SPP RE Transition Notice of Proposed Transfer Regional Entities 21-Day Comment Period: 12-1-2017 Through 12-22-2017
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The Economic Benefits of Kansas Wind Energy
THE ECONOMIC BENEFITS OF KANSAS WIND ENERGY NOVEMBER 19, 2012 Prepared By: Alan Claus Anderson Britton Gibson Polsinelli Shughart, Vice Chair, Polsinelli Shughart, Shareholder, Energy Practice Group Energy Practice Group Scott W. White, Ph.D. Luke Hagedorn Founder, Polsinelli Shughart, Associate, Kansas Energy Information Network Energy Practice Group ABOUT THE AUTHORS Alan Claus Anderson Alan Claus Anderson is a shareholder attorney and the Vice Chair of Polsinelli Shughart's Energy Practice Group. He has extensive experience representing and serving as lead counsel and outside general counsel to public and private domestic and international companies in the energy industry. He was selected for membership in the Association of International Petroleum Negotiators and has led numerous successful oil and gas acquisitions and joint development projects domestically and internationally. Mr. Anderson also represents developers, lenders, investors and suppliers in renewable energy projects throughout the country that represent more than 3,500 MW in wind and solar projects under development and more than $2 billion in wind and solar projects in operation. Mr. Anderson is actively involved in numerous economic development initiatives in the region including serving as the Chair of the Kansas City Area Development Council's Advanced Energy and Manufacturing Advisory Council. He received his undergraduate degree from Washington State University and his law degree from the University of Oklahoma. Mr. Anderson can be reached at (913) 234-7464 or by email at [email protected]. Britton Gibson Britton Gibson is a shareholder attorney in Polsinelli Shughart’s Energy Practice Group and has been responsible for more than $6 billion in energy-related transactions. -
Kansas Wind Energy Update House Energy & Utilities Committee Kimberly Svaty on Behalf of the Wind Coalition 23 January 2012
KANSAS WIND ENERGY UPDATE HOUSE ENERGY & UTILITIES COMMITTEE KIMBERLY SVATY ON BEHALF OF THE WIND COALITION 23 JANUARY 2012 Operating Kansas Wind Projects •1272.4 MW total installed wind generation •10 operating wind projects •Equates to billions in capital investment and thousands of construction jobs and more than 100 permanent jobs •Kansas has the second best wind resource in the nation th •Ranked 14 in the nation in overall wind power production • Percent of Kansas Power by wind in 2010 – 7.1% th •Kansas ranked 5 in the US in 2010 for percentage of electricity delivered from wind • Operating Kansas Wind Projects Project County Developer Size Power Turbine Installed In-Service Name (MW) Offtaker Type Turbines Year (MW) Gray County Gray NextEra 112 MKEC Vestas 170 2001 KCP&L 660kW Elk River Butler Iberdola 150 Empire GE 1.5 100 2005 Spearville Ford enXco 100.4 KCP&L GE 1.5 67 2006 Spearville II 48 48 2010 Smoky Hills Lincoln/ TradeWind 100.8 Sunflower – 50 Vestas 56 2008 Phase I Ellsworth Energy KCBPU- 25 1.8 Midwest Energy – 24 Smoky Hills Lincoln/ TradeWind 150 Sunflower – 24 GE 99 2008 Phase II Ellsworth Energy Midwest – 24 1.5 IP&L – 15 Springfield -50 Meridian Cloud Horizon 204 Empire – 105 Vestas 67 2008 Way EDP Westar - 96 3.0 Flat Ridge Barber BP Wind 100 Westar Clipper 40 2009 Energy 2.5 Central Wichita RES 99 Westar Vestas 33 2009 Plains Americas 3.0 Greensburg Kiowa John Deere/ 12.5 Kansas Power Pool Suzlon 10 2010 Exelon 1.2 Caney River Elk TradeWind 200 Tennessee Valley Vestas 111 2011 Energy Authority (TVA) 1.8 Operating Kansas Wind Projects Gray County Wind Farm- Gray County, Kansas - Kansas' first commercial wind farm was erected near the town of Montezuma by FPL Energy (now NextEra Energy Resources) in 2001. -
Planning for Wind Energy
Planning for Wind Energy Suzanne Rynne, AICP , Larry Flowers, Eric Lantz, and Erica Heller, AICP , Editors American Planning Association Planning Advisory Service Report Number 566 Planning for Wind Energy is the result of a collaborative part- search intern at APA; Kirstin Kuenzi is a research intern at nership among the American Planning Association (APA), APA; Joe MacDonald, aicp, was program development se- the National Renewable Energy Laboratory (NREL), the nior associate at APA; Ann F. Dillemuth, aicp, is a research American Wind Energy Association (AWEA), and Clarion associate and co-editor of PAS Memo at APA. Associates. Funding was provided by the U.S. Department The authors thank the many other individuals who con- of Energy under award number DE-EE0000717, as part of tributed to or supported this project, particularly the plan- the 20% Wind by 2030: Overcoming the Challenges funding ners, elected officials, and other stakeholders from case- opportunity. study communities who participated in interviews, shared The report was developed under the auspices of the Green documents and images, and reviewed drafts of the case Communities Research Center, one of APA’s National studies. Special thanks also goes to the project partners Centers for Planning. The Center engages in research, policy, who reviewed the entire report and provided thoughtful outreach, and education that advance green communities edits and comments, as well as the scoping symposium through planning. For more information, visit www.plan- participants who worked with APA and project partners to ning.org/nationalcenters/green/index.htm. APA’s National develop the outline for the report: James Andrews, utilities Centers for Planning conduct policy-relevant research and specialist at the San Francisco Public Utilities Commission; education involving community health, natural and man- Jennifer Banks, offshore wind and siting specialist at AWEA; made hazards, and green communities. -
Retail Demand Response in Southwest Power Pool
ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY LBNL-1470E Retail Demand Response in Southwest Power Pool Ranjit Bharvirkar, Grayson Heffner and Charles Goldman Lawrence Berkeley National Laboratory Environmental Energy Technologies Division January 2009 The work described in this report was funded by the Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis of the U.S. Department of Energy under Contract No. DE-AC02-05CH11231. Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by its trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or The Regents of the University of California. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof, or The Regents of the University of California. Ernest Orlando Lawrence Berkeley National Laboratory is an equal opportunity employer. LBNL-1470E Retail Demand Response in Southwest Power Pool Prepared for the Office of Electricity Delivery and Energy Reliability, Permitting, Siting, and Analysis U.S. -
Reliability Conference Presentation
MRO 2020 Virtual Reliability Conference MRO Shares the ERO Vision: A highly reliable and secure North American bulk power system. Key Characteristics of HEROs 3 The hallmark of reliability in complex, interdependent systems is not that errors won’t occur... It’s that errors and operating anomalies won’t create an uncontrolled, cascading event. What It Means To Be Reliable 4 Our Footprint 195 Registered Entities 3 Reliability Coordinators 4 Planning Coordinators 2 RTOs 5 Outreach and Engagement Provide guidance to individual registered entities regarding specific concerns • [email protected] Host conferences and training events on matters important to reliability and security of the bulk power system Assist industry experts in developing guidance documents • Standard Application Guides • Best practice whitepapers Publish tips, lessons learned and recommendations Bimonthly newsletter: Midwest Reliability Matters 6 WebEx Chat Feature Open the Chat Feature: The chat feature will appear to the right of the WebEx window. Attendees should chat their questions to: “Dana Klem”. Select Dana Klem by using the drop down arrow in the “To” field. 7 MRO Advisory Council Structure MRO Members MRO Board of Directors President and Board CEO Committees Governance and Personnel Organizational Group Finance and Audit MRO Staff Committee Oversight Committee Committee CMEP Advisory Security Advisory Reliability Council Council Advisory Council Security Advisory NERC Standards Council Threat Special Protection System Review Forum Forum Working Group Subject Matter Expert Protective Relay Subgroup Teams 8 What is the Reliability Advisory Council? The MRO Reliability Advisory Council was established to provide advice and council to the MRO Board, staff, and members on risks to the regional bulk power system, as well as increase outreach and awareness in key risk areas. -
Wind Powering America Fy08 Activities Summary
WIND POWERING AMERICA FY08 ACTIVITIES SUMMARY Energy Efficiency & Renewable Energy Dear Wind Powering America Colleague, We are pleased to present the Wind Powering America FY08 Activities Summary, which reflects the accomplishments of our state Wind Working Groups, our programs at the National Renewable Energy Laboratory, and our partner organizations. The national WPA team remains a leading force for moving wind energy forward in the United States. At the beginning of 2008, there were more than 16,500 megawatts (MW) of wind power installed across the United States, with an additional 7,000 MW projected by year end, bringing the U.S. installed capacity to more than 23,000 MW by the end of 2008. When our partnership was launched in 2000, there were 2,500 MW of installed wind capacity in the United States. At that time, only four states had more than 100 MW of installed wind capacity. Twenty-two states now have more than 100 MW installed, compared to 17 at the end of 2007. We anticipate that four or five additional states will join the 100-MW club in 2009, and by the end of the decade, more than 30 states will have passed the 100-MW milestone. WPA celebrates the 100-MW milestones because the first 100 megawatts are always the most difficult and lead to significant experience, recognition of the wind energy’s benefits, and expansion of the vision of a more economically and environmentally secure and sustainable future. Of course, the 20% Wind Energy by 2030 report (developed by AWEA, the U.S. Department of Energy, the National Renewable Energy Laboratory, and other stakeholders) indicates that 44 states may be in the 100-MW club by 2030, and 33 states will have more than 1,000 MW installed (at the end of 2008, there were six states in that category). -
Engrossed Senate Bill 2313—Testimony in Support House Energy and Natural Resources, Chairman Porter March 18, 2021
PO Box 1856 Bismarck, ND 58502 701-258-8864 1-800-981-5132 www.usnd.org Engrossed Senate Bill 2313—Testimony in Support House Energy and Natural Resources, Chairman Porter March 18, 2021 Chairman Porter, members of the committee, I am Carlee McLeod, President of the Utility Shareholders of North Dakota (USND), and I come before you to testify in support of Engrossed Senate Bill 2313 on behalf of my members, including ALLETE, Montana Dakota Utilities, Otter Tail Power Company, and Xcel Energy. When this bill was heard in the Senate committee, it was in the midst of the weather event (Feb 14-20) that crippled the south and disrupted power in several transmission organizations, including the Southwest Power Pool (SPP), Electric Reliability Council of Texas (ERCOT), and Midcontinent Independent System Operator (MISO). Since that time, we’ve gleaned some clear-cut information, but it will be months of investigation before we see the full picture. Much of what we know is too complicated for the soundbite driven crowd, and messaging of varying levels of truth have filled the void that hasn’t been or can’t be filled quickly or simply. As this body moves to develop germane energy policy, it is imperative that we all understand the same truths about this event and what they mean about our reliability and resource adequacy. Without that common understanding, subsequent policy is unlikely to address any real, substantive issues. Bearing that in mind, we want to thank you for your time and attention last week as representatives from regional transmission organizations (RTOs) and utilities shared information about their experiences during the event. -
Kansas Wind Farm Pilot Agreements Per Mw
Kansas Wind Farm Pilot Agreements Per Mw Askance Nathaniel sometimes paddles any whine misapplies perennially. Lyndon still clangs mother-liquor while eloquent Emile euhemerized that tranquilization. Refined Agustin censors, his leapers stapled revile isometrically. Easements for market value in kansas, energy farm will. Probably choose renewable energy farm is per mw were primarily utilityscale wind farms are agreements being developed a windmill pump installed. Wind-rich states-North Dakota Texas and Kansas-could accomplish this. Nysted offshore farms much is per mw from empirical and kansas to. Installing and Maintaining a secure Wind Electric Energygov. Mw be a pilot agreement between sites that in mw than texas wind farm project uncertainty in efficiency in most per mw. Project various construction is FGE Power's 5004-MW Goodnight Wind Energy farm in Armstrong. Only a pilot? Unfortunately, its prominence often corresponded to its myriad challenges. The supply curves described earlier are based on switch type of transmission and the GIS optimization described here. What is OPC's position transfer the vessel Wind Project 14 A. Power development impacts on electricity market supported by analyzing its name from wind is wind industry would complicate wind. Involving affected remained opposed after random project was communities early is critical to identifying constructed. Mw marena renovables wind turbine setbacks from kathleen sebelius, nyiso system operations will be installed. Be pushed it might have. In AC electricity, the current flows in width direction from zero to a maximum voltage, then back afraid to zero, then sentence a maximum voltage in the plate direction. Kilowatt-hour MW megawatt NREL National Renewable Energy Laboratory RPS. -
Tn the Matter of the Application of Southwest Power Pool, Inc
TN THE MATTER OF THE APPLICATION OF SOUTHWEST POWER POOL, INC. FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE LIMITED DOCKET NO. 04-137-U PURPOSE OF MANAGING AND ORDERNO. 6 COORDINATING THE USE OF CERTAIN FACILITIES LOCATED WITHIN THE STATE OF ARKANSAS IN THE MATTER OF THE APPLICATION OF ) OKLAHOMA GAS & ELECTRIC COMPANY ) FOR APPROVAL OF ITS PARTICIPATION IN ) DOCKET NO. 04- 1 11 -U THE SOUTHWEST POWER POOL REGIONAL ) ORDERNO. 1 TRANSMISSION ORGANIZATION 1 IN THE MATTER OF A PROTECTIVE ORDER ) FOR THE COST BENEFIT STUDY 1 REGARDING THE SOUTHWEST POWER ) DOCKET NO. 04-129-U POOL REGIONAL TRANSMISSION 1 ORDERNO. 2 ORGANIZATION IN THE MATTER OF THE APPLICATION OF ) SOUTHWESTERN ELECTRIC POWER ) COMPANY’S RELATIONSHIP TO THE ) DOCKET NO. 04-143-U SOUTHWEST POWER POOL REGIONAL ORDERNO. 1 TRANSMISSION ORGANIZATION ) IN THE MATTER OF THE EMPIRE DISTRICT ) ELECTRIC COMPANY APPLICATION TO TRANSFER FUNCTIONAL CONTROL OF 1 DOCKET NO. 05-132-U CERTAIN TRANSMISSION ASSETS TO THE ) ORDERNO. 1 SOUTHWEST POWER POOL, INC. ) ORDER In this Order, the Commission (a) grants the Application of Southwest Power Pool, Inc. (“SPP”) for a Certificate of Public Convenience and Necessity (“CCN’) to transact the business Dockets No. 04-137-U; 04-1 11-U; 04-129-U; 04-143-U; 05-132-U Orders No. 6, 1, 2, 1, & 1 respectively Page 2 of 40 of a public utility in Arkansas by asserting functional control of certain transmission facilities in Arkansas; (b) denies SPP’s request for waiver of the applicability of various provisions of state law; and (c) grants, subject to certain conditions, the Applications of Southwestern Electric Power Company (“SWEPCO”), Oklahoma Gas & Electric (“OG&E”) and Empire District Electric Company (“Empire”) to transfer functional control of their Arkansas transmission facilities to SPP. -
Southwest Power Pool, Inc. Docket No. PA08-2-000
20090115-3088 FERC PDF (Unofficial) 01/15/2009 126 FERC ¶ 61,045 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff. Southwest Power Pool, Inc. Docket No. PA08 -2-000 ORDER APPROVING AUDIT REPORT , DETERMINING ISSUE O F SEPARATION OF FUNCTIONS, AND DIRECTING COMPLIANCE AND OTHER CORRECTIVE ACTIONS (Issued January 15, 2009) 1. In this orde r, the Commission approve s the attached Audit Report (Report) prepared by the Division of Audits in the Office of Enforcement (OE) , with the assistance of staff from the Office of Electric Reliability . The Report contains staff’s findings and recommendati ons with respect to Southwest Power Pool, Inc.’s (SPP ’s ) Regional Entity (RE) function. 1 The audit addresses SPP’s compliance with (1) the SPP , Inc. Bylaws, (2) the Delegation Agreement between the NERC and SPP , and the conditions included in the relevant Commission orders , and (3) other obligations and responsibilities directed by the Commission . 2. This audit was intended to enable the Commission to determine whether SPP’s governance structure creates a “very strong” separation between its RTO and RE fun ctions , as required by the Commission in Order No. 672 .2 In subsequent orders addressing the NERC -SPP Delegation Agreement , we reserved our determination on this 1 As an RE, SPP is responsible for enforcing the mandatory electric reliability standards of the North American Electric Reliability Corporation (NERC) that the Commission approved. SPP also operates as a Regional Transmission Organization (RTO). Southwest Power Pool, Inc. -
Report on Outages and Curtailments During the Southwest Cold Weather Event of February 1-5, 2011
Report on Outages and Curtailments During the Southwest Cold Weather Event of February 1-5, 2011 Prepared by the Staffs of the Federal Energy Regulatory Commission and the North American Electric Reliability Corporation Causes and Recommendations August 2011 FERC/NERC Staff Report on the 2011 Southwest Cold Weather Event Table of Contents I. Introduction..................................................................1 II. Executive Summary.....................................................7 III. The Electric and Natural Gas Industries.................13 IV. Preparations for the Storm.......................................49 V. The Event: Load Shed and Curtailments................73 VI. Causes of the Outages and Supply Disruptions....139 VII. Prior Cold Weather Events.....................................169 VIII. Electric and Natural Gas Interdependencies........189 IX. Key Findings and Recommendations.....................195 - i - FERC/NERC Staff Report on the 2011 Southwest Cold Weather Event This page intentionally left blank. - ii - FERC/NERC Staff Report on the 2011 Southwest Cold Weather Event ATTACHMENTS Acronyms Glossary Appendices Task Force Members Legislative and Regulatory Responses by the States Categories of NERC Registered Entities Electricity: How it is Generated and Distributed Power Plant Design for Ambient Weather Conditions Impact of Wind Chill Winterization for Generators Natural Gas: Production and Distribution Natural Gas Storage Natural Gas Transportation Contracting Practices GTI: Impact of Cold Weather on Gas Production - iii - FERC/NERC Staff Report on the 2011 Southwest Cold Weather Event This page intentionally left blank. - iv - FERC/NERC Staff Report on the 2011 Southwest Cold Weather Event I. Introduction The southwest region of the United States experienced unusually cold and windy weather during the first week of February 2011. Lows during the period were in the teens for five consecutive mornings and there were many sustained hours of below freezing temperatures throughout Texas and in New Mexico. -
North American Electric Reliability Corporation Docket No. RR14-6-000
149 FERC ¶ 61,028 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Chairman; Philip D. Moeller, Tony Clark, and Norman C. Bay. North American Electric Reliability Corporation Docket No. RR14-6-000 ORDER ON 2015 BUSINESS PLANS AND BUDGETS (Issued October 16, 2014) 1. On August 22, 2014, North American Electric Reliability Corporation (NERC) filed 2015 business plans and budgets for each Regional Entity,1 the Western Interconnection Regional Advisory Body (WIRAB), Peak Reliability, Inc. (Peak Reliability), and itself (collectively, NERC Application). For the reasons discussed below, the Commission accepts the 2015 business plans and budgets of NERC, the Regional Entities, WIRAB, and Peak Reliability, as well as the associated attachments and updates. The Commission authorizes NERC to issue billing invoices to fund the fiscal year 2015 operations of the Regional Entities, WIRAB, Peak Reliability, and itself.2 I. Background A. Regulatory History 2. Section 215 of the Federal Power Act (FPA) requires the Commission to certify an Electric Reliability Organization (ERO) to develop mandatory and enforceable 1 The eight Regional Entities are Florida Reliability Coordinating Council, Midwest Reliability Organization, Northeast Power Coordinating Council, Inc., ReliabilityFirst Corporation, SERC Reliability Corporation, Southwest Power Pool Regional Entity, Texas Reliability Entity, and Western Electricity Coordinating Council (WECC). 2 On October 14, 2014, NERC submitted a “Request to Submit Revisions to the 2015 Budget and Assessments of Peak Reliability, Inc. to Reflect Additional Revenues from British Columbia Hydro and Power Authority,” in Docket No. RR14-6-001. The Commission will address this filing in a subsequent order. Docket No.