Eglinton Crosstown Open House Panels Pt. 1
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Transit City Etobicoke - Finch West LRT
Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report - Appendices Transit City Etobicoke - Finch West LRT APPENDIX M – Consultation Record March 2010 March 2010 Appendix M Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report - Appendices 3.0 List of Interested Persons Participating in the Consultations 1.0 Introduction This appendix documents in detail the consultations carried out with the technical agencies, the public, Consultation was carried out to encourage technical agencies to provide input during the course of the and the First Nations communities. study. The following agencies were invited to be involved and provide comment on the TPAP study for the EFWLRT: 2.0 Description of Consultations and Follow-up Efforts The general public, government agencies and various interest groups were provided opportunities to Government Review Agencies Technical Agencies Canadian Environmental Assessment All Stream review and comment on this project during the course of the study. The City of Toronto Public Agency Consultation Team was involved in the overall public consultation process. They offered a wide range Environmental Canada MTA All Stream Inc. of communication methods to the public, including project web site, dedicated telephone number, fax, Department of Fisheries and Oceans Telus and email address for contacting the project team. Indian and Northern Affairs Canada Enwave Energy Corporation (INAC) Transportation Canada-Ontario Region Group Telecom/360 Network Technical agencies, including federal, provincial, municipal agencies, utilities, and potential interested Ministry of Aboriginal Affairs Hydro One Network Inc. -
Yonge Subway Extension Transit Project Assessment
Yonge Subway Extension Transit Project Assessment Councillors Briefing January 22, 2009 inter-regional connectivity is the key to success 2 metrolinx: 15 top priorities ● On November 28, 2008 Regional Transportation Plan approved by Metrolinx Board ● Top 15 priorities for early implementation include: ¾ Viva Highway 7 and Yonge Street through York Region ¾ Spadina Subway extension to Vaughan Corporate Centre ¾ Yonge Subway extension to Richmond Hill Centre ¾ Sheppard/Finch LRT ¾ Scarborough RT replacement ¾ Eglinton Crosstown LRT 3 …transit city LRT plan 4 yonge subway – next steps TODAY 5 what’s important when planning this subway extension? You told us your top three priorities were: 1. Connections to other transit 2. Careful planning of existing neighbourhoods and future growth 3. Destinations, places to go and sensitivity to the local environment were tied for the third priority In addition, we need to address all the technical and operational requirements and costs 6 yonge subway at a crossroads ● The Yonge Subway is TTC’s most important asset ● Must preserve and protect existing Yonge line ridership ● Capacity of Yonge line to accommodate ridership growth a growing issue ● Extension of Yonge/Spadina lines matched by downstream capacity ● Three major issues: 1. Capacity of Yonge Subway line 2. Capacity of Yonge-Bloor Station 3. Sequence of events for expansion 7 yonge-university-spadina subway – peak hour volumes 8 yonge subway capacity: history ● Capacity of Yonge line an issue since early 1980s ● RTES study conclusions (2001) ¾ -
Recent Achievements - (June 2013 to September 2013)
To: Metrolinx Board of Directors From: Robert Hollis Managing Director & Executive Vice President PRESTO Date: September 10th, 2013 Re: PRESTO Quarterly Report Recent Achievements - (June 2013 to September 2013) • Through the summer months, transit riders continued to embrace PRESTO and, as of August 26th, 2013, the system had reached more than 750,000 activated cards in circulation. On average, we’re welcoming 35,000 new PRESTO customers each month in the GTHA. o 75% of GO Transit riders are using PRESTO, making up the largest portion of the PRESTO customer base. • Ottawa’s OC Transpo continues its public deployment of PRESTO, with an average of more than 1,000 cards being distributed daily and over 167,000 total customers currently tapping on to an easier commute. The roll out program will run through October 2013, as 200,000 total cards will have been distributed to customers and the OC Transpo rollout will officially be complete. st o OC Transpo began offering a reduced rate fare on PRESTO as of July 1 . This reduced price is an incentive for customers to convert to PRESTO. th o As of Aug 15 , OC Transpo began charging the full $6 issuance fee for PRESTO cards. • PRESTO has also completed and launched The PRESTO Panel, a versatile and dynamic online market research tool. PRESTO began recruitment in August 2013, with a test group of registered customers who completed the 2012 Customer Satisfaction Survey. 130 Adelaide Street West, Suite 1500 130, rue Adelaide ouest, bureau 1500 Toronto, Ontario, Canada M5H 3P5 Toronto, Ontario, Canada M5H 3P5 o The PRESTO Panel provides customer feedback that can be used to generate a wealth of insights into the system, and drive improvements in a variety of areas. -
Attachment 4 – Assessment of Ontario Line
EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively. -
Transit Notice April 18, 2018
Transit Notice April 18, 2018 Harbourfront streetcar tunnel General maintenance Date: April 21 to April 23, 2018 Content/timeline accurate at time of printing Work description and purpose During the April 21 weekend, TTC staff will be working inside the Harbourfront streetcar tunnel to conduct rail and overhead inspections/maintenance and cleaning debris/sand along the tracks. TTC crews will be working at the Spadina/Queens Quay Loop to upgrade cables in the substation. City crews will be working in the streetcar right of way on Queens Quay to inspect underground hydro vaults. The City is also planning maintenance work on the Gardiner Expressway. Transit service changes (from 2 a.m. April 21 to 5 a.m. April 23) Temporary changes will be made to the 510/310 Spadina and 509 Harbourfront streetcar services and replacement buses will be employed to accommodate these work activities. 509 Harbourfront Replacement buses will operate over entire 509 Harbourfront route. 510/310 Spadina Streetcar 510/310 Streetcars will operate on Spadina Avenue from Spadina Station (at Bloor) to the Charlotte Loop. Some streetcars will operate to the King / Church intersection via King Street. 510/310 Spadina Buses See map for route details or visit ttc.ca for more information. 510 Spadina bus service will operate from Charlotte Loop to Spadina Loop via Bremner Boulevard and Rees Street. 310 Spadina bus service will operate from Charlotte Loop to King/Yonge intersection via Bay Street. Work hours Work will be around-the-clock to ensure the resumption of transit service on Monday morning. Efforts will be made to keep noise level to a minimum; noise will be evident when some equipment is in full operation. -
Transit City Progress Update
Toronto Transit City Light Rail Plan City – TTC Team Progress Update February, 2008 Transit City Progress Update CATEGORIES 1. Light Rail Lines and Facilities 2. Vehicles 3. System and Design Standards 4. Processes 1 Progress Update – Light Rail Lines and Facilities PRIORITIZATION OF LINES • report to Commission : November 14, 2007 • lines evaluated against 31 criteria • results: confirm top 3 priorities: – Sheppard East LRT – Etobicoke-Finch West LRT – Eglinton Crosstown LRT • endorsed by Commission, Metrolinx 2 Criteria for Evaluation of Transit City LRT Lines Line Performance: Environmental: • Ridership • Number of Car-Trips Diverted / Replaced – Existing • Reduction in Greenhouse Gases – Projected • Current Market Share / Mode Split • New Rapid Transit Coverage, Reach Constructability, Physical Challenges: – Area (hectares) – Population • Major Physical Challenges, Obstacles – Full-time Jobs • Municipal Right-of-Way Available – Part-time Jobs • Designated, Recognized in Official Plan • Major Generators • Community, Political Acceptance, Support – En Route • Access to Yard, Maintenance Facilities – Terminals – New (Annual) Passenger-Trips/Route-Kilometre – Total (Annual) Passenger-Trips/Route-Kilometre Capital Cost: • Cost/Rider • Construction, Property Costs • Vehicle Costs City- and Region-Building: • Pro-rated Maintenance Facility Costs • Supports MoveOntario 2020 Objectives • Total Cost/Kilometre • Supports Places to Grow Principles • Supports Toronto Official Plan Objectives – Serves Priority Neighbourhoods – Avenues – Re-urbanization -
376 Bathurst Street 2,500 - 4,724 SF MOVE-IN READY SUBLEASE
376 Bathurst Street 2,500 - 4,724 SF MOVE-IN READY SUBLEASE ANDREW BOYD JORDAN MORRISON OWEN LECKY Sales Representative, Principal Sales Representative Sales Representative 416.673.4052 416.673.4061 647.252.4166 [email protected] [email protected] [email protected] Partnership. Performance. avisonyoung.ca Highlights • Character-filled space with open concept setting and backyard patio • Kitchenette and common room consisting of ping pong table, flat screen TV and additional work area as seen shaded in yellow • Well serviced by public transit, situated on the 505 and 511 Streetcar line Details Floor Plan OPPORTUNITY Suite 201 RENTAL RATE Option 1: 4,724 sf Contact Listing Agent Option 2: 2,500 sf* (*as outlined in red) AVAILABILITY SUBLEASE TERM Immediate August 31, 2021 E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young Commercial Real Estate (Ontario) Inc., Brokerage Transit/Amenities Map 506 College Line 510 Spadina Line 376 BATHURST STREET 505 Dundas Line Vila Verde Churrasqueira 501 Queen Line 504 King Line 511 Bathurst Line Union Station E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young Commercial Real Estate (Ontario) Inc., Brokerage ANDREW BOYD JORDAN MORRISON OWEN LECKY Sales Representative, Principal Sales Representative Sales Representative 416.673.4052 416.673.4061 647.252.4166 [email protected] [email protected] [email protected] Partnership. Performance. E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young Commercial Real Estate (Ontario) Inc., Brokerage avisonyoung.ca. -
204 Spadina Avenue Newly Renovated Building - 5,521 SF (Divisible) for Lease: Office
204 Spadina Avenue Newly Renovated Building - 5,521 SF (divisible) For Lease: Office Here is where your business will grow. lennard.com 204 Spadina Avenue 5,521 SF Office Available for Lease near Dundas Street West and Spadina Avenue in Downtown West Property Highlights • Building signage available • Spadina Avenue streetcar at front door • Located in Downtown West • Substantially renovated • Excellent amenities nearby • Close proximity to many restaurants Available Space Availability Retail - Leased! Immediately 1st Floor - 2,744 SF Listing Agents 2nd Floor - 2,777 SF Paul Cheevers** Contiguous Office - 5,521 SF Vice President 416.649.5949 Net Rent [email protected] $25.00 PSF (Year 1 + escalations) **Broker Additional Rent $13.58 PSF (2021 Estimate) (plus hydro - separately metered) Flexible Office Use Central location to Downtown Core Open Space Concept Interior 204 Spadina Avenue Leased! Retail 1st Floor - 2,744 SF 204 Spadina Avenue 2nd Floor - 2,777 SF 204 Spadina Avenue 204 Spadina Avenue at Queen West 505 Dundas What’s Near By 204 Spadina Avenue is located near Dundas Street West and Spadina Avenue at the heart of Toronto’s downtown core. This exceptional office building has direct access to streetcar stops. Excellent Amenities Bathurst Street nearby. Substantially renovated and located near many restaurants and amenities! 501 Queen 504 King 5 204 Spadina Avenue 510 Spadina St Patrick Station Dundas Street W Osgoode Station Queen Street W 501 Queen Adelaide Street W St. Andrew Station King Street W 504 King Union Station Spadina Avenue Front Street W Amazing Transit Opportunities Walk Times from 204 Spadina Avenue 505 Dundas Streetcar: 4 min St. -
510 SPADINA STATION" Streetcars
a condominium community June 17, 2013 Toronto Transit Commission, 1900 Yonge Street, Toronto, Ontario, M4S 122 RE: ShorMurn Southbound "510 KING" and "510 SPADINA STATION" streetcars Dear Sir/Madame: We are the Board of Directors of 'The Hudson", a 281 unit residential condominium dwelling located at 438 King Street West, on the north east corner of King and Spadina. We are writing again to request that the Toronto Transit Commission (the "TTC") reopen for discussion and consideration the recommendations from your September 30, 2010 meeting in respect of the 510 Spadina Streetcar route. Please add this letter and the issues contained in this letter in your agenda at the next Commission meeting on June 24, 2013. We request that the TTC eliminate the short-turn streetcars that operate from Spadlna Station via south on Spadina Avenue, east on Adelaide Street West, and south on Charlotte Street to King Street West (the "short-turn streetcars"). The short-turn streetcars return northbound as "510 SPADINA STATION", operate from Charlotte Street and King Street West via west on King Street and north on Spadina. From a service perspective, with the increased density and condominium development south of Front Street, there is justification in the present day to extend the streetcar service and turn the streetcars at Spadina/Queens Quay. As you know, the continued construction at King/Spadina area includes the newly built "Charlie" condos at Charlotte/King. Since 2010, two other condominiums have been built nearby, with another one already excavated on Charlotte Street. This area where the short-turn streetcars are routed will only see increased congestion, traffic impediments and slower passage through the intersection at King/Spadina. -
Results of the King Street Transit Pilot
For Action Results of the King Street Transit Pilot Date: April 11, 2019 To: TTC Board From: Chief Customer Officer Summary The King Street Transit Pilot began on November 12, 2017 providing greater priority for the TTC’s King streetcar customers between Bathurst Street and Jarvis Street over the past year and a half. From a transit perspective, the pilot project is a success: Faster and more predictable transit travel times: On average, streetcars now travel faster during all periods of the day and times are more predictable, making the service more attractive. Approximately 30,000 minutes of travel time are saved by King streetcar customers daily. More people taking transit along the King Street corridor: With more predictable travel, more people are taking King streetcars than ever, with daily weekday ridership growing by 16% from 72,000 to 84,000 boardings per day. Capacity grew on King Street through the pilot project to meet unprecedented increases in demand. Greater customer satisfaction with King streetcar service: Prior to the pilot, overall customer satisfaction with King streetcar service was low on key measures such as travel time, comfort, and wait time. Through the pilot period, customer satisfaction on all these measures has significantly improved. Improved efficiency and reliability of streetcar operations: Streetcar service on King Street is now more productive, with 25% more customers per hour of service operated. Overall reliability has improved with reduced variability in the busiest portion of the route. TTC and City staff recommend that the pilot project be made permanent as the King Street Transit Priority Corridor with immediate enhancements to the pilot design, such as improvements to streetcar stops and improved signage at intersections. -
Relief Line South Environmental Project Report, Section 5 Existing and Future Conditions
Relief Line South Environmental Project Report Section 5 - Existing and Future Conditions The study area is unique in that it is served by most transit modes that make up the Greater 5 Existing and Future Conditions Toronto Area’s (GTA’s) transit network, including: The description of the existing and future environment within the study area is presented in this • TTC Subway – High-speed, high-capacity rapid transit serving both long distance and local section to establish an inventory of the baseline conditions against which the potential impacts travel. of the project are being considered as part of the Transit Project Assessment Process (TPAP). • TTC Streetcar – Low-speed surface routes operating on fixed rail in mixed traffic lanes (with Existing transportation, natural, social-economic, cultural, and utility conditions are outlined some exceptions), mostly serving shorter-distance trips into the downtown core and feeding within this section. More detailed findings for each of the disciplines have been documented in to / from the subway system. the corresponding memoranda provided in the appendices. • TTC Conventional Bus – Low-speed surface routes operating in mixed traffic, mostly 5.1 Transportation serving local travel and feeding subway and GO stations. • TTC Express Bus – Higher-speed surface routes with less-frequent stops operating in An inventory of the existing local and regional transit, vehicular, cycling and pedestrian mixed traffic on high-capacity arterial roads, connecting neighbourhoods with poor access transportation networks in the study area is outlined below. to rapid transit to downtown. 5.1.1 Existing Transit Network • GO Rail - Interregional rapid transit primarily serving long-distance commuter travel to the downtown core (converging at Union Station). -
Road Closures for the Toronto International Film Festival: Effects on Transit Service
STAFF REPORT ACTION REQUIRED Road Closures for the Toronto International Film Festival: Effects on Transit Service Date: July 29, 2015 To: TTC Board From: Chief Executive Officer Summary Organizers of the 2015 Toronto International Film Festival (TIFF) have advised the TTC that, again this year, they are asking that King Street be closed, between University Avenue and Spadina Avenue, for four days, for the celebration and promotion of the festival. Similar closures have taken place in previous years and, regardless of the various approaches tried by the TTC to retain and provide a quality service under such circumstances, the reliability, speed, and overall quality of service on the 504 King route were seriously affected. For this reason, TTC staff do not support the closure of King Street, even though we understand the importance of the festival itself to the economy and international reputation of Toronto. If King Street, between University and Spadina Avenues, is closed for the 2015 TIFF (September 10 to 13, 2015) then, in order to avoid the same detrimental effects on the 504 King streetcar service as has occurred in previous years, the route will be split to operate as two geographically-separated halves – one between Broadview Station and York Street, and the other between Dundas West Station and Bathurst Street. This would remove streetcar service from a section of King Street, between York and Bathurst Streets. While this change in service would cause significant inconvenience for TTC customers destined for this area, the overall inconvenience would be much less than the unreliable and slow service for all users of the route due to the road closure.