FORM-1 Murarkhedi Sand Quarry at Chambal River
Total Page:16
File Type:pdf, Size:1020Kb
FORM-1 Murarkhedi Sand Quarry at Chambal River Mining Project:-Category ‘B2’ Lease Area: 6.770 Ha. Khasra No. 1, 252 Vill.-Murarkhedi, Tehsil- Badnagar District- Ujjain (M.P) Project Proponent Mr. Shivkumar Singh Tomar Resi. Vill.--2/1, Rajendra Nagar, Agar Road, Ujjain, District- Ujjain M.P Form-1 Murarkhedi Sand Quarry APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S. No. Item Details 1. Name of the project Murarkhedi Sand Quarry (Chambal River) of Mr. Shivkumar Singh Tomar , 2. S. No. in schedule The project comes in the category ‘B2’ as per MoEF O.M. No. J-13012/12/2013-IA-II (I) dtd. 24 th December 2013. 3. Proposed capacity / area / length / Proposed Capacity : 2015 Cu.mt/year Sand tonnage to be handled / command area / Mining Lease Area: 6.770 Hect. lease area / number of wells to be drilled Lease Period: 05 Years 4. New / Expansion / Modernization New Project 5. Existing Capacity/Area etc. 6.770 Hectare 6. Category of Project i.e. 'A1 or 'B' The project comes in the category ‘B2’ as per MoEF O.M. No. J-13012/12/2013-IA-II (I) dtd. 24 th December 2013. 7. Does it attract the general condition? No If Yes, please specify. 8. Does it attract the specific condition? No If Yes, please specify. 9. Location Vill -Murarkhedi , Teh - Badnagar , Distt. Ujjain(M.P) Plot/Survey/Khasra No. Khasra no. -1, 252 Village Murarkhedi Tehsil Badnagar District Ujjain State Madhya Pradesh 10. Nearest railway station/airport along The nearest Railway Station is Palsora with distance in kms. Makrawa which is about 15 KMS from mine site. The nearest Airport is Indore which is about 97 KMS from mine site. Page 2 Form-1 Murarkhedi Sand Quarry 11. Nearest Town, city, District The nearest City is Ujjain which is about 36 Headquarters along with distance in KMS from mine site. kms. The nearest District head quarter is Ujjain which about 40 KMS from mine site. 12. Village Panchayats, Zilla Parishad, Village Panchayat - Malpura Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Mr. Shivkumar Singh Tomar , 14. Registered Address Resi. Vill. -- 2/1, Rajendra Nagar, Agar Road, Ujjain, District - Ujjain l , M .P 15. Address for correspondence: Resi. Vill. -- 2/1, Rajendra Nagar, Agar Road, Ujjain, District - Ujjain , M .P Name Shivkumar Singh Tomar Designation (Owner/Partner/CEO) Owner Address Resi. Vill .-- 2/1, Rajendra Nagar, Agar Road, Ujjain, District- Ujjain, M.P Pin Code 450331 E-mail [email protected] Telephone No. 9977087852 Fax No. Not Available 16 Details of Alternative Sites ex amined, if Mineral river sand is naturally occurring any Location of these sites should be resource. Hence no alternative can be chosen. shown on a Topo sheet. 17. Interlinked Projects No . 18. Whether separate application of N.A. interlinked project has been submitted? 19. If yes, date of submission N.A. 20. If no, reason N.A. 21. Whether the proposal involves approval/ clearance under: If yes, details of the same and their status to be given, (a) The Forest Conservation) Act, 1980? No (b) The wild life (Protection) Act, 1972? No c) The C.R.Z. Notification, 1991? No 22. Whether there is any Government No Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) No Page 3 Form-1 Murarkhedi Sand Quarry 24. Whether there is any litigation pending No litigation is pending against the project or against the project and/or land in which the project land in any court of law to the the project is propose to be set up? best of knowledge. (a) Name of the Court, (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. • Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Information/Checklist Yes / No Details thereof (with approximate S.No. confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes Proposed min ing site confined to river bed change in land use, land cover so that topographical features will be or topography including changed slightly. No other area will increase in intensity of land disturb. use (with respect to local land use plan) 1.2 Clearance of existing land, No No vegetation and buildings? 1.3 Creation of new land uses? No N.A. 1.4 Pre -construction No Not required. Sand is directly sent to investigations e.g. bore houses, marke t. soil testing? 1.5 Construction works? No None 1.6 Demolition works? No None 1.7 Temporary sites used for No The labo urs will deployed from nearby construction works or housing villages only. Hence no need to construct of construction workers? house for them. 1.8 Above ground buildings, No Excavation of river sand maximum up to structures or earthworks 0.35 mts depth. including linear structures, cut And fill or excavations Page 4 Form-1 Murarkhedi Sand Quarry 1.9 Underground works including No No underground working is proposed. mining or tunneling? There will be only opencast working. 1.10 Reclamation works? No No reclamation measures will be adopted at site except leveling of river bed after achieving up to 1.5 mtr depth from river bed level. River itself replenishes with sediment carried during monsoon season. 1.11 Dredging? No No 1.12 Offshore structures? No N.A. 1.13 Production and manufacturing Yes Production Capacity: - 2015 Cu.mt/year processes? 1.14 Facilities for storage of goods No No storage facility required, sand will be or materials? sold out directly to the consumer. 1.15 Facilities for treatment or No No solid waste will be generated. disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing No N.A. of operational workers? 1.17 New road, rail or sea traffic No N.A. during construction or operation? 1.18 New road, rail, air waterborne No N.A. or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No N.A. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No N.A. lines or pipelines? 1.21 Impoundment, damming, No N.A. culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No N.A. 1.23 Abstraction or transfers of No No water form ground or surface waters? Page 5 Form-1 Murarkhedi Sand Quarry 1.24 Changes in water bodies or the No No change in water bodies, drainage or run land surface affecting drainage off is anticipated. or run-off? 1.25 Transport of personnel or Yes Sand will be transported through tippers & materials for construction, trucks by road to the consumers. Workers operation or will come from nearby villages by their decommissioning? own convenience. 1.26 Long -term dismantling or No N.A. decommissioning or restoration works? 1.27 Ongoing activity during No N.A. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in No Local people will be deployed. either temporarily or permanently? 1.29 Introduction of alien species? No Local species will be planted. 1.30 Loss of native species or No No . genetic diversity? 1.31 Any other actions? No N.A. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. No. Information/ Checklist Yes / No Details thereof (with approximate confirmation quantities / rates, wherever possible) wit h source of information data 2.1 Land especially undeveloped No The proposed site is near river bed hence or agricultural land (ha) it is neither undeveloped nor agriculture land. 2.2 Water (expected source & Yes 5 KLD water will be used which procured competing users) unit: KLD from nearby villages. 2.3 Minerals (MT) Yes Sand - 2015 Cu.mt/year 2.4 Construction material - stone, No N.A. aggregates, sand / soil (expected source - MT) 2.5 Forests and timber (source - No N.A. MT) Page 6 Form-1 Murarkhedi Sand Quarry 2.6 Energy including electricity No N.A. and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources No N.A. (use appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health: S. No. Information / Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 3.1 Use of substances or materials, No N.A. which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No N.A. disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. Yes The living status and s ocio -economic by changing living conditions? condition of the people will upgrade due to the increase in earning sources because they will get employment. 3.4 Vulnerable groups of people No N.A.