Army Basing Salisbury Plain: Outline Environmental Appraisal Interim Report Salisbury Plain Army Basing Programme Outline Environmental Appraisal Interim Environmental Report Version 1 Dated: 19 February 2014 DIO Ops Projects Ramillies Bldg Marlborough Lines Monxton Rd Andover SP11 8HJ © Crown Copyright (2014) DOCUMENT CONTROL SHEET Change Version Originator Date of Change Description of change No. No. of change 1 1 RD December Initial draft 2013 2 1 RB February 2014 Revised draft for comment 3 1 CCB February 2014 Draft final 4 1 GR/CCB February 2014 Final issue Contributors: DIO Programme Head David Underhill DIO Assistant Pro gramme David Snelgrove Manager: Study Team: DIO ABP Infrastructure Delivery Team & PSP URS Author: Colin Bush (URS) Reviewers: DIO ODC IPS Team Conditions of Use The material in this document is subject to Crown copyright protection unless otherwise indicated. The Crown copyright protected material (other than the Royal Arms and departmental or agency logos) may be reproduced free of charge in any format or medium provided it is reproduced accurately and not used in a misleading context. Where any of the Crown copyright items in this document are being republished or copied to others, the source of the material must be identified and the copyright status acknowledged. The permission to reproduce Crown protected material does not extend to any material in this document which is identified as being the copyright of a third party. Authorisation to reproduce such material must be obtained from the copyright holders concerned. This document has been produced by the Defence Infrastructure Organisation and is subject to standard Ministry of Defence conditions of use. Control of this document is to be in accordance with DIO Document Quality Management Procedure. Proposed amendments and comments should be directed to the Document Owner at the address above. Salisbury Plain Masterplan Outline Environmental Appraisal TABLE OF CONTENTS 1. INTRODUCTION ................................................................ 1 1.1 About this Interim Environmental Report ........................... 1 1.2 Need for an Outline Environmental Appraisal .................... 1 1.3 Relationship with the Masterplan and Planning Applications ........................................................................ 1 1.4 Other forms of Assessment ............................................... 2 1.5 Structure of the Interim Environmental Report................... 3 1.6 To Comment on the Interim Environmental Report ........... 3 2. SALISBURY PLAIN MASTERPLAN .................................. 4 2.1 Introduction ........................................................................ 4 2.2 Army Basing Programme ................................................... 4 2.3 Salisbury Plain Training Area ............................................. 4 2.4 Salisbury Plain Masterplan ................................................ 4 3. PROPOSED DEVELOPMENT .......................................... 6 3.1 The Proposals .................................................................... 6 4. MILITARY TRAINING ...................................................... 11 4.1 Overview of Training on SPTA ......................................... 11 4.2 Potential Environmental Impacts of Military Training Activities ........................................................................... 12 4.3 Environmental Management Arrangements on SPTA ..... 13 4.4 Future Training Requirement ........................................... 14 4.5 Methodology for Assessing Future Training Requirement16 5. APPROACH TO THE APPRAISAL .................................. 17 5.1 Introduction ...................................................................... 17 5.2 Outline Environmental Report .......................................... 18 5.3 Defining Significance ........................................................ 18 5.4 Mitigating Adverse Effects................................................ 20 5.5 Assessment Scenarios..................................................... 21 5.6 Spatial Scope ................................................................... 21 5.7 Trans-boundary Effects .................................................... 21 5.8 Development Programme and Construction .................... 22 6. ECOLOGY AND NATURE CONSERVATION ................. 23 6.1 Baseline Environmental Conditions ................................. 23 6.2 Possible Ecology and Nature Conservation Effects ........ 25 6.3 Assessment Methodology ................................................ 26 7. ARCHAEOLOGY AND CULTURAL HERITAGE ............. 31 7.1 Baseline Environmental Conditions ................................. 31 7.2 Possible Archaeology and Cultural Heritage Effects ....... 34 INTERIM ENVIRONMENTAL REPORT i Salisbury Plain Masterplan Outline Environmental Appraisal 7.3 Assessment Methodology ................................................ 34 8. WATER RESOURCES .................................................... 38 8.1 Baseline Environmental Conditions ................................. 38 8.2 Possible Water Resources Effects ................................... 38 8.3 Assessment Methodology ................................................ 40 9. LANDSCAPE, TOWNSCAPE AND VISUAL.................... 42 9.1 Baseline Environmental Conditions ................................. 42 9.2 Possible Landscape, Townscape and Visual Effects ...... 43 9.3 Assessment Methodology ................................................ 44 10. SOILS ............................................................................... 48 10.1 Baseline Environmental Conditions ................................. 48 10.2 Possible Soils Effects ....................................................... 48 10.3 Assessment Methodology ................................................ 49 11. NOISE AND VIBRATION ................................................. 50 11.1 Baseline Environmental Conditions ................................. 50 11.2 Possible Noise and Vibration Effects ............................... 50 11.3 Assessment Methodology ................................................ 50 12. AIR QUALITY ................................................................... 57 12.1 Baseline Environmental Conditions ................................. 57 12.2 Possible Air Quality Effects .............................................. 57 12.3 Assessment Methodology ................................................ 57 13. SOCIO-ECONOMICS AND COMMUNITY ...................... 59 13.1 Baseline Environmental Conditions ................................. 59 13.2 Possible Socio-economic and Community Effects .......... 60 13.3 Assessment Methodology ................................................ 61 14. TRANSPORT AND ACCESS .......................................... 62 14.1 Baseline Environmental Conditions ................................. 62 14.2 Possible Transport Effects ............................................... 62 14.3 Assessment Methodology ................................................ 63 15. INTER-RELATIONSHIPS AND CUMULATIVE EFFECTS64 16. OUTLINE ENVIRONMENTAL REPORT ......................... 65 16.1 Structure of the Outline Environmental Report ................ 65 17. GAP ANALYSIS ............................................................... 66 17.1 Introduction ...................................................................... 66 INTERIM ENVIRONMENTAL REPORT ii Salisbury Plain Masterplan Outline Environmental Appraisal 17.2 Identified Gaps ................................................................. 66 18. WORK CARRIED OUT TO DATE ................................... 68 18.1 Introduction ...................................................................... 68 18.2 Army Basing Programme Environmental Team .............. 68 18.3 Meetings with Key Stakeholders ...................................... 68 18.4 Environmental Sub-Group ............................................... 68 18.5 Scoping Report ................................................................ 68 19. REFERENCES ................................................................. 69 20. APPENDIX A – RESPONSE TO SCOPING COMMENTS71 20.1 Comments on the Scoping Report ................................... 71 INTERIM ENVIRONMENTAL REPORT iii Salisbury Plain Masterplan Outline Environmental Appraisal 1. INTRODUCTION 1.1 About this Interim Environmental Report The Defence Infrastructure Organisation (DIO) proposes to seek planning permission for certain developments in and around Salisbury Plain as part of the Army Basing Programme (ABP), which provides accommodation for Army personnel returning from Germany or otherwise relocating during the period to 2020. A Masterplan is being developed to facilitate consultation on the ABP proposals as they affect Salisbury Plain, including Salisbury Plain Training Area (SPTA). The Masterplan will be accompanied by an Outline Environmental Appraisal (OEA), which will describe baseline conditions, identify possible significant environmental effects, capture the cumulative effects of the proposals and recommend mitigation measures to offset any identified significant adverse environmental effects at an early stage. This Interim Environmental Report (IER) summarises the work undertaken to date to inform the Masterplan and accompanies the Planning Context Report for public consultation. It includes a summary of the comments received from stakeholders to an earlier consultation on the Scope of the OEA which took place in December 2013. This can be found in Appendix A, which also
Recommended publications
  • Dorset & South Wiltshire
    Groundwater Situation Report Wessex (Dorset & South Wiltshire) Update 12th September 2017 Current situation Current forecast risk of groundwater flooding There are currently no groundwater flood alerts for Salisbury Plain, Cranborne Chase and the West of Dorset. The latest summary of the water situation in the South West, giving details of the rainfall, groundwater levels and river flows, can found on the GOV.UK website. The link to these pages is below: August finished much drier than it started. Overall for the month the long term average (LTA) for August was ‘normal’ at 95% LTA, 62 mm. The rivers responded well to the rainfall and most flows reflect the geographical distribution of the rainfall, drier in the north and west and wetter in the south and east. Most rivers are now ‘normal’ for the time of year though South Newton on the groundwater dominated Chalk is ‘below normal’ for the time of year. The groundwater sites show a mixed response with some groundwater sites responding to the wetter than average summer, 134% LTA, whilst others on the Chalk and Greater Oolite are still ‘notably low. Several boreholes have received significant recharge this month and were still increasing at month end others while still receding are doing so at a lower rate. Sites on the Greater Oolite and Chalk are ‘notably low’ for the time of year. Many others are ‘normal’ with the exception of Kingston Russell Road, situated in the West Dorset catchment, which was ‘notably high’. In the West of Dorset, the level at the Kingston Russell borehole, on 12/09/2017, was 105.760 metres above sea level (mAOD).
    [Show full text]
  • Wiltshire Botany
    WILTSHIRE BOTANY JOURNAL OF THE WILTSHIRE BOTANICAL SOCIETY ISSUE NO. 3, February 2000 CONTENTS 1 E DITORIAL 2 The Flora of Berwick St. James Barbara Last 15 Grassland Communities on Salisbury Plain Training Area: Results of the ITE ecological survey Kevin Walker and Richard Pywell 28 The recent history of Batology in Wiltshire Rob Randall 33 Plant records 1997 35 Addition to 1996 records 36 Plant records 1998 Wiltshire Botany 3, 2000, page1 EDITORIAL Each issue of Wiltshire Botany so far has managed to break new ground. This issue contains the first village flora to be included. Barbara Last has systematically recorded the plants growing in Berwick St James, and her article gives an account of her findings. Hopefully, it will inspire others to do similar work in their own localities. Our second article is the first systematic account we have published on the vegetation of Salisbury Plain. In this case, Kevin Walker and Richard Pywell describe the grassland communities of the MoD Training Area. Kevin and Richard can be contacted at the Institute of Terrestrial Ecology, Monks Wood, Abbots Ripton, Huntingdon, Cambs., PE17 2LS. Tel. 01487 773381.Fax. 01487 773467. Email; [email protected] Innovation is complemented by continuity. Rob Randall’s article continues his account of the history of recording the many different species of bramble in Wiltshire. His account brings us more or less up to the present day. It is hoped that the next issue will contain what is effectively an up-to-date bramble flora of Wiltshire. As in previous issues, a selection of the Society’s plant records is included.
    [Show full text]
  • Accounting for National Nature Reserves
    Natural England Research Report NERR078 Accounting for National Nature Reserves: A Natural Capital Account of the National Nature Reserves managed by Natural England www.gov.uk/naturalACCOUNTING FOR-england NATIONAL NATURE RESERVES Natural England Research Report NERR078 Accounting for National Nature Reserves: A Natural Capital Account of the National Nature Reserves managed by Natural England Tim Sunderland1, Ruth Waters1, Dan Marsh2, Cat Hudson1 and Jane Lusardi1 Published 21st February 2019 1 Natural England 2 University of Waikato, New Zealand This report is published by Natural England under the Open Government Licence - OGLv3.0 for public sector information. You are encouraged to use, and reuse, information subject to certain conditions. For details of the licence visit Copyright. Natural England photographs are only available for non commercial purposes. If any other information such as maps or data cannot be used commercially this will be made clear within the report. ISBN 978-1-78354-518-6 © Natural England 2018 ACCOUNTING FOR NATIONAL NATURE RESERVES Project details This report should be cited as: SUNDERLAND, T., WATERS, R.D., MARSH, D. V. K., HUDSON, C., AND LUSARDI, J. (2018). Accounting for National Nature Reserves: A natural capital account of the National Nature Reserves managed by Natural England. Natural England Research Report, Number 078 Project manager Tim Sunderland Principal Specialist in Economics Horizon House Bristol BS1 5TL [email protected] Acknowledgements We would like to thank everyone who contributed to this report both within Natural England and externally. ii Natural England Research Report 078 Foreword England’s National Nature Reserves (NNRs) are the crown jewels of our natural heritage.
    [Show full text]
  • Army Basing Salisbury Plain Consulting for A
    Army Basing - Salisbury Plain Consulting for a Masterplan 1 Introduction Government announcements The Army Basing Plan announced on 5th March 2013 confi rmed Salisbury Plain as a major focus of the Reaction Force element of Army 2020. For further details on the wider programme see the Tri-Fold leafl et available at the exhibition, whilst stocks last, or online at www.gov.uk/government/consultations/salisbury- plain-training-area-master-plan-army-basing-programme. The Government has committed £800 million to be invested in the Salisbury Plain area. The planned changes In total there will be approximately 7,700 people moving to the Salisbury Plain area comprising 4,300 additional service personnel with their families. To provide the necessary infrastructure the key elements of the Masterplan for the Army Basing Project are: • Extensive new construction and refurbishment of existing buildings within the existing base perimeter for: • Single living accommodation (SLA), with dining, catering, recreational, and welfare facilities; and • Technical accommodation, including workshops, garages, armouries, stores and offi ces. • Outside the existing base perimeter there will be changes to the training area; and up to 1,400 new houses for service family accommodation (SFA). The Masterplan We are preparing a Masterplan to illustrate necessary changes to existing infrastructure to serve the needs of this larger community of Army personnel and service families. A public consultation on the emerging proposals is currently underway. Following completion of the consultation a full Masterplan will be produced. The fi nal Masterplan together with the supporting Environmental Report will set the planning framework for the development of each site and be submitted to Wiltshire Council for endorsement.
    [Show full text]
  • The Smith Family…
    BRIGHAM YOUNG UNIVERSITY PROVO. UTAH Digitized by the Internet Archive in 2010 with funding from Brigham Young University http://www.archive.org/details/smithfamilybeingOOread ^5 .9* THE SMITH FAMILY BEING A POPULAR ACCOUNT OF MOST BRANCHES OF THE NAME—HOWEVER SPELT—FROM THE FOURTEENTH CENTURY DOWNWARDS, WITH NUMEROUS PEDIGREES NOW PUBLISHED FOR THE FIRST TIME COMPTON READE, M.A. MAGDALEN COLLEGE, OXFORD \ RECTOR OP KZNCHESTER AND VICAR Or BRIDGE 50LLARS. AUTHOR OP "A RECORD OP THE REDEt," " UH8RA CCELI, " CHARLES READS, D.C.L. I A MEMOIR," ETC ETC *w POPULAR EDITION LONDON ELLIOT STOCK 62 PATERNOSTER ROW, E.C. 1904 OLD 8. LEE LIBRARY 6KIGHAM YOUNG UNIVERSITY PROVO UTAH TO GEORGE W. MARSHALL, ESQ., LL.D. ROUGE CROIX PURSUIVANT-AT-ARM3, LORD OF THE MANOR AND PATRON OP SARNESFIELD, THE ABLEST AND MOST COURTEOUS OP LIVING GENEALOGISTS WITH THE CORDIAL ACKNOWLEDGMENTS OP THE COMPILER CONTENTS CHAPTER I. MEDLEVAL SMITHS 1 II. THE HERALDS' VISITATIONS 9 III. THE ELKINGTON LINE . 46 IV. THE WEST COUNTRY SMITHS—THE SMITH- MARRIOTTS, BARTS 53 V. THE CARRINGTONS AND CARINGTONS—EARL CARRINGTON — LORD PAUNCEFOTE — SMYTHES, BARTS. —BROMLEYS, BARTS., ETC 66 96 VI. ENGLISH PEDIGREES . vii. English pedigrees—continued 123 VIII. SCOTTISH PEDIGREES 176 IX IRISH PEDIGREES 182 X. CELEBRITIES OF THE NAME 200 265 INDEX (1) TO PEDIGREES .... INDEX (2) OF PRINCIPAL NAMES AND PLACES 268 PREFACE I lay claim to be the first to produce a popular work of genealogy. By "popular" I mean one that rises superior to the limits of class or caste, and presents the lineage of the fanner or trades- man side by side with that of the nobleman or squire.
    [Show full text]
  • The Church of St
    THE CHURCH OF ST. THOMAS à BECKET, TILSHEAD REPORT FOR YEAR ENDED 31st DECEMBER 2014 Background The parishes of Chitterne, Orcheston, Shrewton and Tilshead Photograph by Betty Druce were merged on 1st January 2014 to form the Salisbury Plain Benefice, a single ecclesiastical parish with one Parochial Church Council (PCC). However the four constituent villages each retained a local church committee to attend to matters of local concern. These are subcommittees of the PCC. Membership During the year the following served as members of both the Tilshead Church Committee and the Benefice PCC:. Rector: The Reverend Eleanor Rance Churchwardens: Libby Anson (Treasurer from April 2014) Ewart Grant (Secretary from June 2014) Representative on the Deanery Synod: Gillian Goldsmith Elected members: Claire Cooper Vix Mackay In addition Simon Bedford and Frank Newell attended the first meeting of the year, and Frank Newell remained Treasurer until he moved from the village in April. Robert Pryor, Vice Chairman of the PCC, was in attendance at subsequent meetings. George Murray succeeded Frank Newell as Electoral Roll Officer, but was not a member of the Church Committee. Church attendance At 31st December 2014 there were 44 people on the Electoral Roll, eight of whom were not resident in the Benefice. Three were residents of Shrewton, and the remaining 33 lived in Tilshead. No names were added or deleted during the year. The pattern of three services a month in Tilshead continued, with a rotating Benefice service on the second Sunday. The average attendance at Sunday services was 17. As always this average conceals wide swings.
    [Show full text]
  • Topic Paper 13: Military Issues
    Wiltshire Local Development Framework Working towards a Core Strategy for Wiltshire Topic paper 13: Military issues Wiltshire Core Strategy Consultation January 2012 Wiltshire Council Information about Wiltshire Council services can be made available on request in other languages including BSL and formats such as large print and audio. Please contact the council on 0300 456 0100, by textphone on 01225 712500 or by email on [email protected]. This paper is one of 16 topic papers, listed below, which form part of the evidence base in support of the emerging Wiltshire Core Strategy. These topic papers have been produced in order to present a coordinated view of some of the main evidence that has been considered in drafting the emerging Core Strategy. It is hoped that this will make it easier to understand how we have reached our conclusions. The papers are all available from the council website: Topic Paper 1: Climate Change Topic Paper 2: Housing Topic Paper 3: Settlement Strategy Topic Paper 4: Rural Signposting Tool Topic Paper 5: Natural Environment Topic Paper 6: Retail Topic Paper 7: Economy Topic Paper 8: Infrastructure and Planning Obligations Topic Paper 9: Built and Historic Environment Topic Paper 10: Transport Topic Paper 11: Green Infrastructure Topic Paper 12: Site Selection Process Topic Paper 13: Military Issues Topic Paper 14: Building Resilient Communities Topic Paper 15: Housing Requirement Technical Paper Topic Paper 16: Gypsy and Travellers Core Strategy Topic Paper Military Issues Contents 1.0 Introduction
    [Show full text]
  • Hill Cottage Orcheston - Wiltshire
    Hill Cottage Orcheston - Wiltshire Hill Cottage Orcheston Nr Shrewton Salisbury SP3 4RW A superbly refurbished & improved detached period cottage situated in a lovely rural hamlet with versatile accommodation that retains its intrinsic charm & character ● Located at the Head of the Till Valley ● Sitting Room with Woodburner ● Light & Airy Garden/Dining Room Situation Hill Cottage is situated in a lovely, slightly elevated setting overlooking fields in the small, rural yet accessible village of Orcheston at the head of the Till Valley on the Southern edge of Salisbury Plain. Orcheston has two 13th Century ● Kitchen/Breakfast Room & Family Area churches and gives its name to a species of meadow grass. It was also the birth place of both the footballer turned race horse trainer Mick Channon and the writer and poet Maurice Ridley who is said to have been Dorothy L Sayers model for ● Four Bedrooms & Two Bath/Shower Rooms Lord Peter Wimsey. The larger nearby village of Shrewton is just a mile away and has an excellent choice local facilities including a primary school, surgery, supermarket, butchers, garage, pubs and sports ground. ● Boot Room, Utility Room & Cloakroom More extensive amenities can be found in the medieval cathedral city of Salisbury and market town of Devizes both being around 13 miles distant and offering a good range of shopping, education, leisure and medical facilities. There are transport ● Split-Level Cottage Garden & Parking facilities close at hand with Orcheston being located just off the A360 which links with the local road network giving ready access to the other main towns in the region including Andover, Bath, Chippenham, Marlborough and Warminster whilst Viewing strictly by appointment via the nearby A303 trunk road joins with the M3, making London accessible for the motorist.
    [Show full text]
  • Highways England Interim Advice Note 135/10, 2010, (Ref 7.7)
    A303 Amesbury to Berwick Down TR010025 6.1 Environmental Statement Volume 1 6 Chapter 7: Landscape and visual APFP Regulation 5(2)(a) Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 October 2018 A303 Amesbury to Berwick Down 7 Landscape and visual 7.1 Introduction and competent expert evidence 7.1.1 This chapter assesses the potential landscape and visual effects of the construction and operation of the Scheme. This chapter details the regulatory and policy framework related to landscape and visual matters, summarises the methodology followed for the assessment, and describes the existing environment in the area surrounding the Scheme. Following this, the design, mitigation and residual effects of the Scheme are discussed, along with the limitations of the assessment. 7.1.2 This chapter of the ES has been undertaken by competent experts with relevant and appropriate experience. The technical lead for the landscape and visual impact assessment (LVIA) is Richard Hammond and his professional qualifications and experience are summarised in Appendix 1.1. 7.2 Legislative and policy framework 7.2.1 As discussed in Chapter 1, the primary basis for deciding whether or not to grant a Development Consent Order (DCO) is the National Policy Statement for National Networks, (NPSNN and Ref 7.1), which, at sections 4 and 5, sets out policies to guide how DCO applications will be decided and how the effects of national networks infrastructure should be considered. Table 7.1 identifies the NPSNN policies relevant to the LVIA and then specifies where in the ES chapter information is provided to address the policy.
    [Show full text]
  • Draft Phase 3 Planning Context Report
    Salisbury Plain Army Basing Programme Planning Context Report Consultation Draft Phase 3 Report Date: 19 February 2014 DIO Ops Projects Ramillies Bldg Marlborough Lines Monxton Rd Andover SP11 8HJ Army Basing Programme: Infrastructure Delivery Planning Context Report – Consultation Draft Contributors : DIO Area Project Manager David Underhill DIO Project Manager: David Snelgrove DIO Planning Mark Limbrick, Stephen Harness Study Team: DIO ABP Infrastructure Delivery Team & PSP WYG Author: Jennifer Liu, WYG Contributors: WYG SPTA Team Reviewers: DIO PM & Planning Team; Steve Barrett, WYG Primary Distribution : DIO PM; DIO ID Team; WYG SPTA Team Army Basing Programme: Infrastructure Delivery Planning Context Report – Consultation Draft Contents Executive Summary 5 1.0 Introduction 7 2.0 Proposals for Salisbury Plain 15 3.0 Site Sift Methodology 19 4.0 Site Sift 24 5.0 Socio-Economics 32 6.0 Heritage 45 7.0 Military Base Development 51 8.0 Training 53 9.0 Transport 58 10.0 Engagement Plan 72 11.0 Timescales and Processes 79 Glossary Army Basing Programme: Infrastructure Delivery Planning Context Report – Consultation Draft Appendices Appendix 1 MCA Site Scoring Criteria Appendix 2 Site Sift Stages Heat Maps Appendix 3 Area Wide Site Sift Outputs Appendix 4 Settlement Level Site Sift Outputs Appendix 5 Single MCA Criteria Site Sift Outputs Appendix 6 Site Scoring Methodology Appendix 7 Sensitivity Test Heat Maps Appendix 8 Schedule of Overall MCA Scores and Assessment of Sites Appendix 9 Preferred/Potential SFA Site Plans Appendix 10 Schools Map Appendix 11 Military Base Zoning Plans Appendix 12 Military Base Development – Constraints Tables Appendix 13 Training Plan Appendix 14 Preliminary Traffic Calculations and Transport Figures Appendix 15 Outline List of Media Outlets Army Basing Programme: Infrastructure Delivery Planning Context Report – Consultation Draft Executive Summary The Army Basing Programme (ABP) is the latest in a series of major announcements by the Government towards a major reconfiguration of the British Army.
    [Show full text]
  • Salisbury Plain Training Area (SPTA) Newsletter: January 2018
    Salisbury Plain Training Area Newsletter January 2018 www.gov.uk/government/publications/salisbury-plain-training-area-spta-newsletter This Newsletter can be found at the above link The DIO runs a Twitter account for news and updates on the Salisbury Plain Training Area using the Twitter hashtag #modontheplain. This account now has over 4250 followers. If you’d like to follow us go to: www.twitter.com/mod_dio January 2018 Newsletter The range is fully operational from 8 Jan 18 although the majority of staff are back on 2 Jan 18. The new Training Year will start on a very quiet note for the first two weeks with a Challenger 2 armoured squadron and 2 mechanised infantry company conducting low level collective training in the Centre in the East from 15 Jan onwards. A brigade Headquarters is conduction a manoeuvre and communication exercise run by 3 (UK) Armd Division. The last 2 weeks of January see 2 armoured companies and 2 armoured squadrons with challenger 2 as the main users with various courses from Warminster and Larkhill. Live firing is taking place in the centre with Lt Gun, Mortars and Small arms. There are a number of specialist FIND units out using their optical and radar detection equipment. The red flags will be down in the WEST and CENTRE until the 8 Jan 18. The public should be aware that tank crossings over the A360, A345, A338, B390, and the C22 (Tilshead to Chitterne) roads will be very busy and if conditions are wet mud clearance parties will be working on the crossings.
    [Show full text]
  • Prisoner of War Camps
    Prisoner of War Camps Prisoner of war camps in the UK: German PoWs somewhere in England bring in the harvest. Photograph: Hulton Archive/Getty Images What would happen if the UK's prison population suddenly increased by 400,000 people? That's what occurred between 1939 and 1948, when thousands of Germans, Ukranians and others became Britain's prisoners of war, according to a new book. The camps where the PoWs were imprisoned have largely (but not all) disappeared. At one time hundreds of them were spread across the UK. The best known was Island Farm in Wales - scene of a 'great escape' in 1945, with some German POWs getting as far as Birmingham and Southampton. Author Sophie Jackson has written a book, Churchill's Unexpected Guests, examining this overlooked period of Britain's history, looking at what happened to every camp from the period. “Researching POW camp locations proved a challenge when compiling Churchill's Unexpected Guests. Few official lists of camps or prisoners remain from that time and most camps were temporary and pulled down after the war. Some have subsequently been built on. Most modern camp lists are based on archaeological work – ironic when the camps existed a mere 60 years ago. English Heritage has worked hard to find the locations of camps, but even so many are still undiscovered. Records from the time give an insight into camp life and sometimes reveal the name of a camp, but often the documents didn't reveal the actual address, and prisoners were not allowed to write their camp address on any letters they sent home.
    [Show full text]