Sample Procurement Plan

(Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) Public Disclosure Authorized (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary).

I. General

1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 Public Disclosure Authorized

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.]

Procurement Method Prior Review Threshold Comments US$ Public Disclosure Authorized 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary]

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by

Public Disclosure Authorized the Bank or delete if not applicable]

4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by

July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

1 2 3 4 5 6 7

Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise

July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable]

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods

July 9, 2010 PROCUREMENT : Bangladesh NATP-2: National Agricultural Technology Program - Phase II Project PLAN General Information

Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2017-03-09 Revised Plan Date(s): (comma delineated, leave blank if none)2020-11-16 Project ID: P149553 GPN Date: Project Name: Bangladesh NATP-2: National Agricultural Technology Program - Phase II Project Loan / Credit No: IDA / 56650 Executing Agency(ies):Department of Fisheries

WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Document Amount Amount Document / Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion Type (US$) (US$) Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

WD4-1 / Post-Harvest Service Center at Natore- Establishment of fish landing center- 01 - Supporting Agricultural Under Construction of landing Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 96,774.19 0.00 Implementat 2018-12-10 2018-12-10 2018-12-31 2019-01-21 2019-02-25 2019-08-24 platform, ice plant, water Envelope Development ion supply facility, insulated cold storage for temporary preservation of ice or iced fish etc.- Lot 1

WD4-2 / Post-Harvest Service Center at Mymenshing-Establishment of fish landing center- 02- Supporting Agricultural Pending Construction of landing Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 96,774.19 0.00 Implementat 2018-12-10 2018-12-10 2018-12-31 2019-01-21 2019-02-25 2019-08-24 platform, ice plant, water Envelope Development ion supply facility, insulated cold storage for temporary preservation of ice or iced fish etc.- Lot 2

NATP-2/DOF/WD-1 / Repair & renovation of 01 Supporting Agricultural Single Stage - One Computer room, 02 Training IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 54,426.03 40,116.99 Completed 2020-01-23 2020-01-27 2020-01-23 2020-02-06 2020-02-13 2020-02-18 2020-03-12 2020-03-24 2020-03-24 2020-07-22 Envelope rooms and 35 rooms of Development dormitory of Faridpur FTEC

NATP-2/DOF/WD-2 / Repair & renovation of 01 Supporting Agricultural Single Stage - One Computer room, 01 Training IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,035.50 28,274.59 Completed 2020-01-23 2020-01-27 2020-01-23 2020-02-06 2020-02-13 2020-02-18 2020-03-15 2020-03-24 2020-03-22 2020-07-22 Envelope rooms and 19 rooms of Development dormitory of Savar FTA

NATP-2/DOF/WD-3 / Repair Supporting Agricultural & renovation of 01 Training Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 13,266.27 9,982.40 Completed 2020-01-23 2020-01-27 2020-01-23 2020-02-06 2020-02-13 2020-02-18 2020-02-27 2020-03-24 2020-03-11 2020-07-22 room and 04 rooms of Envelope Development dormitory of Raipur FHTC

NATP-2/DOF/WD-4 / Repair & renovation of 01 Training Supporting Agricultural Single Stage - One rooms and 07 rooms of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 12,497.04 9,879.14 Completed 2020-01-23 2020-01-27 2020-01-23 2020-02-06 2020-02-13 2020-02-18 2020-03-01 2020-03-24 2020-03-11 2020-07-22 Envelope dormitory of Natore Sadar Development FSMF

NATP-2/DOF/WD-5 / Repair & renovation of 01 Supporting Agricultural Computer room, 01 Training Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 21,893.49 17,725.39 Completed 2020-01-23 2020-01-27 2020-01-23 2020-02-06 2020-02-13 2020-02-18 2020-03-01 2020-03-24 2020-03-18 2020-07-22 rooms and 10 rooms of Envelope Development dormitory of Parbatipur FTEC

Page 1 NATP-2/DOF/WD-6.A / Establishment of fish landing center at Singra, Natore (construction of Supporting Agricultural Single Stage - One landing platform, ice plant, IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 88,757.39 74,000.21 Signed 2020-01-23 2020-01-27 2020-01-23 2020-02-06 2020-02-13 2020-02-18 2020-03-10 2020-03-24 2020-03-24 2020-10-20 Envelope water supply facility, Development insulated cold storage for temporary preservation of ice/iced fish etc.)

NATP-2/DOF/WD-6.B / Establishment of fish landing center at Trishal, Mymensingh (construction Supporting Agricultural Single Stage - One of landing platform, ice IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 88,757.39 77,133.14 Signed 2020-01-23 2020-01-27 2020-01-23 2020-02-06 2020-02-13 2020-02-18 2020-03-11 2020-03-24 2020-03-25 2020-10-20 Envelope plant, water supply facility, Development insulated cold storage for temporary preservation of ice/iced fish etc.)

NATP-2/DOF/WD-7 / Supporting Agricultural Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.00 4,819.20 Completed 2020-02-10 2020-02-05 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-07 2020-04-11 2020-03-16 2020-06-10 Charan beel of Kalihati Envelope Development , Tangail

NATP-2/DOF/WD-8.A / Supporting Agricultural Habitat improvement of Beel Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 3,950.29 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-09 2020-04-11 2020-03-23 2020-06-10 haria, of , Envelope Development Kishoreganj

NATP-2/DOF/WD-8.B / Supporting Agricultural Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 3,950.29 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-09 2020-04-11 2020-03-23 2020-06-10 Sadia kunia beel of Tarail Envelope Development Upazila, Kishoreganj

NATP-2/DOF/WD-8.C / Supporting Agricultural Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 5,408.57 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-07 2020-04-11 2020-03-16 2020-06-10 Nobodia beel of Pakundia Envelope Development Upazila, Kishoreganj

NATP-2/DOF/WD-8.D / Habitat improvement of Supporting Agricultural Single Stage - One Chotodigha beel of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 5,346.48 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-07 2020-04-11 2020-03-16 2020-06-10 Envelope Mithamoin Upazila, Development Kishoreganj

NATP-2/DOF/WD-9 / Supporting Agricultural Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 7,901.42 Completed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-09 2020-04-11 2020-03-23 2020-06-10 Zazira beel of Sadar Envelope Development Upazila, Madaripur

NATP-2/DOF/WD-10.B / Supporting Agricultural Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 5,241.34 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-07 2020-04-11 2020-03-18 2020-06-10 Hiron beel of Kotalipara Envelope Development Upazila, Gopalganj

NATP-2/DOF/WD-10.A / Supporting Agricultural Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 4,720.56 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-07 2020-04-11 2020-03-18 2020-06-10 Baghiar beel of Kotalipara Envelope Development Upazila, Gopalganj

NATP-2/DOF/WD-11.A / Supporting Agricultural Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 5,224.18 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-07 2020-04-11 2020-03-16 2020-06-10 Kashian beel of Kendua Envelope Development Upazila, Netrokona

NATP-2/DOF/WD-11.B / Supporting Agricultural Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 4,593.63 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-07 2020-04-11 2020-03-24 2020-06-10 Nakdhora beel of Madan Envelope Development Upazila, Netrokona

Page 2 NATP-2/DOF/WD-11.C / Habitat improvement of Supporting Agricultural Single Stage - One Bisorpasha haor of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 4,417.12 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-05 2020-04-11 2020-03-16 2020-06-10 Envelope Kalmakanda Upazila, Development Netrokona

NATP-2/DOF/WD-11.D / Supporting Agricultural Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 3,950.29 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-09 2020-04-11 2020-03-23 2020-06-10 Dharam beel of Barhatta Envelope Development Upazila, Netrokona

NATP-2/DOF/WD-15.A / Supporting Agricultural Habitat improvement of Beel Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 4,126.39 Signed 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-05 2020-04-11 2020-03-23 2020-06-10 Chatra of Atgharia Upazila, Envelope Development Pabna

NATP-2/DOF/WD-15.B / Supporting Agricultural Under Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 4,044.24 Implementat 2020-02-10 2020-02-04 2020-02-10 2020-02-24 2020-02-24 2020-03-07 2020-03-09 2020-04-11 2020-06-10 Shaowladaha beel of Envelope Development ion Chatmohor Upazila, Pabna

NATP-2/DOF/WD-9.A / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-15 2020-09-20 2020-10-11 2020-11-05 2020-12-10 2021-03-10 Shashikor beel of Kalkini Envelope Development ion Upazila, Madaripur

NATP-2/DOF/WD-9.B / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-10 2020-09-15 2020-10-06 2020-10-31 2020-12-05 2021-03-05 Khilgram beel of Kalkini Envelope Development ion Upazila, Madaripur

NATP-2/DOF/WD-10.C / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-10 2020-09-15 2020-10-06 2020-10-31 2020-12-05 2021-03-05 Orakandi beel of Kashiani Envelope Development ion Upazila, Gopalganj

NATP-2/DOF/WD-10.D / Habitat improvement of Supporting Agricultural Pending Single Stage - One Nashukhali beel of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-10 2020-09-15 2020-10-06 2020-10-31 2020-12-05 2021-03-05 Envelope Tungipara Upazila, Development ion Gopalganj

NATP-2/DOF/WD-10.E / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-10 2020-09-15 2020-10-06 2020-10-31 2020-12-05 2021-03-05 Sailobala beel Tungipara Envelope Development ion Upazila, Gopalganj

NATP-2/DOF/WD-12 / Habitat improvement of Supporting Agricultural Pending Single Stage - One Barang river beel of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-10 2020-09-15 2020-10-06 2020-10-31 2020-12-05 2021-03-05 Envelope Baniachang Upazila, Development ion Habiganj

NATP-2/DOF/WD-13 / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-10 2020-09-15 2020-10-06 2020-10-31 2020-12-05 2021-03-05 Baromedhi beel of Dirai Envelope Development ion Upazila, Sunamganj

NATP-2/DOF/WD-14 / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-10 2020-09-15 2020-10-06 2020-10-31 2020-12-05 2021-03-05 Hurol beel of Nasirnagar Envelope Development ion Upazila, Brahmanbaria

NATP-2/DOF/WD-15.B.A / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-10 2020-09-15 2020-10-06 2020-10-31 2020-12-05 2021-03-05 Shaowladaha beel of Envelope Development ion Chatmohor Upazila Pabna

Page 3 NATP-2/DOF/WD-15.C / Supporting Agricultural Pending Habitat improvement of Beel Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,889.28 0.00 Implementat 2020-09-10 2020-09-15 2020-10-06 2020-10-31 2020-12-05 2021-03-05 Ruhul of Faridpur Upazila, Envelope Development ion Pabna

GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Supporting Agricultural GD/DOF-08 / Office Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 12,905.00 10,632.39 Completed 2017-03-02 2017-04-30 2017-03-12 2017-03-27 2017-05-15 2017-04-12 2017-05-24 2017-05-15 2017-06-04 2017-06-14 2017-06-24 Furniture for PIU and ICT Envelope Development

Supporting Agricultural GD/DOF-28 / Office Request for Single Stage - One IDA / 56650 Technology for Fisheries Post Limited 3,900.00 2,981.18 Completed 2017-03-15 2017-03-13 2017-05-09 2017-04-02 2017-05-29 2017-04-06 supplies and consumables Quotations Envelope Development

GD/DOF-25 / Preparation and printing of pond record Supporting Agricultural Single Stage - One book, CIG saving books, IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,700.00 17,552.59 Completed 2008-03-10 2017-03-29 2008-03-15 2008-04-07 2017-04-17 2008-04-20 2017-05-10 2008-05-23 2017-05-30 2008-06-22 2017-06-20 Envelope leaflet, aquaculture advice Development slip pad etc.

GD/DOF-24 / Reagent and Supporting Agricultural chemicals for Quality Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,709.00 33,429.33 Completed 2017-09-25 2018-05-28 2017-09-30 2018-04-15 2017-11-07 2018-06-11 2017-12-03 2018-06-11 2018-01-07 2018-06-26 2018-07-06 2018-06-28 Assurance Laboratories Envelope Development under DoF.

GD/DOF-26 / Printing of Supporting Agricultural Request for Single Stage - One leaflets on project IDA / 56650 Technology for Fisheries Post Limited 6,450.00 4,618.42 Completed 2017-09-01 2017-09-17 2017-10-27 2017-12-14 2018-04-25 2017-12-31 Quotations Envelope intervensions and AIF Development

Supporting Agricultural GD/DOF-13 / Water Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 525,484.00 412,993.89 Completed 2017-02-23 2017-02-12 2017-02-23 2017-03-06 2017-03-06 2017-03-20 2017-03-29 2017-04-22 2017-04-02 2017-06-21 2017-05-30 Analyzing Kit Envelope Development

Supporting Agricultural GD/DOF- 17 / Sound Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 12,903.00 11,765.69 Completed 2017-09-28 2018-03-05 2017-10-03 2018-02-06 2017-11-14 2018-03-18 2017-12-14 2018-04-01 2018-01-18 2018-04-09 2018-07-17 2018-04-17 System with Accessories Envelope Development

Supporting Agricultural GD/DOF-30_1 / Printing of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 12,905.00 3,089.76 Completed 2017-10-20 2017-12-19 2017-10-25 2017-12-06 2018-01-03 2018-01-05 2018-01-08 2018-02-09 2018-01-29 2018-08-08 2018-02-15 aquaculture manual Envelope Development

GD/DOF-29 / Procuremet, installation and reconfiguration of router for Supporting Agricultural Request for Single Stage - One Internet connectivity at IDA / 56650 Technology for Fisheries Post Limited 3,490.00 2,666.03 Completed 2017-10-22 2017-10-29 2017-12-13 2017-11-23 2018-06-11 2017-12-18 Quotations Envelope 9th,10th and other floors of Development Matsha Bhaban, Ramna, .

GD/DOF-30 / Procurement Supporting Agricultural of training materials for Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 32,300.00 17,249.99 Completed 2017-10-31 2017-12-06 2017-11-05 2017-12-17 2017-12-21 2018-01-16 2018-01-07 2018-02-20 2018-01-22 2018-08-19 2018-03-12 training to be conducted Envelope Development cetrally by PIU, NATP, DoF

Supporting Agricultural GD/DOF-31 / Mobile Tablet Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 756,129.03 532,304.63 Signed 2018-02-18 2018-02-01 2018-02-23 2018-02-01 2018-03-30 2018-03-04 2018-04-29 2018-05-03 2018-06-03 2018-06-03 2018-09-01 SIM with 3G Connectivity Envelope Development

GD/DOF-32 / Printing and Supporting Agricultural Request for Single Stage - One binding of Fisheries Master IDA / 56650 Technology for Fisheries Post Limited 2,900.00 2,071.01 Completed 2018-01-30 2018-01-29 2018-03-15 2018-02-14 2018-09-11 2018-02-19 Quotations Envelope Plan Development

Page 4 GD/DOF-33 / Upgrading the connectivity of DoF by Fiber Optic Backbone Network Supporting Agricultural (1st, 3rd, 4th and 9th floor) Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 17,690.00 15,672.21 Completed 2018-04-30 2018-04-30 2018-05-03 2018-05-05 2018-05-24 2018-05-17 2018-06-21 2018-06-03 2018-07-19 2018-06-21 2019-01-15 2018-06-27 and Wi-Fi Internet Envelope Development connectivity from 1st to 8th floor of Matshya Bhaban, Dhaka

GD/DOF- 16 / Preparation Supporting Agricultural Request for Single Stage - One of video on aquaculture IDA / 56650 Technology for Fisheries Post Open - National 6,387.09 5,889.35 Completed 2018-05-28 2018-07-02 2018-04-01 2018-12-29 2018-06-28 Quotations Envelope technologies Development

GD/DOF- 27 / Preparation Supporting Agricultural of Video on project Request for Single Stage - One IDA / 56650 Technology for Fisheries Post Open - National 6,451.62 3,569.30 Completed 2018-05-28 2018-07-02 2017-11-02 2018-12-29 2018-01-19 interventions and support for Quotations Envelope Development rural fish farmers

GD/DOF-24-1 / Reagents Supporting Agricultural and chemicals for quality Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,709.68 0.00 Canceled 2018-09-25 2019-05-09 2018-09-25 2018-10-16 2019-05-21 2018-11-06 2019-06-12 2018-12-11 2019-02-19 assurance laboratories under Envelope Development DoF

GD/DOF-34 / Procurement Supporting Agricultural Request for Single Stage - One of Office Supplies & IDA / 56650 Technology for Fisheries Post Limited 3,225.81 2,935.63 Completed 2018-08-30 2019-03-25 2018-09-30 2019-04-18 2018-10-30 2019-05-03 Quotations Envelope Consumable for FY 2018-19 Development

Supporting Agricultural Single Stage - One GD/DOF-18 / Fishing Net IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 1,056,774.19 762,468.86 Signed 2018-08-30 2019-01-06 2018-08-30 2018-09-27 2019-02-05 2018-10-25 2019-04-21 2018-11-29 2019-05-14 2019-04-28 Envelope Development

GD/DOF-23 / Fish Feed Supporting Agricultural Single Stage - One and Ingredient Testing Lab IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 258,064.52 235,437.43 Completed 2019-01-30 2018-12-23 2019-01-30 2019-02-27 2019-01-14 2019-03-27 2019-02-25 2019-05-01 2019-03-21 2019-08-29 2019-05-28 Envelope Equipment Development

GD/DOF-24-1-2 / Reagents Supporting Agricultural and Chemicals for Quality Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,709.67 35,313.59 Completed 2019-07-22 2019-05-09 2019-07-22 2019-11-06 2019-08-12 2019-05-21 2019-09-02 2019-06-12 2019-10-07 2019-06-20 2019-12-16 2019-06-23 Assurance Laboratories Envelope Development under DoF

NATP-2/DOF/GD-24.1.2 / Supply of Reagents and Supporting Agricultural Single Stage - One Chemicals for quality IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 35,502.95 35,277.08 Completed 2020-01-23 2020-01-14 2020-01-23 2020-02-06 2020-02-02 2020-02-18 2020-02-11 2020-03-24 2020-03-10 2020-06-22 2020-06-07 Envelope assurance laboratories under Development DoF

NATP-2/DOF/GD-42 / Supporting Agricultural Single Stage - One Supply & Installation of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 142,011.83 93,606.93 Signed 2020-01-23 2020-05-31 2020-01-23 2020-02-06 2020-06-14 2020-02-18 2020-06-28 2020-03-24 2020-07-14 2020-06-22 Envelope Fish Feed Pelleting Machine Development

NATP/DOF/GD-24.1.2.3 / Procurement of Supply of Supporting Agricultural Under Single Stage - One Reagents and chemicals for IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 35,335.69 0.00 Implementati 2020-09-10 2020-09-14 2020-09-15 2020-10-06 2020-10-07 2020-10-31 2020-12-05 2021-01-30 Envelope quality assurance Development on laboratories

NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

GD/DOF-16 / Preparation Supporting Agricultural Request for Single Stage - One ov Video on Aquaculture IDA / 56650 Technology for Fisheries Post Limited 6,450.00 0.00 Canceled 2017-10-03 2017-11-28 2018-05-27 Quotations Envelope Technologies. Development

Page 5 GD/DOF-27 / Preparation of Supporting Agricultural Video on project Request for Single Stage - One IDA / 56650 Technology for Fisheries Post Limited 3,900.00 0.00 Canceled 2017-09-15 2017-11-10 2018-01-09 interventions and supports Quotations Envelope Development for rural fish farmers.

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BD-DOF-26634-CS-QCBS / Supporting Agricultural Quality And Cost- Market Access and Supply IDA / 56650 Technology for Fisheries Post Open - National 263,664.00 0.00 Canceled 2017-10-25 2017-11-15 2017-12-29 2018-01-26 2018-02-25 2018-04-01 2018-05-06 2021-05-05 Based Selection Chain Service Provider Development

SD/DOF/F-04 / Market Supporting Agricultural Quality And Cost- access and supply chain IDA / 56650 Technology for Fisheries Post Open - National 263,664.52 213,196.35 Signed 2018-10-14 2018-08-01 2018-11-04 2018-08-26 2019-01-09 2019-03-20 2019-02-06 2019-04-30 2019-03-08 2019-05-21 2019-04-12 2019-06-27 2019-05-10 2019-07-17 2020-05-09 Based Selection service provider Development

SD/DOF/F-05 / Development Supporting Agricultural Quality And Cost- of Website under DoF for IDA / 56650 Technology for Fisheries Post Open - National 25,806.45 23,597.85 Signed 2018-12-06 2018-12-23 2018-12-27 2019-03-11 2019-03-20 2019-04-08 2019-04-18 2019-05-08 2019-05-21 2019-06-12 2019-06-25 2019-07-10 2019-07-09 2020-07-09 Based Selection Fish Farmers Development

INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Supporting Agricultural Individual SD DOF/IC-04 / Assistant IDA / 56650 Technology for Fisheries Post Consultant Open 160,000.00 146,226.38 Signed 2017-02-23 2016-11-27 2017-03-10 2017-03-12 2017-03-20 2017-03-06 2017-04-20 2017-03-14 2021-09-30 Manager (Accounts) Development Selection

Supporting Agricultural Individual SD DOF/IC-05 / Training & IDA / 56650 Technology for Fisheries Post Consultant Open 270,000.00 742,924.35 Signed 2017-02-23 2016-11-27 2017-02-28 2017-02-27 2017-03-10 2017-03-06 2017-04-23 2018-03-21 2021-10-09 Communication Expert Development Selection

Supporting Agricultural Individual SD DOF/IC-07 / Monitoring IDA / 56650 Technology for Fisheries Post Consultant Open 270,000.00 247,641.45 Signed 2017-02-24 2016-11-27 2017-03-11 2017-03-12 2017-03-27 2017-03-06 2017-04-27 2017-03-21 2021-10-06 and Evaluation Expart Development Selection

Supporting Agricultural Individual SD DOF/IC-06 / ICT IDA / 56650 Technology for Fisheries Post Consultant Open 160,000.00 146,226.38 Signed 2017-02-24 2016-11-27 2017-03-11 2017-03-05 2017-03-21 2017-03-22 2017-04-21 2017-03-22 2021-09-30 Specialist Development Selection

SD/DOF/IC- 08 / Market Supporting Agricultural Individual Access and Supply Chain IDA / 56650 Technology for Fisheries Post Consultant Open 22,258.00 22,376.17 Signed 2017-08-26 2017-09-04 2017-10-29 2018-01-22 2017-11-19 2018-01-25 2017-12-24 2018-01-31 2018-06-22 Specialist (Short term Development Selection individual consultant)

SD DOF/IC-07A / Supporting Agricultural Individual Pending Monitoring and Evaluation IDA / 56650 Technology for Fisheries Post Consultant Open 29,716.00 0.00 2020-10-29 2020-12-05 2020-12-21 2021-01-21 2021-09-30 Implementation Expert Development Selection

Page 6