PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining area of 3.000Ha. in survey No. 517 of Machapuram Village, Devanakonda Mandal, District has been leased to Sri.A.Rama Swamy for a period of 10 years by Deputy Director of Mines & Geology, Kurnool vide Proceedings No. 4672/Q1/2008 dated: 06-11-2008.

The proposed area is not fit for agriculture and the Department of Mines and Geology indicate that the subject area has mineral deposits for extraction. The salient features of the project are given Table 1.1.

Table 1.1 The Salient Features of the Project Project Name Road Metal of Sri.A.Rama Swamy Mining Lease Area 3.000Ha Location of Mine MachapuramVillage, Devanakonda Mandal, , . Toposheet number 57E/10 Proposed production of mine 10260 Cu.m / annum Method of mining Opencast semi mechanized mining Drilling/Blasting Controlled Blasting and drilling is proposed. No. of working days 300 days Water demand 5.0 KLD Sources of water Water will be supplied from bore wells of the nearby area Man power 34 Nearest railway station Aspari Railway station – 30.0 km (SW)

Nearest airport Rajiv Gandhi International Airport - 197km (N)

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

2.1 Identification of Project and Project Proponent The Quarrying area for Road Metal has been leased to Sri.A.Rama Swamy in Machapuram Village, Devanakonda Mandal, Kurnool District by the Deputy Director of Mines & Geology, Kurnool, over an extent of 3.000Ha. for a period 10 years.

Sri.A.Rama Swamy has proposed the project located in the above mentioned notified area and the firm has been in this business since the last 10 years.

PFR-I

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

2.2 Brief Information about the Project The mining lease area of 3.000Ha. is located in Government land. Open cast semi mechanized mining is followed and it has been proposed to produce approximately 10260 Cu.m / annum of building stone material. The nearest habitation is Nellibanda village, which is at a distance of 1.5 km.

2.3 Need for the Project and Its Importance to the Country or Region The demand for building stone has increased due to rapid industrialization and growth in infrastructure. So the number of building stone producing quarries is increasing in India. Building Stone and M-Sand have to produce as they form the aggregate in the concrete mixture used in the construction industry. The Indian Railways also requires the material for the maintaining the existing network and also for the never ending expansion.

As per EIA notification 2006 project proponent is submitting the proposal to get Clearance for production capacity of 10260 Cu.m / annum from District Level Environmental Appraisal Committee/District level Impact Assessment Authority of Andhra Pradesh constituted by MoEF&CC, GOI for the purpose of grant of quarry lease for which Notification is issued.

2.4 Demands-Supply Gap There is huge demand since the material is used extensively in Construction, Railways, Roadways and many other sectors. This project will help in reducing the Demand- Supply gap in the area.

2.5 Domestic/ Export Markets The material is used in the domestic market and in there is no scope for exporting the material.

2.6 Employment Generation Proposed mining is semi mechanized method and this project operation will provide livelihood to the 34 workers. It will provide employment to the people residing in vicinity.

PFR-II

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

3.0 PROJECT DESCRIPTION

3.1 Type of Project Including Interlinked and Interdependent Projects, If Any. The proposed mine area is of 3.000Ha. area, No interlinked projects are associated with this project.

3.2 Location of the project The mining lease area is located in Survey No. 517 of Machapuram Village, Devanakondau Mandal, Kurnool district, Andhra Pradesh. The mine lease area falls in Survey of India Toposheet No.: 57 E/10

Google map is given in Figure-1. Topographical Map of 10km Radius in Figure -2

PFR-III

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

Figure 1 Google Map of the Study Area

PFR-IV

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

Figure 2 Topographical Map of 10km Radius

PFR-V

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

3.3 Details of Alternate Sites No alternate site was considered as the project is mineral specific and site specific.

3.4 Size or magnitude of operation The mine has lease over an area of and the 3.000Ha. production rate is 10260 Cu.m / annum. The lease follows open cast semi mechanized mining.

3.5 Geology and Reserves

3.5.1 Topography Topographically the Q.L. area is a hillock gently slopes towards West direction. Generally it is low lying plain land with an average altitude of 426m to 453m above M.S.L. and dendritic to sub dendritic drainage is observed.

3.5.2 Geology The Geological formations in the Kurnool District can broadly be divided in two distinct and well marked groups and older group of Metamorphic rocks belonging to Archean and Younger group of Sedimentary rocks belonging to the Proterozoic age the later cover part of Gondwana block. The remaining parts of District are occupied by Archean Rocks which consist of Schist, Gneisses, Quartz veins and basic dykes. The Archean rocks have suffered considerable degree of tectonic disturbances, as a result of which the rocks have been metamorphosed and recrystallized.

Stratigraphic Sequences established in the area is as follows:-

Geological age Litho logy Recent Alluvium Pleistocene Laterite ------Unconformity------Younger intrusive, epidote veins, quartz veins and reefs. Pegmatite’s veins of Alkali Feldspar granite and syenite Dolerite / Gabbro / Basalt dykes Leuco Granite Nebulitic to homophonous biotite granite Peninsular gneissic complex (Migmatite group) Nebulitic to homophonous Hornblende Granite and Leuco Hornblende granite

PFR-VI

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

Archean Biotite Granite Gneiss, Hornblende Granite Gneiss, Porphyritic Hornblende Road Metal

3.5.3 Exploration Since this is a fresh mine no existing work has been done.

Reserves Geological reserves are given below in Table 3.1.

Table 3.1-Details of Reserves

Reserves @ Rock Wastage@ Category 95% in M³ 5% in M³ Proved (A-A)’ 228342 12018 Proved (B-B’) 256115 13480 Total 484457 25498 After Buffer Zone 411782 21673 After Slope Deduction 359456 18919

Total Mined Reserves of Road Metal = 31000m3 Net Mineable Reserves of Road Metal Q L. area= 359456-31000 M3 = 328456 m3 Life of the Quarry: Mineable reserves/Annual production=328456/10260= 32.0 years *(Source: Mining plan)

3.6 PROJECT DESCRIPTION WITH PROCESS DETAILS

3.6.1 Method of Mining The quarrying in the sanctioned area is of open cast method other than fully mechanized mining method with drilling and blasting. The ROM will be sized and sorted in the crusher established outside the quarry lease area loaded on to tippers and tractors using JCB, Mining will be carried out by formation of benches of height 6 m each. Considering the technical parameters like surface topography, quality variations, geo-technical aspects are required for production and extraction of building material in the area. It is proposed to work from the deposit by adopting benches formations with ultimate pit

PFR-VII

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

slope of 45°. The benches height and the width will be maintained as specified by D.G.M.S. The width of the working benches shall not be less than the height. The year wise production and development plan indicates the site for disposal of waste, site for afforestation as shown in map. The plan showing position of the working pit proposed for extension etc. Due care has to be taken in designing the benches and advancing the benches for production. The ground water table is much below the proposed working level.

Production parameters

The Mineral production target for two years is given in Table 3.2

Table 3.2 Year wise Granite Production Programme Reserves Bench Year Height Road Metal Waste in Cu.m Cu.m 1st year 6m 10260 513 2nd year 6m 10260 513 Total 20520 1026 *Source: Mine plan

The machinery used to carry out the mining operations are given Table 3.3

Table 3.3 Mining Machinery Purpose Type of Capacity & Make Machinery Nos Breaking Crawler drill 4.5" 100 mm dia Atlascapco/cp 450cfm/2nos Loading Loader/Excavator lno. Haulage Tippers 25-tonner, 2nos Water tanker Tractor type 1 no

PFR-VIII

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

3.7 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Product/s, Mode of Transport of Raw Material and Finished Product No raw material will be required in the proposed project. The operation involves the extraction of material and dumping in stock yard. Loading of the building stone material will be done mechanically by tippers and transported from the quarry to the required site. The rejected material will be dumped separately.

3.7.1 Use of Mineral The extracted material will be used in Construction, Railways, Road ways and many other sectors

3.7.2 Processing No processing at site is involved.

3.8 Resource Optimization/ Recycling and Reuse Not envisaged.

3.9 Availability of Water Its Source, Energy/ Power Requirement and Source

3.9.1 Water Requirement Water is required only for drinking purposes and dust suppression. The number of working people is around 34 so the total water requirement will be around 5.0 KLD. This water will be supplied from bore wells of nearby area.

3.10 Quantity of Wastes to be Generated (Liquid and Solid) And Scheme for their Management/ Disposal

3.10.1 Solid Waste Generation& its Disposal There is no mineral reject or sub-grade mineral in this quarry. However, about 5% interstitial voids and intercalated waste is anticipated which is computed separately. This will be utilized for the formation of internal roads and balance utilized to form a barrier all along the 7.5m buffer zone of the QL applied area to a height of 27m.

3.10.2 Liquid Effluent No liquid effluent will be generated at the mine site. The domestic wastewater generated will be sent to septic tanks followed by soak pits.

4.0 SITE ANALYSIS 4.1 Connectivity

PFR-IX

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

4.1.1 Nearest Railway Station Aspari railway station is about 30 km distance towards SW from the mine area.

4.1.2 Nearest Airport Rajiv Gandhi International Airport is about 197 km distance from mine site.

4.2 LANDFORM, LANDUSE AND LAND OWNERSHIP The notified area is Government land. It is barren with boulders and followed sheet rock is exposed in the area and also sheet rock is seen in the surface level with soil cover..

4.3 Climatic data from secondary sources The average annual rainfall is about 529.6 mm. The observed maximum temperature is 380Cin summer season and minimum temperature is 180C in winter seasons. The rainfall does not disturb the mining activities. Moderate wind velocities, prevailed in north east to south west direction.

5.0 PLANNING BRIEF 5.1 Planning Concept The quarrying in the sanctioned area is of open cast method other than fully mechanized mining method with drilling and blasting. The ROM will be sized and sorted in the crusher established outside the quarry lease area loaded on to tippers and tractors using JCB, Mining will be carried out by formation of benches of height 6 m each. Considering the technical parameters like surface topography, quality variations, geo-technical aspects are required for production and extraction of building material in the area. It is proposed to work from the deposit by adopting benches formations with ultimate pit slope of 45°. The benches height and the width will be maintained as specified by D.G.M.S. The width of the working benches shall not be less than the height. The year wise production and development plan indicates the site for disposal of waste, site for afforestation as shown in map. The plan showing position of the working pit proposed for extension etc. Due care has to be taken in designing the benches and advancing the benches for production. The ground water table is much below the proposed working level.

5.2 Population projection The project will employ mostly workers from nearby villages. There will not be any increase in population due to the project.

5.3 Land use planning The project site is Government land. There will be change in landuse as the material is excavated.

PFR-X

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

5.4 Assessment of Infrastructure Demand (Physical & Social) On the basis of the preliminary site visit, the infrastructure demand in the villages was assessed on the basis of need and priority. The existing infrastructure is satisfactory but the approach road has to be maintained regularly.

5.5 Amenities/Facilities Site Services like Work shed, First Aid, Drinking water as required will be provided within the leased area.

6.0 PROPOSED INFRASTRUCTURE

6.1 Industrial Area (Processing Area) No infrastructure is proposed.

6.2 Residential Area (Non Processing Area) As the local persons will be given employment, no residential area/ housing is proposed within the mining lease area.

6.3 Green Belt Green belt will be developed along the boundaries of mine lease area.

6.4 Water Management About 1.5 KLD will be required dust suppression and 1.5 KLD for greenbelt purpose, 1.0 KLD is for processing, 1.0 KLD for Domestic use, therefore total water requirement is 5.0 KLD. This water will be supplied from bore wells of the nearby area.

6.5 Sewerage System The domestic wastewater generated will be sent to septic tanks followed by soak pits.

6.6 Industrial Waste Management Not applicable.

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN Not Applicable.

8.0 PROJECT SCHEDULE & COST ESTIMATES The Total cost of project would be around Rs. 40 Lakhs.

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

PFR-XI

PROJECT: Road Metal PRE-FEASIBILITY REPORT APPLICANT: Sri. A.Rama Swamy

9.1 Financial and Social Benefits with Special Emphasis on the Benefit to the Local People Including Tribal Population, If Any, In the Area. The extraction of the material will be done in open cast method other than fully mechanized mining method with drilling and blasting. So local labour will be used. Supporting ancillary facilities will help the local people once the project commences. ***********

PFR-XII