BRIEF NOTE ON INDUSTRY- M/S. BALAJI AMINES LTD

M/s. BALAJI AMINES LTD.(BAL) is a limited company (the plant was originally in the name of Bhagyanagar Chemicals Ltd., which is a WOS (Wholly Owned Subsidiary) of BAL having lease agreement) and commenced its commercial operations in 1994, Focusing its attention on developing technology for import substitute products without any kind of pollution, introduced quality products DMAHCL, TMAHCL other HCLs and natural products such as Solonesol, 10 DAB etc. a) Name and location details M/s. BALAJI AMINES LTD of the project Plot No: 4 & 5, Beside Sub-Station-II, I.D.A, Bollaram, Jinnaram (M), Medak District, Telangana State b) Address of project Mr. B. Jogeshwar Rao, Plant Manager proponent for 3rd Floor, K.P.R House, SP Road, Secunderabad, Telangana correspondence E-Mail : [email protected] Objective of the project Expansion of existing manufacturing unit. Project details Additional Buildings , RO works & any other construction works for Expansion Details of the major products S. Quantity Product Name manufactured along with by No Kg/Month products (Quantity /month) 1 16-Alpha hydroxyPrednisolone 200.00 2 Beclomethasone Dipropionate 200.00 3 17-valerate 500.00 4 250.00 5 Betamethasone dipropionate 500.00 6 Betamethasone Sodium Phosphate 250.00 7 700.00 8 1500.00 9 Dimethylamine Hydrochloride 12,00000.00 10 Emtricitabine 600.00 11 Pivalate 525.00 12 Furoate 500.00 13 Lamivudine 400.00 14 Furoate 500.00 15 Nadolol 400.00 16 Povidone Iodine 200000.00 17 PVP-A Copolymer Series 50000.00 18 VP/DMAEMA Quaternized(PQ-11) 50000.00 Total 1,507,025.00

a)Proposed capacity 18084.3 TPA Status of Organization Limited Company Government / Semi Government /Public/Private Investment(Rs) Proposed Expansion : 3.0 Crores Total Labor Force During construction - 10 During operation After Expansion - 95 Nature of land Industrial land (IDA/Revenue/Others) Location and land use The proposal is within the existing land. The total area of the details of the area with unit is schematic plan 4. 2 Acres and Plant layout is Enclosed Details of the water bodies Aminpur Lake – 3.0 Km SSW around the proposed Katya tank – 3.31 Km ENE industry within 10 KM Radius Amb Cheruvu – 6.5 Km SE (Arial Distance) Tank Near Bachupalli – 3.0 Km SE Patel Cheruvu – 5.6 Km S Irla Kunta – 6.7 Km S Kotla Kunta – 7.0 Km S Gopi Cheruvu – 7.48 Km SSW Nallagandla Cheruvu – 8.9 Km SSW Pedda Cheruvu – 5.5 Km SSW Chaki Cheruvu – 9.0 Km WSW Timmakka Cheruvu – 8.2 Km W Tank Near Krishnareddy Pet – 4.3 Km W Danara Cheruvu – 2.1 Km NW Bamana Cheruvu – 5.4 Km NW Bappana Cheruvu – 5.6 NNW Details of the Reserved Kazipalli RF – 3.0 Km NNW Forests around the Unit Wailal RF – 6.5 Km NNW industry within 10 KMs Pottaguda RF – 7.5 Km NNW Radius (Arial Distance) Kodakonchi RF – 8.4 Km NW Gajula Ramaram RF – 6.8 Km E Suraram RF – 7.8 Km E Borampet RF – 5.6 Km ENE Dundugal RF – 6.7 Km NNE Kistaipalli RF – 5.9 Km NNE Distance(If within 10 Km (Arial Distance) ) to the nearest Nil  National Park Nil  Sanctuary Nil  Heritage sites Nil  Monument Nil Greenery plan within 33% industrial premises: Area% of total area Details of the source of TSIIC Water Supply water (Rivers, Lakes, Ground, public supply) Water Balance a) Water requirement 135.00 KL/day i) Domestic(KL/day) 4.00 KL/day ii)Industrial(KL/day)  Process 21.00 KL/day  Washings 03.00 KL/day  Boiler make up 36.00 KL/day  Cooling Towers Make up 63.00 KL/day  DM Plant 2.00 KL/day  Scrubbing System 2.00 KL/day  Gardening 4.00 KL/day b) Waste Water Generated 57.50 KL/ day i)Domestic(KL /day) 3.50 KL /day ii) Industrial(KL /day)  Process 29.00 KL/day  Washings 03.00 KL/day  Boiler Blow down 06.0 KL/day  Cooling towers blow down 12.0KL/day  DM Plant Regeneration 02.0 KL/day  Scrubbing System 02.0 KL/day c) Expected quality of waste pH- 5.5 to 8.5 water TDS-2100 to 70000.00 mg/liter SS - 80-150 COD-1600 to 18000.00 mg/ltr d)Effluent treatment ZLD System proposal e) Mode of disposal HTDS Sent to stripper followed by MEE and ATFD. (Pond/River valley/under Condensate will be send to ETP followed by RO. ground sever/ Irrigation/ LTDS Effluents sent to ETP followed by RO system.RO Ocean/others specify Rejects sent to MEE system and RO Permeate to Reuse. F)Total area allotted for Nil disposal of waste water No waste water will be disposed on to the ground. Hence area not allotted Grinders/Crushers Nil Boiler Likely emissions: SPM <0.27 gm/sec SO2 <1.15 gm/sec NOx <1.54 gm/sec Power Generation Nil b) Details of Control For stack: Height of the chimney will be 30 meters. equipment a)Details of Solid waste Organic Residue – 901 Kg/Day Inorganic solid waste – 38 Kg/Day MEE salts – 1375.00 Kg/Day Spent carbon – 16 Kg/Day Coal ash from Boiler – 7050 Kg/Day ETP Sludge – 30 Kg/Day Solvent Distillation bottom Residue – 43 Kg/Day i) Domestic About 15 Kg/day ii)Hazardous  Used Oils - 500 Liters/Annum  Containers & Container liners of Hazardous waste and chemicals - 1000 No’s/Month  Used Lead Acid Batteries - 2 No’s/Year Ambient Noise level a) Source of noise and DG Set when in operation and motors Vibrations b) Noise and Vibration Silencer will be provided and regular maintenance of motors control measure proposed. will be followed Power requirement 850 HP and Public supply indicating Source of supply Stack Emissions For 2Lakh & 10 Lakh kcal/hr. Thermo pack Boiler Thermopack Boiler Coal Fired Boiler 2 No’s 3.0 TPH Coal fired Boiler DG Set Details DG Sets Existing – 375 KVA DG Set proposed – 360 KVA