SHEFFIELD CITY COUNCIL Development, Environment and Leisure Directorate

Total Page:16

File Type:pdf, Size:1020Kb

SHEFFIELD CITY COUNCIL Development, Environment and Leisure Directorate SHEFFIELD CITY COUNCIL Development, Environment and Leisure Directorate REPORT TO WEST AND NORTH DATE 21/02/2006 PLANNING AND HIGHWAYS AREA BOARD REPORT OF DIRECTOR OF DEVELOPMENT SERVICES ITEM SUBJECT APPLICATIONS UNDER VARIOUS ACTS/REGULATIONS SUMMARY RECOMMENDATIONS SEE RECOMMENDATIONS HEREIN THE BACKGROUND PAPERS ARE IN THE FILES IN RESPECT OF THE PLANNING APPLICATIONS NUMBERED. FINANCIAL IMPLICATIONS N/A PARAGRAPHS CLEARED BY BACKGROUND PAPERS CONTACT POINT FOR ACCESS Bob Bryan TEL NO: 36329 John Williamson 34944 AREA(S) AFFECTED CATEGORY OF REPORT OPEN 2 Application No. Location Page No. 03/04404/FUL Top Side Farm, 13 Top Side, Grenoside, 5 Sheffield, S35 8RD 04/03546/FUL Former Magnet Hotel, Southey Green Road, 12 Sheffield, 05/00224/OUT Sheffield Ski Village, Vale Road, Sheffield, S3 22 9SJ 05/00917/FUL Riverdale Flats, 15 Riverdale Road, Sheffield, 38 S10 3FA 05/01170/CAC Riverdale Flats, 15 Riverdale Road, Sheffield, 53 S10 3FA 05/03910/FUL Garden Of, 4A Slayleigh Lane, Sheffield, 56 05/03978/FUL The Dell, Loxley Road, Loxley, Sheffield, S6 63 6RW 05/04298/FUL Land Adjacent To 34, Stephen Lane, Grenoside, 69 Sheffield, S35 8QZ, 05/04507/OUT Land Opposite 76 To 92, Green Street, Deepcar, 76 Sheffield, S36 2PZ, 05/04572/FUL Land Adjoining 18, Churchill Way, Sheffield, S35 83 2PY, 3 4 SHEFFIELD CITY COUNCIL Report Of The Head Of Planning, Transport And Highways, Development, Environment And Leisure To The NORTH & WEST Planning And Highways Area Board Date Of Meeting: 21/02/2006 LIST OF PLANNING APPLICATIONS FOR DECISION OR INFORMATION *NOTE* Under the heading “Representations” a Brief Summary of Representations received up to a week before the Area Board date is given (later representations will be reported verbally). The main points only are given for ease of reference. The full letters are on the application file, which is available to members and the public and will be at the meeting. Case Number 03/04404/FUL Application Type A Full Planning Application Proposal Application under Section 73 to vary Condition 8 imposed by 99/0472P - Resurfacing of drive entrance and courtyard Location Top Side Farm, 13 Top Side, Grenoside, Sheffield, S35 8RD Date Received 26/11/2003 Team NORTH & WEST Applicant/Agent Development Land & Planning Recommendation Grant Conditionally Subject to: 1 The development shall be begun not later than the expiration of five years from the date of this decision. In order to comply with the requirements of the Town and Country Planning Act. 2 Before the development is commenced, a sample panel of stonework shall have been constructed on site and approved in writing by the Local Planning Authority In the interests of the visual amenities of the locality 3 Before the development is commenced a sample of the proposed new roofing material shall have been submitted to and approved by the Local Planning Authority. In the interests of the visual amenities of the locality 4 Before the development is commenced, full details of the proposed window and door specifications including materials, final finish and reveal depths shall have been submitted to and approved by the Local Planning Authority. In the interests of the visual amenities of the locality. 5 Before the development is commenced, full details of the proposed service installations, including meter boxes, security systems, satellite dishes, external lighting, etc., shall have been submitted to and approved by the Local Planning Authority. In the interests of the visual amenities of the locality 6 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995, Part 1 (Classes A to E inclusive), Part 2 (Class A), or any order revoking or re-enacting that Order, no extensions, porches, ancillary curtilage buildings, swimming pools, enclosures, fences, walls or alterations which materially affect the external appearance of the dwelling shall be constructed without the prior permission of the Local Planning Authority To ensure that the traditional architectural character of the building group is retained and there is no visual intrusion which would be detrimental. 7 The car parking accommodation shown on the plans, including the refurbished cart shed, shall be provided prior to the occupation of the dwellings and shall thereafter be retained. To ensure that adequate car parking accommodation is available 8 The drive entrance shall be resurfaced within 3 months of the date of this permission in accordance with the submitted plans in a material to be submitted and approved in writing by the Local Planning Authority and the resurfaced concrete courtyard surface shall be retained as constructed. In the interests of traffic safety and the amenities of the locality. 9 The existing gateposts adjacent to the cart shed shall be retained in the position indicated on the plans unless otherwise agreed by the Local Planning Authority In the interests of the visual amenities of the locality 6 10 Before the development is commenced, full details of the proposed new boundary treatments shall have been submitted to and approved by the Local Planning Authority. In the interests of the visual amenities of the locality Site Location LOCATION AND PROPOSAL The site is located on the southwest side of Topside on the edge of the built up area of Grenoside. In 1999 planning permission was granted for the rebuilding of a derelict barn to form a dwellinghouse in the middle of a range of three buildings arranged in an ‘L- shape’ alongside a courtyard (application no. 99/0427P refers). 7 Condition no.8 of planning permission no. 99/0427P stated that ‘the drive entrance and courtyard shall be resurfaced in accordance with the submitted plans within 6 months of the occupation of the dwelling’. The reason for the condition was in the interests of traffic safety and the amenities of the locality. The site area to which application no. 99/0427P related included the access off Topside and most of the courtyard beyond it but excluded a significant portion of the western part of the courtyard. The approved drawings noted that the existing concrete to the courtyard was to be broken out and removed and relayed with pressed concrete paving with stone cobble effect finish, and that the existing concrete surface on the access drive was to be dug out and relayed with granite or stone setts. The whole of the courtyard and part of the access drive has since been resurfaced in concrete with a plain textured finish. The current planning application seeks vary condition no.8 of the previous planning permission to provide granite setts from the site entrance into the yard and retain the existing concrete surface to the remaining areas of the yard. In support of the proposal the applicant has made the following submissions; - prior to the restoration of the derelict former agricultural building the farmyard was previously surfaced in concrete, with no pattern in the concrete and replacing it with concrete represents no change and no adverse demonstrable harm; - the former farmyard is well screened from public view, the part of the yard visible adjoining the public highway is being treated in granite setts; - the approved plans cover two-thirds of the yard and that if a pressed cobbled effect concrete surface is provided the yard will contain three separate and different surface treatments resulting in an alien surface treatment detrimental to the overall appearance of the site and setting of the traditional buildings; - the provision of cobble effect pressed concrete surfaced farm yards are uncommon features not replicated in the conservation area. The applicant has investigated the use of a textured surface treatment but considers the cost to be excessive and unwarranted in this instance. RELEVANT PLANNING HISTORY In 1999 planning permission was granted for the rebuilding of a derelict barn in the middle of a range of three buildings arranged in an ‘L-shape’ alongside a courtyard (application no. 99/0427P refers). Condition no.8 of planning permission no. 99/0427P stated ‘The drive entrance and courtyard shall be resurfaced in accordance with the submitted plans within 6 months of the occupation of the dwelling’. The reason for the condition was in the interests of traffic safety and the amenities of the locality. 8 SUMMARY OF REPRESENTATIONS 10 letters of objection have been received relating to the following matters; - the courtyard and driveway look a mess, the finish is not in keeping with the standards in this conservation area, the plain concrete of which 90% can be seen from Topside spoils the effect of the three restored dwellings; - the site is not now a working farmyard, it is purely an area for access to the dwellings and car parking; - the cobbled effect would obliterate the blight created by the uncharacteristic use of concrete, the original should be implemented in full; 2 letters of objection have been received from Grenoside Conservation Society relating to the following matters; - this development was allowed to go ahead providing the character of the area was not affected; - this development is in the heart of the Conservation Area and should not be allowed to override the original plans; - do not accept that cobble effect pressed concrete surfacing is inappropriate, this is an integral part of the planning consent that recognises the changes that would take place in the restoration of this former derelict agricultural building. Ecclesfield Parish Council’s comments; - no objection. PLANNING ASSESSMENT The site lies within the Grenoside Conservation Area. Policies BE15, BE16 and BE17 of the Sheffield Unitary Development Plan relate to development in conservation areas. Policy BE15 seeks to preserve or enhance buildings and areas of special architectural and historic interest. Policy BE16 seeks to ensure that proposals contain sufficient information to judge their impact, that buildings which make a positive contribution are retained and that redevelopment sites which detract from a conservation area will be encouraged where it would enhance the character or appearance of the area.
Recommended publications
  • Sheffield Development Framework Core Strategy Adopted March 2009
    6088 Core Strategy Cover:A4 Cover & Back Spread 6/3/09 16:04 Page 1 Sheffield Development Framework Core Strategy Adopted March 2009 Sheffield Core Strategy Sheffield Development Framework Core Strategy Adopted by the City Council on 4th March 2009 Development Services Sheffield City Council Howden House 1 Union Street Sheffield S1 2SH Sheffield City Council Sheffield Core Strategy Core Strategy Availability of this document This document is available on the Council’s website at www.sheffield.gov.uk/sdf If you would like a copy of this document in large print, audio format ,Braille, on computer disk, or in a language other than English,please contact us for this to be arranged: l telephone (0114) 205 3075, or l e-mail [email protected], or l write to: SDF Team Development Services Sheffield City Council Howden House 1 Union Street Sheffield S1 2SH Sheffield Core Strategy INTRODUCTION Chapter 1 Introduction to the Core Strategy 1 What is the Sheffield Development Framework about? 1 What is the Core Strategy? 1 PART 1: CONTEXT, VISION, OBJECTIVES AND SPATIAL STRATEGY Chapter 2 Context and Challenges 5 Sheffield: the story so far 5 Challenges for the Future 6 Other Strategies 9 Chapter 3 Vision and Objectives 13 The Spatial Vision 13 SDF Objectives 14 Chapter 4 Spatial Strategy 23 Introduction 23 Spatial Strategy 23 Overall Settlement Pattern 24 The City Centre 24 The Lower and Upper Don Valley 25 Other Employment Areas in the Main Urban Area 26 Housing Areas 26 Outer Areas 27 Green Corridors and Countryside 27 Transport Routes 28 PART
    [Show full text]
  • Admired Properties
    Page 1 of 3 ADMIRED PROPERTIES Why invest in Sheffield? Sheffield is a city with a welcoming, independent spirit and a thriving cultural scene, well known for its industrial roots dating back to its heyday in the 1900’s as the Steel City. The city of steel, backed from its rich heritage firmly secured in the industrial revolution, is now considered one of the northern economic powerhouses. In a prospering hub with a population of 560,000, is expected to reach to over 633,000 by 2037. As a result, the government have already planned to transform infrastructure in anticipation of its rapid growth by driving £238 million into the city. Along with some other northern cities such as Liverpool, Leeds and Newcastle, Sheffield has become one of the most exciting investment hotspots in the UK property sector. Whether you’re looking to invest in commercial property, student housing or residential buy to let, there are a vast amount of opportunities in Sheffield. House prices in Sheffield The population of Sheffield More than 25% of Sheffield It is estimated that the local have grown by almost is predicted to grow 15% graduates choose to stay economy will grow £3bn 25% in the last five years by 2035 (Sheffield City in the city permanently by 2025 (The Sheffield City (Zoopla, December 2018) Council, 2018) (University of Sheffield, Region Strategic Economic 2018) Plan 2015-2025) Page 2 of 3 ADMIRED PROPERTIES THRIVING YOUNG POPULATION There is a huge demand for private residential rental property both in the city centre and in the suburbs of Sheffield, mainly due to Sheffield being home to two of the UK’s largest universities (Sheffield University and Sheffield Hallam University).
    [Show full text]
  • A Masterplan for the Lower Don Valley, Sheffield Strategy for Destination
    A Masterplan for the Lower Don Valley, Sheffield Strategy for Destination Development LOCUM DESTINATION CONSULTING ROCKWOOD HOUSE PERRYMOUNT ROAD HAYWARDS HEATH WEST SUSSEX RH16 3TW UNITED KINGDOM TEL: +44 (0) 1444 459449 FAX: +44 (0) 1444 458911 E-MAIL: [email protected] WEB: www.locum-destination.com DATE: 07 July 2004 FINAL JOB: J04001 FILE: j04001 report draft 040707.doc July 2004 Destination Market Analysis CONTENTS 1 Executive Summary 4 1.1 Current State Analysis 4 1.2 Destination Development Strategy 7 2 Introduction 11 2.1 The Lower Don Valley Master Plan 11 2.2 The Destination Market Analysis 11 2.3 Consultees 12 3 Sheffield – Past, Present and Future 13 3.1 Summary 13 3.2 Background 13 3.3 Sheffield City Strategies 15 3.4 Sheffield Sports Strategies 18 3.5 Tourism Strategies 23 4 The Visitor Market Context 26 4.1 Summary 26 4.2 The Yorkshire Context 27 4.3 The Sheffield Context 32 4.4 How Does Sheffield Compare to the Other Core Cities? 38 5 Destination Audit of the Lower Don Valley 42 5.1 Summary 42 5.2 Assessment of the Lower Don Valley Destination 45 5.3 Meadowhall 49 5.4 Sports Venues 49 5.5 Other 58 Locum Destination Consulting J04001/JEA/7/7/04/j04001 report final 040707.doc Page 2 Destination Market Analysis 6 The Role of Destination Thinking 60 6.1 Summary 60 6.2 The Role of Destination Thinking in Regeneration 60 6.3 The Role of a Large-Scale Visitor Attraction 60 6.4 Creating a Destination: Some Contextual Thinking 62 6.5 The Opportunity 62 6.6 The Destination Effect 63 6.7 Getting the Logic Right 65 7 Developing
    [Show full text]
  • Providing a Better Life for Humankind
    SchDeFaoocuparl lttyment NamOfe AcrMEnginonyechmanicaeering.l VerEnginticallyeering.. 5th Line Department Name Acronym Vertically. 5th Line Department NaUnmdeergraduate OrCo ursesOther TiIntle. 5tBihoe Linngine eering. Sub-heaProvidingding/explanat a betoryt ertex tlif if ree quirfore dhumankind. 2 The University of Sheffield Contact us Contents Bioengineering Welcome from the Director of Bioengineering 3 What is Bioengineering? 4 Faculty of Engineering University of Sheffield Studying Bioengineering at the University of Sheffield 6 Mappin Street Sheffield S1 3JD Bioengineering Degrees at Sheffield – Building on our Success 8 Tel: +44 (0) 114 222 7837 Student Support 10 Fax: +44 (0) 114 222 7836 Careers and Prospects 11 www.sheffield.ac.uk/bioengineering What our Students Think 11 [email protected] Living in Sheffield 12 Entry Requirements 13 How to Apply 13 Visit Us 14 Further Information 14 3 Welcome from the Director of Bioengineering Thank you for your interest in Bioengineering at the University of Sheffield. The University of Sheffield’s Faculty of Engineering is one of the finest places to study in the UK. We have an excellent reputation for the quality of our teaching and research, for the support we offer our students and for the employability of our graduates. Bioengineering at the University of Sheffield is an innovative and technology driven subject, backed up by our long tradition of engineering and medical excellence. Our courses produce multi-skilled graduates with technical command and great potential. Our Bioengineering degrees have been designed to provide flexibility and choice. We offer BEng and MEng degrees with a common first year followed by a wide range of options that enable you to specialize in an area of your choice.
    [Show full text]
  • Development Services Report to Cabinet
    SHEFFIELD CITY COUNCIL Development, Environment and Leisure Directorate REPORT TO CABINET DATE 11 July 2007 REPORT OF EXECUTIVE DIRECTOR OF ITEM DEL SUBJECT SHEFFIELD DEVELOPMENT FRAMEWORK CORE STRATEGY: SUBMISSION TO SECRETARY OF STATE SUMMARY Approval is sought to submit the Core Strategy of the Sheffield Development Framework (SDF) to the Government with a view to adoption by the beginning of 2009 having received the Inspector’s binding recommendations. The Core Strategy contains the vision and objectives for the SDF and its main spatial policies. Major strategic issues concern the supply of land for housing and employment and the potential to provide for the increased number of trips that will result from new development. RECOMMENDATIONS That: The Cabinet agree that the Core Strategy be submitted for independent examination to the Secretary of State for Communities and Local Government, as required by Section 20 of the Planning and Compulsory Purchase Act 2004 The Core Strategy be referred to the full meeting of the City Council on 25 July 2007 for approval Future non-statutory draft area action plans and other planning documents issued for public consultation be in broad conformity with the submitted Core Strategy, unless representations or further evidence for the public examination indicate otherwise The submitted Core Strategy be used to inform planning decisions in the period up to publication of the Inspector’s Report in 2008, unless representations or further evidence for the public examination indicate otherwise. RELEVANT SCRUTINY BOARD IF DECISION CALLED IN Culture, Economy and Sustainability FINANCIAL IMPLICATIONS YES NO PARAGRAPHS 13.1 CLEARED BY Paul Schofield BACKGROUND PAPERS Document for approval: SDF Core Strategy CONTACT POINT FOR ACCESS Peter Rainford TEL NO: 273 5897 AREA(S) AFFECTED All Panel Areas CATEGORY OF REPORT OPEN CLOSED Paragraphs(s) Statutory and Council Policy Checklist Category of Report OPEN Financial Implications NO – para.
    [Show full text]
  • Head of Development Services Development, Environment and Leisure
    HEAD OF DEVELOPMENT SERVICES DEVELOPMENT, ENVIRONMENT AND LEISURE REPORT TO CABINET 27TH OCTOBER 2004 UPDATE ON PROPOSALS TO STIMULATE REGENERATION IN THE UPPER DON VALLEY 1.0 PURPOSE OF THE REPORT 1.1 In February 2003, Civic Regeneration produced a multi-disciplinary masterplan on the Upper Don Valley and identified a significant number of proposals which could contribute to the Valley’s regeneration. Cabinet endorsed the Civic Regeneration proposals in a report on 12 November 2003. 1.2 The purpose of this report is twofold. Firstly, to update Cabinet members on consultation and implementation issues in relation to the above Upper Don Masterplan proposals. Secondly, to describe a programme of further actions needed to achieve a successful economic, environmental and social regeneration in the Upper Don. 2.0 INTRODUCTION 2.1 After a period of industrial re-structuring, Sheffield is emerging as a leading location for quality inward investment in office, industrial, retail and residential activities. Various studies have indicated that there is at present a deficit in the provision of suitable accommodation in virtually all categories of accommodation. 2.2 In addition to the City Centre, Sheffield has a number of significant development areas, which are known as the four Strategic Regeneration Areas (SRAs). These are: the Lower Don Valley, the Airport Business Park, Central Riverside and the Upper Don Valley. These areas have significant potential to provide improved and additional business and industrial use accommodation. 2.3 In order to address economic development at a city wide level, Creative Sheffield was launched earlier this month. Based on the model of an Urban Regeneration Company, unlike the existing Sheffield One which only services the City Centre, the new organisation will work across the whole city.
    [Show full text]
  • Parkwood Springs DRAFT MASTERPLAN
    Parkwood Springs DRAFT MASTERPLAN Supplementary Planning Document 2018 - 2028 1 CONTENTS 1. Introduction & Context ............. 6 2. Key Themes .......................... 14 3. Concept Plan ......................... 30 4. Guiding Principles ................. 42 5. Delivery Programme.............. 46 List of Figures Figure 1: Sheffield City Region ........................................................................................................................................................................................... 7 Figure 2: Sheffield, The Outdoor City ................................................................................................................................................................................. 8 Figure 3: Parkwood Springs in its Local Context ............................................................................................................................................................... 9 Figure 4: Planning policy context of the Masterplan .......................................................................................................................................................... 10 Figure 5: Core Strategy Key Diagram (2009) — ............................................................................................................................................................... 11 Figure 6: Unitary Development Plan - North East Proposals Map (1998) .........................................................................................................................
    [Show full text]
  • Our Visitors' Guide
    For help and advice on any aspect of visiting the University and the city, call the Visitor Information service on 0114 222 1255 . If you’re on campus, pop in and see us at Level 4, University House. www.sheffield.ac.uk/visitors Our This publication is available in alternative formats. Visitors’ To request a different format: T: 0114 222 1303 E: disability.info@sheffield.ac.uk Guide. Copyright © The University of Sheffield 2007 SRAM 0296 Campus Landmarks Campus Landmarks Secret city “ If I’m not mistaken Watson, that was the Dore and Totley tunnel through which we have just come, and if so we shall be in Sheffield is a city of contradictions and surprises . It’s a well Sheffield in a few minutes.” known fact and an open secret. It’s quirky, mysterious and green. Sherlock Holmes It’s arty, down to earth, clever and funny. It’s poetic, romantic, northern and strong. It’s quiet and busy, the world’s biggest small town. Sheffield welcomes warmly and brings out the best. This is a city that makes friends and influences people. This is a city where people work, study and have fun together. This is a city where people know each other and say hello to each other in the street. Make yourself at home. Green city Winter Garden Peace Gardens The Botanical Gardens Surrey Street Pinstone Street Clarkehouse Road Open daily 8am– 6pm Open 24 hours. Admission free Admission free. Another prime example of what Sheffield does effortlessly, that is The largest temperate glasshouse A city-centre oasis for office to maintain more attractive, in any European city is home to workers, shoppers, students and green, public spaces than any more than 2,000 plants from families, with some interesting other city in the UK.
    [Show full text]
  • The Magazine for Sheffield 23,000 Copies • Est
    The Magazine For Sheffield 23,000 copies • Est. 1991 • August 2021 • www.grapevinesheffield.net Smoke of War Sheffield, 1915 - p.33 Spying For Germany? Incas Were Gay Swimming School Christmas Dinner! Sheffield Lord Mayor’s Trial - p.18 Amazing Teapot Discovery - p.3 Lessons For Children - p.29 And Half-Price Meals - p.3, p.31 How To Cook Steel Dancers In The Frame Patio In Porcelain Knightly Roof Work Some Heavy Recipes - p.34 On Psalter Lane - p.26 Sleek Ceramic Look - p.30 Repairing Camelot - p.8 2 Grapevine Magazine t seems,” announced my old chum Mr Smith when he visited me embassy (being Churchill Fellows), and it was not long before one yesterday, “that the University of Sheffield’s archaeology department of the diplomats said: “I suppose you lads want to go tomb robbing.” Iis history. I’ve heard it’s going to be closed, which must be of great “Yes, please!” we replied, whereupon Our Man in Lima drove us concern to you - our city’s most esteemed tomb robber.” in his car to an area of desert a few miles north. It seemed strewn “Smith, it’s almost 50 years since I hung up my excavating trowel, with discarded newspapers, which turned out to be shrouds and I must tell you that scratting for bits of pottery was no more of people buried centuries ago. All around, as far as the eye interesting than typing the crown green bowling results, which was one could see, were bones from desecrated graves. of my first tasks as a cub reporter on the Ossett Observer.
    [Show full text]
  • City Policies and Sites
    City Policies and Sites 1 INTRODUCTION 1 What is the Sheffield Development Framework about? 1 What is the City Policies and Sites document about? 1 What is the purpose of this Consultation Draft? 3 Proposals Map Key 4 Site Allocations 5 PART 1: CITY-WIDE POLICIES 2 ECONOMIC PROSPERITY AND SUSTAINABLE EMPLOYMENT 14 A1 Infrastructure Requirements and Developer Contributions 14 A2 Requirements for Economic Prosperity and Sustainable Employment 17 3 SERVING THE CITY REGION 19 B1 City Centre Design 19 B2 Development in the City Centre Shopping Streets and the Cultural Hub 22 4 ATTRACTIVE AND SUSTAINABLE NEIGHBOURHOODS 25 C1 Access to Local Services and Community Facilities in New Residential Developments 25 C2 Residential Design 27 C3 Safeguarding Sensitive Uses from Nuisance 29 C4 Development in District and Neighbourhood Centres 32 C5 Shopping and Leisure Development and Community Facilities outside Existing Centres 34 5 OPPORTUNITIES AND WELL-BEING FOR ALL 36 D1 Provision for the Needs of All Users 36 D2 Open Space in New Housing Developments 38 D3 Delivering Affordable Housing 39 6 TRANSPORT AND MOVEMENT 43 E1 Development and Trip Generation 43 E2 Parking 46 E3 Design for Roads and Movement 49 7 GLOBAL ENVIRONMENT AND NATURAL RESOURCES 52 F1 Pollution Control 52 F2 Requirements for Waste Management 54 8 GREEN ENVIRONMENT 57 G1 Safeguarding and Enhancing Biodiversity and Features of Geological Importance 57 Sheffield City Council City Policies and Sites G2 The Green Network 60 G3 Trees, Woodland and the South Yorkshire Forest 62 G4 Water
    [Show full text]
  • Centenary Tall Ship Challenge the Adventure of a Lifetime
    The University of Sheffield Centenary Tall Ship Challenge The adventure of a lifetime Sign up as a crew member of the Tall Ship Stavros Niarchos on a voyage around the Balearic Islands – and help us raise funds for children in Sheffield with speech and literacy difficulties. Dates: 31 March – 7 April 2005 Destination: Join the ship in Palma, Majorca, sail around the Balearic Islands, return to Palma for a Centenary celebration ashore and a last night on board Cost: £495 per person, including insurance and Centenary The Stavros Niarchos reception, but excluding flights No previous sailing experience is necessary – all you need is a sense of adventure and a determination to meet the challenge. Our 48 trainees (16 alumni, 16 students, 16 staff) will be managed by an experienced, professional crew. Patron of the Centenary Tall Ship Challenge Vanessa Lawrence, Director General and Chief Executive of Ordnance Survey and a keen sailor, is the voyage’s Patron,“Sailing a Tall Ship is something I have always wanted to do, and to do so with alumni, students and staff will be a really memorable occasion.” See a profile of Vanessa on page 5. Fundraising challenge We plan to raise a minimum of £10,000 to provide specialist equipment to support the Department of Human Communication Sciences’ work in the community. Their staff and students provide specialist in-house and outreach support for Sheffield children with persisting speech difficulties (eg cleft palate, dyspraxia) and associated literacy problems (eg dyslexia). We suggest a personal fundraising target of at least £200 each, to help us achieve this.
    [Show full text]
  • Preferred Options for City Policies
    Transformation and Sustainability SHEFFIELD DEVELOPMENT FRAMEWORK PREFERRED OPTIONS FOR CITY POLICIES For consideration by Cabinet – 11 April 2007 Development Services Sheffield City Council Howden House 1 Union Street Sheffield S1 2SH April 2007 Availability of this document See Chapter 2 ‘How to Comment’ If you would like a copy of this document in large print, audio format, Braille, on computer disk, or in a language other than English, please contact us for this to be arranged: telephone (0114) 273 4212, or e-mail [email protected], or write to: SDF Team Development Services Howden House 1 Union Street Sheffield S1 2SH CONTENTS Page 1. Introduction to Preferred Options 1 2. How to Comment on the Options 7 Development and Land Use 3. Conditions on Development (PC) 9 4. Business and Industry (PB) 11 5. Shopping and Built Leisure (PS) 29 6. Community Facilities, Services and Institutions (PCF) 47 7. Housing (PH) 55 8. Flexible Use Areas (PF) 85 9. Waste Management (PW) 87 10. Open Space and Sports Facilities (POS) 93 11. Countryside and Green Belt (PGB) 105 Design and Environment 12. Urban Design (PUD) 115 13. Historic Environment (PHE) 139 14. Green Environment (PGE) 155 15. Natural Resources (PR) 173 Transport 16. Transport (PT) 191 Implementation 17. Planning Obligations (PPO) 209 APPENDICES A Emerging and Preferred Options 213 B Acceptable Uses – Summary Tables 227 1. INTRODUCTION TO THE PREFERRED OPTIONS What is the Sheffield Development Framework? 1.1 The Sheffield Development Framework is the City Council’s Local Development Framework, prepared in accordance with the Planning and Compulsory Purchase Act 2004.
    [Show full text]