Council Activities

Total Page:16

File Type:pdf, Size:1020Kb

Council Activities 75 long term plan 2012-22 Council Activities GROUPS OF ACTIVITIES includes those activities which enable people to live closely together by establishing with the Community This section outlines all of the activities of Council and minimum standards for development and behaviour. includes information so that the Community can see The activities within this group are: how we plan, manage, deliver and fund activities. This council activities section is divided into eight “groups of activities”: • Animal Control 1. Roading • Building Control 2. Sewerage • Civil Defence and Emergency Management 3. Solid Waste Management • Compliance 4. Stormwater • Environmental Health 5. Water Supply • Resource Management 6. Development and Regulatory Services The Community Services Group includes activities 7. Community Services which provide services and facilities for the 8. Corporate Services Community’s enjoyment. The activities within this group are: The first five groups of activities encompass the • Community Development infrastructural services role of Council. These are Housing Care Services generally accepted as essential for a predominantly • urban population. The cost of providing these • Libraries and Archives five groups of activities accounts for over 50% of • Parks and Reserves Council’s rates draw. • Passenger Transport The Development and Regulatory Services Group • Pools • Public Toilets • Theatre Services 76 Council Activities continued The Corporate Services Group includes activities ACTIVITY PLANNING which provide democratic processes and provide or Each activity has a robust Activity Plan or Asset promote business-to-business relationships. The Management Plan that outlines the activity’s direction activities within this group are: and how Council plans to manage this. The main • Democratic Process points from each of these plans are included in this • Destinational Marketing section. Enterprise • Full Activity Plans or Asset Management Plans • Investment Property are available for viewing on www.icc.govt.nz or by contacting Council on 03 211 1777. 77 long term plan 2012-22 Roading WHat WE DO The Roading Activity provides a safe, convenient and • Surface water channel systems efficient transport system in the City. To achieve this, • Bridges Council manages and develops the roading network • Culverts council activities and roading infrastructure, which is comprised of: • Street furniture • Street lights • Parking facilities • Traffic signs and signals • Vehicle access crossings • Footpaths • Cycle tracks. • Drainage 78 WHY WE DO IT Footpaths are provided for safe and comfortable passage of pedestrians around the City areas. Council has the option of owning road assets or Streetlights are provided for the safety of all road supporting private sector developers and landowners users, including motorists, cyclists and pedestrians, in the provision of roads through development. The during night time hours. Roading Activity is generally regarded as the most essential activity associated with enhancing the District’s economy and accessibility. Council has identified the WHat WE CONTRIBUTE to THE CITY roading network including street lighting, footpaths and Council provides a road network to promote the parking as a strategic asset owned by Council. economic, environmental, social and cultural well- The land that roads are situated on (the road reserve) being of the Community. Being able to safely is kept in public ownership so that all people can travel within and through the District enables the freely move around the City. This allows for the ready Community to develop and function. Being able to movement of goods and services on roads, and for move easily within an urban area by road (including the location of electricity, gas, water, stormwater, cycleways and footpaths) creates efficiencies and sewers and telecommunications networks within the opportunities for the Invercargill Community, as well road reserve. as, those who live outside the District. Community Outcome Council’s Role in Achieving How the Activity Contributes Healthy lifestyles in a healthy Provide and promote access to The footpaths and cycleway network environment. open spaces, including green encourages people to become physically spaces and the coast. active and provides access to open spaces. A diverse and growing Ensure that the building blocks Quality road surfaces, road signs and economy. for sustainable business are in markings and traffic signals allow people place, including energy, water, and vehicles to easily travel within the communications and workforce. District in a safe and efficient manner for their business and leisure activity requirements. A City that is a great place to Design spaces, buildings and roads Council provides street lighting, signs, road live and visit. with community safety and interest markings and signals on urban roads so in mind and encourage others to do that vehicles, cyclists and pedestrians can the same. travel in safety. The Roading Activity ensures that the District is easy to get around and the road network is well maintained. 79 long term plan 2012-22 Potential Significant Negative Effects 1. Negative Effect: 1. Monitor: Annual NZTA report on crash statistics Road deaths and injuries. for Invercargill City. Response: · Prepare a ‘minor improvement projects’ plan each year. · Prepare renewals plans and maintenance plans to address potentially unsafe road surfaces (especially blackspots). · Set appropriate speed limits. · Maintain a road safety strategy and a road safety action plan. · Work closely with NZTA, the New Zealand Police and Road Safety Southland. 2. Negative Effect: 2. Monitor: Survey of user satisfaction/perception Effects of poor quality roading assets and of safety for infrastructure under direct Council council activities personal security when using the City’s roading control (eg footpath and road surface condition). network. Response: Develop guidelines to improve the level of service (eg footpath upgrade policy), targeted level of service improvements (eg better lighting works and safety audits). 3. Negative Effect: 3. Monitor: Notification of spill by call centre from Hazardous material spills within the road Customer Contact or Emergency Services. corridor or transport facility. Response: As set out in Emergency Response, Maintenance Contractor is required to make safe within one hour of notification. 4. Negative Effect: 4. Monitor: Complaints and call centre queries. Health and safety risks associated with the Response: Improve safety of the roading construction, maintenance or operation of the network to reduce the occurrence of crashes. transportation infrastructure. 5. Negative Effect: 5. Response: Promote the active transport modes The impact on public health from the reliance on such as walking and cycling. Investigate the cars. future demand for public transport services and infrastructure. The Roading Activity is managed to ensure that it does not create significant negative effects on the social, economic, environmental and cultural well-being of the Community. 80 WHat THE COMMUNITY CAN EXpect Council will continue to provide the Roading Activity. Community How the Activity Customer Level Council’s Role Measure of Service Outcome Contributes of Service A City that is Design spaces, buildings Council provides street Provision of a street Compliance with the a great place and roads with lighting, signs, road lighting network in New Zealand Street to live and community safety and markings and signals urban areas. Lighting Standard. visit. interest in mind, and on urban roads so that encourage others to do vehicles, cyclists and the same. pedestrians can travel in safety. A diverse Ensure that the building Quality road surfaces, Invercargill has good Invercargill’s urban and growing blocks for sustainable road signs and markings quality roads. and rural roads economy. business are in place, and traffic signals allow are smoother than including energy, water, people and vehicles the New Zealand communications and to easily travel within average. workforce. the District in a safe Traffic signs, road Signs and maps are and efficient manner name signs and promptly “responded for their business public street maps to” when vandalised and leisure activity are well maintained. or missing.* requirements. Operational traffic Traffic signals are signals promote the “responded to” safe movement of within one hour for people and vehicles. emergency works, four hours for serious faults and 12 hours for minor faults.* Healthy Provide and promote The footpaths and Provision of good Sealed footpaths lifestyles in access to open spaces, cycleway network condition smooth condition rating. a healthy including green spaces encourages people footpaths. environment. and the coast. to become physically Promotion of Council’s cycling active and provides Council’s cycling network is fully access to open spaces. network. marked. * “Responded to” means that Council’s contractor has been informed, inspected the issue and taken the necessary steps to resolve the problem. 81 long term plan 2012-22 Baseline Measure Target 2012/13 Target 2013/14 Target 2014/15 Target 2015-22 2010/11 60% Compliance with the Increasing Increasing Increasing 100% New Zealand Street percentage percentage percentage compliance by Lighting Standard. 2019 Achieved. Invercargill’s urban Achieve Achieve Achieve Achieve The average and rural roads are New Zealand smoother than the Territorial New Zealand average. Authority road smoothness
Recommended publications
  • Policies 249
    249 long term plan 2012-22 Policies The following policies set out basic principles and associated guidelines that Council will follow to direct and limit actions, in pursuit of its long term goal of sustainable development and providing for Community well-being now and into the future. policies 250 Significance Policy PURPOSE • The costs (financial and non-financial). The Invercargill City Council endeavours to be open • Implications on Council’s capacity to undertake its in its decision making, having taken into account the activities. views of its communities. The Policy on Significance • Section 97 (certain decisions to be taken only details: if provided for in the Long Term Plan), Local • The Invercargill City Council’s general approach Government Act 2002. to determining the significance of proposals The following financial thresholds are identified as and decisions in relation to issues, assets or significant: other matters that have not been included in the • Increase greater than 2% to general or targeted Annual Plan and/or Long Term Plan consultation rates for an activity. processes. • Unbudgeted expenditure of $5 million. • The thresholds and criteria to be used in • Unbudgeted annual operating cost increases in determining the extent of significance. excess of $500,000. • The Invercargill City Council's procedures for making decisions. The Invercargill City Council will use the following criteria to determine the level of significance where a • The strategic assets of the Invercargill City proposal or decision meets the significance threshold Council. test: If a proposal or decision is determined by this policy • Whether the decision flows logically and to be significant, the Council will engage and consult consequentially from a decision already with the Community before making a final decision.
    [Show full text]
  • Short Walks in the Invercargill Area Invercargill the in Walks Short Conditions of Use of Conditions
    W: E: www.icc.govt.nz [email protected] F: P: +64 3 217 5358 217 3 +64 9070 219 3 +64 Queens Park, Invercargill, New Zealand New Invercargill, Park, Queens Makarewa Office Parks Council City Invercargill For further information contact: information further For Lorneville Lorneville - Dacre Rd North Rd contents of this brochure. All material is subject to copyright. copyright. to subject is material All brochure. this of contents Web: www.es.govt.nz Web: for loss, cost or damage whatsoever arising out of or connected with the the with connected or of out arising whatsoever damage or cost loss, for 8 Email: [email protected] Email: responsibility for any error or omission and disclaim liability to any entity entity any to liability disclaim and omission or error any for responsibility West Plains Rd 9 McIvor Rd 5115 211 03 Ph: the agencies involved in the management of these walking tracks accept no no accept tracks walking these of management the in involved agencies the Waikiwi 9840 Invercargill While all due care has been taken to ensure the accuracy of this publication, publication, this of accuracy the ensure to taken been has care due all While Waihopai Bainfield Rd 90116 Bag Private Disclaimer Grasmere Southland Environment 7 10 Rosedale Waverley www.doc.govt.nz Web: Web: www.southerndhb.govt.nz Web: Bay Rd Herbert St Findlay Rd [email protected] Email: Email: [email protected] Email: Avenal Windsor Ph: 03 211 2400 211 03 Ph: Ph: 03 211 0900 211 03 Ph: Queens Dr Glengarry Tay St Invercargill 9840 Invercargill
    [Show full text]
  • Hwcp Management Ltd
    HWCP MANAGEMENT LTD INNER CITY REDEVELOPMENT October 2018 Contents 1. Introduction .................................................................................................................................................... 3 2 Site Description .............................................................................................................................................. 4 3. Urban Context ................................................................................................................................................ 6 4. Description of Activity .................................................................................................................................... 8 4.1 Overview of Redevelopment ................................................................................................................................ 8 4.2 Heritage Building Demolition ................................................................................................................................ 8 4.3 Urban Design ....................................................................................................................................................... 10 4.4 Demolition and Construction .............................................................................................................................. 11 5. Invercargill City District Plan Assessment....................................................................................................... 11 5.1 Business 1 Zone ..................................................................................................................................................
    [Show full text]
  • The Tablet the Construction Involved the Creation of Bedroom Accommodation That Would Be Connected to the Existing Living Space for the Sisters
    THE MON T HLY MAGAZINE FOR T HE CA T HOLI C S OF T HE DUNE D IN DIO C ESE HE ABLE T March 2012T T Issue No 173 Christ is leading us into new life Dear Brothers and Sisters in Christ netball squad look bleak, and the baby just cutting teeth. On such days, life becomes a juggling act and getting LENT is with us and the Church’s invitation is again to take through to nightfall is an achievement in itself. up our cross and follow Jesus on his way to Calvary. We all experience trials and temptations in a society that From ashes to Easter – I always think that Lent and Easter trumpets individualism; we need to remind ourselves that is a microcosm of our whole life and our journey of faith to in those darker moments we are not alone, and we do not Calvary and Resurrection, patterned on Christ’s life, death have to go it alone. Our faith is in a Servant King who is and Resurrection. there for us, is with us, indeed, within us. Fr Tony Gittens We know, too, our time on earth is fraught with all sorts said recently: “We may have cause for pessimism at times of trials and tribulations. I often think that, beset by a daily but we must never lose hope.” dose of problems and temptations, we see more of the As we journey through Lent to Easter, we know that Calvary Cross than the Resurrection in life’s journey. was not the end – it was only the end of the beginning – As I write this, I think of our diocese of Dunedin, and Jesus’ death ushered in the new life of the Resurrection incorporating Otago and Southland, and some of the and the outpouring of his Spirit.
    [Show full text]
  • Review of the Archaeology of Foveaux Strait, New Zealand, by Chris Jacomb, Richard Walter and Chris
    REVIEW OF THE ARCHAEOLOGY OF FOVEAUX STRAIT, NEW ZEALAND CHRIS JACOMB, RICHARD WALTER and CHRIS JENNINGS University of Otago The waters and shores of Foveaux Strait make up one of the coldest, windiest environments in New Zealand and, lying well outside the tropical horticulture zone, could not have been less like the environment of the Polynesian homelands. Yet they contain an extensive archaeological record which includes a low density but wide distribution of sites, as well as some rich artefact assemblages held in private and public collections. The record is not well dated but the few radiocarbon dates and the material culture and economy suggest that occupation commenced as early there as in any other part of the country. In considering why people moved so far south so early, Lockerbie (1959) rejected push factors such as demographic or resource pressures and argued that there must have been some serious attractors (pull factors) in play. Working today with a much shorter chronology, push motives seem even less likely but it is difficult to imagine what the pull factors might have been. Foveaux Strait settlement coincides with the expansion of moa hunting in southern New Zealand but there were never many moa (Dinornithiformes) along the south coast and moa bone is rare in south coast middens. There are resident populations of sea mammals including New Zealand fur seal (Arctocephalus forsterii) and sea lion (Phocarctos hookeri) but these were not restricted to Foveaux Strait (Smith 1989: 208), nor do the sites show high levels of sea mammal predation. Today, one of the most important seasonal resources is the sooty shearwater (mutton bird or titi(Puffinus) griseus) but again, there are no strong archaeological indicators of an early emphasis on mutton birding (Anderson 1995, 2001; Sutton and Marshall 1980).
    [Show full text]
  • Annual Report 2009
    invercargill licensing trust annual report 2009 INcLUdEs Invercargill n Invercargill Licensing Trust Licensing Trust n ILT Foundation ANNUAL GENERAL MEETING To be held at Elmwood Garden 1 September 2009 at 7.30pm A Few Words from Henry ... “Yes, you squashed cabbage leaf ... you incarnate insult to the English language, I could pass you off as the Queen of Sheba”. My Fair Lady was simply George Bernard Shaw’s Pygmalion both delighted and scandalized its first audiences spectacular in 1914. A brilliantly witty reworking of the classical tale of a sculptor who falls in love with his perfect female statue. Pygmalion is named after the Cypriot King from Greek mythology who fell in love with his own creation: an ivory statue called ‘Galatea’. When he fell in love with Galatea, the Goddess Aphrodite brought the statue to life and Pygmalion married her. As well as reflecting Shaw’s feminist views, Pygmalion provides a commentary on the class system which may not be so irrelevant today! Henry Higgins believes he can transform Eliza Doolittle, a cockney flower girl, into a Duchess at ease in ‘polite’ society by changing the way she speaks. However, his ‘creation’ has a mind of her own and a battle of wills begins that challenges them both in unexpected ways. my By the time Lerner and Leowe’s musical adaptation of Pygmalion, My Fair Lady, ended its New York run in 1962, it had run six and a half years and for 2,717 performances, more than any other previous musical in stage history. In London, the show had a five and a half year run of 2,281 performances with New York’s fair original cast members, Rex Harrison, Julie Andrews and Stanley Holloway.
    [Show full text]
  • SIS) – 2017 Version
    Awarua Bay-New River Estuary New Zealand EAAF NETWORK SITE CODE FOR OFFICE USE ONLY: E A A F 1 3 8 Site Information Sheet on East Asian-Australasian Flyway Network Sites (SIS) – 2017 version Available for download from http://www.eaaflyway.net/about/the-flyway/flyway-site-network/ Categories approved by Second Meeting of the Partners of the East Asian-Australasian Flyway Partnership in Beijing, China 13-14 November 2007 - Report (Minutes) Agenda Item 3.13 1 of 20 Information Sheet on EAA Flyway Network Sites | Awarua Bay-New River Estuary [EAAF138] Notes for compilers: 1. The management body intending to nominate a site for inclusion in the East Asian - Australasian Flyway Site Network is requested to complete a Site Information Sheet. The Site Information Sheet will provide the basic information of the site and detail how the site meets the criteria for inclusion in the Flyway Site Network. When there is a new nomination or an SIS update, the following sections with an asterisk (*), from Questions 1-14 and Question 30, must be filled or updated at least so that it can justify the international importance of the habitat for migratory waterbirds. 2. The Site Information Sheet is based on the Ramsar Information Sheet. If the site proposed for the Flyway Site Network is an existing Ramsar site then the documentation process can be simplified. 3. Once completed, the Site Information Sheet (and accompanying map(s)) should be submitted to the Secretariat. Compilers should provide an electronic (MS Word) copy of the Information Sheet and, where possible, digital versions (e.g.
    [Show full text]
  • Information on Waste/Clean up of Tiwai Point
    Reference: 20210058 15 March 2021 On 15 February 2021, the Ministry for the Environment transferred the following part of your request to the Treasury: “…the latest comprehensive report MFE has (generated from whatever source) on on [sic] either of the above (waste/cleanup).” Please find enclosed the following document: Item Date Document Description Decision 1. 30 October 2020 Project 14 - Identification and Evaluation of Release in part Remediation Options I have decided to release the document listed above, subject to information being withheld under one or more of the following sections of the Official Information Act, as applicable: • personal details, under section 9(2)(a) – to protect the privacy of natural persons, including that of deceased natural persons • confidential information, under section 9(2)(ba)(i) – to protect information which is subject to an obligation of confidence or which any person has been or could be compelled to provide under the authority of any enactment, where the making available of the information would be likely to prejudice the supply of similar information, or information from the same source, and it is in the public interest that such information should continue to be supplied • legally privileged information, under section 9(2)(h) – to maintain legal professional privilege • information to carry on negotiations, under section 9(2)(j) – to carry on negotiations without prejudice or disadvantage 1 The Terrace PO Box 3724 Wellington 6140 New Zealand tel. +64-4-472-2733 https://treasury.govt.nz In making my decision, I have considered the public interest considerations in section 9(1) of the Official Information Act.
    [Show full text]
  • Southland Conservancy
    A Directory of Wetlands in New Zealand SOUTHLAND CONSERVANCY Te Anau Basin Wetland Complex (71) Location: 45o27'S, 167o46'E. To the east and southeast of Lake Te Anau, Southland, South Island. Area: c.2,400 ha. Altitude: 180-360 m. Overview: The Te Anau Basin Wetland Complex consists of seven distinct and isolated wetlands within the Te Anau Basin. These sites are the Dome Mire and Dismal Swamp area, Kepler Mire, Amoeboid Mire, Kakapo Swamp, Dunton Bog and two areas within the Snowdon Forest. The Dome Mire and Dismal Swamp area and Kepler Mire are described in greater detail as Sites 71a and 71b, respectively. All of the wetlands have a similar glacial origin; however, individual sites vary as a consequence of their history, drainage (water table, amounts of ponded water), fertility, topography etc. The complex of peatlands contains a rich variety of plant communities which include several significant plant distributions and provide important habitat for wildlife. Physical features: The Te Anau Basin lies on the eastern margin of Fiordland, a gneiss/schist/granite massif uplifted by the Alpine Fault on its western margin and carved by extensive glaciation through the Quaternary. On its eastern flank, down-faulting in the Te Anau Basin area has contributed to the preservation of soft Tertiary sedimentary rocks, and the deposition of glacial gravels. During the last glaciation, glaciers occupied much of the basin. Depressions and areas of limited drainage developed in the moraines, tills and outwash gravels as the glaciers retreated. Wetlands have developed on these glacial outwash deposits of last glacial to post-glacial age.
    [Show full text]
  • Wednesday 21 August 2013 Parks
    TO: INFRASTRUCTURE AND SERVICES COMMITTEE FROM: THE DIRECTOR OF WORKS AND SERVICES MEETING DATE: WEDNESDAY 21 AUGUST 2013 PARKS STRATEGY Report Prepared by: Robin Pagan − Parks Manager SUMMARY The draft Parks Strategy has been now been completed and is ready for Council's consideration. RECOMMENDATIONS That the draft Parks Strategy for Council's Parks Division now be adopted. IMPLICATIONS 1. Has this been provided for in the Long Term Plan/Annual Plan? Yes 2. Is a budget amendment required? To complete the proposed levels of service, increased spending will be required in selected areas which may be off−set by decreased levels of service in other areas. This will need to be addressed at the time of drafting budgets. 3. Is this matter significant in terms of Council's Policy on Significance? Yes 4. Implications in terms of other Council Strategic Documents or Council Policy? This Strategy will link with Asset Management Plans, Long Term Plans and Reserve Management Plans. 5. Have the views of affected or interested persons been obtained and is any further public consultation required? Workshops have been held with Councillors. FINANCIAL IMPLICATIONS The sum of $1.1 million over the next ten years is required to increase the levels of service in selected areas; this can in part be achieved by reallocation of existing budgets. PARKS STRATEGY The draft Parks Strategy for Invercargill Reserve land administrated by the Parks Division is now ready for council's consideration and adoption. 0069 Work on the Strategy has been carried out over the past 12 months with Xyst Consultancy producing this final draft.
    [Show full text]
  • Opportunities for Private Jets at Invercargill Airport
    OPPORTUNITIES FOR PRIVATE JETS AT INVERCARGILL AIRPORT We believe Invercargill Airport has the capacity, infrastructure, location and determination to be the Airport of choice for private jet operations in the South. Invercargill Airport has New Zealand’s third longest runway and has one of the highest airport availabilies in New Zealand. The airport is a modern facility (upgraded in June 2016) which is well supported by the excellent aviation infrastructure, training facilities, and offers space to park private jets of all sizes. Aviation Environment Southland has one of the largest low traffic airspace in New Zealand, with Air Traffic Control provided at Invercargill Airport. Southland is blessed with stunning scenery. In flying terms, this translates to a variety of terrain, ranging from gently rolling pasture and hill country to rugged coastlines, alpine lakes, snow-capped mountains and complex alpine terrain. The landscape is accompanied by a wide range of weather conditions, from beautiful clear sunny days in summer and winter, to cold, blustery conditions. In almost all conditions Invercargill Airport remains open to service its customers. Southland’s daylight hours are another blessing for aviators. In summer, daylight begins as early as 5am while the evening twilight extends as late as 10.30pm, which translates to an incredible 16 hours flying time. This provides long, lower risk opportunities to use the Airport aviation facilities. On a dark, clear night, it is possible to witness the world-famous Aurora Australis (Southern Lights). This magical atmospheric condition is like a spectacular light show in the night sky. It occurs when particles from the sun interact with the earth’s magnetic field - the resulting electric charge makes the gases in the atmosphere glow red, yellow and green.
    [Show full text]
  • Urban and Industry
    The Southland Economic Project URBAN AND INDUSTRY SOUTHLAND DISTRICT COUNCIL Cover photo: Matāura looking south across the Matāura River Source: Emma Moran The Southland Economic Project: Urban and Industry Technical Report May 2018 Editing Team: Emma Moran – Senior Policy Analyst/Economist (Environment Southland) Denise McKay – Policy and Planning Administrator (Environment Southland) Sue Bennett – Principal Environmental Scientist (Stantec) Stephen West – Principal Consents Officer (Environment Southland) Karen Wilson – Senior Science Co-ordinator (Environment Southland) SRC Publication No 2018-17 Document Quality Control Environment Policy, lanning and egulatory ervices Southland Division Report reference Title: The outhland conomic roject: Urb an ndustry No: 2018-17 Emma Moran, enio olicy nalyst/Economist, nvironment outhland Denis McKay, licy d anning Administrator, nvironment outhland Prepared by Sue ennett, Principal nvironmental cientist, tantec Stephen est, Principal onsents fficer, Environment Southland Karen ilson, enio cience o-ordinator, nvironment Southland Reviewed by: Ke urray, RMA anner, Departmen f onservation Approved for issue by The overnance ro or he outhlan conomic roject Date issued ay 2018 Project Code 03220.1302 Document History Version Final Status: Final Date May 2018 Doc ID: 978-0-909073-41-1 municipal fi i thi reproduced from consultants’ outputs devel wi territorial authoriti Southl Distri Council Southl Distri Council Invercargill Ci Council l reasonabl nformati withi thi incl esti cul average concentrations over four years Disclaimer multiplied by the annual flows. This is a ‘broad brush’ calculati i may di Envi Southl accounti contami National Poli val thi i system’s existing performance (the base) and its upgrade scenarios. Citation Advice Moran, ., McKay D., Bennett, ., West, ., an Wilson, .
    [Show full text]