerhat. • G. R. Rice 1000.000 MT has been allocated to the “AILA” affected districts Barishal, Barguna, Bhola, Jhalokathi and Satkhira. • 400 pcs Saree and 1 Carton Water purification tablet for Charfassion Upazila of Bhola, 400 pcs Saree and 1 Carton Water purification tablet for Kolapara and 300 pcs Saree for Galachipa upazila of Patuakhali and 400 pcs Saree and 1 Carton Water purification tablet for Shyamnagar Upazila of Satkhira District have been allocated.
    [Show full text]
  • TR 16 Agricultural Khas Land Settlement
    Technical Report 16: Khas Land Settlement Government of Bangladesh World Food programme Government of the Netherlands CHAR DEVELOPMENT AND SETTLEMENT PROJECT II Pi Dbœqb I emwZ ¯’vcb cÖKí 2 BANGLADESH Agricultural Khas Land Settlement in South Eastern Coastal Chars Of Bangladesh Technical Report No. 16 May 2004 Md. Zafar Alam Senior Land Adviser CDSP-II CDP Haskoning Consultants for Development Programmes Royal Dutch Consulting Engineers and Architects Sheltech Sheltech Consultants i Technical Report 16: Khas Land Settlement Table of contents List of Table.................................................................................................................iv List of Pictures, Maps and Figure.................................................................................v List of Appendix ..........................................................................................................vi List of Abbreviations ................................................................................................ vii Summery................................................................................................................... viii 1. Introduction ......................................................................................................1 2. Land Settlement Procedure in Bangladesh.......................................................3 2.1 Land Settlement: Legal Coverage ....................................................................3 2.1.1 Land Settlement: from tax collection to landless rehabilitation.......................3
    [Show full text]
  • Climate Change Adaptation Project Preparation in LGED Context And
    Climate Change and Bangladesh: Optimization of Projects for LGED Monzur Sadeque Executive Engineer (Planning), LGED 1 Scope of the Presentation • LGED & Climate Change Adaptation Projects • Unutilized & Underutilized Potentials • Scopes of Different Sectors • LGED’s Responsibilities • Near Future Projects 2 Himalaya Bay of Bangle A Sand witch Country between the Mountain and the Sea 3 Background • The country is lying in front of natural disasters ; flood and cyclone storms • Climate change impacts increasing natural disasters with other impacts like sea level rise, salinity intrusion, draught, extreme weather, erosion, drainage congestion etc. 4 Background • The country is vulnerable to climate change due to climatic, physiographic and socio economic factors like population, low income, poor resource management etc. • Needs solution of present problems as well as future anticipated problems….. 5 What are the Risks ? 6 Mainstreaming the Risks • In 1990s- WOMEN IN DEV. (WID) • In 2000s- Environment & Sustainable Development • In 2010s- Climate Mainstreaming 7 Climate Change Projects-LGED Name of Financed Area the Project and By Estimated Cost (Crore Tk) CDTA/ PPTA/PDA for ADB Amtoli, Coastal Towns (Climate Galachipa,Pirozep Infrastructure Improvement Investment ur, Mathbaria, Project (3 projects) Fund) Daulatkhan, 48.52 Bhola, Kalapara, Barguna Coastal Towns ADB -Same- Infrastructure Improvement (CIF) Project 876.00 8 Climate Change Projects-LGED Name of Financed Area the Project and By Estimated Cost (Crore Tk) CDTA/ PPTA/PDA for ADB Amtoli, Coastal Towns (Climate Galachipa,Pirozep Infrastructure Improvement Investment ur, Mathbaria, Project (3 projects) Fund) Daulatkhan, 48.52 Bhola, Kalapara, Barguna Coastal Towns ADB -Same- Infrastructure Improvement (CIF) Project 876.00 9 Climate Change Projects-LGED Name of Financed Area the Project & Estimated By Cost (Crore Tk.
    [Show full text]
  • Multi-Scale Assessment of Risks to Environmental Hazards in Coastal Area of Bangladesh
    Multi-Scale Assessment of Risks to Environmental Hazards in Coastal Area of Bangladesh by Momtaz Jahan MASTER OF SCIENCE IN WATER RESOURCES DEVELOPMENT INSTITUTE OF WATER AND FLOOD MANAGEMENT BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY December, 2018 Multi-Scale Assessment of Risks to Environmental Hazards in Coastal Area of Bangladesh A thesis submitted by Momtaz Jahan Student ID: 1014282024 Session: October 2014 In partial fulfillment of the requirements for the degree of MASTER OF SCIENCE IN WATER RESOURCES DEVELOPMENT INSTITUTE OF WATER AND FLOOD MANAGEMENT BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY December, 2018 ii BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY INSTITUTE OF WATER AND FLOOD MANAGEMENT The thesis titled “Multi-Scale Assessment of Risks to Environmental Hazards in Coastal Area of Bangladesh” submitted by Momtaz Jahan, Student ID: 1014282024 F, Session: October, 2014 has been accepted as satisfactory in partial fulfillment of the requirement for the degree of Master of Science in Water Resources Development on 17 December, 2018. BOARD OF EXAMINERS .................................................. Dr. Mashfiqus Salehin Chairman Professor (Supervisor) Institute of Water and Flood Management Bangladesh University of Engineering and Technology, Dhaka ................................................. Dr. Sujit Kumar Bala Member Professor and Director (Ex-officio) Institute of Water and Flood Management Bangladesh University of Engineering and Technology, Dhaka ...............................................
    [Show full text]
  • Bangladesh: Human Rights Report 2015
    BANGLADESH: HUMAN RIGHTS REPORT 2015 Odhikar Report 1 Contents Odhikar Report .................................................................................................................................. 1 EXECUTIVE SUMMARY ............................................................................................................... 4 Detailed Report ............................................................................................................................... 12 A. Political Situation ....................................................................................................................... 13 On average, 16 persons were killed in political violence every month .......................................... 13 Examples of political violence ..................................................................................................... 14 B. Elections ..................................................................................................................................... 17 City Corporation Elections 2015 .................................................................................................. 17 By-election in Dohar Upazila ....................................................................................................... 18 Municipality Elections 2015 ........................................................................................................ 18 Pre-election violence ..................................................................................................................
    [Show full text]
  • Disaster Relief Emergency Fund (DREF) Bangladesh: Tropical Storm
    Disaster relief emergency fund (DREF) Bangladesh: Tropical Storm DREF operation n° MDRBD011 GLIDE n° ST-2012-000176-BGD 18 October 2012 The International Federation of Red Cross and Red Crescent Society (IFRC) Disaster Relief Emergency Fund (DREF) is a source of un-earmarked money created by the Federation in 1985 to ensure that immediate financial support is available for Red Cross and Red Crescent emergency response. The DREF is a vital part of the International Federation’s disaster response system and increases the ability of National Societies to respond to disasters. CHF 292,693 has been allocated on 17 October 2012 from the IFRC’s Disaster Relief Emergency Fund (DREF) to support the National Society in delivering immediate assistance to some 25,000 beneficiaries. Unearmarked funds to repay DREF are encouraged. Summary: A fast moving tropical storm hit some remote islands in three different coastal districts in Bangladesh at 22hr00 on 10 October 2012. Due to the speed which this tropical storm formed, it was not being tracked by any meteorological agencies. The affected districts are Noakhali, Bhola and Chittagong. The Bangladesh Red Crescent Society (BDRCS) local district units reports at least 31 people were killed and 100 injured NDRT conducting assessment in one of the affected in the cyclonic storm that swept seven upazilas (sub- areas in Mogadia Union of Mirershorai Upazila in districts) of Noakhali, Bhola and Chittagong districts. Chittagong. Photo: BDRCS’s NDRT members. Over 46 fishermen are missing along with 20 trawlers in Meghna river. BDRCS quickly responded to the disaster and the volunteers from the Cyclone Preparedness Programme (CPP) took part on the search and rescue.
    [Show full text]
  • Review of Aquaculture & Fish Consumption in Bangladesh
    Review of Aquaculture & Fish Consumption in Bangladesh Review of Aquaculture and Fish Consumption in Bangladesh Ben Belton, Manjurul Karim, Shakuntala Thilsted, Khondker Murshed-E-Jahan, William Collis, Michael Phillips WorldFish gratefully acknowledges the highly valued unrestricted funding support from the Consultative Group on International Agricultural Research (CGIAR), specifically the following members: Australia, Canada, Egypt, Germany, New Zealand, Norway, the Philippines, Republic of South Africa, Sweden, Switzerland, the United Kingdom, the United States of America and the World Bank. REVIEW OF AQUACULTURE & FISH CONSUMPTION IN BANGLADESH ii This publication should be cited as: Belton, B. et al. 2011. Review of aquaculture and fish consumption in Bangladesh. Studies and Reviews 2011-53. The WorldFish Center. November 2011. Authors Ben Belton, Manjurul Karim, Shakuntala Thilsted, Khondker Murshed-E-Jahan, William Collis, Michael Phillips Project Number BA2377IFA Project Leader Ben Belton National Library of Malaysia Cataloguing-in-Publication Data ISBN: 978-983-2346-79-1 Cover photos: Front cover “Harvesting fish in Bagerhat” by Balaram Mahalder Back cover top picture "Live common carp for sale at Bogra wholesale market" by Biplob Basak Back cover bottom picture "Nutrient dense mola" by Biplob Basak Layout and design: Bold Inspiration © 2011 The WorldFish Center. All rights reserved. This publication may be reproduced in whole or in part and in any form for educational or nonprofit purposes without the permission of the copyright holders provided that due acknowledgement of the source is given. This publication may not be copied or distributed electronically for resale or other commercial purposes without prior permission, in writing, from the WorldFish Center. To obtain permission, contact the Communications and Donor Relations Division, [email protected].
    [Show full text]
  • Diversity of Cropping Systems in Chittagong Region
    Bangladesh Rice J. 21 (2) : 109-122, 2017 Diversity of Cropping Systems in Chittagong Region S M Shahidullah1*, M Nasim1, M K Quais1 and A Saha1 ABSTRACT The study was conducted over all 42 upazilas of Chittagong region during 2016 using pre-tested semi- structured questionnaire with a view to document the existing cropping patterns, cropping intensity and crop diversity in the region. The most dominant cropping pattern Boro−Fallow−T. Aman occupied about 23% of net cropped area (NCA) of the region with its distribution over 38 upazilas out 42. The second largest area, 19% of NCA, was covered by single T. Aman, which was spread out over 32 upazilas. A total of 93 cropping patterns were identified in the whole region under the present investigation. The highest number of cropping patterns was 28 in Naokhali sadar and the lowest was 4 in Begumganj of the same district. The lowest crop diversity index (CDI) was observed 0.135 in Chatkhil followed by 0.269 in Begumganj. The highest value of CDI was observed in Banshkhali, Chittagong and Noakhali sadar (around 0.95). The range of cropping intensity values was recorded 103−283%. The maximum value was for Kamalnagar upazila of Lakshmipur district and minimum for Chatkhil upazila of Noakhali district. As a whole the CDI of Chittagong region was 0.952 and the average cropping intensity at the regional level was 191%. Key words: Crop diversity index, land use, cropping system, soybean, and soil salinity INTRODUCTION household enterprises and the physical, biological, technological and socioeconomic The Chittagong region consists of five districts factors or environments.
    [Show full text]
  • Coastal Erosion and Human Perceptions of Revetment Protection in the Lower Meghna Estuary of Bangladesh
    remote sensing Article Coastal Erosion and Human Perceptions of Revetment Protection in the Lower Meghna Estuary of Bangladesh Thomas W. Crawford 1,*, Md Sariful Islam 1 , Munshi Khaledur Rahman 2 , Bimal Kanti Paul 3, Scott Curtis 4 , Md. Giashuddin Miah 5 and Md. Rafiqul Islam 6 1 Department of Geography, Virginia Tech, Blacksburg, VA 24061, USA; [email protected] 2 Department of Geology and Geography, Georgia Southern University, Statesboro, GA 30458, USA; [email protected] 3 Department of Geography and Geospatial Sciences, Kansas State University, Manhattan, KS 66506, USA; [email protected] 4 Lt Col James B. Near, Jr., USAF, ’77 Center for Climate Studies, Department of Physics, The Citadel, Charleston, SC 29409, USA; [email protected] 5 Vice-Chancellor, Bangabandhu Sheikh Mujibur Rahman Agricultural University, Gazipur 1706, Bangladesh; [email protected] 6 Department of Agronomy, Bangabandhu Sheikh Mujibur Rahman Agricultural University, Gazipur 1706, Bangladesh; rafi[email protected] * Correspondence: [email protected]; Tel.: +1-540-231-7216 Received: 21 July 2020; Accepted: 17 September 2020; Published: 22 September 2020 Abstract: This study investigates coastal erosion, revetment as a shoreline protection strategy, and human perceptions of revetments in the Lower Meghna estuary of the Bangladesh where new revetments were recently constructed. Questions addressed were: (1) How do rates of shoreline change vary over the period 2011–2019? (2) Did new revetments effectively halt erosion and what were the magnitudes of erosion change? (3) How have erosion rates changed for shorelines within 1 km of revetments, and (4) How do households perceive revetments? High-resolution Planet Lab imagery was used to quantify shoreline change rates.
    [Show full text]
  • Mamoni Health Systems Strengthening Activity (USAID Cooperative Agreement AID-388-LA-13-00004)
    MaMoni Health Systems Strengthening Activity (USAID Cooperative Agreement AID-388-LA-13-00004) Quarterly Report January 01, 2018– March 31, 2018 Submitted April 30, 2018 Cover Photo Story: Nijhum Dwip looks forward to a healthy future “I would deliver at home as I did before”, Shaheena said when she was asked what she would do if the health center were not there. Shaheena had her second baby delivered at the Nijhum Dwip (a remote island in Hatiya upazila on the south of Bangladesh) Union Health and Family Welfare Centre (UH&FWC) on the day the facility started functioning. For Shaheena, delivering at a health facility was hardly an option before. Shaheena lives in a village in Nijhum Dwip. The nearest health facility from Nijhum Dwip was in Jahajmara union which was hard-to-reach and expensive, would take at least 2-3 hours journey by engine boat and rikshaw van. For about 30,000 people who call Nijhum Dwip their home, ‘delivery at home’ had therefore been the only option. On November 1, 2017, the remote island got its first health center equipped with sufficient essentials to provide a range of basic healthcare services including normal delivery services. Six weeks later, the Nijhum Dwip UH&FWC started providing 24/7 normal delivery services to the community. Now the people of Nijhum Dwip, one of the hardest-to-reach areas in Bangladesh, have the option to avail normal delivery services by skilled birth attendants around-the-clock and free of cost. The establishment of the Nijhum Dwip UH&FWC represents a novel initiative undertaken by the district family planning department and local government with MaMoni HSS project playing the facilitation role.
    [Show full text]
  • (RTIP-II), Region-2 PHASE II UZR SUBPROJECTS
    Local Government Engineering Department (LGED) Public Disclosure Authorized Second Rural Transport Improvement Project (RTIP-II), Region-2 Public Disclosure Authorized PHASE II UZR SUBPROJECTS WITHOUT ACQUISITION OF PRIVATE LANDS 2014 – 2015 Public Disclosure Authorized SOCIAL IMPACT MANAGEMENT PLAN (SIMP) Public Disclosure Authorized January 2015 Social Impact Management Plan Social Impact Management Plan (SIMP) Region 2, Second Year UZR Subprojects without Acquisition of Private Land Table of Contents 1. INTRODUCTION ........................................................................................................... 1 1.1. Project Background .................................................................................................. 1 1.2. Region 2 Project area ............................................................................................... 1 1.3. Second Year Subprojects in Region 2 ...................................................................... 2 1.4. Social Implication of UZR Subprojects without Land Acquisition ......................... 2 1.5. Measures to Minimize Impacts ................................................................................ 4 1.6. Social Impact Management Plan (SIMP) ................................................................. 4 1.7. Approval and Disclosure .......................................................................................... 4 2. SOCIOECONOMIC INFORMATION ........................................................................... 5 2.1. Project
    [Show full text]
  • Government of the People's Republic of Bangladesh
    Government of the People’s Republic of Bangladesh Local Government Engineering Department Dbœq‡bi MYZš¿ ¿ Office of the Executive Engineer ‡kL nvwmbvi g~jgš District:Laxmipur www.lged.gov.bd Memo No: 46.02.5100.001.07.001.19-574 Date: 25/03/2019 e-Tender Notice No:33/2018-19 e-Tender is invited in the National e-GP System Portal (https://www.eprocure.gov.bd) for the procurement of following works are given below Tender Sl. Last Selling Date Closing Date and Opening Date and Proposal Name of the Scheme with Package No No. and Time Time Time ID 01 284923 1.Improvement of Ramganj Nagherdighirpar Hat 29/04/2019 30/04/2019 30/04/2019 Road via Harishchar Road From Ch. 00m-5675m Up to 17.00pm Up to 13.00pm 13.00pm under Ramganj Upazila Dist. Laxmipur. Road ID- 451652011 2.Improvement of Bhobanigon GC- Refuje Market- Megna Bazar-Chakbazar-Munshirhat Road at ch.00m- 9000m under Sadar Upazila Dist. Laxmipur. Road ID- 451432006 3.Improvement of Raipur-Panpara Road. At Ch.00m- 5950m Under Raipur Upazila Dist.-Laxmipur. Road ID- 451582002 4.Improvement of Lowrence -Khaserhat-Anderchar road.at ch 00m-5000m.Under Komolnagar Upazila Dist. Laxmipur. Road ID- 451743007 5.Improvement of Torabganj GC - Shantirhat - Hajiganj Bazar - Banderhat - Chowdhuryhat - Ramgati Bazar Roadch.00m-12000m Under Ramgati Upazila Dist. Laxmipur. Road ID- 451732007. (Total Cost of Salvage Materials Tk. 7265349.00) Package No: CW-05/RCIP/LAX This is an online tender, where only e-Tender will be accepted in the National e-GP portal and no offline / hard copies will be accepted.
    [Show full text]