M/s. GKRS PROPERTIES at Sy No. 41/E, Village, , Ranga Reddy , State.

FORM - 1

I) Basic Information

S.No. Item Details 1 Name of the project/s M/s. GKRS PROPERTIES Gated Community Residential Villas 2 S. No. in the schedule The project is categorized under 'B-2' under item 8(a) of Schedule - Gazette Notification dated Sep 14th, 2006 and subsequent amendments issued by MoE&F, New Delhi on 01.12.2009 and

04.04.2011. 3 Proposed capacity /area/ Total Plot Area = 32,171.45 Sq Mts/7 length/ tonnage to be Acres 38 Guntas handled/command area/lease Built-up Area = 27,387.99 Sq.mts area/ No of the well to be Greenbelt Area = 3,233.04 Sq.mts drilled 4 New/Expansion New /Modernization 5 Existing capacity/Area etc… NA

6 Category of project A or B Category B ( ‘B2’) 7 Does it attract the general This project does not attract general condition? If yes please specify conditions. 8 Does it attract the specific This project does not attract specific condition? If yes please specify conditions. 9 Location Plot/ survey /Khasra no Sy No. 41/E, Village Bandlaguda Jagir Village, /Mandal Rajendranagar Mandal, District , State Telangana State 10 Nearest Railway station/Air R.S – 10.0 Kms (NE) port along with the distance in RGIA, – 15.0 Kms (S) kms 11 Nearest , , District Hyderabad - 8.0 Kms Headquarters along with distances in kms. 12 Village Panchayats, Zilla GHMC Parishad, Municipal Corporation, Local body (complete postal Address with telephone no. to be given

13 Name of the applicant M/s. GKRS PROPERTIES 14 Registered address M/s. GKRS PROPERTIES H.No: 10-3-311/20, 3rd Floor, Road No:1, Castle Hills, , Hyderabad 500057, Telangana State 15 Address of the correspondence Name Sri. B. Goutham Reddy, Designation Partner /owner/partner/CEO M/s. GKRS PROPERTIES Address Plot No: 8,9,10,11, Silicon Valley Layout, Flat No 103 & 104, Fortune Chambers, Image garden Road, , Hyderabad Pin code 500081 E-mail [email protected] Telephone no + 91 9701346172 Fax no 16 Details of Alternative Sites No Alternative Sites are examined examined if any. Location of these sites Should be shown on a Topo sheet. 17 Interlinked Projects Not Applicable 18 Whether separate application Not Applicable of interlinked projects has been submitted 19 If yes, date of submission Not Applicable 20 If no reason Not Applicable 21 Whether the proposal involves approval / clearances under: if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, No 1980? (b) The Wild life (protection)Act, No 1972? (c) The C.R.Z notification, 1991? No 22 Whether there is any No Government order/ policy relevant/relating to the site? 23 Forest land involved (Hectares) No 24 Whether there is any litigation No litigation is pending against the pending against the project project in any court of law to the best of and/or land in which the knowledge.

project is propose to be set up? (a)Name of the court (b)Case no. (c) Orders/directions of the court, if any and its relevance with the proposed project. (II) Activity 1.0 Construction, operation or decommissioning of the Project involving actions, which will cause Physical Changes in the locality (topography, land use, changes in water bodies, etc.). S.No. Information / Checklist Yes Details thereof (with approximate confirmation /No quantities /rates, wherever possible ) with sources of information data 1.1 Permanent or temporary Yes The proposed project activity is change in land use, land cover construction of Gated Community or topography including Villas. The site area is located in increase in intensity of land GHMC area. The present land is use (with respect to local land barren land and is not used for any use plan) productive purpose. The proposed project activity shall enhance the land cover. Topography: The present topography of the site is almost flat: Due to the project the topography of the project area will change. However, the drainage pattern will remain as per the existing pattern. 1.2 Clearance of existing land, No The land is barren and containing vegetation and buildings? mainly shrubs and bushes. The same shall be cleared. Buildings: There are no structures, hence not applicable. 1.3 Creation of new land uses? Yes There will be creation of new land use, which will be as per the approval of the HMDA, Hyderabad. 1.4 Pre-construction Yes There will be no physical impact on investigations e.g. bore holes, the locality due to the soil testing or soil testing? other pre-construction investigations. Geotechnical/soil investigation

report is enclosed. 1.5 Construction works? Yes Construction of 83 no’s gated Community Villas 1.6 Demolition Works? No There are no structures in the proposed area; hence there are no demolition works involved. 1.7 Temporary sites used for Yes The site will have temporary store construction works or housing rooms and site office during of construction works? construction phase, which will be later demolished. The demolition waste will be used within the site itself. Temporary shelters for construction workers are not required as majority of labor will be hired from the surrounding locations 1.8 Above ground buildings, Yes The project will involve construction structures or earthworks of 83 no’s gated Community Villas. including linear structures, The maximum height of the cut and fill or excavations proposed complex will be 10.0 mts. Thus, there will be a visual impact on the surroundings. This will add to the change in the localized physical environment. In the post construction phase, tree plantation and landscaped areas (>10%) will be provided which will enhance the aesthetic beauty of the area. 1.9 Underground works including No Not Applicable mining or tunneling? 1.10 Reclamation Works? No Not envisaged. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and No No manufacturing activity. manufacturing processes? Activity is Construction of Residential Villas. 1.14 Facilities for storage of goods Yes Temporary storage shed will be or materials? provided at site. The proposed project will have temporary sheds for the storage of construction materials. After the structural erection of the building, the

construction materials will be stored at the earmarked places, so that the same is not carried away and causes obstruction in the storm water drains. 1.15 Facilities for treatment or Yes The details of solid and liquid waste disposal of solid waste or generated & their disposal during liquid effluents? the construction and post construction phase are tabulated as: Construction Phase: S.No. Source Nature of Waste Treatment/Disposal 1 Site Preparation Solid waste: Not Applicable activities None 2 Construction Solid waste: Not Applicable activities Construction waste Recyclable waste Sold to the vendors Inert waste (Brick, Used for road masonry, making, & land filling Concrete, etc.) within the project site. 3 Construction Solid waste: Will be sent to Workers (Total = 45 kg / day) Municipal Facility, Biodegradable (35 kg/day) for disposal sites non – biodegradable (10 kg/day) Effluent: (> 8.0 KLD) Will be treated in temporary septic tank & soak pit. Post Construction Phase: S. No Source Treatment/Disposal 1 Domestic effluent Will be treated in STP of capacity 60 KLD based on (54.58 KLD) FAB technology. Recycled Water Available – 43.66 KLD Usage of treated effluent: • Flushing (23.904 KLD) • Greenbelt (9.685 KLD) • Washings (2.0 KLD) • Public sewer line ( 8.08 KLD) 2 Solid waste As under: S.No Bins Particulars Quantity Treatment Disposal 1 Green Compostable 219.44 No in situ Municipal (households) waste kg/day treatment. Waste •Kitchen waste Collected facility •Garden waste and stored

at designated places. 2 Dark grey Non- 10 kg/day No in-situ Municipal Bins biodegradable treatment. Waste (households) waste + Collected facility recyclable and stored waste: at • Plastics designated • Metal cans places. • Glassware 3 Blue Paper waste Not Efforts to Sent to (households) • Paper quantified recycle to the • Newspaper the best vendors • Cardboards possible for •Packing extent. recycling. material Will be collected on daily basis. 4 S.T.P Sludge 10kg/day -- Used as manure

1.16 Facilities for long term No Manpower requirement of housing of operational operational workers is nominal and workers? will be recruited from surroundings therefore no long term housing facilities are envisaged. 1.17 New road, rail or sea traffic No There will be no new road and rail. during construction or During construction phase, traffic operation? will increase due to inward movement of raw materials. In the post construction phase, there will be increase in the traffic levels due to proposed project. 1.18 New road, rail, air waterborne No There is no new rail, air borne or other transport transport infrastructure required for infrastructure including new the project. or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No Due to the upcoming project, there existing transport routes or will be no closure or diversion of infrastructure leading to existing transport routes or changes in traffic movements? infrastructures leading to changes in traffic movements. 1.20 New or diverted transmission No Not envisaged lines or pipelines?

1.21 Impoundment, damming, No The proposed development will not culverting, realignment or disturb the natural terrain of the other changes to the area and will not disturb the water hydrology of watercourses or courses in any ways i.e. no drain aquifers? flows from the site. Rain Water Harvesting system is proposed to recharge the GWL 1.22 Stream crossings? No There are no stream crossings in the proposed site. 1.23 Abstraction or transfers of Yes Water requirement of the project water from ground or surface will be met from Public Water waters? Supply/Bore Wells. 1.24 Changes in water bodies or No The development will be carried out the land surface affecting with no disturbance to major water drainage or run-off? or the land surface, affecting drainage or runoff. 1.25 Transport of personnel or Yes Transportation of personnel or materials for construction, material will be by trucks on road. operation or decommissioning? 1.26 Long-term dismantling or No Restoration works for the project on decommissioning which could long term will be an ongoing activity have an impact on the which will not have any impact on environment? physical environment. 1.27 Ongoing activity during No There is no decommissioning decommissioning which could activity. have an impact on the environment? 1.28 Influx of people to an area in Yes During the construction phase, either temporarily or there will be inward and outward permanently? movement of local labour in the construction site, this will be an ongoing temporary activity and will not call for permanent influx of people. However, during the post construction phase, there will be regular movement of residents, visitors, staff and related personals. 1.29 Introduction of alien species? No No alien species will be introduced. Only selected local and native plant species will be planted. 1.30 Loss of native species or No None

genetic diversity? 1.31 Any other actions? No None 2.0 USE OF NATURAL RESOURCES for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information /Checklist Yes/ Details thereof (with confirmation No approximate quantities /rates, wherever possible) with sources of information data 2.1 Land especially undeveloped No Net plot area – 32171.45 Sq Mts or agricultural land (ha) 2.2 Water (expected source & Yes Water Requirement : 75.18 KLD competing users) Unit : KLD Fresh water requirement – 39.60 KLD Source: Public Supply/Bore Well. Recycled water – 35.58 KLD Source : S.T.P recycle 2.3 Minerals (MT) Yes Marble, Granite, etc. will be used as per the requirement. 2.4 Construction material – stone, Yes Construction materials like coarse aggregates, and / soil aggregate, fine aggregate, granite. (expected source- MT) Kota stone, Dolhur stone, Marble, bricks, sand, cement, steel will be used. The raw materials will be sourced from local dealers & traders. 2.5 Forests and timber (source – Yes Wood will be used only for MT) preparing window and door frames. Doors will be made of fire retardant materials with specific fire rating. The required timber and fire retardant material will be procured from local traders. 2.6 Energy including electricity Yes Power Required : 1000 KVA and fuels (source, competing Source: Telangana State Power users) Unit: fuel (MT), energy Distribution Company Limited (MW) (TSPDCL). Back-up power: 2 x 500 KVA DG sets for emergency during power failures. Fuel: HSD required for DG Set @ 76 Liters, will be sourced from local traders

2.7 Any other natural resources No Not Applicable (use appropriate standard units) 3.0 Use, storage, transport, handling or production of substances or materials which could be harmful to human health or THE ENVIRONMENT or raise concerns about actual or perceived RISKS TO HUMAN HEALTH. S. Information /Checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible ) with sources of information data 3.1 Use of substance or No There will be storage of HSD to the materials, which are tune of 100 Liters (approx) in the hazardous (as per MSIHC project, which will be stored in the rules) to human health or the inbuilt storage tanks of DG set. environment (flora, fauna, The significant hazard due to the and water supplies) same will be negligible as the exposure level will be confined within a small area in the consequence of unforeseen hazard. 3.2 Changes in occurrence of No There will be no release of any disease or affect disease hazardous substance in the vectors (e.g. insect or water construction as well as post borne diseases) construction phase. The waste water generated to the tune of 54.58 KLD will be treated in STP of capacity 60 KLD based on FAB technology. Further, storm water network will be well designed to leave no stagnant water pockets, at any point of time. The storm water line will not cross wastewater line. The biodegradable as well as non- biodegradable waste will be collected at earmarked places and will be sent to waste disposal sites. Proper sanitization will be done to prevent any disease vector. 3.3 Affect the welfare or people No The living conditions of the public of e.g. by changing living the nearby areas will not be affected conditions? due to upcoming of the project. The solid waste will be suitably

treated, while the liquid effluent will be treated in the sewage treatment plant of adequate capacity. 3.4 Vulnerable groups of people No None who could be affected by the project e.g. hospital patient’s children, the elderly etc., 3.5 Any other causes No None

4.0 Production of SOLID WASTES during construction or operation or decommissioning (MT/ month) S. Information /Checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible ) with sources of information data 4.1 Soil, overburden or mine No There is no activity which may wastes generate spoil, overburden & mine waste. 4.2 Municipal waste (domestic Yes Construction Phase: and or commercial wastes) About 50 kg/day solid waste of solid waste will be generated, which will be disposed – off suitably. Operational Phase: A system of segregation at source will be implemented. Colour coding of the bins will be provided for different types of wastes. 4.3 Hazardous wastes (as per No Construction Phase: Hazardous Waste No hazardous waste will be Management Rules) generated. Provisions will be made to segregate and recycle the waste Yes to the vendors. Waste will be sent to authorize recyclers. Post Construction Phase: Used Oils from – 30 LPA Used Batteries – 2 no’s/year Will be sent to authorize recyclers. 4.4 Other industrial process No Not Applicable wastes 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes About 10 Kg/day sludge will be from effluent treatment generated from STP, which will be used as manure in landscaping.

4.7 Construction or demolition Yes During construction some amount wastes of construction debris may be generated which will be segregated and whatever re-saleable will be sold to supplier and rest waste will be used for filling up of low lying areas and development of internal roads and boundary walls etc 4.8 Redundant machinery or No Most of the equipment used for the equipment construction will be hired. Surplus equipment and material will be disposed off to the appropriate agencies. 4.9 Contaminated soils or other No No soil contamination is anticipated materials as the proposed project is a construction project all the waste generated will be in the form of solid waste of reusable nature. 4.10 Agricultural wastes No There will be no agriculture waste. 4.11 Other solid wastes No There will be no other solid waste. 5.0 Release of pollutants or any hazardous, toxic or noxious substances to AIR (Kg/hr) S. Information /Checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible ) with sources of information data 5.1 Emissions from combustion Yes The source of emissions will be from of fossil fuels from stationary D.G. set of cumulative capacity of or mobile sources 500 kVA, used in common areas in case of power cuts or failure (partial power back). The maximum predicted concentrations due to DG sets emission rate are given as under:

Parameter D.G set (500 KVA) PM 0.3 Nox 9.2 CO 3.5 HC 1.3 (All units in g/KW-hr) EPA/CPCB certified D.G. Sets for

low emission standards will be installed so as to maintain the emission within the norms etc. Further, the DG sets will be provided with a safe stack height of 5 m above the roof of DG house to keep the emissions within the permissible norms. Low sulphur content fuel (HSD – 76 ltr/hr) will be used to keep the emissions within the permissible norms.

Mobile Sources: There will be emissions from the exhausts of the vehicles in the construction as well as operational phase. The engines of the transport vehicles will be switched off while they are waiting to access the site and while loading & unloading. Idle construction equipment will be throttled down or switched off. PUC certified vehicles will be used for bringing construction materials. In the operational phase effective green belt will help to contain the emissions within the permissible range. A total of 3,233.04 Sq.mts will be under landscape area during the post construction phase. The residents in the post construction phase will be encouraged for carpooling & the use of mass transportation services. Further, the project is situated within the city itself, which will help to reduce the emissions in terms of commutation & associated vehicular exhausts. 5.2 Emissions from production No There is no production process in processes the project. 5.3 Emissions from materials Yes The fugitive emission expected from handling including storage or construction phase will be dust transport arising from material handling and

vehicular emission from transport vehicles. These include the emissions due to idling of the vehicles during loading and unloading activities. Construction waste will be reutilized within the site itself to reduce the emissions during transportation. Further, idling of the vehicles will be reduced to the extent possible. The haul road will be made moist to avoid the air borne dust & PUC certified vehicles will be used. 5.4 Emissions from construction Yes The fugitive dust emission sources activities including plant and are: equipment • Excavation • Haul road movements • Construction • Material Handling • Finishing The sources of air emissions from

the above activities are PM10, PM2.5, NOx, HC, etc. Mitigation measures like: minimizing drop heights of debris, enclosures, covered transport, use of barriers, wetting surface, plantation, avoid idling of vehicles etc. 5.5 Dust or odors from handling Yes • Water spraying to prevent dust of materials including pollution from different sources of construction materials, construction. sewage and waste. • Speed restriction of all the vehicles approaching the site and within the site. • All transportation vehicles will be suitably covered with tarpaulin & overloading of the vehicles will be avoided. • Covering of the construction site on all four sides to a considerable height to prevent dust emissions and other pollutants to the surrounding environment.

• Ensuring vehicles stick to the access track to prevent mud and dirt being deposited on roads. • Covering loads to limit materials or litter blowing off and reducing smells. • Proper Sewage Treatment System and Solid Waste Management System will be provided and will be well maintained so as to avoid the problems of odor. 5.6 Emissions from incineration No None of waste 5.7 Emissions from burning of No No material waste will be burnt in waste in open air (e.g. slash open air. materials, construction debris) 5.8 Emissions from any other No None sources 6.0 Generation of Noise and Vibration, and Emissions of Light and Heat: S. Information /Checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible ) with sources of information data 6.1 From operation of equipment Yes Noise may be generated from the e.g. engines, ventilation plant, construction equipment’s and crushers operation of DG sets. The following measures will be taken: • EPA/CPCB certified DG sets conforming to the standards for noise will be used. • Temporary noise barriers will be provided all around the project site. • Light pollution will be restricted using cut-off shield fixtures on site. • Ensuring that all lights strike a surface directly and do not point at the sky or surrounds. It will be kept minimum, consistent with safety and security. • EMF radiations at site will be reduced by ensuring that

construction supply connection is adequate for the task, using line filters on the mains connecting cables, installing power factor correction equipment. • An area of about 3,233.04 Sq.mts will be under landscape/green belt which will help to contain the emissions within the project sites. 6.2 From industrials or similar No None processes 6.3 From construction or Yes During construction drilling, demolition crushing, concrete mixing activities will create noise and vibrations. These will be temporary in nature and will be phased out once the construction is over. There are no demolition works. Ready mix concrete will be used to reduce the noise & vibrations due to the operation of concrete mixer truck, etc. 6.4 From blasting or piling No Blasting operations are not envisaged in the proposed project. However, noise from piling activities shall be as follows: 100 dB (A) at 50 ft from source 124 dB (A) at 3.3 ft from source Temporary noise barrier will be provided all around the project site to contain the noise within the permissible norms. 6.5 From construction or Yes During the construction phase and operational traffic. post construction phase, noise will be generated from movement of vehicles. The construction site will be shielded to avoid the noise propagation. In the post construction phase, the efficient green belt planning will reduce the noise propagation. Proper traffic management is an integral part of design which helps

in reducing the noise & vibrations and other emissions due to traffic movements. Proper traffic management plan in line with the provisions of NBC- 2005 will be constituted. 6.6 From lighting or cooling No There will be change in the light systems pollution level of the project area. Urbanization activity leads to massive lighting in the area. In this project provisions are made to use object focused light using energy efficient lights and prominent lights will be solar powered. 6.7 From any other sources No None

7.0 Risks of CONTAMINATION OF LAND OR WATER from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea : S.No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 7.1 From handling, storage, use Yes The project will handle and storage or spillage of hazardous of HSD up to 0.2 KL. Inbuilt storage materials facility in DG set will be as per statuary norms. 7.2 From discharge of sewage or No The wastewater generated will be other effluents to water or the treated in an STP. Sewage will not land (expected mode and be discharged into the open place of discharge ) surfaces causing the contamination of ground water. 7.3 By deposition of pollutants No During construction, there will be emitted to air into the land or fugitive emissions generated from into water excavation, material transfer, construction operations, finishing operations, road construction, exhaust from vehicles, and stationary sources, etc. 7.4 From any other sources No There will not be any other sources, which will contaminate land & water resources.

7.5 Is there a risk of long term No There will not be building -up of build up of pollutants in the pollutants in the environment from environment from these this project. sources? 8.0 Risk of accidents during construction or operation of the Project, which could affect human or the environment S.No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 8.1 From explosions, spillages, Yes There will be no hazardous fires etc from storage, substance or chemical used in the handling, use or production proposed project as per the HWM of hazardous substances Rules, 2008. However, spent oil from DG sets and transformers will be generated which will be stored in the spent oil tank prior to disposal to actual users at earmarked places. The fuel used in the DG set will be stored in the inbuilt storage tanks which will be designed to meet out all safety norms. Required firefighting arrangements will be provided in the project. 8.2 From any other causes Yes The major risks involved in the project would be working at different construction heights and mishaps due to human errors, bad construction practices and associated electric hazards. All Safe construction practices & precautionary measures will be adopted and use of PPE will be mandatory. However, to meet out the minor incidences and accidents first aid measures at site will be provided. All safety measures will be in place prior to commencement of operations so as to avoid any risk of human life. 8.3 Could the project be affected No The project site is located at a by natural disasters causing higher elevation and the seismic

environmental damage (e.g. zone for the project area is Zone-II, floods, earthquakes, which is considered safe. landslides, cloudburst etc)? 9.0 Factors which should be considered (such as consequential DEVELOPMENT) which could lead to ENVIRONMENTAL EFFECTS or the potential for cumulative impacts with other existing or planned activates in the locality S.No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 9.1 Lead to development of Yes The proposed project is a supporting. utilities, ancillary construction of Residential development or development Complex. So it leads to development stimulated by the project of supporting facilities and ancillary which could have impact on & related activities. the environment e.g.:

· Supporting Yes infrastructure (roads, Existing power supply, waste or Yes waste water treatment, etc.) No · Housing development No · Extractive industries · Supply industries No · Other 9.2 Lead to after use of the site, No None which could have impact on the environment

9.3 Set a precedent for later No --- developments 9.4 Have cumulative effects due No None to proximity to other existing or planned project as with similar effects )

(III) Environment Sensitivity

S.No. Areas Name/ Aerial distances (within 15 Identity km.) Proposed project location boundary 1. Areas protected under Yes Golkonda Fort – 5.0 Kms (N) international conventions, Kutubshahi Tombs – 6.0 Kms national or local legislation for (N) their ecological, landscape, Charminar – 10.0 Kms (E) cultural or other related values 2. Areas which are important or Water - 1.2 Kms (E) sensitive for ecological reasons Bodies Himayatsagar - 2.9 Kms (W) – Wetlands, water courses or Osmansagar - 7.0 Kms (W) other water bodies, coastal Mir Alam Cheruvu – 5.0 Kms (E) zone, biospheres. Mountains,

forests Forests Chilkur PF - 2.5 Kms (NW)

3. Areas and by protected, None -- important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or None --- underground waters 5. State, National boundaries None --- 6. Routes or facilities used by the None --- public for access to recreation or other tourist, pilgrim areas 7. Defense installations Yes Golkonda Artilery Center – 4.0 Kms 8. Densely populated or built-up Rajendr 3.0 kms (SE) area anagar

9. Areas occupied by sensitive Rajendr 3.0 kms (SE) man-made land uses anagar (hospitals, schools, places of worship, community facilities ) 10. Areas containing important, Water Musi River - 1.2 Kms (E) high quality or scarce Bodies Himayatsagar - 2.9 Kms (W) resources (ground water Osmansagar - 7.0 Kms (W) resources, surface resources, Mir Alam Cheruvu – 5.0 Kms (E) forestry, agriculture, fisheries, tourism, minerals) Forests Chilkur PF - 2.5 Kms (NW) 11. Areas susceptible to natural None The area is classified as Zone II

hazard which could cause the (Least-moderate Damage Risk project to present Zone) as per the BIS environmental problems classification. (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) IV. Proposed Terms of Reference Not Applicable for EIA Studies B-2 Category Project