Ministry of Regional Development and Infrastructure of

ROADS DEPARTMENT OF GEORGIA

12/06/2018 Tsiteli Khidi – Sarpi Benefits after accomplishment of East-West Highway

- Accomplished 170 km – $635 M - Length reduction to 30km - Ongoing 95 km – approx. $620 M - Traveling Time reduction of 50% - Planned 185 km – approx. $2 Billion - Driving Speed increased by WWW.BUILD.GOV.GE80-100% Chumateleti – Argveta – 52km -> Estimated Budget USD 1.2 Billion (F1-WB-EIB; F2 –ADB; F3-EIB; F4-JICA) www.georoad.g e

www.georoad.g e Argveta F4 Ubisa F3 F2 Khevi F1

F0 Chumateleti

Kharagauli

WWW.BUILD.GOV.GE F0 Zemo Osiauri – Chumateleti -> 14.0 km. Construction Period: 2018-2021 WB/EIB/GOG

Zestafoni

F0

Kharagauli Chumateleti

Zemo Osiauri

Tunnels Bridges Number of Lanes

•5 Tunnels (total length 2.4km; • 21 Bridges (total length • 4 Lanes the longest 1.5 km) 5.7km;the longest 0.6km) WWW.BUILD.GOV.GE F1 Chumateleti – Khevi -> 11.7 km.

Construction Period: 2018-2022 WB/EIB/GOG

Khevi

F1

Chumateleti

Kharagauli

Tunnels Bridges Number of Lanes

•3 Tunnels (total length • 20 Bridges (total length • 4 Lanes 2.5km; the longest 1.7km) 2.0km; the longest 0.3 km)

WWW.BUILD.GOV.GE F2 Khevi - Ubisa -> 12.2 km

Construction Period: 2018-2022 ADB/GOG

F2

Zestafoni

Chumateleti

Kharagauli

Tunnels Bridges Number of Lanes

•20 Tunnels (total length 9.5km; • 35 Bridges (total length 8.3km; • 4 Lanes the longest 1.3 km) the longest 1.2 km) WWW.BUILD.GOV.GE F3 Ubisa – Shorapani -> 13.0 km

Construction Period: 2018-2022 EIB/GOG

Argveta F3

Zestafoni

Kharagauli Chumateleti

Tunnels Bridges Number of Lanes

•18 Tunnels (total length 13.9 km; • 27 Bridges (total length 6.0 km; • 4 Lanes the longest 1.6 km) the longest 1.1 km) WWW.BUILD.GOV.GE F4 Shorapani - Argveta -> 14.7 km

Construction Period: 2018-2022 JICA/GOG

Argveta F4

Zestafoni

Kharagauli Chumateleti

Tunnels Bridges Number of Lanes

•12 Tunnels (total length 8.5 km; • 14 Bridges (total length 5.0 km; • 4 Lanes the longest 0.9km) the longest 1.1km) WWW.BUILD.GOV.GE Kvesheti - Kobi -> 22.7 km Construction Period: 2018-2023

Section 1 – 10.0 km

Jvari Pass North Existing road Gudauri

Kobi

Section 2 Section 1

Kvesheti

Tunnel Number of Lanes

•1 Tunnel (9 km) • 2 Lanes

WWW.BUILD.GOV.GE Kvesheti - Kobi -> 22.7 km Construction Period: 2018-2023

Section 2 – 12.7 km

Jvari Pass North Existing road Gudauri

Kobi

Section 2 Section 1

Kvesheti

Tunnels Bridges Number of Lanes

•4 Tunnels (the longest 1.5km) • 6 Bridges (the longest 0.4 km) • 2 Lanes

WWW.BUILD.GOV.GE Future Projects Pipeline

Southern Direction - 64 km - Red Bridge Algeti - Sadakhlo Total Length – approx. 320 km

Northern Direction – 45 km Total Budget – approx. Natakhtari - Jinvali USD 1.7 Billion Pasanauri Bypass Arsha - Stephantsminda Bypass Stephanstminda – Gveleti USD Eastern () Direction – 138 km - Sagerejo - Bakurtsikhe Bakurtsikhe – Bypass (Chumlaki) – Bypass

Western Direction – 73 km Upgrading of Bypass - section to 4-lane highway Access Road to the Deeps Sea Port Bridge over River Rioni in (Including Access Roads) Bypass – Sarpi (Border of Turkey)

WWW.BUILD.GOV.GE Thank you!

WWW.BUILD.GOV.GE