ELECTRICITY OF , RP287 POWER COMPANY NO.2 I I TRANSMISSION, DISTRIBUTION AND DISASTER Public Disclosure Authorized RECONSTRUCTION PROJECT | (Credit No.3034-VN)

FEASIBILITY STUDY 11 OkV Transmission Line and -Substation projects | in Southern Vietnam Public Disclosure Authorized Il | RESETTLEI4ENT ACTION PLAN

Head of Department : Duong Thi Thanh Truc Project Director : Duong Thi Thanh Tru

Public Disclosure Authorized Members : Tran Quang Khaii Tran Nguyen Quang Huy4

Ho Chi Minh City, 16th, May, 2005 * FOR THE DIRECTOR OF POWER ENGINEE SULTING COMPANY No.3 I (g ~\IRECTOR I~~~~~~~~~~~~~~~~~~~~~ Public Disclosure Authorized

May, KHAI May, 2005.

I | Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

TABLE OF CONTENTS l EXECUTIVE SUMMARY ...... 4 CHAPTERI ...... 19 INTRODUCTION ...... 19 | 1.1 Project Objective ...... 19 1.2. Objective of the Report ...... 21 1.3. Policy Framework ...... 22 1.4. Principles and Objectives ...... 22 1.5. Existing Power Distribution Situation in Project Areas ...... 22 1.6. Necessity of the project ...... 26 1.7. Project Ownership and organization ...... 30 1.8. Overall Project Description ...... 30 I CHAPTER2 ...... 34 INSTITUTIONAL AND LEGAL FRAMEWORK ...... 34 2.1. Institutional Framework ...... 34 2.2. Legal Framework ...... 38 CHAPTER3 ...... 45 ENTITLEMENT POLICY ...... 45 3.1. Impact Categories ...... 45 | 3.2. Entitlement ...... 46 CHAPTER4 ...... 52 RESETTLEMENT SITES ...... 52 4.1. Mitigation measures ...... 52 4.2. Measures to minimize land acquisition and losses ...... 52 4.3. Result of mitigation measures ...... 54 4.4. Agreement on S/Ss locations and T/L routes ...... 57 4.5. Resettlement Site ...... 57 CHAPTER 5 ...... 58 PUPLIC PARTICIPATION ...... 58 5.1. Community meetings ...... 58 5.2. Socio - economic Surveys ...... 58 5.3. Objectives of Information Campaign and Consultation Program ...... 58 5.4. Resettlement Information Booklet (RIB) ...... 59 CHAPTER 6 ...... 61 BASELINE INFORMATION ...... 61

I Power Company No.2 Page 1 Power Engineering & Consulting Company No.3 Transmnission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations I in Southern Vietnam 6.1. Data Gathering Activities ...... 61 6.2. Socio-economic Surveys ...... 61 6.3. Economy characteristics of project related provinces ...... 62 6.4. Census and Inventory ...... 65 CHAPTER 7 ...... 69 PROJECT IMPACTS ...... 69 7.1. Types of Impact ...... 69 7.2. Project Impacted People ...... 70 7.3. Project Impacted Assets ...... 81 CHAPTER 8 ...... 90 I IMPLEMENTATION ARRANGEMENT ...... 90 8.1. Measures for the Project Implementation ...... 90 8.2. RAP Implementation Process ...... 90 8.3. Essential Actions ...... 91 8.4. Implementation Schedule ...... 92 8.5. Staffing for RAP implementation ...... 93 8.6. Complaints and Grievances ...... 95 8.7. Monitoring and Supervision ...... 96 CHAPTER 9...... 99 COSTS AND BUDGETS ...... 99 9.1. Budgets ...... 99 9.2. Compensation Cost Estimate ...... 99. 9.3. Compensation Unit Prices ...... 99 9.4. Cost Estimation ...... 104 9.5. Total Cost Estimate for RAP Implementation ...... 105 I CHAPTERIO ...... 119 DISCLOSURE ...... 119 I I I I

I Power Company No.2 Page 2 Power Engineering & Consulting Company No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam I lOkV Transmission lines and substations in Southern Vietnam

ABBREVIATIONS

CRC Compensation and Resettlement Committee DMS Detailed measurement survey DONRE Department of Natural Resource and Environment DOC Department of Construction DOF Department of Finance and Price DOI Department of Industry DPC District People's Committee DRC District Resettlement Committee EIA Environmental Impact Assessment EVN Electricity of Vietnam FS Feasibility study GOV Government of Vietnam HH Household LURC Land Use Right Certificate MOC Ministry of Construction MOF Ministry of Finance and Price MOI Ministry of Industry OD 4.30 World Bank's Operational Directive 4.30 PAH Project affected household PAP Project affected person PC2 Power Company No.2 PECC Power Engineering & Consulting Company PMB Project Management Board PPC Provincial People's Committee RAP Resettlement Action Plan RIB Resettlement Information Booklet ROW Right of way S/S Substation T/L Transmission line VND Vietnam Dong WB World Bank

Power Ib Company No.2 Page 3 Power Engineering & Consulting Company No.3 I | Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam I EXECUTIVE I SUMMARY 0.1. INTRODUCTION 0.1.1 The project

Implementing the Govermment of Vietnam's policy on the industrialization and moderization program, the Electricity of Vietnam (EVN) has decided to use the World Bank fmancial resources for the invesment of the "Transmission, distribution and disaster reconstruction", credit No.3034-VN, borrowed from World Bank. Power Company No.2, on behaft of EVN, will develop the sub-projects for the 3 110kV S/S in 4 districts and 2 cities of 6 provinces and 110kV T/Ls traversing 10 districts and 2 towns of 6 provinces in Southern Vietnam (see Appendix 1 for Map | of Project area) with ie following components: Table 0.1.1 - Project Components

Substation Transmission line No Province Capacity From To Length Name Location (MVA) Lengto(km

1 Soc Trang My Tu Tra Coi A 25 Soc Trang My Tu 16.732 Hamnlet, My Huong Comm. My Tu Dist. 2 Binh Mui Ne Long Son 40 Phan Thiet Mui Ne 24.483 Thuan Harmlet, Mui Ne Ward, Phan Thiet City 3 Lam Dong Da Lat 2 Da Thien 40 Di Linh Duc Trong 40.153 Hamlet, Ward 8, Da Lat City 4d Hau Giang Chau Thi Tu Hamlet, 40 Connect from Phung Hiep 15.357 Thanh Mot Ngan Tra Noc - Soc town, Chau Trang 11 OkV Thanh A Dist. T/L, in Chau Thanh A Dist. 5 Tien Giang Cai Be Hau Vinh 40 Cai Be Branch 0.05 Hamlet, Hau Thanh Comm. Cai Be Dist. 6 Ben Tre Cho Lach Nhon Phu 25 Mo Cay Cho Lach 30.686 Hamnlet, Hoa Provincial Cho Lach Nghia Comm. border between 7.200 3 Cho Lach Dist. Vinh Long and Ben Tre provinces 3 ______(w ithin the B en

I Power Company No.2 Page 4 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 110kV Transnission lines and substations in Southern Vietnam

Tre province territory) * 7 Vinh Long Vinh Long Provincial 14.544 border between Vinh Long and I Ben Tre provinces (within the Vinh Long province territory)

I TOTAL 6 substations 210 Length 157.06

PMB - PC2 has entered contracts with the Consultants* for the establishment of the I FS, EIA and the RAP for the sub-projects of 110kV S/Ss and T/Ls in the southern . Note. *PC2 appointed (i) Power Engineering & Consulting Center, (ii) Power Engineering & Consulting Company No. 1, (iii) Power Engineering & Consulting Company No.2, (iv) Power Engineering & Consulting Company No.3, and, (v) Eleco Shareholding Company to carry out the preparation of FSs, EIAs and survey for RAPs of each sub-project. The RAP for the overall project are prepared by PECC3. 0.1.2. Objectives of the Report

Objectives of the Resettlement Action Plan report to define resettlement and compensation program for the projects in such a way as to limit as much as possible the number of project affected persons and their afffected properties and to ensure that all PAPs shall be compensated for their losses at replacement costs and will be- provided with rehabilitation measures to assist them to improve, or at least maintain, their pre-project living standards and income earning capacity. The RAP preparation has been carried out with the consultation and participation of PAPs and local authorities in the project areas. 0.1.3. Policy Framework

This RAP for the sub-projects under PC2 is based on the Policy Framework for 3 Compensation, Resettlement and Rehabilitation of Project Affected Persons (see Appendix 2 for Policy Framework for Compensation, Resettlement and Rehabilitation of Project Affected Persons). According to the Policy Framework, the eligibility for compensation and rehabilitation entitlement includes all affected persons, households and institutions with or without legal status on their assets I included in the RAP inventory prior to the RAP cut-off date. By the actual RAP implementation, PMB/compensation council(s) will organize the survey for the actual prevailing prices for the adjustment of the compensation unit prices, if

Power Comrlpany No.2 Page 5 Power Engineering & Consulting Company No.3 I Transnmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam I necessary and the amount of compensation will be displayed at the Communes's People's Committee Offices. 0.1.4. Principles and Objectives

According to the Government Decree No.197/2004/ND-CP and resettlement principles of World Bank, the resettlement and compensation program must be designed so as to improve or at least to maintain living standards of PAPs as before the imnplementation of the project. Both resettlement and land acquisition must be minimized as much as possible. Cash compensation (for houses or structures, farm products,...) shall be paid at the prices that were submitted by CRC and approved by local PPC in order to reach the replace price for land, housesand perennial trees and the market price for annual crops. The resettlement and compensation program must be carried out in the progress on schedule with an appropriate monitoring program.

The principles outline in the WB OD 4.30 (adopted in the Policy Framework) are based for the preparation of this RAP.

Apart form direct compensation, all PAPs permanently losing more than 25% of their residential/productive land or other incomes are entitled to be trained or received other restoration measures. All PAPs being resettled are entitled to receive (i) transport allowance; (ii) relocating subsidy; (iii) training or other restoration measures and (iv) timely relocating bonus. In these sub-projects, there are 226 households (1,066 persons) losing more than 25% of their fixed assets (residential/productive land and/or houses/structures).

Although the surveys have been carried out, the sub-project issues have been communicated to the people in the project related localities along with community participation S/S locations and T/L routes have been approved by the local authorities, it is agreed between the local authorities and the PC2's PMB that the cut-off date shall be the dates of the community meetings in the project related localities in respect of RAP where the cut-off date is officially declared by the competent local authorities.

No Province Sub-project Cut-off date

1 1 Binh Thuan Phan Thiet - Mui Ne T/L May 28, 2004 Mui Ne S/S May 28, 2004 2 Lam Dong I Di Linh - Duc Trong T/L May 27, 2004

Power Company No.2 Page 6 Power Engineering & Consulting Company No.3 I | Transrmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam I 3 Tien Giang Cai Be S/S June 1, 2004 1 4 Ben Tre 3 Mo Cay - Cho Lach T/L May 18, 2004 Vinh Long - Cho Lach T/L May 5, 2004 Cho Lach S/S June 16, 2004 5 Soc Trang Soc Trang - My Tu T/L June 2, 2004 My Tu S/S June 2, 2004 6 Vinh Long Vinh Long - Cho Lach T/L April 28, 2004 7 Hau Giang 3 Can Tho - Chau Thanh T/L July 8, 2004 Chau Thanh S/S July 8, 2004 0.1.5. Existing Power Distribution Situation in Project Areas The existing power distribution networks in the project areas (covering 40 communes, belong to 15 districts/towns/cities of 7 provinces), in general, are I incapable of meeting the current and future demand due to unapt T/Ls (too long distance and/or too small conductor diameter, leading to low service quality and 3 high loss) and lack of S/Ss

Details of the situation of existing power distribution in the project area are shown 3 in Table 1.5 in Chappter 1.

0.1.6. Projection of Power Supply in the Project Areas U With the ever increasing demand of power supply in the project areas, such forecast and planing for the future (2004-2010) power supply demand and distribution U network in the project areas has been prepared by PC2 and approved by the Vietnamese Govermnent.

Details of power supply demand projection in the project area are shown in Chappter 1.

0.1.7. Project Ownership and Organization

. Investor Power Company 2 3 . Management Power Network Project Management Unit

* Power Company No.2 Page 7 Power Engineering & Consulting Company No.3 IU | Transmnission, distribution and disaster reconstruction Project - Vietnam I1 OkV Transmission lines and substations in Southern Vietnam

. Provincial Power Service in 7 projects related provinces i.e. Soc Trang, 3 BinBh Thuan, Lam Dong, Hau Giang, Tien Giang, Ben Tre and Vinh Long

3|* Consulting agencies PC2's Power Engineering & Consulting Center Power Enineering & Consulting Company 1 | Power Enineering & Consulting Company 2 Power Enineering & Consulting Company 3 Hanoi Eleco Shareholding Company 3 0.1.8. Overall Project Description The project comprises of six 110kV S/Ss with total capacity of 210MVA and six 110kV transmission 3 lines with 157.06km in total length covering 11 districts, 2 towns and 2 cities of 7 provinces. (see Table 0.1.1 in this Chapter for the Project Components). Project Affected People

Total number of PAPs* 1,169 HHs 5,198 persons | in which . PAHs with permanent acquisition of more than 11 25% of productive land

. PAHs with permanent acquisition of less than 25% 1,152 of productive land

. PAHs with permanent acquisition of more than 103 3 25% of residential land

. PAHs with permanent acquisition of less than 25% 94 3 of residential land

. PAHs with temporary acquisition of productive 1,169 I land

3 . PAHs with houses totally affected 226 HHs (1,066 persons) . PAHs with structure totally affected 130 HHs

. PAHs with annual/perenial trees/crops affected in 1,159 HHs part or total 4,990 Persons

E| Power Company No.2 Page 8 I Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 1lOkV Transmnission lines and substations in Southern Vietnam

. PAHs with bussiness partly or totally affected Nil

1 . PAHs required to be relocated 226 HHs (1, 066 persons)

Notes: * Excluding 1 project affected state-own organization i.e. PMB of Lam 3 Vien forest, Da Lat city (Lam Dong province) with permanent affected forest land and pine trees due to construction of Da Lat 2 substation. 3 Project Impacted assets: . Permanent land acquisition | - Individual PAPs 102,557 m2 - Lam Vien PMB 8,233 m2 110,790 m2 | Temporary land acquisition - Individual PAPs 2,111,875 mr - Lam Vien PMB 0 m2

2,111,875 m2 * . Permanent affected trees - Individual PAPs 381,324 trees - Lam Vien PMB 50 trees (pines) 381,374 trees * Pennanent affected houses 283 units 1 . Permanet affected structures 416 units . Temporary affected structures Nil

. Permanent affected crops 48,056 m2 1 . Temporary affected crops 975,981 m2 0.2. Institutional and Legal Framework t 1 0.2.1. Institutional framework:

* The overall responsibility for enforcement of the Policy Framework and for * planning and implementing of this RAP's rests with PC2, PC2's Power Network PMB and the People's Committees of the project related provinces and their

3 | Power Company No.2 Page 9 Power Engineering & Consulting Company No.3 I | Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam l relevant Institutions (i.e. Provincial and District CRCs, provincial DOFs, DOCs, DOIs, ... )

PC2, its Consultants and Provincial Powers are responsible for carrying out cencus, socio-economic survey and inventories, preparing RAP and for the day-to-day implementation within their respective jurisdiction.

The project related District and Commune People's Committees will participate in the RAP preparation and implementation. 0.2.2. Legal Framework

All GOV and WB policies related to land acquisition, compensation and resettlement (OD 4.30) are applied for this RAP. Where GOV and WB policies are not compatible, the WB's OD 4.30 shall prevail with certain required waivers. 0.3. Entitlement Policy

This RAP has been prepared on the basis of the OD 4.30 of the WB on involuntary resettlement adopted in the Policy Framework. The principle objective of the Policy Framework is to ensure that all PAPs will be compensated for their losses at replacement cost and provided with rehabilitation measures to assist them in improving, or at least maintain their pre-project living standards and income earning capacity.

The Policy Framework lays down the priciples and objectives, eligibility criteria of PAPs, entitlements, legal and institutional framework, modes of compensation and rehabilitation, people's participation and grievances procedures that will guide the- compensation, resettlement and rehabilitation of the PAPs.

Apart from direct compensation, all PAHs permanently would lose more than 25% of their residential/productive land or other incomes are entitled (i) transport allowance; (ii) relocating subsidy; (iii) training or other restoration measures and (iv) timely relocating bonus. (GOV Decree 197/CP). See Appendix 3 for the Entitlement Matrix. 0.4. Resettlement Site

Thanks to mitigation measures through public consultations the initial stage and design stage of the project, the socio-economic surveys, inventories and census show that there are 226 HHs (1,066 persons) whose fixed assets (residential/productive land and/or house/structures) being acquired more than 25% of their total holding and required to be relocated.

Power I Company No.2 Page 10 Power Engineering & Consulting Company No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam I IOkV Transmission I lines and substations in Southern Vietnam At the stage of this RAP preparation, actual land allocation required for the development of the resettlement site can not be defined, however, Official Agreements (approved by PPCs) on T/L route and S/S location have been obtained and Official Agreement (approved by the related district People's Committees) on the allocation of resettlement land, if required, have been obtained. Base on the result of socio-economic surveys on PAHs, it is shown that all PAHs who are required to be resettlement have spare land. In addition, they would like to be compensated for their losses (land/house/structures) in cash so that they can use it to resettle by their own. Therefore, the project does not need to set up any resettlement area.

See Appendix 4 for Agreements on S/Ss Location and T/L Routes. 0.5. People's Participation The consultation with PAPs in getting their feedback will limit contradiction and avoid delays in project implementation. The RAP is developed in close consultation with local authorities and PAPs in order to maximize their participation in resettlement planning and implementing and the socio-economic benefits of PAPs to the project. Local authorities and PAPs were consulted through line alignment, draft of resettlement policy, RAP implementation, grievance mechanism and monitoring and evaluation on the restoration of PAPs livelihood after the project 3 implementation. (See Appendix 6 for Minutes of Community Meettings and Appendix 8 for Pamphlets). 3 0.6. Baseline Information 0.6.1. Data Gathering Activities * The Consultants' staves carried out the census and inventory by means of direct interviews and "Questionnaires" during April - June, 2004 covering 100% of PAPs I in the project affected areas of 40 communes/towns/wards belong to 15 districts/towns/cities of 7 project related provinces. 1 0.6.2. Socio - economic Survey The socio-economnic surveys have been carried out aiming at providing baseline data on the localities traversed by the sub-projects covering 40 conimunes/towns/wards belong to 15 districts/towns/cities of the project related l l provinces. Survey data cover the information on the characteristics of the communities, their sources of income, revenue, socio-economic situation. The survey also aims at identifying characteristics of affected areas, assessing the

Power Company No.2 Page 11 Power Engineering & Consulting Cornpany No.3 I I I I I I I I I Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

development of population, houses, socio-economic etc. The survey data are used for establishing resettlement policy and bases for evaluting restoration of living standards. 0.6.3. Economy

Economy in the project related provinces, among the open-door market economy of the whole country, developes on the trend of increasing industry and services sectors in the overwhelming agiculture, aquaculture, fishery and forestry sectors. In the project areas, the population is mainly farmers (48.6 %) with sources of income from farming combined with small scale live-stock breeding. People with sources of income from fishing/aquaculture just occupied 1.56 %. The small scale services and business occupied 10.62 %, the wage-earners (from both state-owned and private sectors) occupied 15.38 %, free lance laborers occupied 10.54 %, handicraft occupied only 0.21 % and the rest belong to others. 0.6.4. Census and Inventory The census and inventory show that:

. Number of PAHs 1,169 HHs (5,198 persons) . Number of PAHs required to be resettled 226 HHs (1,066 persons) a Number and area of removed houses 226 units (16,208 m2)? ...... _.___....._._. _...... _ . Area of residential 2 _1 _ ~~~~~~~~ ~...... affected residential land 27,704 m ...... _...... _...... * l . Area of affected productive land 93,318 m2 . Quantity of other fixed assets affected (various 15,915 m2 l l categories) ...... ---...... --...... ------...... ------...... -- i . Temporary impact on productive land ** 2 * … 2,024,718m * .} ..-...... _ ...... Business lost including structures, land and other fixed Nil assets | Impact on tenants who leased the houses for residential Nil purpose _ . . . 3 | . Impacton sensitive areas Nil . Temporary impact on non-productive land (include 19,754 m 2 public road, lake, river, etc.) Notes.

3 * There are 283 houses will be affected (19,998m2) in total, of which there are 57 2 houses (3,694m ) do not need to be removed since they can be improved to obtain | the safety standard.

| I Power Company No.2 Page 12 Power Engineering & Consulting Company No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern l Vietnam ** The productive land comprises of paddy field, garden, and natural/artificial | forest

*** There are 8,233m2 of the pine tree forest land belong to the Lam Vien Forest PMB are permanently affected.

The census and inventory also shows the PAH's characteristics: * Average family size 4.31 persons - Man 53.4% - Woman 46.6 % | - Children (<17 years old) 25.18 % - Elderly (> 60 years old) 11.45 % | * Education University/College 5.15% High school 21.67% Secondary 28.43% I Primary 34.56% Reading/Writing 1.66% Illiterates 1.66% Occupation PAPs are mainly earning by farming, small cale bussiness and wage earner. Income (annual average income) 22,812,394 VND/HH/year I Amenity Most of PAHs are supplied with power, however, there are only 29.41% HHs with water supply. More than half of total HHs have transportation means. | 0.7. Project impacts 0.7.1. Project Affected People (PAPs)

I The following persons to be identified by the baseline information collected for this RAP are:

I| (a) persons whose houses are partially or totally affected (temporarily or permanently) by the project;

V| (b) persons whose premise and/or agricultural land is partially or totally affected (permanently or temporarily) by the project;

I Power Conmpany No.2 Page 13 I Power Engineering & Consulting Conpany No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam

(c) persons whose businesses are partially or totally affected (temporarily or pennanently) by the project;

(d) persons whose crops (annual and perennial) and trees are partially or totally affected by the project, and (e) persons rented houses which are affected by the project. | Result of the socio-economic surveys and census show that: Total number of PAHs is 1,169 HHs (5,198 persons), of these:

. PAHs with permanent acquisition of more than 25% of 11 I productive land

. PAHs with permanent land acquisition of less than 25% of 1,152 I productive land

a PAHs with totally affected houses 226 HHs (1,066 persons) | PALHs with partly affected houses 57 HHs (253 persons) . PAHs with totally affected structures 226 HHs | PAHs with annualy/perennial trees/crops affected in part of 1,169 HHs total (5,198 persons)

| PAIs with business partly or totally affected Nil

. PAlHs requiured to be relocated 226 HHs (1,066 persons) 0.7.2. Project Impacted Assets The project will impact on:

I a) Permanent land acquisition for tower foundations, substation areas and some access road for the project construction. | I b) Permanent impacts on houses, structures, trees, crops and other assets in the proposed tower foundation areas, substation areas and in ROWs. I c) All trees and crops or other assets surrounding the tower foundation and ROWs.

Power Company I No.2 Page 14 Power Engineering & Consulting Cornpany No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 1lOkV Transmission lines and substations in Southern Vietnam

d) Temporarily acquired land required during construction of the project. Results of the socio-economic surveys show that: . Permanent land acquisition 110,790 m2 . Temporary land acquisition 2,108,153 rn2 . Permanent affected structures 19,998 m2 * Temporary affected structures Nil . Permanent affected crops 48,056 m2 . Temporary affected crops 975,981 rn2 Notes. - The productive land comprises of paddy field, garden, and natural/artificial forest - There are 2 8,233m of the pine tree forest land belong to the Lam Vien Forest PMB are permanently affected. Base on the socio-economnic surveys and public consultation, all most PAPs opted for cash compensation for their losses. 0.7.3. Mitigation Measures Mitigation measures had been undertaken from the initial design stage through public consultation, close cooperation with various local authorities and related offices. There are 226 HHs (1,066 persons) with their fix assets will be need to be relocated. However, almost PAPs prefer to be compensated for their losses in cash. Therefore, they can resettle by their own. So, resttlement sites do not required. 0.8. Implementation Arrangements 0.8.1. Implementation Schedule Right after the investment for the project is approved, PAPs will be informed again of their rights, policy of this RAP, including legal framework, eligibility provisions, entitlements, rates and mode of compensation/assistances, implementation time- schedule and complaint and grievance rights mechanism. Such information will be delivered to PAPs through community meeting, pamphlets ... 0.8.2. Institutional Arrangements PC2, assigned by EVN, is responsible for all of operations on investment guidelines, investigation and design, project construction as well as supervision of compensation and resettlement of the project. PC2 will directly guide the whole

Power Company No.2 Page 15 lI Power Engineering & Consulting Company No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

implementing process of the project including RAP implementation. It will be assisted from provincial, district and commune authorities and all relevant institutions. 0.8.3. Complaint and Grievances

During the project implementation, PAP's complaints grievances will be resolved according to the Vietnamese laws and regulations. PAPs' raising complaints will be treated fairly and guided by related agencies on the procedures and necessary formalities for lodging their complaints of RAP without administrative fees throughout such process. There are 4 steps of complaints lodging for PAPs i.e. Commune level, District level, Provincial level and, in extreme cases, the PAPs can bring the issues to Court by using the Bureau of Law Consultants, free of charge. (See Figure 8.6 for Grievance Redress Administrative and juridical Structures Available to PAPs) 0.8.4. Supervision, Monitoring and Evaluation

The implementation of RAP will be constantly supervised and monitoried by PC2's PMB and Local People's Committee. Moreover, an independent external monitoring agency will be entrusted and contracted with PMB right after RAP approval and will commence their supervision and monitoring activities from the beginning of the RAP implementation.

The result of selection of independent monitoring agency will be submitted to the WB for its concurrence. 0.9. Cost and Budget

0.9.1. Cost Estimate - RAP Implementation

| Components Amount 1. Preparation of RAP and DMS Initial state - Preparation of RAP 1,081,251,412 Implementation stage - DMS 1,700,000,000 3| Sub-total 1 2,781,251,412 2. Compensation and Rehabilitation *| Compensation 18,160,336,728 Compensation for land 7,058,665,168 Compensation for house 5,728,019,960 Compensation for trees and crops 4,424,569,000 Compensation for structures 949,082,600

| Power I Company No.2 Page 16 Power Engineering & Consulting Company No.3 I | Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations I in Southern Vietnam Rehabilitation 3,643,880,000 Transport allowance 2,065,000,000 Relocation subsidy 884,880,000 Timely movement incentive 298,000,000 Occupation changing 186,000,000 Resettlement allowance 210,000,000 Sub - total 2 21,804,216,728 3. Management I Management 500,000,000 Training, workshop, information campaign etc. 330,000,000 | - Sub - total 3 830,000,000 4. External Monitoring =2% of (1+2) 491,709,363 Sub - total 4 491,709,363 5. Contingency = 20% of (1+2) 4,917,093,628 Sub - total 5 4,917,093,628 Grand Total (1+2+3+4+5) 30,824,271,131 | Notes

- Budget for RAP implementation will be from the counterpart fund i.e. EVN

- The interested independent external monitoring agency will prepare the techniccal and financial proposals for bidding and actual cost will be decided through procurement for independent external monitoring agency. 0.9.2. Cost Estimated - Overall Project Investment

Unit: VND Total Cost of Total Cost of RAP Project Total Cost of Project Total cost of Implementation as Construction/ RAP Implementation Project Investment Percentage of Total Cost of Installation Project Investment 477,695,724,550 30,824,271,131 508,519,995,681 6.06% I 0.10. Disclosure

Draft of Policy Framework and Entilement Matrix has been disclosured at the People's Committees of 11 districts, 2 towns and 2 cities of 7 project related provinces.

Draft of RAP has been disclosed at 7 offices of the project related Provincial People's Committee and has been agreed by local Provincial People's Committees.

| i Power Company No.2 Page 17 Power Engineering & Consulting Company No.3 I Transmnission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern I Vietnam It also will be disclosed at Vietnam Development and Information Center (VIDC) of the World Bank office in Hanoi. All feedback from local authorities and PAPs are intergrated in this RAP. | The final RAP will be cleared by the WB and approved by the project related PPCs. :I I I Il

I I I

i | Power Comnpany No.2 Page 18 I Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project I lOkV - Vietnam Transniission lines and substations in Southern Vietnam

CHAPTERI INTRODUCTION

| 1.1 Project Objective

Objectives of the project is to contribute to the GOV's poverty alleviation program in the rural areas by providing basis infrastructure services i.e. electricity. The efficiency improvement of the 11 0kV power distribution networks (transmission lines and substations) in the project areas comprises of the construction and installation of

Substation Transmission line No Province Name Location Capacity Name.Location (MVA) From To L(ekng)h Legt I Soc Trang My Tu Tra Coi A 25 Soc Trang My Tu 16.732 I Hamlet, My Huong Conmi. My Tu Dist. 3 2 Binh Mui Ne Long Son 40 Phan Thiet Mui Ne 24.483 Thuan Hamlet, Mui Ne Ward, Phan 3 Thiet City 3 Lam Dong Da Lat 2 Da Thien 40 Di Linh Duc Trong 40.153 Hamnlet, Ward 8, Da Lat City 4 Hau Giang Chau Thi Tu Hamlet, 40 Connect from Thanh Phung Hiep 15.357 I Mot Ngan Tra Noc - Soc town, Chau Trang 11OkV Thanh A Dist. T/L, in Chau I Thanh A Dist. 5 Tien Giang Cai Be Hau Vinh 40 Cai Be Branch 0.05 Hamlet, Hau Thanh Comrnm. I ______Cai Be Dist. 6 Ben Tre Cho Lach Nhon Phu 25 Mo Cay Cho Lach 30.686 Harnlet, Hoa * Provincial border Cho Lach Nghia Comm. between Vinh 7.200 Cho Lach Dist. Long and Ben I| Tre provinces (within the Ben *| Tre province territory) *i 7 Vinh Long Vinh Long Provincial 14.544 I | border between Vinh Long and

3| Power Company No.2 Page 19 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam

Ben Tre provinces (within the Vinh Long 3 province territory) TOTAL 6 substations 210 MVA Total length of 6 transmission lines 157.06

Station Supply Areas and | ~~~No Province NaeLocation *Name CaciyProe ______(DistrictPurposes _ _ _ \,_____D tr c )C p i y 1 Soc Trang My Tu (sub) My Tu Dist. 25 To receive and distribute the power capacity to meet. the demand of My Tu town and adjacent areas of Soc Trang province in the period of 2005-2010. 2 Binh Thuan Mui Ne Phan 3 Thiet 40 To meet the demand of township development of Mui Ne ward and adjacent areas. 3 Increase the power capacity, improve the reliability of the local power network. 3 Lam Dong Da Lat 2 I Da Thien 40 To receive 11OkV power Hamlet, Ward source, supply additional 8, Da Lat City charges of Northern Da Lat City through 22kV power grid, in order to satisfy the 3. electrical development demand of Da Lat City in the period 2006 - 2010. In addition, the Da Lat No.2 'I 1 OkV substation will be a spare power source in order to provide electricity for Da * Lat City in case the Da Lat No.1 llOkV substation has a breakdown, equipment _*______r ep ai r o r m a in te n an c e 4 Hau Giang Chau Thanh Thi Tu 40 Hamlet, Mot To Improve the HNgam , Moto, supply ability of the electricpower Ngan Town, grid in remote rural area, 3 Ds t. conditions in order to widen the distribution network for providing electricity to poor households which are far ______3 .______. ______from existing pow er grid.

U| Power Company No.2 Page 20 I Power Engineering & Consulting Conpany No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam I 10kV Transmission lines and substations in Southern Vietnam

I 5 Tien Giang Cai Be Hau Vinh 40 To meet demand of the Cai Hamlet, Hau Be district. In the future, it Thanh Comrn. will supply power for An Cai Be Dist. Thanh, Hoa Khanh, Ba Dat industrial areas and Hoa 3 Khanh National Trade Center. Besides, when it is necessary, the project will I share the electricity availability with My Tho *______11 OkV substation. 6 I Ben Tre Cho Lach Nhon Phu 25 To meet additional charge Hamlet, Hoa demand of Cho Lach Nghia Comm. District in the period 2005- I Cho Lach Dist 2010 To improve the power supply quality for I distribution network of Cho Lach District and *______surrounding areas.

Implementing the project components, land acquisition will be required for stations, pole foundations, access roads and ROWs. However, the construction of these 110kV T/Ls and S/Ss will not cause a large scale of land acquisition and resettlement. I Current data shows that there is lack of electricity (almost constantly overloaded) due to: - The ever increasing demand.

- Lack of electricity supply sources and transformers Therefore, implementing this project will satisfy the requirement of power network development in the project areas, meet immediate requirements and electricity demand in future, increase electricity supply and share the electricity availability with the existing substation which were currently overloaded. The project will not only U directly satisfy the ever increasing demand for industries, handicraft, tourism, agriculture and aquaculture development but also improve the spiritual and material 3 life of communities in the project areas. (See Appendix 1 for Maps of ProjectAreas) 1 1.2. Objective of the Report Objective of the RAP is to define a resettlement and compensation program for the project i in such a way as to minimize as much as possible the number of project affected persons and their afffected properties and to ensure that all PAPs shall be comnpensated for their losses and will be provided with rehabilitation measures to

| Power Company No.2 Page 21 Power Engineering & Consulting Company No.3 | Transmnission, distribution and disaster reconstruction Project - Vietnam I 1OkV Transmission lines and substations in Southern Vietnam l assist them improving, or at least maintaining, their pre-project living standards and income earning capacity.

The RAP preparation has been carried out with consultation and participation of 3 PAPs and local authorities in the project areas. 1.3. Policy Framework | The Project has prepared policy framework for socially negative impacts from the project (see Appendix 2 for Policy Frameworkfor Compensation, Resettlement and 3 Rehabilitation of Project Affected Persons). The principle objective of the Policy Framework for Compensation, Resettlement and Rehabilitation is to ensure that all PAPs will be compensated for their losses and provided with rehabilitation measures to assist them improving, or at least maintaining, their pre-project living 3 standards and income earning capacity. The Policy Framework lays down the principles and objectives, eligibility criteria of PAPs, entitlements, legal and institutional framework, modes of compensation and rehabilitation, peoples participation features and grievances procedures that will guide the compensation, resettlement and rehabilitation of the PAPs. This RAP is based on the Policy Framework. 1.4. Principles and Objectives

The principles outlined in the World Bank's Operational Directives 4.30 have been adopted in preparing this Policy Framework. In this regard the following principles and objectives would be applied:

(a) Acquisition of land and other assets, and resettlement of people will be *minimizedas much as possible.

(b) All PAPs residing, working, doing business or cultivating land in right of way of transmission line, surrounding areas of tower foundation, the surveys are entitled to be provided with rehabilitation measures sufficient to assist them to improve or at least maintain their pre-project living standards, income earning capacity and production levels. Lack of legal rights to the 3 | assets lost will not bar the PAPs from entitlement to such rehabilitation measures. | (c) The rehabilitation measures to be provided are: (i) compensation at replacement cost without deduction for depreciation or salvage materials for 3 houses and other structures; (ii) agricultural land for land of equal productive capacity acceptable to the PAP or in cash at replacement cost according to 3 | PAP's choice; (iii) replacement of residential/premise land of equal size

| Power Conmipany No.2 Page 22 Power Engineering & Consulting Company No.3 Transnmission, distribution and disaster reconstruction Project - Vietnam I I OkV Transnmission lines and substations in Southern Vietnam

acceptable to the PAP or in cash at replacement cost according to PAP's choice, (iv) and transfer and subsistence allowances. (d) Replacement residential and agricultural land will be as nearby as possible to 3 te land that was lost, and acceptable to the PAP. (e) The resettlement transition period will be minimized and the rehabilitation means will be provided to the PAPs no later than one month prior to the expected start-up date of works in the respective Project site. | (f) Plans for acquisition of land and other assets and provision of rehabilitation measures will be carried out in consultation with the PAPs, to ensure minimal disturbance. Entitlements will be provided by PAPs no later than one month prior to expected start-up of works at the respective project site. (g) The previous level of community services and resources will be maintained or improved. (h) Financial and 3 physical resources for resettlement and rehabilitation will be made available and as when required. (i)Institutional 3 arrangements will ensure effective and timely design, planning, consultation and implementation of the Inventories and RAPs. 3 (1)Effective and timely supervision, monitoring and evaluation of the implementation of the Inventories and RAP will be carried out. 3 1.5. Existing Power Distribution Situation in Project Areas The existing power distribution networks in the project areas (covering 40 3 communes belong to 15 districts/towns/cities of 7 provinces) in general, are in incapable of meeting the current and future demand due to unapt T/Ls (too long 3 distance and/or too small conductor diameter, leading to low service quality and high loss) and lack of S/Ss 3 Details of the existing power distribution situation in the project area are shown in Table 1.5 KU _ 3

Power Company No.2 Page 23 Power Engineering & Consulting Company No.3 l m m m m m m m m m m m m m m m Transmission, distribution and disaster reconstruction Project - Vietnam m m m - - I I OkV Transmission lines and substations in Southern Vietnam

Table 1.5 - Existing Power Distribution Situation in the Project Areas Existing S/S Existing T/L Sr Province/ Name Capacity Name From To Distance Supplying No District to Remarks (MVA) from S/S (km) I Binh 110/S5kV Phan 16 11 OkV Phan Ri - Phan Ri Phan 57 Phan Thiet Low service Thuan Ri quality Phan Thiet Thiet Dist. with high loss 110/35/22/15kV 40+25+16 1lOkV Ham Ham Thuan Phan 58 Phan Thiet Too long distance Phan Thiet Thuan - Phan - Phan Thiet Thiet Dist. Do not satisfy the Thiet current demand 110/22kV Duc 16 11OkV Ham Ham Thuan Duc Linh 55 Duc Linh Dist. Linh Thuan - Duc Linh 2 Lam 110/22kV Duc 40 220kV Da Nhim Da Nhim Bao Loc 110 Bao Loc Dist. Low service quality Dong Trong - Bao Loc with high loss 110 /22kV Di 25 220kV Ham Ham Thuan Bao Loc 29 Bao Loc Dist. Long distance Linh with Thuan - Bao Loc low reliability and 11 OkV Da Nhim Da Nhim Duc 41 Duc Trong service quality with - Duc Trong Trong Dist. highloss Do not satisfy the 66kV Da Nhim - Da Nhim Da Lat 33 Da Lat City current demand Da Lat 3 Tien 220kV CaiLay 40 Giang Too long distance Low service quality 11 OkV My 25 with high loss Thuan 4 Ben Tre 110/22kV Mo 25 22kV Mo Cay - Mo Cay Vinh 35 Cho Lach Low service Cay quality Vinh Thanh Thanh with high loss

Power Company No.2 Page 24 Power Engineering & Consulting Cormpany No.3 m m m m m m - m m m m m m m m m m Transmission, distribution and disaster reconstruction Project - Vietnam m - I I OkV Transmnission lines and substations in Southern Vietnam

Existing S/S Existing T/L Sr Province/ Name Capacity Name From To Distance Supplying to Remarks No District (MVA) from S/S (km) Do not satisfy the current demand 5 Hau 110/22kV Vi 40 11 OkV Rach Gia Rach Gia Vi Thanh 53.5 Vi Thanh Low capacity, high Giang Thanh - Vi Thanh loss 6 Soc 1IOkV/22kV 40+25 lOkVTraNoc- TraNoc Soc Trang 79.8 Soc Trang Too long distance Trang Soc Trang Soc Trang Low service quality 11OkV Soc Soc Trang Bac Lieu 47 Soc Trang with high loss Trang - Bac Lieu 7 Vinh 11 OkV Vinh Within Vinh Long town 7 Vinh Long Long Long - Vinh town Long town I10 kV Sa Dec - Sa Dec Vinh 23.4 Vinh Long Vinh Long Long I lOkV Vinh Vinh Long Vung 24.5 Vung Liem Long - Vung town Liem Liem 1OkV Vung Vung Liem Tra Vinh 39.7 Tra Vinh Liem - Tra Vinh

Power Comnpany No.2 Page 25 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmnission lines and substations in Southern Vietnam

1.6. Necessity of the project 3 Demand of power supply in the Project Areas With the ever increasing demand of power supply in the project areas, such forecast and planing for the future (2004-2010) power supply demand and distribution network in the project areas has been prepared by PC2 and approved by the Vietnamese Government.

Details of power supply demand in the project area are shown as follow: | 1.6.1. Binh Thuan province

a. Power supply capability of existing system (Unit: MVA) 2004 2005 Substation 2008 2010 Snorm Smax Snorrn Smax Snorm Smax Snonn Smax Luong Son 25 8.5 25 12.93 25 18.2 25 Phan Thiet IT 40 27.3 * 32.9 46.2 66.5 ~~~~.65 ~ ~~ ~ ~~~6580 Phan Thiet 2T 25 6.8 Mui Ne 0 0 40 14 40 22.9 40 32 Estimated additional demand (unit. MW) Additional I charge Demand 2005 2008 2010 Low alternative 41.85 61.026 81.984 Standard alternative 59.79 87.18 117.12 High alternative 71.748 104.616 140.55 b. Efficiency of the project.

U - Satisfy the electrical demand of Mui Ne area and surrounding areas j| - Enhance the capacity of providing electricity, decrease loss of electrical energy, *T increase the reliability and safety, quality of electrical voltage. 1.6.2. Lam Dong province

a. Power demand of Da Lat city (2005-2010 period)

No Additional charge Power consumption (GWh) 2005 2010 1 Family consume 58,371 80,040 2 Agriculture-Forestry 5,297 11,615 5 3 Industry-Construction 17,685 24,758

Power Company No.2 3 Page 26 Power Engineering & Consulting Company No.3 Transmnission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

4 Bussiness - Service 12,613 17,973 5 Other activities 9,903 13,560 Total 103,879 147,946 b. Efficiency of the project. Satisfy the electrical development demand of Da Lat City in the period 2006 - 2010. In addition, the Da Lat No.2 110kV substation will be a spare power source in order to provide electricity for Da Lat City in case the Da Lat No. 1 110kV substation has a breakdown, equipment repair or maintenance. 1.6.3. Soc Trang province a. Power consumption demand - Soc Trang district Power consumption status of Soc Trang

Power consumption (MWh) No Additional charge 2003 2004 1 Family consume 128,176 145,736 2 Agriculture-Forestry 3,992.67 4,539 3 Industry-Construction 93,660 106,491 4 Bussiness - Service 10,339 11,755 5 Other activities 2,404 2,733 Total 238,600 271,255 Estimated additional demand (unit: MW) U Additional charge 2005 2010 2015 Demand Standard alternative 7,368 14,000 26,600 - My Tu district

Power consumption status of My Tu

Power consume (MWh) No Supply for Family consume 1999 2000 2001 2002 2003 1 Family consume 298 361 427 506 600 2 Agriculture-Forestry 35 42 50 59 70

Power Company No.2 Page 27 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

3 Industry-Construction 8,385 10,146 12,023 14,247 16,883

l4 Bussiness - Service 3,274 3,962 4,694 5,563 6,592

5 Tiansportation 19 23 27 32 38

Total 12,100 14,600 17,300 20,500 24,200 Estimated additional demand

Power demand (kW) * ~~~No Supply for 2005 - 2010 2010 1 Family consume 584 1,100 2 Agriculture-Forestry 69 130 3 Industry-Construction 13,009 24,502 4 Bussiness - Service 411 774 5 Transportation 28 53 Total 14,200 26,600

b. Efficiency of the project

Satisfy the electrical demand, receive and distribute power for My Tu town and surrounding areas of Soc Trang province in the period 2005 - 2010. 1.6.4. Tien Giang province

Power consumption status of Cai Be district and adjacent areas Power consume Area (MWh) 2001 2002 2003 Cai Lay 56,502 64,412 73,430 My Thuan 27,709 31,589 36,011 CaiBe 79,200 88,704 101,821 Total 165,412 186,706 213,264

Power demand of Cai Be district (2005-2010 period)

Unit. MVA Year 2003 2004 2005 2006 2007 2008 2009 2010 Additional 3.6 4.1 21.21 17.25 10.06 11.47 13.08 * ~~charge______Power 25.71 29.31 33.42 54.63 71.88 81.94 93.41 106.49 demand

Power Company No.2 Page 28 Power Engineering & Consulting Company No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern I Vietnam b. Efficiency of the project.

- Enhancing the capacity of providing electricity for project area. - Decrease loss of electrical energy. * - Increase the reliability and safety, quality of electrical voltage. 1.6.5. Ben Tre province

Power consumption status of Cho Lach (MWh).

* No. Supply for 2000 2005 2010 1 Industry - Construction 2388 5822 13,047 2 Agriculture, Forestry, Aquaculture 550 969 1937 3 Trading, Hotels, Restaurants 41 93 196 4 Administrative offices, households 6,638 14,453 26,690 I 5 Others 576 1,355 3,113 Total 10,193 22,692 44,983 Pmax with concurrent factor (MW) 2,814 5,524 10,106

a. Power demand in the period 2005 - 2010 Year 2004 2005 2006 ]2007 2008 2009 2010 Capacity (MW) 6.5 I 7 7.5 8 8.5 9.1 9.9 b. Efficiency of the project:

- Intensify capacity source, satisfy the additional charge development demand of Cho Lach district in the period after 2005.

- Reduce providing power radius of distribution network, from there increase the reliability, reduce loss of electrical voltage and electrical energy of distribution | network.

1.6.6. Hau Giang province

No Power demand 2004 2005 2006 2007 2008 2009 2010 I Chau Thanh + Chau 74.5 82.5 95.5 110.5 127.8 147.9 171.2 I ~ ~~~ThanhA + Phung Hiep (GWh)

2 Pmax (MW) 18.3 20.4 23.3 22.5 25.8 29.6 33.6 Efficiency of the project.

I | Power Company No.2 Page 29 I Power Engineering & Consulting Comnpany No. 3 | Transmission, distribution and disaster reconstruction Project - Vietnam I IOkV Transmission lines and substations in Southern Vietnam

- Satisfy the additional charge demand of Chau Thanh district - Hau Giang province, create good conditions for converson from 15kV network to 22kV network,

- Decrease loss of electrical energy and increase quality of electrical voltage for area. 1 1.7. Project Ownership and organization . Investor Power Company 2 | . Management Power Network Project Management Unit . Provincial Power Service in 12 project related provinces i.e. Soc Trang, I Binh Thuan, Lam Dong, Hau Giang, Tien Giang, Ben Tre and Vinh Long . Consulting agencies PC2's Power Engineering & Consulting Center Power Enineering & Consulting Company 1 Power Enineering & Consulting Company 2 Power Enineering & Consulting Company 3 Hanoi Eleco Shareholding Company I 1.8. Overall Project Description 1.8.1. Sub-station

* Capacity 25 MVA - 40MVA | Voltage level 110/22 kV 1.8.2. Branch

| * Voltage level 110 kV . Conductor AC240 . Number of circuit 1 circuit a Pole Zinc-plated steel towers. 1.8.3. Transmission line * Voltage level 110 kV . Conductor AC240/32 or ACKP185/29 l * Grounding Shield Wire OPGW 46 or OPGW 50 or OPGW 57 . Insulator Glass or ceramic

Power I Comipany No.2 Page 30 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transrnission lines and substations in Southern Vietnam

1.8.4. Project Components Table 1.8.4 - Project Components

Substation Transmission line No Province Name Location CaPacty From To Length NameLocation ~~ (MA) (m 1 Soc Trang My Tu Tra Coi A 25 Soc Trang My Tu 16.732 I Hamnlet, My Huong Comm. My Tu Dist. 3 2 Binh Mui Ne Long Son 40 Phan Thiet Mui Ne 24.483 Thuan Hamlet, Mui Ne Ward, Phan Thiet City 3 Lam Dong Da Lat 2 Da Thien 40 Di Linh Duc Trong 40.153 Hamlet, Ward 8, Da Lat City 4 Hau Giang Chau Thi Tu Hamlet, 40 Connect from Phung Hiep 15.357 Thanli Mot Ngan Tra * Noc - Soc town, Chau Trang 11OkV Thanh A Dist. T/L, in Chau Thanh A Dist. I 5 Tien Giang Cai Be Hau Vinh 40 Cai Be Branch 0.05 Hamlet, Hau Thanh Comrn. I Cai Be Dist. 6 Ben Tre Cho Lach Nhon Phu 25 Mo Cay Cho Lach 30.686 Harmlet, Hoa Provincial border * Nghia Comm. between Vinh 7.200 Cho Lach Dist. Long and Ben Tre provinces I (within the Ben Tre province *______territory) 7 Vinh Long Vinh Long Provincial 14.544 border between * Vinh Long and Ben Tre provinces (within the Vinh Long province | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~territory) I TOTAL 6 substations 210 Length 157.06 1.8.5. Project impacts I - Project Impacted People

Power Company No.2 I Page 31 Power Engineering & Consulting Company No.3 i I I I I I I | Transmission, distribution and disaster reconstruction Project - Vietnam I lOkV Transmission lines and substations in Southern Vietnam

Total number of PAHs 1, 169 HHs 5,198 Persons I in which . PAHs with permanent acquisition of more than 11 25% of productive land

! PAHs with permanent acquisition of less than 25% 1,152 | of productive land

. PAHs with permanent acquisition of more than 138 25% of residential land

. PAHs with permanent acquisition of less than 25% 88 I of residential land

. PAHs with houses totally affected 226 HHs (1,066 persons) . PAHs with structure totally affected 226

. PAHs with annual/perenial trees/crops affected in 1,169 HHs part or total 5,198 Persons

* PAHs with bussiness partly or totally affected Nil

. PAPs required to be relocated 226 HHs (1, 066 persons) I Notes: excluding 1 project affected state - own organization i.e: - PMB of Lam Vien forest, Da Lat city (Lam Dong province) woth I permanent affected forest land and pine trees due to construction of Da Lat 2 substation. -Project Impacted assets: . Permanent land acquisition

- Individual PAPs 102,557 m 2 - Lam Vien PMB 8,233 m 2 110,790 m: I . Temporary land acquisition

- Individual PAPs 2,111,875 m2

- Lam Vien PMB 0 m 2

2,111,875 m2

| I Power Company No.2 Page 32 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam

. Permanent affected trees I - Individual PAPs 381,324 trees - Lam Vien PMB 50 trees (pines) * 381,374 trees

a . Permanent affected houses 226 units . Pernanet affected structures 416 units * . Temporary affected structures Nil . Permanent affected crop 48,056 mr I* Temporary affected crop 975,981 mr I I I I

I I I I

I Power Company No.2 Page 33 Power Engineering & Consulting Comnpany No.3 I , | Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmnission lines and substations in Southern Vietnam l CHAPTER 2 INSTITUTIONAL AND LEGAL FRAMEWORK

2.1. Institutional Framework 2.1.1. Overall Responsibility - The overall responsibility for enforcement of the Policy Framework and for planning and implementing this RAP's rests with PC2, PMB of Power Networks and the People's Committees of Soc Trang, Binh Thuan, Lam Dong, Hau Giang, Tien Giang, Ben Tre and Vinh Long provinces and relevant I institutions (Provincial and District CRCs, Provincial DOFs, DOCs, DOIs, DONREs,...).

PC2, its Consultants and Provincial Powers are responsible for carrying out census, socio-economic surveys and inventories and preparing RAP and for | the day-to-day implementation thereof within their respective jurisdiction. The related District and Commune People's Committees will participate in the I RAP preparation and implementation.

These administrative units will also ensure the active and effective I participation of the PAPs in the RAP preparation and implementation. In order to have acceptable RAP to the WB and to implement RAP smoothly, PC2 is responsible for (i) hiring qualified consultants to prepare RAP; (ii) appointing qualified social safeguard staff at PC2's PMB and each provincial PMB. - Funds 3 for implementing RAP will be from counterpart fluds based on budgetary requirements established by the project provincial CRCs. 1 2.1.2. Detail Responsibility Electricity of Vietnam

Electricity of Vietnam is the owner of the project and is responsible for managing * and organizing of investigation, design, budget arrangement, funding and * supervision for RAP implementation. Project Management Board The PMB is responsible for the implementation of RAP, including the impact survey, delivery of entitlements, performance of the restoration program, redress of complaints, internal monitoring. Main tasks of PMB as follows: - Establish master plan, manage and supervise the RAP implementation.

Power Conpany I No.2 Page 34 Power Engineering & Consulting Cohpany No.3 I I I Transmnission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transrnission lines and substations in Southern Vietnam

- Responsibility for organizing information dissemination/disclosure, public meeting: disclose RAP to all relevant local authorities, Resettlement Committees, disseminate DMS and Entitlement forms to all PAPs. - Organizing/training survey teams to carry out the Detail Measurement Survey (DMS) and RAP implementation for all levels of People's Committees and relevant agencies. - Supervising/monitoring the compensation payment, land acquisition and land * clearance. - Report the RAP implementation progress and clearance work to WB and EVN. Provincial People's Committees - The PPCs are responsible for endorsing the RAP and clearly direct/ demarcate the responsibilities for their relevant institutions in implementing RAP. - Approve the compensation unit costs, allowances and establish appraisement committees, compensation committees at all different administrative levels and approve lands for compensation. 3 - Settling complaints and grievances. RAP Related Provincial Departments * The Provincial DOFs are responsible for studying and issuing unit prices of the compensation and submitting to Provincial Powers for approval. Right from the | initial stage of the RAP implementation, the DOFs will closely co-ordinate with DOCs, DONREs, DARDs, District People's Committees and independent external | monitoring agency in order to evaluate the unit prices which are applicated in the RAP and propose to PPCs for approval and ensuring the compensation unit prices to be at the replacement value at the time of compensation payment. Provincial Compensation/Resettlement Committee (CRC) The Provincial CRCs are responsible for implementing RAP according to the approved Schedule. The Provincial CRCs will be headed by the Vice-chairmen of the Provincial People's Committees. The Provincial CRCs are responsible for: - Assisting PMB and District CRCs in preparing detailed plans for compensation and resettlement. - Checking all inventory of impacts and detailed implementation plans | submitted by District CRCs. Approving the implementation plans submitted by the District CRCs.

| - Solving 3 complaints if the redressal is fail at the district level.

3 Power Cormpany No.2 Page 35 Power Engineering & Consulting Cornpany No.3 11I1 11 11 11 11 | Transmnission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern l Vietnam The Provincial CRCs will consist the representatives of: - Department of Finance and Price. - Department of Construction. - Department of Natural Resources and Environment. - Chairmain of People's Committees of related districts. - Representative of Provincial PMB. Districts People's Committees

The District People's Committees are responsible for guiding the compensation and resettlement activities in their respective district areas: - Direct the relevant institutions for carrying out impact survey; public consulation, information dissemination on the resettlement policy and RAP implementation. | - Establishment of District CRCs. - Responsible for settling complaints of PAPs at district level. U District Compensation/Resettlement Committees

The District CRCs are principal institution responsible for the implementation of RAP in their respective district areas. The District CRCs recruit experienced personnel for gathering of base-line information and inventory. The District CRCs are responsible for:

- Organizing the survey team to carry out Detailed Measurement Survey (DMS) for affected houses and assets; finalizing DMS and Entitlement forms for each PAH or PAP.

A - Checking the unit prices of compensation as applied in RAP, suggesting for the adjustment of the unit prices in conformation with market prices/replacement costs (if required).

- In co-ordination with PMB, organizing the meeting with PAPs, communes, disseminates the Resettlement Information Booklet (RIB), DMS and entitlement forms to PAPs.

- - Based on the policy and approved process in RAP, preparing the detailed implementation plan (quarterly, semi-annual, annual plans) and the together U with PMB pay entitlements to PAPs in a timely manner.

Power Company No.2 Page 36 Power Engineering & Consulting Company No.3 I l l Transmiission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transimission lines and substations in Southern Vietnam

- Settling the complaints and grievances of PAPs, solving any difficulties during the implementation period, and suggesting the solutions for the outstanding issues to Provincial CRC. The District CRCs will be headed by the Vice-chairmain of the District People's Committees. The District CRCs will consist of the following representatives: - Department of Finance and Price - Department of Natural Resources and Environment I - Department of Industry - Affected communes - PAPs Commune People's Committees People's Committees of communes will be responsible for: | - Contributing to census and inventory surveys. - In co-ordination with District CRC for public meeting, information I dissemiination, complementation/allowance payment to PAPs. - Transferring all feedback by PAPs to District CRC and settle the complains at I | the communal level. Suggesting the solutions for the outstanding issues (if any).

- Assisting local people in overcoming the difficulties during the construction period, assist PAPs in repairing of affected houses. Arranging land in the case | PAPs require compensation by land for land. Project Affected Persons (PAPs)

PAPs are ready with their necessary RAP related papers, ownership of other assets. PAPs are responsible for carefully checking on their lost assets and respective entitlements and clear land in a timely manner once PAPs receive full entitlements. | (See Figure 2.1.2 for RAP Implementation Institutional Organization Chart) I LI I

I Power Comnpany No.2 Page 37 Power Engineering & Consulting Company No.3 IIIIIII | Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

Frigure 2.1.2 - RAP Implementation Institutional Organization Chart

i " ~~~~~~~~~~~~~~~~~Provincial . | EVN People's l l t ~~~~~~~~~~~~~Committee _

>/ ~~~~Provincial District 3 PC2 Compensation Compensation Committee Committee

District Commune PMB > Compensation < > People's Committee Committee

Independent External Monitoring < > PAPs Agency

2.2. Legal Framework 2.2.1. World Bank policies

The Legal framework governing the implementation of this Policy Framework and 3 the Inventories and RAP are OD 4.30 on Involuntary Resettlement of the World Bank.

The primary objective of the World Bank policy is to explore all alternatives to avoid or at least minimize involuntary resettlement. Where resettlement is unavoidable, the living standard of displaced persons should be restored or improved related to those conditions that prevailed prior to the Project. The policy applied to the talking of land and other assets when land acquisition results in the loss of the shelter, the loss of all or part of productive assets, or access to them, and the loss of income source or other means of livelihood. According to the OD 4.30 on involuntary resettlement. PAPs shall be compensated and assisted in such a way as to warrant the improvement or at least the maintenance of pre-project living standard condition. Measures required to ensure that resettlement has a positive outcome include:

I Power Company No.2 Page 38 I Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

(a) Consulting with potential project affected people on feasible measures for resettlement and rehabilitation;

(b) Providing PAPs with options for resettlement and rehabilitation; (c) Enabling their participation in planning and selecting these options; (d) Providing compensation at full replacement cost for losses; | (e) Choosing relocation sites that at least guarantee the same benefifs and services as the replaced sites replace; (f)Providing allowances, I training and income support to assist in making a smooth transition; (g) Identifying vulnerable groups and providing special assistance to these u (h) groups, and (h) Establishing an institutional and organizational structure that supports this * process to a successful end. The Eligibility Criteria and Compensation defines that the PAPs eligible for compensation include:

(a) Those who have formal legal rights to land or other assets; (b) Those who 3 initially do not have formal legal rights to land or other assets but have a claim to legal rights based upon the laws of the country; upon the possession of documents such as land tax receipts and residence certificates; or upon the permnission of local authorities to occupy or use the project affected plots, and (c) Those who have no recognizable legal right or claim to the land they are occupying. PAPs whose houses are partially or totally affected (temporarily or permanently) by the project and whose residential and premise and/or agricultural land is partially or |* totally affected (temporarily or permanently) by the project are provided compensation for the land they lose, and other assistance as necessary to achieve the | | objectives set out in this policy, if they occupy the project area prior to the cut-off date defined in this RAP. | PAPs whose I business are partially or totally affected (temporarily or permanently) by the project are provided resettlement assistance and other supports as necessary | to achieve the objectives 3 set out in this policy, if they occupy the project area prior to the cut-off date defined in this RAP.

I | Power Company No.2 Page 39 Power Engineering & Consulting Comnpany No.3 I | Transnission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transnmission lines and substations in Southern Vietnam

Persons who encroach on the areas after the cut-off date defined in this RAP are not entitled to receive compensation or any other forn of resettlement assistance. The methodology to be used in the valuation of losses for this project is based on their replacement cost. In this project, losses comprise land, structures and other assets. Replacement cost for land includes the value of land at market price plus the cost taxes and fees to get LURC. For houses and other structures, the market cost of the materials should be used to calculate the replacement cost to build a replacement structures with area and the quality should be at least as good as those affected. For both totally I and partially affected structures, compensation includes market cost of material, plus the costs of material transport, labor and contractor fees, registration 3 and transfer taxes. Depreciation of the assets and amount saved in material will not form a part of | replacement cost. 2.2.2. Vietnam Policies The GOV I laws, decrees and regulations that govern the preparation of this RAP and warrant its legality are:

I - Constitution of Vietnam (1992) confirms the right of citizens to own a house and to protect the ownership of the house. -| The Land Law of Vietnam dated July 14th, 1993. Amendment dated November 26 , 2003. Article ]

Land is common property of the people and is subject to exclusive administration by the State. The State assigns the land to Government and Non-Government Organization, households and individuals for long term stable use with or without land use charge. The State also leases land. Assignee, lessee or individual that has land use right transferred from a third | party, is by this law commonly called land user. Article 3 The U State will protect the right and legal investments of Land User. A State assigned household or individual Land User has a right to exchange, transfer, lease, inherit, or mortgage for a loan the Land User Right. AAticle 27 "In case of utmost necessity, when the State recovers land being used by a land user for national defense, security, national benefit or public interest purposes, the land user shall be compensated for damages"

* Power Company No.2 Page 40 I. Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

- The Government Decree No.181/2004/ND-CP dated October 2 9th 2004 on the implementing guidelines for Land Law 2003. - The Circular No.05/BXD-DT dated February 9 th, 1993 of Ministry of Construction on the classification of house types. - The Circular No.07/2001/TT-BCN of Department of Industry dated September 01st, 2001 on implementation guiding for some technical item stipulated in Government Decree No.54/1999/ND-CP dated July 08th, 1999 on safety protection of high voltage electrical network.

- The Circular No.106/2002/TTLT/BTC-BCN dated Nov 2 2nd, 2002 of Ministry of Industry on the compensation and subsidy costs for high voltage power network project.

- The Circular No.1 16/2004/TT-BTC issued on December 7th, 2004 by the Ministry of Finance provides guidelines to implement the Decree 197/2004/ND-CP. - The Decree No.197/2004/ND-CP issued by GOV on December 3rd, 2004, in replacement of Decree 22CP, regulates compensation, support and resettlement when land is recovered by the State. This Decree guides the implementation of compensation for land, compensation for property, support policies and resettlement relating to land acquisition.

- The Government Decree No.54/1999/ND-CP dated July 0 8th, 1999 on safety protection of high voltage electrical network and the Government Decree

No.118/2004/ND-CP dated May 10th, 2004 on adjustment of the Decree I No.54/1999/ ND-CP. l | - The Government Decree No.64/CP dated September 27 th, 1993 on the * distribution of agricultural land to the households in long term for the agricultural purposes.

- The Government Decree No.188/CP dated November 16th, 2004 on the method to determine land price and the price frame of land types. I - Decisions of the project related provincial People's Committees on the * applicable unit prices for compensation:

People's Committee The Decisions of Provinces Soc Trang 104/QD-UBT.97 dt. August 23' , 1997 139/QD-UBT.97 dt. December 13th, 1997 ______|105/2000/QD-UBNDT dt. August 23rd, 2000

I Power Company No.2 Page 41 Power Engineering & Consulting Company No.3 I I II I II I I1 | Transmission, distribution and disaster reconstruction Project - Vietnam 110kV Transmission lines and substations in Southern Vietnam

385/QD.HC.01 dt. August April 16th, 2001 Binh Thuan 27/2002/QD-CTUBBT dt. April 19th, 2002 37/2002/QD-CTUBBT dt. May 22 nd, 2002

2667/2002/QD-CTUBBT dt. October 19th, 2002 I Lam Dong* 1201/QD-UB dt. August 16th, 1997 2237/1998/QD-UB dt. August 31t, 1998 I1 9/1999/QD-UB dt. October 4 th,1999

107/2000/QD-UB dt. October 18th, 2000 70/2002/QD-UB dt. April 26th, 2002 112/2002/QD-UB dt. August 30 t, 2002 168/2002/QD-UB dt. December 4th, 2002 Can Tho 60/2000/QD-UB dt. October 12a, 2000 45/2003/QD-UB dt. June 17t, 2003 Ben Tre 1379/QD-UB dt. June 28', 1999

Notes: * For Chau Thanh 110kV Subsation and Can Tho-Chau Thanh 110kV I Transmission line, areas affected by these projects belong to Hau Giang province. Since Hau Giang province don't have decision on I compensation unit cost, so Consultant applied compensation unit costs for these projects based on decisions of Can Tho PPC. I 2.2.3. Compatibilities of GOV and WB Approaches There are a number of ways in which the approaches of the GOV - either in policy I or practice - are compatible with WB guidelines. The most important. compatibilities are:

I - Vietnam has a process whereby most people without legal land rights may meet conditions of legalization and receive compensation for losses. I - Permanent residents are provided with options that include relocation to an improved site, or cash, or a combination of the two. - Resettlement sites offer not only better improved infrastructure and services but represent a highter standard of living.

- Allowance are provided to help the PAPs in the transition period and there is *| an institutional structure through which people are informed, can negotiate * compensation, and can appeal.

- Difference between the approaches and measures that need to be addressed within the program also exist. However, in this context, procedures exist within national and Provincial/City governments that allow the granting of

I Power Company No.2 Page 42 Power Engineering & Consulting Comnpany No.3 I~ .- | II I Transmission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmrission lines and substatioiis in Soutlhern Vietnam

waivers of of domestic law on specific projects that may be in conflict with that of the funding agency.

- On the issue of land tenure and the legal right to compensation, the Government and World Bank approaches are compatible. The government has its own process in place whereby land occupied without legal documentation can be legalized; this land, however, is compensated for at a rate equal I to 100% of land price minus the taxes and fee for land use right registration from October 15th 1993 (Article 6,7,9,10 of Decree 38/2000ND- CP on the payment for the Land Use Right). 2.2.4. Required Waivers In order to meet the requirements of the World Bank OD 4.30 on Involuntary Resettlement a number of articles in various Vietnamese laws and regulations which do not ensure compensation at replacement cost or set eligibility provisions which do not extend the right to rehabilitation and or assistance to households without proper land paper, will be waived. The articles of law and regulations that will be waived are mentioned below (i) Eligibility to Compensation and or assistance- Decree 197 - Article 7 of the Decree 197 (Cases where land is recovered without a compensation) stipulates that any person whose land is recovered and who has not met one of the conditions of Article 8 of this Decree, or who has violated the plan, or who violates the protecting corridor work, or who illegally occupies land shall not receive compensation when the state recovers the land. In case of necessity, the Provincial People's Committee shall consider and decide on a case-by-case basis. - Article 18,19, 20 of the Decree 197:

Houses and structures on non-eligible-for-compensation land, which have not violated announced land use plans or the right of way will be assisted at 80% of replacement cost

Houses and structures on non-eligible-for-compensation land, which have violated announced land use plans or the right of way will not be assisted. If necessary, the PPC will consider on the case by case basis. - Article 28, 29 of Decree 197: DPs losing more than 30% of productive land will be entitled to living stabilization and training/job creation assistance. - To ensure that the objectives of this resettlement policy are met, a special decision of the Government waiving Article 7, 18, 19, 20, 28, 29 of Decree

Power Com-pany No.2 Page 43 Power Engineering & Consulting Cormipany No.3 I Transmnission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transimission lines and substations in Southern Vietnam

197 is needed to permit assistance and rehabilitation measures for illegal users of land as proposed in the policy. (ii) Pr-ice of Land for Calculation of Compensation - According to the Vietnamese regulations, calculation for land compensation will be based on Decrees 188/CP, 197/2004/ND-CP, 17/1998/ND-CP and Decision 302/TTg.

- Article 4, 5 of Decree 188/CP on the method to determine land price and application conditions.

- Article 9 of Decree 197: The compensation rates for land shall be determined by the PPC for the type of land which has been used for at the time of land acquisition.

- To ensure that the objectives of the project resettlement policy are met, unit price for land compensation established by the Project Provincial/City People's Committees will be adjusted to meet the replacement costs. (iii) Assistance Policy for DPs who Rent State-owned dwelling houses - Decree 19 7 Article 21 of Decree 197/2004/ND-CP states that DPs who rent State-owned dwelling houses shall be provided with monetary supports equal to 60% of the land value and 60% of the value of currently rented houses, in cases where there are no resettlement houses to be arranged for them. To ensure that the objectives of the policy are met, a special decision of the Government of Vietnam regarding waiver of - Article 21 of Decree 197/2004/ND-CP is needed to permit assistance and rehabilitation measures for DPs who share State-owned dwelling houses as proposed in this policy. The Prime Minister of Vietnam and Chairpersons of the project provinces in approving/adopting (prior to the project appraisal) the policies and objectives set forth in this Policy Framework will grant the waivers to the above imentioned Articles 7, 9, 18, 19, 20, 21, 28, 29; and any other laws or regulations which contradict this Project Resettlement Policy.

l I

l Power I Comnpany No.2 Page 44 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam

CHAPTER 3 ENTITLEMENT POLICY

3.1. Impact Categories

By the nature of the project impacts as described above and based on the surveys of the PAPs, the impacted categories could be classified as below: 3.1.1. Temporary Impact within ROW All of households have productive land, crops, trees or structures in ROW of T/Ls, surrounding areas of tower foundation, in the temporary service roads, which are temporarily affected only during the construction period. Category 1: The households have trees, crops which are damaged by the project during the construction period due to construction of temporary access roads or conductor stringing.

Category 2: The households have residential, garden, productive lands which are temporarily accquired during the project construction period. 3.1.2. Permanent Impact

The households have land and properties that will be permanently acquired for the tower foundations, the subsation areas, the permanent access roads for construction and maintenance of the project. All of households have house (total or a part of house area) or structures, or trees in ROW of the transmission line, which need to be removed, demolished, or cut.

Category 3: The households have house or structures which are partially dismantled and the dismantled portion will not affect to the safety or using purposes of the entire house or structure, and the lost house/structure portion could be rebuilt in adjacent areas already owned by the PAH. Impact on cleared residential land in ROW would be temporary as it could be reused for restricted purposes. Category 4: The households have house or structures which are partially or totally dismantled and the dismantled portion will not affect to the safety or using purposes of the entire house or structure (the dismantled areas are more than 25% of total areas or even less than 25% of total area, but the remaining area can not be used or inconvenient for using), therefore, the house needs to be totally removed and rebuilt in remaimiing adjacent areas already owned by the PAPs. Impact on cleared residential areas will be temporary as they can be reused for restricted purposes.

I Power Company No.2 Page 45 Power Engineering & Consulting Company No.3 l Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmnission lines and substations in Southern Vietnam

Category 5: The households have house or structures which are partially or totally dismantled, and the dismantled portion will be affected the safety or using purposes of the entire house or structure, so the house/structures needs to be total removed and rebuilt. But PAH does not have sufficient spare residential land for the reconstruction of a house of equal dimensions as the house lost. The threshold of sufficient residential land is at 100 m2 for rural areas.. Category 6: The households have residential land, productive land which will be acquired permanently by the project, including for the construction of permanent roads and maintenance of the project. Category 7: The households have the job or other services are affected by the project. * 3.2. Entitlement 3.2.1. Definition and Limitation of Eligibility PAP is individual, firm or institution with or without land registration papers who owned, rented or used land, properties and business which are affected by the project.

All PAPs will be entitled to receive full compensation for their respective losses as long as they are included in the PAPs inventory list or can prove that they used the affected items before the cut-off date. The same applies to PAPs whose incomes are affected by the project. The cut-off date has been fixed at the day of the inventory completion of DMS and- will be proclaimed by local authorities. i* Encroachers who settled into the proposed affected areas after the cut-off date will not be considered as PAPs therefore having no entitlement to compensation and U resettlement. They will be required to demolish their structures and cut the trees or harvest the crops for land clearance to the project. In case necessary, they will be forced to remove out of the proposed project area. Nevertheless, they do not have to pay any fine or sanction. 3.2.2. Resettlement and Compensation Principles The principles outlined in the World Bank's Operational Directives 4.30 have been | adopted in preparing this Policy Framework. In this regard the following principles and objectives would be applied:

l| (a) Acquisition of land and other assets, and resettlement of people will be minimized as much as possible.

*| Power Company No.2 Page 46 Power Engineering & Consulting Company No.3 I,. . | Transmission, distribution and disaster reconstruction Project - Vietnam I1 OkV Transmission lines and substations in Southern Vietnam

(b) All PAPs residing, working, doing business or cultivating land in right of way of transmission line, surrounding areas of tower foundation, the surveys are entitled to be provided with rehabilitation measures sufficient to assist them to improve or at least maintain their pre-project living standards, income earning capacity I and production levels. Lack of legal rights to the assets lost will not bar the PAPs from entitlement to such rehabilitation measures. (c) The rehabilitation measures to be provided are: (i) compensation at replacement cost without deduction for depreciation or salvage materials for 3 houses and other structures; (ii) agricultural land for land of equal productive capacity acceptable to the PAP or in cash at replacement cost according to | PAP's choice; (iii) replacement of residential/premise land of equal size acceptable to the PAP or in cash at replacement cost according to PAP's choice, (iv) and transfer and subsistence allowances. (d) Replacement residential and agricultural land will be as nearby as possible to 3 te land that was lost, and acceptable to the PAP. (e) The resettlement transition period will be minimized and the rehabilitation | means will be provided to the PAPs no later than one month prior to the expected start-up date of works in the respective Project site. | (f) Plans for acquisition of land and other assets and provision of rehabilitation measures will be carried out in consultation with the PAPs, to ensure minimal disturbance. Entitlements will be provided by PAPs no later than one month prior to expected start-up of works at the respective project site. I (g) The previous level of community services and resources will be maintained or improved. | (h) Financial and physical resources for resettlement and rehabilitation will be made available and as when required. | (i) 3 Institutional arrangements will ensure effective and timely design, planning, consultation and implementation of the Inventories and RAPs. | (I) Effective 3 and timely supervision, monitoring and evaluation of the implementation of the Inventories and RAP will be carried out. 3.2.3. Eligibility to Compensation Entitlement The PAPs' (or project affected people) eligible for compensation will include: I U . - Those who have formal legal rights to land or other assets - Those who initially do not have formal legal rights to land or other assets but * have a claim to legal rights based upon the laws; upon the possession of

| Power Conmany 3 No.2 Page47 Power Engineering & Consulting Company No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

documents such as land tax receipts and residence certificates; or upon the permission of local authorities to occupy or use the project affected plots, and - Those who have no recognizable legal right or claim to the land they are occupying - if they occupy the project area prior to the cut-off date defined in the RAP

The PAPs are identified by the baseline information collected for RAP: - Persons whose houses are partially or totally affected (temporarily or 3 permanently) by the project

- Persons whose premise and/or agricultural land is partially or totally affected 3 (temporarily or permanently) by the project - Persons whose crops (annual and perennial) and trees are partially or totally affected by the Project, and

- Persons whose businesses are partially or totally affected (temporarily or | permanently) by the project. 3.2.4. Compensation Policy

Compensation for crops will be provided at market price. Compensation for land, houses, structures, trees, and other assets will be provided at the replacement cost. Compensation for land losses:

3 - Compensation for productive land losses (less than 25% of total land of PAHs' holdings) will be provided at the replacement cost for the equivalent I area and all other losses will be provided in cash.

- Compensation for productive land losses (more than 25% of total land of PAHs' holdings) will be provided in terms of land for land at the equivalent area and quality of land acquired by the project or in cash at replacement cost according to PAls' option.

Compensation for houses, structures, trees, and other assets will be provided in cash at the replacement costs.

Compensation for crops will be given in cash at market price approved by PPC and calculated basing on maximum productivity of the last 3 years (according to the Circular 116 of Ministry of Finance)

Compensation prices defined in this RAP are tariffs established by the DOFs of the project related provinces and approved by their provincial People's * | Committees based on the Decree 188/CP and the Circular No.116 of Ministry of Finance.

| Power Company No.2 Page 48 Power Engineering & Consulting Company No.3

U~~ ~ ~ iIIII Transmission, distribution and disaster reconstruction Project - Vietnam 10OkV Transrnission lines and substations in Southern Vietnam

Since the time from RAP preparation to time of the project implementation may be long, at the implementation time, such prices may not correspond to market or replacement rates. Therefore, all applied prices will be checked again at the beginning of RAP implementation and adjusted if necessary. The Detailed Measurement Survey (DMS) will be also carried out by Resettlement Committees at the beginning of project implementation. The evaluation of unit prices at the implementation time will be done by the independent monitoring agency and provincial DOFs. This activity will later be required in TOR for Independent Monitoring. 3.2.5. Compensation Entitlement by Categories Category Entitlement

1 - Cash compensation for affected trees, crops at replacement cost plus cost * for cutting trees, crops at market price. - No compensation for land 3 - Reinstate land after the project construction ...... I...... I...... ,...... _...... _._...... _... 2 - Cash compensation for affected trees, crops at replacement cost plus cost 3 for cutting trees, crops at market price. - No compensation for land ...... - Reinstate land after the project construction 3 - The damaged house/structure will be compensated in cash at full replacement cost. I - No compensation for land - No deduction for depreciation and salvage materials. | 4 - Cash compensation reflecting full replacement cost of the house/structures. 3 - Cash compensation reflecting full replacement cost of lost land area - No deduction for depreciation and salvage materials. 3 5 - PAP can opt for: (i) "Land for land": the provision of replacement residential land (house site and garden) of equivalent size, satisfactory to the PAP or cash 3 compensation reflecting full replacement cost according to PAP's choice (ii) Cash compensation reflecting full replacement cost of the house/structures. - No deduction for depreciation and salvage materials. |~~~~~~~~~~~~~~...... - - - -...... I 6 PA' losing productive land Lanid loss < 25% of their total landholdings 3l______- Cash compensation for the lost area if the remaining plot is still

I Power Comnpany No.2 Page 49 I Power Engineering & Consulting Company No.3 | Transnmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

economically viable. - Cash compensation for the whose impacted plot if the remaining plot is I not economically viable - Cash compensation for properties associated with land 3 Land loss > 25% of their total landholdings - PAP can opt for the followings: (i) "Land for land" with the same area and productive of impacted area if the remaining plots are still economic-viable and for whole impacted plots if the remaining plot are not econornic-viable. 3 (ii)Cash for land at the replacement cost. - Compensation for trees and affected fruit-trees at the replacement cost. - Rehabilitation assistance. PAP losing residential and garden land - If remaining land is sufficient for reorganizing (more than 60 m2 in the I urban area and 100 m2 in the ru.ral area): Cash compensation for lost area and assets associated with land. l*- If remaining land is not sufficient for reorganizing: PAP can opt for: (i) Cash compensation at replacement cost for land and assets on land, or I (ii) "Land for land" compensation for the whole residential area which PAP occupied (not only for the impacted areas) and properties associated with occupied land. For affected house and building, the same entitlement to PAP of categories 3 or 4 or 5. 7 Temporary impacts Compensation for income lost during the affected period. Permanent impacts l - Provision of alternative business site of equal size and accessibility to customers and satisfactory to PAP. - Cash compensation for lost business, structures reflecting full replacement cost of the structures without depreciation. - Cash compensation for the lost of income during the transition period.

3.2.6. Allowances Besides the direct compensation for the losses, PAPs also entitled to subsidies/allowances as stipulated in the Decree No. 197 of GOV. These allowances are as below:

Transport allowance (Article 27, Decree No.197)

This allowance is for PAPs who are totally impacted on houses and have to be move to new sites or reorganize to the remaining U residential areas

I Power Coipany No.2 Page 50 Power Engineering & Consulting Company No.3 I | Transmnission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transimission lines and l substations in Southern Vietnam i) PAHs which have to move their houses to new places within the Province will be entitled to an allowance from 1,000,000VND to 3,000,000 VND (per household) ii) PAHs have to relocate out of their Provinces will be entitled to transport allowance from 3,000,OOOVND to 5,000,000 VND (per household). This subsidy allowance is for the transportation of their salvable materials and living facilities.

Relocation Subsidy for Resettlement (Article 28, Decree No.19 7) This subsidy allowance is a food allowance for PAPs who are totally impacted on house and therefore have to reconstruct for their new houses. Each member of PAH will be subsidized 30 kg of rice (equivalent) /person/month in six months. Rehabilitation Allowance (Article 29, Decree No. 197) PAHs or individuals who have directly farming production when Government recover more than 30% of productive land will be supported subsidy for changing occupation for labours of PAHs; with subcidy level and specific labours will be stipulated by PPC to agree to reality of local situation. Other Allowance (Article 32, Decree No.197)

Timely Movement Incentive: Person, firm had acquisition land, timely dismantled, relocated following plan of RCC will have incentive 3,000,000 VND/ household (maximum is 5,000,000 VND/ household).

._2 li li_ l l

Comlpany IPower No.2 Page 51 I Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam I lOkV Transniission lines and substations in Southern Vietnam

CHAPTER4 3 RESETTLEMENT SITES

4.1. Mitigation measures

Thanks to mitigation measures undertaken right from the initial design stage I through public consultation, close cooperation with various local authorities and related offices, the project impacts are almost marginal.

All individuals, households or institutions (PAPs) who are impacted temporarily or permanently by the project are owners of land and properties, land and house renters in S/S areas, ROW of T/Ls and in proposed areas for tower/pole foundation and temporary service roads.

There are 226 HHs (1,066 persons) with their fixed assets (houses/structures and residential/productive land) required to be relocated. 4.2. Measures to minimize land acquisition and losses. 4.2.1 Consultation and participation

During the project preparation PC2 Consultants have conducted detail survey on the project impacts. The survey teams have also conducted discussions and consultations with local authorities and local people on the possible impacts caused by the project, particularly the S/S locations and alignment of T/L routes so as the selected line routes and S/S locations are the least impact option. The proposed layouts of the S/S areas and T/L routes are also displayed and discussed again in the RAP community meeting.

The draft layout of S/S area and T/L routes has been communicated by PC2 to the relevant bodies i.e. provincial, district and commune People's Conunittees, Dept. of Natural Resource and Environment, provincial/district/commune cadastral services etc. for comments and public display. The valuable feedback of local authorities and PAPs were taken into account for design. 1 4.2.2 Impact limitation measures in design stage , | Substations

The average area of the S/Ss in this project is around 6,000m2 and 650m2 of branch 3 (in case of S/S + branch).

Location of the S/Ss have been presented and discussed in the related community meetings and related district/conmmune People's Committees and concerned offices i.e. Natural Resource and Environment, Agriculture, Cadastral etc.

| I Power Comnpany No.2 Page 52 Power Engineering & Consulting Company No.3 II III I, ,, l l Transniission, distribution and disaster reconstruction Project - Vietnam 1 IOkV Transmission lines and substations in Southern Vietnam

Official agreements on locations of S/Ss have been obtained from the related provincial People's Comnmittees. Route selection

| The project impacts mitigation measures have been scrutinized during the design stage, particularly for the route selection. Appropriate route would reduce the project cost and adverse impacts on the local communities and environment. The follwing principles were followed: 1 . The selected routes are shorted possible with S/S location of optimal services. Such routes are closed to public roads to avoid land accquisition for access 3 roads and minimize cost during construction, operation and maintenance. . The T/Ls routes should avoid traversing or running close to the important 3 projects (i.e. gasoline, explosive storages, radio station), sensitive locations (i.e. historic and cultural assets) protected forests and areas with high trees. 3 Slope sides and turnings are also avoided to reduce leveling and angle towers. During the mapping of the routes, PC2 and its Consultants have thoroughly studied 3 different alternatives on map and at sites to select the optimal ones. To avoid impacts, certain changes in direction of the routes and many turning angles (> 10°) of the routes are applied to avoid impacts to the houses/structures. Official agreements on locations of T/L routes have been obtained from the related 3 provincial People's Committees. Technical Solutions

I The applicable average tower distance is around 196 m. Height of towers are vary from 20m to 35m, especialy, for sections across rivers, the height of tower can be | reach to 120m.

Application of different dimensions for pole/tower foundations to be suitable to I| their functions and the selected locations. Area of pole/tower foundation size will vary from 22m2 to 289m2 .

1) 4.2.3 Mitigation measures in construction stage *g During the detail technical design, PC2 and its Consultants will reinvestigate the routes and make certain modification, if necessary, for optimal results. In the construction stage, the construction process and organization will be used and I optimized to ensure the complying with the current regulations of construction works and imiinirnize the negative impacts: 3| - Construction method is finished for each item to minimize time of temporary land acquisition.

* Power Company No.2 Page 53 I Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam

- Managing construction teams. The construction camps for workers shall be located on the bare or public lands near by headquarters of communes. The I camps shall not be built in populated areas. - The construction works will be carried out after crops harvested in order to 3 minimize the impacts on crops. - In order to minimize the temporary impacts by excess roads during the construction period, canals, existing roads, paths are considered for the excess roads.

4.3. Result of niitigation measures Impacts on Land

3 Area (m2 ) Individual PAPs

- Pernanent impact on residential land 27,704 - Temporary impact on residential land Nil l - Permanent impact on productive land 93,318 3 - Temporary impact on productive land 2,024,718 l State-owned Institutional PAPs - Permnanent impact on productive land . Lam Vien PMB (Lam Dong province) 8,233 | - Temporary impact on productive land

. Lam Vien PMB (Lam Dong province) Nil I Impacts on Houses/Structures

3 - Total affected houses 226 units - Total other affected structures

. Kitchen 72 units a Lavatory 130 units | . Livestock house 130 units . Tombs 231 units | . Cisterns 84 units

Power Company No.2 Page 54 Power Engineering & Consulting Com-pany No.3 l Transmission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmission lines and substations in Southern Vietnaam

Other Impacts

3 - Affected business Nil - Impact on natural preserving zones, sensitive areas Nil - Impact on tenants who leased housed for residential purpose Nil - Impact on ethnic ininorities Nil PAPs

Household Person 1 - Total PAHs with more than 25% of affected 174 695 productive land

I - Total PAHs with more than 25% of affected 138 552 residential land - PAHs required to be relocated 226 1,066 PAPs opted for cash compensation for their certain impacted assets at the I replacement cost.

There are many PAPs who would be marginally affected on garden, residential land I and other assets volunteer to contribute their affected trees, crops, fences etc. of insignificant values for the project construction.

The socio-economic surveys show that there are 226 PAIs (907 persons) whose fixed assets being acquired more than 25% of their total holding and required to be * relocated.

Table 4.3: PAPs Required to be relocated

PAPs required Reasons of Land No Province District Commune to be Relocated Acquisition 3 ______HHs Persons S/S ROW 1 Binh Thuan Ham Thuan Bac Ham Thang 9 40 x Ham Nhon 3 11 Phan Thiet Mui Ne 2 10 x .. ------...... ~ ~~~-~ ~ Sub-Total ...... _...... 14 61 ...... 2 Lam Dong ...... _ .. Di Linh Dinh Lac ~~~~~~~~~~~...... 1 6 ...... x ...... Di Linh ...... 18 76 I..... _._- ...... x - ...... Duc Trong Lien ...... --...... Nghia 11 35 ...... x ...... -...... -...... _._.. ._._...... Gia Hiep w~~~~~~~~~~~~~...... 1 9 ...... x I...... I...... -_...... I...... Phu Hoa .._...... _... ~~~~~~~~~~~~~~~~~...... 2 10 ...... - .-...... - -...... x | ...... -- ...... ,...... ,...... 3 Sub-Total 33 136 a ...... -......

|3 Power Cornpany No.2 Page 55 Power Engineering & Consulting Company No.3 I U ~~~Transmrission, distribution and disaster reconstruction Project - Vietnam 110kV Transmnissioni lines and substations in Southern Vietnam I~~~~ ~ ~ ~ ~ ~~ ~ ~ ~~ ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~...... I...... -...... 3 Ben Tre Mo Cay & Cho 92 462 x Lach I~~ ~ ~ ~ ~ ~~ ~~~~~~~~~...... I...... Cho Lach Vinh Binhi 3 19 x Son Dinh 2 11 x I ~~~~~~~~~Lach 1 ~ ~~~~~~~~~~~~~Cho6 x Sub-Total 98 498 I ~~ ~~~~4Soc Trang My Tu My Huong 6 26 x 1 4 x Thuan Hung 2 11 x Phu My 5 24 x Soc Trang Wardl10 1 6x Sub-Total IS 71 5 Vinh Long Vinh Long Tan Hoa 4 22 x Truong An 2 15 x

- ~~~~~~~8 6 ~~Ward22 x Longllo Tan Hanh 9 46 x Phuoc Hau 2 12 ...... -...... - ...... x I.-~~~~~~~.. -- . . - - ...... -...... Long Ho 2 8 x Mang Thit Long My 2 9 x ...... I- .. - . . - - -. ...- ...... -... - -. I ~~~...... -....- ...... My Phuoc 2 11 x My An 2 14 x I ~ ~~~~~~~~~~~~31 ~~~~~~~~~Sub-Total159 6 Tien Giang Cai Be Hau Thanhi 4 12 x I ~~~~~~~~~~~~4 ~~~~~~~~~~Sub-Total12 7 Hau Giaing Chau Thanh Mot Ngan 3 19 x

3 - ~~~~~~~~Ngan ~~4 ~~~~~~~~~~~~Mot4 x Tan Phu 5 33 x -- ~~~~~Thanh Phung Hiep Long Thanh 1 6 x Binh Thanh 2 13 x I~~~ ~~ ~ ~~ ~~~~~~...... ---...... --... _...... - ...... Thanh Hoa 10 48 x Tan Binh 6 6 x Sub-Total 31 129 I ~~~~~~~~~~226 ~~~~~~~~~~~~~~~~~~~Total1,066

I ~~~~~Power Com-pany No,2 Page 56 Power Engineering & Consulting Company No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam 1IOkV Transmission lines and substations in Southern Vietnam I 4.4. Agreement on S/Ss locations and T/L routes

| Apart from the community meetings in the project areas, the Consultants' representatives have held meetings with the districts and communes People's 3 Committees on the T/L routes selection, S/S locations selection.

Official agreements (approved by PPCs) on T/L routes and S/S locations have been obtained.

Table 4.4(a) - Agreement on S/S Locations and T/L Routes. l Agreement on S/S Locations and No Provinces S/Ss and T/Ls T/L Routes Official Letter No. Dated

| 1 Binh Thuan Mui Ne S/S 2056 / UBBT-ND June 3, 2004 Phan Thiet - Mui Ne T/L 2056 / UBBT-ND June 3, 2004

I 2 Lam Dong Di Linh - Duc Trong 1872 / UB May 18, 2004

3 Soc Trang My Tu S/S 101 / CV.HC.01 April 5, 2004

Soc Trang - My Tu T/L 101 / CV.HC.01 April 5, 2004

4 Ben Tre Mo Cay - Cho Lach T/L 058 / CV-UB July 1, 2004

Cho Lach S/S 835/CV-UB May 27, 2004 5 Tien Giang Cai Be S/S 1347/UB May 7, 2004

6 Hau Giang Chau Thanh S/S 659 / UB April 15, 2004

Can Tho - Chau Thanh T/L 659 / UB April 15, 2004

(See Appendix 4 for Agreements on T/L routes and S/S locations) 4.5. Resettlement Site a There are 226 HHs (1,066 persons) need to be resettlement. However, these HHs do not gather but live separately in 40 communes of 15 districts/towns/cities of 7 I provinces. Base on the socio-economic surveys, it is showed that all affected HHs have spare land so that they can resettle by their own and, in addition, all HHs who need to be removed, claimed that they would like to be compensated for their loss (houses, land, crops and other assets) in cash so that they can self-resettle. | Therefore, the project does not need to set up any resettlement site. l

I Power Company No.2 Page 57 I Power Engineering & Consulting Company No.3 Transmnission, distribution and disaster reconstruction Project - Vietnam I1 OkV Transimission lines and substations in Southern Vietnam

CHAPTER 5 PUPLIC PARTICIPATION

5.1. Community meetings

During the project preparation (along with RAP preparation), PMB and the Consultants have held many community meeting at the commune level in the project areas with the participation of PAPs and representatives of Commune People's Committees, other government offices and commune NGOs (Women Unions, Youth Unions, Farmers Associations, Fatherland Fronts, War Veterants etc.)

In the comnmunity meeting, PAPs' queries on RAP related issues i.e. entitlements, compensation etc. are explained by PMB representatives and PAPs' opinions were recorded.

The prevailing opinion of PAPs in the areas:

- PAPs would like to be informed of the actual project implementation time- schedule well in advance so as to prepare themselves for ground clearance. - PAPs would like to be compensated at suitable cost for their losses. (See Appendix 6 for Samples of Minutes of Community Meetings) 5.2. Socio - economic Surveys

Consultants have carried out the socio-economic surveys and full-in the "Questionnaires" covering 100% of PAPs in the project areas. (see Appendix 7 for Sample of "Questionaires")

The survey teams have also distributed the Pamphlets (see Appendix 8 for Samples of Pamphlet).

See Appendix 10 for Socio-economic household data sheet.

5.3. Objective of Information Campaign and Consultation Program

Information dissemination to, consultation with and participation of the affected people and involved agencies (i) reduce the potential conflicts, (ii) minimize the risk | of project delays, and (iii) enable the project to design the resettlement and rehabilitation program as a comprehensive development to fit the needs and priorities of the affected people, thereby maximizing the economic and social benefits of the project investment. l

I Power Company No.2 Page 58 I Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transnission lines and substations in Southern Vietnam

The objective of the Public Information Campaign and PAP Consultation Program * is as follows:

- To share full information on the proposed project areas, its components and * activities with the affected people. - To obtain information about the needs and priorities of the effected people as well as information about their reactions/feedback to proposed policies and activities.

- To obtain the cooperation and participation of the affected people and communities required to be undertaken for resettlement planning and implementation.

- To ensure transparently in all activities related to land acquisition, resettlement * and rehabilitation. There are two phases of the public information campaign and PAPs consultation: Phase 1: Information campaign, PAPs and agencies consultation during resettlement planning and RAP preparation Phase 2: Information campaign and consultation during resettlement implementation 5.4. Resettlement Information Booklet (RIB) To ensure that PAPs, their representative and local government of the affected areas fully understand the detail of RAP, RIB will be prepared by PC2, and will be | distributed to all PAPs in the project area in the initial duration of the- implementation stage. | The RIB will contain information on the followings: Basic features - Project description 3 - Project design objectives - Implementation schedule I - Project impacts - Eligibility to compensation and rehabilitation and entitlement policies for the project affected people - Institutions are responsible for resettlement - Information dissemination and consultation with the affected people | - Grievances and appeals

Power Conpany No.2 Page 59 Power Engineering & Consulting Company No.3 I 11 " | Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam

- Monitoring and evaluation of RAP implementation

| Specific entitlement of PAPs

- Description of the detailed impacts of the project on the specific household

- Compensation rates for each types of impacts

- Date of delivery of entitlements. I l I I I

I

I I I I~~~~~~

* ~~~Power Coripany No.2 Page 60 Power Engineering & Consulting Compa-ny No.3 Transrnission, distribution and disaster reconstruction Project - Vietnam _ 1 OkV Transmission lines and substations in Southern Vietnam CHAPTER 6 BASELINE INFORMATION

6.1. Data Gathering Activities

The census and inventory work of the project impacts were carried during April - June, 2004 by the Consultants and under the assistance of the related local authorities. The inventory work includes:

- Census of all PAPs.

- Survey for PAHs who have houses (partially or fully demolished) within the project area.

- Survey for impacts on trees inside and outside the ROW follow the regulation

for the safety protection in the Decree No.54/1999/ND-CP on 8th July, 1999

and Decree No.1 18/2004/ND-CP dated May 1 oth 2004.

- Survey for impacted land acquisition area for tower foundation.

- Survey for temporary land acquisition area.

- Survey for other impacted assets

The socio-economic survey of PAPs was carried out for 100% of PAPs.

The socio-economic survey for PAPs defines the characteristic of imnpacted community, evaluates the population, housing status, main economnic activities, and- living standards of PAPs etc.

6.2. Socio-economic Surveys

The socio-economic surveys are aiming at providing baseline data on the localities traversed by the T/Ls and S/S locations, covering:

No Province District Commune 1 Binh Thuan 1+1* 3 2 Lam Dong 2+1** 8 3 Ben Tre 2 9 4 Tien Giang 1 1 5 Hau Giang 2 6 6 Soc Trang 2 4 7 Vinh Long 3 9 ...... --...... -...... * Phan Thiet City

** Da Lat City

Power Company No.2 Page 61 Power Engineering & Consulting Company No.3 I IIIIII11 | Transmnission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transimission lines and substations in Southern Vietnam

(covering 40 communes belong to 15 districts/towns/cities of 7 provinces)

| Survey data cover the information on the characteristics of the communities, their sources of income, revenue, socio-economic situation. The survey also aims at 3 identifying characteristics of affected areas, assessing the development of population, houses, socio-economic etc. The survey data are used for establishing resettlement policy and bases for evaluating restoration of living standards. 6.3. Economy characteristics of relevant provinces 1 6.3.1. Binh Thuan:

The Binh Thuan provice locates between two of the biggest city: Ho Chi Minh and Nha Trang so it is advantageous for Binh Thuan in development. Specially, Binh Thuan has 192 km of coastal boundary, so the economy of Binh Thuan is strongly developed in fishery and tourism.

Agriculture occupied 12.29% of the economy, industry-construction occupied 30.1% and bussiness-service made up 57%.

2 - Natural area: 7,283km , in which Ham Thuan Bac occupies 1,282km 2 and Phan Thiet city occupies 205.6 km2 - Population: 1,079,700 people | - Population density: 134 people/km2 6.3.2. Lam Dong:

+ Duc Trong District: - Natural area: 902.2km2 , occupied 9.2% of the 3 whole province.

- Population: 139,500 people | - Population density: 155 people/km 2 There are many ethnic minorities live in the district: K'Ho, Cil, Thai, Nung, etc.

Duc Trong plays an important role in the economic-social development plant of the Lam Dong province. Agriculture occupied 59.96% of the economy, industry-construction occupied 13.92% and bussiness-service makes up * 26.12%.

84.6% and 3.5% worker work in agriculture and small scale industry made | respectively. Annual income is relatively high, about 3,000,000 VND/person/month.

I Power Company No.2 Page 62 I Power Engineering & Consulting Company No.3 3 Transmission, distribution and disaster reconstruction Project - Vietnam I1 OkV Transniission lines and substations in Southern Vietnam

+ Di Linh District: - Natural area: 1,628km 2, is the largest district of the | province

- Population: 130,386 people | - Population density: 80 people/km 2 Di Linh has high potentiality in agricultural development. Agriculture I occupied 77% of the economy, industry-construction occupied 11% and bussiniess-service made up 9.26%. * Annual income is about 2,500,000 VND/person/month. 1 6.3.3. Ben Tre: + Cho Lach District: - Natural area: 18.879 ha 3 - Population is about 132,543 people - Population density: 693 per/km 2 3 Cho Lach district's fruit-tree area is about 10.349 ha, occupied 31.9% fruit tree area of Ben Tre province with diversity products. | Agriculture plays a very important role in the district's economic structure. Area for agriculture occupied 67% natural area. Industry and small scale industry is slowly developed. Products mainly supplied for local demand. + Mo Cay district: - Natural area: 35.538 ha

- Population is about 269,340 people. .3| - Population density: 752 per/km2 It is very suitable for planting three main trees: rice, coconut and sugar-cane. | The profit from these kinds of trees is rather high. Industry and small scale industry in this region are developed for a long time with traditional products, mainly made from coconut tree.

6.3.4. Tien Giang Tien Giang stays near the so it is advantageous for economic development. Population of Tien Giang is 1,068,300 people, in which 50% in labour age. 3 Cai Be District: - Natural area: 420.9km 2 - Population: 277,400 people. | - Population density: 659 per/km2

Power I Conpany No.2 Page 63 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam I Area for agriculture is 33,333ha, area for fishery is 3,960ha. I 6.3.5. Soc Trang + My Tu District:

* Population: 203,259 people. *| GDP: 1,551,600,000,000 VND Economics: Economic continues to develop rapidly Branch Mechanism rate

Agriculture - forestry - 12,9% |3Aquaculture Industry, construction 30,1% 3 Tourist, Services 57%

|* Industry - handicraft: Development of operating factories in My Tu district is medium, not synchronous. Some factories will be invested. Handicraft is developed better, but items traditional with new type have been not.

* . Agriculture: Agriculture of city is concentrated at the edge of sea. Catch and Process aquaculture is regularly.

| * Tourist, Services: Tourist and services are main economics. Recently, it has developed rpidly.

+ Soc Trang town: - Natural area: 7,650 ha

- Population: 122,342 people, in which 10% is Kho Me people and Hoa people.

Soc Trang town is economic center of province, economic development rate is about 8 - 9%. Annual income is 9,500,000 VND/person/year. 6.3.6. Vinh Long

Vinh Long province which belongs to Mekong river delta is bounded by Tien Giang in the North,by Can Tho in the South, Ben Tre in the East, and Tra Vinh in the Southern-east. The very large Vinh Long province founded in the year 1832 was one of 6 Nam Ky's provinces. The township of Vinh Long currently is Vinh Long town, 136km far from Ho Chi Mirnh city.

I Power Company No.2 Page 64 Power Engineering & Consulting Company No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam 110kV Transmission lines and substations in Southern Vietnam

II...... No Administrative kM2 ) Population Density unit Areas ( (person) (person)/km 2 ) 1 Vinh Long town 48 120,500 2,516 2 Binh Minh district 244 171,900 703 3 Long Ho district 193 147,400 764 4 Mang Thit district 158 98,800 626 5 Tam Binh district 280 157,400 563 6 Tra On district 258 145,700 564 7 Vinh Liem district 294 170,000 578 Total 1,475 1,011,700 6 314

In terms of Vinh Long province economic development, the agriculture, aquiculture, industry, and services have achieved stable and high rate in the annual development. 6.4. Census and Inventory 6.4.1. Population and Household Characteristics The socio-economic survey traversing the T/Ls covering 40 communes/towns/ wards, belong to 15 districts/towns/cities of 7 provices of the project areas is carried out for 100% of all PAPs. Features of surveyed households are as follows: . Average offamily size 4.31 persons - Man 53.4% - Woman 46.6 % * Age groups

- I - 17 years old 25.18 % - 18 - 60 years old 63.37 % - Above 60 years old 11.45 % * a Heads of HH

- Male 92.16 % - Female 7.84 % . Education standard.-

University/College 5.15 % High school (10 - 12 classes) 21.67 % Secondary (6 - 9 classes) 28.43 % Primary school (1 - 5 classes) 34.56 %

Power Conpany No.2 Page 65 Power Engineering & Consulting Company No.3 Transmnission, distribution and disaster reconstruction Project - Vietnam 1lOkV Transmnission lines and substations in Southern Vietnam l Reading/writing 1.66 % Illiterate 1.66 %

Occupation Farming 48.6 % Fishing/aquaculture 1.56 % Small scale business 10.62 % Wage earners (state-owned and private sectors) 15.38 % Handicarft 0.21 % Retired 0.4 % Housewife 4.45 % Jobless 0.91 % School children/students 2.48 % Having special assistance 0.26 % Free lance laborers 10.54 % Other occupation 3.78 %

. Income

Average annual income 22,812,394 VND/HH/year Highest average income 120,000,000 VND/year Lowest average income 2,400,000 VND/year

Percentage of HHs having average income < 400,000 1.55 % VND/month Percentage of HHs having average income from 4.09 % 400,000 VND to 600,000 VND/month Percentage of HHs having average income from 10.4 % 600,000 VND to 800,000 VND/month Percentage of HHs having average income from 12.72 % 800,000 VND to 1,000,000 VND/month Percentage of HHs having average income > 1,000,000 71.24 % VND/month

. Anenity

HHs with power supply 91.16 %

Power Company No.2 Page 66 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

HHs with water supply 29.41 % HHs with motor bikes 42.43 % HHs with TV 65.75% HHs with telephones 12.15 % HHs with bicycles 64.71 % HHs with boats 11.76 % HHs with electronic facilities 35.29 %

. Average annual expenses (per HH) Regular expenses - Food/foodstuff 29.92 % - Electricity 1.28 % - Water 0.39 % | - Rent 1.74 % - Clothing 1.11 % - Health 0.63 % - Education 8.25 % - Travel/communication 2.65 % -Tax 0.52 % | - Other 0 % 46.48 % I . Irregularannual expenses (per HH)

- Festivities 6.25 % I - Mournig 3.95 % -Furniture 3.60 % - House repair 0.26 % -Vehicle repair 0.52 % -Others 1.65 % 16.24% 6.4.2. Healthcare All districts covered by the project have 1 district general hospital each and all communes covered by the project have 1 healthcare station each.

Power Company No.2 Page 67 Power Engineering & Consulting Company No.3 Transmnission, distribution and disaster reconstruction Project - Vietnam I IOkV Transmission lines and substations in Southern Vietnam

The commune health care services is usually taking care of minor illness or maternity deliveries. The district hospital can take care of more serious illness or minor operations. However, such health services are suffering from poor facilities or lacking of equipment. 6.4.3. Housing Condition

According to the Circular 05-BXD/DT dated February 9th, 1993 regarding house classification, houses are divided into 4 classes as below: - 1st class house - 2nd class house - 3rd class house - 4th class house

Houses or buildings of 1st and 2nd classes are permanent structures with modern facilities & interior decorations, private toilets & bathroom, separate living room & bedroom. This type of building is usually located in big city or centers and does not appear in the project's area.

Buildings of 3rd class are permanent structures with brick wall, reinforced concrete roof, brick floor, conventional facilities & interior decorations.

Buildings of 4th class are semi-permanent structures with brick or wooden wall in the rural, tile roof zinc-galvanized iron sheet, brick or cement floor and usually without toilets. This type of building is very popular in the project's area. Temporary house is semi-solid house, brick or wooden wall in the rural with leaf roof.

The housing conditions of the communities in the project areas are follows:

- Cat. I Nil - Cat. 2 Nil - Cat.3 2.93% - Cat.4 75.82% - 'Temporary' 21.25 %

See Appendix 9 for Housing Categories defined in the Vietnamese Construction. I

Power Company No.2 Page 68 Power Engineering & Consulting Company No.3 | Transimission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

CHAPTER 7 3 PROJECT IMPACTS

* | The data gathering activities in the socio-economnic surveys for the baseline information are shown in Chapter 6. From such baseline information, statistics of | project impacts are shown below. 7.1. Types of Impact

ROW is defined on the Decree No.54-1999 ND-CP dated July 8th 1999 by GOV on "Security protection for high voltage power network" and Decree No.1 18/2004/ND-

CP dated May 1 0 th 2004 on adjustment of the Decree No.54/1999/ ND-CP. U - All houses and public structures in ROW are required to remove or could be * existed with the restricted conditions. - All high trees in tower foundation areas and in ROW of T/L shall be cut so that the distance from the top of trees to the lowest conductor is not less than 4.0m. All trees out of ROW but it is supposed to touch to the conductors (should be 3 at least under 1.0m from top of fallen trees to the conductors) will be cut. - All structures out of ROW but it is supposed to impact on the project such as I explosive storages, gas stations quarries, communication centers etc. will be removed.

- Permanently land acquisition for the project consists of: 3 Land acquired for substations Land acquired for tower foundations | Land acquired for permanent access roads - Temporary impacted land for the project consists of: | - Land area surrounding the foundation during the period of foundation digging and tower erecting. I Land area for the service roads for transportation of material into the tower positions. This land area will be proposed temporary from 1 to 2 months. * Temporary impacted land area in conductor tension consists of a line along the route, 15 meters wide and would be impacted from 1 to 2 months. - Inventory survey work for impacts is carried out during April - June, 2004 with the results shown in the table below.

I Power Company No.2 Page 69 Power Engineering & Consulting Company No.3 3 Transimission, distribution and disaster reconstruction Project - Vietnam 11okV Transmission lines and substations in Southern Vietnam

7.2. Project Affected Persons (PAPs)

The following persons to be identified by the baseline information collected for this RAP are Project Affected Persons:

3 a) persons whose houses are partially or totally affected (temporarily or pemianently) by the project; | b) persons whose residential and premises and/or agricultural land is partially or totally affected (permanently or temporarily) by the project; | c) persons whose businesses are partially or totally affected (temporarily or permanently) by the project; | 3 d) persons whose crops (annual and perennial) and trees are partially or totally affected by the project, and

3 e) persons whose rented houses for residential purpose are affected by the project

| Results from the Socio-economic surveys show that: HHs Persons

I -. Total number of PAPs 1,169 5,198 in which . Permanently PAPs ...... I I ...... -...... _...... _.. .. -w_...... Number of PAPs with more than 25% of productive land 11 52 3 permanently acquired

Number of PAPs with less than 25% of productive land 1,158 5,146 permanently acquired ...... I...... I...... -...... _...... Number of PAPs with more than 25% o total residential land 138 615 permanently affected

Number of PAPs with less than 25% of residential land 88 451 permanently affected ...... I...... I...... I ...... _...... _......

I ~~~~~~~~~~~~...... -.1...... I...... - --- ...... - ...... - I.I . . - Number of PAPs with permanently impact on houses (total) 226 1,066 Number 3 of PAPs with permanently impact on structures (total) 174 771

| Number of PAPs with trees/crops totally/partially impacted 1,169 5,198 ~~~~~~~~~~~~~~~~~~~~~~...... I...... I ...... I...... I...... I......

Power Company No.2 Page 70 Power Engineering & Consulting Company No.3 I1. . . TransmTission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam

Number of PAPs with permanently total/partial impact on Nil bussiness

~~~~~~~~~~~~~~~~~~~~~...... I...... -- ...... - -...... <...... - I - -I.. .. -...... _ - -...... 3 Number of PAPs required to be relocated | ~~~~~~~~~~~~~~~~~~~~~~~~~...... -.....- .... I 1...... 226 1,066 ......

...... I...... _.".0..__..._ ...... __...... 3 PeranentlyImpacted PAPs 1,169 5,1988Total I ...... I...... I...... -...... I...... -... ._.._ ......

| -. Temporarily PAPs ...... __...... ------...... - _ _.,...... - - ...... Number of PAPs with temporary land acquisition X-- 1,101 4,896 ...... --...... -...... -...... -.-.-. --.--...-.. ._......

...... - -...... __...... __. __...... _,_,...... _.._..,.._._.. Number of PAPs with temporarily total/partial impact on houses/structures Nil ...... I...... I...... _...... _...... _

...... _ _. _ _ _ ...... Number of PAPs with temporarily totalpartial impact on business ...... -...... Nil ...... _. .._...... _ ......

~~~~~~...... I...... I -...... ---- ...... 3 Total Temporarily Impacted PAHs 1,101 4,896 Note:

- I HH may fall into more than I impact category.

- This table does not include impacted institutions/organizations. 7.2.1. Number I of PAPs Province/District/Commune PAPs Households Persons * 1. Phan Thiet - Mui Ne T/L Binh Thuan province 1.1 Ham Thuan Bac District 1 1.2 Phan Thiet City 119 557

Sub-total 1 119 557 2. Di Linh - Duc Trong T/L Lam Dong province 3 1.1 Di Linh 68 334 1.1. 1 Di Linh township 18 76 1.1.2 DinhLac comnmune 30 146

I Power Conpany No.2 Page 71 Power Engineering & Consulting Company No.3 I 3 Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

1.1.3 Tam Bo commune 20 112 3 1.2 Duc Trong 87 362 1.2.1 Ninh Gia Commune 18 63 | 1.2.2 Phu Hoa Commune 17 64 1.2.4 Gia Hiep Commune 13 58 3 1.2.6 Phu Hoi Conmmune 24 126 1.2.7 Lien Nghia township 15 51 Sub-total 2 155 696 ...... _...... _.._...... 3. Soc Trang - My Tu T/L | Soc Trang province 1.1 My Tu District | ~~~ ~ ~~~~~~~~~130662 1.2 Soc Trang District Sub-total | ...... 3 130 662 ~~...... I...... I...... _ .-...... _._._...... __ I 4.Chau Thanh - Can Tho TIL Hau Giang province

1.1 Chau Thanh Dist 35 63 1.1.1 Tan Phu Thanh commune 5 33 1.1.2 Mot Ngan township 30 30 | 1.2 Phung Hiep Dist 139 499 1.2.1 Long Thanh commune 3 15 1 1.2.2 Binh Thanh comnmune 3 20 1.2.3 Thanh Hoa conmnune 117 448 | 1.2.4 Tan Binh commune 16 16 Sub-total 4 174 562 Z ~~~~~~~~~~~~~...... -.I...... I...... I 5.Vinh Long - Cho Lach ...... Vinh Long province * 1.1 Vinh Long town 12 59 1.1.1 Tan Hoa commune 4 22 1.1.2 TruongAnconmmune 2 15 3 1.1.3 WardNo.8 6 22 1.2 Long Ho 13 66 3 1.2.1 Tan Hanh commune 9 46

I Power Company No.2 Page 72 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transrrmission lines and substations in Southern Vietnam

1.2.2 Phuoc Hau commune 2 12 * 1.2.3 Long Ho township 2 8 1.3 Mang Thit 6 34 1.3.1 Long My commune 2 9 1.3.2 My Phuoc commune 2 11 3 1.3.3 My An commune 2 14 Ben Tre province

3 1.1 Cho Lach 6 36 1.1.1 Vinh Binh commune 3 19 1 1.1.2 Son Dinh commune 2 11 1.1.3 Cho Lach 1 6 * Sub-total 5 37 195 ...... - - ...... - ...... ,...... _...... _...... 6. Mo Cay - Cho Lach Ben Tre province

3 * 1.1 Cho Lach 288 1,308 1.1.1 Hoa Nghia commune 53 255 1.1.2 Long Thoi commune 108 503 1.1.3 Vinh Thanh commune 44 253 1.1.4 Hung Khanh Trung commune 83 369 1.2 Mo Cay 238 1,189 1.2.1 Tan Thanh Tay conmmune 58 269 1.2.2 Thanh An commune 3 19 1.2.3 Phuoc My Trung conmmune 1 4 1.2.4 Da Phuoc Hoi commune 77 410 1 | 1.2.5 Tan Binh commune 99 487 Sub-total 6 526 | ...... I...... 2,497 ...... I...... -...... _.... * 7. Cai Be S/S Tien Giang province

1.1 Cai Be 4 12 1.1.1 Hau Thanh commune 4 12 Sub-total 7 4 12 8. My Tu S/S

ii |Power Corpany No.2 Page 73 I Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

Soc Trang province

3 1.1 My Tu 3 11 1.1.1 My Huong commune 3 11 Sub-total 8 3 11 9. Mui Ne S/S Binh Thuan province

1.1 Phan Thiet City 2 10 1.1 IMuiNe Ward 2 10 Sub-total 9 2 10 U 10. Chau Thanh S/S Hau Giang province

| 1.1 Chau Thanh 4 23 1.1. I Mot Ngan township 4 23 Sub-total 10 4 23 Ia. Cho Lach S/S Ben Tre province

1.1 Cho Lach S/S 3 13 1.1. 1 Hoa Nghia commune 3 13

* . Sub-total 11 |~~~~~~~~ ...... 3 12 ...... I...... I...... "...... _ ...... _...... 12. Da Lat 2 ...... I...... Nil Nil ...... I...... _.. 3 Total 1,169 5,198

7.2.2 Total PAPs by Categories

Table 7.2.2.a - Total Project Impacted

1 Categories Number of HiHs

1. PAP who has land, trees, crops, which are damaged by the 1,169 project during the construction period

| 2. PAP who has house/structures, which are partially damaged or Nil cut, and the damaged portion will not affect the entire house or 3 structure (the dismantled areas are < 25% of total areas), and the lost house/structure portion could be rebuilt in adjacent areas already owned by the PAP. Impact on cleared residential land in ROW would be owned by the PAP. Impact on cleared residential

3 | Power Conmpany No.2 Page74 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transrnission lines and substations in Southern Vietnam l land in ROW would be temporary as it could be reused for restricted purposes.

3. PAP who has house which are partially or totally damaged, 226 and the damaged protion will effects to the safety or using purpose of the entire house or structure (the dismantled areas are more than 25% of total areas or even less than 25% of total area, but the remaining area can not be used or inconvenient for using), so the house need to be totally removed and rebuilt in remaining adjacent areas already owned by the PAPs. 4. PAP who has houses, which are partially or totally damaged, Nil and the damage portion will effects to the safety or using purpose of the entire house or structure, so the house/structure need to be totally removed and rebuilt. But PAH does not have sufficient spare residential land for the reconstruction of a house of equal dimensions as the house lost.

5. PAP who has residential land, productive land which will be acquired permanently for the project, including for permanent roads construction and maintenance of the project: (a) acquired productive land areas is more than 25% of total 11 productive land PAPs' holdings.

(b) acquired productive land areas is less than 25% of total 1,152 productive land PAPs' holdings.

(c) the remaining residential land areas is less than lOOm 2 (in 103 rural areas)

(d) the remaining residential land areas is equal or more than 94 l00m2 (in rural areas)

6. PAP impacted permanently or temporarily on bussiness or Nil other services.

7. Impacts on public works i.e. schools, water supply resources, Nil sewage systems, road

8. Tenants who have leased of house for residential purposes Nil

Power Comnpany No.2 Page 75 Power Engineering & Consulting Company No.3 .1I1111 Transmnission, distribution and disaster reconstruction Project- Vietnam I IOkV Transmission lines and substations in Souther Vietnam

Table 7.2.2.b - Total PAPs by Impact Categories - Locality Distribution

Impact categories Province/DistrictlCommune 5 1 2 3 4 a b d 6 7 8 1. Binh Thuan 119I ' 129°) 1.1 Ham Thuan Bac 1 1.. Ham Thang 9 4 5 1.1.2 HamNhon 3 2 1 1.2 Phan Thiet 1.1. 1 Mui Ne 2 2 2 1 1 Sub-total 121 14 2 129 7 7 2. Lam Dong 2.1 Di Linh 2.1.1 DiLinh 18 18 18 14 4 2.1.2 DinhLac 30 1 30 1 2.1.2 Tam Bo 20 20 2.2 Due Trong 2.2.1 Ninh Gia 18 18 2 2.2.2 PhuHoa 17 2 17 8 6 2.2.3 Gia Hiep 13 1 13 1 2.2.4 Phu Hoi 24 24 16 4 2.2.5 Lien Nghia 15 11 15 5 7 Sub-total 155 33 155 46 22 3. Soc Trang 130(') 130(4)

Power Company No.2 Page Power Engineering & Consulting Cornpany No.3 76 1- -n -rn ------n - -n - --- -= Transmission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmission lines and substations in Southern Vietnam

Inpact categories Province/District/Commune 5 1 2 3 4 a b c d 6 7 8 3.1 My Tu 3.1.1 My Huong 3 7 3 6 3 3.1.2 Thuan Hung 2 1 1 3.1.3 Phu My 5 3 2 3.2 Soc Trang 3.2.1 Ward 10 1 1 Sub-total 133 15 3 130 7 7 4. Hau Giang 4.1 Chau Thanh 4. 1.1 Tan Phu Thanh 5 5 5 5 4.1.2 Mot Ngan 34 7 3 30 2 1 4.2 Phung Hiep 4.2.1 Long Thanh 3 1 3 3 4.2.2 Binh Thanh 3 2 3 2 4.2.3 Thanh Hoa 117 10 117 10 4.2.4 Tan Binh 16 6 16 6 Sub-total 178 31 3 174 2 27 5. Vinh Long 5.1 Vinh Long town 5.1. 1 Tan Hoa 4 4 4 3 1 5.1.2 Truong An 2 2 2 1 1 5.1.3 Ward8 6 6 6 4 2

Power Company No.2 Page 77 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmission lines and substations in Southern Vietnam

Impact categories Province/District/Commune 5 1 2 3 4 a b d 6 7 8 a b c d 5.2 Long Ho

5.2.1 Tan Hanh 9 9 9 7 2 5.2.2 Phuoc Hau 2 2 2 2 5.2.3 Long Ho 2 2 2 2 5.3 Mang Thit 5.3.1 Long My 2 2 2 2 5.3.2 My Phuoc 2 2 2 2 5.3.3 MyAn 2 2 2 2 Sub-total 31 31 31 25 6 6. Ben Tre 6.1 Cho Lach

6.1.1 Hoa Nghia 53 53 6 1.2 Long Thoi 108 108 5 11 6 1.3 Vinh Thanh 44 44 6 1.4 Hung Khanh Trung 83 83 4 5 6.1.5 Vinh Binh 3 3 3 3 6.1.6 Son Dinh 2 2 2 2 6.1.7 Cho Lach 4 1 2 1 1 6.2 Mo Cay 98(5) 6.2.1 Tan Thanh Tay 58 58 1 5 6.2.2 Thanh An 3 3 6.2.3 Phuoc My Trung 1 1

Power Comnpany No.2 Page 78 Power Engineering & Consulting Company No.3 -- m ------m m m m m Transnission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmission lines and substations in Southern Vietnam

=_____ Impact categories Province/District/Commune 5 1 2 3 4 a b d 6 7 8 6.2.4 Da Phuoc Hoi 77 77 3 4 6.2.5 Tan Binh 99 99 Sub-total 535 98 2 532 19 25 7. Tien Giang 7.1 Cai Be 7.1.1 Hau Thanhi 4 4 1 1 4 Sub-total 4 4 1 1 4 Total 1,169 226 11 1,152 103 94

Note: The RAP of Phan Thiet - Mui Ne, Soc Trang - My Tu and Mo Cay - Cho Lach projects do not show the statistic PAPs according to localities

(1): 119 PAPs affected (category 1) by the Phan Thiet - Mui Ne T/T (2) 129 PAPs affected (category 5b) by the Phan Thiet - Mui Ne T/T (3) 130 PAPs affected (category 1) by the Soc Trang - My Tu T/T ( 130 PAPs affected (category Sb) by the Soc Trang - My Tu T/T (5) 98 PAPs affected (category 3) by the Mo Cay - Cho Lach T/T

Power Company No.2 Page 79 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 110kV Transmission lines and substations in Southern Vietnam I Table 7.2.2c Total PAPs Required to be Relocated - Locality Distribution

I PAPs required Reasons of Land No Province District Commune to be Relocated Acquisition lHHs Persons S/S ROW 1 Binh Thuan Ham Thuan Bac Ham Thang 9 40 X Ham Nhon 3 11 X Phan Thiet Mui Ne 2 10 X Sub-Total 14 61 2 Lam Doug Di Linh Dinh Lac 1 6 X Di Linh 18 76 X | Duc Trong Lien Nghia 11 35 X Gia Hiep 1 9 X *I|Phu Hoa 2 10 X Sub-Total 33 136 3 BenTre Mo Cay & Cho 92 462 X Lach Cho Lach Vinh Binh 3 19 X Son Dinh 2 11 x ChoLach 1 6 X | Sub-Total 98 498 4 Soc Trang My Tu My Huong 6 26 X 1 4 X Thuan Hung 2 11 X j | Phu My 5 24 X Soc Trang WardIO 1 6 X Sub-Total 15 71 5 Vinh Long Vinh Long Tan Hoa 4 22 X Truong An 2 15 X Ward 8 6 22 X I Long Ho Tan Hanh 9 46 X Phuoc Hau 2 12 X LongHo 2 8 X Mang Thit Long My 2 9 X My Phuoc 2 11 X | MyAn 2 14 X Sub-Total 31 159 6 Tien Giang Cai Be Hau Thanh 4 12 X

Power Comnpany No.2 Page 80 Power Engineering I & Consulting Company No.3 Transm-ission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transimission lines and substations in Southern Vietnam

SSub-Total 4 12 7 Hau Giang Chau Thanh Mot Ngan 3 19 X Mot Ngan 4 4 X Tan Phu 5 33 X | Thanh Phung Hiep Long Thanh 1 6 X Binh Thanh 2 13 X Thanh Hoa 10 48 X Tan Binh 6 6 X Sub-Total 31 129 Total 226 1,066

7.3. Project Impacted Assets

The project will impact on:

. Permanent land acquisition for tower foundations, substation areas and some access road for the project construction.

. Pen-nanent impact on houses, structures, trees, crops and other assets in the proposed tower foundation areas, substation areas and in ROWs. . All trees and crops or other assets surrounding the tower foundation and ROWs.

* . Temporarily acquired land required during construction of the project.

Results of the socio-economic surveys show that:

Pennanent Impacts

. Residential land and productive land acquisition for tower foundations, S/S areas, access roads.

. Trees, crops in the proposed tower foundation areas and S/S areas.

. High trees in ROW that to be cut (the distances from the tops of the trees to the conductors are not less than 4 m) and high trees adjacent to ROW but | could touch the conductors in case of fallen. Permanent Land Acquisition from Individual PAPs

. Residential land 10,866 m2 *. Paddy field 45,521 rn2 i. Crop land 2,535 m2 . Garden land 30,472 m2

Power Company No.2 Page 81 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

. Industrial crop land 2,910 m 2 I Otlher type of land 10,273 m2 Permanent Land Acquisition from State-owned Organization | . Artificial pine tree forest land 8,233 in 2 (Lam Vien Forest PMB, Lam Dong province)

Temporarily Impacts

* . Productive land is temporarily acquired in the period of the project I construction.

. Trees, crops along the strips in ROW of T/L during the construction period. Temporarily Land Acquisitionfrom Individual PAPs

f Residential land 83,435 m2

* Paddy field 726,315

| Crop land 249,666

. Garden land 668,401

| . Industrial crop land 188,513 . Other type of land 191,823 m 2

Temporarily Land Acquisition from State-owned Organization Nil

Impact on Houses/Structures and Facilities

. Houses 226 units 16,208 m 2 | . Structures

o Kitchen 72 units 535 m2 o Lavatory 130 units 696 m2 o Livestock house 130 units 2,187 m2

o Tombs 231 units

o Cisterns 84 units

7.3.1. Number, Category and Area of the Houses/Structures Lost I I

| Power Comrpany No.2 Page 82 Power Engineering & Consulting I Company No.3 Transm-ission, distribution and disaster reconstruction Project - Vietnam 110kV Transm--issioni lines and substations in Southern Vietnam

~~Table I 7.3.1 a Number, Category and Area of the House Lost distribute by Sub- * ~~~Project______

Proj ect HiHs Category Area (Mn) Tranismissioni line Phan Thiet -Mui Ne 12 Cat.4 810 I DiLinh-DucTrong ~~~~~~~~~~~~~~~~~~~~~~~33Cat.4 1,924 57 Cat.4 3,694 Soc Trang - My Tu 14 Tern 661 Vinh Long - Cho Lach 37 Cat.4 1,844 Chau Thanh -Can Tho 28 Cat.4 1,451 8 Cat. 3 1,143 Mo - Cay Cho Lach 36 Cat.4 3,733 48 Tern 4,076

~ ~ ~ ~ ~ ~ ~ ...... -...... - ...... - .... I ...... -.-..... - -.------...... Substations

3 Cat.4 172 I BeCai 1 ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~Tern 54 My Tu 1 Cat.4 60 Mui Ne 2 Cat.4 160 Chau Thanh 3 Cat.4 216 Cho Lach Nil Da Lat 2 Nil Total 226 16,208

~~Table 7.3.1 - I b Number, Category and Area of the Structure Lost distribute by * ~~sub -project

W ~~~~~~~~Project Kitchen Lavatory Livestock Cisterns house- I ~~~~~T/Ls Unit Area Unit Area Unit Area Unit Phan Thiet -Mui Ne 12 100 12 64 1 15 ~~~~~DiLinh - I Duc Trong 40 297 38 203 15 252 41 Soc Trang -My Tu 8 62 8 38 5 78 3 I~ ~ ~ ~ ~~~~...... I ...... Vinh ...... -----...... Long - Cho Lach 2 8 9 1801 ...... Chau Thanh - Can Tho * ~~~~~MoCay - Cho Lach 58 311 98 1,649 39

Power Com-paniy No.2 Page 83 Power Engineering & Consulting Com-pany No.3 Transmission, distribution and disaster reconstruction Project - Vietnam IOkV Transmission lines and substations in Southern Vietnam

I ~~~~~~~~~~~~~~...... I...... I...... I...... I...... I......

...... I...... I...... -...... S/Ss | ~~~~~~~~~~~~~~~~~~~~~~~~~~~...... I...... - ...... Cai Be 4 26 4 27 ...... I...... I...... I...... My Tu 3 14 3 18 2 13 Mui Ne 2 14 2 11 ...... I...... -...... I...... -...... I...... - -...... _...... Chau Thanh 3 22 3 16 | .~~~~~~~~~...... I...... - -. -...... Cho Lach Da Lat 2

~Total 72 535 130 696 130 2,187 84 I I i I' I I

Io

'I~~~oe niern &Cnutn onayN. I I I I I I I I I I I I I I I I I I I I I I I I I I I

| ~~~PowerEniergCo nsligNo.3 owany ae8 Tranismission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmission lines and substations in Southern Vietnam

7.3.2. Number and Area of Land Lost Table 7.3.2- Area of Land Impacted distribute by sub-Project

Residential land Paddy field Crop land Garden land Industrial crop Forest Other type of land Project land Per. Tem. Per. Tem. Per. Tem. Per. Tem. Per. Tem. Per. Tem. Per. Tem. (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) T/Ls

Phan Thiet - 3,322 66 413 192,180 110 42,683 40,182 Mui Ne 2,150 86,139

Di Linh - Duc 1,206 78,043 359 23,231 2,251 145,668 1,842 118,137 2,910 188,153 Trong

...... _ _ ...... ____._...... _...... _~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~...... SocTrang-My 307 120 1,461 127,034 174 1,133 117,676 Tu

Vinh Long - 1,844 2,210 6,191 164,615 61,315 12,198 61,660 3,355 Cho Lach 67,494

Chau Thanh - 245 1,486 5,732 173,643 861 25,845 Can Tho

Mo Cay Cho 661 1,510 1,606 45,011 7,121 304,901 Lach 38,190

S/Ss

Cai Be 650 8,220 140

Power Company No.2 Page 85 Power Engineering & Consulting Company No.3 m m m m m m m m m - m m m m - m m m m m Transmission, distribution and disaster reconstruction Project - Vietnam I IOkV Transmission lines and substations in Southern Vietnam

Residential land Paddy field Crop land Garden land Industrial crop Forest land Other type of land Project Per. Tem. Per. Tem. Per. Tem. Per. Tem. Per. Tem. Per. Tem. Per. Tem. (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m2) (m) (mr) (m2) (m2) My Tu 715 6,205 819 Mui Ne 1,700 ...... - - - -.-...... 716 4,768 ...... __._..._._..__.__._ .....___...... _...... Chau Thanh 216 5,399 601 5,660 Cho Lach 9,935 Da Lat 2 ...... 8,233 ...... - -..._-__---__-.- ...... _...... Total 10,866 83,435 45,521 726,315 2,535 249,666 30,490 668,401 2,910 188,153 8,233 10,273 191,823

Power Company No.2 Page 86 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

7.3.3. Quantity and Type of Crops and Trees Lost Table 7.3.3 a Permanently Impacted Crops

Unit: m2 U Project Agricultural Land Rice Maize Bean Vegetables U T/Ls Phan Thiet - Mui Ne 1,400 I Di Linh - Duc Trong 4,000 5,400 11,140 Soc Trang - My Tu 7,500 385 400 I Vinh Long - Cho Lach 200 Chau Thanh - Can Tho 296 I Mo Cay Cho Lach 16,400 4,300 2,747

* ~~SISs. Cai Be 140 200 | My Tu 750 300 800 Mui Ne I Chau Thanh 6,000 Cho Lach I ~~Da Lat 2 Total 32,546 4,385 10,540 14,887

U I I I I

Power Company No.2 Page 87 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 110kV Transmnission lines and substations in Southem Vietnam

Table 7.3.3 b Permanently Impacted Crops (Unit: item)

Garden land Industrial crop land Forestry

|Project Mango Orange Coconut Plum Longan Jacqkfruit Durian Mandarin Others Eucalyptus Pepper Coffee Tea Mulberry Pine apple orange

T/Ls

Phan Thiot -CMuie 74 6

Di Linh -24,8 Duc Trong 98 16 5 20 4 102 202 423 16 07 30,000 15,000

My Tu 66 3 39 2 1 4 3 171 18

Cio Long 62 86 70 112 544 20 37

Chau Thanli - 266 80 6 200 15 20 185 Can Tho

ChoL ay 17,682 161,8 24,736 6,697 '25,4 690 357 10,400 2,600 54,113 620 1,612 Cho Lach 4 4

S/Ss Cai Be 10 6 MyPTu 6 13 10 1 15 116 Mui Ne 40 16 10 11 15

Claui 150 20 Cho Lach 50 300 250 50 Da Lat 2 50 TotalF 18,504 1162,023 24,958 7,089 26,309 719 501 10,887 2,620 54,979 149 636 124,807j 30,000 16,612 50

Power Company No.2 Page 88 Power Engineering & Consulting Comipany No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam

7.3.4. Impact on Bussiness

I Nil 7.3.5. Quantity and Category of Other Fixed Assets Affected I Nil I I I I I I I I I I I I I I

| Power Conpany No.2 Page 89 Power Engineering & Consulting Company No.3 I 3 Transmission, distribution and disaster reconstruction Project - Vietnam I IOkV Transmnission lines and substations in Southern Vietnam

CHAPTER8 IMPLEMENTATION ARRANGEMENT

I 8.1. Measures for the Project Implementation 8.1.1. Announcement to PAPs

All PAPs shall be thoroughly informed about the rights and policies of RAP I including the eligibility, entitlement policy, modes and rates of compensation, schedules and complaint and grievances rights. The RIB will be prepared by PMB and then it will be delivered to all PAPs or informed at the meeting in districts and I communes.

Public announcement tasks shall be implemented immediately after GOV and WB I approval of project is obtained. The RIB consists of: - Impacts and entitlement policy. - Eligibility to compensation and resettlement.

- Implementation organization for compensation, resettlement. - Responsibility of related parties in implementing RAP. I - Grievances and complaint mechanism. 8.1.2. Compensation Deadlines

Compensation payment for land, houses at least 3 months before the land clearance, compensation for trees and crops and all allowances will be paid at leat 1 month before the land acquisition date.

For PAHs who have to be relocated, local authorities and PC2 and its PMB shall make every effort to (a) arrange independent house for PAHs who opt for independent house and/or (b) assist them in purchasing residential land and | construction for the house and to be sure no land clearance if these PAIs have not completed their house building at new resettlement site. I 8.1.3. Resettlement and Clearance Deadline

PAHs with impacted of houses and land received full compensation and subsidies, I are requested to move out of the affected portion of the house or to clear land at least 15 days before the commencement civil work. I 8.2. RAP Implementation Process RAP implementation will be inclued in 3 actions as follows:

I Power Company No.2 Page 90 Power Engineering & Consulting Company No.3 I~~~~~ Transmission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmission lines and substations in Southern Vietnam

i. General action Right from the beginning of the project preparation, iimplementation work.

ii. Separate action At several times, once for each project component.

iii. Continuous action Continuous action for the stages of RAP implementation.

8.3. Essential Actions

8.3.1. Action 1

Just after the award of capital borrows convention of WB, PC2 and its PMB will select and contract a qualified agency for independent external monitoring.

Note: the provincial and district CRCs are already exist.

8.3.2. Action 2

CRC carries out the DMS and inventory of affected assets (on the basis of the surveys for this RAP) and together with the independent monitoring and other related agencies, carry out the evaluation for the applicable unit cost in RAP and propose to each PPC for amendment of the applicable unit prices in RAP, if it is necessary, to ensure that PAPs are compensated at replacement costs at the time of RAP implementation.

Article 9 of decree 197/CP states that the prices of land for calculation of compensation shall be determined by the PPC for the type of land which has been used at the time of land acquisition. The decree No. 188/2004/ND-CP, Circulars No. 1 14/2004/TT-BTC, No.1 16/2004/TT-BTC and others related documents are also applied for this calculation. The price of land for calculation of compensation for land acquired by the project will be adjusted to meet the replacement price and decided by the Chairmen of the Provincial People's Committees based on the proposal of the DOFs.

8.3.3. Action 3

Immediately after the completion of DMS and inventory survey, CRCs will inspect and define the official number of PAPs, irnpacted properties and total compensation.

8.3.4. Action 4

CRC will officially announce the policy, schedule of the RAP to PAPs at public meeting including issues related to compensation, resettlement and land clearance. 8.3.5. Action 5

Power Company No.2 Page 91 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam I lOkV Transmission lines and substations in Southern Vietnam

Compensation payment for houses and deliver assistance to PAPs affected on houses, and then compensation payment for PAPs affected on other properties.

PAHs that permanently impacted more than 25% of total productive land or incomes will be entitled to rehabilitation assistance. They will be assisted for the training or or other economic restoration programs.

The proposals for training or economic restoration programs will be prepared by PC2 or its Consultant(s) in the period of RAP implementation. The proposals will be developed based on the consultation with local authorities and the participation of PAPs. The proposal also includes the possibility of employment after training. The proposal will be furnished to IDA for its concurrence.

8.3.6. Action 6

During the project implementation, PMB and Independent External Monitoring Agency will supervise/monitor all activities of RAP implementation and rehabilitation programs.

8.4. Implementation Schedule

One of the RAP provisions is that RAP will be carried out in accordance with the mentioned process for the purposes of security for land clearance and implementation of civil work.

The implementation schedule must ensure the synchronized linkage between RAP implementation and commencement of civil work i.e. the appropriate compensation schedule and construction schedule. The compensation payment shall be completed prior to the commencement of the relevant project components.

All RAP activities must be satisfactorily complemented before the WB issues a no objection for award of contract for the sub-project. Any changes to the RAP after WB clearance will require review by the WB Office in Hanoi before cormmencement of construction.

Proposed RAP implementation schedule is as follows:

Schedule for PMB and Project CRCs:

* Establishmnent of Project CRCs (already exist)

* Preparing RAP/EMDP April.04 - Sept.04

* Review and approval/clear of RAP by project related ||~~~PsW ~~PPCs/WB Jul.04 - Dec. 04

* Negotiation (GOV and WB) Mar. 05 I

Power Company No.2 Page 92 Power Engineering & Consulting Company No.3

I~~~~~ ~'fD Transmnission, distribution and disaster reconstruction Project - Vietnam 1 lOkV Transnmission lines and substations in Southern Vietnam

* Effectiveness May. 05 * Commencement of Public information May. 05 * Commencement of Field works (DMS) Jun. 05 * Cormnencement of Payment of compensation Jul.05

Schedule for PAPs:

* Commencement of declaration of quantity and status of properties Jun. 05 * Commencement of receiving compensation and ground clearance Jul.05

3 Civil works Oct.05 - Oct.06

Monitoring April.05 - April.08 All RAP activities must be satisfactorily completed before the World Bank issues a no objection for award of contractfor the sub-projects. Any changes to the RAP I after WB clearance will require review by the WB Office in Hanoi before commencement of construction. 8.5. Staffing for RAP implementation 8.5.1. Proposed Staffing for RAP implementation Staffing for the RAP implementation is proposed in the following table. Table Staffing for RAP Implementation

No Institutions Number of Staff Working time 1 PC2 PMB 1 3 months 2 Local PMBs 1 x7 3 months 1 3 Provincial CRCs I x7 3 months 4 District CRCs 1 x 15 3 months I 5 Commune People's Committees 1 x40 3 months 6 Consultants 12 3 months I 7 Independent External Monitoring 12 12 + 6 months

The independent external monitoring agency shall dedicate their apt workforce to satisfy the external monitoring requirement of the WB with defined schedule. They shall commence their monitoring work right from the beginning of the RAP I implementation through its completion. The external monitoring is required to carry out the monitoring 6 months after the completion of the RAP implementation for the surveying of the satisfaction level of PAPs. It is estimated that 1 Inception

I Power Company No.2 Page 93 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 110kV Transmission lines and substations in Southern Vietnam

Report, 6 Progress Reports (quarterly report) and 1 Final Report will be prepared by the Independent Monitoring Agency. 8.5.2. Training and Workshop In order to carry out RAP implementation smoothly and effectively, prior to RAP implementation, organizing trainings, workshops for social safeguard staff of EVN, PC2 and its Consultants and officials of local authorities are necessary. The trainings, workshops will be held by PMB. The objectives of trainings, workshops are to guide all relevant agencies/people for taskforces, requirement for carrying out DMS survey, and steps of RAP implementation as well as monitoring and evaluation, report preparation, base line data management. One intermediate training course and one primary training course are proposed to be organized at the initial stage of the RAP implementation. I One workshop for all RAP implementation related personnel is proposed to be held by the initial stage of actual payment of compensation. The training courses and workshops are to be organized in Soc Trang, Binh Thuan, Lam Dong, Hau Giang, Tien Giang, Ben Tre and Vinh Long provinces within a short course of time i.e. 1 day. * Table Number of proposed trainees

No Resettlement Organization Number of Content I 1 Intermediate training 1.1 PC2 PMB 2 - DMS and Entitlement Determination. 1.2 Local PMBs 2 x 7 - Key RAP policies. 1.3 Provincial CRCs 2 x 7 - Mechanism for redressing the 1.4 District CRCs 2 x 15 complaints/grievances. - Internal Monitoring 1.5 Consultants 12 ~~~RAP implementation.and evaluation of I . 2 Primary training 2.1 Officers of districts 2 x 15 - DMS, inventory, survey. 2.2 Intemal monitoring office 2 x 7 - Key RAP policies. I - Monitoring and evaluation of RAP implementation - Community participation and I consultation - Complaints l and grievances

I Power Comnpany No.2 Page 94 Power Engineering & Consulting Company No.3 l Transmnissioni, distribution and disaster reconstruction Project - Vietnam I IOkV Transmission lines and substations in Southern Vietnam

8.6. Complaints and Grievances Since the entire resettlement and rehabilitation program is being carried out with the participation of the PAHs and the impacted scale of this project will be relatively small, it is expected that no grievance issue will raise. However, to ensure that the PAHs have avenues for redressing their grievances related to any aspect of compensation and resettlement, detailed procedures of redresses of grievances have been established for the project. The objective is to respond to the complaints of the PAMs speedily and in a transparent manner. The mechanism is designed to be easy, transparent and fair. By resolving grievances at the project level, the progress of the project would be more effective ascertained. The procedures are as follows: Stage 1 - Commune Level

If any person is aggrieved by any aspect of the resettlement and rehabilitation program, he/she can lodge an oral or written grievance with commune authorities. In case an oral complaint is made, it will be written on paper by the conmune and processed. Commune People's Committee will settle the issue within 15 days. Staae 2 - DistrictLevel If any aggrieved person is not satisfied with the decision in Stage 1, he/she can bring the complaint to the attention of the district CRC and withiin 15 days from the date of the receipt of the decision in Stage 1, the district CRC will reach a decision on the complaint within 15 days. Staze 3 - ProvincialLevel If any aggrieved person is not satisfied with the decision in Stage 2, he/she can bring the complaint to the attention of the provincial CRC and within 15 days from the date of the receipt of the decision in Stage 2, the district CRC will reach a decision on the complaint Staze 4 - Court Case If the PAP is still dissatisfied with the decision in Stage 3, he/she can bring the case to the district Court in accordance with the "Civil Procedure Act" and within 15 days of receiving the decision of in Stage 2, the case shall be settled in the district Court without any charges or fees. The district Court's decision will be a legal basis for compensation.

PAPs can make an appeal on any aspect of the resettlement and rehabilitation program, including compensation rates being offered.

Power Conpany No.2 Page 95 Power Engineering & Consulting Company No.3 I, | Transmission. distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

Detailed procedures for redress of grievances and appeal process shown publicized among the PAPs during participation meeting. This information is also incorporated into the RIB to be disseminated to the PAPs before the beginning of implementation.

Please see Figure 8.6 for Grievance Redress Administrative and Juridical Structures Available to PAPs.

Figure 8.6 Grievance Redress Administrative and Juridical Structures 3 Available to PAPs

Provincial People's f Provincial Court Committee l_ _ _ I I ~~~~~~~~~~~~~~A

District People's District Court Committee ___

| District CRC

* _ |__Commune People's 1 Committee Mass Media _ I

PA Ps ...... Law yer

| 1;' Complaints A Bring to Court 8.7. Monitoring and Supervision

The implementation of RAP shall be constantly supervised and monitored by PMB in co-ordination with local People's Committees.

An independent monitoring agency will be entrusted with external monitoring tasks. The selection of this agency will be submitted to the proposal of PMB and WB. | The selected independent external monitoring agency shall be contracted by the PMB immediately after RAP approval and shall begin supervision and monitoring activities from the beginning of the implementation phase.

Power Companiy No.2 Page 96 Power Engineering & Consulting Company No.3 I~~~~~~~~~~~II Transnission, distribution and disaster reconstruction Project - Vietnam 11 OkV Translmission lines and substations in Southern Vietnam

8.7.1. Internal Monitoring

Internal supervision and monitoring include the following activities:

a) Monitoring the population and socio-economic surveys of PAP and inventory of the PAP's assets, status, occupation and living conditions and supervising the implementation of compensation, resettlement and rehabilitation for the PAP in the terms agreed by the PAPs.

b) Monitoring whether the implementation of resettlement and compensation tasks are carried out as provided in this RAP.

c) Monitoring the availability and quality of replacement land.

| d) Monitoring the timely and sufficient deployment of resettlement and compensation funds for this RAP.

| e) Investigate and fairly assess each case of complaint and grievance.

f) Internal monitoring agencies will prepare a quarterly report detailing the I progress of RAP implementation. Such a report should be made available to appropriate government authorities, WB and external monitoring agencies.

I 8.7.2. External Monitoring

Beside evaluation the quarterly reports produced by internal monitors and conduct the same thing of investigation assigned to internal monitoring, the external monitoring agency will be responsible for following activities:

* a) At the beginning of RAP implementation, review unit cost of compensation applied in RAP, check at the site for ensuring that, the compensation costs are at replacement value or otherwise, recommend to PC2 and PPCs for adjusting.

b) Evaluation of inventory survey (DMS) and Entitlements to PAPs.

c) Evaluation of socio-economic impacts of the project on the PAPs.

d) Supervision of the implementation of RAP to achieve the objectives of the RAP in particular "to improve or at least maintain the incomes and living conditions of the PAP after the resettlement".

e) Putting forward the amendments for the implementation of RAP so as to achieve the objectives of this RAP.

f) Offering suggestions on how improve RAP programs.

| g) Closely monitoring compensation activities and be prepared to give informed evaluation of complaints and grievances cases.

I Power Conpany No.2 Page 97 Power Engineering & Consulting Cornpany No.3 II I 3 l Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transi-iission lines and substations in Southern Vietnam

h) Write working reports to be submitted to PMB and WB every 6 months to the appropriate GOV authorities, the WB and to the representatives of the PAPs. i) Produce a final document to be prepared six months after the completion of the entire resettlement program. This document shall provide detailed evaluation of the RAP and its implementation, shall document both by means of interviews with the PAP the situation and the opinions of these latter after they have been resettled and compensated. j) Finally, on the bases of the RAP implementation experience this document shall provide suggestions both to help reinforce local RAP expertise and to improve future resettlements plans. I Terms of Reference (TOR) for independent monitoring will be prepared by PC2 and submit to WB for its concurrence prior to invitation of independent monitoring.

I I' I' I

I

| Power Company No.2 Page 98 Power Engineering & Consulting Company No.3 Transrmission, distribution and disaster reconstruction Project - Vietnam 110kV Transmission lines and substations in Southern Vietnam

CHAPTER9 I COSTS AND BUDGETS

| 9.1. Budgets

Budget for RAP implementation will be the counterpart fumds i.e. EVN (including management, independent monitoring and contingency). * 9.2. Compensation Cost Estimate

Compensation cost estimate for temporay and permanently impacted house, structure, agricultural land, forestry land, cultivated land, trees and crops based on: - Decree No.188/ND-CP dated November 16th 2004. - Decision for unit costs of compensation of the Provincial People's Committees of Soc Trang, Binh Thuan, Lam Dong, Hau Giang, Tien Giang, Ben Tre and Vinh Long provinces.

- Survey for replacement costs and market price for structures, land, trees by Consultants in the period of carrying out impact survey (April - June, 2004). 9.3. Compensation Unit Prices

The following Decision in respect of compensation unit prices (land, structures, trees, crops) for various projects in the project related provinces are applicable for | this project.

Follows are Decision of the project related PPCs on the applicable compensation uniit prices: People's Committee The Decisions * of Provinces Soc Trang 104/QD-UBT.97 dt. August 23 , 1997 139/QD-UBT.97 dt. December 13th, 1997 105/2000/QD-UBNDT dt. August 23rd, 2000 385/QD.HC.01 dt. August April 16th, 2001 I Binh Thuan 27/2002/QD-CTUBBT dt. April 9lth, 2002

37/2002/QD-CTUBBT dt. May 22nd, 2002 l 2667/2002/QD-CTUBBT dt. October 19th, 2002 Lam Dong* 1201/QD-UB dt. August 16th, 1997 2237/1998/QD-UB dt. August 31th, 1998 119/1999/QD-UB dt. October 4th, 1999 107/2000/QD-UB dt. October 18th, 2000

Power Company No.2 Page 99 Power Engineering & Consulting Company No.3 iI Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

l 70/2002/QD-UB dt. April 26th, 2002 112/2002/QD-UB dt. August 30 h, 2002

168/2002/QD-UB dt. December 4 , 2002 Can Tho 60/2000/QD-UJB dt. October 12i, 2000

45/2003/QD-UB dt. June 1 7 h, 2003

Ben Tre 1379/QD-UB dt. June 28 th, 1999

Notes. * For Chau Thanh 110kV Subsation and Can Tho-Chau Thanh 110kV Transmission line, areas affected by these projects belong to Hau Giang province. Since Hau Giang province not yet have decision on compensation unit cost, so Consultant applied compensation unit costs for these projects based on decisions of Can Tho PPC.

To ensure that the applied unit costs for compensation are at the replacement costs, during the impact survey, the Consultants had carried out the survey on unit prices in 15 relevant districts/towns/cities of the above mentioned provinces and compare them with the unit costs approved by the respective Provincial People's Committees. Construction prices given by contractors for recently structures are similar to construction prices applied in RAP.

The applicable compensation unit prices in this RAP reflected the prevailing market prices in the project areas, except the land price: the prevailing market price of land in the project areas is, in general, slightly higher than that in the approved ones.

The contingency component would cover such differences by the time of actual RAP implementation.

9.3.1. Compensation Unit Prices for Structures

The compensation unit prices for structures approved by the project related Provincial People's Committees reflect the building materials and labor costs proposed by the local construction contractor.

Table 9.3.1 Compensation Unit Prices for Houses/Structures

Unit: VND Houses Structures

No Provinces Cat.1 Cat.2 Cat.3 Cat.4 Temp. Kitchen Toilet Power 2 2 2 l(in ) (i ) (in ) (m2 ) (m2 ) (item) (item) (item) I Soc Trang 1,354,000 738,000 2 Binh Thuan 821,000 3 Lam Dong 750,000 600,000 300,000 4 Can Tho 1,177,800 873,760 500,000 2,000,000 500,000

Power Company No.2 Page 100 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam I 1 OkV Transmission lines and substations in Southern Vietnam

| 5 Tien Giang 650,000 650,000 220,000 220,000 6 Ben Tre 120,000 35,000 7 Vinh Long 120,000 35,000

Notes: Compensation unit prices only listed where impact may occurred. 9.3.2. Compensation Unit Prices for Land Compensation for land shall be at replacement cost. Land unit prices is established separately conforming to the regular price frame of the Decree No.188/CP and Circular 145 of MOF by using "K" factor as described above.

K factor is used for the adjustment of unit cost to meet replacement value at the time of issuance of unit cost. These unit prices are based on the replacement costs for land, house, trees and market prices for crops. However, the compensation unit costs will be reviewed by local authorities and Independent External Monitoring Agency at the beginning time of RAP implementation and adjustment will be done by the provincial People's Committee (if required and to be used for calculation the entitlements of PAP) for unsuring that PAP will be compensated at the replacement costs for land, house, trees and market prices for crops according to this RAP policy.

Table 9.3.2 Compensation Unit Prices for Land Unit: VND/m 2

No Provinces Residential Perennial Annual No Provinces land trees land trees land Others 1 Soc Trang 270,000 10,836 7,740 46,000 27,000 21,000 2 Binh Thuan 1,000,000 300,000 257,600 95,200 3 Lam Dong 430,000 3,500 5,500 4 Can Tho 85,000 45,000 30,000 5 Tien Giang 95,000 6 Ben Tre 19,300 14,600 19,300 500 7 Vinh Long 19,300 19,300 19,300 500

Notes: Compensation unit prices only listed where impact may occurred. The prevailing market price of land in the project areas is slightly higher than that in the above stated approved ones. Apt K factor shall be applied for the adjustment of unit cost to meet the replacement value by the time of issuance of unit cost for this

Power Company No.2 Page 101 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 1IOkV Transmission lines and substations in Southern Vietnam

project. The contingency component would cover such differences by the time of actual RAP implementation. 9.3.3. Compensation Unit Prices for Trees and Crops Compensation for crops shall be at market prices. According to Circular 145 of MOF, compensation for fruit trees is determined based on the remaining harvests, perennial trees to be compensated at the replacement cost and annual crops to be compensated at the average yields of three latest years. On the reference of local unit prices, surveyed market prices and prices proposed by PAPs. Comperison show that unit prices are not much altered.

I l I I I I I

I I1 II III I, ......

| ~~~Power Companiy No.2 Page 102 Power Engineering & Consulting Comlpany No.3 ransmisMson, dis!ution adisaster reconstruction Project - Vietnam I IOkV Transmission lines and substations in Southern Vietnam

Table 9.3.3 Compensation Unit Prices for Trees and crops

i~~~~0>\ X ' X.!0 Cn~~~~~~~~~~~~ d XA rBoince I1 1UO0 CnTo 500,0200 ,000 200,00018,u 14,o soo 1Z, 120 ,000 60,000 25,00,000 250 2000 0,000 3 00,000 ,.0 ZO.O} 3)0 0 0,0 60 ,

BPince 12 0 30000,000 150,000 10 TDong Thuan C I_I_I_N. Soc CanTlioTraing 1200100,000 1000z,o200,00010,000 180,000120,000 140,00060,000 15,000 100,000y N35,000 Pag 103 25,0005000 602,000 10200,000 0000 45,000n 3120,0000060,002,0 Giuang

La 20,0,000 ,00 10,000 800,000 30,000 120,0000 10,000 100,000 455,000 120,000 300,000 300,000 25,000 Dong

PonwTreC300,000 150,000a100,00

Power Engineering & Consulting Conpany No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transimnission lines and substations in Southern Vietnam

9.3.4. Flow of Fund

Fund for the implementation of RA1P will be from the GOV contribution. PC2 will transfer such budget to Provincial CRCs.

Provincial CRCs will transfer such budget to District CRCs. The District CRCs are reponsible for:

- Payment of compensation and all entitled allowances directly to PAPs - Payment to cover costs of overall RAP activities. 9.3.5. Inflation Adjustment

| The rates of compensation and cash entitlements for rehabilitation and allowances payable to the PAPs that be reviewed and, if necessary, adjusted at the actual time of RAP implementation based on the actual annual inflation rate upon request of the CRCs.

9.4. Cost Estimation

Expenditures for RAP comprising of: Preparation:

- Office works i.e. design study, preparation of statistic survey forms. - Field works i.e. census and inventory, socio-economic survey.

3 Survey work is carried out in tow stages: Preliminary stage (for RAP preparation) and Detailed Measurement Survey (at the early time of project and RAP 3 implementation) Compensation and Rehabilitation

Based on the impacted categories and extent of impacts which decribed in the above chapter, compensation and rehabilitation costs are included: | - Compensation for permanently land acquisition

- Compensation for temporary and permanently trees and crops (including the costs of cutting the trees)

- Compensation for houses and structures required to be removed from the proposed ROWs (including demolishment cost and repair cost).

- Subsidy, allowance for rehabilitation, consists of: relocating subsidy, transport allowance, training subsidy etc. - Incentive for timely movement.

Power Conpiany No.2 Page 104 Power Engineering & Consulting Comnpany No.3 I| Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transrnission lines and substations in Southern Vietnam

Management

- Cost for staff of PMB and CRCs includes in: physical basis, salary and allowance for administrative organization. The local PMB and CRCs shall undertake many works during the project implementation and only some members will be contracted to work for a certain period of time. - Cost for trainings, workshop, informarion campaign etc. Monitoring When carrying out the project, PMB of PC2 will enter a contract with an independent external monitoring agency to carry out the external monitoring. Since cost of monitoring work has not yet envisaged in detail, it is entimated at about 2% of total cost of compensation and RAP preparation. The interested independent external monitoring agency will prepare the technical and financial proposals for bidding actual cost will be decided through procurement for independent monitoring.

Contingency

From the implementation and on-going implementing projects of similar nature, the rate for contingency is estimated about 10-20% of total cost of compensation and RAP preparation.

9.5. Total Cost Estimate for RAP Implementation 9.5.1. Preparation of RAP and DMS Initial stage - Preparation of RAP

At the initial stage of the preparation for the establishment of RAP, a socio- economic survey workforce has to be established. This workforce will carry out (a) studying the designs and field visits, (b) establishment the socio-economic survey forns (interview) and inventory forms (with preliminary measurements of fixed assets and counting of properties), (c) organizing community meetings and public consultation and distribution of project related pamphlets ... (d) socio-economic survey by means of fill in the 'Questionnaires' and direct interview, (e) data processi ng and (f) establishment of the RAP for approval.

PMB has signed contracts with PECC of PC2, PECC1, PECC2, PECC3 and Hanoi Eleco to carry out the above mentioned task.

| Power Cornpany I No.2 Page 105 Power Engineering & Consulting Company No.3 Iv 3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

Table 9.5.1.a Cost of RAP preparation in the initial stage Unit. VND

I No Province Component Amount My Tu S/S s ~~~I Soc Trang 17,559,087 Soc Trang - My Tu T/T 35,500,000 Mui Ne S/S * ~~2 Binh Thuan 20,000,000 Phan Thiet - Mui Ne T/T 45,000,000 Da Lat No.2 S/S 50,000,000 | Lam3 Dong Di Linh - Duc Trong T/T 123,910,230

Chau Thanh S/S 50,000,000 4 1 Hau Giang Can Tho - Chau Thanh T/T 38,500,000 5 Tien Giang Cai Be S/S 20,069,595 I 6 Vinh Long Vinh Long - Cho Lach 80,000,000 Cho Lach S/S * ~~7 Ben Tre 30,000,000 Mo Cay - Cho Lach T/T 70,712,500 8 RAP preparation for the overall project 500,000,000 Total 1,081,251,412 Implementation stage - DMS Preparing for the RAP implementation, the district CRC's Support Working Team is mobilized to carry out (a) the preparation of DMS and inventory forms, RIB, (b) organizing community meeting, (c) DMS and inventory work, (d) negotiation with PAPs and (e) fmalizing the PAP's compensation and rehabilitation forms and submit to district CRC for approval. Support Working Teams:

Table 9.5.1.b Support Working Teams

Support Working No Province District/ No Project Teams Province town/city Team Staff Total 3 ______staff MyTu ~My Tu S/S 2 3ec 1 Soc Trang Y Soc Trang - My Tu T/T 2 3 each 6 Soc Trang town Soc Trang - My Tu T/T 1 3 3 2 Binh Thuan Phan Thiet city Mui Ne S/S 1 3 3

Power Com-pany I No.2 Page 106 Power Engineering & Consulting Company No.3 U Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

Ham Thuan Bac Phan Thiet - Mui Ne T/T 1 3 3 Da Lat city Da Lat No.2 S/S 1 3 3 U 3 Lam Dong Di Linh Di Linh - Duc Trong T/T 1 3 3 Duc Trong Di Linh - Duc Trong T/T 1 3 3 9 Chau Thanh A Chau Thanh S/S 4 Hau Giang Can Tho - Chau Thanh T/T 2 3 each 6 Phung Hiep Can Tho - Chau Thanh T/T 1 3 3 5 Tien Giang Cai Be Cai Be S/S 1 3 3 Vinh Long town Vinh Long - Cho Lach T/T 1 3 3 6 Vinh Long Long Ho Vinh Long - Cho Lach T/T 1 3 3 Mang Thit Vinh Long - 3 Cho Lach T/T 1 3 3 Vinh Long - Cho Lach T/T Cho Lach Cho Lach S/S 3 3 each 7 Ben Tre 9 Mo Cay - Cho Lach T/T Mo Cay Mo Cay-Cho Lach T/T 1 3 3 * Total 57 Total Support Working Teams' staffs 57 staffs x 3 months 171 mm Total Implementation State 1,700,000,000 VND (The estimates also include expenses on basic salary, per diem, accommodation, traveling of staff, printing of forms, pamphlets and community meeting)

Total cost of RAP Preparation

* Initial stage (preparation of RAP) 1,081,251,412 VND Implementation stage I 1,700,000,000 VND Total 2,781,251,412 VND 1 9.5.2. Compensation and Rehabilitation

Details of comnpensation and rehabilitation cost are shown in the following tables as per project components

Soc Trang Province My Tu substation

No Components Unit Quantity Unit cost Amount A Compensation for Land 249,953,319 1 Residential land 2 m 715 270,000 193,050,000 2 Paddy field 2 m 6205.25 7,740 48,028,635

| Power Company No.2 Page 107 Power Engineering & Consulting Comnpany No.3 I1 111 111 111 Transmission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmnission lines and substations in Southern Vietnam

3 Perennial trees land m2 819 10,836 8,874,684 B Compensationfor house 81,240,000 1 Temporaty m2 60 1,354,000 81,240,000 C Compensationfor trees and crops 27,540,000 |I -Star-apple Tree 11 100,000 1,100,000 2 Mango Tree 40 200,000 8,000,000 3 Coconut Tree 16 200,000 3,200,000 4 Plum Tree 10 60,000 600,000 3 5 Eucalyptus Tree 76 15,000 1,140,000 6 Jack Tree 135 100,000 13,500,000 D Allowances 14,200,000 1 Transport allowance Household 1 2,000,000 2,000,000 2 Relocation subsidy Person 8 900,000 7,200,000 3 Timely movement incentive Household 1 5,000,000 5,000,000 Total 372,933,319 Soc Trang - My Tu transmissionline * No Components Unit Quantity Unit cost Amount A Compensationfor Land 77,797,500 1 Residential land m2 307.5 46,000 14,145,000 2 Annual trees land m2 1,845 21,000 38,745,000 3 Perennial trees land m2 922.5 27,000 24,907,500 I B Compensationfor house 607,93-8,000 1 Cat.4 mr 195 1,354,000 264,030,000 2 Temporary m2 466 738,000 343,908,000 C Compensation for trees 39,675,000 | 1 Eucalyptus Tree 59 15,000 885,000 2 Mango Tree 92 200,000 18,400,000 | 3 Bead-tree Tree 8 60,000 480,000 4 Star-apple Tree 10 100,000 1,000,000 5 Coconut Tree 50 200,000 10,000,000 6 Plum Tree 16 60,000 960,000 7 Jack Tree 5 200,000 1,000,000 I 8 Bamboo Tree 6 50,000 300,000 9 Orange Tree 17 100,000 1,700,000 10 Palmyra Tree 3 100,000 300,000 11 Longan Tree 7 200,000 1,400,000 12 Banana Tree 226 5,000 1,130,000

Power Company No.2 Page 108 Power Engineering & Consulting Company No.3 I*_ Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transniission lines and substations in Southern Vietnam I 13 Shaddock Tree 7 200,000 1,400,000 _* 14 Cheiry Tree 12 60,000 720,000 D Compensationfor others (Kitchen, WC, cattle cage, .. 30,615,000 E Allowances 158,300,000 I 1 Transport allowance Household 14 2,000,000 28,000,000 2 Relocation subsidy Person 67 900,000 60,300,000 3 Timely movement incentive Household 14 5,000,000 70,000,000 Total 914,325,500 * Binh Thuan Province Mui Ne substation

No Components Unit Quantity Unit cost Amount A Compensationfor Land 3,345,200,000 1 Residential land m2 1,700 1,000,000 1,700,000,000 2 Perennial trees land m2 5,484 300,000 1,645,200,000 I B Compensationfor house 131,360,000 1 Cat.4 m2 160 821,000 131,360,000 I C Compensationfor trees 12,055,000 1 Star-apple Tree 11 120,000 1,320,000 2 Mango Tree 40 140,000 5,600,000 3 Coconut Tree 16 180,000 2,880,000 U 4 Plum Tree 10 140,000 1,400,000 5 Eucalyptus Tree 15 25,000 375,000 6 Jack Tree 4 120,000 480,000 I D Compensation for others (Kitchen, WC, cattle cage, ...) 11,600,000 U E Allowances 43,000,000 I Transport allowance Household 2 2,000,000 4,000,000 2 Relocation subsidy Person 10 900,000 9,000,000 3 Resettlement Households 2 15,000,000 30,000,000 Total 3,543,215,000

I Phan Thiet - Mui Ne transmission line

No Components Unit Quantity Unit cost Amount A Compensationfor Land 1,108,027,200 I I Residential land m2 3,322 257,600 855,747,200 2 Annual trees land m2 2,650 95,200 252,280,000 B Compecnsationfor house 604,260,000 1 Cat.4 m2 810 746,000 604,260,000

I Power Company No.2 Page 109 Power Engineering & Consulting Comnpany No.3 I I I 3 Transmissioni, distribution and disaster reconstruction Project - Vietnam 11OkV Tranismission lines and substations in Southern Vietnam I C Cornpensation for trees 27,410,000 I 1 Eucalyptus Tree 62 25,000 1,550,000 2 Mango Tree 74 140,000 10,360,000 3 Star-apple Tree 9 120,000 1,080,000 4 Coconut Tree 52 180,000 9,360,000 5 Plum Tree 19 140,000 2,660,000 6 Jack Tree 20 120,000 2,400,000 D Compensationfor others (Kitchen, WC, cattle cage, ) 22,242,600 E Allowances 249,900,000 1 Transport allowance Household 12 2,000,000 24,000,000 2 Relocation subsidy Person 51 900,000 45,900,000 3 Resettlement Household 12 1,500,000 180,000,000 Total 2,011,839,800 Lam Dong Province

Di Linh - Duc Trong transmission line No Components Unit Quantity Unit cost Amount A Compensationfor Land 549,812,310 I 2 Residential land m 1,206.37 430,000 518,739,100 2 2 Annual trees land m 2,158.73 5,500 11,873,015 3 2 Perennial trees land m 5,485.77 3,500 19,200,195 B Compensationfor house 2,063,040,000 I Cat.3 m2 588 750,000 x 30% 132,300,000 aI2 Cat.4 Ml 3,106 600,000 x 30% 559,080,000 3w Cat.4 m2 1,880 600,000 1,128,000,000 4 2 Temporary m 44 300,000 13,200,000 C Compensationfor trees 1,456,960,000 1 Eucalyptus Tree 6 30,000 180,000 2 Pepper 16 120,000 1,920,000 3 Mango _ Tree 102 200,000 20,400,000 4 Coffee Tree 25,002 45,000 1,125,090,000 5 Coconut Tree 16 120,000 1,920,000 6 Plum Tree 5 80,000 400,000 7 Jack Tree 99 120,000 11,880,000 1V 8 Banana Grove 55 25,000 1,375,000 9 Shaddock Tree 3 100,000 300,000 10 Guava Tree 3 50,000 150,000

Power Cornpany No.2 Page 110 I Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project 11 OkV - Vietnam Transmnission lines and substations in Southern Vietnam

U 11 Star-apple Tree 4 120,000 480,000 12 Custard-apple Tree 136 80,000 3 10,880,000 13 Mulbenry m2 750 1,500 1,125,000 14 Tea Tree 30,000 6,500 195,000,000 3 15 Avocado Tree 158 120,000 18,960,000 16 Longan Tree 8 300,000 2,400,000 3 17 Durian Tree 211 30,000 63,300,000 18 Others Tree 12 100,000 1,200,000 D Compensationfor others (Kitchen, WC, cattle cage, ... ) 839,205,000 E Allowances 520,800,000 1 Transport allowance Household 33 2,000,000 66,000,000 I 2 Relocation subsidy Person 432 900,000 388,800,000 3 Timely movement incentive Households 33 2,000,000 | 66,000,000 Total 5,429,817,310 Notes: * Houses impacted by the project but these houses don't need to move out of the ROW (according to the Government Decree No.54/1999/ND-CP). These households will be compensated by cash equivalent to 30% of house value. Hau Giang Province | Chau Thanh substation No Components Unit Quantity Unit cost Amount A Compensationfor Land 435,030, 000 I Residential land 2 m 216 85,000 18,360,000 2 Paddy field m2 I 5,399 30,000 161,970,000 3 Garden land 2 m 5,660 45,000 254,700,000 B Compensationfor house 188,732,160 * Cat.4I M2 216 873,760 188,732,160 C Compensationfor trees and crops 114,400,000 I| I Paddy 2 m 6,000 2,000 12,000,000 2 Plum Tree 20 120,000 2,400,000 6 3 Mango Tree 150 500,000 75,000,000 4 Ivy Tree 100 250,000 25,000,000 D Compenisationfor others 8,500,000 1 Kitchen Item 3 500,000 1,500,000 I 2 Toilet Item 3 2,000,000 6,000,000 3 Power meter Item 2 500,000 1,000,000 E Allowvanices 44,820,000

3 Power Company No.2 Power Engineering Page 111 I & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 110kV Transmission lines and substations in Southern Vietnam

1 Transport allowance Household 3 3,000,000 9,000,000 2 Relocation subsidy Person 14 630,000 8,820,000 I 3 Occupation changing Person 12 1,000,000 12,000,000 4 Timely movement incentive Household 3 5,000,000 15,000,000 Total 791,482,160 Can Tho - Chau Thanh transmission line No Components Unit Quantity Unit cost Amount A Comnpensation I for Land 378,252,759 1 Residential 2 land m 1,980 85,000 168,300,000 2 Paddy I field m2 5,714 30,000 171,421,791 3 Garden 2 land m 857 45,000 38,530,968 B Compensation for house 1,768,049,800 |1 Cat.1 m2 125 1,177,800 147,225,000 2 Cat.4 mr 1,855 873,760 1,620,824,800 C Compensation for trees and crops 350,556,000 1 Paddy mrn 49,678 2,000 99,356,000 2 Plum 3 Tree 200 120,000 24,000,000 3 Mango Tree 266 500,000 133,000,000 4 Pomelo Tree 85 300,000 25,500,000 I 5 Ivy Tree 12 250,000 3,000,000 6 Orange Tree 80 200,000 16,000,000 I 7 Coconut Tree 6 250,000 1,500,000 8 Mandarin orange Tree 20 250,000 5,000,000 9 Rambutan Tree 62 300,000 18,600,000 10 Durian Tree 15 600,000 9,000,000 11 Mangosteen 3 Tree 26 600,000 15,600,000 D Allowances 752,060,000 1 Transport 3 allowance Household 28 3,000,000 84,000,000 2 Relocation subsidy Person 562 630,000 354,060,000 3 Occupation changing Person 174 1,000,000 174,000,000 4 Timely movement incentive Household 28 5,000,000 140,000,000 Total 3,248,918,559 Tien Giang Province 3 Cai Be substation and Branch No Components Unit Quantity Unit cost Amount A Compensation I for Land 255,318,000

Power Conpany I No.2 Page 112 Power Engineering & Consulting Comnpany No.3 *I Transmission, distribution and disaster reconstruction Project - Vietnam 110kV Transrrission lines and substations in Southern Vietnam

U~~~~~~~~~~~~~~~~~~~~~~~~1 Residential 2 land m 650 95,000 61,750,000 2 Paddy 2 field m 8,220 23,000 189,060,000 3 Garden land m2 140 32,200 4,508,000 B Compenisationfor *I- house 127,400,000 1 Cat.4 . m 196 650,000 127,400,000 C Compensationfor trees 1,950,000 1 Mango Tree 10 180,000 1,800,000 2 Plum Tree 6 25,000 150,000 D Compensationfor others (Kitchen, WC, cattle cage, ...) 17,600,000 E Allowances 20,800,000 I Transport allowance Household 4 2,000,000 8,000,000 a 2 Relocation subsidy Person 12 900,000 10,800,000 3 Timely * movement incentive Household 4 500,000 2,000,000 Total 423,068,000 Vinh Long and Ben Tre Provinces

Vinh Long - Cho Lach transmission line No 3 Components Unit Quantity Unit cost Amount A Compensation for Land 392,174,400 1 Residential 2 3 land m 1,844 19,300 35,589,200 2 Paddy 2 field m 6,191 19,300 119,486,300 3 Perennial 2 trees land m 12,198 19,300 235,421,400 w ~~~~4Others Ml 3,355 500 1-,677,500 B Compensation for house 156,000,000 1 Cat 4 m2 1,300 120,000 156,000,000 C Compenisation for trees and crops 512,028,000 I a Trees and crops on permanent affected land I Paddy 2 m 6,191 1,200 7,429,200 2 Fruit-trees 2 m 12,198 600 7,318,800 b Trees and crops on temporary affected land 1 Paddy 2 m 40,600 1,200 48,720,000 2 Fruit-trees 2 m 249,200 600 149,520,000 I a Trees and crops inside corridor but over safety distance 1 Fruit-trees 2 m 249,200 600 149,520,000 D Compenisation for others (Kitchen, WC, cattle cage, ..J) 19,320,000 Total 1,079,522,400 3 | Cho Lach substation

| Power 3 Conpany No.2 Page 113 I Power Engineering & Consulting Company No.3 Transmnission, distribution and disaster reconstruction Project - Vietnam 110kV Transmnission lines and substations in Southern Vietnam

l No Components Unit Quantity Unit cost Amount A Coinpen?sationfor Land 145,051,000 1 Perennial 2 trees land m 9,935 14,600 145,051,000 B Co0npensationfor trees and c) ops 144,000,000 I 1 Mango Tree 50 180,000 9,000,000 2 Longan Tree 300 100,000 30,000,000 3 3 Durian Tree 250 380,000 95,000,000 4 Mangosteen Tree 100 100,000 10,000,000 Total 289,051,000 Mo Cay - Cho Lach transmission line No Components Unit Quantity Unit cost Amount A Compensationfor Land 122,048,680 a 1 2 Residential land m 660 13,000 8,580,000 2 Paddy 2 field m 763 13,000 9,919,000 3 3 Perennial trees land m2 7,965 13,000 103,549,680 B Comnpensationfor house and structures 3 C Compensationfor trees and crops 1,737,995,000 1 Paddy 2 m 763 10,000 7,630,000 2 Eucalyptus Tree 31 10,000 310,000 3 Bead-tree Tree 40 10 400,000 4 Bamboo Tree 81 5,000 405,000 5 Mango Tree 690 300,000 207,000,000 6 Orange Tree 7,150 70,000 500,500,000 7 Palmyra Tree 200 300,000 60,000,000 8 Star-apple Tree 355 250,000 88,750,000 3 9Coconut Tree 755 300,000 226,500,000 10 Rambutan Tree 610 300,000 183,000,000 11 Plum Tree 380 100,000 38,000,000 12 Longan Tree 930 150,000 139,500,000 13 Durian Tree 440 500,000 220,000,000 14 Pepper Tree 85 100,000 8,500,000 * 15 Jack Tree 45 150,000 6,750,000 * 16 Shaddock Tree 145 350,000 50,750,000 D Allowvances 1,840,000,000 I* I Transport allowance Household 92 20,000,000 1,840,000,000 Total 3,700,043,680

[I Power Company No.2 Page 114 I Power Engineering & Consulting Company No.3 Transniission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmission lines and substations in Southern Vietnam

Table 9.5.2 Summary of Compensation and Rehabilitation

0 No Components ~~~~~~~~~~~~~~~~~Compensation Allowances Total Land House Trees and crops Structures 1 Soc Trang province

My Tu substation 249,953,319 81,240,000 27,540,000 14,200,000 372,933,319 Soc Trang - My Tu T/L 77,797,500 607,938,000 39,675,000 30,615,000 158,300,000 914,325,500 2 Binh Thuan province

Mui Ne substation 3,345,200,000 131,360,000 12,055,000 11,600,000 43,000,000 3,543,215,000 Phan Thiet - Mui Ne T/L 1,108,027,200 604,260,000 27,410,000 22,242,600 249,900,000 2,011,839,800 3 Lam Dong province

Da Lat No.2 substation *

Di Linh-Duc Trong T/L 549,812,310 2,063,040,000 1,456,960,000 839,205,000 520,800,000 5,429,817,310 4 Hau Giang province

Chau Thanh substation 435,030,000 188,732,160 114,400,000 8,500,000 44,820,000 791,482,160 Can Tho - Chau Thanh T/L 378,252,759 1,768,049,800 350,556,000 752,060,000 3,248,918,559 5 Tien Giang

Cai Be substation 255,318,000 127,400,000 1,950,000 17,600,000 20,800,000 423,068,000 6,7 Vinh Long and Ben Tre

Vinh Long - Cho Lach T/L 392,174,400 156,000,000 512,028,000 19,320,000 1,079,522,400

Power Cormpany No.2 Power Engineering & Consulting Company No.3 Page 115 m rn m - m - m - m - - m - m m m m - Transmission, distribution and disaster reconstruction Project - Vietnam m m - I I okV Transmnission lines and substations in Southern Vietnam

Cho Lach substation 145,051,000 144,000,000 289,051,000 Mo Cay-Cho LachT/L 122,048,680 1,737,995,000 1,840,000,000 3,700,043,680 Total 7,058,665,168 5,728,019,960 4,424,569,000 949,082,600 3,643,880,000 21,804,216,728 Notes: * Da Lat No.2 substation: Since acquired land used for the Da Lat No.2 substation is public land (forestry land), so compensation cost can be regarded as insignificant.

Power Com,pany No.2 Page Power Engineering & Consulting Com,pany No.3 116 Transmission, distribution and disaster reconstruction Project - Vietnam I IOkV Transmission lines and substations in Soutlhern Vietnam

9.5.3. Management

Management

Cost for staff of PMB and CRCs includes in: physical basis, salary and allowance for administrative organization. The local PMB and CRCs shall undertake many works during the project implementation and only some members will be contracted to work for a certain period of time. * PC2 PMB I staff x 3 months 3m/m Local PMBs 1 staff x 7 x 3 months 21mi/m * Provincial CRCs 1 staff x 7 x 3 months 27m/m * District CRCs 1( x 15) staff x 3 months 45m/m Commune People's Conmmittee (1 x 40) x 3 months 120m/m Total 216m/m Total cost of Management 500,000,000 VND (including basic salary, allowances, traveling, meetings and admin, expenses)

Training, workshop, information campaign etc. One intermediate training course and one primary training course are proposed to be organized riglht at the beginning of the RAP implementation and one workshop is proposed to be held at the commencement of actual payment of compensation The training course and workshops are to be organized in each of the project related province within a short course of time i.e. 1 day Total cost of training courses and workshop is estimated at 330,000,000 VND. 9.5.4. Monitoring The independent external monitoring of RAP implementation is estimated at about 2% of total cost of compensation/rehabilitation and RAP preparation. The interested independent external monitoring agency will prepare the technical and financial proposals for bidding and actual cost will be decided through procurement for independent external monitoring agency. 9.5.5. Contingency

The rate for contingency is estimated about 20% of total cost of compensation and RAP preparation and implementation.

9.5.6. Total cost of RAP implementation

Power Company No.2 Power Page 117 I Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

The overall cost of RAP implementation is integrated in the table below. Table 9.5.6 Total cost of RAP implementation

Components Amount 1. Preparation of RAP and DMS Initial state - Preparation of RAP 1,081,251,412 Implementation stage - DMS 1,700,000,000

Sub - total 1 2, 781,251,412 I 2. Compensation and Rehabilitation Compensation 18,160,336,728 Compensation for land 7,058,665,168 Compensation for house 5,728,019,960 Compensation for trees and crops 4,424,569,000 Compensation for structures 949,082,600 Rehabilitation 3,643,880,000 Transport allowance 2,065,000,000 Relocation subsidy 884,880,000 Timely movement incentive 298,000,000 Occupation changing 186,000,000 Resettlement allowance 210,000,000 Sub - total 2 21,804,216,728 3. Management

Management 500,000,000 Training, workshop, information campaign etc. 330,000,000 Sub - total 3 830,000,000 4. External Monitoring = 2% of (1+2) 491,709,363 Sub - total 4 491,709,363 5. Contingency = 20% of (1+2) 4,917,093,628 Sub - total 5 4,917,093,628 Grand Total (1+2+3+4+5) 30,824,271,131 Notes:

- Budget for RAP implementation will be from the counterpart fund i.e. EVN - Cost of preparation of RAP are included in subproject estimates.

Power Comnpany No.2 Page 118 I Power Engineering & Consulting Conpany No.3 Transrmission, distribution and disaster reconstruction Project - I I OkV Vietnam Transmnission lines and substations in Southern Vietnam

CHAPTER 10 I DISCLOSURE

| Drafts of Policy Framework and Entitlement Matrix has been disclosed at the project related People's Committees' offices of 11 districts, 2 towns and 2 cities of |7 project related provinces. Draft of RAP has been disclosed at 7 offices of the project related Provincial People's Comrmittees and at Vietnam Development and Information Center (VDIC) of World Bank office in Hanoi. All feedbacks from local authorities and PAPs are integrated in this RAP. RAP will be finalized after obtaining the WB's clearance and the provincial | People's Committee approvals. I

I

P

I

111 ~ Poe opayN. [ll Pg 1 I -

I ~ Power Comnpany No.2 Page 119 Power Engineering & Consulting ComXpany No.3 I. | Transmission, distribution and disaster reconstruction Project - Vietnam 1 lOkV Transmission lines and substations in Southern Vietnam

I APPENDICES

APPENDIX 1: MAPS OF PROJECT AREAS

APPENDIX 2: POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION

APPENDIX 3: ENTITLEMENT MATRIX APPENDIX 4: AGREEMENT ON SUBSTATION LOCATIONS AND TRANSMISSION LINE ROUTES APPENDIX 5: AGREEMENT ON RESETTLEMENT PLAN REPORTS | 1 APPENDIX 6: COMMUNITY PARTICIPATION MEETING APPENDIX 7: SAMPLE OF QUESTIONNAIRE

APPENDIX 8: SAMPLE OF PAMPHLET

APPENDIX 9: HOUSING CATEGORIES * (VIETNAM CONSTRUCTION STANDARDS) APPENDIX 10: SOCIO-ECONOMIC HOUSEHOLD DATA SHEET OF I PROJECT AFFECTED PEOPLE APPENDIX 11: INVENTORY OF PROJECT AFFECTED PEOPLE

Power Company No.2 Power Engineering & Consulting Company No.3 I1 I Transmission, distribution and disaster reconstruction Project - Vietnam 1 IOkV Transmission lines and substations in Southern Vietnam I I I I

I APPENDIX I U MAPS OF PROJECT AREAS

l I I I

I

Il Power Cornpany No.2 Power Engineering & Consulting Company No.3 I Trung Thai- "'4);- LAND USE WITHIN PROJECT SITE CAN THO - CHAU THANH 10 KOV TRANSMISSION UNE. BAN D6 DjA DO VI TRI DItfNQ DAY 1 oKV CAN THC - CHAU THANH -/ 2 Thuan Tan L lih |' thin RH Thn , \\ I3t > 'finh Ntnh -

. ,

/ Ph&Bknh(4Px> '-~~~~~~~N..~~dp1U1UIN2 ¶VTrjjdng(H1in Tr! LEogI n , - / M

\\/ /- Dtile CiHAUThannel/fnh M; A, , Ph tJ eH*sng

-~ i-i.'-.- T UVPTOLog nnn JL¶O! uA- <-4 - m Naa fa4~j : t '' - C -'Al '--- ut .2 ,7hu T MM diBih (6)p39' ' ToThanhIrI %l R /en G I H6&B N Ip Thi T n l- _ Pn _T TA 1 n,..Phn(2 H T.T ITHANH s P,"rvinc0bundaly/RanhGiei~Trun Ccb,in/SBUnml;-- LTul K ,4YJ, /1WRNSISOHung itN Nhon18 Nho KhAnh RSn PhhHug l tTa ,zCdiS ~ 19VTRAteNSMSSONKINT63DK1KYUSAI$NTAU1@ C lBIAUJTN ThNDA HK BSTATIOIfhlnd/StfnNgieois ____ Ph Nhflu n / nh ung f _ ;___

116a L p 'C 1UVUDTAIO/RAIIKV ~

_ z r: P:vincetn:ndalylflanGHi uilnA oituUn/uil : g:ri; - L I

1, C-1 ......

I~~~~~~~~~~~~~~~~I

l~~~~~~~~wl

I~~~~~~~~~~~~f)l tC A AP LATZANVEViTMTRAM 1 BIEN IlOk 21/ Il\ 7 | I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~lW~~~~~~~~~~~~g I rInA(~~~~~~~~~~~~~~~~~~~~~~~~~~~~

I~~o I~~~~~~~~~~ I~~~~~~~h MY ILA ,AN IzXHIE \ \ Y X / '/' HIUM8UAT 'RUNG I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I 0 TAN'VILUGE ' A\ 'j&

Rol# * | O,O@- //,/ ,T X //, -A// IHANH VILLAGE<

'~~~~~-.-----.--\: s | | - - / ' '7 \ A CC't

UitrtramcttakhudStrun9ciheue9huyn863achalkhon95omthucapHipXaionuhuyecaiBestThTidGian OKmJ 1 2 4Km CHUTHiCH - LEGENDS: |~~~~~~~~~~~~~~~~~~~~~~~~HE TRIIL; V ,-GNE

I TUAID0RG\,>/,//-/y/ 6 2 /~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Hi AII

U 'ia / / fi --- _ S , C .>E I n~ . -

l I-Afg ' \XP S * X ll~~~~~~~~~~~' * -T . 0DWCITAY VILLAGE -

STT/No. LOAI DAT Sa DUNG/ DESCRIPTION D~~~~~~~~~TIENTRi CT HOAKTHUANH/RAKlmtr E 1K'SBTTO DONG HOAHIEP ONG H6A HItP VILlAGE IT7T.CAl BE CABE1 TOWN

VI TRI TRAM (PAZ CHON)/ SITE OF CAI BE SUBSTATION (ALTERNATIVE 2) TY LE XICH: VI tritram dot t4i khu dgt ruong c4nh dtfdng huy0n 863 chch 0L1 kha&ng500m th,uQc gpiti.-4t, xMi1,i4,huyGn CAI Bb,tTnh Tidn Giang 0Km 1 2 4Km CHO THICH - LEGENDS: Thesie ofCal Be substation islocated atHau Thuan hamist, HauThauh vIllage, CaiBe ditrc, lien Glangprovince andat tIe fieiarea near No. 883 road (500in fromi NO. highway). ______

I DIPIN TICHDATXTRAM DAT CHO DL% AN / CONTRUCTION SURFACE(AREA) OF THEPRJCPROJECT T6NGCtNGTY0|t k vA UT NABImx90m=8100m2DAY A D1,! KPV NHAKNH EMI Kilometers - NEWll1KV SUBSTATION

STT/No.3DAT LOAI StI7DVJNG I DESCRIPTION DIEN TrCH TH6A THuAN / AREA 2 1 HANH LANG TUYON E)IONG DAY 122kV NHANH R2 vAO TRAM 15m x 6Dm- 90Cm LAND AREA FOR I10kV BRANCH TRANSMISSION LINE PLA N 6 2 DAT xAY DUNG TRAM 9CM X 9CM = 8100M2 T NG CONG TY EI~ RMBE P 1/2VClB LAND AREA FOR CONSTRUCTION SUBSTATION 102K A ESBTTO

3 EU6NGvAO TRAM 13m x 7Cm = 91CM2 POWER ENGINEERIM IUl AND 110 KV BRANCH TRANSMISSION LINE

I b&kf | LLrU LAND AREA FOR ROAD ACCESS INTRANCEl DuTONG ANSUBSTATION DIEN 1 iCH DAT CHO 11 31 Om2 l P imdcAb DLrC HUY I < I NGHialistCRepHAbTHITRAM BIEN AP 1 ST0/22KV 'AlB 2

4 HANH LANG f)UdNG DAY 22kV XUAT TUYEN 2Cm x 7Cm = 140CM 2 BANjet06angerTRuI TRAMu LAND AREA FOR 22kV FEEDERS Cifferet Tg ~S BT TO ' IEPA BranchP.Manager L6 Dinh Trufng S B T TO ' IEPA T6NGDIEN TICH DATCHO DL,! AN 1131Cm2 LKHA - NGHNGHI~~~~~~~~~~~~~~~~DsNneCbyU THIHuFEASIBIALTIITYEASTUDYT STUY 07200 TOTAL AREA Ki4mhaI | l TOTAL AR EA | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1 .6 DinhL Trnr ng TR1-04.22BEDN-03V1 |0 l ~~ ~ ~ ~ ______Ce e bL i h Ti c n R - 4 2 8 E - 310 7 | '; 0 t t

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~D

~~~~~~~~~~~~~~~~~~~~~~ ~ ~ ~.~ ~ ~ ~ ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~C

:AN jIDAT C6NG NGHI KHO TANG . I - -== -.-

~ ~ ~ ~ ~ ~ AMTR~A E)AT~ TRUONG HOC~ CHUYEN~ NGHItP ~ ~ ~ ~ ~ A ARE M- N-O .~~~~~~~~~~~~~~~~~~~~~~~- -~~~~~~~~~~AYf ~~~~~-~~~~~~~~~'~D S W C * _ - Z~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~A I

<------IsusnerE..,+y.OATQUANSUDATDUTRUPHATTRIfN~~~~~~~~~~~~~~~~~~~~------

DAT GA XNH CN VIENDTDlTTC |~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~EiTFU- TA ,'NGCN

I _0--- DAiT TLAVNGHOCu§NHge=M^ *~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~IFCARE

Di T_CH ARE ___ | I ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~f. - ~ - ~ ~ ~~ ~ ~~ ~ ~ ~ ~ ~ ~ ~

1 KtHULe HC 4r-D i .-'TO LE ,CA.1 VP4O.L AREIA/

/ }- t

0 '' s~~~~.IOI.1A 0 " No lA HTOIGHWAY

TRAM I MOI Nt, MCJIDU ~,, Nt -''-

- - - -7- - (37 SE II 1IOkV PHAN THI6T - - - - - DUONG DAY - MUI NE TRANSMIS SION LANNED _ - - 1P

t THIETjc TORSAE SAIGONP~~~~~~~~~~~~HAN

KUO IC O SAiGONPHATIETU TOURLISHHAREAN KHU~ DU LICH su6I~ TitN ~ ~ ~ ~ ~ ~ ~ HUULCH6ION (W)@ U C T B Y T U IS R AL3 - t 5^ _____993 ~~TO9 iBENt~ XE- NGOAI TH-/ _ LANGTRE ~ TOURIST~KHUHU AREA RA~ ~ CDLY~ H ~.Hk D_-~~~~~~~~~~Uf IE TUIS AE HONRO TORS S AREAo^l OH NT O RSA REAb ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~D

KHOLY NUOC THAI WAV]XWATEE R EAIWNT KHU DU LICH DUN cAT BAY CHU THICH KHU XUfLY RAC THAI ~~~~~~~~~~~~~~~~~~~~LEGEND GAMAGEDISFOSM DUN CAT SAY TOURIST AREA

______FXR~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~DINGDAY 110OkV HIr-N HOJU = ,T=ARE d NG OAT LAM MU6I LA~9T^TGAT__, I lO~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1kVTRANSMISSION LINE EXISIING c6N CAT A SAN CAT EX.KdNG DAY I110kV DV,KIgN XDM I~~~~~~~~~~ I 10kV TRANSMISSION LINE PLANNED

CANG,----- TRAM BItN AP I110kv H16N HOJU 110~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~9-k V SUBSTATION EXIS77IM SANBAY Dt,! KI(EN XDM -- TRAM BICN AP GUONG O- - ~~220kV. 110kV SUBS TA iON PLANNED ------EIUONG sAT -GA RAIWAY

13t~NXE E064 NGOAI BW rAO DAYllOkV S6CTRANG - M9 TO 1. SOC TRANG -MY TU II OkV TRANSMISSION LINE/ SUNG 2. MY TU 11 OkV SUBSTATION/TRAM BIEN AP 11 OkV M9 TO

T W% Ch6a a V6n V LAn T khl,. 7 a's .7y Mba L-V A %mo TN A .1 W M., Khm II, L6 An T*3 xA An H14p. 4 11 A ft Loa gA Som Rilh

V. - 14 ji kV Tirr I I , A '.. t MU-9 KW f ift Low A I.. :7 vdr.9 L tt 7 4p ml DIX 0,3 a "I M. A DA v %I P c, L Cs ..4 is -yHucng BOV Yttp 14r .%. '."t Nb& 3 7 H68 Loog: Win HN (J6

Thibn Tinh C4*a '3W fto. 'O.4 0,3 6 11N. 0, Oft N6 kh6mg m A .0 4 Has. 10 Ph6 Ninh 7 efu xic 0.9 phubng _kl 0A. G.5 U w A lr GA Tri C Kh MA NO 140 phutngi malp khan 4 ...... RF k T. 0.3. Tto. MIM Xh Lar A :' k 7 JA 4. % cjuq*Abko hUOng 4 Z. xA An Ninh PL..A 0 OZVH ;.mfr_ % #ch 0 Chiv TMO, KtnmNdi Kh. ftfiuTwh aj 61 twe" ude Kh. irb Lby hdu, blin 81nhp Ph.2 ngO o-P J, a., PhO T4fC .. I QL" C6. J H, 16- i V DUN 4 T NO2 ToAM A2 'DJ V, - W TU S& D2 N TA Ul ahoo ra Ag G-U 71) 1 1CkV phttbng Io UkAll DJ L Ts, $X -na 6m,alA

MOM t, Xi Phu My N^ Wm 9 A2 86 06 T; An DD Btmg IC&

A VIM' 35 Tim 0(Wn DI r

Xi TU#" HLing 16LAn I aLM3coc x II't, Tq An Al 00 u,

rem 86c A u TIM ChAu . -oc rem, S6c ------D.'s An !.,\ /' Tim , 0 eW - Tom S&ez ;0-1` tim r Bk Din If-A. TAMN. 191A T Ue ci A----`--' e xi Dqi T& 4.41- xi Mg Thuon

- T An RIVER, CANAL12SONG, KINH RACH 11 OkV TRANSMISSION LINE EXISTING SOIL/IDAT NONG NGHIP TRANG - MY TO THItT Kt DAI 167321-n AGRICULTURAL SOC TRANG - MY TU IlOkV TRANSMISSION LINE - eD IlOkV SOC, L:s VILLAGE KHU DAN CU 22OkV, IlOkV SUBSTATION

I lOkV SUBSTATION EXISI ING | THE 110KV MO CAY - CHO LACH LINE - BEN TRE PROVINCE |DLJONG DAY 1 10 KV MO CAY - CHO LACH - TINH BEN TRE

. i_.CHdL~~~LAH NHd, ErI1

J H.~~ BIN AN ~ ~~~~~~~~~~~~~~~~~~~~~IV| = _ ~~~~~~~ ~

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

4 & THA I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~t

t I ~~~~~~~~~~~~~~~~~~~~~~~~Legend/chIUgiAi ______huy4nP.nTbfg dii Mi, dW" .dn

ChA U -. el-hn.l.eh dii, -dd thi |~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~o A11^l ^°H ... 1t=.

I <.. .*.N.n.N....i.>m---^*-">M>,>st

.. .oeldely .f eflibi,en,eddip ghhh.1 i y ...... 9...... l I l".||_ . ,.,s.W .....aEis"-Mb-.pR-=esa-DrIc.->I~~~~~~~ip h t fid . do -

, isi.h bndMdOn 0194 4 di iiO~~~~.pie.,. fietenff4.MO ~ ~ ~ ~ ~ ~~~~~~~4 o, o elyliehO~ ~io.d&)dhng ~ ~ nhdi ~ ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

Ahehd nerdA)ed h a.o.*d.i1.dgeypd

Tieph.ll0 WLf ondgOddiI0 hRn - PRO .. d.W I~~~~~~~~~~~~~~~~~~~~~~~~~~~~--.WA1.U dhW I~~~~~~~~~~~~~~~Wf t YD-r DIf'NG DAY I 1OKV VINH LONG - CHO LACH 110KV VINH LONG - CHO LACH TRANSMISSION LINE

, 'a-,,G 100.0; .:St ; ;5 099 . <- |I| x , kV G th 1 n 2 jn,o I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~2vt' G4 llrW'Jrnh :3 ationaCo LghwcyuNboto

~~~ %~77

Pham Rung Memor~3j O .. * .G8S-: oofri

a r a Xn n * l~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~GfCoBam L h .6 |; 5- at 6aH h G8 IS _

- 'I%ti'~~~~~~~~~~ff'aIHqh~~~~~~~..1 N 53

I * 0 A O IE OT

ELECTRICflY OFViE NAM

POWER ENGINEERINGEN INERNGCONULTIG CONSULlING COMPANYOMPNYNO1 NO.1 110KVII KVTR TRANSMIS~~~~~~~~~~~~PWE NSMS UNEUN I 1 1OKV VINH LONG-GCHO LACH TRANSMISSION LINE MAP OF LINE ROUTE Manager of Depart Vu Quang Dungf Projei managr Van Xuan Anh Check Le Dinh Cuong FS 512004 2904fDO

Design N 2004nThDD01 ONOW.L 3.00-HWin ia A)1OL I A'fU NONJiIG . ~

I V~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Vin- K~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Hni

lidA-- I- -"usx

NPM AO Aicia Ara -- -N

nnNown'Mr NIIN mocc 4va c

(iLL AuLLaaaI2rI fr.. l ON 10* -- JW. 'a * NJINflOA~~OuAyusNQ41u 4IUW%¶~~4~4*I$+tItP

(iLAGLI bf _____ T 9 - Lb 1

roH~~~~:Il~~~::a4,P? ' - .6-f I.6W.La,' flflHPiOIHAqOtiAyODNQlU- - Al- I. .-. -r

I Ir~~~~~

I/ - Transmnission, distribution and disaster reconstruction Project - Vietnam 1 IOkV Transmission lines and substations in Southern Vietnam l l I I

APPENDIX 2

POLICY FRAMEWORK FOR I COMPENSATION, RESETTLEMENT AND REHABILITATION I I I' I I I I

Power Company No.2 Power Engineering & Consulting Company No.3 | Transmission, distribution and disaster reconstruction Project - Vietnam 1 lOkV Transmission lines and substations in Southern Vietnam

POLICY FRAMEWORK FOR COMPENSATION, RESETLLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS I TABLE OF CONTENTS

* Section 1: Introduction

A. Policy Framework B. Project Affected people C. Principles and Objectives D. Inventories X E. Resettlement Plans

Section 2: Institutional and Legal Framework

A. Institutional Framework B. Legal Framework

* Section 3: Entitlement Policy

* Section 4: People's Participation

Section 5: Baseline Information

* A. Inventories B. Resettlement Plans

Section 6: Implementation Arrangements

A. Implementation Schedules B. Complaints and Grievances C. Supervision, Monitoring and Evaluation

Section 7: Costs and Budget l

I Power Company No.2 Appendix 2 - Page 1/14 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

* SECTION I INTRODUCTION

A. Policy Framework 1. This resettlement policy framework prepared based on the OD4.30 of the World Bank on involuntary resettlement. The principle objective of the Policy Framework is to ensure that all project affected persons (PAPs) will be compensated for their losses at replacement cost and provided with rehabilitation measures to assist them to improve, or at least maintain, their pre-project living standards and income earning capacity. I 2. The Policy Framework lays down the principles and objectives, eligibility criteria of PAPs, entitlements, legal and institutional framework, modes of compensation and rehabilitation, people participation features and grievances procedures that will guide the compensation, resettlement and rehabilitation of the PAPs. B. Project Affected People (PAPs) 3. The PAPs include the following persons to be identified by the baseline information I collected for each of the Inventories and Resettlement Plans as specified in Section 5 of this Policy Framework: I - Persons whose houses are in part or in total affected (temporarily or permanently) by the project; - Persons whose premise and/or agricultural land is partially or totally affected (temporarily or permanently) by the project; - Persons whose businesses are affected in part or in total (temporarily or permanently) by the project; and - Persons whose crops (annual and perennial) and trees are affected in part or in total by the Project. C. Principles and Objectives 4. The principles outlined in the World Bank's Operational Directives 4.30 have been adopted in preparing this Policy Framework. In this regard the following principles and objectives would be applied: (a) Acquisition of land and other assets, and resettlement of people will be minimized as much as possible. (b) All PAPs residing, working, doing business or cultivating land in right of way of transmission line, surrounding areas of tower foundation, the surveys are entitled to be provided with rehabilitation measures sufficient to assist them to improve or at least

Power Company No.2 Appendix 2 - Page 2/14 Power Engineering & Consulting Comnpany No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

maintain their pre-project living standards, income earning capacity and production levels. Lack of legal rights to the assets lost will not bar the PAPs from entitlement to such rehabilitation measures. (c) The rehabilitation measures to be provided are: (i) compensation at replacement cost without deduction for depreciation or salvage materials for houses and other structures; (ii) agricultural land for land of equal productive capacity acceptable to the PAP or in cash at replacement cost according to PAP's choice; (iii) replacement of residential/premise land of equal size acceptable to the PAP or in cash at replacement cost according to PAP's choice, (iv) and transfer and subsistence allowances. * (d) Replacement residential and agricultural land will be as nearby as possible to te land that was lost, and acceptable to the PAP. I (e) The resettlement transition period will be minimized and the rehabilitation means will be provided to the PAPs no later than one month prior to the expected start-up date of works in the respective Project site. (f) Plans for acquisition of land and other assets and provision of rehabilitation measures will be carried out in consultation with the PAPs, to ensure minimal disturbance. Entitlements will be provided by PAPs no later than one month prior to expected start-up of works at the respective project site. (g) The previous level of community services and resources will be maintained or improved. (h) Financial and physical resources for resettlement and rehabilitation will be made I available and as when required. (i) Institutional arrangements will ensure effective and timely design, planning, consultation and implementation of the Inventories and RPs. (i) Effective and timely supervision, monitoring and evaluation of the implementation of the Inventories and RP will be carried out. D. Abbreviated Resettlement Plan 5. In case less than 200 people are affected by each sub-project components, an I Abbreviated Resettlement Plan will be prepared by the respective Project Management Board (PMB) and consolidated by EVN for any given, and furnished to the World * Bank for its concurrence. 6. Each Abbreviated Resettlement Plan will be included: (1) a census survey of affected persons and valuation of assets; (2) description of compensation and other resettlement assistance to be provided; (3) consultation with affected people about acceptable alternative; (4) institutional responsibility for implementation and

Power Coi-npany No.2 Appendix 2 - Page 3/14 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 1IOkV Transmnission lines and substations in Southern Vietnam

procedures for grievances redress; (5) arrangements for monitoring and implementation; and (6) a timetable and budget. 7. The Abbreviated Resettlement Plan will be completed no later than four months prior to the estimated date for commencement of works under the project. Each Abbreviated Resettlement Plan will be fmrnished to the World Bank for consideration no later than three months prior to the actual initiation of the works under the Project. Compensation, resettlement and rehabilitation activities will only commence after the World Bank as found acceptable the respective Abbreviated Resettlement Plan and EVN has approved it. The compensation, resettlement and rehabilitation activities will be completed before awarding the contracts of civil works under each sub-project. E. Full Resettlement Plan 8. In case more than 200 people are affected by each sub-project component, a Full Resettlement Plan will be prepared by the respective Project Management Board (PMB) in accordance with the provisions of this Policy Framework. The RP will be furnished by PMB to the World Bank for its concurrence. 9. Each full RP include: (1) description of the project; (2) project potential impacts; (3) objective; (4) socio-economic studies; (5) legal framework; (6) institutional framework; (7) eligibility; (8) valuation and compensation for losses; (9) resettlement measures; (10) site selection; site preparation and relocation; (11) housing, infrastructure, and social services; (12) environmental protection and management; (13) participation and consultation; (14) integration with host population; (15) grievances procedures; (16) organizational responsibilities; (17) implementation schedule; (18) cost and budget; and, (19) monitoring and evaluation. 10. Each RP will be completed no later than four months prior to the estimated date for commencement of the works. Each RP will be furnished to the World Bank for consideration by no later than three months prior to the actual initiation of the works under the Project. Compensation, resettlement and rehabilitation activities will only commence after the Work Bank found acceptable the respective RP and EVN approved it. The compensation, resettlement and rehabilitation activities will be completed before awarding contracts of civil works under each sub-project. l I

Power Conpany No.2 Appendix 2 - Page 4/14 Power Engineering & Consulting Company No.3 I1 Transmission, distributioln and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam SECTION 2 INSTITATIONAL AND LEGAL FRAMEWORK

A. Institutional Framework 11. The responsibility for preparing and implementing the Policy Framework and I RPs are as follows: (a) The overall responsibility for enforcement of the Policy Framework and for planning and implementing RPs rests with Power Companies in charge of EVN (EVN PMB). PMB is responsible for preparing Inventories and RPs and for the day-to-day implementation thereof within their respective jurisdiction. The I people committee at the commune level will ensure the active and effected participation of the PAPs in the preparation and implementation of RPs. In order to have RPs acceptable to the World Bank to implement RP smoothly, EVN PMB is responsible for (i) hiring qualified consultants to prepare RPs; (ii) 3 appointing qualified social safeguard staff at each PMB. (b) Funds for implementing RP will be from EVN funds, established in consultation with local governments (provincial, district and commune peoples committees) and the PAPs. B. Legal Framework 12. The legal framework governing the implementation of this Policy Framework and the Inventories and RPs are OD 4.30 on Involuntary Resettlement of the World Bank and Vietnamese laws:

3 - The Land Law of Vietnam dated July 14th, 1993. Amendment dated November 26 th, 2003.

| - The Decree 197/2004/ND-CP issued by GOV on December 3rd, 2004, in replacement of Decree 22CP, regulates compensation, support and resettlement when land is recovered by the State. This Decree guides the imnplementation of compensation for land, compensation for property, support I policies and resettlement relating to land acquisition.

- The Circular No. 116/2004/TT-BTC issued on December 7th, 2004 by the | Ministry of Finance provides guidelines to implement the Decree 197/2004/ND-CP.

| - The Government Decree No. 54/1999/ND-CP dated July 08th, 1999 on safety protection of high voltage electrical network.

3 Power Company No.2 Appendix 2 - Page 5/14 Power Engineering & Consulting Company No.3 I1 Transmission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam

- The Government Decree No.64/CP dated September 27th, 1993 on the distribution of agricultural land to the households in long term for the 3 agricultural purposes. - The Government Decree No.188/CP dated November 16th, 2004 on the method to determine land price and the price frame of land types.

- The Circular No.05/BXD-DT dated February 9th, 1993 of Ministry of Construction on the classification of house types. 13. Article 27 of the Land Law provides that: "In case of utmost necessity, when | the State recovers land being used by a land user for national defense, security, national benefit or public interest purposes, the land user shall be compensated for 3 damages"

1

l l l I I I

I Power Company No.2 Appendix 2 - Page 6/14 Power Engineering & Consulting Company No.3 I 3 Transmnission, distribution and disaster reconstruction Project - Vietnam 1OkV Transmission lines and substations in Southern Vietnam

| SECTION 3 ENTITLEMENT POLICY

14. PAPs will be entitled to the following types of compensation and rehabilitation measures: (a) PAPs losing agricultural land crops i) The general mechanism for compensation for lost agricultural land will be through provision of "land by land" arrangements of equal productive capacity, satisfactory to the PAP. I However, if the PAP prefers to receive cash compensation then the following applies:

- If the portion of the land to be lost represents 25% or less of the total area of the landholding, and the remaining land is still a viable economic holding, cash compensation, at full replacement cost, may be provided to the PAP; or

- If more than 25% of villager's agricultural land is acquired and the remaining holding is not viable then the Project will acquire the entire landholding and provide cash compensation at full replacement cost. ii) PAPs will be compensated for the loss of standing crops and fruit or industrial trees at market price. Productive trees will be compensated at replacement cost. Fruit trees will be compensated for the remaining harvests. I iii) PAPs whose land is temporarily taken by the works under the each sub- project will be compensated for their loss of income, standing crops and for I the cost of soil restoration and damaged infrastructure. Land will be rehabilitated after the project construction by PMB. | (b) PAPs losing residential land and house/structure i) The mechanism for compensating loss of residential land and structures will be: (1) the provision of replacement residential land (house site and garden) of equivalent size, satisfactory to the PAP or cash compensation at replacement cost according to PAPs options, and (2) cash compensation reflecting full replacement cost of the house/structures, without deduction 3 for depreciation or salvage materials or compensate in kind according to PAPs option. | ii) If residential land is only partially being affected by the project and the remaining areas are not sufficient for reorganizing PAPs then at the request I Power Company No.2 Appendix 2 - Page 7/14 Power Engineering & Consulting Cornpany No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transimission lines and substations in Southern Vietnam

of the PAP, the entire residential land will be required at full replacement cost. iii) If house/structure is only partially being affected by the project and the remaining areas are not convenient to using, the house/structure will be acquired at full replacement cost, without depreciation. iv) Tenants, who have leased a house for residential purposes will be provided with a cash grant of six months rental fee at the prevailing market rate in the area, and will be assisted in identifying alternative accommodation. | (c) PAPs losing business The mechanism for compensating loss of business will be: (1) the provision of alternative business site of equal size and accessibility to customers, satisfactory to the PAP; (2) cash compensation for lost business structure reflecting full replacement cost of the structures, without depreciation; and (3) cash compensation for the loss of income during the transition period. (d) PAPs will be also be provided compensation at full replacement cost, without deduction for depreciation and salvage material for any other fixed assets affected in part or in total by the project, such as tombs and water wells, etc. 15. In case where community infrastructure such as schools, factories, water sources, roads, sewage systems is damaged, PMB and EVN will ensure that these would be restored or repaired as the case may be, at no cost to the community. 16. Besides the direct compensation for the losses, PAPs also will be entitled to subsidies/allowances as stipulated in the Decree No.197 of GOV. These subsidies/allowances are below: Transport allowance (Article 27, Decree No. 197) This allowance is for PAPs who are totally impacted on houses and have to be move to new sites or reorganize to the remaining residential areas i) PAHs which have to move their houses to new places within the Province will be entitled to an allowance from 1,000,000VND to 3,000,000 VND (per household) ii) PAHs have to relocate out of their Provinces will be entitled to transport allowance from 3,000,000VND to 5,000,000 VND (per household). This subsidy allowance is for the transportation of their salvable materials and living facilities. Relocation Subsidy for Resettlement (Article 28, Decree No. 19 7) I

Power Company No.2 Appendix 2 - Page 8/14 Power Engineering & Consulting Comnpany No.3 I Transrnission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

This subsidy allowance is a food allowance for PAPs who are totally impacted on house and therefore have to reconstruct for their new houses. Each member of PAH will be subsidized 30 kg of rice (equivalent) /person/month in six months. Rehabilitation Allowance (Article 29, Decree No.197) PAHs or individuals who have directly farming production when Government recover more than 30% of productive land will be supported subsidy for changing occupation for labours of PAHs; with subsidy level and specific labours will be stipulated by PPC to agree to reality of local situation. Other Allowance (Article 32, Decree No.197) Timely Movement Incentive: Person, firm had acquisition land, timely dismantled, relocated following plan of RCC will have incentive 3,000,000 VND/ household (maximum is 5,000,000 VND/ household). 17. By the nature of the project impacts, the impacted categories are classified into 7 categories. The entitlement matrix is attached (see Appendix 3). I

I

I ~~~Power Cornpaniy No.2 Appendix 2 - Page 9/14 Power Engineering & Consulting Cornany No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

| SECTION 4 PEOPLE'S PARTICIPATION

18. The local authorities and its relevant organizations, PAPs and host communities will participate throughout the various stages of the planning and implementation of RPs. The PAPs will be fully informed of the provisions of this Policy Framework at public meetings held by the respective PMB and local authorities. 19. Each PAP will be fully informed and consulted by the relevant District ] People's Committee and/or Commune People's Committee of their entitlements and rehabilitation choices under the respective. I l l l l l I I I l I I

Power Conmpany No.2 Appendix 2 - Page 10/14 Power Engineering & Consulting Company No.3 Il Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

* SECTION 5

BASELINE INFORMATION

* A. Census and Inventory

20. The baseline information will include the following information for each household:

- Number of persons and names

- Number, type, and area of the houses lost

- Number and area of all the residential plots lost

I - Number, category and area of agricultural land lost

- Quantity and types of crops and trees lost

- Businesses lost including structures, land or other fixed assets

- Productive assets lost as a percentage of total productive assets

- Quantity and category of other fixed assets affected by each sub-project

- Temporary damage to productive assets

The inventory form is attached (see Appendix 11)

* 21. The entitlement of assets and land affected are calculated based on the above information.

B. Resettlement Plan

22. The baseline information for a RP will include: a) an Census and Inventory; and b) a detailed socio-economic survey of all PAPs describing their age, sex, ethnicity, education, occupation, sources of income, and total household income. The form for socio-economic is attached (see Appendix 10) I I I

Power Company No.2 Appendix 2 - Page 11/14 Power Engineering & Consulting Company No.3 Transmnission, distribution and disaster reconstruction Project - Vietnam I lOkV Transinission lines and substations in Southern Vietnam

* SECTION 6 IMPLEMENTATION AND ARRANGEMENTS

A. Implementation Schedule

I 23. A detailed implementation schedule of the various activities to be undertaken will be included in each RP. The RP implementation schedule must be developed based on the linkage to the civil work implementation schedule. 24. Payment of compensation and furnishing of other rehabilitation entitlements (in cash or in kind) and relocation if that be the case, will be compensated prior awarding contracts for civil works. * B. Complaints and Grievances First step

If any person is aggrieved by any aspect of the resettlement and rehabilitation program, he/she can lodge an oral or written grievance with commune authorities. Commune People's Committee will resolve the issue within 15 days from the date it receive the complaint. Second step

If any aggrieved person is not satisfied with the decision in Stage 1, he/she can bring the complaint to the District People's Committee (DPC) or District Resettlement Committee (DRC) within 15 days from the date of the receipt of the decision in Stage 1, the District People's Committee or District Resettlement Committee will reach a decision on the complaint within 15 days. Third step

If the PAP is still not satisfied with the decision at district level, he/she can appeal to the Provincial People's Committee (PPC) or Provincial Resettlement Committee (PRC) within 15 days of receiving the of the DPC or DRC, the Provincial People's Committee or Provincial Resettlement Committee will reach a decision on the complaint within 15 days. * Fourth step

If the PAP is still not satisfied with the decision at provincial level, the case may be submnitted for consideration by the District Court within 15days of receiving the decision of PPC or PRC.

C. Supervision, Monitoring and Evaluation

25. Implementation of RPs will be regularly supervised and monitored by the respective PMB in coordination with the respective People's Committee of district

Power Company No.2 Appendix 2 - Page 12/14 Power Engineering & Consulting Comnpany No.3 Transmission, distribution and disaster reconstruction Project - Vietnam l1 OkV Transmission lines and substations in Southern Vietnam

and cormnunes. The findings will be recorded in quarterly reports to be fumished to EVN. Internal monitoring and supervision will: - Verify that the baseline information of all PAPs has been carried out and that the valuation of assets lost or damaged, and the provision of compensation, resettlement and other rehabilitation entitlements has been carried out in accordance with the provisions of this Policy Framework and the respective RP.

- Oversee that the Inventories and RPs are implemented as designed and approved.

- Verify that funds for implementing the Inventories and RP are provided to the respective PMBs at local level (provincial/district) in a timely manner and in amounts sufficient for their purposes, and that such funds are used by the respective PMBs in accordance with the provisions of RP. - Record all grievances and their resolution and ensure that complaints are dealt with in a timely manner. 26. An independent agency or agencies or individual consultant will be retained by PMB of the EVN to periodically carry out external monitoring and evaluation of the implementation of RPs. The independent agencies will be academic or research institutions, non-Governmental Organizations (NGO) or independent consulting fimns, all with qualified and experienced staff and terms of reference acceptable to the World Bank. 27. In addition to verifying the information furnished in the internal supervision and monitoring reports of the respective PMBs, the external monitoring agency will visit a sample of 20% of households in each relevant province six months after | each RP implementation to: a. Detennine whether the procedures for PAPs participation and delivery of compensation and other rehabilitation entitlements have been done in accordance with this Policy Framework and RP. b. Assess if the Policy Framework objective of enhancement or at least restoration of living standards and income levels of PAPs have been met. * | c. Gather qualitative indications of the social and economic impact of Project implementation on the PAPs. d. Suggest modification in the implementation procedures of RPs, as the case may be, to achieve the principles and objective of this Policy Framework.

Power Company No.2 Appendix 2 - Page 13/14 Power Engineerinlg & Consulting Comnpany No.3 l 3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

| SECTION 7 COSTS AND BUDGET

Each RP will include detailed cost of compensation and other rehabilitation entitlements and relocation of PAPs. If that be the case, with a breakdown by agricultural land, residential land, business land, houses, businesses and other assets. The cost estimates will take adequate provision for contingencies. Sources of funding for the various RP activities will be clearly specified in the cost tables. For the sub-projects, funds for implementing RPs will be from EVN. EVN will arrange budget for implementing RPs of all subcomponents. I

I I I I I I I I I

Power Company No.2 Appendix 2 - Page 14/14 Power I Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

I

I APPENDIX 3

| | ENTITLEMENT MATRIX I l I I I I l

Power Company No.2 Power Engineering & Consulting CompanyNo.3 I Trainsmssionstribtandsaster reconstructinProject - Vietnam 110kV Transmission lines and substations in Southern Vietnam

Appendix 3 Entitlement Matrix

No Type of loss Application Defnition of Compensation Policy Implementation issues

I Temporaiy acquisition All PAPs The households - Cash compensation for: - Trees have to be cut are regulated by of productive land in have trees, with/ without land . The affected trees based on the Article 7 of Decree 54/1999/ND-CP and ROW crops, other registration paper type and age the Decree No. 11 8/2004/ND-CP of assets in included in the . The crops based on the crop type Government on the protection of the high ROW inventory or able and average productivity of the voltage networks. to prove land last 3 years. The quantity of crop - PMB and local authorities determine and occupancy prior will be compensated by affected ensure that compensation for trees will be to cut-off date. time. at the replacement cost and for crops at the - No compensation for land market price. If PAP is requested for - Rehabilitate land after the cutting affected trees, PMB will pay money project construction for this work. PAP has right for using salvable trees. - Full compensation at least 01 month before land clearance. Payment to PAPs will be delivered by PMB and Compensation and Resettlement Committees (CRCs). - Affected land in ROW will be rehabilitated by contractors after the project construction and land could be used with the restricted purposes. - Finance available for compensation and well information disclose/disseminate. 2 Temporary acquisition All PAPs -do- - Cash compensation for affected - Trees have to be cut are regulated by of residential and with fruit trees and trees at Article 7 of Decree 54/1999/ND-CP and garden land in ROW orchards or replacement cost. the Decree No.I 18/2004/ND-CP of without house or trees in - No compensation for land Government on the protection of the high structures in ROW ROW - Rehabilitate land after the voltage networks.

Power Company No.2 Appendix 3 - Page 1/7 Power Engineering & Consulting Company No.3 mTrTratssionstribuoandisaster reconstructinProject - Vietnam I I I 1 1 I I IOkV Transmission lines and substations in Southern Vietnam

project construction - PMB and local authorities determine and ensure that compensation for trees will be at the replacement cost. If PAP is requested for cutting affected trees, PMB will pay money for this work. PAP has right for using salvable trees. - Full compensation to PAPs at least 01 month before land clearance. Affected land in ROW will be rehabilitated by contractors after the project construction. - Payment to PAPs will be delivered by PMB and CRCs - Finance available for compensation and well information disclose/disseminate. 3 Temporary impact on All PAPs -do- House/building: - House and building have to be demolished residential and garden have house/ - PAP can opt for: or could be existed are regulated by Article land. Partial building and (i) Remain their houses or 8 of Decree 54/1999/ND-CP and the house/building within trees/fruit building in ROW with the Decree No.11 8/2004/ND-CP of ROW (area in ROW trees in conditions regulated by Article 8 Government on the protection of the high less than 25% of total ROW of Decree 54/1999/ND-CP and voltage networks. area) and the the Decree No.1 18/2004/ND-CP - Consultation for PAP's options on the demolished area does of Government on the protection remains of their house in ROW or move not impact to the/ of the high voltage networks. out of ROW. remaining house! Subsidy allowance for fireproof - PMB and local authorities determine and building. Residential materials and lightning arrestors ensure that compensation will be at the outside of ROW iS for the existing house/building; or replacement cost, without deduction for sufficient for re- (ii) Cash compensation for the salvable materials organizing (more than directly affected rooms at the - PAPs will demolish the impacted part/ 60 rgn in the urban area replacement cost and cost for room and reconstruct/or improve their and 100 rm in the rural demolishing an affected room. houses themselves. area) - No compensation for land - Full compensation for trees and fruit trees at least 01 month before land clearance. If

Power Company No.2 Appendix 3 - Page 2/7 Power Engineering & Consulting Comnpany No.3 Tranismission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmission lines and substations in Southern Vietnam

- Rehabilitate land after the PAP is requested for cutting affected trees, project construction by PMB will pay money for this work. PAP contractors. has right for using salvable trees Tree and fruit-tree: - Full entitlement to PAPs impacted on - Compensation for affected trees house/building at least 03 months before and fruit trees at the land clearance. replacement cost. - Payment to PAPs will be delivered by Allowances: PMB and CRCs - Relocating allowance of 30 kg - Land in ROW could be used with restricted of rice equivalent per person per purposes. month in six months - Finance available for compensation and well information disclose/disseminate. 4 Temporary impact on All PAPs -do- House/building: - House and building have to be demolished residential land or have house/ - PAP can opt for: or could be existed are regulated by Article garden land. Impact building and (i) Remain their houses or 8 of Decree 54/1999/ND-CP and the more than 25% or less trees/fruit building in ROW with the Decree No.11 8/2004/ND-CP of than 25% of total trees in conditions regulated by Article 8 Government on the protection of the high house/ building area ROW of Decree 54/1999/ND-CP and voltage networks. but the demolished area the Decree No.11 8/2004/ND-CP - Consultation for PAP's options on the will impact to the of Government on the protection remains of their house in ROW or move remaining of house/ of the high voltage networks. out of ROW. structure. Land outside Subsidy allowance for fireproof - PMB and local authorities determine and f roWaisici(more materials and lightning arrestors ensure that compensation will be than 60 rgn in the urban for the existing house/building; or replacement cost at the time of payment. 2 area and 100 m in the (ii) Cash compensation at - PAPs will demolish the impacted areas and rural replacement cost for full areas of reconstruct/or improve their houses impacted house/building. themselves. - No compensation for land - Full compensation for trees and fruit trees - Rehabilitate land after the to PAPs at least 01 month before land project construction by clearance. If PAP is requested for cutting contractors. affected trees, PMB will pay money for

Power Comnpany No.2 Appendix 3 - Page 3/7 Power Engineering & Consulting Company No.3 Transmiission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmission lines and substations in Southern Vietnam

Tree and fruit-tree: this work. PAP has right for using salvable - Compensation for affected trees trees and fruit trees at the - Full compensation for impacted house and replacement cost. allowances to PAPs at least 03 months Allowances: before land clearance. - Relocating allowance of 30 kg - Payment to PAPs will be delivered by of rice equivalent per person per PMB and CRCs month in six months - Cleared residential could be reused with restricted purposes. - Finance available for compensation/ rehabilitation and well information disclose/disseminate. 5 Temporary impact on All PAPs -do- PAP can opt for one of the - House and building have to be demolished r esidential land or have house/ following: or could be existed are regulated by Article garden land in ROW. building and (i) Remain their houses or 8 of Decree 54/1999/ND-CP and the Full or partial house/ trees/fruit building in ROW with the Decree No. 118/2004/ND-CP of building impacted and trees in conditions regulated by Article 8 Government on the protection of the high land outside of ROW is ROW of Decree 54/1999/ND-CP and voltage networks. sufficient for the Decree No.11 8/2004/ND-CP - Consultation for PAP's options on the reorganizing (more of Government on the protection remain of their house in ROW or move out than 60 mr in the urban of the high voltage networks. of ROW. area and 100 mr in the Subsidy allowance for fireproof - PMB and local authorities determine and rural materials and lightning arrestors ensure that compensation will be for the existing house/building; or replacement cost at the time of payment. (ii) Cash compensation for the - Replacement land and resettlement sites whole residential area which PAP development. occupied (not only for the - PAPs receive compensation. impacted areas) and properties - PAPs receiving compensation will associated with occupied land at demolish the impacted areas and replacement cost. Impacted land reconstruct/or improve their houses will be obtained by local themselves. .____ authorities; or

Power Comnpany No.2 Appendix 3 - Page 4/7 Power Engineering & Consulting Company No.3 Transmissioni, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

(iii) "Land for land" with the - Full compensation for trees and fruit trees same area PAP occupied and cash to PAPs at least 01 month before land at replacement cost for the clearance. If PAP is requested for cutting affected assets associated with affected trees, PMB will pay money for land. Land occupied by PAP will this work. PAP has right for using salvable be obtained by local authorities. trees - Compensation for affected trees - Full compensation for impacted house and and fruit tree at the replacement allowances to PAPs at least 05 months cost. before land clearance. Allowances: - Payment to PAPs will be delivered by - Relocating allowance of 30 kg PM:B and CRCs of rice equivalent per person per - Cleared residential could be reused with month in six months restricted purposes. - Transportation allowance for - Finance available for compensation/ relocating PAP according to the rehabilitation and well information Compensation Decree disclose/disseminate. 197/2004/ND-CP of GOV - PMB consults with PAPs who are eligible - Rehabilitation . assistance if to rehabilitation for their options and PAPs permanently losing prepare proposal for rehabilitation business or more than 25% of programs in the period of RP their incomes. implementation. - Timely Movement Incentive: PAHs, who relocate on timely manner, will get a maximum bonus of 5,000,000VND/household

6 Permanent acquisition All PAPs -do- For PAP losing productive land: - Consultation for PAP's options on land of land for tower occupied a. Land loss less than 25% of compensation foundations, land and their total landholdings - PMB and local authorities determine and substations and access properties - Cash compensation for the lost ensure that compensation will be associated

Power Company No.2 Appendix 3 - Page 5/7 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam I I OkV Transmrission lines and substations in Southern Vietnam

roads etc. with land area if the remaining plot is still replacement cost at the time of payment. permanently economically viable. - Replacement land and resettlement sites impacted by - Cash compensation for the development. tower whole impacted plot if the - Full compensation for trees and fruit trees foundations, remaining plot is not to PAPs at least 01 month before land substations economically viable. clearance. If PAP is requested for cutting and access - Cash compensation for affected trees, PMB will pay money for roads etc. properties associated with land this work. PAP has right for using salvable b. Land loss equal or more than trees 25%of their total - Full compensation for impacted house and landholdings allowances to PAPs at least 05 months PAP can opt for the followings: before land clearance. (i) "Land for land" with the same - No award civil work contract before area and productive of impacted completion of compensation and area if the remaining plots are still reorganizing houses or relocation. economic-viable and for the - Payment to PAPs will be delivered by whole impacted plots if the PM1B and CRCs remaining plots are not economic- - Finance/land available for compensation/ viable. rehabilitation and well information (ii) Cash for land at the disclose/disseminate. replacement cost. - PMB consults with PAPs who are eligible - Compensation for trees and fruit to rehabilitation for their options and trees at the replacement cost. prepare proposal for rehabilitation - Rehabilitation assistance. programs in the period of RP For PAP losing residential and implementation. garden land: - In remaining land is sufficient for reorganizing (more than 60 mr in the urban area and 100 m2 in the rural area): cash compensation for lost area and

Power Comnpany No.2 Appendix 3 - Page 6/7 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam I lokV Transmission lines and substations in Southern Vietnam

assets associated with land. - If remaining land is not sufficient for reorganizing: PAP can opt for Cash compensation at replacement cost for land and assets on land, or "Land for land" compensation for the whole residential area which PAP occupied (not only for the impacted areas) and properties associated with occupied land. For affected house and building, the same entitlement to PAP of '______categories 3 or 4 or 5. 7 PAP impacted on All PAPs -do- (a) Temporary impact on business - Full compensation for incomes lost to business or other impacted on or other services PAPs at least 01 month before land services business and Compensation for income lost in clearance. other the affected time - PMB consults with PAPs who are eligible services (b) Permanent impact on business to rehabilitation for their options and or other services prepare proposal for rehabilitation Rehabilitation assistance programs in the period to RP implementation.

Power Comnpany No.2 Appendix 3 - Page 7/7 Power Engineering & Consulting Cornpany No.3 Transmission, distribution and disaster reconstruction Project - Vietnam I 11OkV Transmission lines and substations in Southern Vietnam l I I I I

APPENDIX 4 AGREEMENT ON SUBSTATION LOCATIONS | AND TRANSMISSION LINE ROUTES l I I I l I I

Power Company No.2 Power Engineering & Consulting Company No.3 II IIIIIII PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM HAU GIANG PROVINCE Independence - Freedom - Happiness

No. 1377/UB Dt. April 15'"', 2004

To: Power Engineering and Consulting Company No.3

Sub Agreement on Location of Chau Thanh 110kV substation and Can Tho - ChauThanh 110kV transmission line

Considering official letter No.1610 EVN/TVD3-LD dated March 8 2004, official letter

No.1865 EVN/TVD3-LD dated March 2 9 th 2004 and official letter No.1900 EVN/TVD3- th LD dated March 31th 2004 of PECC3 and DOI Statement No. 94/TTr-SCN dated April 8 2004 on the subject above. The PPC agreed as follows: 1. Location of Chau Thanh 110kV substation: Thi Tu hamlet, Mot Ngan town, Chau Thanh A district, Hau Giang province. The location is: - 900m far from Xang Xa No canal - 500m far from Tan Hiep Bridge - 15m far from officer of Sentence Enforcement Team of Chau Thanh A district (towards the National Road No.61) | - 50m far from edge of Road No.929 2. Route of Can Tho - Chau Thanh transmission line

- From: Existing Tra Noc - Soc Trang 110kV transmission line - To: Project's Chau Thanh 110kV substation

I Signed for Chairman of Hau Giang province

Sd/- Sam Trung Viet Vice Chairman I I PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM LAM DONG PROVINCE Independence - Freedom - Happiness

No. 1377/UB Dt. April 15"'t,2004

To: People's Committee of Da Lat city Department of Natural Resources and Environment Power Company No.2 Power Engineering and Consulting Company No.3

Sub Agreement on Location of Da Lat No.2 110kV Substation

Considering official letter No.807/UB dated April 8tI', 2004 of Da Lat city People's Committee on the subject above. The PPC agreed with the proposed location, land plot of Da Lat No.2 110kV substation according to contents of report and proposition of People's Committee of Da Lat city in official letter No.807/UB dated April 8th , 2004 (the substation locates on plot No.25 of Drawing No. 46B of Ward No.8 Da Lat city, 150m far from the centre of Mai Anh Dao road. Area of substation is 4,200 m2 ). The Department of Natural Resources and Environment, Power Company No.2 and Power Engineering and Consulting Company No.3 implement the necessary procedures for land acquisition, land use for the project according to regulations.

Signed for Chairman of Da Lat province l Sd/- |Hoang Si Son Vice Chairman I I I PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM SOC TRANG PROVINCE Independence - Freedom - Happiness

No. 401/CV.HC.01 Dt. May 4t1', 2004

To: I Power Engineering and Consulting Company No.2

Sub Agreement on Location of Soc Trang 220kV, My Tu 110kV substations and Route of transmission lines

3 Considering reports of Power Engineering and Consulting Company No.2 on the subject above. | Chairman of Soc Trang Provincial People's Committe agreed to proposition of PECC2 on location of Soc Trang 220kV, My Tu 110kV substations and Route of transmission lines, | detail as follows: 1. Soc Trang 220kV substation locates on field of Ward No.10 of Soc Trand town, on the West of National Road No. 1. It is 250m far from the National Road No.1. Proposed area: Substation 230m x 160m Access road 12m x 250m 2. My Tu 1100kV substation locates on field of Tra Coi A hamlet of My Huong I commune. It is 300m far from Provincial Road No.13, 2km far from Statue of Huynh Huy Trang town.. 1 Proposed area: Substation loom x loom Access road 15m x 50m 3. Route of 0 Mon - Soc Trang 220kV transmission line (the route section goes through | Soc Trang province) - The route section from beginning point in Soc Trang province to My Tu 110 kV | substation: the route comes along B4 canal, 300-400 far from edge of the canal. - The route section from My Tu 110kV substation to Soc Trang 220kV substation: 3 the toute comes along Provincial Road No.13, 300-400 far from the Provincial Road No.13. In point which is 2km far from T-junction of An Ninh commune, the 3 route comes across the Provincial Road No.13. From that the route comes straight, then turns and connects to Soc Trang 220kV substation. I 4. Route of Bac Lieu - Soc Trang 220kV transmission line (the route section goes through Soc Trang province): the route comes along the National Road No.1, parallel with Bac Lieu - Soc Trang 1 1OkV transmission line. 5. Route of Soc Trang - My Tu 1 OkV transmission line: the route comes parallel with 0 Mon - Soc Trang 220kV transmission line, the route section from My Tu subsation to Soc Trang substation is shown in above article 3. Signed for Chairman of Soc Trang province

Sd/- Nguyen Duy Tan Vice Chairman I I I I I I' I'

I I

I ~~ ~ .|.| PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM BINH THUAN PROVINCE Independence - Freedom - Happiness

No. 2056/UBBT-ND Dt. June 3d 2004

To: I Department of Industry Department of Construction I Department of Natural Resources and Environment Department of Agriculture and Rural Development Binh Thuan Power People's Committee of Phan Thiet city I People's Committee of Ham Thuan Bac district

Sub Agreement on Location of Mui Ne 110kV substation and Phan Thiet - Mui Ne I 110kV transmission line

Considering official letter No.258 CN/KT dated May 21st 2004 Department of Industry on the subject above. Chairman of Binh Thuan Provincial People's Committe agreed to location, area of Mui Ne I10kV substation and route of Phan Thiet - Mui Ne 110kV transmission line as in Drawing No.TR.04.10.1 Dn.01 dated April, 2004. Of which: 1. Route of Phan Thiet - Mui Ne 110kV transmission line: the beginning point is proposed substation, belongs to Ham Liem commune, Ham Thuan Bac district.The end point is Mui Ne 110kV substation. The route comes parallel with Road No.67, more than 200m far from the centre of this Road. The route doesn't come across Bay-Mui Ne Sand Hill. 2. Mui Ne 110kV substation: locates adjoining area of Long Son - Suoi Nuoc Planning Area. Area of substation is about 6,800 m2 .

Signed for Chairman of Binh Thuan province

| Sd/- Nguyen Van Duna |V Vice Chairmani I I PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM LAM DONG PROVINCE Independence - Freedom - Happiness

No. 1872/UB Dt. May 18ti', 2004

To: Power Company No.2 Power Engineering and Consulting Company No.2

Sub Agreement on Location of Da Teh 110kV substation Route of Tan Phu - Da Hoai - Da Teh 110kV T/L Route of Di Linh - Duc Trong 110kV T/L

Considering proposition of PECC2 (official letter No.589/EVN/TVD2-P20 dated April 20th, 2004) and Department of Industry (official letter No.149/CV-CN dated May 5th, 2004) on the subject above. The PPC agreed as follows: 1. Da Teh 1 OkV substation - Vacant land plot 500m from the Da Teh to Cat Tien (belong to Hamlet 5, An Nhon commune, Da Teh district). The location is 6km far from the office of the Da Teh | district People's Committee. - Area 90m x 90m | - Road 20mx 50m 2. Transmission lines - Layout No. DD-04-103-DN.01 - Layout No. DD-04-104-DN.01

Signed for Chairman of Lam Dong province

U Sd/- Hoang Si Soni Vice Chairman I PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM TIEN GIANG PROVINCE Independence - Freedom - Happiness

No. 1347/UB Dt. May 7"', 2004

To: Department of Industry

Sub Agreement on Location of Cho Gao, Cai Be 110kV substations and Branchs

on Considering official letter No.229/CN dated May 5 th, 2004 of Department of Industry the subject above. The PPC agreed with location of Cho Gao, Cai Be 110kV substations and branchs

according to official letter No.229/CN dated May 5 th, 2004 of DOI.

Signed for Chairman of Tien Giang province

Sd/- Tran Thanh Trung Vice Chairman 1l

I I l I~~. . || I PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM BEN TRE PROVINCE Independence - Freedom - Happiness

No. 1058/CV-UB Dt. July 1st, 2004

To: Hanoi Eleco Shareholding Company

Sub Agreement on Route of Mo Cay - Cho Lach 110kV transmission line

Considering official letter No. 1 8/ELECO/PTK-CV dated April 26th, 2004 of Hanoi Eleco of Industry on and Statement No.26/TT-QLD-SCN dated June 28 th 2004 of Department * the subject above. 1) The PPC agreed with route of Mo Cay - Cho Lach 110kV transmission line (alternative shown in drawing attached to official letter No.11 8/ELECO/PTK-CV of Hanoi Eleco. The start point is Mo Cay 110kV substation, the end point is Cho Lach 110kV substation. Length of the route is 29.4 kilometers. The Project Owner needs to cooperate with the revelant organizations for the project * implementation.

Sd/- Nguyen Quoc Bao I Chairman of Ben Tre province I l

I l

PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM BEN TRE PROVINCE Independence - Freedom - Happiness

No. 1057/CV-UB Dt. July I", 2004

To: Power Engineering and Consulting Company No.1

Sub Agreement on Route of Vinh Long - Cho Lach 110kV transmission line

Considering official letter No.851/CV-EVN-TVD1.P17 dated May 7th, 2004 of PECCI and Statement No.26/TT-QLD-SCN dated June 28h 2004 of Department of Industry on l| the subject above. The PPC agreed with route of Vinh Long - Cho Lach 11 OkV transmission line (alternative 1) shown in Drawing No.29.2004-DD-01 attached to official letter No.851/CV-EVN- TVD 1.P 17 of PECC 1. The start point is Vinh Long 220kV substation, the end point is Cho Lach 110kV substation. Length of the route is 30 kilometers. The Project Owner needs to cooperate with the revelant organizations for the project implementation.

Sd/- Nguyen Quoc Bao Chairman of Ben Tre province I I I'

I' I1 PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM BEN TRE PROVINCE Independence - Freedom - Happiness

No. 835/CV-UB Dt. May 27"', 2004

To: Power Company No.2

Sub Agreement on Location of Cho Lach 110kV substation

Considering official letter No.3705/EVN/DL2/TVTK.3 dated May 1 0h, 2004 of Power Company No.2 on the subject above. The Ben Te Provincial People's Committee agreed with location of Cho Lach 110kV substation which shown in Drawing No.04-BTr-024B-Dt-01 attached to official letter No.3705/EVN/DL2/TVTK.3 of Power Company No.2. The substation locates on Phu Son I hamlet, Hoa Nghia commune, Cho Lach district, Ben Tre province. Total area of substation is 8,304 m.2 The Project Owner needs to cooperate with the local revelant organizations for the project implementation.

Sd/- Nguyen Quoc Bao I Chairman of Ben Tre province I I I I I U , ,' ,- ,. .. . a Transmission, distribution and disaster reconstruction Project - Vietnam 1IOkV Transmission lines and substations in Southern Vietnam l I I

APPENDIX 5

AGREEMENT ON | RESETTLEMENT PLAN REPORTS l I I I I I I I

Power Company No.2 Power Engineering & Consulting Company No.3 I1______PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM SOC TRANG PROVINCE Independence - Freedom - Happiness

No.720/UB Dt. Dec 2 7th', 2004

To: I Power Engineering and Consulting Company No.2

Sub Estimation compensation of damage, site clearance for construction of power works in Soc Trang area

of According to document No.1590/HDTD dated November 1st, 2004 of Director Department of Finance on proposal cost estimate for transmission line and substation 110 kV, 220 kV on Soc Trang area. 3 The Director of Soc Trang's PPC has these comments: 1. Temporary calculation for transmission line and substation in provincial area as follow:

- Land price: according currently price, in 2005 when the province issues new price, the price will be revised in - Price of house and construction works is calculated by unit price as issued Decision No.692/QD.HC.04, dated May 18th, 2004 of the Provincial Chairman 2. The cost estimate base on the unit cost is 12,307,802,919 VND, specification for each | project as follow:

- 110 kV Soc Trang - My Tu: 914,325,500 VND I - 220 kV Bac Lieu - Soc Trang: 6,069,117,500 VND - 110 kV My Tu substation: 372,933,319 VND - 220 kV 0 Mon - Soc Trang: 3,171,296,000 VND - 220 kV Soc Trang substation: 1,780,130,600 VND Signed for Chairman of Soc Trang Provincial People's Committee

Sd/- | Truong Minh Chanh Vice Chairmani l l

PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM TIEN GIANG PROVINCE Independence - Freedom - Happiness

No.1232/UB Dt. Nov 12th, 2004

To: I Power Engineering and Consulting Company No.2 (PECC2)

Sub Agreement on Resettlement Plan (RP) report of Cai Be 110 kV substation * and branch

| For agreement on RP report of Cai Be 110kV substation and branch, considering official PPC has letter No.01769/EVN/TVD2/KSTH dated Nov 8 th, 2004 of PECC2, Tien Giang's these comments: and - Agree to implement these policies of the RP report of Cai Be 110kV substation branch issued by the PECC2 attached to the official letter No.

01 769/EVN/TVD2/KSTH dated Nov 8 th, 2004. the | - The investor need to cooperate with authority agencies to easily implement project. The Tien Giang PPC inform to PECC2 for reference and implementation. I'

Signed for Chairman of Tien Giang Provincial People's Committee

Sd/- Nguyen Van Phong Vice Chairman I I I PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM BINH THUAN PROVINCE Independence - Freedom - Happiness

No. 3975/UBBT-XDCB Dt. October 1 lh, 2004

To: Power Engineering and Consulting Company No.2 I Sub Comments on Resettlement Plans (RP) of Phan Thiet - Mui Ne 110kV transmission line and 110 kV Mui Ne substation

I Considering official letter No. 1200/EVN - TVD2/ KSTH dated 6/8/04 on resettlement plans (RP) of Phan Thiet - Mui Ne 110kV transmission line and 110 kV Mui Ne substation. Binh Thuan's PPC has these comments: 1. Compensation persons: Based on Decision No.17/2003/QD-UBTT dated April 18th, 2003 of Binh Thuan's PCC as follow: I - Organization, households, person inside country will be compensated when the Government acquisition land for nation defend, security, nation interest and of the | public advantage must satisfy requirements as stated in Article 6 Decision. - Person who is compensated for assets on acquisition land must be legal owner of thess assets, association with regulations of Law. 2. Compensation principles: Implement as Article 5 of Decision No.17/2003/QD-UBBT dated April 18 th, 2003 of Binh Thuan's PPC, as detail: - When land acquisition is done by Government for using in purpose as regulations at Article 1 of this Decision, based on special cases, the person who has acquisition land will be compensated by cash, house or land. - When compensation by land. house which have different on area, value then the different wvill be solved according to regulations at Article 9, 10, 11 of this Decision. 3. Comnpensation policies: Unit cost for compensation is done according to Decisions: I I on Decision No.37/2004/QD-UBBT dated May 17th, 2004 of Binh Thuan's PPC unit cost for compensation of house, construction works, fruit tree, plant, grave when land acquisition by the government for construction in province area. Circular No.106/2002/TTL/BTC-BCN dated November 22n, 2002 of Ministry of Finance and Ministry of Industry on guideline of compensation, supporting for construction of high voltage transmission line. Decree No.17/2003/QD-UBBT dated April 18th, 2003 of Binh Thuan'PPC on issued regulation of implementation of Decree No.22/1998/ND-CP dated April

I~~~~~~~~~~I24 th, 1998 of the Government regulars of Decree No.27/2002/QD-UBBT dated April 9th 2002 of Binh Thuan on land price in Binh Thuan province These above unit cost of compensation, policies of subsidize if changing on price then the implementation will apply the new price at the time of compensation. I Signed for I Chairman of Binh Thuan Provincial People's Committee

Sd/- Nguyen Van Thu Vice Chairman I I I Il I Il I I

PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF VIETNAM HAU GIANG PROVINCE Independence - Freedom - Happiness

No. 1232/UB Dt. August 30th, 2004

To: Power Engineering and Consulting Company No.3 (PECC3)

l Sub Agreement on Resettlement Plan (RP) report of 110 kV transmission line Can Tho - Chau Thanh and 110 kV Chau Thanh substation

Answering the official letter No.3306/EVN/TVD3-MT dated July 2 Ist,2004 of the PECC3 on agreement on Resettlement Plan (RP) report of 110 kV transmission line Can Tho - Chau Thanh and 110 kV Chau Thanh substation, funded by World Bank After study the RP report issued by the PECC3 and proposal comments of relevant agencies on construction of the 110 kV transmission line Can Tho - Chau Thanh and 110kV Chau Thanh substation. Hau Giang's PPC agree on contents of RP and engage with these policies to easy implement the project. Propose PECC3 to implement remaining procedure. I

Signed for Chairman of Hau Giang Provincial People's Committee

Sd/- Nguyen Van Thang I Vice Chairman

I' I' I' VIETNAM I PEOPLE'S COMMITTEE SOCIALIST REPUBLIC OF LAM DONG PROVINCE Independence - Freedom - Happiness

No.1232/UB Dt. July 26th, 2004

To: Power Engineering and Consulting Company No.3 (PECC3)

Sub Agreement on Resettlement Plan (RP) report 110 kV Da Lat 2 substation I Answering the official letter No.3216/EVN/TVD3-MT dated July 14th, 2004 of the | PECC3 on agreement on Resettlement Plan (RP) report of Da Lat No.2 110 kV substation and the RP report attached. I Lam Dong's PPC agrees on contents of RP of Da Lat No.2 110kV substation of the RP the issued by PECC3 on July 6th, 2004 and engages with these policies to easy implement | project.

Signed for Chairman of Lam Dong Provincial People's Committee

Sd/- Hoang Si Son Vice Chairman

I I Transrnission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam I l I l l I APPENDIX 6

I | COMMUNITY PARTICIPATION MEETING I

I I l l I U~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Power Company No.2 Power Engineering & Consulting Conpany No.3 5 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmlission lines and substations in Southern Vietnam

COMMUNITY PARTICIPATION MEETING

U DATE: May 26th, 2004 I PLACE: Office of the People's Committee of Lam Dong province. SUBJECT: Community participation on EIA and RP of "Di Linh - Duc Trong 110kV i transmission line" of 3034-VN project.

PARTICIPANTS:

I - Di Linh district, Lam Dong province: + Vang Huy Luong - Office's staff of People's Committee of District.

+ Tran Dinh Nhien - Chairman of People's Committee of Tam Bo commune.

+ Nguyen Tien Dung - Vice-Chairman of People's Committee of Dinh Lac commune.

+ Nguyen Van Thao - Vice-Chairman of People's Committee of Di Linh town.

- Ninh Gia commune, Duc Trong district:

+ Trinh Van Dinh - Staff of Compensated department of district.

I + Huynh Cong Hung - Office's staff of People's Committee of Ninh Gia commune.

+ Dinh Ngoc Ky - Representative of No.78 farm.

- Phu Hoi commune, Duc Trong district:

+ Vo Hoang Vu - Vice-Chairman of People's Committee of Phu Hoi * commune.

+ Trinh Van Dinh - Staff of Compensated department of Du Trong district.

| - Lien Nghia town, Duc Trong district:

+ Vo Quoc Hung - Chairman of People's Committee of town.

+ Le Van Tu - Chairman of Old person association.

- Power Engineering & Consulting Company No.2 (PECC2):

+ Dao Van Pha - Deputy Manager of Consulted department.

+ Le Anh Tuan - Staff of Transmission line design department. - PAPs

| Power Conmpany No.2 Page 1/16 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 1lOkV Transmission lines and substations in Southern Vietnam I The overall project objectives as well as the "Di Linh - Duc Trong 11OkV transmission line" component, EIA and RP are briefly explained by the representative PECC2 with the following contributions from the participants: - Route of The Transmission line that PECC2 chosen on provincial area is reasonable, avoid scheme areas of the local, and minimize impacts for populated areas and protected forests. - Agreed with methods to minimize environmental impacts of the project in choice route, working stage. - Currently the power supply is not sufficient and at low quality, we are encouraged to have the power supply networks extended by the project, therefore, we will certainly 3 support and extent full cooperation for the project implementation. - Both resettlement and land acquisition must be minimized as much as possible. I - PAPs will be informed of the information unit prices applicable in this project right from the beginning of the RP implementation. I - Cash compensation for house or structures shall be paid at the cost approved by province PC; cash compensation for crop shall be paid at the market - price. I - Resettlement period must be minimized and the cash of compensation should be provided to PAPs before the beginning of the construction activities affecting them, 3 no site clearing if the full compensation has not been done yet I I l *I I

I Power Company No.2 Page 2/16 Power Engineering & Consulting Comnpany No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

COMMUNITY PARTICIPATION MEETING

DATE: May 1 0 th, 2004 PLACE: Office of the People's Committee of Ben Tre province. SUBJECT: Community participation on EIA and RP of "Mo Cay - Cho Lach 110kV transmission line" of 3034-VN project. PARTICIPANTS: - Da Phuoc Hoi commune, Mo Cay district: + Phan Van Giang - Chairman of People's Committee of commune. + Nguyen Van Phuoc - Staff of Land survey department of commune.

- Tan Binh commune, Mo Cay district:

+ Le Van Hien - Vice-Chairman of People's Committee of commune. + Nguyen Van Quang - Staff.

+ Nguyen Tung Chinh - Staff of Land survey department.

- Tan Thanli Tay commune, Mo Cay district: + Huynh Van Phuc - Power Management Board. + Nguyen Van Be - Power Management Board. + Nguyen Van Du - Power Management Board. - Hung Khanh Trung commune, Cho Lach district: + Tran Van Long - Vice-Chairman of People's Committee of commune. + Le Van Doan - Staff of Land survey department. - Vinh Thanh commune, Cho Lach district: + Nguyen Van Trung - Staff of People's Committee of commune. + Duong Thi Tuyet Nhung - Staff of Land survey department. + Ta Van Nam - Staff

- Long Thoi commune, Cho Lach district:

+ Huynh Van Dong - Vice-Chairman of People's Committee of commune. - Hoa Nghia commune, Cho Lach district: + Tran Hoang Dung - Vice-Chairman of People's Committee of commune. + Pham Hong Son - Staff of Economic department.

Power Company No.2 Page 3/16 Power Engineering & Consulting Conpany No.3 I | Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

I - Representative of Consulting Company: + Nguyen Quoc Huy - staff. - + Nguyen Huu Ngan - staff. + Nguyen Minh Tue - staff. + Dang Huu - staff.

| - PAPs. The overall project objectives as well as the "Mo Cay - Cho Lach 1 lOkV transmission line" component, EIA and RP are briefly explained by the representative with the following contributions from the participants: | - Route of The Transmission line on provincial area is reasonable, avoid scheme areas of the local, and minimize impacts for populated areas. The project does not intersect historical and cultural monuments, temples and pagodas of local residents. - Currently the power supply is not sufficient and at low quality, we are encouraged to have the power supply networks extended by the project, therefore, we will certainly support and extent full cooperation for the project implementation. - Ground reinstatement should to minimize social disturbance during the construction period. - In case of land acquisition for the substation, PC2 should closely cooperated with the local administration to carry out the resettlement plan as defined by government policy. Due attention should be paid to the relocation of tombs, if necessary, with satisfactory compensation for such relocation. - PAPs will be informed of the information unit prices applicable in this project right from the beginning of the RP implementation. - Cash compensation for house or structures shall be paid at the cost approved by province PC; cash compensation for crop shall be paid at the market - price. - In case of large scale land acquisition, we would like to have the resettlement land of equal category to maintain our production, and living standards. I I

Power Company No.2 Page 4/16 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam I1 OkV Transimission lines and substations in Southern Vietnam

* COMMUNITY PARTICIPATION MEETING

0 DATE: May 28th, 2004 I PLACE: Office of the People's Committee of Binh Thuan province. SUBJECT: Community participation on EIA and RP of "Phan Thiet - Mui Ne 110kV I transmission line" of 3034-VN project. PARTICIPANTS:

- Local government representative: + Nguyen Van Tiep - Manager of Managed urban department of Phan Thiet city, Binh Thuan province. + Nguyen Huu Nam - Staff of Land survey department of Mui Ne ward, Phan Thiet city, Binh Thuan province. + Phan Van Nhan - Manager of Traffic-Industry-Constructed department of Ham Thuan Bac district, Binh Thuan province.

- Power Engineering & Consulting Company No.2 (PECC2): + Dao Van Pha - Deputy Manager of Consulted department. + Le Anh Tuan - Staff of Transmission line design department.

- PAPs representative: + Nguyen Thi Lai + Tran Ngoc Thom The overall project objectives as well as the "Phan Thiet - Mui Ne 110kV transmission line" component, EIA and RP are briefly explained by the representative PECC2 with the following contributions from the participants: - Agreed with the selection of the Transmission line route. - Route of The Transmission line that PECC2 chosen on provincial area is reasonable, avoid scheme areas of the local, and minimize impacts for populated areas and protected forests.

- In case of land acquisition for the substation, PECC2 should closely cooperated with the local administration to carry out the resettlement plan as defined by government policy.

- Project impacts are minor, however, due attention should be paid to the compensation and resettlement issue and construction time schedule. - Satisfactory compensation should be finalized prior to the project construction.

I Power Company No.2 Page 5/16 Power Engineering & Consulting Cornpany No.3 I1s Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transnmission lines and substations in Southern Vietnam

- PAPs will be informed of the information unit prices applicable in this project right from the beginning of the RP implementation. - Cash compensation for house or structures shall be paid at the cost approved by province PC; cash compensation for crop shall be paid at the market - price. | - Resettlement period must be minimized and the cash of compensation should be provided to PAPs before the beginning of the construction activities affecting them, no site clearing if the full compensation has not been done yet. - Resettlement distance must be minimized in case compensation is land for land type. I I I I I I I I I I I I

Power Cornpany No.2 Page 6/16 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 1 lOkV Transmission lines and substations in Southern Vietnam I COMMUNITY PARTICIPATION MEETING

I DATE: June 2nd, 2004 I PLACE: Office of the People's Committee of My Huong commune, My Tu district, Soc Trang province. I SUBJECT: Community participation on EIA and RP of "Soc Trang - My Tu 110kV transmission line" of 3034-VN project. I PARTICIPANTS: - Local government representative: I + Tran Van Chinh - Vice-Chairman of People's Committee of My Huong commune. + Nguyen Nhat Linh - Staff of Land survey department of My Huong commune.

- Power Engineering & Consulting Company No.2 (PECC2):

+ Dao Van Pha - Deputy Manager of Consulted department.

+ Le Anh Tuan - Staff of Transmission line design department.

+ Vu Anh Tien - Staff of Substation design department.

- PAPs.

The overall project objectives as well as the "Soc Trang - My Tu 110kV transmission line" I component, EIA and RP are briefly explained by the representative PECC2 with the following contributions from the participants:

- Route of The Transmission line that PECC2 chosen on provincial area is reasonable, I avoid scheme areas of the local, and minimize impacts for populated areas. - Agreed with methods to minimize environmental impacts of the project in choice route.

- There must be measures to minimize social disturbance during the construction period. The project is constructed in dry season, so PAPs will easily to move.

- PAPs will be informed of the information unit prices applicable in this project right from the beginning of the R-P implementation.

- Cash compensation for houses or structures shall be paid at the substitution cost; cash compensation for crops shall be paid at the market-price.

- Resettlement period must be minimized and the cash of compensation should be provided to PAPs before the beginning of the construction activities affecting them, no site clearing if the full compensation has not been done yet.

Power Company No.2 Page 7/16 Power Engineering & Consulting Cormpany No.3 11 Transmnission, distribution and disaster reconstruction Project - Vietnam 1 lOkV Transnission lines and substations in Southern Vietnam - COMMUNITY PARTICIPATION MEETING

I DATE: April I9th , 2004 I PLACE: Office of the People's Committee of Vinh Long province. SUBJECT: Community participation on EIA and RP of "Vinh Long - Cho Lach 110kV I transmission line" of 3034-VN project. PARTICIPANTS: I - Tan Hoa commune, Vinh Long town: + Doan Thanh Dung - Chairman of People's Committee. + Huynh Van Lien - representative inhabitants. - Tan Hanh commune, Long Ho district: + Nguyen Van Hieu - Vice-Chairman of People's Committee. + Nguyen Duong Chu - representative inhabitants.

- My Phuoc commune, Mang Thit district: I + Nguyen Huu Anh - Vice-Chairman of People's Council. + Le Van Huong - representative inhabitants. - Phuoc Hau commune, Long Ho district: + Huynh Hoang Anh - Chairman of People's Committee.

+ Pham Van Truyen - representative inhabitants.

- 8th ward, Vinh Long town: + Dinh Sy Thong - Chairman of People's ward. + Trinh Phi Hung - Representative of inhabitants. - Long Ho town, Long Ho district:

+ Ho Van Tam - Chairman of People's town. I + Nguyen Van Sau - representative inhabitants. - Binh Hoa commune, Long Ho district:

+ Nguyen Thi Hanh - Chairman of People's Committee. + Nguyen Van Nho - representative inhabitants. - Thanh Duc commune, Long Ho district: + Ho Van Thoi - Chairman of People's Committee.

Power Company No.2 Page 8/16 Power Engineering & Consulting Company No.3 I~~ Transmission, distribution and disaster reconstruction Project - Vietnam I1 OkV Transmnission lines and substations in Southern Vietnam

+ Dang Van Thanh - representative inhabitants. - Long My commune, Mang Thit district: * + Le Kim Khiet - Chairman of Commune People's Committee. + Nguyen Van Bay - representative inhabitants. - My An commune, Mang Thit district: + Tran Van Tam - Chairman of People's Committee. + Nguyen Van Chiu - representative inhabitants. * - Power Engineering & Consulting Company No.1 (PECCl): + Do Tan Cong - staff. + Van Xuan Anh - Director of the project. I The overall project objectives as well as the "Vinh Long - Cho Lach 1 OkV transmission line" component, EIA and RP are briefly explained by the representative PECC1 with the I following contributions from the participants: - Route of The Transmission line that PECC1 chose on provincial area is reasonable, avoid scheme areas of the local, and minimize impacts for populated areas and protected forests.

- Agreed with methods to minimize environmental impacts of the project in chosen route, working stage.

- Currently the power supply is not sufficient and at low quality, we are encouraged to have the power supply networks extended by the project, therefore, we will certainly support and extent full cooperation for the project implementation. - Well in advance public communication on the project time schedule is necessary so that people will have sufficient time to plan for their crops and resettlement. - PAPs will be informed of the information unit prices applicable in this project right from the beginning of the RP implementation.

I' I.

I Power Comnpany No.2 Page 9/16 Power Engineering & Consulting Cornpany No.3 lI1 ...... Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

| COMMUNITY PARTICIPATION MEETING

I DATE: June 1st, 2004 I PLACE: Office of the People's Committee of Hau Thanh commune, Cai Be district, Tien Giang province. I SUBJECT: Community participation on EIA and RP of "Cai Be 110kV substation" of 3034-VN project. I PARTICIPANTS: - Local government representative: I + Doan Van Dam - Chairman of People's Committee of Hau Thanh commune, Cai Be district. + Nguyen Thanh Bang - Staff of judicial department of Hau Thanh commune, Cai Be district. + Nguyen Van Cap - Staff of Economic department of Cai Be district. - Power Engineering & Consulting Company No.2 (PECC2): + Dao Van Pha - Deputy Manager of Consulted department. + Luu Duc Huy - Director of the project. + Le Anh Tuan - Staff of Transmission line design department. - PAPs.

The overall project objectives as well as the "Cai Be 1 10kV substation" component, EIA |H and RP are briefly explained by the representative PECC2 with the following contributions from the participants: - Currently the power supply is not sufficient and at low quality, we are encouraged to have the power supply networks extended by the project, therefore, we will certainly support and extent full cooperation for the project implementation. - In case of land acquisition for the substation, PECC2 should closely cooperated with the local administration to carry out the resettlement plan as defined by government policy. - Due attention should be paid to the relocation of houses, if necessary, with satisfactory compensation for such relocation. - PAPs will be informed of the information unit prices applicable in this project right from the beginning of the RP implementation. - In case of large scale land acquisition, we would like to have the resettlement land of equal category to maintain our production, and living standards.

I Power Company No.2 Page 10/16 Power Engineering & Consulting Company No.3- Transmnission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmission lines and substations in Southern Vietnam I

COMMUNITY PARTICIPATION MEETING

I DATE: July 7 th, 2004 PLACE: Office of the People's Commnittee of Chau Thanh A district, Hau Giang province. I SUBJECT: Community participation on EIA and RP of "Chau Thanh 110kV substation" of 3034-VN project. I PARTICIPANTS: - Chau Thanh A district: + Dong Van Thanh - Vice-Chairman of People's Committee. + Huynh Van Thinh - Chairman of People's Committee of Mot Ngan town + Nguyen Hoang On - Vice-Chairman of People's Council.

| - Power Engineering & Consulting Company No.3 (PECC3): + Pham Le Du - staff. + To Khoa Truong - staff. - PAPs. The overall project objectives as well as the "Chau Thanh 110kV substation" component, I EIA and RP are briefly explained by the representative PECC3 with the following contributions from the participants:

- Agreed with the selection of the substation location, methods to minimize environmental impacts of the project in working stage. - Ground reinstatement should to minimize social disturbance during the construction period. - Currently the power supply is not sufficient and at low quality, we are encouraged to have the power supply networks extended by the project, therefore, we will certainly support and extent full cooperation for the project implementation.

- Well in advance public communication on the project time schedule is necessary so that people will have sufficient time to plan for their crops and resettlement. - Resettlement period must be minimized and the cash of compensation should be provided to PAPs before the beginning of the construction activities affecting them, no site clearing if the full compensation has not been done yet. I

Power Corrmpany No.2 Page 11/16 Power Engineering & Consulting Company No.3 Transnmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam iI COMMUNITY PARTICIPATION MEETING

I DATE: June 16th, 2004 I PLACE: Office of the People's Committee of Cho Lach district, Ben Tre province. SUBJECT: Community participation on EIA and RP of "Cho Lach 110kV substation" of I 3034-VN project. PARTICIPANTS:

I - Local government representative: + Do Van Lom - Deputy Manager of Finance and Price department. + Nguyen Van Ket - Vice-Chairman of Fatherland Front's Committee. + Le Doi The - Chairman of People's Committee town. + Nguyen Van Diep + Mai Van Nguyen - Manager of Resource and Environmental department

+ Vo Phuoc Loc - Staff of Economic department. + Bui Thanh Bien - Manager of Economic department. + Le Phuoc Toan - Vice-Chairman of People's Committee district + Bui Van Bi + Lam Hong Van + Nguyen Van Viet

+ Pham Hong Som - People's Committee of Hoa Nghia commune. + Vo Thi Tuyet Dang - Farmer's association

+ Nguyen Thi Kien - Women's association

- Power Engineering & Consulting Company No.2 (PECC2):

+ Nguyen Duc Trung - Deputy Manager of Power network project department.

+ Nguyen Quoc Hung - Staff of Design department. I + Nguyen Tuan Anh - Staff of Design department. + Nguyen Ngoc Thoai - Staff of Design department. - Nguyen Thi Hoa -Office of Science, Technical and Environmental. - Nguyen Huu Duy Lam - Power network project management board - PAPs.

Power Company No.2 Page 12/16 Power Engineering & Consulting Company No.3 I Transmnission, distribution and disaster reconstruction Project - Vietnam 11OkV Transmnission lines and substations in Southern Vietnam I The overall project objectives as well as the "Cho Lach 1lOkV substation" component, ELA and RP are briefly explained by the representative PECC2 with the following contributions I from the participants: - There are no impact on natural preserving zones, vestiges, pagodas, sensitive areas 3 and ethnic minorities. - Agreed with methods to minimize environmental impacts of the project in chosen substation location, working stage. - In case of land acquisition for the substation, PECC2 should closely cooperated with the local administration to carry out the resettlement plan as defined by government policy. I - PAPs will be informed of the information unit prices applicable in this project right from the beginning of the RP implementation. l

Power CornpainyNo.2 -Page 13/16 Power Engineering & Consulting Corrpany No.3- Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

I COMMUNITY PARTICIPATION MEETING

U DATE: April 27th, 2004 I PLACE: Office of the People's Committee of No.8 ward, Da Lat city, Lam Dong province. SUBJECT: Community participation on EIA and RP of "Da Lat No.2 110kV substation" of I 3034-VN project. PARTICIPANTS:

- Local government representative: + Vo Kim Hoang - Chairman of People's Committee of No.8 ward. * + Tran Van Dung - Staff of Land survey department of No.8 ward. + Dinh Minh Thai - Manager of Lam Vien special forestry zone Management Board + Pham Ngoc Lam - Forester of No.8 ward.

- Power Engineering & Consulting Company No.3 (PECC3): + Tran Quang Khai - staff. + Tran Nguyen Quang Huy - staff. * The overall project objectives as well as the "Da Lat No.2 110kV substation" component, I EIA and RP are briefly explained by the representative PECC3 with the following contributions from the participants:

- Agreed with the selection of the Transmission location, and minimize impacts for * populated areas and protected forests.

- Agreed with methods to minimize environmental impacts of the project in working period.

- There are no households will be affected by the project, land acquired for the substation construction is forestry land (pine forest).

- There are no impacts on natural preserving zones, vestiges, pagodas, sensitive areas and ethnic minorities.

- Since the construction site is artificial forestry area, the clearing for substation and access road construction does not acquire land or remove houses of local inhabitants. l

Power Company No.2 Page 14/16 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam I COMMUNITY PARTICIPATION MEETING

I DATE: May 28th , 2004 PLACE: Office of the People's Committee of Mui Ne ward, Phan Thiet city, Binh Thuan province. SUBJECT: Community participation on EIA and RP of "Mui Ne 110kV substation" of 3034-VN project. I PARTICIPANTS: - Local government representative: + Nguyen Van Tiep - Manager of Managed urban department of Phan Thiet city, Binh Thuan province. + Nguyen Huu Nam - Staff of Land survey department of Mui Ne ward, Phan Thiet city, Binh Thuan province. - Power Engineering & Consulting Company No.2 (PECC2): + Dao Van Pha - Deputy Manager of Consulted department. + Le Anh Tuan - Staff of Transmission line design department. - PAPs representative: + Nguyen Thi Lai + Tran Ngoc Thom I The overall project objectives as well as the "Mui Ne 110kV substation" component, EIA and RP are briefly explained by the representative PECC2 with the following contributions I from the participants: - Project implementation is fully supported. | - Agreed with the selection of the substation location, methods to minimize environmental impacts of the project in working stage. | - Satisfactory subsidy allowances for PAPs include: transportation, rehabilitation, allowance households for difficulties of changing occupation that lost productive land or income. - PAPs will be informed of the information unit prices applicable in this project right from the beginning of the RP implementation. - In case of large scale land acquisition, we would like to have the resettlement land of equal category to maintain our production, and living standards. - Resettlement period must be minimized and the cash of compensation should be provided to PAPs before the beginning of the construction activities affecting them, no site clearing if the full compensation has not been done yet.

Power Company No.2 Page 15/16 Power Engineering & Consulting Comipany No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam I COMMUNITY PARTICIPATION MEETING

DATE: June 2nd, 2004 I PLACE: Office of the People's Committee of My Huong commune, My Tu district, Soc Trang province. I SUBJECT: Community participation on EIA and RP of "My Tu 110kV substation" of 3034-VN project. I PARTICIPANTS:

- Local government representative: + Tran Van Chinh - Vice-Chairman of People's Committee of My Huong commune. + Nguyen Nhat Linh - Staff of Land survey department of My Huong commune.

I - Power Engineering & Consulting Company No.2 (PECC2): + Dao Van Pha - Deputy Manager of Consulted department. + Le Anh Tuan - Staff of Transmission line design department. + Vu Anh Tien - Staff of Substation design department.

- PAPs. The overall project objectives as well as the "My Tu 110kV substation" component, EIA and RP are briefly explained by the representative PECC2 with the following contributions from the participants: - Agreed with the construction of the substation, and its location is reasonable, avoid | scheme areas of the local, and minimize impacts for populated areas. - Agreed with methods to minimize environmental impacts of the project. - There must be measures to minimize social disturbance during the construction period. The project is constructed in dry season, so PAPs will easily to move. - PAPs will be informed of the information unit prices applicable in this project right from the beginning of the RP implementation. - Cash compensation for houses or structures shall be paid at the substitution cost; cash compensation for crops shall be paid at the market-price. - Resettlement period must be minimized and the cash of compensation should be provided to PAPs before the beginning of the construction activities affecting them, no site clearing if the full compensation has not been done yet.

Power Conpany No.2 Page 16/16 Power Engineering & Consulting Company No.3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

I I

APPENDIX 7

SAMPLE OF QUESTIONNAIRE I l I I I I l I

I Power Corpany No.2 Power Engineering & Consulting Company-No.3 I | Transmission, distribution and disaster reconstruction Project - Vietnam I 10kV Transmission lines and substations in Southern Vietnam QuestionnaireNo.1

QUESTIONNAIRE FOR INVENTORY OF LOSSES Code: ...... Nam e of respondent: ...... A dd re ss : ...... S tr e e t: ...... H am let: ...... I Commune/Ward: ...... D istr ic t : ...... P ro v in c e : ...... 1. INFORMATION OF HOUSEHOLD An~ Age

-~~~~~~~~~~~ ~~~~Residential No Name in full Education** registration u status** * 2Adult member 3 4 I Under 17 years old

2

5 I Total members of family ...... Total adult members ...... + Total members under 17 years old ...... (*) Relationship to owner: 1. Husband/wife 2. Father/Mother 3. Children 4 Grandchild 5 Grandparent 6. Others I (**) Education. 1. Analphabetic 2. Can read and write 3. Primary school I 4. Secondary school 5. High school 6. University graduate 7. Intermediate school/Vocational school | Ethnic minority households:

Attending school I Primary school Secondary school High school University Male Female Male Female Male Female { Male Female

I Power Cornpany No.2 Appendix 7 - Page 1/7 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam QuestionnaireNo. 1

I (***) Residential registrationstatus: 1. Permanent residential registration 1 2. Temporary residential registration 3. Temporary absence 4. No residential registration

1.1. Occupation and average monthly income of family members

No Name Occupation* icome per month Total Regular Other sources I2 3

Totalfamily income I (*) Occupation 1. Wage-earner 7. Unstable occupation 2. Retirement 8. Other occupation 3. Handicraft 9. Housewife 4. Farmer 10. Schooling/training 5. Aquaculture/fishing 11. Unemployed 6. Business 12. Eligibility for especial assistance The family is in the income group:

High a Above medium O Medium O Low E (In relation with average income ofprovince) 1.2 Average expenses of household (VND)

Monthly expenses Total Other expenses Total * Food aFestivals

* Electricity * Funerals/weddings I * Water * Purchasing household appliance * Rent house *Repairs of house * Education * Repairs of motorbike/ motor boat

* Transport . Others 3Clothes * Medical * Taxes, fees

* Others _

1.3 In case the household relocates a new place, number of members:

* 1. Be lost one's job O 2. Be decreased income O 3. Unknow El I 1.4 Use of the house 1. Use for living E 2. Use for business E 3. Partly living and partly business El 4. for rent El 5. Vacant E1 6. Others E

Power Company No.2 Appendix 7- Page 2/7 Power Engineering & Consulting Company No.3 11 U Transmission, distribution and disaster reconstruction Project - Vietnam I10kV Transmnission lines and substations in Southern Vietnam QuestionnaireNo.1 j 1.5 Household comforts and appliances in possession 1. Toilets * 2. Kitchen 3. Water connection firom network O Water Meter C 4. Electricity O Electricity Meter O 5. Motorbike a 6. Motor-boat C 3 7. Bicycle D 8. Television O 9. Fridge O 10. Washing-machine a 11. Electronic produce C I 12. Telephone a 13. OthersO I 1.6 Does the household have any disabled member? Yes O No O | 1.7 If 'Yes' to 1.6, please ascertain the type of disability disabled level 3 No Name Age Type of disability Totally Partially Mild Male Female 1. Blind I 2. Hearing impairs 3. Mentally retarded 1 =_____ 4. Orthopaedically handicaped 5. Others 1.8 Does the household have any elderly member? 1. Yes O 2. No O | If "yes", please give details about age, physical condition, dependency status etc.

......

L ~ ~~...... I...... I 1.9 According to you, what are the special needs of the elderly and disable persons? (Example: medical care, mobility, food, social ... )

I ~~~...... I...... I 1.10 Health of household 1. Water disease (diarrhea, dysentery ...) O 2. Respiration (bronchitis ... ) C 3. Internal disease (cardiac, liver ...) a 4. Skin disease C

I Power Cornpany No.2 Appendix 7- Page 3/7 Power Engineering & Consulting Company No.3

11_ _ _ _ ! Transmission, distribution and disaster reconstruction Project - Vietnam l 1OkV Transmission lines and substations in Southern Vietnam QuestionnaireNo.1

1.11 Religion 1. Buddhism E1 2. Catholicism 0 3. Others 0 * 2. INFORMATION ON AFFECTED ASSETS 2.1. Residential land Land for housing and land for business Unit: m Existing residential land Legal status Affected residential land

Land for housing Land for business

I ; With Without With Without X X I i ; ownership ownership ownership ownership .

Related papers to residential land:

I: ::: ::::::::::::::::::::::::::......

I * Incase witlhout ownership, please write specifically state of rent, state of temporary residence, ... and monthly expense for renit. I 2.2. Cultivated land Unit: m Legal status I Items Existing area Affected area With Without Temporary use ownership ownership l Paddy field Crops land I Industrial trees land Garden I Forest Pond Other I Related papers to cultivated land: ...... X ...... I...... I 2.3. Affected perennial trees and annual trees Affected perennial trees and fruit trees I

Power Company No.2 A4ppendix 7 - Page 4/7 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam QuestionnaireNo. 1

U State of State of Type of trees Amount (tree) cutting Type of trees Amount (tree) development

______~~~~~(year) ______(year) * Eucalyptus * Longan I *.China-tree * Durian * Bamboo * Pepper I *.Mango * Cashew * Orange * Coffee I *.Palm * Jack * Star apple * Plum * Coconut * I *.Rambutan *

I Affected annual trees

m ~~~~~~~~Amount State of cutting Tp oftes Amount d taeveopmn Type of trees (tree) (crop/year) oftrees (tre) develop/yrType ent

•Paddy * Maize *Sugar-cane * Pineapple *Bean * Other I Cassava ......

I 2.4 House

Constructionp Existing house Affected house Type of Total Total house Total Total house house Owned Encroached house construction house construction Yes No landland land plot surface area land plot surface area

1S" class

2 nd class__ 3 r class

4 th class Temnporary I Related papers to house: ...... I...... I...... * In case without ownership, please write specifically state of rent, state of temporary residence, ... and monthly expense for rent house. 2.5. Other structures

Power Company No.2 Appendix 7 - Page 5/7 I Power Engineering & Consulting Conpany No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 110kV Transrnission lines and substations in Southern Vietnam QuestionnaireNo.1

Items Measurement Estimated price Related papers I .* Kitchen * Toilet * Cattle cages * Cistem l Well I. Yard * Electricity supply system lI * Water supply system * Bridge, sewer * Entrance * Church/shrine * Graves I * Others 3. INFORMATION ON COMPENSATION AND RESETTLEMENT 3.1 Willingness for resettlement 1 Yes a 2. No D If 'No', what are your suggestions?

......

D ......

I Apart fiom this house and this plot of residential land, does the household have any other house or other land in commune/district/province? 1. Yes El 2. No C If 'Yes', please give details about address, area, type of house/land ......

I...... 3.2 What form of compensation for land would you perfer?

1. Land for lost land D 2. Cash for lost land [ 3.3 What form of compensation for house and other losses would you perfer? 1. Provide materials and labour for construction of house at self-selected location D 2. Cash for structures for self-relocation D 3. Independent house settled by the project a 4. Other options I 3.4 What form of restoration for income would you prefer? 1. Financial assistance D

I Power Comnpany No.2 Appendix 7 - Page 6/7 Power Engineering & Consulting Company No.3 Transnission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam Questionnaire No. 1

2. Allocate aplot a 3. Assistance in employment seeking O | 4. Assistance for training a 5. Training for appropriate new skill a 6. Assistance in credit for restoration of business O 7. Other proposals ...... I...... I...... I. 3.5 What form of resettlement would you prefer? (Pleaserecord in order ofpreference: 1, 2, 3... in the blank space) 1. Land is compensated at the replacement cost, trees/crops are compensated at the market price. E I 2. Resettle on the remaining of your land a 3. Adequate technical infrastructures (road, electricity supply system, water supply system, ... ) at new site El 4. Adequate social infrastructure (school, market, ... ) at new site El 5. Easy to open business at new site E I 6. Good community at new site El 7. Good environment quality at new site E 8. Got a house in resettlement area without incurring debt El 9. Training and employment El 10. Additional suggestions, if any ......

Date . Month .. Year Interviewer (Sign and write one 'sfull name) I' I' I'

Power Comnpany No.2 Appendix 7- Page 7/7 Power Engineering & Consulting Company No.3 Transmnission, distribution and disaster reconstruction Project - Vietnam I 1 OkV Transmission lines and substations in Southern Vietnam l I I I

APPENDIX 8

SAMPLE OF PAMPHLET I I

I I

. I

Power Company No.2 Power Engineering & Consulting Company No.3 3 Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmission lines and substations in Southern Vietnam

Appendix 8 - Pamphlet

The "Transmission, distribution and disaster reconstruction" Project utilizes the WB loan I to construction the 110kV Transmission Lines and Substations in 7 provinces: Soc Trang, Binh Thuan, Tien Giang, Vinh Long, Ben Tre, Lam Dong and Hau Giang provinces. I PC2 will implement the sub-project of construction and installation of 110kV Substations and 110kV Transmission Lines in the above mentioned provinces. I 1. Project Affected Household? All households, institutions, individuals having land and properties on such land i.e. houses, structures, trees, crops in the safety corridor of the power networks (T/Ls and S/Ss) to be constructed and installed by the project. 2. Who will define the affected areas and affected properties? - PMB of PC2 and Provincial PMBs will supply the District and Commune Compensation Committees with the layouts of T/L routes and S/S locations. - The District and Commune Compensation Committees are responsible for defining the affected areas and carrying out the surveys and inventory of * affected properties. - Affected areas are areas lying within the safety corridor of the aerial T/L. Such safety corridor is defined by distance from the outer most cable to each side at the static state (Government Decree No.54/1999/ND-CP dated July 8th 1999: 15m wide ROW is applicable to 110kV). 3. Types of impacts? - Permanent Impact: Land, houses, structures, other properties and trees (higher than 4m) lying in the safety corridor of T/Ls and S/Ss. - Temporary Impact: Trees, crops and other properties affected during the construction work. 1 4. Land in the safety corridorof T/Ls and S/Ss will be taken for the project? No. But such land use is limited to cultivation of crops and trees not higher than 4m. I 5. Who will be compensated and who will not be compensated? |- All families, institution, individuals who have properties (land, houses, structures, trees, crops) affected by the project and who could legally claimed their land use rights and ownership of their properties prior to the cut-off date will be compensated and assisted.

Power Company No.2 Appendix 8 - Page 1/4 Power Engineering & Consulting Company No.3 I I Transmission, distribution and disaster reconstruction Project - Vietnam 1lOkV Transmission lines and substations in Southern Vietnam

- Encroached land and/or structures erected after the cut-off dated will not be compensated. Such properties shall be removed by their owners. 6. Compensation tariff? Compensation tariff shall be established by the Provincial Compensation/ Resettlement Committee that reflects the actual market prices of the locality, and approved by the provincial People's Commnittee. All PAPs shall be compensated with replacement cost - the actual market prices at the time of compensation - for their affected properties without depreciation and without deduction of reused materials. Affected land shall be compensated by land of similar category or cash. 7. In case of houses partly affected? - In case the affected part does not affect the structure of the house and the residential purpose in the remaining part, the affected part shall be | compensated. - In case the affected part affects the structure of the house and the remaining part can not used for the residential purpose, the whole house shall be compensated. 8. When PAPs will receive the compensation and move? - PAPs required to be resettled shall be compensated for land, houses, structures, trees, crops, ... at least 3 months prior to land acquisition. - PAPs with partly affected properties and be resettled on their own land plot shall be compensated for the affected houses, structures, trees, crops, ... at least 2 months prior to land acquisition. - PAPs with affected trees, crops only shall be compensated at least 1 month prior to construction. 9. Are there other entitlements apart from compensation for PAPs required to be resettled? Yes. Apart from compensation for land and other properties, PAPs required to be resettled shall enjoy the transport allowance, livelihood assistance ... All allowance, supports... will be clearly defined in the RP. 10. In case PAPs are paid with parts of compensation and other allowances but already asked to move or clear the ground? I

Power Company No.2 Appendix 8 - Page 2/4 Power Engineering & Consulting Company No.3 I * Transmission, distribution and disaster reconstruction Project - Vietnam 1 1OkV Transmission lines and substations in Southern Vietnam

PAPs only hand-over their land or clear ground when already received full compensation and other entitlements. 11. When receiving compensation, PAPs may be asked to contribute a certain amount to a certain organization or a certain amount withheld by the compensation committee? Nobody is authorized to collect or without any amount from PAPs' compensation | and other entitlements. If such is the case, PAPs have to report immediately to district compensation committee, PMB or local authorities for settlement. 12. Who will inform PAPs time-schedule for compensation, land acquisition, ground | clearanceand other related information? PMB, Provincial Compensation Committee, District Compensation Committee are responsible for the information to PAPs' entitlements, RP, compensation policy and tariff, time-schedule for payment of compensation, land acquisition, ground- clearance and construction. 13. In case PAPs disagreed with DMS results or other related issues, where can they | lodge their complaint? - Lodge their complaint to the Commune People's Committee. | - In case PAPs disagreed with the settlement of the Commune People's Committee, lodge their complaint to the District People's Committee where settlement should be processed within 15 days. - In case PAPs disagreed with the settlement of the District People's Committee, such case will be brought to court. Administrative fees are exempted at all levels. I 14. Who will supervise the compensation? An internal monitoring unit will be set up within the PMB to carry out the internal monitoring of RP, and An independent external monitoring agency will be contracted by PMB to carry out the external monitoring of RP. I 15. PAPs' responsibilities? - Participate in all related community meeting and read all related information, I - Be ready with all related papers i.e. residential registration, ownership of other properties.

Power Company No.2 Appendix 8 - Page 3/4 Power Engineering & Consulting Company No.3 * Transmission, distribution and disaster reconstruction Project - Vietnam 11 OkV Transmnission lines and substations in Southern Vietnam

- Read and thoroughly understand all related forms i.e. socio-economic survey, DMS, property inventory, compensation and resettlement commitment ... and participate in all such activities.

16. Any PAPs with any related query and at any time can approach the following institutions. - Provincial Power Company - District/provincial CRCs - PC2's Power Networks PMB

3rd Floor, 72 Hai Ba Trung Road, Dist. 1, Ho Chi Minh city.

I' I' I'

I'

I' I' I' I'

Power Cornpany No.2 Appendix 8 - Page 4/4 Power Engineering & Consulting Company No.3 Il I Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam I l I

APPENDIX 9 U HOUSING CATEGORIES l l (VIETNAM CONSTRUCTION STANDARDS) l l

I' I I I I

Power Comrpany No.2 Power Engineering & Consulting Company No.3 I Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam I Appendix 9 - Classification of Civil Structures

Category Quality of structures of houses Grade of Level of and Using fire Level of facilities surfaces Level of power and structures period resistance finishes water supply Cat. 1 More than I or II With bed rooms, dinning With high With high grade of 100 yrs. room, drawing room, kitchen grade finish/ power and water and attached bathrooms in the decoration supply and same level of the apartment materials sanitation facilities Cat.2 50-100 II With bed rooms, dinning With a few With good power yrs. room, drawing room, kitchen finish/ and water supply and attached bathroorms in the decoration and sanitation same level of the apartment materials facilities I Cat.3 20-50 yrs. IV - With bed rooms, drawing Average With power and room and kitchen in the water supply of same level of the medium materials apartment. - Shared bathroom which may be in other level Cat.4 Less than V - With shared 1-2 room(s) Masonry - Electricity for 20 yrs. - Shared kitchen and light only bathroom - Water supply to kitchen and shared bathroom 3 -- Low grade materials

Temporary There is no official specification for 'temporary' structures/houses. However, it is understood that houses/structures of this category are usually built with low grade wood, plank, bamboo, leaf, straw, soil floor,... or mixed with some low grade bricks and masonry and corrugated steel sheets for temporary housing. I I l

Power Comnpany No.2 Appendix 9 - 1/1 Power Engineering & Consulting Company No.3 I~.' Transmiission, distribution and disaster reconstruction Project - Vietnam I 11OkV Transmission lines and substations in Southern Vietnam I I I I I APPENDIX 10

SOCIO-ECONOMIC HOUSEHOLD DATA SHEET I OF PROJECT AFFECTED PEOPLE I I l I I I I I

Power Company No.2 Power Engineering & Consulting Company No.3 I I

I Appendix 10 - Socio-Economic Household Data Sheet of Project Affected People I PAPs' Socio-economic household data sheet - Commune Distribution, cover 40 communes in 11 districts + 2 towns + 2 cities of 7 project related provinces are shown below.

Commune Ham Thang I District Ham Thuan Bac Province Binh Thuan

I Address of Ethic Main occupation Estimated No Household/ Heads of HHs Male Female Group Education and sources of Total Income Hamlet Income per Month I I Le Van Lai X Kinh Secondary Farming _ 1,810,000 2 Nguyen Chi Thanh X Kinh Secondary Farming 1,230,000 *3 Nguyen Minh Ng9c X Kinh Secondary Farming 1,900,000 4| Nguyen Minh Vui X Kinh High-school _ Farming 565,000 5 Nguyen Thi Xu X Kinh Secondary Farming 2,100,000

Do6an Van B6ng X Kinh _fligh-school Farming 880,000 *7 )Do-AnVan Trung X Kinh High-school Farming 1,250,000 8 DoAn Van Sam X Kinh University 1,700,000 3 9 DoAn Thi Cam Linh X Kinh University 2,000,000

I Commune Ham Nhon District Ham Thuan Bac Province Binh Thuan

Address of Eth Main occupation Estimated * No Household / Heads of HHs Male Female Education and sources of Total Income * Hamlet Group Income per Month Tran C6ng Danh X Kinh High-school Farming 1,300,000 |2 Nguyen Thj om X Kinh Illiterate Farming . 350,000 3 Nguyen Thi Thu X Kinh Illiterate Farming 1,560,000

Ward Mui Ne l City Phan thiet * Province Binh Thuan

HoAddress of Ethic Main occupation Estimated *No Household / Heads of HHs Male Female Education and sources of Total Income Hamlet Group Income per Month Nguyen Van Nhamn X Kinh Secondary Business 4,850,000 2 TrLrong Van Ctr X Kinh Illiterate Farming 2,250,000 l I 11 Commune My Huong District My Tu I Province Soc Trang

* Address of Ethic Main occupation Estimated No Household Heads of HHs Male Female Education and sources of Total Income Hamlet Group Income per Month 600,000 I| Nguyen Qu6c Kh&i X Kinh Secondary Farming IATran Ngoc Giau X KhaMe High-school Wage earner 2,000,000 3 Huynh Van Tiet X Kinh_ Primary 200,000 2,580,000' | 4- Ddng Van HMng _X _Kinh _ University Wage earner . __ ___. Van DO X KhaMe__Mai High-school Aquatic farming 2,500,000 Farming 1,000,000 6 _ Liu Van Tien X _ _ Kinh Secondary 7 Tra Coi A DAnga_VAn Vu_ X Kinh Secondary Unstable 1,200,000 8 Tra Coi A Ng6 Thanh Lam X Kinh Primary Unstable__ 1,600,000 - I 9 Tra Coi A Dang Van Cuang X Kinh High-school Wage earner 1,250,000

I Commune Thuan Hung District My Tu Province Soc Trang

Address of Main occupation Estimated No Household / Heads of iHs Male Female Ethic Education and sources of Total Income Hamlet Group Income per Month I Thach Sanh X KhaMe Secondary Business 900,000 1,200,000 w 2 Lam Thj Diep X Kinh Primary Farming

I Commune Phu My District My Tu Province Soc Trang

I Address of Ethic Main occupation Estimated No Household/ Heads ofHHs Male Female Group Education and sources of Total Income Hamlet Group Income per Month I Trieu Lam X KhaMe Secondary Business 1,635,000 2 Thach Men X Kho Me Primary Wage-earner 1,480,000 I 3 Lam Xthao X Kho Me Primary 1,850,000 4 Thach Bien X Kha Me High-school Business 1,750,000 5 S Yen Rxen X Kho Me Secondary Farming 2,420,000 I I I i Ward 10 Town Soc Trang Province Soc Trang

Estimated Address of Ethic Main occupation of Total Income U No Household Heads of HHs Male Female G Education and sources per Month Hamlet Income I Tran Van Bay X Kinh High-school Farming 1,350,000

I Commune Hau Thanh District Cai Be I Province Tien Giang

Estimated Address of Ethic Main occupation sources of Total Income * No Household / Heads of HHs Male Female Group Education and I Hamlet Income per Month 3,000,000 I Hau Vinh Nguyen_Van Sau X _ Kinh Primary, Unstable 300,000 2 Hau Vinh DOng Thi Yen Oanh X Kinh Secondary Farming Farming 2,000,000 3 Hau Vinh _ D6 Thanh Cong X Kinh_ Secondary 4 Hau Vinh DO Van Tuan X Kinh Secondary Business 2,700,000

Commune Tan Hoa * Town Vinh Long Province Vinh Long

Address of Ethi Main occupation Estimated Toial Income No Household/ Heads of HHs Male Female Education and sources of I Hamlet Group Income per Month 150,000 I Tan Phu Huynh Van Lien X Kinh Primary Farming Tan Phu Nguyen Thanh Huig X Kinh Secondary Farming 300,000 IT2 900,000 3 Tan Quoi Tran Van Chau X Kinh Secondary Farming 800,000 4 Tan Quoi Bui Van DO X Kinh Secondary Farming I' Commune Truong An I Town Vinh Long Province Vinh Long

Main occupation Estimated Addressof sources of Total Income I No Household / Heads of HHs Male Female Ethic Education and per Month Hamlet Group Income 600,000 I Tan Quoi Tay Nguyen Van Day X Kinh High-school Farming 1,700,000 2 Tan Quoi Tay Nguyen Van HuLng X Kinh Secondary Farming I I Ward 8 Town Vinh Long I Province Vinh Long

* Address of Ethic Main occupation Estimated No Household Heads of HHs Male Female G Education and sources of Total Income Hamlet Income per Month I I No.3 Trinh Tuyet Hang X Kinh Secondary Farming 700,000 2 No.3 Trjnh Phi Hing X Kinh High-school Wage earner 1,700,000 3 No.3 Ha NgQc Son X Kinh High-school Wage earner 2,400,000 4 No.3 Vo Hong Nhi X Kinh High-school Wage earner 2,700,000 5 No.3 Le Thj Thanh Tung X Kinh High-school Wage earner 1,500,000 6 No.3 Pham Thi Mai X Kinh Secondary Wage earner 3,100,000

Commune Tan Hanh District Long Ho Province Vinh Long

I Address of Ethi Main occupation Estimated No Household / Heads of HHs Male Female Education and sources of Total Income fl Hamlet Group Income per Month I Tan An Nguyen Quoc Em X Kinh Primary Farming 650,000 I 2 Tan An Le Van Ty X Kinh Primary Farming 750,000 3 Tan An Nguyen Durang Chu X Kinh Primary Farming 950,000 4 Tan An Le Van Tai X Kinh High-school Wage earner 3,500,000 Kinh Secondary Wage_earner 2,200,000 I _5 Tan Hung Nguyen Van Thai X 6 Tan Hung H6 Van Y X Kinh High-school Business 2,200,000 7 Tan Hung Nguyen Thi Be X Kinh Secondary Business -1,700,000 I 8 Tan Hung Nguyen Thi Ngoc Lan X Kinh Primary Unstable 500,000 9 Tan Hung Nguyen Van Ngan X Kinh High-school Wage earner 2,200,000

Commune PhuocHau District Long Ho Province Vinh Long

No Address of Ethic Main occupation Estimated No Household I Heads of HHs Male Female Go Education and sources of Total Income Hamlet Group Income per Month I Phuoc Hanh B Le Minh Trac X Kinh High-school Wage earner 3,600,000 Primary Farming 1,200,000 I 2 Phuoc Hanh A Pham Van Truyen X Kinh l I 1 own Long Ho Iistrict Long Ho rovince Vinh Long

* Address of Ethic Main occupation Estimated lo Household/ Heads of HHs Male Female Ethic Education and sources of Total Income Hamlet Group Income per Month | I No.6 T6ng Van Sau X Kinh Primary Farming 1,000,000 2 No.6 Huynh Quang Tieu Xuan X Kinh Primary Farming 1,200,000

Commune Long My I istrict Mang Thit frovince Vinh Long

* Address of Eth. Main occupation Estimated tlo Household / Heads of HHs Male Female Ethic Education and sources of Total Income Hamlet Group Income per Month !_Long Hoa 2 Nguyen Vdn_Bdng X Kinh Primary Farming 1,200,000 Long Hoa 2 Nguyen Van Chinh X Kinh Primary Farming 1,200,000

I ommune My Phuoc I istrict Mang Thit frovince Vinh Long

U Address of Eth. Main occupation Estimated Income to Household / Heads of HHs Male Female Ethic Education and sources of Total Hamlet Group Income per Month I Cai Can I Le Van Hurong X Kinh Primary Farming 600,000 2 Cai Can I Dinh Thi Kim Hoa X Kinh Secondary Wage earne 2,300,000

Commune Phuoc An Iistrict Mang Thit rovince Vinh Long

Address of Eth. Main occupation Estimated I Income lo Household / Heads of HHs Male Female Ethip Education and sources of Total Hamlet Group Income per Month 3 Le Tan Nghiep X Kinh Secondary Farming 1,200,000 2 Ngo Thi Luorm X Kinh Primary Farming 1,500,000 l I I I Commune Vinh Binh District Cho Lach Province Ben Tre

* Address of Ethic Main occupation Estimated * No Household / Heads of HHs Male Female G Education and sources of Total Income Hamlet Income per Month I i Loc Hiep Nguyen Van Thuan X Kinh Primary Farming 800,000 2 Loc Hiep Nguyen Van Thanh X Kinh Primary Farming 700,000 3 Loc Hiep Le Thj Bon X Kinh Primary Farming 800,000 I Commune Son Dinh I District Cho Lach Province Ben Tre

I Address of Main occupation Estimated No Household / Heads of HHs Male Female C Education and sotirces of Total Income Hamlet Group Income per Month I Son Duy Le Van BAng X Kinh Secondary Farming 800,000 2 Son Duy Tran VanChin X Kinh Primary Farming 900,000 3 Son Duy Nguyen Van DAn X Kinh Secondary Wage earner 1,800,000

| Commune Hoa Nghia District Cho Lach I Province Ben Tre

Address of Eth Main occupation Estimated of Total Income 3 No Household / Heads of HHs Male Female G Education and sources Hamlet Group Income per Month I Nhon Plhu Tran Thi Cam Linh X Kinh Secondary 1,600,000 2 Nhon Phu LeThi Linh X Kinh Secondary 3,000,000 3 Nhon Phu LLrong V&n Bay x Kinh Primary Farming 1,000,000 I 4 Nhon Phu Nguyen Van Ong X Kinh Secondary Farming 900,000 * Nhon Phu Tran Van Hue X Kinh Secondary Wage earner 4,800,000 6 Nhon Phu Nguyen Van An X Kinh Primary Farming 3,100,000 I 7 Hoa Thanh Vo Van Tam X Kinh Primary Farming 1,500,000 8 Hoa Thanh Tran Khanh Hong X Kinhi Secondary Farming 1,400,000 9 Hoa Thanh Lam Van Ba X Kinh Primary Wage earner 1,300,000 I 10 Hoa Thanh1 Tran Thi B6ng X Kinh Primary Allowanced 800,000 11 Hoa Thainh V6 Thi ThAnih X Kinh Secondary Handicraft 1,200,000 IH12 Hoa Thanhi Nguyen Thi Hoa X Kinh Primary Farming 1,000,000 13 Hoa Thainhi Nguyen Van Bi X Kihil Primary Farming 1,200,000 14 Hoa Thanli Hulnh Van Ngoan X Kinih High-sclhool Farming 2,050,000 I 15 Hoa Thanih Lam Viet Dac X Kinii Secondary Farminig 2,400.000 16 Hoa Thaiii Ho Thi Bay X Kinhl Illiterate Farming 1,000,000 17 Hoa Thanihi Ngu)yen Th; Taiii X KhTi Secondarv Farm-ning 1,900.000

~~~~~ IIIII Address of Ethic Main occupation Estimated | No Household Heads of HHs Male Female G Education and sources of Total Income Hamlet GopIncome per Month 18 Hoa Thanh Ng6 Taii Phan X Kinh Secondary Farming 1,500,000 * 19 Hoa Thanhi Tran Van Th&i X Kinhi Secondary Farming 2,800,000 * 20 Hoa Thanhii Ph,am VAn Chinh X Kinh Primary Farming 600,000 21 Hoa Thanh Tran Van Hung X Kinh Primary Farming 2,000,000 22 Hoa Thanh Tran Van MLroi X Kinh Secondary Farming 2,500,000 23 Hoai An Mai Chi Hieu X Kinh Secondary Wage earner 3,000,000 24 LongHiep HaNguyen Hung X Kinh Secondary _-_ Farming 2,300,000 1,300,000 25 Long Hiep Vo C6ng Mang X Kinh Farming 1,500,000 26 Long Hiep Huynh_Van Nam X Kinh Secondary Farming 27 Long Hiep Huynh Thj Lau X Kinh Secondary Farming 1,000,000 1,200,000 * 28 Long Hiep Tra.nThi Murng _ _ X Kinh Secondary Farming 1,300,000 29 Long Hiep Nguyen Thanh Long_ X Kinh Primary Farming 30 Long Hiep Phan Van Be X ___ Kinh Primary _ Farming 1,200,000 I 1,500,000 31 Long Hiep Tran Van Thang X Kinh Primary Farming 32 Long Hiep Ho Thi Banh X Kinh High-school Wage earner 2,000,000 I 33 Long Hiep Phan Thi Phuroang X Kinh Primary Farming 1,000,000 34 Long Hiep Ho Thi Tn_ X Kinh University Wage earner 2,700,000 1,100,000 35 Long Hiep Nguyen Van Lai X _ Kinh Primary _Farming I 36 Long Hiep Pham Thi Diem Phirung _ X Kinh Primary Farming 1,000,000 37 Long Hiep Phan Van Men X Kinh Secondary Farming 1,400,000 38 Long Hiep Le VAn T6 X Kinh Secondary _Farming 1,900,000 1,500,000 39 Long Hiep Nguyen Thj Hao X Kinh Secondary Farming 40 Long Hiep Nguyen Thi Ba X Kinh Secondary Farming 2,500,000 I41 Long Hiep Phan Van R6 X Kinh Primary Farming 1,300,000 42 Long Hiep Nguyen Ng.c_Em X Kinh Primary Farming 1,400,000 43 Long Hiep Ng6 Thanh Se X Kinh High-school_ Farming -1,500,000 I 44 Long Hiep Vo Thien Nguyen X Kinh Secondary Farming 2,300,000 45 Long Hiep Ng6 Van Huan X Kinh Secondary Farming 2,000,000 1,800,000 46 Long Hiep Vo Cong Chumng X Kinh Primary Farming I 47 Long Hiep Tran Thi Khuyen X Kinh Primary Farming 800,000 48 Long Hiep Nguyen Van Giup X Kinh Secondary Farming 1,500,000 49 Long Hiep Pham Thi Thay X Kinh Primary Wage earner 1,000,000 I 50 Long Hiep Pham Van Thu X Kinh Read/ Write Farming 800,000 51 Long Hiep Pham Thi Hong X Kinh Secondary Handicraft 1,000,000 I 52 Long Hiep Vo Thi Thu Thuy X Kinh Secondary Farming 1,900,000 53 Long Hiep Vo Thi Chinh X Kinh High-school Farming 2,000,000 54 Long Hiep Vo Thi Thu X Kinh High-school Farming 1,000,000 55 Long Hiep Nguyen Van Thanh X Kinh Secondary Farming 2,000,000 I I I I Commune Hung Khanh Trung District Cho Lach I Province Ben Tre

Estimated * Address of Ethic Main occupation Total Income * No Household Heads of HHs Male Female Education and sources of per Month Hamlet Income 2,450,000 I Gia Khanh Nguyen_Van Bay xX Kinh Primary Farming_ I 1,800,000 2 Gia Khanh Vo Van On X Kinh Primary Farming 750,000 3 Gia Khanh Nguyen Thi Nu6i X Kinh Illiterate Farming Gia Khanh Hu'nh Thi SAnh X Kinh Primary Retired 300,000 I 1,000,000 5 Gia Khanh Nguyen Thi Nau X Kinh Primary Farming 1,000,000 6 Gia Khanh Nguyen Van Nguyen X Kinh Secondary Farming 2,133,333 7 Gia Khanh Dinnh Van Hai X Kinh University Farming __ 2,266,667- 8 Gia Khanh Le Thi Nam X Kinh Secondary Farming 1,100,000 I 9 Tan Hung Nguyen Van Mong _ X _ Kinh Secondary Farming _ 890,000 10 Tan Hung Nguyen Van Hoang X Kinh Secondary _ Farming 2,266,667 11 Tan Hung Phan Van Hung X Kinh Secondary Farming 2,200,000 12 Tan Hung Pham Van Trong X Kinh Secondary Handicraft I 1,500,000 13 Tan Hung Nguyen Van Kh&i X Kinh Secondary Wage earner 816,667 14 Tan Hung Nguyen Van Trieu X Kinh Primary Farming 400,000 | 15 Tan Hung Nguyen Van Hong X Kinh High-school Farming 583,333 16 Tan Hung Nguyen Van Do X Kinh Illiterate Farming _ 1,625,000 17 Tan Hung Nguyen Van Nhieu X Kinh Read/ Write Farming 800,000 18 Tan Hung Huynh Van Tan X Kinh Primary Farming 1,800,000 19 Tan Hung DLnang Thi Thu_ X Kinh Primary Farming 1,050,000 20 Tan Hung Nguyen Van Bi X Kinh Primary Farming 920,000 * 21 Gia Khanh Pham Van Ba X Kinh Secondary Retired 2,500,000 22 Tan Hung Phan Van Nang X Kinh Secondary Farming 23 Tan Hung Huynh Van Luong X Kinh High-school Farming 600,000 I 10,000,000 24 Cai Tac Huynh Van Thieu X Kinh Primary Farming 1,300,000 25 Cai Tac Le Van Thu X Kinh Primary Farming 26 Phu_Long Mai Van Nguyen X Kinh High-school Wage earner 3,500,000 I 1,200,000 27 Phu Long Nguyen Van Hieu X Kinh Secondary Farming 800,000 28 Cai Tac Duong Vian Hien X Kinh High-school Farming 29 Phu Long Pham Van Thi X Kinh Secondary Farming 1,500,000 I 1,200,000 30 Phu Long Ngo Thi Cam Le X Kinh Secondary Farming 1,200,000 31 Phu Long Phlam Van Hau X Kinh Secondary Farming I 500,000 32 Phu Long Tra^n Quang Thong X Kinh Primary Farming 5,000,000 33 Phu Long Nguyen Thj Ba X Kinh Primary Farming 34 Cai Tac Nguyen Van_Bay x Kinh Read/ Write Farming 400,000 I 400,000 35 Phu Long Le Van Danh X Kinh Read/ Write Farming 1,200,000 36 Cai Tac Ngo Thi Kiem X Kinh Illiterate Farming 2,000,000 37 Cai Tac Tran Van Bay X Kinhl Secondary Farming 1,900,000 * 38 Plhu Long Nguyen Thi A X Kiii1 Primary Farming 800,000 39 Cai Tac B1ii Thi Biet X Kinh Illiterate Farming 40 Phu Long Ngyuen1 Van Thlalng X Kinhl Primary Farming 1,000.000 I 1.000,000 41 Phi Long Nguyen1 Van Lai X Kihal Primary Farmi-in I 42 PhlLi Lon, Tran Van On X Kinil Primiiary Farm-iing 1.400.000

~~~~~~~~~~~~~|||I I.II Address of Ethic Main occupation Estimated No Household I Heads of HHs Male Female C Education and sources of Total Income Hamlet roup Income per Month 43 Cai Tac Nguyen Thi Ly X Kinh Primary Farming 600,000 * 44 Phu Long Tran Thi 0 X Kinh Primary Farming 1,200,000 * 45 Phu Long Train Van Len X Kihil Primary Farming 700,000 46 Cai Tac Ngyen Van Bay X Kinh Primary Farming 800,000 fl 47 Cai Tac Phan Tan Hung X Kinh Primary Wage earner 700,000 * 48 Cai Tac 3Bui Thi Huiu X Kinh Primary Farming 1,100,000 49 Cai Tac Nguyen Thi H6ng X Kinh Primary Farming 1,100,000 I 50 Phu Long Trixong Thi Mang X Kinh Illiterate Farming 700,000 51 Cai Tac Dinh Thi Be Ba X = Kinh Primary Farming 600,000 __ _ 600,000 52 Cai Tac Nguyen Van Thi X Kinh Primary Farming | 53 Phu Long Tr_n VanKiMen X Kinh Read/ Write Farming 1,700,000 54 Cai_Tac Nguyen Van Chanh X Kinh Secondary Farming 1,200,000 Farming _ 1,070,000 * 55 Phu Long _ Huynh Thi Trong_ _ X Kinh Primary * 56 Phu Long Tran Van Khur X Kinh Primary Farming 1,000,000 57 Phu Long Nguyen Van R6ng X Kinh Secondary Farming 1,000,000 I 58 Phu Long Pham Van Tam x _ Kinh Secondary Farming 700,000 59 Phu Long Pham Van Nhanh X Kinh Primary Farming 800,000 _ 1,250,000 60 Phu Long Nguyen Thi Dam x Kinh Secondary Farming I 61 Phu Long Tran Van Phai X Kinh Primary Farming 800,000 62 Phu Long Ngo Van Binh X Kinh Primary _ Wage earner 1,350,000 Farming 1,000,000 63 Cai Tac Le Van C6ng__ _ X Kinh Primary 64 Cai Tac Dinh HiuiDrc X Kinh Primary Farming 800,000 800,000 65 Cai Tac Dinh Tan Long X Kinh Secondary Farming I 66 Cai Tac Dinh Van Tam X Kinh Secondary Farming 900,000 67 Phu Long Pham Thi Hao X Kinh Primary Farming 1,540,000 68 Cai Tac Tran Thj Thuy X Kinh Primary Farming -1,200,000 69 Cai Tac Pham Thi Ngoc X Kinh Secondary Farming 2,000,000 I 70 Phu Long Pham Van Sca X Kinh Primary Business 1,400,000 71 Cai Tac Pham Van Luyen X Kinh Primary Farming 2,000,000 72 Cai Tac Tran Van Hiem X Kinh Read/ Write Farming 2,400,000 73 Phu Long Huynh Van Lurang X Kinh Secondary Farming 1,800,000 74 Cai Tac Tran Thi Giau X Kinh Primary Farming 1,400,000 75 Phu Long Le Van Cu X Kinh Read/ Write Farming 2,300,000 76 Cai Tac Tran Van Quen X Kinh Prirmary Farming 1,000,000 77 Phu Long Nguyen Van Trung X Kinh Secondary Farming 3,000,000 78 Phu Long Nguyen Thi Loan X Kinh Secondary Farming 2,000,000 79 Cai Tac Nguyen Van Lang X Kinh High-school Farming 1,500,000 * 80 Phu Long Tran Thi Bay X Kinh Primary Farming 1,500,000 I 81 Cai Tac Huynh Thi Clii X Kinh Primary Wage earner 2,000,000 82 Phu Long Nguyen Van ST X Kinhi High-school Farming 1,000,000 I 83 Phu Long Nguyen Van Sanh X Kinh Primary Farming 700,000 I I lommune Vinh Thanh I istrict Cho Lach ovince Ben Tre

Estimated * Address of Eth. Main occupation Heads of HHs Male Female E Education and sources of Total Income L Household / per Month Hamlet Group Income 1,700,000 | Vinh Hung 2 Nguyen Van Minh X Kinh Secondary Farming 1,700,000 V inh Hung 2 Nguyen Van Tu X Kinh Secondary Farming 1,880,000 Vinh Hung 2 Trieu Thi Vien X Kinh Primary Farming a Farming 2,000,000 Secondary B13i Van X X Kinh 2 . 0, .. ._ Vinh Hung_2 _ . _ . _- _-- _ .-- _ __ _ Farming 2,500,000 5 Vinh Hung 2 Trinh Kim Yen X __ Kinh Primary 4,100,000 Vinh Hung 2 Phan Van Thuan X Kinh Primary Business -Illiterate ___Wage earner 1,000,000 9 Vinh Hung 2 Vo Thi Nhieu_0 _ _ _ X = Kinh Farming 1,300,000 8 Vinh Hung 2 Nguyen Van Thang X_ _ Kinh Primary 1,900,000 Vinh Hung 2 Nguyen Van R c X Kinh Primary Farming I 1,600,000 2 Nguyen Van Bruu X Kinh Secondary Farming ) Vinh Hung _ - _ .-. - - . - - _ _ _- - ~~~ -~ _- _ - _ -. _ -__ _- Farming 1,000,000 11 Vinh Hung 2 Nguyen Van Tan X Kinh Primary 2,500,000 | V5inh Hung 2 Bui Hoang Giang _ X Kinh Secondary Farming Vinh Hung 1 Buzi Thi Lan X_ Kinh Illiterate Allowanced 1,100,000 Farming 2,500,000 14 Vinh_Hung 1 Nguyen Van Ty X Kinh Primary 1,100,000 I Vinh Hung I Nguyen Van Phuc X Kinh Primary Farming 2,500,000 t6 V inh Hung 1 Nguyen Th_i Hong _ X Ki nh High-school Farming 1,700,000 7 Vinh Hung I Triuarng Van Hien X Kinh Primary Farming 2,200,000 8 Vinh Hung 1 Nguyen Van Hau X Kinh Secondary Farming 1,700,000 19 Vinh Hung I Nguyen Van Nen X Kinh Secondary Farming 2,600,000 0 Vinh Hung I Tran Thi Cuc X Kinh Primary Farming 1,100,000 *1 VVinh Hiep Le Van Binh X Kinh Secondary Farming 1,100,000 22 Vinh Hiep Le Van Ve X Kinh Primary Farming 3 Vinh Hiep Tran Van Ba X Kinh Primary Farming 1,500,000 1,100,000 4 Vinh Hiep Le Van Bao X Kinh Secondary Farming Kinh Secondary Farming 1,100,000 25 Vinh Hiep -Nguyen Thj Anh X 3,000,000 6 Vinh Hiep Nguyen C6ng Thich X Kinh Secondary Farming 1,200,000 7 Vinh Hiep Nguyen Thi Xanh X Kinh Secondary _ Farming 1,000,000 28 Vinh Hiep Nguyen Van Lam X Kinh High-school Farming 3,300,000 !9 Vinh Hiep ODng Van Rang X Kinh Secondary Farming Primary Farming 700,000 10 Vinh Hiep Nguyen Van Lam X Kinh 550,000 I Vinlh Hiep Dang Van Bon X Kinh Secondary Farming 2,100,000 Hiep Le Van Tien X Kinh Primary Farming 2 Vinh 2,600,000 33 Vinh Hiep Le Thi Su X Kinh Primary Farming 4 Vinh Hiep Nguyen Van Chieu X Kinh Primary Farming 1,700,000 2,000,000 *5 Vhiib Hiep Le Thj Sach X Kinh Secondary Farming 2,000,000 36 Vinh Hiep Le Diih Twong X Kiih Secondary Farming 1,500,000 7 Vinh Hiep Le Van Giac X Kihll Illiterate Farmilg 1,800,000 8 Vinh Hiep DOng Van Ky X Kihil Secondary Farming 900,000 39 Vinih Hiep Ho Van H6a X Kinil Secondary Farming 4,500,000 0 Vinhl Hiep Nguye;n VAn Chaiu X Kinh Secondary Farming Farming 1,500,000 I] Viini Hiep Nguye&n Van DOjnhl X Kinii Secondary 2 Vihii Hiep Nguen1 Van DOng X Kihli Primary Farming 2.200,000 Address of Eth. Main occupation Estimated No Household I Heads of HHs Male Female GEthi Education and sources of Total Income 3 Hamlet roup Income per Month 43 Hoa Khanh Vo Van Phan X Kinh Primary Farming 2,400,000 I 44 Vinh Chinh Le Van BEy X Kinh Primary Farming 1,700,000

I Commune Long Thoi District Cho Lach Province Ben Tre

I Address of Ethic Main occupation Estimated No Household/ Heads of HHs Male Female G Education and sources of Total Income Hamlet Income per Month I Long Hoa Nguyen Thi Au X Kinh High-school Farming 2,700,000 1,000,000 2 Long Hoa Nguyen Thi Cau X _ Kinh Primary Farming 3 Long Hoa Nguyen ThiHt X Kinh Secondary Farming 2,000,000 4 Long Hoa Tran Thi Phu' X Kinh Read/ Write Farming 2,100,000 5 Long Hoa Dinh Kim Chu6ng X Kinh "Illiterate Handicraft 3,100,000 6 Long Hoa Tran Thi Thuy X Kinh Primary _Farming 2,000,000 oLong Hoa Diinh Kimk H&i X Kinh _ Aquaculture 3,300,000 8 Long Hoa Ho Van Thang X Kinh Read/ Write Aquaculture 2,000,000 9 Long Hoa Dinh Kim Ph6 X Kinh Primary Farming 3,900,000 10 Long Hoa Ly H.u Trinh X Kinh Primary Farming 1,500,000 11 Long Hoa Nguyen Kim Chon X Kinh Read/ Write Farming 1,000,000 12 Long Hoa Nguyen Thi T6 X Kinh Primary Farming 4,000,000 13 Long Hoa Le Thi Vang X Kinh Secondary Farming 2,100,000 14 Long Hoa Tran Thi Tri X Kinh Secondary Allowanced 1,200,000 15 Long Hoa Nguyen Van Vinh X Kinh University Farming 10,000,000 16 Long Hoa Le Van Thieu X Kinh Primary Farming 1,200,000 17 Long Hoa Nguyen Thanh Hung X Kinh Secondary Farming 3,200,000 18 Long Hoa Doan Van Khainh X Kinh Secondary Farming 1,400,000 19 Long Quoi Huynh Thi An X Kinh Read/ Write Retired 1,000,000 20 Long Quoi Nguyen Van Thanh X Kinh Primary Farming 1,600,000 21 Long Quoi Nguyen Van L6c X Kinh Primary Farming 1,400,000 22 Long Quoi Pham Van Thi X Kinh Primary Farming 1,200,000 23 Long Quoi Phan VAn LAnh X Kinh High-school Farming 1,200,000 24 Long Quoi Vo Hong Trung X Kinh Secondary Farming 1,400,000 25 Long Quoi Huynh Trung Gia X Kinh Secondary Farming 2,800,000 26 Long Quoi Vo Ngoc Chan X Kinh Secondary Farming 1,900,000 *27 Long Quoi Vo Van Lau X Kinh Secondary Farming 2,200,000 28 Long Quoi Nguyen Thi Nan X Kinh Primary Farming 1,000,000 29 Long Quoi TrLrang Qu6c Khanh X Kinh Inter-mediate Farming 1,800,000 30 Long Quoi Nguyen The Hung X Kinh Secondary Farming 4,000,000 31 Quan An Ph,am Thj TLr X Kinh Secondary Farming 3,000,000 I32 Quan An TrLrog Tlii Nh,an X Kinh Primary Farming 900,000 33 Quani An Le Van Thieu X Kihii Secondary Farming 2,000,000 34 Quani An Tran Van Be X Kihil Secondary Farming 1.500.000 35 Quani An Tran VAn Ret X Kihii Secondar-y Farminig 1.100.000

I~~~~~~~~~~~~~~~~~~~~~~~~ Address of Ethic Main occupation Estimated No Household Heads of HHs Male Female Group Education and sources of Total Income Hamlet GopIncome per Month 36 Quan An DOVan Khanig X Kinh Primary Farming 1,200,000 37 Quan An Nguyen Van DOng X Kinh Secondary Farming 900,000 38 Quan An Ha Van Duing X Kinh Secondary Farming 1,300,000 39 Quan An Le Van Chuc Anh X Kinh Primary Farming 2,000,000 40 Quan An Nguyen Van Hoa X Kinh Secondary Farming 1,700,000 41 Quan An Le Thi Ut Mu6i X Kinh Secondary Farming 1,400,000 42 Quan An Le Van Chuc Em X Kinh Secondary Farming 1,500,000 43 Quan An Tran Van Tien X Kinh Illiterate Farming 900,000 44 Quan An Ly Vinh Bru X Knh Read/Write_ Farming _ 6,000,000 45 Quan An Do HuruD3cD X Kinh Primary Farming 2,600,000 46 Quan An Nguyen Van Ut X_ _ Kinh Primary Farming 2,600,000 47 Quan An Truang Thi Ba X Kinh Illiterate Farming 1,200,000 I 48 Quan An Nguyen Van Sat X Kinh Primary Farming 2,100,000 49 Quan An Nguyen Van Chi X Kinh Primary Farming 2,100,000 50 Quan An Nguyen Huru Vo X Kinh Primary_ Farming 2,400,000 E 1 Quan An Do Van Cai X Kinh Primary Wage earner 2,300,000 52 Quan An Nguyen Thj Thuy Lan X Kinh Secondary Farming 1,800,000 53 Quan An Phan Tan DOng X Kinh Read/ Write Farming 900,000 I 54 Quan An Luang_Thi Hue X Kinh Secondary Farming 800,000 55 Quan An Vo Van Hien X Kinh Secondary Farming 6,300,000 56 Quan An T6ng Van T6n X Kinh Primary Farming 1,200,000 57 Quan An Le Thi Nam X Kinh Primary Farming 800,000 58 Quan An Nguyen Thi Yen X Kinh Secondary Farming 1,100,000 59 Quan An Nguyen Thi Lac X Kinh Primary Farming 700,000 800,000 * 60 Quan An Voi Van CCanh X Kinh Secondary Farming 61 An Thanh Phan Van L6 X Kinh Secondary Farming -1,500,000 I 62 An Thanh Nguyen Van Chan X Kinh Primary Farming 1,400,000 63 An Thanh Phan Van Ngon X Kinh Primary Farming 800,000 64 An Thanh Luong Thi Bich Van X Kinh Primary Farming 2,500,000 I 65 An Thanh Nguyen Thi Can X Kinh Primary Farming 2,000,000 66 An Thanh Nguyen Thi Phien X Kinh Primary Farming 450,000 67 An Thanh Thai Van Hao X Kinh Primary Farming 1,600,000 I 68 An Thanh Ho Trung Hung X Kinh Secondary Farming 900,000 69 An Thanh Le Dinh Trung X Kinh Primary Farming 1,800,000 70 An Thanh Va Thi Thra X Kinh High-school Wage earner 7,700,000 71 An Thanh Dang Can H6a X Kinh Primary Farming 3,000,000 72 An Thanih Nguyen Thi Nong X Kinh Secondary Farming 1,300,000 I 73 An Thanh Tran Van Muei X Kinh Primary Farming 900,000 *74 An Thanh Nguyen Thien Sy X Kinh High-school Farming 4,800,000 75 An Thanh Nguyen Van DO X Kinh Primary Farming 2,000,000 E 76 An Thanhi Nguye^n Thj Hai X Kinh Primary Farming 1,500,000 77 An Thainhi Nguyen Thi Lam x Kihii Secondary Farming 2,700,000 78 An Thanhli Nguyen Van H6a X Kinh Primary Farming 1,200,000 I 79 An Thainhi Nguyen Van Nga X Kinh Primary Farming 1.200,000 80 An Thaihli Nguye'n HuuLDun1g X Kinh Secondary Farmiing 1,000,000 81 An Thanhll NguLen1 Van PhCu X Kinil Primary Farminig 2,650,000 I Address of Ethic Main occupation Estimated No Household I Heads of HHs Male Female Group Education and sources of Total Income Hamlet Income per Month

82 An Thanih Ho Van D6 X Kiih Secondary Farming 2,000,000 I 83 An Thanih Nguyen Van Ch6ng X Kinh Primary Farming 2,500,000 84 An Thanh Nguyen Thi Nam X Kinh Primary Business 4,000,000 85 An Thanh Huynh Van Sang X Kinh Secondary Farming 3,500,000 86 An Thanh Nguyen Van Trinh X Kinh Primary Farming 3,500,000 87 An Thanh Nguyen Van Han X Kinh Secondary Farming 1,500,000 88 An Thanh Tran Van Xin X Kinh Primary Farming 2,800,000 3,500,000 89 An Thanh Nguyen Van Ut _ X Kinh High-school Farming 90 An Thanh B13i Quang_Minh X Kinh Secondary Farming 3,000,000 91 An Thanh Nguyen Van Bay X Kinh Primary Farming 2,500,000 2,000,000 92 An Thanh Nguyen Van Chtrcng X _ Kinh_ Secondary Farming 93 An Thanh Nguy8n Thi Tuyet _ X Kinh Secondary__ Farming _ 2,000,000 ...... 2,500,000 I 94 An Thanh Nguyen Van Thom __ X '' Kinh _ High-school Farming 95 An Thanh Nguyen Duy Phuk X Kinh Secondary Farming 2,200,000 96 An Thanh Nguyen Thi Thao X Kinh Read/ Write _ Farming 2,500,000 I 97 An Thanh Trurang Huru Chi Dat X Kinh University' Wage earner 3,200,000 98 An Thanh Huynh Van Rong X Kinh High-school Farming 2,000,000 99 An Thanh Le Thanh Hai X Kinh Primary Farming _ _1,100,000 I 100 An Thanh Ly Thi Cc X Kinh Primary Farming _1,600,000 101 An Thanh Nguyen Viet X Kinh University Farming 2,000,000 I 102 An Thanh Nguyen ChungNam X Kinh University Wage earner 2,900,000 103 An Thanh Pham Van Tjch X Kinh Secondary Farming 2,700,000 104 An Thanh Le Van H6a X Kinh Secondary _ Farming 1,700,000 105 An Thanh Nguyen Van Tinh X Kinh Secondary Farming 3,500,000 106 An Thanh Nguyen Van X6ng X Kinh Secondary Farming 3,000,000 107 An Thanh Nguyen Hong An X Kinh Secondary Farming 800,000 108 An Thanh Pham Van Bien X Kinh Illiterate Farming 1,400,000

Commune Da Phuoc Hoi District Mo Cay Province Ben Tre I Address of Ethic Main occupation Estimated No Household / Heads of HHs Male Female Education and sources of Total Income Hamlet Group Income per Month

I Tan Loc Nguyen Hoang Minh X Kinh Secondary Unstable 1,400,000 I 2 Tan Loc Tran Vmnh Loc X Kinll Secondary Farming 1,000,000 3 Tan Loc Nguyen Van Hoang X Kihih Primary Farming 1,400,000 4 Tan Loc Tran Van DOng X Kinh Secondary Farming 2,000,000 I 5 Tan Loc Tran Van H1ing X Kinh Primary Unstable 1,300,000 6 Tan Loc B13i Van Hu-&ng X Kihll Primary Farming 2,500,000 7 Tan Loc Tran Van Rip X Kinh Secondary Farming 2,500,000 I 8 Tan Loc Nguyell Van Giau X Kihi l Secondary Wage earner 1,300,000 9 Tan Loc Le Thanili Hong X Kihli Secondary Wage earner 1.300,000 E 10 Tan Loc 1rain riii Be Sau X Kinli Primary Unstable 1.800.000 I~~ Address of Ethic Main occupation Estimated No Household / Heads of HHs Male Female Education and sources of Total Income Hamlet Group Income per Month 11 Tan Loc Bui Van Binh X Kinh Secondary Unstable 2,750,000 12 Tan Loc VO Van Be X Kinh Primary Farming 1,800,000 13 Tan Loc Nguyen Van Thanih X Kinh Primary Farming 1,150,000 14 Tan Loc Nguyen Van Ut X Kinh High-school Farming 2,000,000 I 15 Tan Loc Nguyen Van Curu X Kinh Secondary Wage earner 2,100,000 16 Tan Loc Vo VAn Chai X Kinh Secondary Farming-- 1,900,000 17 Tan Loc Vo Van Manh X Kinh Secondary Farming 3,000,000 I 18 Tan Loc Tran Van Hoang X Kinh Secondary Wage earner 1,600,000 19 Tan Loc Nguyen Van Kha X Kinh Primary Farming 2,100,000 20 Tan Loc Tran Thi Muai X Kinh Illiterate Unemployed 600,000 Farming 2,050,000 21 Tan Loc _ Huynh Van Sang_ X ___ Kinh _-Primary 22 Tan Loc B13i Thi Chia X __Kinh Secondary Wage earner 600,000 I 23 Tan Loc Huynh Van Hoang _ X _ Kinh Primary Farming__ 1,500,000 24 Tan Loc Nguyen Trong Nghia X Kinh Wage earner 900,000 25 Tan Loc Tran Van Durc X Kinh Secondary Farming 2,200,000 26 Tan Loc Le Thi Hanh X Kinh ,Primary Wage earner 1,100,000 27 Tan Loc Tran Thi Mai X Kinh High-school Farming 1,500,000 28 Tan Loc Vo_Thi Ky X Kinh Primary Farming 845,000 I 29 Tan Loc Vo Van Phe X Kinh Primary Farming _ 1,450,000 30 Tan Loc Nguyen VVan nX X Kinh Secondary Farming _ 1,400,000 31 Tan Loc Nguyen_Van Kha X Kinh Primary Farming 2,100,000 I 32 Tan Loc Nguyen Thong Lmnh X Kinh High-school Farming 1,600,000 33 Tan Loc Nguyen Xuan Hoat X Kinh High-school Farming 2,000,000 34 Tan Loc Nguyen Van Danh X Kinh Secondary Farming 1,600,000 35 Tan Loc Le Thi A X Kinh Illiterate Farming 1,800,000 36 Tan Loc Vo Thi Hoa X Kinh Primary Farming 1,700,000 I 37 Tan Loc Le Hai Dien X Kinh _University Wage earner 2,300,000 38 Hoi Thanh Nguyen Van Thang X Kinh High-school Farming 1,070,000 39 Hoi Thanh Nguyen Van DOm X Kinh Primary Farming 1,770,000 I 40 Hoi Thanh Nguyen Van Diep X Kinh Secondary Farming 2,100,000 41 Hoi Thanh Phani Van Dinh X Kinh Secondary Farming 1,600,000 42 Hoi Thanh Phan Van Set X Kinh Secondary Farming 1,200,000 43 Hoi Thanh Phan Van Em X Kinh Secondary Farming 1,200,000 44 Hoi Thanh Phan Van Set X Kinh Primary Farming 1,400,000 45 Hoi Thanh Huynh Van Cu X Kinh Secondary Farming 1,300,000 46 Hoi Thanh Mai Thi Chuc X Kinh Primary Farming 1,700,000 47 Hoi Thanh Nguyen Thanh Tam X Kinh Primary Farming 1,200,000 I 48 Hoi Thanhl Ho Thi Thu X Kinh Secondary Farming 900,000 49 Hoi Thanh Le Thi DA X Kinh Secondary Farming 3,300,000 50 Hoi Thanh Dinih Van Tien X Kinh Primary Farmilg 1,300,000 I 51 Hoi Thanh DO Van Man X Kinh Secondary Farming 1,400,000 52 Hoi Thanhii Vo Van Hai X Kihil Secondary Farming 1,500,000 53 Hoi Thanhi Tran Van Hiep X Kihil Secondary Farming 1,550,000 I 54 Hoi Thanhii Tran Van Deo X Kinh Primary Farming 1,500,000 55 Hoi Thanihl Phliam Van Thiniii X Kiih Secondary Farminig 5.000,000 56 Hoi Thanh Pham Van Sel X Kinh Secondary Wage earner 3.350.000 Address of Ethic Main occupation Estimated No Household Heads of HHs Male Female G Education and sources of Total Income Hamlet roup Income per Month 57 Hoi Thanh Pham Van Mum X Kinil Primary Farming 1,200,000 * 58 Hoi Thanh Le VAn Chau X Kinh Secondary Business 3,800,000 * 59 Hoi Thanh Tran Thi Hue X Kinh Secondary Wage earner 1,200,000 60 Hoi Thanh Thai ThAnhl San X Kinh Prinary Farming 900,000 I 61 Hoi Thanh Phan Van Danh X Kinh High-school Farming 2,100,000 62 Hoi Thanh Phan Van VT X Kinh University Farming 1,700,000 63 Hoi Thanh Phan Van Hien X Kinh Secondary Wage earner 1,200,000 64 HoiThanh Phan Van Loc X Kinh Secondary Farming _ 1,600,000 - 65 Hoi Thanh Cao Van Lam x Kinh Secondary Farming 1,300,000 66 Hoi Thanh Tr;n Van Chau _ X _ Kinh Primary Farming 1,300,000 67 HoiThanh Tran VAn Thura X Kinh Secondary Farming 1,500,000 68 Hoi Thanh Va Minh Phurang X Kinh Secondary _ Business 2,800,000 * 69 Hoi Thanh Vo Van Ba X Kinh Primary Farming 1,100,000 I 70 Hoi Thanh Tran Thj Thiet X Kinh Primary Farming 2,300,000 71 Hoi Thanh Nguyen Van Nhieu X Kinh Primary _ arming 950,000 I 72 Hoi Thanh Vo Van Chau X Kinh Secondary _Farming 2,300,000 73 Hoi Thanh Le Thi Ba X Kinh Secondary Farming 1,300,000 74 Hoi Thanh Dang Van Hon X Kinh Primary _Farming 2,100,000 75 Hoi Thanh Huynh Thanh Hoa X Kinh Secondary _ Wage earner 1,100,000 * 76 Hoi Thanh Huynh Van Nghla X Kinh Primary _ Farming 2,500,000 77 Hoi Thanh Pham Thj A X Kinh Secondary Farming 1,250,000 I Commune Tan Binh District Mo Cay Province Ben Tre

Address of Ethic Main occupation Estimated No Household / Heads of HHs Male lFemale Grop Education and sources of Total Income fl Hamlet Group Income per Month I Tan An Do Van Khinh X Kinh Primary Farming 4,300,000 2 Tan An Mai Van Suru X Kinh Read/ Write Farming 2,700,000 3 Tan An Nguyen Thi Ngai X Kinh Secondary Farming 2,400,000 4 Tan An Do Thi Yen X Kinh Primary Farming 1,400,000 I s5 Tan An Huynh Thi Cay X Kinh Primary Farming 1,300,000 6 Tan An Pham Thanh cong X Kinh Primary Farming 5,100,000 7 Tan An Nguyen Van Dinh X Kinh Read/ Write Farming 1,800,000 I 8 Tan An Nguyen thj Hoang X Kinh Secondary Farming 1,100,000 9 Tan My H6 Thi Dinh X Kinh1 Illiterate Farming 1,100,000 10 Tan My Huytnh Thj Ph6 X Kinh Read/ Write Farming 2,200,000 I IITan Duc A HuLInh VanL Meo X Kinh Secondary Farming 1,100,000 12 Tan Duc A Trieu Van Duing X Kihil University 1,500,000 13 Tan Duc A D3inh Vani T'ot X Kinih Primary Farming 450.000 134Tani Duc A DNh11el VAni Hal I 4Tan Duc A Nguye Van I-lai X Kihil High-sclhool Farming 2,000,000 15 Tan Duc A Hus'lnh VAn Tam X Kinih Primary Farming 1,100.000 I 16 Tan DLuc A DAo Mlinh Tualn X Kinih High-sclhool Wage earnler 3.850,000 Address of Ethic Main occupation Estimated No Household / Heads of HHs Male Female G Education and sources of Total Income Hamlet roup Income per Month 17 Tan Duc A Le Van Tam X Kinh Primary Farming 600,000 18 Tan Duc A Vo Quoc Dung X Kinh Read/ Write Farming 1,600,000 19 Tan Duc A Tran Van Hung X Kinh Primary Business 2,200,000 20 Tan Duc A Nguyen Van H6a X Kihih High-school Farming 1,100,000 21 Tan Duc B Nguyen Van Son X Kinh Primary Farming 1,200,000 22 Tan Duc B Luong Thi Than X Kinh Illiterate Farming 1,100,000 23 Tan Duc B Nguyen Thi Bay X Kinh Primary _ _Farming 1,500,000 24 Tan Duc B Nguyen_Van_Sang X _ Kinh Primary Farming 2,500,000 25 Tan Duc B Tran Q cVu X _ Kinh High-school Farming 1,000,000 26 Tan Duc B Lurcang Thj Ut __ X __Kinh Read! Write Farming 2,000,000 27 Tan Duc_B Nguyen Van Huynh X_ __ Kinh Read/!Write Farming _ 1,500,000 28 Tan Duc B Vo Thi Sau X Kinh High-school Farming 2,100,000 29 Tan Duc B Nguyen Thi Choi _ X Kinh Primary _ Farming 1,800,000 30 Tan Duc B Trurang Van Tuan X Kinh Secondary Farming 2,200,000 31 Tan An Mai Van Thu X_ Kinh Primary Farming I ,690,000 32 Tan An Nguyen_thi Hoa X Kinh Primary _ Farming 3,400,000 33 Tan An Dang Van SAch X Kinh Secondary Farming 800,000 34 Tan An Mai Van Chau X Kinh High-school Farming 1,500,000 35 Tan An Mai Thi Lam X Kinh Illiterate Farming 900,000 36 Tan An Le Van Hue X Kinh Primary Wage earner 1,485,000 37 Tan An Mai Van Dau X Kinh Secondary Farming 2,000,000 I 38 Tan An Mai Van Hiep X Kinh Illiterate Farming 1,700,000 39 Tan An Huynh_Van Be X Kinh Read/ Write Farming 700,000 I 40 Tan An Pham Van Tinh X Kinh Primary Farming 1,300,000 41 Tan An Ho Van Lap X Kinh Secondary Farming 1,100,000 42 Tan An Khau Van Phuc X Kinh Primary Farming -1,600,000 43 Tan An D6 Thi Xoan X Kinh High-school Farming 1,400,000 44 Tan An Khau Van Huru X Kinh University 9,070,000 45 Tan An D6Hio u ThAnh X Kinh Secondary Farming 4,10000 46 Tan An Nguyen Thi Nam X Kinh Read/ Write Wage earner 2,000,000 47 Tan An D o Thi Anh X Kinh Primary Farming 2,750,000 48 Tan An Pham Van Nguy X Kinh Primary Allowanced 1,000,000 49 Tan My Huynh Thj Ph6 X Kinh Read/ Write Farming 1,600,000 50 Tan My Vo Tan Phat X Kinh Primary Farming 1,500,000 51 Tan My Tran Thj Nhieu X Kinh Illiterate Farming 1,050,000 52 Tan My H6 Van Nur X Kinh Primary Farming 2,400,000 53 Tan My Le Van Tien X Kinh Primary Farming 2,500,000 54 Tan My Nguyen Van Ruong X Kinh Primary Farming 700,000 55 Tan My Trieu Van Nhieu X Kinh Secondary Farming 2,000,000 56 Tan My HuS'nh Thj Be X Kinh Primary Farming 1,500,000 57 Tan My Tran Thi Tao X Kinh Secondary Farming 1,500,000 58 Tan My Bui th; Bong X Kinh Read/ Write Farming 1,800,000 59 Tan My Nguyen VAn Do X Kinh Read/ Write Farming 500,000 60 Tan My Tran Van Ut X Kinhl Secondary Farming 1,100,000 61 Tan My Duonai Van ThAng X Kinh1 Secondarv Farming 1,500,000 62 Tan My DuoLcValln D6t X Kinhl SecondarV Farminig 1,800.000 I I Address of Ethic Main occupation Estimated No Household Heads of HHs Male Female Education and sources of Total Income Hamlet Group Income per Month 63 Tan My Duorng Van Ch6t X Kinh Secondary Farming 1,400,000 I 64 Tan My Hu5nh Anh Tuani X Kinh High-school 2,950,000 65 Tan My Nguyen Van Nhani X Kinh High-school Farming 1,500,000 66 Tan Duc A Huynh Van ThAnh X Kinh Secondary Farming 1,400,000 I 67 Tan Duc A Tran Thi Nam X Kinh Read! Write Farming 1,300,000 68 Tan Duc A Tran Thj Tu X Kinh Secondary _ Farming 1,300,000 69 Tan Duc A Le Van San X Kinh Primary Farming 1,500,000 70 TanDucA Phan Van Ga X Kinh Illiterate Farming_ 2,200,000 900,000 - 71 Tan_Duc_A Nguyen ThAnh CUng X _ Kinh Secondary Farming 72 Tan Duc A Nguyen Van Thi X Kinh __Primary __ Farming 300,000 73 Tan Duc A Nguyen Van Hung X __i _Knh Secondary ___ Farming __ 600,000 74 Tan Duc A Nguyen Van BAy_ X Kinh Secondary Wage earner 390,000 I 75 Tan Duc A Tran Van Thanh X Kinh Secondary Farming 2,500,000 76 Tan Duc A Nguyen Van Mem X Kinh Primary Farming 2,600,000 77 Tan Duc A TRurongThi Hue Em X Kinh High-school Farming 1,500,000 78 Tan Duc A Nguyen Thi Be X Kinh Primary Farming 1,000,000 79 Tan Duc A Nguyen Trong Nam X Kinh High-school Farming 3,000,000 80 Tan Duc A Nguyen Tan ThAnh X Kinh Secondary Farming 2,800,000 I 81 Tan Duc A Huynh Thj R7i X Kinh Read/ Write Farming 2,100,000 82 Tan Duc A Tran Van Chinh X Kinh High-school Farming 1,800,000 83 Tan Duc A Nguyen Minh Nhat X Kinh Primary Farming 1,400,000 84 Tan Duc A Nguyen_Van Be Tir X Kinh Primary Farming 2,300,000 85 Tan Duc A Le Van Triuorng X Kinh Primary Farming 1,900,000 86 Tan Duc A Tran Van Cu X K inh Prirmary Farming 2,100,000 2,200,000 87 Tan Duc A _ Nguyen Van T6ng X Kinh Secondary Farming 88 Tan Duc A Vo Thanh Tien X Kinh High-school Farming -1,650,000 89 Tan Duc A DO Van Binh X Kinh Secondary Farming 1,500,000 90 Tan Duc A Pham Thi Be X Kinh Primary Farming 1,090,000 91 Tan Duc A Le Van Nau X Kinh Illiterate Farming 1,150,000 92 Tan Duc A Le VanBe X Kinh Primary Farming 2,500,000 93 Tan Duc A Le Van Trong X Kinh Secondary Farming 1,600,000 94 Tan Duc A VO Thi Hai X Kinh Read/ Write Farming 600,000 95 Tan Duc A Nguyen Cong Van X Kinh Secondary Farming 2,000,000 96 Tan Duc A Nguyen Van Nhat X Kinh Primary Farming 950,000 97 Tan Duc A Le Van Het X Kinh Secondary Farming 800,000 98 Tan Duc A Nguy6n Van Na X Kinh Primary Farming 3,500,000 1,600,000 I 99 Tan Duc A Tran Van Non X Kinil Read/ Write Allowanced I I I I~~ |I Commune Tan Thanh Tay District Mo Cay U Province Ben Tre

* Address of Ethic Main occupation Estimated * No Household Heads of HHs Male Female Education and sources of Total Income Hamlet Group Income per Month E I Thanh Bac Phan Van Nguru X Kinh Secondary _ Farming _ 1,800,000 2 Thanh Bac Huynh Van Phuc X Kinh Farming 800,000 3 Thanh Bac Nguyen Van Minh X Kinh Secondary _ Farming 3,300,000 I 4 Thanh Bac Vo Van Thau X Kinh Secondary Farming 1,400,000 5 Thanh Bac Nguyen_Van Thau X _ Kinh Secondary Farming 1,300,000 6 Thanh Bac Vo Thi NhAnh X Kinh Primary Allowanced 1,700,000 earner ____ 3,700,000 7 -0Thanh Bac DaImGia Nguyen - x ___ Kinh Secondary _ Wage 8 Thanh Bac Huynh Thanh Sang X Kinh Secondary Farming 4,450,000 I 9 Thanh Bac Nguyen Van Tam X _ Kinh Read/ Write Retired 800,000 10 Thanh Bac Nguyen Van Be Hai X Kinh Secondary _ Farming 2,500,000 11 Thanh Bac Pham Ky X Kinh Secondary Wage_earner 900,000 E 12 Thanh Bac Nguyen Van Dl) X Kinh Secondary Farming _ 900,000 13 Thanh Bac Duarrng Van Thep X Kinh Secondary Farming _ 1,400,000 14 Thanh Bac Nguyen Van Thanh X Kinh Secondary Farming 1,300,000 I 15 Thanh Bac Nguyen Thi Xe X Kinh Secondary Unstable 1,200,000 16 Thanh Bac Nguyen Thj Be X Kinh _Secondary _ Farming 1,500,000 17 Thanh Bac Ho Thi Got X Kinh Read/ Write Allowanced 700,000 I 18 Thanh_Bac Huynh Van_ HLrung X Kinh _Secondary Farming 1,000,000 19 Thanh Bac Vo Van Do X Kinh Primary Wage earner 900,000 20 Thanh Bac Bui Thi Binh X Kinh Primary Farming 3,000,000 21 Thanh Bac Le Thi Dura X Kinh Primary Farming 1,130,000 22 Thanh Bac Trurcng Thi L'ung X Kinh Secondary Farming -1,000,000 I 23 Thanh Bac Nguyen_Van Be X Kinh Primary Farming 1,200,000 24 Thanh Bac Nguyen Thi B6ng X Kinh Secondary _ Farming 900,000 25 Thanh Bac Tran Van Hoa X Kinh Primary _ Farming 1,100,000 I 26 Thanh Bac Le Ngoc Thu X Kinh Secondary Farming 1,300,000 27 Thanh Bac Tran Van PhLrcing X Kinh Primary Farming 900,000 28 Thanh Bac TrAn Van Du X Kinih Secondary Farming 1,700,000 I 29 Thanh Bac Nguyen Van Y X Kinh Primary- Farming 800,000 30 Thanh Bac Nguyen Van Be Nam X Kinh High-school Farming 800,000 31 Thanh Bac Nguyen Van Trung X Kinh Primary Farming 1,200,000 I 32 Thanh Bac Huy'nh Van HAi X Kinh High-school Retired 4,105,000 33 Thanh Bac Hu1nh Trung Hieu X Kinh Secondary Farming 1,070,000 I 34 Thanh Bac Phan Van Thong X Kinh Primary Farming 936,000 35 Thanh Bac Lu Van Dang X Kinh Primary Farming 2,000,000 36 Thanh Bac D6 Van Ty X Kinh Secondary Farming 1,000,000 E 37 Thanh Bac Nguyen Van Be Sau X Kinh Secondary Farming 700,000 38 Thanh Bac Nguyeni Van Be Tam X Kinhl Secondary Farming 900,000 39 Thanhi Bac Triai Th; Tat X Kinh Primary Farming 900,000 I 40 Thainhi Bac Nguyen Van Ro X Kih1i Secondary Farming 900,000 41 Thaiihi Bac Hu'.hll Van Minii X Kinhl Primary Farming 1,500,000 42 Thaiihi Bac Trat Van Be Hai X Kinhl Primiiary Farming 900.000 I~~~~~~~~~~~~ Estimated 1 Address of Ethic Main occupation of Total Income No Household/ Heads of HHs Male Female Education and sources per Month Hamlet Group Income 1,500,000 43 Thanhi Bac L Tan Thanil X Kihil Primary Farming 1,450,000 rn 4 4 Thanh Bac Nguyen Van Hung X Kinh Primary Farming 1,222,000 45 Thainhi Bac Huynh Thi Tam X Kinh Primary Farming 1,900,000 46 Thanhl Bac Nguyen Van Lan X Kinhi Primary Farning 1,400,000 47 Thanh Bac Le Van Ba X Kinh Primary Farming 700,000 * 48 Thanh Bac Nguyen Huiu Thanh X Kinh Secondary Farming_ 800,000 49 Thanh Bac Nguyen Thi Ut X Kinh Secondary Farming 1,000,000 50 Thanh Bac Thai HoAng San X Kinh Primary Farming 1,600,000 51 Thanh Bac Tran Thi Kieu X Kinh Primary Farming Farming 600,000 52 Thanh Bac _ Nguyen Thj Na _ X Kinh Primary 700,000 53 Thanh Bac Vo_Thi Se X Kinh Primary Farming 2,000,000 54 Thanh Bac Nguyen Van Trieu X _ Kinh Secondary Farming __ Farming _ 2,700,000 55 Thanh Dong D,ng Thi Tham X Kinh Secondary _ 1,400,000 * 56 Thanh Dong DoVan Thanh X Kinh Secondary Farming 3,000,000 57 Thanh Dong Nguyen Thj Ren X Kinh Secondary Farming 1,800,000 E 58 Thanh Dong Pham H6ng Nam X ,Kinh Secondary _ Farming _ 600,000 59 Thanh Dong V6 San Lam X _ Kinh Secondary Farming 900,000 60 Thanh Hoa Nguyen Van Tien X Kinh Secondary _ Farming 1,300,000 61 Dong Thuan Vo Thi HA _ X Kinh Secondary _ Farming I 1,550,000 62 Thanh Hoa Nguyen VAn Be X Kinh Secondary Farming 1,300,000 63 Phuoc Ly Vo Thi Nhur Y X Kinh Secondary Farming I I I I I

I' I' I1 I~~~~. Iown Di Linh Iistrict Di Linh rovince Lam Dong

* Address of Eth. Main occupation Estimated lo Household / Heads of HHs Male Female Education and sources of Total Income Hamlet Group Income per Month HungVuong Vu Minh Tan X Kinh High-school Business 3,200,000 HnDo_an Thi Diem Tran Nguyen Lam X Kinh High-school Farming 1,400,000 I Dao Duy_Tu Ha Van Duyen X Kinh High-school _ Farming 2,900,000 Dao Duy_Tu Nguyen Thi Nga X ___Kinh Read/write Allowanced 400,000 5 Dao Duy Tu Le Truo&ng Tho. X Kinh High-school Farming 1,300,000 _ j Hung Vuong__ Nguyen T"ac Son __ X=_ Kinh 00 High-school_ Farming- 1,200,000 * Hung Vuong Ly Quang Nhan X Kinh University Wage earner 5,900,000 8 Hung Vuong Pham Thi_B6ng X _ Kinh High-school Farming 1,900,000 I Dao Duy Tu Doan Thi Ly X _ Kinh High-school Wage earner 1,800,000 *0 Dao Duy Tu Nguyen Huru Nghi X Kinh Primary __ Wage_earner 2,200,000 11 Dao Duy Tu Mai Duy Khiem X Kinh University Wage earner 2,300,000 2 Dao Duy Tu Nguyen Xuan Hoan X- Kinh High-school _Business 1,400,000 03 Doan Thi Diem Le Minh Thao X Kinh University Wage earner 3,800,000 14 Doan Thi Diem T6ng Thj Ngoc Hoa X Kinh High-school Business 2,700,000 5 Hung Vuong Nguyen Thi Chinh X Kinh High-school Farming 1,300,000 16 Doan Thi Diem Nguyen Nhtu Y X Kinh High-school Wage earner 1,600,000 i7 Doan Thi Diem Tran NgQc Anh X Kinh Secondary Farming _ 1,200,000 8 Hung Vuong Nguyen Thi Muroi X Kinh High-school Wage earner 3,000,000

I ommune Dinh Lac District Di Linh Irovince Lam Dong

Address of Ethic Main occupation Estimated Total o Household / Heads of HHs Male Female Group Education and sources of Income per Hamlet Income Month

^ Due K.'broy X K'Ho Secondary Farming 450,000 | Due K.'bies X K'Ho High-school Farming 500,000 3 Due K.'djeoh X K'Ho Primary Farming 950,000 I Due K.'tii X K'Ho High-school Unstable 925,000 Due K.'deo X K'Ho Read/write Farming 600,000 6 Due Ka. Nh6t X K'Ho Primary Farming 700,000 I Due D6 Manh Hung X Kinh Secondary Wage earner 1,800,000 Due Ka. hieu X K'Ho Read/write Farming 300,000 9 Kao Kuil K. reo X K'Ho Secondary Farming 700,000 !0Kao Kuil K. rol X K'Ho Primary Farming 600,000 1 Kao Kuil K.' me. u X K'Ho Read/write Farming 400,000 2 Kao Kuil K.'br6i X K'Ho Primary Farming 700,000 3 Kao Kuil K.' mIl X K'Ho Read/write Farming 700,000 14 Kao Kuil K.' br6oh X K'Ho Read/write Farmnig 700,000 I Kao Kuil K.' d&m X K'Ho Primarv Farming 800.000 I Address of Ethic Main occupation Estimated | No Household I Heads of HHs Male Female GEthi Education and sources of Total Income Hamlet GopIncome per Month 16 Kao Kuil K.' chaim X K'Ho Read/write Farming 700,000 I 17 Kao Kuil K.' breu X K'Ho Primary Farming 500,000 18 Kao Kuil K.' res X K'Ho Primary Farming 700,000 19 Kao Kuil K.' bro X K'Ho Secondary Farming 800,000 I 20 KaoKuil K.' brol X _ K'Ho _ Read/write Farming 800,000 21 Kao Kuil Tram Minh Luiy X Kinh Secondary__ Farming 500,000 22 Kao Kuil Nguyen Van Chau X Kinh Secondary Farming 500,000 23 Kao Kuil Nguyen Van Ph6ng X Kinh Secondary Farming 500,000 24 Tan Phu Trtrcrng van Thang X Kinh Primary Farming __ 1,400,000 I 225 Tan Phu Nguyen_Thi Xoan __ X Kinh High-school Farming 1,300,000 26 Tan Phu Ltang ngoc Vien X Kinh High-school Farming _ 600,000 27 Tan Phu Dao V n Lrc _ X __ Kinh Secondary _ F_arming 1,000,000 _Kinh Secondary Farming 700,000 I 28 Tan_Phu _ _ Ng6 Quang Hieu X _i_ 29 Tan Phu Dam Van Nham X Kinh Secondary Business 2,200,000 30 Tan Phu Nguyen Xuan Ljch X Kinh Secondary Farming 1,600,000 I Commune Gia Hiep District Di Linh Province Lam Dong

N Address of / Mal Fea Ethic Main occupation Estimated NoHousehole Heads of HHs Male Female Group Education and sources of Total Income *Hamlet GopIncome per Month I I No.1I K.' brel X K'Ho Read/write Farming___ 900,000 2 No.7 Trinh Quoc Binh X - Kinh Primary Farming 900,000 3 No.7 Vu Van Binh X Kinh High-schoolH Farming 600,000 4 No.7 Pham DOrc My X Kinh Secondary Wage earner 1,600,000 5 No.7 Va Vun Quyet X Kinh Secondary Farming 1,100,000 6 No.7 Nguyen B-a Thanh X Kinh Primary Farming 1,200,000 7 No.7 Nguyen Van C61 X Kinh High-school Farming 1,800,000 I 8 No.7 Hoang Thi Tharm X Kinh Secondary Farming 1,000,000 9 No.7 Nguyen DOrc Minh X Kinh Secondary Farming 1,800,000 10 No.7 Doan Van Nhi X Kinh Read/write Allowanced 200,000 1* No.7 Nguyen Van Hiep X Kinh Secondary Farming I,000,000 12 Phu Hiep 2 Hoang Minh Tuan X Kinh High-school Wage earner 1,400,000 13 Phu Hiep 2 Tran Van Cur X Kinh Secondary Farming 1,200,000 Commune Tam Bo District Di Linh I Province Lam Dong

* Address of Ethic Main occupation Estimated * No Household/ Heads of HHs Male Female G Education and sources of Total Income Hamlet Income per Month I I Hiep Thanh I Nguyen Xuan Thanh X Kinh Primary Farming 3,700,000 2 Hiep Thanh I Phing Thi TAo X Kinh Primary Handicraft 1,000,000 3 Hiep Thanh I Le Hong_Phung X Kinh Secondary Farming 900,000 I 4 Hiep Thanh I Truong Dac Ca X Kinh Secondary Farming 1,200,000 5 Hiep Thanh I Ta D(rc huy X Kinh Secondary Farming 1,700,000 6 Hiep Thanh I Nguyen Hfru Quyet X Kinh Secondary Farming 3,100,000 7 Hiep Thanh I Nguyen Van Hau X Kinh High-school Wage earner 2,000,000 8 Hiep Thanh I Nguyen Huru Trong X Kinh Secondary Farming 3,100,000 I 9 HiepThanh I Bui Thanh_Thuy X _ Kinh High-school Wage earner __,600,000 I10 Hiep Thanh I Le Thi Than X Kinh _ Secondary Wage_earner __1,200,000 11 Hiep Thanh I Tran Dinh Nam X _ Kinh _ High-school Wage earner 1,800,000 I 12 Hiep Thanh 2 HA K6ng Senh X Ning _ Secondary Farming 1,500,000 13 Hiep Thanh 2 Vo Van ThAnh X Kinh Secondary _ Farming 1,100,000 14 Hiep Thanh 2 Lirang Van Truang_ X Kinh Secondary Farming 1,000,000 I 15 Hiep Thanh 2 Le Ngoc Hoc X _ Kinh Secondary _ Farming _ 1,800,000 16 Hiep Thanh 2 Nguyen DOuc Den X Kinh _ Secondary Farming 2,500,000 17 Hiep Thanh 2 Duang Bon X Kinh Secondary _ Farming 2,500,000 |18 Hiep Thanh 2 DO Kim Tam X Kinh High-school Farming 1,000,000 19 Hiep Thanh 2 Nguyen Van ThA X Kinh High-school Farming 900,000 20 Hiep Thanh 2 D6 H6ngMinh X Kinh High-school Business 2,000,000

Commune Ninh Gia District Duc Trong Province Lam Dong

Address of Main occupation Estimated No Household/ Heads of HHs Male Female Ethic Education and sources of Total Income Hamlet Income per Month

1 I Farm No.78 Nguyen Van Huy X Kinh Secondary Farming 1,200,000 2 Farm No.78 Pham Ngoc Son X Kinh Secondary Farming 1,100,000 3 Farm No.78 Le Van Dung X Kihih High-sclhool Wage earner 1,200,000 4 Farm No.78 Lu u-Huy Trur&ng X Kinh High-sclhool Farming 2,000,000 5 Farm No.78 Nguyen Tuan Cur&ng X Kinh High-school Wage earner 1,800,00,0 * 6 Farn No.78 Nguyen Xuan Thuy X Kinh High-school Farming 1,200,000 7 Farm No.78 Nguyen Van Linhi X Kinh High-school 800,000 |I 8 Farn No.78 Nguyen Van Binh X Kinh Secondary Farming 1,200,000 9 Farm No.78 A. Phong X Kinh University 7,000,000 10 Farm No.78 HoAng Trong Kin X Kinh High-school Wage earner 5,239,000 11 Farmi No.78 Nguyen Th; HoAi Bac X Kinh High-school Farming 1,300,000 12 Farm No.78 Vi Van Vuaong X Kihi High-sclhool Wage earner 1,200,000 I 13 Thieni Chi Tran Vaii kieu X Kihii Secondary Farminig 1.100,000 Address of Ethic Main occupation Estimated Income No Household I Heads of HHs Male Female Education and sources of Total Hamlet Group Income per Month 1,300,000 14 Thien Ci1i Nguyen Thi Ho6ng Hoa X Kinh Primary Farming 600,000 I 15 Thien Chi Le Ngoc Tjnh X Kinh Secondary Farming 16 Thien Chi Nguyen Van Xuan X Kihii Secondary Farming 1,050,000 1,300,000 17 Thien Chi Nguyen Hutu Ch6t X Kinh Secondary Farming 900,000 I 18 Thien Chi Nguyen Anh Nhat X Kinh Secondary Farming

I Commune Phu Hoi District Duc Trong Province Lam Dong

Address of Eth, Main occupation Estimated of Total Income * No Household / Heads of HHs Male Female G Education and sources Hamlet roup Income per Month I R'Chai Sa Ao Ha Duyen X K'Ho Secondary Farming 1,200,000 800,000 2 R'Chai Ha Hien X K'Ho Secondary Farming I 800,000 3 R'Chai So Ao Ru Land X K'Ho Secondary Farming 850,000 4 R'Chai Ka Sa K' Loan X K'Ho Secondary Farming I 1,200,000 5 R'Chai Ha Chin X K'Ho Secondary Farming 1,900,000 6 R'Chai K'Rieng X K'Ho Secondary _Farming 950,000 7 R'Chai K'_Sai X K'Ho Secondary Farming I 800,000 8 R'Chai K' Soi X K'Ho Secondary Farming 9 R'Chai K' Br6ng X K'Ho Secondary Farming 1,340,000 10 R'Chai D6ng Tan Toan X Kinh Secondary Farming 1,100,000 * 11 Ba Pre Ya Huy_ X Kinh Secondary Farming 1,000,000 12 Ba Pre Phan Van Thanh X Kinh Secondary Wage earner -1,200,000 13 Ba Pre Tran Quang X Kinh Secondary Farming 800,000 14 Ba Pre Huynh Pho X Kinh Secondary Wage earner 1,100,000 15 Ba Pre Nguyen Ng,c Minh X Kinh High-School Wage earner 2,300,000 16 Ba Pre Pham Thi Van X Kinh Secondary Business 1,100,000 17 Ba Pre Nguyen Thanh Minh X Kinh High-School _ Wage earner 1,600,000 E 18 Ba Pre K' L6i X K'Ho Secondary Wage earner 2,380,000 19 Ba Pre K' Loan X K'Ho Secondary Farming 700,000 20 Ba Pre Ya - Te X K'Ho Elementary Farming 2,100,000 I 21 Ba Pre Ma - Dem X K'Ho Elementary Farming 940,000 22 Ba Pre Ha'Sih X K'Ho Secondary Farming 1,200,000 23 Ba Pre Pham NgQc Thanh X Kinh Secondary Farming 1,400,000 I 24 Ba Pre N6ng Thj Tuyet Hruang X Kinh Secondary Farming 800,000 25 Phu An Hoang Cong Thien X Kinh Secondary Farming 1,200,000 26 Phu An DOng Dinh Yen X Kinh Secondary Farming 800,000 I 27 Phu An Ho Thi Hoa X Kinh Secondary Handicraft 600,000 28 Phu An Nguyen Vinh X Kinh Secondary Farming 600,000 29 Phu An Le Van Thallih Liem X Kinh Secondary Wage earner 1,000,000 30 Phul An NguyelnNggc Duang X Kihii Secondary Farming 2,100,000 31 Phu An Ka Sa K' Get X K'Ho Secondary Farminig ] 400,000 1 32 Phu An Tran Dunig X Kinhi Secondar) Wage earner 650,000 I Address of Main occupation Estimated No Household I Heads of HHs Male Female Ethic Education and sources of Total Income Hamlet Group Income per Month

33 Phu An D0 Van Tuat X Kihil Secondary Farming 600,000 IP34 Phu An Vo Dinh Thuan X Kinh University Handicraft 5,000,000 35 Phu An Tong Thi Tuyet Hoa X Kinh Secondary Farming 1,000,000 36 Phu An Dang Van Phap X Kinh Secondary Farmiing 900,000 || 37 Phu An Dinh Minh Duc_ X Kinh Secondary Business 3,600,000 38 Phu An Tran Thanh X Kinh Secondary Business 2,100,000 39 Phu An Mai Van Xanh X Kinh High-School Farming 1,100,000 40 Phu An Nguyen Tran Thuy X Kinh Secondary Farming 800,000 41 Phu An Nguyen Van Tien X Kinh Secondary Farming 900,000

Town Lien Nghia I District Duc Trong Province Lam Dong

3 Address of Ethic Main occupation Estimated * No Household / Heads of HHs Male Female Education and sources of Total Income Hamlet Group Income per Month I I Zone No.7 Duang Trung Du X Kinh_ Secondary _ Farming 500,000 2 Zone No.7 Pham Thj Que X Kinh Secondary Farming 900,000 I 3 Zone No.7 Luxu Thi Mui X Kinh Secondary _ Farming 1,200,000 4 Zone No.7 Au Ly Sang X Kinh High-school Farming 1,200,000 5 Zone No.7 Trieu Viet Tien X Kinh Secondary Farming 1,200,000 6 Zone No.4 Doan Ngoc Curng X Kinh University Wage earner 3,000,000 7 Zone No.2 Vo6ng Ca Sol X Thai High-school Farming 1,600,000 8 Zone No.2 Phan Thi Hien X Kinh High-school Farming 900,000 I 9 Zone No.4 Nguyen Thj DOrc X Kinh High-school Business 2,500,000 10 Zone No.2 Voong Thong Sanh X Thai High-school Farming 1,200,000 11 Zone No.2 Trieu Van Th6ng X Kinh University Farming 1,400,000 I 12 Zone No.4 Biui Nguyet X Kinh High-school Farming 1,700,000 13 Zone No.4 Phan Chau Ngoc X Kinh Secondary Farming 1,000,000

Commune Long Thanh I District Phung Hiep Province Hau Giang

Address of Ethic Main occupation Estimated -No Household / Heads of HHs Male Female Grop Education and sources of Total Income Hamlet Group Income per Month I I Long Hoa Nguyen Van Dura X Kinh Primary Wage earner 1,800,000 2 Long Hoa Tran Van Hung X Kinh Secondary Business 3,300,000 13Long Hoa Tran Van R61 X Kinh Secondary 2,400,000 I I Commune Thanh Hoa District Phung Hiep Province Hau Giang

* Address of Ethic Main occupation Estimated * No Household / Heads of HHs Male Female G Education and sources of Total Income Hamlet Income per Month I I No.1 Tran Thi Ban x Kinh Secondary Farming 1,200,000 2 No.1 Nguyen Van Minh X Kinh High-school Farming _3,200,000 3 No. I Nguyen Van H6ng X __ Kinh Secondary Wage earner 3,600,000 I 4 No.1 Nguyen Thi Ut X Kinh Secondary Wage earner 2,400,000 5 No. I Nguyen Hung Hau X Kinh High-school Farming 1,900,000

6 No.1 _ Nguyen Van T6 _X __ _ Kinh _ High-school Wage earner 2,300,000 7 No.I Tran NgQc loi __X _ Kinh Secondary Wage earner 2,600,000 8 No.1 Nguyen Van Thanh X Kinh Secondary Wage earner 2,800,000 9 No.1 Le Van Diem _ X = _Kinh __Secondary Wage_earner_ 1,200,000 10 No.1 Vo Van Vien X HKnhHigh-school Wage earner 2,200,000 INo. I Nguyen Van Ba X Kinh Secondary _ Farming 900,000 I 12 No. I Nguyen Van Kham X Kinh High-school Wage earner 1,600,000 13 No.i Ngo Van Tra X Kinh Read/write Farming 3,700,000 14 No.1 Nguyen Van Chuoang X Kinh University _ Farming 3,900,000 15 No.1 Huynh Van Nam X Kinh High-school Farming 700,000 16 No. 1 Ly Thi Lieu X _ Kinh High-school Wage earner 1,000,000 17 No. I Cao Van Churong X Kinh High-school Wage earner 1,600,000 18 No.1 Nguyen Van Son X Kinh University Wage earner 2,400,000 19 No.1 Huynh Thj Hiem X Kinh Primary Business 1,500,000 IN 20 No.1 Huynh Thi Cuc _ X Kinh University Wage earner 1,400,000 21 No.1 Huynh Thi My Van X Kinh Primary Business 1,600,000 22 No.1 Tran ThanhVinh X Kinh Secondary Farming 1,600,000 23 No.1 Tang Van H6n X Kinh Secondary Wage earner 800,000 24 No.1 Cao Thanh Phuong X Kinh Secondary Farming 1,400,000 25 No. 1 Nguy6n Van Ut X Kinh Secondary Business 1,500,000 26 No.1 D6 van Binh X Kinh Primary Farming 700,000 27 No.1 Tran Thanh Hung X Kinh Secondary Business 1,400,000 28 No.1 Nguyen Thi Ba X Kinh Primary Farming 700,000 29 No.1 Le Van Thu X Kinh Secondary Farming 800,000 30 No.1 Huynh HTuu Tu X Kinh Read/write Wage earner 1,800,000 31 No.3 H6 Van Ba X Kinh Farming 650,000 32 No.3 Nguyen Van Ban X Kinh Farming 700,000 33 No.3 Nguyen Van Thanh X Kinh Secondary Farming 800,000 I 34 No.3 Le Van Diem X Kihih Secondary Wage earner 1,200,000 35 No.3 Ho Van DOrc X Kinh Secondary Wage earner 1,400,000 36 No.3 Cao Vu Hien X Kinh High-school Farming 700,000 I 37 No.3 Huynh Th; Cuc X Kinh Secondary Farming 800,000 8 No.3 Tran Quoc Nam X Kihli High-school Wage earner 1,400,000 39 No.3 Nguyen The Cu&ng X Kinh High-sclhool Wage earner 1,500,000 I 40 No.3 Tran Thanlh Tring X Kihli Secondary Farming 800,000 41 No.3 Tran viet TruLlg X Kihli Wage earmer 1.500,000 I 42 No.3 Ho Van Ttd X Kinll Secondary Wage earner i,400,000 Address of Ethic Main occupation Estimated No Household / Heads of HHs Male Female Education and sources of Total Income Hamlet Group Income per Month

43 No.3 La Van C6n X Kinh Secondary Wage earner 1,200,000 I 44 Tam Vu I Phan HCu Nhiem X Kinh High-school Farming 1,000,000 45 Tam Vu I le Miih Luan X Kinh Secondary Wage earner 1,400,000 46 Tam Vu I Phan huu Tich X Kinh High-school Wage earner 1,300,000 I 47 Tam Vu I Nguyen Thi Ba X Kinh Secondary Wage earner 1,500,000 48 Tam Vu I Tran Van Dan X Kinh Secondary Wage earner 1,200,000 49 Tam Vu I LeThieu Hoa X Kinh Secondary Farming 900,000 50 TamVu I Tran QuangNgoi X Kinh High-school Wage earner 1,400,000 51 Tam Vu I Le Thi Sau _ X Kinh Secondary Farming 900,000 52 Tam Vu I Dinh Van Bac X Kinh Secondary Wage earner 1,000,000 53 Tam Vu I V6Thi Cuc X_ Kinh High-school Farming__ 800,000 54 Tam Vu I Tran Thi Giau X Kinh Secondary Farming 1,000,000 I 55 Tam Vu I Vo Van S& X Kinh Secondary Farming 800,000 56 Tam Vu I Tran Van_CuaoYng X Kinh Secondary Farming 900,000 57 Tam Vu I Nguyen Van Sau X Kinh Secondary Farming 1,000,000 I 58 Tam Vu I Lam Thi xuan Dao X Kinh Secondary Farming 1,400,000 59 Tam Vu I Nguyen Van Thang X Kinh Secondary _ _Farming 1,200,000 60 Tam Vu I Tran Van Dan x Kinh Secondary _ Wage earner 1,000,000 I 61 Tam Vu 1 Le_Van Tich X Kinh High-school Wage earner 1,000,000 6 62 Tam Vu I Le Phat Minh X Kinh High-school Farming 800,000 63 Tam Vu I H6 Van Ut X Kinh Secondary Wage earner 1,500,000 I 64 Tam Vu I Nguyen Van Mtr&i X Kinh High-school Wage earner 1,400,000 65 Tam Vu I Tran Thi Thu X Kinh Secondary Farming 900,000 66 Tam Vu I Ho Van Can X Kinh Secondary_ Wage earner 1,200,000 * 67 Tam Vu I Tran Van Binh X Kinh High-school Wage earner 1,200,000 68 Tam Vu I Phan Van Lam X Kinh Primary Farming -1,600,000 69 Tam Vu I Ta Thi Tur X Kinh Secondary Wage earner 1,400,000 70 Tam Vu I Bui Van Chi X Kinh High-school Farming__ 1,900,000 71 Tam Vu I Lucrng Van Chinh X Kinh Secondary Farming 1,400,000 I 72 Tam Vu I Nguyen Van Vinh X Kinh Primary Farming__ 2,500,000 73 Tam Vu I Nguyen Kim Em X Kinh High-school Farming 700,000 74 Tam Vu I Nguyen Van Nhan X Kinh High-school Wage earner 2,000,000 I 75 Tam Vu I Le Thj Htx6ng X Kinh Secondary Wage earner 1,500,000 76 Tam Vu I Vo Van Tri X Kinh High-school Farming 800,000 77am T Vu I Phan Thi Quang X Kinh High-school Farming 600,000 78 Tam Vu I Le Van Sau X Kinh High-school Farming 700,000 79 Tam Vu I Dang Van Viet X Kinh University 1,400,000 80 Tam Vu I Tran Thi MNy X Kinh High-school Farming 600,000 81 Tam Vu I Trurong Van Sau X Kinh High-school Farming 900,000 82 Tam Vu I Nguyenl Van Do X Kinh Secondary Farming 800,000 83 Tam Vu 2 Tang Thi Tinh X Kinh Secondary Unstable 1,100,000 84 Tam Vu 2 Mai Van H,6i X Kihl l Secondary Wage earner 2,000,000 85 Tam Vu 2 Mai Van C6ng X Kinh Secondary Wage earner 1,500,000 86 Tam Vu 2 DO Van Ha X Kinh Wage earner 1,000,000 87 Tam Vu 2 NguLeVn Van Hy X Kinhl Secondarv Farming 900,000 I 88 Tam Vii 2 NguyenL Van Phlilc X Kihll High-school 1,300,000 I Main occupation Estimated Address of Ethic and sources of Total Income Household Heads of HHs Male Female G Education No Income per Month Hamlet Group High-school Farming 800,000 89 Tam Vu 2 Dlng Van DOo X Kinh Farming 900,000 H 90 Tam Vu 2 Doan Van NhAn X Kinlh Primary Secondary Wage earner 1,200,000 91 Tam Vu 2 Nguyen Hu~u Oanhl X Kinh Secondary Farming 900,000 92 Tam Vu 2 Nguyen Van Nhien X Kinh Secondary Wage_earner 1,600,000 93 Tam Vu 2 Le Van Mau X Kinh Secondary Wage earner 1,200,000 * 94 Tam Vu 2 Phan thi Mau X Kinh Wage earner 1,500,000 95 Tam Vu 2 Doan Van Chan X Kinh Secondary Wage_earner _ 1,400,000 96 Tam Vu 2 Tang Van Lanh X Kinh High-school Farming 850,000 97 Tam Vu 2 Le Thi Ba X Kinh Secondary High-school Farming 1,900,000 98 Tam Vu 2 Le Nhat Nang X Kinh High-school Wage earner 2,000,000 99 Tam Vu 2 Vo Van Sa X Kinh High-school Farming 1,200,000- 100 Tam_Vu 2 Nguyen Van Thanh X Kinh Secondary Wage earner 2,000,000 * 101 Tam Vu_2 Nguyen Hoang Yen _X Kinh Farming 2,300,000 102 Tam Vu 2 NguyenThi Chot X Kinh Secondary Wage_earner 1,950,000 103 Tam_Vu 2 Ngui Truarng Lanh X Kinh High-school High-school Farming 800,000 * 104 Tam Vu 2 _ VoVanQuang X_ Kinh Secondary Farming _ 700,000 * 105 Tam Vu 2 Phan Thi Thom X Kinh Farming 700,000 106 Tam Vu 2 Nguyen Van Tam x Kinh High-school_ Wage earner 1,900,000 107 Tam Vu 2 L8 Thi Dinh X Kinh High-school Wage earner 1,900,000 108 Tam Vu 2 Lurng Van_BAy _ X Kinh Secondary Wage_earner 2,000,000 109 Tam Vu 2 Nguyen Thi Ba X Kinh Secondary Farming 800,000 110 Tam Vu 2 NguyenVan Bit To X Kinh Primary H Farming 700,000 111 TamVu 2 Tran Thi The X Kinh Primary Unstable 400,000 112 Tam Vu 2 Nguyen Van TLr X Kinh Secondary I Farming 700,800 113 Tam Vu 2 Le Van Thang X Kinh Secondary Farming 700,000 114 Phu Khoi Trang Kim Tua X Kinh Secondary Wage earner 1,200,000 115 Phu Khoi LuVan D an x Kinh High-school Wage earner 1,100,000 116 Phu Khoi Lu Minh HAi X Kinh Secondary

| Commune Binh Thanh District Phung Hiep H Province Hau Giang

occupation Estimated Address of Ethic Main and sources of Total Income Household / Heads of HHs Male Female Education H No Income per Month Hamlet Group Secondary Farming 2,800,000 * I Thanh My A Nguyen Van Tam X Kinh High-school Farming 2,600,000 * 2 Thanhll My A Nguyen Thi BAy X Kinh Farming 2,400,000 3 Thanlh My A Nguyen Van Hieu X Kinh Primary

H H~ I Commune Tan Binh I District Phung Hiep Province Hau Giang Estimated Ethic Main occupation Address of of Total Income Female Education and sources Heads of HHs Male per Month No Household! Group Income Hamlet Farming 800,000 X Kinh High-school I ] Tan Hiep Huynh Va Ba 1,000,000 X Kinh Secondary _ Farming 2 Tan Hiep Nguyen Van Nghiem 750,000 X Kinh Secondary Farming 3 Tan Hiep Nguyen Thi Be Nam 700,000 Kinh High-school Farming Tan Hiep Trunng Van Ma_n X * 4 Secondary Farming 800,000 Nguyen Thj Kien X Kinh 5 Tan Thanh Farming _ _ 700,000 X Kinh Primary __ 6 Tan Thanh Doan Van Curng -1,400,000 I -,--.- Kinh High-school Farming Long A -- L6VAn Bay -- --. x - 7 -Tan High-school Farming_ _ 1,000,000 Van Hng X Kinh 8 Tan Long A DoAn Farming 800,000 X Kinh Secondary 9 Tan Long A Le Van Luc 700,000 I Kinh Secondary Farming Tan Long A Ly Thai Hiep X 10 High-school Farming _ _ 1,000,000 B13i Thi Thu Nga X Kinh 11 Tan Long A Farming _ 1,200,000 Minh Thach X Kinh High-school 12 Tan Long A Nguyen Farming 700,000 I X Kinh Secondary _ 13 Tan Long B Vo Van Hieu 800,000 Kinh Secondary Farming B V6 Van Tanh X 14 Tan Long Farming 800,000 Phu X __ Kinh_ _ Primary * 15 Tan LongB __NguyenThi Farming 1,200,000 X Kinh High-school 16 Tan Long B Nguyen Tan Bac Ai

Commune Tan Phu Thanh I District Chau Thanh A Province Hau Giang Estimated Eth. Main occupation of fl Address Education and sources of Total Income of HHs Male Female GEthi - No Household / Heads Income per Month Hamlet 1,000,500 X Kinh Primary Retired I Long An D3ng Van Bao Primary Wage earner 2,400,000 Than X Kinh 2 Long An Tran earner 2,800,000 X Kinh University Wage 3 Long An Nguyen Phuroc Tan 1,400,000 I X Kinh Primary Wage earner 4 Long An Le Thi Lieu 3,500,000 X Kinh Primary Unstable 5 Long An Nguyen Van Hai I 11 Il I1 I1 Mot Ngan I Chau Thanh A Hau Giang ice occupation Estimated Main Total Income Ethic and sources of Education per Month of Male Female Income Iress HHs Heads of Group 1,200,800 ousehold Wage earner let Primary 1,500,400 X Kinh Business _ Nguyen Thi Hoa Kinh Secondary 1,800,300 lo.lA X Farming_ Phan Thi Ngwgc High-school 1,500,300 IA X Kinh Wage earner _ Le Van Tur Kinh_ Secondary 1,500,300 JIA X Business Le Van Xe Secondary 1,500,500 "4o.IA X Kinh Farming __ Nguyen Thi Hai High-school 1,300,400 .AI X Kinh Wage earner Tran Van Thanh Kinh High-school 1,200,300 IA X _ Business Nguyen Van T&m Kinh Secondary 1,400,300 No.IA _ X Wage earner Le Thi Toi Kinh Primary 1,300,300 .IA X Wage earner Le Thanh Trung Secondary 1,500,300 to.IA X _ Kinh Farming Nguyen Van Bay High-school 1,000,500 lo.IA X Kinh Wage earner Van Hung High-school 1,500,600 o.IA Nguyen X Kinh Wage earner Huynh C6ng Trieu Kinh Secondary 1,300,300 Nlo. IA X _ Wage earner Tiet Van Nguac Kinh High-school 500,300 IA X Farming go. Van Chinh Secondary 1,500,500 o.lA Nguyen X Kinh Farming _ Tran Van Cat Kinh High-school 1,200,400 No.IA X _Wage earner Nguyen Van My Kinh Secondary -- 900,300 3No.]A X Farming_ Nguyen Van Tho _Secondary 1,500,400 No.IA X Kinh Wage earner Vo Van Tiu Kinh High-school 1,800,200 3 No.IA X Business D6 Van Dat Kinh Secondary 1,500,500 No.]A X Wage earner Mai thj Be Ba _High-school 1,000,400 No. IA X Kinh Farming Cao Van Nam Kinh Primary 1,300,300 I No. I A X Wage earner Van D&i Kinh Secondary No.lA Nguuy6n X Business 1,200,300 J Nguyen Van Sang Secondary 1,000,400 2 No.lA X Kinh Wage earner Thi Nh& High-school 800,400 No.lA Nguyen X Kinh Farming $ Tran Van Sach Kinh Secondary 1,300,400 No.IA X Wage earner Nguyen Van Thang Secondary 1,000,200 No.IA X Kinh Wage earner Van Nh$t Secondary 1,500,300 No.IA Nguyen X Kinh Farming W Van Tep Kinh High-school 500,500 No. IA Nguyen X Farming Tran Van Neo Kinh High-school 3,600,000 29 No.lA X Wage earner Nguyen Van Manh Kinh Secondary 2,800,000 0 No.IA X Farming Tran Thi Tram Kinh High-school 2,000,000 *I Thi Tu X Farming Tran Thanh Ky Kinh High-school 1,200,000 32 Thj Tu X Business Huynh Huu Phwtc Kinh High-school j 3 Thi Tu X Nguyen Th; Hoa | 4 Thi Tu I Transmission, distribution and disaster reconstruction Project - Vietnam 1 OkV Transmission lines and substations in Southern Vietnam

I

I APPENDIX1 1 I INVENTORY OF PROJECT AFFECTED PEOPLE I

I

| ~~Power Company No.2 | | ~Power Engineering & Consulting Company No.3 I

Appendix 11 - Inventory of Project Affected People I Detail of PAPs' Inventories - Commune Distribution, cover 40 comimnunes in I I districts + 2 towns + 2 cities of 7 project related provinces are showvn in the following tables.

Commune Ham Thang District Ham Thuan Bac I Province Binh Thuan

Total Affected Total agricultural land holding (m2) Affected agricultural land (m ) House I ~ ~~~~~~~~~~Numberof residential residential No Name of Heads of HHs persons in ld ding land Paddy Crops Industrial Garden Paddy Crops Industrial Garden | Housing Existing Affected HR 2an 2hfeldladnree lndnan Others Others 2 2 (Mi) (m) field land treesland land field land trees land land categogy (mi) (mi)

I Le Van Lai 9 600 450 4 175 175 I 2 Nguyen Chi ThAnh 5 400 72 3,120 1,400 4 50 30 3 Nguyen Minh Ngoc 4 3,000 1,000 4 40 40 4 Nguyen Minh Vui 3 90 90 4 60 60 I _S _ NguyenThi Xu 4 1,000 150 4 150_ 100 0 6 DoAn Van B6ng 3 100 60 _ 4 24 24 7 DoAn Van Trung 6 900 550 4 120 120 I 8 DoAn Van Sam 4 100 100 4 96 96 9 DoAn Thi Cam Linh 2 200 120 4 120 120 Total 40 6,390 2,592 3,120 1,400 36 835 765

I Commune Ham Nhon District Ham Thuan Bac Province Binh Thuan

Total Affected Total agricultural land holding (mi2 Affected agricultural land (m ) House Number of residential residential No Name of Heads of HHs persons in hoing land Paddy Crops Industrial Garden Others PaPaddy Crops Industrial Garden Others Housing Existing Affected 2 HH (m ) (2) field land trees land land field land trees land land categogy (m)2 (m2)

I Tran Cong Danh 5 780 230 4 30 30 2 Nguyen Thj 6m 1 100 100 _ Temp. 30 30 3 NguyenThi Thu 5 400 400 4 90 90 Total 11 1,280 730 8 150 150 I I I Ward Mui Ne I city Phan Thiet Province Binh Thuan

Total Affected Total agricultural land holding (m )______Affected agricultural land (m 2 House Nunmber of residential residential Afece * NoName of Heads of HHs personsH i land holding land Paddy Crops Industrial Garden Others Paddy Crops Industrial Garden Otes Housing Exstn Othersgy 2 2 * HH 2~~~~~~~~~~~~~~~~~~()(2) field land trees land land rield land trees land land 80 80 1 Nguy6n Van Nhdmn 5 1,500 1,500 4 2jTru'ang Totalr 5 1,000 200~ 4 80 80

- 160 Total ~ 10 2,500 1,700 8 160

Commune My Huong I District My Tu Province Soc Trang

2 House TotalAffected ~~~~~Total agricultural land holding (mn2 ___ Affected agricultural land (m Number of residential residential Affected No Name of Heads of HHs persons in Pdy Cos Iutra GrenPaddy Crops Industrial Garden Housing Existing Others Others 2 2M HHI 2an 2hfeldladnreeludnan (in (n (in (in) fil ad tesln adfield land trees land land categogy

1-,0001 ------200 __Tepm. 60 - 35- Il Nguyen_Qu6c__K_h_i -3 350 __ 20.0 6,000 ------2-00 __ ___ 40 _30 800 40- Tepm.- 40 2 Tran Nggc GiAu 4-- 350 200 _ 2,000 _ _ __--- _35 __ 120 300 __Io T.epm. 3-5 3 _HuSmnh VdnTit -- - 2 200 _ 200 400 __ __540 4 120 80 I 4~~Ddng VAn Hfung 53020800 _ _1,200 2,300 __4 __70 7 0 ___300 1,000 __300 5 M-ai Vadn- DO _ 350 350 5,0 00 800 __200 Tam 80 50 6 Luru Van Tidn 5 350 _ 300 2,000 200 Tepm. __ 40 .40 7 Ddng Van V 4 250 _250 - 750 __750 I Tepm. 30 30 8 Ng6 Thainh Lm 4 300 300 300 __ _ 300 6 9 D~ngV~nCu~ng 3 350 350 800 800 Tepm. 60 440 Total 37 2,850 2,350 24,650 300 3,120 6,950 300 2,180 8 535

ECommune Thuan Hung I District My Tu Province Soc Trang

Total AfetdTotal agricultural land holding (in 2 Affected agricultural land (Mn) House Number of residential residential Existing Affected No Name of Heads of HHs persons in lnhodg lad Paddy Crops Industrial Garden Otes Paddy Crops Industrial Garden Housing 2 2 HH (m2 (m2 rield land trees land land rield land trees land land Othersgy

48 30 IThiach Sanhi 6 200 140 Temp. 300 1,200 300 4 45 4 2 1 LamDi~~~~~~pTh 5 300 150 4,000 75 Total ii 500 290 4,000 300 1,200 300 4 93 I

Commune Phu My I District My Tu Province Soc Trang

Number of Total Affected Total agricultural land holding (m 2 | Affected agricultural land (m2)2 House Number of residential residential No Name of Heads of HHs persons in land holding land Paddy Crops Industrial Garden Others Paddy Crops Industrial Garden Othe|s Housing Existing Affected HH l (M2) | (m 2 | field land trees land land field land trees land land categogy (Mi) (mi)

I Trieu Lam 6 350 200 4,500 200 2,000 200 Temp. 45 45 2 Thach Men 4 350 350 2,640 400 -1,500 400 Temp. 50 50 3 Lam Xthao 5 300 300 4,635 350 1,200 350 Temp. 45 45 4 Thach Bien 4 300 200 2,000 420 1,360 420 Temp. 48 48 5 Yn Rxen 5 300 350 4,000 300 2,000 300 Temp. 48 48 Total 24 1,600 1,400 17,775 1,670 8,060 1,670 0 0 236 236

I Commune Thuan Hung District My Tu Province Soc Trang

Total Affected Total agricultural land holding (m2) Affected agricultural land (m2) House

No Namof Heads of HHs persons in ld ding land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected HH | m2)h | (2)a Pfiel Creesland land land Others field land trees land land |t |scategogy (m 2 (mi)

I Tran Van Bay 6 350 200 5,000 150 2,500 150 Temp. 40 40 Total 6 350 200 5,000 0 0 150 0 2,500 0 0 150 0 0 40 40 I. I Commune Hau Thanh District Cai Be Province Tien Giang

.~ ~~~~~~_2 ___ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~2 I |Number of | Total Affected | Total agricultural land holding (mi) Affected agricultural land (mi) House

No Name of Heads of HHs persons in Irentald landt | Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected land holding land yOthers Others2 HH (m2) (Mn) fleld land trees land land field land trees land land categogy (in i 2

|I Nguyen Van ISau 3 300 300 140 140 Temp. 54 54 2 DE)ang Thi Yen Oanhl 2 100 100 4 50 20 I 3 D6 Thanh Cong 4 100 100 200 40 4 52 52 4 D6 Van Tuan 3 150 150 4 70 70 I Total 12 650 650 340 40 140 12 226 196 I I

Commune Tan Hoa I Town Vinh Long Province Vinh Long

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I l Number of | Total | Affected Total agl icultural lan(l holding (i 2 ) Affected agricultural land (i 2 ) House Nuniber of residential residential No Name of Heads of HHs persons in land hldm id Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected * ~~ ~~ ~~~ ~~~~~~H ln oling land Others Others 2M 2 H(M2) 1 (m2) [ field land trees land land field land trees land land categogy | (m) (m2)

I I Huynh Van Lien 1 80 60 4 60 60 2 Nguyen Thanihl Hung 3 300 70 Temp. 24 24 3 Train Van ChiAu 5 200 200 500 200 - Temp. 60 60 I 4 Bui Van DP 5 200 200 800 200 Temp. 60 60 Total -14 780 530 - 1,300 400 4 204 204

Commune Truong An I Town Vinh Long Province Vinh Long

Number of Total Affected Total agricultural land holding (m2) Affected agricultural land (m2) House Number of residential residential No Name of Heads of HHs persons in land hldn land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected ladHodig ladOthers Others2 HH l (m2) [ m22 field land trees land land field land trees land land categogy | (i 2 ) (mi)

I Nguyen Van Dlay 5 100 96 300 100 4 96 96 2 Nguyen Van Humng 4 300 100 400 100 4 72 72 Total 9I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 400 196 700 200 8 168 168

Ward 8 I Town Vinh Long Province Vinh Long

Total Affected Total agricultural land holding (m ) | Affected agricultural land (mi2 House

No Name of Heads of HHs persons in Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected | | HH l land~~~~~~~~~(m holding2) land(M2) field |land |trees land land jthrsOthersr ield |land |trees lnd |land categogy (m2)2 | (2(2) I I Trinh Tuyet Hang 2 200 100 200 100 4 40 40 2 Trinh Phi Hung 2 200 100 300- 100 4 72 72 3 HaNgoc San 2 90 90 4 72 72 I 4 Vo H6ng Nhi 5 100 100 4 60 60 5 Le Thi Thanh Tuiig 1 60 60 4 48 48 6 Pham Thi Mai 3 120 120 4 90 90 Total 15 770 570 500 200 24 382 382 I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I I

Commune Tan Hanh I District Long Ho Province Vinh Long

Total Affected Total agricultural land holding (m 2 _Affected agricultural land (m ) House Numiber of reieta rednil No| Name of Heads of HHs persons in land holding land Paddy Crops Industrial Garden Other Paddy Crops Industrial Garden Housing Existing Affected 2 2 2 * | | HH (2) (i ) field land trees land land field land trees land land |t |scategogy i(m) (m )

I 1I Nguyen Quoc Em 4 200 100 726 300 150 4 60 60 *2 Le Van Ty 8 100 100 570 300 . 200 Temp. 48 48 3 NguyenDuangChu 5 150 150 1296 200 200 _ 4 72 72 I 4 Le Van Tai 5 300 300 400 100 4 90 90 5 Nguyen VaniiThi 2 80 80 40 _ 40 4 40 40 6 H6 Van Y 3 -- 200 200 4 48 48 I 7 Nguyen Thi Be 2 24 24 X_ Temp.Te__ 24__ 24 8 Nguyen Thi Ngoc Lan 1 24 24 Temp. 24 24 9 Nguyen Van Ngan 3 300 100 100 4 48 48 Total 33 1,378 1,078 2,592 1,240 790 24 454 454

Commune Phuoc Hau District Long Ho I Province Vinh Long

2 2 | Total Affected Total agricultural land holding (m Affected agricultural land (m2) House I Number of ~~~~~~~~~~residential residential No Name of Heads of HHs persons in land holding land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected 2 2 HHl | (m2 (m ) field land trees land land Ohr field land trees land land categogy (m2 (m )

1 Le Minh Trac 8 150 _ 150 200 100 4 60 60 2 Pham Van Truyen -- -2 - 100 - 100o - - 400 -0- - 20 Temp. 24 24 Total 10 250 250 600 300 4 84 84

Town Long Ho District Long Ho Province Vinh Long

2 2M Total Affected Total agricultural land holding |m Affected agricultural land (in) House Number of residential residential No Name of Heads of HHs persons in lad holdin land Paddy Crops Industrial Garden Otes Paddy Crops Industrial Garden Housing Existing Affected 2 2 land holding land Others ~~~~~~~~~~~~~~~~Othersusn2xitn Afece HH (mi ) (m ) field land trees land land field land trees land land categogy (mi) (mi)

I T6ngVan SaLu 2 120 120 4 48 48 I 2 HuS'nh Quang Tieu Xuan 2 150 100 300 150 4 48 48 Total 4 270 220 300 150 8 96 96

I I I

Commune Long My I District Mang Thit Province Vinh Long

lTotal Affected Total agricultural land holding (m2) Affected agricultural land (m 2 House Number of residential residential P No Nmeo Heas ofHHs persons in lnhodg lad Paddy Crops Industrial GardenPad Crp Inutil G deHosg Extng Afcd 2 2M ______~lan ln 2odng tresladeresran Others HH (mNo (in) field land tree land land Ohr field land treesland land categogy (m ) (m

I Nguyen Van Bang 2 80 80 400 200 Temp. 32 32 2 Nguyen Van Chinh 2 100 100 500 100 Temp. 24 24 Total 4 180 180 900 300 - 0 56 56 II Commune My Phuoc District Mang Thit Province Vinh Long

______l ______2 _ - . Total Affected Total agricultural land holding (m Affected agricultural land (m ) House Number of residential residential | No Name of Heads of HHs persons in hoing land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected * ~~~~~~~~~~~~~~~~land laaddreesland filing lan cttgory(in (2n HH (mi2) (m2 ) field land trees land land field land trees la d land ategogy (m (m2

I Le Van H6Huong 3 50 50 Temp. 32 32 2 Dinh ThjiKimHoa - 2 80 80 4 72 72 Total 5 130 130 4 104 104

E Commune Phuoc An District Mang Thit Province Vinh Long

2 2 Total Affected Total agricultural land holding (m 2) Affected agricultural land (mi) House m ~~~~~~~~~~~Numberof residential residential l l No Name of Heads of HHs persons in holding land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected HH land laaddreesland filing land Others M2 2 (Mi2 ) (M2 ) field land trees land land and |dOthers |dcategogy | (i ) (mi)

llI LeTainNghiep 2 200 200 4 32 32 2 Ng6 Thj Lucm 7 50 50 Temp. 24 24 Total 9 250 250 4 56 56 I1 - I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Commune Vinh Binh I District Cho Lach Province Ben Tre

2 NumberIof Total Affected Total agricultural land holding (m ) Affected agricultural land (m 2) House Number of residential residential No Name of Heads of HHs persons inldI rlandholding land Paddy Crops Industrial Garden Others Paddy Crops Industrial Garden Others Housing Existing2 Affected2 HH (Mn) (Mn) rield land trees land land field land trees land land categogy (in (in

I INguye|n Vdn Tlud 5 100 100 500 300 Temp. 48 48 2 Nguyen Van Thanh 2 80 80 300 Temp. 32 32 3 Le Thi B6n 3 100 100 300 200 Temp. 24 24 Total 10 280 280 1,100 500 0 104 104

I Commune Son Dinh District Cho Lach Province Ben Tre

Total Affected Total agricultural land holding (m 2 _Affected agricultural land (m2) House Number of residential residential I No Name of Heads of HHs persons in Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected land holding land ~ 'Others Others2 2 2 2 HH ((m) (mi) field land trees land land field land trees land land categogy (M ) (mi)

I Le Van Bang 2 150 150 400 150 Temp. 32 32

2 Tran Van Chin __ 3 120 120 - 400 __ 100 __ _ Temp. _ 32 ___ 32 3 Nguyen Vdn Dan 3 100 100 200 100 4 72 72 Total 8 370 370 1,000 350 4 136 136

Commune Hoa Nghia I District Cho Lach Province Ben Tre

Total Affected Total agricultural land holding (mi2 Affected agricultural land (m 2 House NoName of Heads of HHs Number of residential residential P Crops I GardenIHo No | Name of Heads of HHs persons in land holding land Paddy Crops Industrial GardendPaddyrsropsIdYdustral Gardes Housing | x2ig | f2 land holding ~~~~~~Others Others 2snxitn Afece HH (m2 2M field land trees land land field land trees land land categogy (in2 (in2 I I Tran Thi Cam Linh 2 300 50 7,000 3,990 Temp. 50 50 2 Le Thi Linh 5 5,000- 1,680 4 3 Vo Van Tam 3 300 300 4,700 300 3 80 80 I 4 Tramn Khaiih Hong 4 300 3,200 450 4 100 5 Lam Van Ba 4 300 7,700 300 3 150 6 Tran Th; B6ng 1 300 4.000 900 4 60 Vo Thi ThWni 5 300 2,700 21 Temp. 8 Luolng Van Bay 3 300 1,200 320 Temp. 35

'I 2 TotalAffected ~~~~Total agricultural land holdig (ni ) Affected agricultural land (mn2) House fl ~~~~~~~~~~~~Nunmberof resdetal rfesiedenia No ersonsName i f Hea(isofresidetial HHs resdential addOthers InPaddyalCropsenIndustriopl GardenilHousingHouExistingti Affectede Noof HeadsName f HHs persons inland holding land Pady CrphedutrasGrdnOthers 2 2 HH 2 (m2 field land trees land land field land trees land land categogy (mn (in

9 Nguyen Vanl Un1g 6 300 5,000 -750 -3 150 IO1 Tran V&ni HL16 6 300 8,700 300 4 65 11 Mai Chi Hi~u 5 300 2,70-0 500 3 -110 --- - 12HA Nguy6n Hbiig 6 300 4,50-0 850 -4 60 I 13 V C6ng_Mdng 4 300 8,635 -575- Temp. -40- 14 Hu~nh Vani Nam 7 300 5,500 900 4 180

15HuS'nh Thi Liu 4 300 3,700 495 - 4 _180

16Tran ThijMfng __6 300 8,000 180 -_Temp. 120 17__ y6 ThTnhhLong 5 300 - -~ 0,000 -150 -200 -T-emp. -150

18 Phan VanBe 6 300 _ 187 __3,000 1,213 4 150 150

-19 TrA-nVan ThAng 7 __ _ ---- 300 1,000 4,-500 40 __20 ---- 4 - - -1-5-0 I 20 H6 TiBdnh 3 300 32 0 __1,500 463 -- 4 120 32 21 Phan ThiPhtfcyng __4 300 1,500 800 _ 580 Temp. 100 I 22 H6 Thi Tri- 4 300 _ 300 3,000 200 -380 -3 1-3-0 130 23 Nguy6n Van Lai 3 300 __1,300 115 125 __ Temp. 50

24 Pham ThijDi6mPhugang _ 4 300 _____ 4,000 __1,975 _Temp. 50

25Phan Vadn Men-- 4 -3-0-0 120___ 3,500 ___654___ 120 26 L Van T6 4 __ 150 __1,500 ____1,200 80 ______587 _Temp. 120

27 Nguy6n Thi HAo 5 300 170 1,200 __ 2,000 ___4 96 96

28 NgynTiBa _4 300 6,200 710 4 180 29 Phani Van R6 5 300 2404038 I 30 Nguy6n NgQc Em 4 300 2,050 1,030 _ Temp. 100 31 Ng6 ThAnh Se 4 300 14,000 1,675 __3 __ 150

32VTinNu- 300 ___1,-500- __1,385 -3 150 I 33 Ng6 VAnHuan 6 _ 300 12,000 20 _500 3 120- 34Vb Cng ChUrng 530600450 ___4 200

35 Trin Thi Khuy6n 1 300 6,000 51 _3 182 I 36 -- Nguyen-VdnGi6p -5- 300 __8,680- 1,190 4 __130 37 Plham Thi Thay2 300 4,000 862 Temp. 77 I 38 Nguye7n ThijHoa 5 300 170 2,500 1,910 4 100 100 39 Nguy6n Van Bi 5 3004,0 __ 30 4 36 40_ Pham Van Thi~ 3 300 1,000 1,000 6247

41 Hu~'nhVdnNgoan 4 300 10,000m 267 _4 200

42 PhmThi 43004 - 5,500 13537

43 V6 Thi Thu T116y -4 300 2,691 312 4- 71

I 44 V6 Thli Chinh 5 300 9,400 104 _4 120 45 Nguye^n Van An 6 300 275 8,200- 775 4 77 77 46 V6 Thi Thu 7 300 3,200.- 337 3 120

47 LUmVi6t Dac 4 300 -36375 3 120 48 Ho Thii BAy 5 300 11,000 188 3 200 49 NgUy6n Thli T6m 7 300 950512 4 100 50 Ng6 Tan Plhan 5 300 1,600 267 Temp. 50 51Train Van Th6ri 10 300 6,000 61 Temp. 60 2 TotalAffected ~~~~~~Total agricultural land holdin (in ) Affected agr-icultural land (m 2) House Nu mber of residential r-esidential I No Name of Heads of HHs persons in hl dPaddy Crops Industrial Garden Paddly Crops Industrial Garden Housing Existing Affected lnholing land te- Others 2 2 HH ln(m 2) (Mn) field land trees land land Otes field land trees land land categogy (in (in

52 Pl~iam V&il Chfnhil 7 300 6,700 1,750 Temp. 100 I 53 Nguy6n VAni Tlhanh 4 300 4,000 825 4 10-0 54 Trdn VAni HiThig 8 300 9,000 825 Temp. 200 55 Train VAn MLr&i 9 300 16,500 2,600 3 200 Total 262 16,050 1,484 6,250 294,029 505 41,787 141 6,053 715

ECommune Hung Khanh Trung District Cho-Lach Province Ben Tre

TotalAffected - ~~~~~Total agricultural land holding (mn2 Affected agricultural land (m 2 House * ~~~~~~~~~~~~~~Numberof residential residential * No Name of Heads of HHs persons in lnhodnlad P dy C ps Iutrl GrenPaddy Crops Industrial Garden Otes Housing Existing Affected HH 2 2 field land trees land land Otes field land trees land land Others(m2 m I (in (in aeoy(n)(n

II Nguy6nVAn BAy 5 3-00 3,0-00 16 ____21 412 2 V6 VAn On 4 300 5,000- 320 4 70 I3 -Nguyen Thi Nu6i _2 __ __ 300 ____ 4,000 100 ______200 _Temp. __100 4 Hu~'nh ThjiSSnh 6 __300 7,000 ___1,240 3 85 __

5 Nguy8n Thi N-au 5 300 2,300 _____ 5,700 -821 -_4 77

I6 Nguy6n VAn Nguy6n 4 300 -4,700 15 0 Temp. _ 60 -7 Dinhi VAn Hai 5 300 4,500 _2,_5-00 _ 5_0 742 4 _ 70 _

8 LE Thi NMm 3 300 _ 4,000 ____4,500 240 _ 4 60

9 NguyEn VAn Mong 5 _ 300 1,700 70 675 ___ Temp. _ 100

10 Nguy6n VAnHodng 5 300 125 7,500 200 _ 1,462 4 100 III Phan VAn Hi'ing 33__3_00 300 2,200 60 -1,2-25 4 100 12_PhaImVAn Trong I11 300 ____ 1,500 _ ___1,500 300 50 ___ _Temp. 70

_1.3_Nguye7n VAn Kh6ri 4 300 __ 1,300 - - 1-80 Temp. 35

I 4N guyen VAn Tri8u 4 300 8,000 675 _Temp. _ 8 15 Nguy8n,VAn H6ng 4 300 1,400 250 Temp. 60 16Nguyen Vdn D6 6 300 2,000 7,000 1,313 4 100 17 Ngu6 h1i6u 5 300 1,700 6_70- Temp. 100

18 Hu~'nhVAn Tin - - - 5 300 700 7,400 18 4 80 I 19 Dtro-ng ThiThu 6 300 4,000 1,125 3 100 20 Nguy6n VAn Bi 5 300 2,000 1,200 -1,500- 208 Temp. 100

21 Pliam VAn Ba 3 300 3,000 0 5,000 430 -Temp. 100 I 22 Plian VAn NAng 4 300 1,500 1,50-0 1,000O 252 Tem-p. 60 23 Hu5nh Vdil LUrO11g 4 300 2,000 6,000 60 458 Tem-p. 100 24 H-uS'nh VAn Thi~u 8 300 2,000 10,000 18 4 120 I 25 LE VAni Thu 5 300 1,000 4,000 125 Temp. 85 26 Mai VAn Nguy6n - 5 300 1,500 100 886 Temnp. 80 TotalAffected ~~~~~~Total agricultural land holdn m _____Affected agricultur-al land (m)2 House Number- of residential residential No Name of Heads of HHs persons in Pdy Cos Iutra GrenPaddy Crops Industrial Garden Housing Existing Affectedi land holding land Pdy Cos nutra Gren Others Others2 M HH ( 2) (in) field land trees land lanid field land trees land land categogy (Mn)(i

27 N guyen Vani HiC'L 4 -300 4,300 66 4 100 28 Drorng_Van Hi&n 4 300 2,000 -168 -- _4_ 1-00 29 Plham Vanl Thi 4 300 3,500 100 -1,110 4 70 30 Ng6 Thi Ci-nLe 3 300 70 3,500 100 350 TaYrn 90- I 31 Pharm Van Hhu 7 300 5,000 100 _ 395 Temp. 80 32 Tran Quang Th6ng 4 ~ 300 -3,500 36-0 Temp. 6

33 Nguyen Thi Ba 5 300 2,200 608 -Temp. 1-00- I 34 Nguyen Van_Bay 4 300 7,000 748 Temp. 80 35 L Vdn DAnh -2 300 __--7,0_00 ____16 _Temp. 60

36 Ng6 Thi Kiem 7 300 ______3,200 106- _4 _60__ _

37 Tr 'n VAn By 3 300 -2,700 15337 -4 168____ I 38 Nguyen Thi A 4306,000 80 680 0_

39 136i Thi Biet 4 300 9,000 406 _ _ Temp. 100 I 40 Ngyuen Van Tlhang 4 300 8,000 595 - 4 0 41 Nguyen-Van Lai 7 -30-0 _3,550 - _- - -60Tm. __ 8

42 Tran VdnOn 3 300 80 4,000 __40 4 120

43 Nguyen Thi L~ 7 300 ___ 4,000 575------Temp-. ____100 44 TrAn Thi 05 2 300 3,300 450- 4 120 I 45 Trdn Van Len 3 300 2,800 -- 326 _Temp. _ _4 46 Ngy6n VAn B4y 5 300 ___ __ 12,000 748 _Temp. 80 _

47 Phan ThnH'ung 3 300 l ,_200 ______,___930_ - Temp. 8 I 48 13iiiThi HL-u 4 300 __ __3,000 21 __ 541-00- 49 Nguyen Thi Hong 7 300 _ 5,000 50 706 Temp. 100

50 Trtrong Thi Mang 5 300 302,900 275 -Temp. 50-

51Dinh Thi BdBa 2 300 1,500 252 Temp. __100 I _------52_Nguyen Van Thi 3 300 -50- 1,000 -2-,000 512 ___Temp. 100 53 Tran Vdn Men 6 300 7,900 -682- _3150_ _ I 54 Nguyen VAn Chdnh 4 300 6,900 1,000 750 Temp. 48 55 _Humnh ThijTrong 4 300 __800 __ _35 4 100

56__Tran VanKh~r 4- 300 4,800 393 _ _Temp. _ 50

57 NguyEn VAn R6ng 4 300 7,000- 1-13 _ Temp. 90 __ 58 Pha4m Va n Thm 3 3-00 ---- 3,800 608 Temp. 90- I 59 Pham Vani NhAnh 3 300 200 4,000 637 Temp. _ 90 60 Nguyen Thi Dam 6 300 5,200 455 Temp. 100 61 Tran Van PhMi 5 300 7,000 73-0 Temp. - 90 62 Ng6 Van B inh 3- 300 -2,300 1-28 Temp. -50 63 LU Vani C6nig 4 300 275 2,700- 450 Temp. 80 64 Dinh Hfiu M(c 2 300 0 3,900.- 250 Temp. 60 I 65 Dinhl Tani Lonig 3 300 4,00. 8 4 0 66 Dinlh Vani Trn 5 300 5,000- 1,973 4 80 67 Pliamr Thi HAo 6 1300 6,300 912 4 75 68 Tran Tiii Thus' 4 300 50 4,300 110 Temp. 80 69 Pliain Thli NgQc 4 3100 2,000 1,000 20 125 4 100 I ~~~~~~~~~~~~ ~~~~~~residentialresidential

No Name of Heads of HHs persons in Pdy Cos Iutra GrenPaddy Crops Industrial Garden Housing Existing Affected2 * land holding land Pady CrphIdutrasGrdnOthers (Mn) ( HH (m~2)( 2 field land trees land laind field land trees land land Othersy (

70 Plham- V5n Sor 4 300 1,000 3 15 4 70 72 Tlrain Van Luyii 5 300 4,500 650 Temp. 80 72TaiVn-Hii 0 2,-300 750 Te-mp. 98 73 Hu~'nh Van Luftg 4 300 6,500 -- 440 Temp. 120 I 74 TrAn Thji GiAu 5 300 4,300 610 _ Temp. 100 75 L Van Cu 5 300 7,200 112 4 87

-- - -4 _ 50 76 Trdn VanQu&n 7 300 300 -2,000 685 I 77 Nguy8n_Van Trung 4 300 1,650 -22 _ Temp.- ___ 170 78 NguyEn Thi Loan 3 300 -6,300 488 4 _ 70

___3 Temp. 8 79 _Nguy6n Van LAn g 3 300 _ _ 5,000 50 650 Temp. 90 I 80 Tran Thi BAy 4 _ 300 5,300 ---- 4 70 81 Hu5nh Thi Chii 7 __ 300 5,000 438 82 Nguy6n Van SY 3- 300 3,350 - - 75 _Temp.- - 80 83 Nuen-Van Salnh 4- - 3-0-0 2,900 - 615 4 70

Total 369 24,900 1,450 27,500 4,700 355,450 .2,442 40,813 132 7,198

Commune Vinh Thanh I District Cho Lach Province Ben Tre

Total Affected Total agricultural land holding (m 2) Affected agricultural land (in) House

-. ~~~~~~~~~~Numberof residential residential Noof HeadsName of HHs persons in land holding land Paddy Crops Industrial Garden Otes Paddy Crops Industrial GardenHosn Extig Afce 2 3 HH ~ ~ ~2 ~ ~~~~~~~~~~~~~~~~~2field land trees land land-A field laud trees land land Otes categogy (in (inM (mn (in

______2,080 __4 __ 80 I I Nguy6n Van Minh 5 300 __ 7,500 4 1.44 2- Nguyen Van Ti.r -6 300 _7,0 00 __11,'000 -1,100 3 Tri6a Thi Vi8n 6 300 _8,000 500 4 _ 70

___ _4 100 I 4 136i Van Xe' 7 _ 300 ___700 - - 4- 200- 15 5 Trinh Ki-m Y6'n _5 __ 3015 -1,700 95-0 4 100 6 Phan Van Thuan - - 10 300 700- 1,0-35 I7 VO Thi Nhi~u 3 300 5,700 ___1,10 Temp. 100 8 Nguyen Van Thang 5 300 3,600 600 Temp. 144 9 Nguy~n Van Ra 4 300 16,700 400 4 -144 10 Nguy8n Vadn Biii 8 -300 9,04-5 500- 4 150 1 Nguyen Van Tdn 3 300 1,200 350 4 80 13Biii Thi LAni 4 300 2,700-- 1,750 Temp. 60

14 Nguye7n Vani Ty 7 300 7,800 0315 15Nguyen Van Ph6ic 3 300 10,00 350 Temp. 150

16 TiNCTly&n H6ng5 300 20,000 300 4 80 I

2 M Total Affected Total agricultural land holding (m | Affected agricultural land (m2 ) House Number of residential residential No Name of Heads of His persons in Paddy Crops land holding land Pdy Cos Industrialndtra GrenGarden Others Paddy Crops Industrial Garden Others Housing ExistingM2 Affected 2 2 HH i(m) (M ) field land trees land land field land trees land land categogy | (i 2) (mi)

*n47 TrLallg Thi Ba 2 300 2,600 150 Temp. 60 48 Nguyen Van Sat 8 300 4,400 850 3 110 I 49 Nguyen Van Chii 3 300 3,500 25 4 100 50 Nguyen Huu Vo 4 300 1,700 394 4 160 51 Do Van Cai 7 300 11,000 10 3 52 Nguyen Thj Thuy Lan 5 300 -1,700 300 4 80 1,700 300 4 80 53 Phan Tan Dong 7 300 _ 2 __00__ 2,000 480 . 4 90 54 LLrong Tlhi Hue 2 300 20010010Tm.8 -~~~~ .,0 ~ ~~~~~~~~~.1 2_0 Temp.. ~ ~~~_ .. I 55- V~~~~~~Vo VaVan Hie^n 5 300 -- 6,000 ___ _1,140 _4 __ 120 56 T6ng Van T6n 4 300 5,000 900 Temp. 80 57 Le Tlhj Nam 2 300 _ __ 5,000 500 Temp. 60 I 57 Nuy ThiLNam 2~ 300 ______58 Nguyen Thj Yn 3 300 7,9000 1,285 Temp. 80 59 Nguyen ThiLAc 4 300 30 2,000 1,163 Temp. 70 60 Vo Van CAnh 4 300 __ 1,500 300 Temp. 40 61 Phan Van L6 4 300 __ __ 2,300 . 35 _ 50 Temp. 70 62 Nguyen Van Chan 3 ___ 300 ___ _ 3,000 30 _25 Temp. 70 63 Phan Van Ngon 4 300 2,600 8 - 550 Temp. 50 64 Lurang Thi Bich Van 4 300 5,500 1,000 4 36 65 Nguyen Thj Can 4 300 10,000 15 1,162 4 100

66 Nguyen Thi Phi2n 1 300 4,100 0 485 4 _ _ 35 - _ 87 Tep 0 67 Thai Van Hao 7 300 63 7,000 8 T 10 _ _ __. .. _ . Tem. 100 I 68 Ho Trung Hung 4 300 7,900 30 __ _ 620 _ __Temp.__ 80_ 69 Le DinhTrung 7 300 10,000 20 30 4 100 70 Vu TilTh;ra 5 300 7,800 300 500 4 100 71 DangCanH6a 6 300 6,000 250 4 100 72 Nguyen Thj Nong 3 300 1,500 ____ 150_____ Temp. 100

73 Tran Van Mu6i 3 300 _ 2,100 154 Temp. 30 I 74 Nguyen Thien Sy 7 300 __ 13,400 _ 1,162 4 80. 75 Nguyen Van D6 4 300 2,000 _ 10 400 4 80

76 Nguyen Thi Hai 5 _5 300 4,300__ 324 _ 4 100 77 Nguyen Thi Lam 5 300 3,700 997 Temp. 50 78 Nguyen Van Hoa 2 300 16,000 150 218 4 90 79 Nguyen Van Nga 6 300 6,400 10 812 Temp. 80 I 80 Nguyen Huu Dung 4 300 186 2,500 785 4 60 81 NguynVan Phu 10 300 50 11,700 140 3 - 150

82 H6 VanieD 5 300 -3,700 550 Temp. 100 I 83 Nguyen Van Chong 6 300 70,000 30 Temp. 100 84 Nguyen Thi Nam 4 300 4,700 390 4 100 I 85 Huy'nh Van Sang 6 300 6,500 450 4 80 * Nguyen86 Van Trinh 10 300 235 10,700 1,550 4 300 87 Nguyenl Van Han 4 300 3,700 510 p. 88 Trhan Van Xin 3 300 45 3,000 852 Temp. 102 89 Nguyen1 Van Ut 8 300 9,800 60 187 4 120 I I (m2) lIceae lani trees land I land hleld land trees land I land categogy W) W)

4,500 2,000 150 3 200 3,700 1,400 4 200 2,700 30 Temp. 100 5,000 7,000 500 4 150 3,000 206 3 120 20 7,400 400 3 200 3,000 1_,000 _ 3 75 20 2,000 4,000 500 4 120

- - 5,000 300 4 1 20 3,000 300 125 3 100 3,000 1,000 4 100 9,300 1,250 4 85 10,890 700 4 120 3,100 450 4 150

_6,000 - 900 4 150 6,700 812 Temp. 48 5,175 337 Temp. 150 2,600 410 Temp. 100 1,000 930 Temp. 90 25 2,000 2,500 50 4 70 25 1,830 Temp. 90

3,900 _ 25 4 80 3,350 325 4 95

7,000 _ 2,000 - __ Temp. 130 130 7,800 3 180 .130 12,000 815 3 200 8,500 580 3 150 2,000 2,000 600 4 110 190 31,800 240,990 850 1,250 26,910 123 5,325 190

Affected Total agricultural land holding (m)l _Affected agricultural land (m2) House residential land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Others Housing Existing Affected 2 field land trees land land Others field land trees land land categogy (mi) (m ) (in) ln (Mn) field land trees land land f-ield land trees land land categogy (ML) (Mi)

5,000 300 Tem-p. 70 8,800 800 4 62 13,000 325 Temp. 100 1-4,000- 1,~500 4 115 -3,100 500 Temp. 90 9,000- 8_62 4 84

5,200- 720 -Temp. 32 12-,000--- 1,050 -4 150

2,000 - 14,700 2,000 Temp. 120

2,500 363 -Temp. 49 __

6,000 1_25 __ Temp. _54 19q,000 ____2,80-0 _ 4 63 5,700 1,950 4 -100 2,300 390- Temp-.- ._4_2__

4,000 .575 4 140 285 675 Temp. 50

6,200 1,000 -- Temp. __ 50

4,000 -618 ___Temp. -70

5,200 _ 1,450 4 70 9,300 2,500 4 100 6,000 1,340 4 85 125 20,50-0 3553 120 3,800 20 650 4 80

34,000 1,500 -Temp. 120 5,400 800 4 120

2,000 ___15,000 550 __ 4 80 17,000 1,200 4 8 12,900 3,500 4 110 4,400 -280 4 90 300 9,000 30 1,300 4 100 - ~ ~~~~~~~~6,000 370--. Temp. -100-- 150 4,9650-. 475 __ Tem p. 100 9,700 600 3 150 -----9,000 80 Temp. 180 -7,700 1,17-5 Temp..- 95 11,000 515 4 130 5,000, 20 450 Tem-p. 70 8,000. 1,050 Temp. 80

4,000 .600 Temp. 45 I km ) I n (m) uleiu iann trees lanca land tield land trees land lana L caLegogy

14,000 24 950 3 113 14,000 200 665 4 80 4,800 1,000 Temp. 70 96 5,000 1,500 Temp. 80 7,200 287 Temp. 100 4,000 1,700 Temp. 130 285 8,000 892 . Temp. 96

11,500 1,450 _ 4 100

_--4,700 448 4 100 9,700 675 Temp. 130 10,000 556 4 250 9,000 300 4 150 115 70,000 4,050 4 200 ___ 6,500 450 4 90 35 9,500 . 20 1,012 Temp. 48 5,000 225 Temp. 120 4,700 4,700 585 4 100 4,000 30 4 60 9,000 450 4 100 2,056 14,000 4,700 910,650 997 90,726 230 10,590

Affected Total agricultural land holding (m 2 Affected agricultural land (m ) House residential Garden Paddy Crops Industrial Garden Other Housing Existing Affected land Paddy Crops Industrial 2 2 field land trees land land Others field land trees land land ers categogy (m2) (m )

150 250 Temp. 80 6,400 51 4 _ 95 2,000 1,000 187 3 150 6,275 2,000 4 90 2,97-5 150 Temp. 80 8,000 1,300 270 4 80 80 5,200 2,000 564 Temp. 80 80 A MAn 937 TemD. 80 2 (n ) field land trees land land field land trees land land categogy W(m) (m')

8,000 525 Temp. 90 1,000 300 Temp. _ 80 6,000 225 4 150 8,000 337 4 90 76,000 138 3,500 350 5,000 475 6,000 952 -6,200 115 200 62 5,000 153 __ _ 7,000 63 4,000 2,000 1,300 3,500 2,200 687

_____ ._._ _ _ ._2,100 1.5 3,000 337 200 6,500 300 5,700 475 2,000 7,000 587 3,500 0 2,000 170 4,600 6,000 1,056 5,000 750 -____ 6,702 956 156 3,000 554_ 1,700 891 210 8,713 1,050 9,000 562 1,700 56 5,170 150 6,000 525 2,700 780 -9,00-0 -562 7,000 600 8,0100 -593 2,000 675 1,800 767 240 10,200. 1,300 10,000 337 (inm (Mn) iineu Liand I trees land land field land trees land land categogy (rn) 7,000 675 4,53.10 -600- 2,200 406- 8,ooo 400 2,700 725 40 4,000 2,000 900

-1,800 250 _ 6,100 562

-- 5,500 600 1,500 250 5,500 900 3,000 187

3,000 850 _ 9,000 600

162 6,0001,0 __ 4,500 87 7,000 787

____ ~~~~~6,000 187 4,000 900 -5,000 2,600 568 ------~~~2,300 112 -- --- ~~~~,00--- 1,203 3,000 150 1,238 20,300 17,200 418,770 1,000 7,540 767 1,157 36,472 29 1,415 80

Affected Total agricultural land holding (Mn) Affected agricultural land(mn 2 ) House residential land Paddy Crops Industrial Garden Otes Paddy Crops Industrial Garden Otes Housing Existing Affected (m 2 rield land trees land land Otes field land trees land land Otes categogy (in) (in)

-2,500 3,500 4,000 1,300 4 100 4,000 Temp. 100 2.500 415 * A~~~~~~~~~~~~~~~~~~5 (in) 1;nUtIcu trees ianu lana lield land I trees land | land | categogy (in) (mi)

9,500 4 200 8,300 4 1oo 7,000 4 150 21,000 4 __100 1,550 700 3 160 5,075 3 100 2,890 4 100 1,700 4 70 . . _~~~~~~~~~3,0 -3,500- ___ -- Temp. 57 2,000 4 75 1,000 4 150 .. ______5,000 Temp._ 90 1,000 4 57 3,000 4 63 3,300 . 4 85 3,400 146 _ 4 100 6,400 40 6,000 Temp._ 48 2,300______4 63 20,000 1,628 4 96 14,500 Temp. 72 2,000 _ 525 Temp. 65 5,500 1,645 Temp. 96 4,500-___ - _ Temp. 200 7,000 650 . . _ s __ . . . _ _ __ _ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~44 75-75 2,700 Temp. _200 1,600 _980 4 72 _30-300 6,000 800 4 200 7,800 4 240 3,700 4 125 10,000 4 120 2,500 Temp. 50 1,000 Temp. 52 1,000 1,500 1,000 4 100 1,000 Temp.- 48 1,000 4 59 4,250- Temp. 150 6,000. Temp. 90 7,500 4 100 (m 2 ) field land trees land land field land j trees land land categogy Wm*) (ml

1.000 4 60 2,500 4 100 6,000 3,200 4 100 9,700 4 130 9,000 4 150 _ 5,500 Temp. 100 6,000 . 4 85 200 7,000 1,000 4 150

- 5,350 ___ 4 150__ 2,400 Temp. _57 __ 9,500 4 _ 150 2,600 _ _ 2,500 Temp. 100 5,000 Temp. 100 7,500 4 120

4,000____ .o 4 120 1,000 Temp. 120_ 2,700 33___ __9 4,000 1,000 4 100 10,000 Temp. 100 __ 7,600 Temp. 100 3,000 9,000 Temp. 70

1,850__ 0 0 0 _ - _4 150 _ 1,600 Temp. 887 3,700 4 100 8,000 8,000 _ _ Temp. 100 10,000 4 98

1,600 Temp. ___ 48 2,800 4 40

28,000 Temp. 50 _ 8,000 4 150 20 1,000 1,632 4 36 20 5,000 700 Temp. 200 3,000 3,500 Temp. 84 4,650 Temp. 105 7,000 5,000 4 - 96 1,000 1,500 Temp. 58 1,500 1,500 4 150 1,875. 4 100 1,810 . 4 1oo (2) field land trees land land -field land *trees land land -categogy Wm)(m

1,000 1,000 Tem.p. -100 6,000 4 1-00 3,560 160 Tem-p. 80 4,000 4 100 2,8-00 - 4- 4-8 12,255 4 103

20 15,600 13,000 55,850 468,935 8,350 7,021 - 241 10,300 20

Affected Total agricultural land holding (m)2_____ Affected agricultural land (m2) House residential laud Paddy Crops Industrial Garden Paddy Crops Industrial Garden Otes Housing Existing Affected 2 ( ) field land trees land land Others field land trees land land Otes categogy (in 2 ) (in 2 )

5,000 __ 1,200 Temp. 80

___ ~~~~~~~~~5,000 _ __ 1,100- 3I 10

935 235 _ Temp. 100 _ 3,000 1,020 Temp. 80 4,000 897 4 110 4,365 851 4 200

5,480 562 __ Temp. 80 30,000 800 -412

2,500 750 4 _ 50

____ ~~2,625 225 Temp. 100

____ ~~~~~3,000 -286. 4 64 120 2,000 468 Temp. 150 120

-2,5-00 --- 5-16 Temp. 80 _

300 -4,000 825 4 100 65

2,000 -~743 4 90 7,000 313 4 100 4,000 525 4 70 4,670 3 50 Temp. 60 15 11,000 775 Temp. 104 15 2,0-00 185 Temp. 100 A 70fl .- 2A 2 ategogy I M I kill (in ) field land trees land land field land trees land land L

1,000 4,700 481 Temp. 60 2,000 870 Temp. 90 60 45 140 1,500 2,000 397 Temp. 4,400 25 4 80 4,800 73 Temp. 90 1,900 _ 657 Temp. _ 100 7,500 1,818 - Temp. _ 80 15,000 825 4 _ 120 100 - 6,105 1,000 4 5,240 1,237 Temp. 100 3,000 502 _4 56 2,500 275 4 50 2,000 1,000 Temp. 80 783 750 Temp. 70 Temp. 100 100 100 9,500 . 1,406 7,300 80 4 100 1,667 4 200 2,300 __ 9,300 6,000 680 4 100 3,000 600 4 100 3,000 50 4 100 2,000 120 4 100 5,555 82 4 80 4,170 20 Temp. 80 780 56 Temp. 80 __ 7,536 550 Temp._ 70 1,500 275 Temp. 42 3,000 416 4 80 4,800 812 Temp. 60 1,000 357 Temp._ 40 5,000 687 4 100 5,000 775 Temp. 70 5,665 800 Temp. 100 4 200 20 20 7,500 1,975 8,350 15 4 100 Temp. - 80 900 200 - 2,000 1,143 Temp. 80 50 1,900 162 Temp. 3,000 791 4 80 Temp. 42 2,000 115 2 2 Affected Total agricultural land holding(n) | Affected agricultural land (mi) House residential land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected (m2 field land trees land land Others field land trees land land Others categogy (m2) (m2 )

200 400 200 4 100 100 200 300 200 4 50 50

100 1,200 - 4 50 50

150 ____ 1,200 4 50 50 200 3,000 4 50 50 400 4,600 600 4 60 60 400 4,600 3 120 120 400 8,000 1,600 300 400 4 50 50 l 400 700 4 50 50 400 700 3 100 100 400 1,600 400 3 130 120 200 800 200 4 50 50 400 600 4 50 50 300 4 50 50 100 4 50 50 40 4 40 40 100 4 50 50 50 4 50 50 4,440 23,000 6,300 1,300 1,000 69 1,150 1,140

2 2

Affected Total agricultural land holding (m )Affected agricultural land (mn House - residential land Paddy Crops Industrial Garden Otes Paddy Crops Industrial Garden Others Housing Existing Affected (in2 ) field land trees land land Otes field land trees land land categogy (in) (Mn)

60 2,000 2,000 450 450 4. 6-0 6-0 5,000 1,000- 5-,50-0 1,500 5,000 1,000

in AAA I Cflfl (m2) fleld land trees land land field land trees land | land | | categogy | (mL) | (mi)

2,800 800 3,000 500 2,000 600 3,000 500 1,800 500 4,500 1,500 4,000_ 1,500 -5,000 2,000 2,000 - - 1,000 10,000 4,000 8,000 900 3,000 1,000 10,000 1,500 _ ...... _10,000 750 10,000 _ 750 _ 8,600 1,500 7,000 _ 1,500 7,000 1,500 5,000 1,000 5,000 1,000 10,000 1,500 5,000 1,500 60 161,800 2,000 36,350 450 4 60 60

2 2.

Affected Total agricultural land holding (m) Affected agricultural land (m ) House residential land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected la2n field land (in trees land land . field land trees land land categogy (m ) (m )

400 3,000 1,500 4 60 60 3,000 450 5,000 750 5,000 750 I ( AM1

5,000 750 2,000 1,000 5,000 750 1,000 150 5,000 750 400 60,000 10,750 4 60 60

Affected Total agricultural land holding (m2) Affected agricultural land (m2) House residential land Paddy Crops Industrial Garden 0th Paddy Crops Industrial Garden Oth Housing Existing Affected (ml2 field land trees land land Others field land trees land land ers categogy (m2) (m 2

400 2,300 2,300 4 48 48 300 4 24 24 85,000 1,275 8,000 1,275 25,000 1,400 3,000 450 400 1,547 _1,000 4 48 48 320 4 48 *48 400 240 240 3 140 140 400 _ _ 1,500 1,000 4 46 46 400 1,600 1,000 4 48 48 --- 400 -500 500_ 4 48 48 400 4,600 ],500 4 64 64 400 6,300 1,050 4 48 48 400 2,600 1,500 4 48 48 400 9,500 1,500 5,200 1,000 5,000 1,000 10,000 -1,500 6,812 750 4,620 18,247 154,312 6,140 5,500 9,700 5,040 43 610 610 Affected Total agricultural land holding (m2) Affected agricultural land (m 2 House residential land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Other Housing Existing Affected (m2) field land trees land land Others field land trees land land chs categogy (m ) (M2)

7,000 1,050 17,000 2,550 8,000 1,200 16,000 2,400 4,500 750 7,000 1,200 10,000 1,650 10,000 1,500 20,000 3,750 7,000 1,050 13,000 1,650 19,000 3,000 400 5,000 1,500 4 36 36 400 2,000 800 4 48 48 .7,000. 1,000 20,000 3,000 10,000 1,500_. . 5,000 750 800 187,500 30,300 8 84 84

Affected Total agricultural land holding (m2) Affected agricultural land (m ) House residential land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Others Housing Existing Affected 2 (m ) field land trees land land Others field land trees land land categogy (m 2) (m 2)

400 1,200 100 4 50 50 35 4 35 35 40 4 40 40 24 1,000 500 Temp. 24 24 A (Inarn,f |(m 2) ieia tana trees lana lana ileia lanca trees lana lana categogy (m-) (mj)

400 4,200 600 4 100 100

150 700 -- 100 4 40 40 400 2,150 150 4 50 50 400 2,010 200 4 50 _ 50 400 4,200 700 4 70 70 100_ 4 60 60 400 5,050 650 4 50 50 150 700 100 4 50 50 200 - - 4 60 60 6,350 75-750- 2,100 750 400 2,650 400 4 lO0 100 100 2,600 600 4 40 40 3,200 800 4 100 100 4,200 800 100 4 50 50 18,000 3,700 5,000 750 3,000 450 3,000 470 400 4 50 50 120 4 4.0.. 40. 400 1,200 1,000 4 50 50 400 5,600 500 - 4 50 50- 400 2,500 1,200 4 50 .50 600 4 160 160 400 3,000 6,600 300 600 4 70 70 400 4 50 50 200 5,000 2,000 4 60 60 10,600 3,000 11,500 3,000 400 4 40 40 2,000 450 9,019 67,460 59,200 700 13,500 13,470 100 120 1,819 1,819 Affected Total agricultural land holding (m2) Affected agricultural land (m 2) House residential land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected 2 (m2 field land trees land land Others field land trees land land Others categogy (n2) (m )

20 0 5,000 12 600 Temp. 20 20

400 8,700 23 - 2,000 4 60 60 200 10,000 2,000 4 80 80 400 10,500 5,000 4 50 _ 50 60 60 200 6,150 - - 1,200 4 200 2,200 400 4 70 70

200 3,650 27 1,000 200 4 ____ 60 60 1-00 -900 22- 200 4- 100- -65 400 430 200 4 80 80 4,010 500 4,000 -700 3,000 7 200 4 50 50 2,120 21,250 24,660 12,630 91 4,000 7,400 2,600 36 630 595

2 2M Affected Total agricultural land holding (mi _ Affected agricultural land (in) House residential land Paddy Crops Industrial Garden Others Paddy Crops Industrial Garden Others Housing Existing Affected (m2 field land trees land land field land trees land land e categogy (m) (m2

30 7,000 120 120 4 30 30 60 6,454 480 4 60 60 4,415 240 90 7,000 10,989 840 8 90 90 Affected TotalT agricultural land holding (mi2 Affected agricultural land (m2 ) House residential land Paddy Crops Industrial Garden Others Paddy Crops Industrial Garden Others Housing Existing Affected (ml) field land trees land land field land trees land land categogy (mi) (m )

1,260 400 48 6,000 .528 48 48 48 365 188 _48 48 8,675 80 6,153 _ 400 4,074 720 7,725 _____ 240 11,178 720 1,152 240 4,234 _ 320 6,623 *80 2,815 240 13,711 560_ 1,653 160 7,993 1,040 0 946 0 200 1,928 280 6,423 480 1,202 200 8,850 200 5,735 240 2,600 240 2,588 312 4 60 60 _1,507 200 10,967 960 4,765 200 1,053 240 3,943 240 3,663 640 9,400 640 9,560 400 4,053 320 6,419 240 7,421 400 11,088 240 (m2 ) inew lana trees land j land I ield j land j trees land land | categogy (L)m(m)

11,651 520 3,115 480 4,829 400 2,506 200 1,346 200 2,739 1,200 4,457 800 1,2141 800

-3,476 440 3,715 240_-- 2,188 160 4,053 240 60 4,842 400 4 60 60 60 3,691 140 4 48 48 13,156 . 480 48 3,943 240 4 48 48 1,922 760 4,056 320 16,046 640 5,605 720 2,065 280 60 3,278 480 4 60 60 4,742 280 - _ 2,347 280 60 5,414 400 4 60 60 17,220 1,040 2,585 160 2,351 400 8,363 400 2,758 232 48 4,236 0 408 4 48 - 48 4,274 160 14,643 560 3,426 . 0 480 5,484 400 18,758 464 1,152 0 240 2,749 168 3,303 240 (m2) iieiu ianu trees ianu lana iieiu iana tanrees au ianu caiegugy km ki

6,418 400 4,321 -180 14,803 640 8,063 480 2,444 304. 1,718 240 2,834 480 995 120 12,607 -480 3,523 160_ 157,535 1,440 ___- 5,138 240 9,829 1,240 2,440 160 4,827. 640 1,094 120- 2,913 240 5,825 240 13,088 400 3,099 200 3,975 240 2,793 240 3,570 160 2,506 200 3,377 240 1,588 400 6,371 200 7,117 240 9,589 240 24 5,960 160 4 24 24 6,222 240 80 10,944 280 4 80 80 5,217 320 3,474 5,497 240 400 644 563,777 204,089 36,716 7,168 40 - 608 608 Affected Total agricultural land holding (m) Affected agricultural land (m 2) House residential land Paddy Crops Industrial Garden Others Paddy Crops Industrial Garden Others Housing Existing Affected (m2) field land trees land laid O field land trees land land categogy (m ) (mn)

60 4 60 60 96 4 96 96 4,312 1,200 156 4,312 1,200 8 156 156

Affected - Total agricultural land holding (m2 Affected agricultural land (m2) House residential land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Others Housing Existing Affected (m2 ) field land trees land land field land trees land land categogy (mi) (mi)

72 6,930 200 4 72 72 5,149 160 60 8,170 -. 240 4 60 60 6,543 280 72 __ 0 09,065 ___ 240 4 72 72 115 2,351 200 4 115 115 9,630 240 6,743 200 10,134 400 10,967 320 8,738 240 9,112 200 7,518 240 60 3,150 208 _ _44 60 60 12,607 320 13,156 280 379 129,963 3,968 20 379 379 2 Affected Total agricultural land holding (m Affected agricultural land (m2) House residential land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing Existing Affected (m2O field land trees land land field land trees land land ers categogy (m2 (m2

108 2,179 2,500 160 4 108 108 48 3,000 4,800 240 60 4 48 48

100 2,800 7,058 160 _ - 4 100 100 100 4,800 1,804 120 4 --- 100 100 125 7,358 - - 7,000 30 1 125 125 481 20,137 23,162 240 530 17 481 481

Affected Total agricultural land holding (mi2 Affected agricultural land (m2) House residential land Paddy Crops Industrial Garden Paddy Crops Industrial Garden Housing 2 Existing Affected (m ) field land trees land land O rs field land trees land land categogy (m2 ) (m2 )

13,150 320 5,317 240 6,437 240 2,348 240 6,437 240 6,547 301 6,939 108 8,990 102 8,430 101 3,100 523 9,768 108 1,939 560 6,312 160 4,593 310 10,847 320 11,870 304 3,643 120

6 47R 1 A AAA O i(m2 ) lieici lana trees land land f-ield land trees land land categogy |(m) | (m)

6,931 190 3,160 160 9,036 118 9,830 160 3,960 120 8,643 240 6,397 120 10,347 269 13,856 - - 240 96 _4 96 96 _ _ _500 500 120 8,000 5,000 3,000 5,000 4 120 120 8,000 3,000 160 264 247,001 5,500 13,154 5,660 12 264 264