APPENDIX 1 (See Paragraph - 6) FORM 1 (I) Basic Information
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX 1 (See paragraph - 6) FORM 1 (I) Basic Information: SN Item Details 1 Name of the Project/s M/s S L R METALIKS LIMITED, Sy no 632, 635 & others, Narayandevarakere Village, Lokappanahola- 583 222. Near Mariyammanahalli, Hagaribommanahalli Tq., Bellary Dist., Karnataka 2 S. No. in the Schedule Schedule-3(a) for Metallurgical industries (ferrous & nonferrous) as per EIA Notification dated 14th September 2006 and as amended in December 2009. 3 Proposed 1. Change of fuel from blast furnace gas to coal capacity/area/length/tonnage to be in the existing blast 6MW handled/command area/lease furnace gas based captive power plant area/number of wells to be drilled. 2. Reduction in capacity of 5500 Nm3/hr producer gas plant to 3. Change of fuel in 50 TPH Reheating furnace from Furnace oil to blast furnace gas. 4 New/Expansion/Modernization Change of fuel from blast furnace gas to coal in the existing blast furnace gas based captive power plant. Reduction in capacity of producer gas plant from 15,000Nm3/hr to 5,500Nm3/hr. Change of fuel in Reheating furnace from Furnace oil to blast furnace gas. 5 Existing capacity/Area etc. PRODUCTS QANTITY Pig Iron 2,10,000 TPA UNITS CAPACITY Blast Furnace 1 x 262 m3 Sinter Plant 1 x 33 m2 Pig Casting Machine 2 x 500 TPD BF Gas based captive 1 x 6 MW Power Plant 6 Category of Project i,e ‘A’ or ‘B’ Category A of Schedule-3(a) for primary Metallurgical industries (ferrous & nonferrous) as per of EIA Notification dated 14th September 2006 and as amended in December 2009. 7 Does it attract the general condition? No 1 If yes, please specify. 8 Does it attract the specific condition? No If yes, please specify. 9 Location Sy no 632, 635 & others Narayandevarakere Village, Lokappanahola, Near Mariyammanahalli, Hagaribommanahalli Tq., Bellary Dist., Karnataka - 583 222. Plot/survey/khasra No. Sy no 632, 635 & others Village Narayandevarakere, Lokappanahola, Tehsil Hagaribommanahalli District Bellary State Karnataka 10 Nearest railway station/airport along Nearest Railway Station: Vyasanakere, 7.2km, with distance in kms. NE direction. Nearest Airport: Hubli, 140 km, West direction. 11 Nearest Town, City, District Head Nearest Village: Lokappanahola: 1.5 km Quarters along with distance in kms. Nearest Town: Hospet – 9.2 km, NE direction. District Head Quarters : Bellary, 70 km, NE direction 12 Village Panchayats, Zilla Parishad, Marabbihalu Village Panchayat, , Municipal Corporation, Local body Bellary zilla parishad, Hagaribommanahalli Taluk (Complete postal addresses with Bellary District, Karnataka State. telephone nos. to be given) 13 Name of the applicant M/s S L R METALIKS LIMITED, Narayandevarakere Village, Lokappanahola, Near Mariyammanahalli, Hagaribommanahalli Tq., Bellary Dist., Karnataka- 583 222. 14 Registered Address M/s S L R METALIKS LIMITED A-2/452, sector 8,Rohini, New Delhi-110085 15 Address for correspondence : Name Shri. K.C.Siddappa Designation (Owner/partner/CEO) Director & CEO Address M/s S L R METALIKS LIMITED, Narayandevarakere Village, Lokappanahola, Near Mariyammanahalli, Hagaribommanahalli Tq., Bellary Dist., Karnataka- 583 222. Pin Code 583 222. E-mail [email protected], [email protected] Telephone No. 8394 294061 Fax No. 8394 294215 16 Details of alternative sites examined, Not Applicable if any. Location of these sites should be shown on a topo sheet. Village- District-State 17 Interlinked Projects Not Applicable 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If yes, date of submission Not Applicable 2 20 If no, reason Not Applicable 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, Not Applicable. 1980? (b) The wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any Government NO Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation Not Applicable pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (ii) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Yes Details thereof (with approximate Sl. Information/Checklist or quantities /rates, wherever possible) No. confirmation No with source of information data Permanent or temporary change The additional coal handling facility will in land use, land cover or be installed in the vacant area within 1.1 topography including increase in existing unit. Yes intensity of land use (with respect No other significant change in land cover to local land use plan) or topography. Clearance of existing land, It does not require clearance of existing 1.2 NO vegetation and buildings? land, vegetation or buildings. Agriculture land acquired for industrial 1.3 Creation of new land uses? Yes use through KIADB Pre-construction investigations are already done and the site is suitable for the activity. S.B.C. is 120 T/m2 and ground water level is 80-120 m below the existing ground level. Soil structure is Pre-construction investigations 1.4 Yes clay loamy. e.g. bore, houses, soil testing? i. Pre soil index 32 % ii. CBR 19 – 24 % iii. Dry density 1.9 iv. OMC 12% v. Grain size 3 Gravel 23 %, Sand 41 %, Silt & clay 36 % Construction works include excavation for foundation of plant machinery a maximum of 4 m depth, above ground buildings of maximum 10 m height for 1.5 Construction works? Yes accommodating the plant-machinery. The construction is in concrete, brick work, steel structure and light sheet roofs. 1.6 Demolition works? No Nil A maximum of 50 workers will be Temporary sites used for engaged during construction of proposed 1.7 construction works or housing of No expansion project. These workers stay at construction workers? nearby villages. No need of temporary site for the construction workers. Factory Buildings will be above the Above ground buildings, ground. The foundations will be just structures or earthworks including 1.8 Yes below the ground level depending on the linear structures, cut and fill or load data & design. Small amount of cut excavations & fill or excavations works is needed. Underground works including 1.9 NO Nil mining or Tunneling? 1.10 Reclamation works? NO Nil 1.11 Dredging? NO Nil 1.12 Offshore structures? NO Nil COAL BASED POWER PLANT (1X 6.0 MW) Existing turbine & auxiliary units will be retained, only coal fired boiler & coal handling system will be installed to utilize the coal for power generation. Producer gas plant (5500 Nm3/hr) Production and manufacturing Extended shaft coal gasifier will be 1.13 YES processes? installed to generate producer gas. Reheating furnace (50TPH) (Rolling mill) Reheating furnace is used in hot rolling mills to heat the steel to temperatures of around 1200 deg C which is suitable for plastic deformation of steel and hence for rolling in the mill. Gr Storage yards for raw material. Yards are compacted and lined with 150 mm thick concrete bed. A. Raw Material Storage yards (Total -- Facilities for storage of goods or acre) 1.14 YES materials? Coal storage area 1.Coal fired boiler – 0.6 acre 2. PGP - 0.3 acre Total - 0.9 acre 4 I. Solid Waste 1. Fly ash – will be used for brick making 2. Bottom ash- will be used for brick making II. Liquid effluents 1. Tar – sold to authorized vendor 2. Cooling water and blow down water - Reused in the PCM & SGP 3. Softener Effluent from DM water - Reused in the PCM & YES SGP 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Water is used mainly as make up in cooling / boiling applications in the plant. Most of the water used in the industry is lost as drift/evaporation in cooling systems. Effluent is generated mainly from cooling water blow down and domestic source. TREATMENT & UTILIZATION A. Cooling waste water & Boiler blow down These effluents contain high dissolved solids and therefore collected in a sump and Reused in the PCM & SGP process. Most of the workers stay at near by villages and towns. Factory vehicles are Facilities for long term housing of provided for transport of employees to 1.16 NO operational Workers? Hospet. Quarters are provided at the site for essential employees. Total persons residing in quarters will be about 30. Only roads are used for traffic during New road, rail or sea traffic during construction and operation. Traffic during 1.17 NO Construction or operation? construction will be about 50 persons/d and during operation 25 persons/d. The site is 4.3 km S from S.H.-25 joining Hospet and Harihar. NH-13 is 6.5 km E New road, rail, air waterborne or from the site. Existing roads will be used other transport infrastructure during construction and operation period 1.18 NO including new or altered routes & for movement of personnel & material. Stations, ports, airports etc? No new roads or other infrastructure is required. Closure or diversion of existing transport routes or infrastructure 1.19 NO Nil leading to changes in traffic Movements? 1.20 New or diverted transmission lines NO Nil 5 or pipelines? Impoundment, damming, culverting, realignment or other 1.21 NO Nil changes to the hydrology of Watercourses or aquifers? 1.22 Stream crossings? NO Nil Abstraction or transfers of water 1.23 NO Nil form ground or Surface waters? Changes in water bodies or the 1.24 land surface Affecting drainage or NO Nil run-off? Transport of personnel or materials for Construction, YES operation or decommissioning? Workers engaged during construction of project will be about 50.