M/S. GKRS PROPERTIES at Sy No. 41/E, Bandlaguda Jagir Village, Rajendranagar Mandal, Ranga Reddy District, Telangana State
Total Page:16
File Type:pdf, Size:1020Kb
M/s. GKRS PROPERTIES at Sy No. 41/E, Bandlaguda Jagir Village, Rajendranagar Mandal, Ranga Reddy District, Telangana State. FORM - 1 I) Basic Information S.No. Item Details 1 Name of the project/s M/s. GKRS PROPERTIES Gated Community Residential Villas 2 S. No. in the schedule The project is categorized under 'B-2' under item 8(a) of Schedule - Gazette Notification dated Sep 14th, 2006 and subsequent amendments issued by MoE&F, New Delhi on 01.12.2009 and 04.04.2011. 3 Proposed capacity /area/ Total Plot Area = 32,171.45 Sq Mts/7 length/ tonnage to be Acres 38 Guntas handled/command area/lease Built-up Area = 27,387.99 Sq.mts area/ No of the well to be Greenbelt Area = 3,233.04 Sq.mts drilled 4 New/Expansion New /Modernization 5 Existing capacity/Area etc… NA 6 Category of project A or B Category B ( ‘B2’) 7 Does it attract the general This project does not attract general condition? If yes please specify conditions. 8 Does it attract the specific This project does not attract specific condition? If yes please specify conditions. 9 Location Plot/ survey /Khasra no Sy No. 41/E, Village Bandlaguda Jagir Village, Tehsil/Mandal Rajendranagar Mandal, District Ranga Reddy District, State Telangana State 10 Nearest Railway station/Air Hyderabad R.S – 10.0 Kms (NE) port along with the distance in RGIA, Shamshabad – 15.0 Kms (S) kms 11 Nearest Town, City, District Hyderabad - 8.0 Kms Headquarters along with distances in kms. 12 Village Panchayats, Zilla GHMC Parishad, Municipal Corporation, Local body (complete postal Address with telephone no. to be given 13 Name of the applicant M/s. GKRS PROPERTIES 14 Registered address M/s. GKRS PROPERTIES H.No: 10-3-311/20, 3rd Floor, Road No:1, Castle Hills, Masab Tank, Hyderabad 500057, Telangana State 15 Address of the correspondence Name Sri. B. Goutham Reddy, Designation Partner /owner/partner/CEO M/s. GKRS PROPERTIES Address Plot No: 8,9,10,11, Silicon Valley Layout, Flat No 103 & 104, Fortune Chambers, Image garden Road, Madhapur, Hyderabad Pin code 500081 E-mail [email protected] Telephone no + 91 9701346172 Fax no 16 Details of Alternative Sites No Alternative Sites are examined examined if any. Location of these sites Should be shown on a Topo sheet. 17 Interlinked Projects Not Applicable 18 Whether separate application Not Applicable of interlinked projects has been submitted 19 If yes, date of submission Not Applicable 20 If no reason Not Applicable 21 Whether the proposal involves approval / clearances under: if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, No 1980? (b) The Wild life (protection)Act, No 1972? (c) The C.R.Z notification, 1991? No 22 Whether there is any No Government order/ policy relevant/relating to the site? 23 Forest land involved (Hectares) No 24 Whether there is any litigation No litigation is pending against the pending against the project project in any court of law to the best of and/or land in which the knowledge. project is propose to be set up? (a)Name of the court (b)Case no. (c) Orders/directions of the court, if any and its relevance with the proposed project. (II) Activity 1.0 Construction, operation or decommissioning of the Project involving actions, which will cause Physical Changes in the locality (topography, land use, changes in water bodies, etc.). S.No. Information / Checklist Yes Details thereof (with approximate confirmation /No quantities /rates, wherever possible ) with sources of information data 1.1 Permanent or temporary Yes The proposed project activity is change in land use, land cover construction of Gated Community or topography including Villas. The site area is located in increase in intensity of land GHMC area. The present land is use (with respect to local land barren land and is not used for any use plan) productive purpose. The proposed project activity shall enhance the land cover. Topography: The present topography of the site is almost flat: Due to the project the topography of the project area will change. However, the drainage pattern will remain as per the existing pattern. 1.2 Clearance of existing land, No The land is barren and containing vegetation and buildings? mainly shrubs and bushes. The same shall be cleared. Buildings: There are no structures, hence not applicable. 1.3 Creation of new land uses? Yes There will be creation of new land use, which will be as per the approval of the HMDA, Hyderabad. 1.4 Pre-construction Yes There will be no physical impact on investigations e.g. bore holes, the locality due to the soil testing or soil testing? other pre-construction investigations. Geotechnical/soil investigation report is enclosed. 1.5 Construction works? Yes Construction of 83 no’s gated Community Villas 1.6 Demolition Works? No There are no structures in the proposed area; hence there are no demolition works involved. 1.7 Temporary sites used for Yes The site will have temporary store construction works or housing rooms and site office during of construction works? construction phase, which will be later demolished. The demolition waste will be used within the site itself. Temporary shelters for construction workers are not required as majority of labor will be hired from the surrounding locations 1.8 Above ground buildings, Yes The project will involve construction structures or earthworks of 83 no’s gated Community Villas. including linear structures, The maximum height of the cut and fill or excavations proposed complex will be 10.0 mts. Thus, there will be a visual impact on the surroundings. This will add to the change in the localized physical environment. In the post construction phase, tree plantation and landscaped areas (>10%) will be provided which will enhance the aesthetic beauty of the area. 1.9 Underground works including No Not Applicable mining or tunneling? 1.10 Reclamation Works? No Not envisaged. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and No No manufacturing activity. manufacturing processes? Activity is Construction of Residential Villas. 1.14 Facilities for storage of goods Yes Temporary storage shed will be or materials? provided at site. The proposed project will have temporary sheds for the storage of construction materials. After the structural erection of the building, the construction materials will be stored at the earmarked places, so that the same is not carried away and causes obstruction in the storm water drains. 1.15 Facilities for treatment or Yes The details of solid and liquid waste disposal of solid waste or generated & their disposal during liquid effluents? the construction and post construction phase are tabulated as: Construction Phase: S.No. Source Nature of Waste Treatment/Disposal 1 Site Preparation Solid waste: Not Applicable activities None 2 Construction Solid waste: Not Applicable activities Construction waste Recyclable waste Sold to the vendors Inert waste (Brick, Used for road masonry, making, & land filling Concrete, etc.) within the project site. 3 Construction Solid waste: Will be sent to Workers (Total = 45 kg / day) Municipal Facility, Biodegradable (35 kg/day) for disposal sites non – biodegradable (10 kg/day) Effluent: (> 8.0 KLD) Will be treated in temporary septic tank & soak pit. Post Construction Phase: S. No Source Treatment/Disposal 1 Domestic effluent Will be treated in STP of capacity 60 KLD based on (54.58 KLD) FAB technology. Recycled Water Available – 43.66 KLD Usage of treated effluent: • Flushing (23.904 KLD) • Greenbelt (9.685 KLD) • Washings (2.0 KLD) • Public sewer line ( 8.08 KLD) 2 Solid waste As under: S.No Bins Particulars Quantity Treatment Disposal 1 Green Compostable 219.44 No in situ Municipal (households) waste kg/day treatment. Waste •Kitchen waste Collected facility •Garden waste and stored at designated places. 2 Dark grey Non- 10 kg/day No in-situ Municipal Bins biodegradable treatment. Waste (households) waste + Collected facility recyclable and stored waste: at • Plastics designated • Metal cans places. • Glassware 3 Blue Paper waste Not Efforts to Sent to (households) • Paper quantified recycle to the • Newspaper the best vendors • Cardboards possible for •Packing extent. recycling. material Will be collected on daily basis. 4 S.T.P Sludge 10kg/day -- Used as manure 1.16 Facilities for long term No Manpower requirement of housing of operational operational workers is nominal and workers? will be recruited from surroundings therefore no long term housing facilities are envisaged. 1.17 New road, rail or sea traffic No There will be no new road and rail. during construction or During construction phase, traffic operation? will increase due to inward movement of raw materials. In the post construction phase, there will be increase in the traffic levels due to proposed project. 1.18 New road, rail, air waterborne No There is no new rail, air borne or other transport transport infrastructure required for infrastructure including new the project. or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No Due to the upcoming project, there existing transport routes or will be no closure or diversion of infrastructure leading to existing transport routes or changes in traffic movements? infrastructures leading to changes in traffic movements. 1.20 New or diverted transmission No Not envisaged lines or pipelines? 1.21 Impoundment, damming, No The proposed development will not culverting, realignment or disturb the natural terrain of the other changes to the area and will not disturb the water hydrology of watercourses or courses in any ways i.e. no drain aquifers? flows from the site. Rain Water Harvesting system is proposed to recharge the GWL 1.22 Stream crossings? No There are no stream crossings in the proposed site.