Summary of Resort

Total Page:16

File Type:pdf, Size:1020Kb

Load more

Summary of Resort Identity of Property: Sunbanks Resort 57662 N. Highway 155 Electric City, WA 99123 Property Description: The subject is currently improved with a lodge, gatehouse, RV and tent sites, dry cabins (power and water), villas (power, water and sewer), model cabins (power, water and sewer), beach and an 18-hole miniature golf course. There is also a floating dock with 50 boat slips and a boat launch on the edge of the lake. A large stage is located near the water and is utilized for two blues festivals held in May and September every year. Plans are to add more amenities in the coming year including a sport court and outdoor pool. Overview: The subject consists of a 119-site RV sites (16 have full hook ups), 99 tent sites, 20 dry cabins, five two-story cabins, four park models and 21 villas. The improvements are accessed via gravel and paved roads. The resort in situated on Banks Lake and also has a marina. Clubhouse: The clubhouse contains the office for the resort, convenience store, dining hall, gift shop, bar/cantina with outdoor seating, espresso bar and living quarters for the caretaker. In the basement are showers and restrooms for guests with one for men and one for women. Lake View Villas: These are one, two, three and five bedroom guesthouses with views of the lake. Each unit has decks off kitchens and family rooms, decks off master bedrooms, central heating and cooling, washer/dryer, dishwasher, fireplaces, satellite televisions and telephones. The one bedroom villas have one bathroom, two bedroom villas have one and one half bathrooms and five bedroom villas have two bathrooms. Lago Del Sol Villas: These wood frame stucco-type siding villas were constructed in 2000. The units are all two-story with a common patio with bbq and a common wall surrounding the small compound. Each unit features a kitchen, full bath and sleeper sofa. The main floors are tiled with carpet on the second level. Each unit has HVAC, power, water and sewer. The units were originally designed to be one-level buildings and were changed midway through construction. There are plans to add a range to the kitchens. Dry Cabins: The subject has ten dry cabins built on pier blocks and ten with footings. The buildings were shipped and assembled from kits and are all very similar. Each cabin sleeps six and includes 286 SF (including loft) with air conditioning and heat, a small microwave and fridge and small front porch with a bbq. Park Models: The subject added two park models to the campsite near the gatehouse in early summer 2011and have added two more. The modular units include one bedroom plus a loft with two full beds, one full bathroom, a kitchenette and small living room. The units are on the shoreline allowing campers to moor their boats along the campsite. However, both units are portable and not considered part of the real property. The income from these units is included in the valuation thought the value attributed to these units is segregated from the overall value and reported as FF&E. RV and Tent Sites: The RV and tent sites are located throughout the developed site but are mostly clustered around the shoreline. The sites are a mix of grass and gravel sites, and most of the areas are treed providing some degree of privacy. According to the on- site manager, there are currently 218 camp and RV sites. However, some of these are only used during the peak of the peak season, such as holiday weekends. Outdoor Stage: There is an outdoor stage used for a blues festival and other events located on the western shoreline. Miniature Golf: There is an 18-hole miniature golf course. Marina and Boat Ramp: The marina is in good condition and was recently replaced with 50 boat slips for overnight moorage. There are also boat rentals. Beach: There is a sand beach close to the stage. Other Amenities: There are plans to an outdoor pool and sport court in 2018. Future Expansion: The lease allows for future expansion of up to 10-15 villas overlooking the lake between 2016 and 2025. There are other potential buildings cited in the lease but are not included for consideration, since the timeline is pre-2016. Golf Course: 18 hole golf course owned by The Port Authority across the bay (1 mile) Neighborhood Overview Neighborhood Description: Electric City is the one of the smallest towns in Grant County and is adjacent to Elmer City, Coulee City and Coulee Dam. The 2017 population of Electric City is 1,020 and up slightly from 1,010 estimated in 2016. The area was developed as part of the Coulee Dam WPA project. Electric City is located on Banks Lake and has good access to Grand Coulee Dam and Lake Roosevelt. The area is predominantly single family residential and agricultural. Retail uses include a grocery store, pharmacy, restaurants, coffee shops and commercial services and are mostly located along Highway 155 and 174 and on Main Street in Coulee City. However, most retail is to the south in Moses Lake. Access & Infrastructure: Primary access to Electric City is Highway 155 that is a two lane state highway that connects to Highway 2 (a major east-west highway) to the south and Highway 174 (a minor east-west highway) to the north. Access is average for a remote area. Grand Coulee Dam: Grand Coulee Dam is a concrete gravity dam on the Columbia River built to produce hydroelectric power and provide irrigation water. Grand Coulee is the largest power station in the United States in terms of potential production and number five in actual production. The project is also a major source of irrigation. Water is pumped from Lake Roosevelt to a feeder canal Banks Lake. Currently, the Columbia Basin Project irrigates 670,000 acres with a potential for 1.1 million acres. Over 60 different crops are grown within the project and distributed throughout the United States. The dam has become a tourist attraction. The visitor center contains historical photos, geological samples, turbine and dam models, and a theater. On summer evenings, the laser light show at Grand Coulee Dam is projected onto the dam's wall. Banks Lake: Banks Lake is a 27-mile long reservoir. At the north end of Banks Lake are Grand Coulee and Electric City. Steamboat Rock State Park is in the north-central portion. The town of Coulee City is at the south end of the lake. It is also a tourist destination offering boating, finishing, picnicking, camping, hunting and swimming. .
Recommended publications
  • Dry Falls Visitor Center Due to the Fact That Many Travelers Saw These Unusual Landforms in the Landscape As They Drove the Coulee Corridor

    Dry Falls Visitor Center Due to the Fact That Many Travelers Saw These Unusual Landforms in the Landscape As They Drove the Coulee Corridor

    Interactive Design Approach IMMERSIVE Theater Topo Model The design approach for the exhibits is closely integrated with the Seating architecture. The layering of massive, linear building walls pro- for 50-60 EXHIBIT vides a direction for the design and layout of exhibit components. Gallery Real ‘Today’ erratic OUTDOOR Terrace Building walls are cut open at strategic points to accommodate WITH EXhibits specific exhibits and to allow for circulation. Smaller, wall-panel exhibits are used for supports and dividers. Equipment ‘Volcanic ‘Ice Age Floods’ Room Period’ Approaching the center, visitors are forced to walk around a mas- sive erratic – these huge boulders are seemingly deposited directly Gallery Animal Modelled erratic Lava flow overhead Freestanding time line animal cutouts on the path to the front door. The displaced rock serves as a strong Welcome in floor icon of the violent events that occurred during the Ice Age Floods. Through the Visitor Center’s front doors, visitors are startled to see another massive erratic precariously wedged overhead between W M Retail / cafe the two parallel building walls. Just out of reach it makes an un- usual photo opportunity for visitors who puzzle over how the rock terrace stays in place. From an interpretive standpoint, it is important to Outdoor Classroom realize no actual erratics are present in the Sun Lakes-Dry Falls with Amphitheater State Park landscape. During the floods, water was moving too quickly for erratics to be deposited at Dry Falls - they were car- ried downstream and deposited in the Quincy and Pasco basins many miles away. However, the results of the visioning workshop determined that erratics are an important and exciting flood fea- ture to display at the Dry Falls Visitor Center due to the fact that many travelers saw these unusual landforms in the landscape as they drove the Coulee Corridor.
  • Millersylvania State Park

    Millersylvania State Park

    STEAMBOAT ROCK STATE PARK MANAGEMENT PLAN November 2010 Washington State Parks’ Mission: The Washington State Parks and Recreation Commission acquires, operates, enhances, and protects a diverse system of recreational, cultural, and natural sites. The Commission fosters outdoor recreation and education statewide to provide enjoyment and enrichment for all and a valued legacy to future generations. Steamboat Rock State Park Management Plan Page 1 ACKNOWLEDGMENTS AND CONTACTS The Washington State Parks and Recreation Commission gratefully acknowledges the many stakeholders and the staff of Steamboat Rock State Park who participated in public meetings, reviewed voluminous materials, and made this a better plan because of it. Plan Author Andrew Fielding, Environmental Planner, Eastern Region Steamboat Rock State Park Area Management Planning Team Tom Poplawski, Steamboat Rock State Park Manager Jim Harris, Eastern Region Director Tom Ernsberger, Eastern Region Operations Manager Brian Hovis, Administrator, Policy and Governmental Affairs, Olympia Headquarters Bill Fraser, Parks Planner, Eastern Region Andrew Fielding, Environmental Planner, Eastern Region Washington State Park and Recreation Commission 1111 Israel Road SW, Olympia, WA 98504 Tel: (360) 902-8500 Fax: (360) 753-1591 TDD: (360) 664-3133 Commissioners (at time of land classification adoption): Fred Olson, Chair Joe Taller, Vice Chair Rodger Schmitt, Secretary Eliot Scull Lucinda S. Whaley Patricia T. Lantz Cecilia Vogt Rex Derr, Director Steamboat Rock State Park Management Plan
  • Top 35 Fishing Waters of Grant County

    Top 35 Fishing Waters of Grant County

    TOP35 FISHING WATERS In Grant County, Washington For more information, please contact: Grant County Tourism Commission P.O. Box 37, Ephrata, WA 98823 509.765.7888 • 800.992.6234 TourGrantCounty.com CONTENTS Grant County Tourism Commission The Top 35 Fishing Waters In Grant County, Washington PO Box 37 1. Potholes Reservoir (28,000 acres) .................................................1 Ephrata, Washington 98837 2. Banks Lake (24,900 acres) .......................................................2 TOP 3. Moses Lake (6,800 acres) .......................................................3 No part of this book may be reproduced in any 4. Blue Lake (534 acres) ...........................................................4 3 form, or by any electronic, mechanical, or other 5. Park Lake (338 acres) ...........................................................5 5 means, without permission in writing from the 6. Burke Lake (69 acres) ...........................................................6 Grant County Tourism Commission. 7. Martha Lake (15 acres) ..........................................................7 FISHING 8. Corral Lake (70 acres) ...........................................................8 © 2019, Grant County Tourism Commission Fifth printing, 10m 9. Priest Lake Pool (below Wanapum Dam) ...........................................8 WATERS 10. Hanford Reach (below Priest Rapids Dam) .........................................10 11. Rocky Ford Creek .............................................................11 In Grant County, Washington
  • John W. Keys III Pump-Generating Plant

    John W. Keys III Pump-Generating Plant

    U.S. Department of the Interior Bureau of Reclamation John W. Keys III Pump-Generating Plant The John W. Keys III Pump-Generating Plant pumps for irrigation and also provides important recreational water uphill 280 feet from Franklin D. Roosevelt Lake benefits to the region. to Banks Lake. This water is used to irrigate approxi- The pump-generating plant began operation in 1951. mately 670,000 acres of farmland in the Columbia Basin From 1951 to 1953, six pumping units, each rated at Project. More than 60 crops are grown in the basin and 65,000 horsepower and with a capacity to pump 1,600 distributed across the nation. cubic feet per second, were installed in the plant. Congress authorized Grand Coulee Dam in 1935, with In the early 1960s, investigations revealed the potential its primary purpose to provide water for irrigation. for power generation. Reversible pumps were installed to When the United States entered World War II in 1941, allow water from Banks Lake to flow back through the the focus of the dam shifted from irrigation to power units to generate power during periods of peak demand. production. It was not until 1943 that Congress autho- The first three generating pumps came online in 1973. rized the Columbia Basin Project to deliver water to the Two more generating pumps were installed in 1983; the farmers of central Washington State. final generating pump was installed in January 1984. Construction of the irrigation facilities began in 1948. The total generating capacity of the plant is now Components of the project include the pump-generating 314,000 kilowatts.
  • Wvter Action

    WVTER TO ACTION GRAND COULEE DAM AND LAKE ROOSEVELT U.S. BUREAU OF RECLAMATION- BONNEVILLE POWER ADMINISTRATION -U.S. NATIONAL PARK SERVICE ake Roosevelt has steadily gained in popularity as a summer tourist attraction. t High reservoir levels most years provide visitors with a rich variety of recreational opportunities. But many people are not aware of the full story behind Grand Coulee Dam and the great lake it created. This brochure explains the origin of Lake Roosevelt, why it was built and how it serves the people of the Pacific Northwest. It represents a unified effort on the part of the three federal agencies most involved in management and oversight of Lake Roosevelt and Grand Coulee Dam: the U. S. Bureau of Reclamation, the Bonneville Power Administration, and the U.S. National Park Service. Who's responsible for what? The U.S. Bureau of Reclamation built and operates the Columbia Basin Project including Grand Coulee Dam. While many parties with diverse needs and interests provide input in the pro­ ject's operation, Reclamation makes the final decisions. To contact a repre­ sentative of Reclamation, call (509) 638-1360 or write to Grand Coulee Project Office, Attention: Code 140, Grand Coulee, Washington 99133. The Bonneville Power Administration markets and distributes power gener­ ated at federal dams on the Columbia River and its tributaries. In 1980, a new federal law charged BPA with ensuring that the Northwest has an adequate sup­ ply of power, whether from hydroelectric dams or other generating resources. BPA schedules power generation at Grand Coulee Dam within constraints established by Reclamation that provide for the project's multipurpose benefits.
  • Banks Lake Drawdown Environmental Impact Statement

    Banks Lake Drawdown Environmental Impact Statement

    Banks Lake Drawdown Final Environmental Impact Statement U.S. Department of the Interior Upper Columbia Area Office Bureau of Reclamation Ephrata Field Office Pacific Northwest Region Ephrata, Washington Boise, Idaho May 2004 MISSION STATEMENTS The mission of the Department of the Interior is to protect and provide access to our Nation’s natural and cultural heritage and honor our trust responsibilities to Indian tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Final Environmental Impact Statement Banks Lake Drawdown Douglas and Grant Counties, Washington Lead Agency: U.S. Department of the Interior Bureau of Reclamation For further information contact: Jim Blanchard Special Projects Officer Ephrata Field Office Bureau of Reclamation Box 815 Ephrata, WA 98823 (509) 754-0226 The Action Alternative describes the resource conditions that would occur with Banks Lake water surface elevations between 1570 feet and 1560 feet, while the No Action Alternative describes the conditions that would occur without the action, with water surface elevation between 1570 feet and 1565 feet. Both the No Action and Action Alternatives include four potential operational scenarios that could occur annually within their respective ranges, depending upon the hydrology of any given year. Both alternatives include refilling the reservoir to elevation 1570 feet by September 22. The No Action Alternative is the preferred alternative. The draft environmental impact statement provided Reclamation’s determination that the Action Alternative “may affect but is not likely to adversely affect” the federally listed bald eagle (Haliaeetus leucocephalus) and would have no effect on the federally listed pygmy rabbit (Brachylagus idahoensis) or Ute ladies’-tresses (Spiranthes diluvialis).
  • Carlson-Duncan-Johnson Grand Coulee 2004

    Carlson-Duncan-Johnson Grand Coulee 2004

    PNNL-14998 Characterization of Pump Flow at the Grand Coulee Dam Pumping Station for Fish Passage, 2004 TJ Carlson JP Duncan RL Johnson FINAL REPORT March 31, 2005 Prepared for the Bonneville Power Administration under a Related Services Agreement with the U.S. Department of Energy Contract DE-AC05-76RL01830 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORY operated by BATTELLE for the UNITED STATES DEPARTMENT OF ENERGY under Contract DE-AC05-76RL01830 Printed in the United States of America Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831-0062; ph: (865) 576-8401 fax: (865) 576-5728 email: [email protected] Available to the public from the National Technical Information Service, U.S.
  • Mars Pathfinder Landing Site Workshop Ii: Characteristics of the Ares Vallis Region and Field Trips in the Channeled Scabland, Washington

    Mars Pathfinder Landing Site Workshop Ii: Characteristics of the Ares Vallis Region and Field Trips in the Channeled Scabland, Washington

    /, NASA-CR-200508 L / MARS PATHFINDER LANDING SITE WORKSHOP II: CHARACTERISTICS OF THE ARES VALLIS REGION AND FIELD TRIPS IN THE CHANNELED SCABLAND, WASHINGTON LPI Technical Report Number 95-01, Part 1 Lunar and Planetary Institute 3600 Bay Area Boulevard Houston TX 77058-1113 LPI/TR--95-01, Part 1 "lp MARS PATHFINDER LANDING SITE WORKSHOP II: CHARACTERISTICS OF THE ARES VALLIS REGION AND FIELD TRIPS IN THE CHANNELED SCABLAND, WASHINGTON Edited by M. P. Golombek, K. S. Edgett, and J. W. Rice Jr. Held at Spokane, Washington September 24-30, 1995 Sponsored by Arizona State University Jet Propulsion Laboratory Lunar and Planetary Institute National Aeronautics and Space Administration Lunar and Planetary Institute 3600 Bay Area Boulevard Houston TX 77058-1113 LPI Technical Report Number 95-01, Part 1 LPI/TR--95-01, Part 1 Compiled in 1995 by LUNAR AND PLANETARY INSTITUTE The Institute is operated by the University Space Research Association under Contract No. NASW-4574 with the National Aeronautics and Space Administration. Material in this volume may he copied without restraint for library, abstract service, education, or personal research purposes; however, republication of any paper or portion thereof requires the written permission of the authors as well as the appropriate acknowledgment of this publication. This report may he cited as Golomhek M. P., Edger K. S., and Rice J. W. Jr., eds. ( 1992)Mars Pathfinder Landing Site Workshop 11: Characteristics of the Ares Vallis Region and Field Trips to the Channeled Scabland, Washington. LPI Tech. Rpt. 95-01, Part 1, Lunar and Planetary Institute, Houston. 63 pp.
  • Coumbia Basin JUN 29 2016 Banks Lake App.Pdf

    Coumbia Basin JUN 29 2016 Banks Lake App.Pdf

    Generation from Irrigation 457 1st Avenue NW Bus: (509) 754-2227 P.O. Box 219 Fax: (509) 754-2425 Ephrata, WA 98823 June 29, 2016 ELECTRONIC FILING The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N. E. Washington, D. C. 20426 Re: Banks Lake Pumped Storage Project FERC No. 14329-000, Application for Extension of the Preliminary Permit and Sixth Six-month Progress Report Dear Secretary Bose: The Federal Energy Regulatory Commission (FERC) issued the preliminary permit for Columbia Basin Hydropower’s1 (CBHP) Banks Lake Pumped Storage Project, FERC No. 14329 (Project) on August 22, 2013 with an effective date of August 01, 2016. The current preliminary permit expires on July 31, 2016. CBHP requests a two-year extension of the preliminary Permit to July 31, 2018. Supporting information is provided below, as well as within the attached Preliminary Permit Amendment Application as required under 18CFR §4.82. This Application for Extension of the Preliminary Permit serves also as the Sixth Six-month progress report. Background Six-month progress reports for this proposed hydroelectric project were submitted on January 9, 2014; July 18, 2014; January 22, 2015; July 8, 2015 and January 15, 2016. Each of these progress reports, along with this filing, details CBHP’s studies and consultations necessary to determine the feasibility of the project and to support an application for a license. Preferred Alternative for Analysis The preliminary permit identifies two potential alternatives for development at Banks Lake. Through investigations already completed and as reported in the Fourth and Fifth progress reports, July 8, 2015 and January 15, 2016 respectively, CBHP determined that Alternative 2 was not practical for a pumped storage project.
  • Banks Lake Pumped Storage Project (North Dam Site) FERC Project No

    Banks Lake Pumped Storage Project (North Dam Site) FERC Project No

    Phil Rockefeller W. Bill Booth Chair Vice Chair Washington Idaho Tom Karier James Yost Washington Idaho Henry Lorenzen Pat Smith Oregon Montana Bill Bradbury Jennifer Anders Oregon Montana September 9, 2015 MEMORANDUM TO: Council Members FROM: Elizabeth Osborne and Gillian Charles SUBJECT: Proposed Pump Storage Project at Banks Lake BACKGROUND: Presenter: Tim Culbertson, Manager, Columbia Basin Hydropower Summary: Tim Culbertson will brief the Council on a potential pumped storage project at Banks Lake and Lake Roosevelt being studied by Columbia Basin Hydropower and other partners. He will discuss the purpose of the project, preliminary costs, current status and expected timeline. Columbia Basin Hydropower, formally the Grand Coulee Project Hydroelectric Authority, is the result of an agreement between the East Columbia Basin Irrigation District, Quincy Columbia Basin Irrigation District, and South Columbia Basin Irrigation District, to develop, operate, and maintain hydroelectric generating facilities on the irrigation systems of the Columbia Basin Project. To date, Columbia Basin Hydropower operates and maintains five power developments and provides Federal Energy Regulatory Commission liaison support for two power developments. In April 2015, Columbia Basin Hydropower concluded a pre-feasibility study for a pumped storage project at Banks Lake, near Grand Coulee Dam, which would provide up to 1,000 MW generating capacity. The study included a preliminary analysis of the costs and benefits of the project. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161 www.nwcouncil.org Fax: 503-820-2370 Overall, the project could provide greater value than other similarly-sized pumped storage projects because of its large reservoir sizes and because the project would not require construction of new dams or reservoirs, but could also have higher installation costs.
  • Lake Roosevelt and the Case of the Channeled Scablands

    Lake Roosevelt and the Case of the Channeled Scablands

    Lake Roosevelt and the Case of the Channeled Scablands Lake Roosevelt National Park Service National Recreation Area U.S. Department of the Interior As you drive toward your summer camping destination at Lake Roosevelt, you spot a giant house-sized, granite rock sitting in the middle of a wheat field. You wonder, “How did that get there?” Later you notice the landscape is dotted with patches of barren black rock and in some areas long deep channels, called coulees, slice through that basalt rock. You find it odd. “What caused that?” How’d that get there? You have just stumbled upon the Case of the Channeled Scab- lands. The deep coulees, barren scablands, the dry falls and the other unusual formations are all a part of the geologic mystery of Lake Roosevelt: a mystery that has puzzled geologists for ages. In the early 20th century, geologists pieced together clues from the rocks in Eastern Washington and came up with two possible explana- Puzzle Piece: Glacial erratic. tions for the curious geologic formations in the area. One group of geo- (Image: National Park Service) sleuths believed that glaciers had created the curiosities, while the other group thought a giant river had carved the landscape. Both groups believed that the scabland case had been wrapped up. Like all good detectives, the geo-sleuths based their investigation on some Words to Know established principles: Igneous rock - Geologic Principle One: Uniformitarianism. Geologic solidified molten change is gradual. It takes millions of years to change the material. Volcanic rocks landscape except when volocanos, earthquakes or floods are involved.
  • Appendix E Shoreline Characterization, City of Grand Coulee

    Appendix E Shoreline Characterization, City of Grand Coulee

    APPENDIX E SHORELINE CHARACTERIZATION, CITY OF GRAND COULEE Appendix E The City of Grand Coulee Shoreline Master Program Update Shoreline Inventory, Analysis, and Characterization Report 1 SHORELINE INVENTORY Appendix E contains the Inventory, Analysis, and Characterization results for the City of Grand Coulee (City). Section 1 describes the land use patterns of the City, specifically detailing: Existing land use Planned land use based on the City’s Comprehensive Plan Preferred use for shoreline areas based on the Shoreline Management Act (SMA) Existing shoreline environment designations based on the City’s current Shoreline Master Program (SMP), if one exists Section 2 summarizes the land-capacity analysis results. Section 3 summarizes the characterization of each shoreline reach within Grand Coulee. The following reaches are included: Banks Lake Crescent Bay Lake Roosevelt 1.1 Land Use Patterns 1.1.1 Existing Land Use The City and the Urban Growth Area (UGA) have about 81 acres of shoreline along Banks Lake, Crescent Bay, and Lake Roosevelt. Most of the shoreline is open space and owned by federal, state, or local governments. Public ownership includes the following: National Parks Service (NPS) U.S. Bureau of Reclamation (USBR) Existing uses include roads, single-family residences, and trail and recreational activities in open spaces. Final Draft Shoreline Inventory and Characterization Report June 2013 Grant County Shoreline Master Program Update 1 110827-01.01 Appendix E 1.1.2 Planned Land Use The City's Comprehensive Plan (plan) provides a 20-year growth plan for the City. It guides the growth and development of the community. The Land Use Element of the plan is intended to provide land for planned growth of the community.