ENERGOPROJEKT JANUARY-MARCH 2020

ENERGOPROJEKT HOLDING PLC AND ENERGOPROJEKT GROUP BUSINESS PLAN FOR 2020 ADOPTED CONTRACTED CONSTRUCTION WORKS ON SYKTYVKAR STADIUM – PROJECT VALUE AMOUNTS TO EUR 35 MILLION ENTEL CONTRACTED THE DRAFTING OF PROJECT DOCUMENTATION CONCERNING FIVE NEW WIND POWER PLANTS BUSY BEGINNING OF THE YEAR ContentsContents In line with the long-standing stand- ard practice and methodology of planning ENERGOPROJEKT HOLDING PLC AND ENERGOPROJEKT GROUP BUSINESS PLAN FOR 2020 of the Energoprojekt Group the following AND MEDIUM-TERM BUSINESS PLAN FOR THE PERIOD FROM 2020 TO 2024 ADOPTED ...... 4 plans were adopted: the annual business CONSOLIDATED FINANCIAL STATEMENTS OF THE ENERGOPROJEKT GROUP FOR 2019 CURRENTLY UNDERWAY . . 5 plan of Energoprojekt Holding Plc and the ALL DECISIONS ADOPTED...... 5 Energoprojekt Group for 2020 and medi- THE CHANGES IN MANAGEMENT...... 5 um-term business plan from 2020 to 2024. According to the annual business plan, the ENERGOPROJEKT VISOKOGRADNJA - THE GENERAL CONTRACTOR OF DELTA HOLDING OFFICE BUILDING IN BELGRADE. . 5 total value of the contracted new jobs in NEW SIGNIFICANT CONTRACT FOR THE CONSTRUCTION OF AIR TRAFFIC CONTROL TOWER AT THE NIKOLA TESLA AIRPORT . . 6 the country and abroad amounts EUR 242,7 CONTRACTED CONSTRUCTION WORKS ON SYKTYVKAR STADIUM – PROJECT VALUE AMOUNTS TO EUR 35 MILLION . . 6 million, out of which in the country EUR IMPLEMENTATION STATUS OF TWO CONTRACTS SIGNED WITH ENERGOPET ...... 6 107,5 million (44%) and overseas EUR 135,2 million (56%). ENTEL CONTRACTED THE DRAFTING OF PROJECT DOCUMENTATION CONCERNING FIVE NEW WIND POWER PLANTS . . 7 The adopted medium-term business ACTIVITIES RELATED TO THE IMPLEMENTATION OF THE PROJECT CONCERNING THE MODERNIZATION OF plan anticipates that consolidated revenue SMEDEREVO STEEL PLANT ...... 7 at the end of the medium-term period will DRAFTING THE PROJECT DOCUMENTATION FOR THE NEEDS OF TWO HOSPITALS IN ...... 7 amount to more than EUR 300 million. At ACTIVATION OF THE CONTRACT WITH AIR TRAFFIC CONTROL OF SERBIA AND MONTENEGRO ...... 8 the same time, the profit rate will range from 3 to 4% over the medium-term period in THE BEGEJ RIVER SPANNED –THE BRIDGE STRUCTURE FINISHED...... 8 regards to the consolidated revenue. THE SAVA QUAY CONSTRUCTION STARTED ...... 8 When it comes to projects, the con- THE CONSTRUCTION OF PATRIJARH PAVLE ROAD STARTED...... 9 struction of the Navigator Business Center GEOPHYSICAL AND GEODETIC SURVEYS IN THE EXTREME CONDITIONS OF THE KOMARNICA CANYON 2 office building is in the final stage (EP SUCCESSFULLY COMPLETED ...... 9 Visokogradnja). We intensively carry out NON-WORKING DAYS DURING THE HOLIDAYS ...... 10 the following projects: the construction of a 2 new passenger and technical railway station CONCEPTUAL SOLUTION OF THE SPORTS COMPLEX OF 110,000 m IN ROSTOV-ON-DON...... 11 in Zemun (EP Niskogradnja i EP Oprema), ARCHITECTURAL SOLUTIONS FOR NEW JOBS IN GHANA ...... 11 the construction of the Zrenjanin bypass, BENI SLIMANE DAM IN ALGERIA...... 13 the new landfill in Vinča, reconstruction of WE PLAN TO KEEP THE FOCUS OF OUR BUSINESS ON CURRENTLY ACTIVE MARKETS FOR WHICH WE HAVE Belgrade streets. Visokogradnja has started THE REFERENCES, LICENSES, LOGISTICS AND "KNOW-HOW"...... 14 the works concerning the new contracts on INTEGRATED MANAGEMENT SYSTEMS ...... 16 construction of the annexe building and air traffic control tower of the Air Traffic Control THE SECOND RECERTIFICATION AUDIT OF FOUR IMS SYSTEMS SUCCESSFULLY CARRIED OUT...... 16 Center at the Nikola Tesla airport, Delta RECERTIFICATION AUDIT OF QMS, EMS И OHSAS WITHIN THE INTEGRATED MANAGEMENT SYSTEM COMPLETED. . 16 Headquarters office building in Belgrade, RECERTIFICATION AUDIT OF INTEGRATED MANAGEMENT SYSTEM FINISHED WITH EXCEPTIONAL SUCCESS . . . .16 and reconstruction of the stadium in the CELEBRATION OF THE STATEHOOD DAY OF THE REPUBLIC OF SERBIA IN THE UNITED ARAB EMIRATES ...... 17 town of Syktyvkar. EP Industrija is working on modernization projects of two hospitals ONE-DAY WORK MEETING WITH CAF'S HIGH REPRESENTATIVES HELD...... 17 in Serbia, while Entel has projects for five SIX DECADES SINCE HPP COMMISSIONING...... 18 new wind power plants in Vojvodina. We are ENERGOPROJEKT AT THE HR CONFERENCE “ORIGINAL TALKS” ...... 18 implementing the Beni Slimane Dam project RECOMMENDATIONS FOR PREVENTIVE MEASURES AND BEHAVIOUR OF EMPLOYEES IN ENERGOPROJEKT GROUP in Algeria according to EP Hidroinženjering TO REDUCE THE NEGATIVE CONSEQUENCES ON THEIR HEALTH AND LIMIT THE CORONAVIRUS SPREADING ...... 19 design and with their expert supervision. We wish Happy Easter and Labor Day A PORTRAIT OF AN EXCEPTIONAL CREATOR - ŽIVODAR ERČIĆ ...... 20 Holidays to all employees, pensioners, share- NEW YEAR'S COCKTAIL FOR EMPLOYEES AND CHILDREN'S NEW YEAR ...... 22 holders, business partners and investors! THE YOUNGEST READER OF THE ENERGOPROJEKT NEWSPAPER ...... 22 THE MAGIC OF ...... 23 VOLUNTARY BLOOD DONATION CAMPAIGN ...... 23

Editorial Board Bogdan Uzelac (President of the Information Board and Editorial Board), Marijana Vasić, Radmila Jovićević, Irena Žunić, Sonja Knežević, Radoje Jovanić (representative of the United Association of Unions) Editorial Editor in Chief: Dragan Aleksić, M.S. Deputy Chief Editor: Borjana Vićentijević Collaborators: M.S. Dragan Aleksić, Marijana Vasić, Sanja Božović, Rada Anđelić, Snežana Timotić, D.Sc Sanja Petrović Bećirović, year LVII Irena Žunić, Vesna Laković, Prof. Dr. Branislav Đorđević, D.Sc Vladimir Beličević, Dušan Petković, Blagoje Gojković, Radivoj Cvetićanin, Ivana Beličević, Aleksandra Miljković, Ivana Vukotić, Jelena Veličković, Đorđe Cvejić, Radmila Jovićević, Zoran Milosavljević, Rade Jovanić, Biljana Svičević Photo: Vladimir Jablanov, Vitomir Rakočević, Energoprojekt archives Design and prepress: Energoprojekt Industrija, Plc Published quarterly, circulation: 1000 Newsroom phone number: +381 (0)11310-1020 Publisher: Energoprojekt Holding a.d. Print: DONAT GRAF doo

2 | ENERGOPROJEKT January-March 2020 CContentsontents hhighlightsighlights

04 ENERGOPROJEKT HOLDING PLC AND ENERGOPROJEKT GROUP BUSINESS PLAN FOR 2020 ADOPTED Late last year, the management of Energoprojekt Holding Plc adopted the annual business plan

06 NEW SIGNIFICANT CONTRACT FOR THE CONSTRUCTION OF AIR TRAFFIC CONTROL TOWER AT THE NIKOLA TESLA AIRPORT SIGNED At the end of December 2019, a group of bidders Energoprojekt Visokogradnja Plc Belgrade, Energoprojekt Oprema Plc Belgrade and Empex Ltd Belgrade, signed a new significant contract

07 ENTEL CONTRACTED THE DRAFTING OF PROJECT DOCUMENTATION CONCERNING FIVE NEW WIND POWER PLANTS Windvision and Entel have signed contracts for the design of five new wind power plants in Serbia

11 CONCEPTUAL SOLUTION OF THE SPORTS COMPLEX OF 110,000 m2 IN ROSTOV-ON-DON The 110,000 m2 big sports complex is located in the central area of Rostov-on-Don and occupies a plot of 5 ha

14 INTERVIEW - NIKOLA PAVLOVIĆ Director of Marketing, Technical Preparation and Business Development at Energoprojekt Visokogradnja Plc We plan to keep the focus of our business on currently active markets

23 THE MAGIC OF ZLATIBOR Energoprojekt Entel Trade Union organized a trip to Zlatibor for employees and their families from February 15 to 17 this year

January-March 2020 ENERGOPROJEKT | 3 Energoprojekt newsnews

In 2020, Energoprojekt Group will aim the focus of its business activities at the restructuring, business stabilization and sustainable development ENERGOPROJEKT HOLDING PLC AND ENERGOPROJEKT GROUP BUSINESS PLAN FOR 2020 AND MEDIUM-TERM BUSINESS PLAN FOR THE PERIOD FROM 2020 TO 2024 ADOPTED t the end of the previous Gross profit - for 2020, the 2020 to 2024. The mentioned access to long-term and more A year, the management planned consolidated gross prof- plan anticipates that consol- stable capital sources; of Energoprojekt it of the Energoprojekt Group idated revenue at the end of • Contracting of new busi- Holding Plc adopted the annual in the country and abroad the Medium-Term period will ness and ensuring the continu- business plan and medium-term amounts to EUR 17,95 million. amount to more than EUR 300 ous operation of companies from business plan for the period from Energoprojekt Holding Plc (par- million. At the same time, the the Energoprojekt Group; 2020 to 2024 of Energoprojekt ent company) plans a gross prof- profit rate will range from 3 to • Permanent adjustment to Holding Plc and Energoprojekt it for 2020 amounting to EUR 2,4 4% over the medium-term peri- market needs and alignment of Group. million. od in regards to the consolidated organization and form of the per- Following the long-stand- New jobs contracting - for revenue. Energoprojekt Group formance with the establishment ing standard practice and 2020, the total contracting of new jobs contracting in the of the strategic partnerships; methodology of planning in new Energoprojekt Group oper- Medium-Term period from 2020 • Preservation and develop- the Energoprojekt Group, the ations in the country and abroad to 2024 will strive to achieve the ment of existing human resourc- Executive Board of Energoprojekt is planned in the amount of EUR projected scope of realization. es, creation of preconditions for Holding Plc held a meeting on 242,7 million, as follows: in the During the Medium-Term the employment of new, young December 25, 2019, and adopt- country EUR 107,5 million (44%) from 2020 to 2024, we will imple- talents necessary for the realiza- ed the annual business plan of and abroad EUR 135,2 million ment the business activities with tion of business plans and the Energoprojekt Holding Plc and (56%). the following priority objectives: acquisition of innovative technol- the Energoprojekt Group for Generally speaking, • Energoprojekt Group will ogies and their implementation 2020. Energoprojekt will base its busi- aim all the business activities at in everyday business; The plan for the country and ness activities on operations in the sustainable development • The development of corpo- abroad for 2020 is expressed in Serbia in 2020, and in its tradi- and growth of all business oper- rate management and corporate euros (according to the fixed tional markets worldwide (in ations in the fields of consulting, culture of Energoprojekt; exchange rate of 118 dinars for countries where it already has a design, engineering and com- • The improvement of con- one euro). business presence, i.e. where it plex projects implementation, trolling and financial reporting in The basic parameters of the already has its foreign compa- that is the accomplishment of Energoprojekt companies; Energoprojekt Group business nies, branches and representa- the vision and the mission of • Further development of plan for 2020 are: tive offices). Energoprojekt Group; risk management methodology Total revenue - for 2020, At the meeting held • Securing the precondi- and Integrated Management the planned consolidated on December 27, 2019, tions for the realization of busi- System; revenue of the Energoprojekt the Supervisory Board of ness activities and ensuring • Increasing the value of the Group in the country and Energoprojekt Holding Plc liquidity with the optimization share capital; abroad amounts to EUR 273,9 adopted the Medium-Term of the credit indebtedness of • Corporate Social Responsi- million. The country will par- Business Plan of Energoprojekt the companies belonging to bility through Long-Term and ticipate with 65% and abroad Group involving the period from Energoprojekt Group, through Sustainable Development. with 35%. In the total planned revenue, operating revenues will account to 98%, with the structure dominated by active jobs (already signed) with 78%, while new jobs (planning to be contracted in 2020) will account to 22%. The most important market share in the anticipated total revenue will be the region of Serbia with 64,9%, the region of Africa (Uganda, Ghana, Algeria, Zambia) with 10,0%, the Middle East region (Qatar, UAE, Oman, Jordan) 9,9%, the region of Russia and Eurasia (Russia, Kazakhstan) with 7,5%, South America region (Peru) with 7,3 % and other markets with 0,4%. In 2020 Energoprojekt Holding Plc (parent company) plans an income of EUR 6,3 million.

4 | ENERGOPROJEKT January-March 2020 newsEnergoprojekt news

Individual financial statements of companies from the Energoprojekt Group for 2019 affirmed CONSOLIDATED FINANCIAL STATEMENTS OF THE ENERGOPROJEKT GROUP FOR 2019 CURRENTLY UNDERWAY n line with the perennial ule of activities and organization- Energoprojekt Holding Plc is in ual financial statements for 2019 I standard procedure, the al scheme for the preparation of progress. (i.e. the Energoprojekt on the website of the Belgrade Supervisory Board of consolidated financial statements Group). Pursuant to the law, Stock Exchange. Energoprojekt Holding Plc (as the of the Energoprojekt Group for the entire process of drafting In line with the schedule, the competent body of the parent 2019, at the beginning of March and consolidating the financial detailed analysis of the opera- company) and the Boards of this year, the competent author- statements of the Energoprojekt tions of each company by the Directors of the subsidiaries of ities of the Energoprojekt Group Group for 2019, as well as the competent authorities of the the Energoprojekt Group have, at reviewed the financial statements reports of certified external audi- Energoprojekt Group will be car- the end of February of the current of the respective foreign subsidi- tors on the audit of the financial ried out during the review of the year, reviewed and determined aries (owned by the Holding and statements for 2019, will be com- annual reports for 2019. the individual financial reports of subsidiaries), i.e. consolidated pleted by the end of April this The next issue of Energoprojekt's companies for financial reports of subsidiaries. year. Energoprojekt magazine will 2019 (including domestic opera- The process of preparing and Energoprojekt Holding Plc contain more information on tions and foreign subsidiaries). determining the consolidated has updated its information on the results of the Energoprojekt's Following the adopted sched- financial statements for 2019 of the issuer with data from individ- business operations in 2019. HOLDING PLC – The 51st Extraordinary Session of the Assembly held ALL DECISIONS ADOPTED he 51st Extraordinary Session of Milovanović resigned on December 9, 2019, the insight into the decisions passed and T the Energoprojekt Holding's due to health issues voting results are available to the share- Assembly took place on January 2.) the disposal of high-value assets holders on the website of the company 15, 2020. In line with the established agen- was approved by undertaking legal action www.energoprojekt.rs (in the section: For da at the session, the following decisions of concluding the banking arrangements/ Investors, part: Shareholders Assembly). were passed: credit guarantee lines with OTP Bank Serbia The document will be available within the 1.) Jovan Korolija was elected as a PLC Beograd, Erste bank PLC Novi Sad and deadlines stipulated by law. President of the Assembly of Energoprojekt Unicredit Bank Serbia PLC Beograd. Holding Plc, considering that Dragoljub The minutes of the session including

HOLDING PLC THE CHANGES IN MANAGEMENT ollowing the resignation of Marko Supervisory Board of Energoprojekt (Executive Director). F Milojević as a member of the Holding Plc: Dobroslav Bojović (President), Following the resignation of Siniša Supervisory Board of Energoprojekt Dragan Ugrčić, Miodrag Zečević, Vitomir Tekić as the member of Board of Directors Holding Plc and the President of the Board of Perić, Branislav Ivković and Nada Bojović. of Energoprojekt Energodata Plc, the Board Directors of Energoprojekt Urbanizan i The Board of Directors of Energoprojekt now functions as follows: Nada Bojović Arhitektura Plc, these Boards now function as Urbanizan i Arhitektura Plc: Gorana Čanković (President) and Sonja Knežević (Acting follows: (President) and Aleksandra Miljković Executive Director). VISOKOGRADNJA PLC – a new job in Serbia ENERGOPROJEKT VISOKOGRADNJA - THE GENERAL CONTRACTOR OF DELTA HOLDING OFFICE BUILDING IN BELGRADE ast year in December, Israeli Architectural Bureau MYS and five storeys are intended for L Energoprojekt Visoko- Architects drafted the concept of rent. We also designed 188 parking gradnja Plc Belgrade has the object, while US studio based places. contracted a new job in the capac- in Paris – StudioS developed the The building will have LEED ity of a general contractor for the interior concept. certification, involving a set of rat- construction of Delta Holding The total investment value ing systems for the design, con- office building Belgrade for amounts to EUR 40 million, and struction, operation, and mainte- Investor NBGP Properties Ltd, the expected deadline for the nance of the green building. The Belgrade. Its value amounts to completion of the works is 15 design of the facility provides the about EUR 22 million. months. We plan to engage 800 energy-efficient building, includ- The foundation stone for additional workers in new prem- ing a rainwater collection system, the office building is laid at the ises. The floor area of the building and the green area on the plot beginning of February 2020, will be 23.000 m2. Out of 11 sto- larger than the built part of the in Block 19 in New Belgrade, reys, two will be for shared use, plot. Moreover, the facility will, as between the Crowne Plaza Hotel business headquarters of Delta announced, be an A-Class building, and the Geneks Apartments. Holding will occupy four of them, i.e. the highest-quality office space.

January-March 2020 ENERGOPROJEKT | 5 Energoprojekt newsnews

VISOKOGRADNJA PLC AND OPREMA PLC – joint appearance NEW SIGNIFICANT CONTRACT FOR THE CONSTRUCTION OF AIR TRAFFIC CONTROL TOWER AT THE NIKOLA TESLA AIRPORT t the end of December 2019, the new A significant contract was signed includ- ing the procurement of works and the construction of the annexe of Belgrade Air Traffic Control Center building with the airport traffic control tower. The director of ATC of Serbia and Montenegro (SMATSA) Predrag Jovanović and director of Energoprojekt Visokogradnja, Zoran Mihailović, on behalf of a group of bidders Energoprojekt Visokogradnja Plc Belgrade, Energoprojekt Oprema Plc Belgrade and Empex Ltd Belgrade, have signed the contract in the presence of the Minister of construction, transport and infrastructure Zorana Mihajlović. On that occasion, Minister Zorana Mihajlovic stated that 2019 was the year of infrastructure. She emphasized that a new tower hasn’t been built in more than 50 years and that it is undoubtedly necessary, given the development of Nikola Tesla Airport and S. Čolakov, the Managing Director of EP, Lj. Vučićević, Chief Financial Officer of EP VG, the importance of the air traffic for the devel- Z. Mihailović, the Director of EP VG, Z. Mihajlovic the Minister of Construction, Transport opment of Serbia. and Infrastructure of the Republic of Serbia, Predrag Jovanović, the Director of SMATSA The value of the contract amounts to EUR represents the part of an investment program provide funds for this project. 17.5 million. The initial works began immediate- worth a total of EUR 126 million, which SMATSA The new 75 metres high tower, with a ly upon contract execution in the Government plans to use by 2023. The European Bank for dome of 100 square metres will be connect- of Serbia. This contract is the part of the SUSAN Reconstruction and Development (EBRD), the ed to the existing building of the Center via program - modernization of air traffic control. It European Investment Bank (EIB) and SMATSA its annexe.

VISOKOGRADNJA PLC- a new job in Russia CONTRACTED CONSTRUCTION WORKS ON SYKTYVKAR STADIUM – PROJECT VALUE AMOUNTS TO EUR 35 MILLION ast December, Energo- works started immediately after L projekt Visokogradnja Plc contract execution in December signed the contract last year. We anticipate the com- involving the reconstruction of pletion of works in January 2021. Syktyvkar Republic stadium, Komi Visokogradnja will be The General Republic, in the Russian Contractor for construction and Federation. finishing works and also instal- The Investor is GKU Komi lation works including the main Republic / the sole investor ser- stadium with seating tribunes for vice of the Komi Republic, and 9000 spectators and an auxiliary the value of the deal is over stadium for ice hockey and out- EUR 35 million. The execution of door landscaping. The model of the stadium with seating tribunes INDUSTRIJA PLC – adaptation and expansion of the production capacities IMPLEMENTATION STATUS OF TWO CONTRACTS SIGNED WITH ENERGOPET n 2019, EP Industrija signed two contracts ted to The Central Register of Integrated Procedures the expansion of production capacities in existing I on the Project Documentation drafting, the technical documentation for the contract involv- production facility and storage was submitted to the consultancy services in the obtaining ing the adaptation of production and business facil- Central Register of Integrated Procedures. All com- process of all necessary approvals and permits for ities to obtain the approval for work execution. We petent public authority holders have issued their planned works, mentioned in June issue of the have started the drafting of the Design for Execution. conditions. We expect to obtain the final location Energoprojekt newspaper. On November 21, 2019, the amended requirements and continue activities in line with In the meantime, we have drafted and submit- Conceptual Design concerning the contract for contractual obligations.

6 | ENERGOPROJEKT January-March 2020 newsEnergoprojekt news

ENTEL PLC – new contracts ENTEL CONTRACTED THE DRAFTING OF PROJECT DOCUMENTATION CONCERNING FIVE NEW WIND POWER PLANTS indvision and Entel have It involves new contracts for modifica- The deadline for implementation permits and approvals, including the W signed contracts for the tion of the Designs for Building Permit of the contract involving the prepara- securing of the building permit. design of five new wind for WPP Alibunar 1 and WPP Alibunar 2. tion of the technical documentation of A total of 370 MW of plants gener- power plants in Serbia: WPP Alibunar The contracts concerning WPP Banat, the modified Design for Building Permit ating the electricity from wind energy 1, consisting of 24 generators with a WPP Banat 2 and WPP Banat 3 involve concerning WPP Alibunar 1 and WPP are installed in Serbia currently. In the total installed capacity of 96 MW, WPP drafting of the Preliminary Design, the Alibunar 2 is four months. The period forthcoming period, the mentioned Alibunar 2, with 18 generators with a Conceptual Design and the Design for of nine months is foreseen for the projects that Entel will be engaged in total installed capacity of 72 MW, as Building Permit. development of complete technical predict that the total installed capacity well as WPP Banat, WPP Banat 2 and Due to changes in the market documentation for WPP Banat, WPP in the new five wind power plants will WPP Banat 3, with the planned pro- and the availability of technically Banat 2 and WPP Banat 3. Apart from be around 500 MW. All of the above duction capacity of 92,4 MW, 105 MW more advanced generators, Windvision technical documentation drafting, Entel indicates the importance of the men- and 92,4 MW respectively. decided to change the type of wind will, within the scope of the contract- tioned projects. It also confirms the fact The cooperation of the mentioned turbine for WPP Alibunar 1 and WPP ed services, also obtain the necessary that they represent the most signifi- companies started in 2015 when Entel Alibunar 2, different from the previously cant projects in the field of renewable was chosen by the Windvision to pro- selected technical solutions. That is energy sources realized in the domestic vide services involving technical control the reason why the modification of the market. of the Designs for Building Permit for Design for Building Permit involving the The contracts mentioned above construction of WPP Alibunar 1 and WPP construction of the said two wind farms represent the continuation of the suc- Alibunar 2. Good cooperation reflected was necessary. On the other hand, WPP cessful engagement of Entel on wind in high quality and reliability of servic- Banat, WPP Banat 2 and WPP Banat 3 power plant projects in Serbia and es rendered, as well as a responsible represent the new wind farms, and for new reference projects that strengthen approach to the job, have recommend- them, Entel will draft the necessary doc- Entel's position in the field of renewable ed Entel for renewal of the collaboration. umentation to obtain building permits. energy.

INDUSTRIJA PLC – implementation of the contract with HBIS Group Iron & Steel continues ACTIVITIES RELATED TO THE IMPLEMENTATION OF THE PROJECT CONCERNING THE MODERNIZATION OF SMEDEREVO STEEL PLANT he technical renovation project in the field of design, nostrification of tech- Building Permit. Smederevo. T of HBIS GROUP Serbia Iron & nical documentation and work execution. Environmental Impact Assessment The drafting of the Design for Steel plant in Smederevo is one The technical control procedure of Study concerning the walking beam fur- Execution for the new sinter plant is of the most significant ongoing jobs in EP the Design for building Permit related to nace was submitted to the competent underway. In the agreement with the Industry. Accordingly, this project requires the walking beam furnace was finished on Ministry, as well as to the local govern- Investor, we will deliver the documenta- a permanent and complex engagement January 25, 2020. The documentation has ment in Smederevo for public inspection tion in phases, and monitor construction of a considerable number of engineers been submitted to The Central Register on December 27, 2019. On January 22, site needs at weekly meetings with all and technicians of all professional profiles of Integrated Procedures to obtain the 2020, the public debate took place in project participants. INDUSTRIJA PLC- UNDP project for modernization of health care facilities in Serbia DRAFTING THE PROJECT DOCUMENTATION FOR THE NEEDS OF TWO HOSPITALS IN SERBIA he tendency of medical dows to improve energy efficiency, Design for the Urban Construction of the Institute for health care of Т care delivery system replacement of elevator facilities, as Project, technical documentation mother and a child Dr Vukan Čupić improvement through the well as modernization of all installa- related to the Preliminary Design in Belgrade and in line with the creation of modern, efficient medi- tions. Individual projects will cover and the Conceptual Design, regard- dynamics stipulated by the contract, cal complexes with increased capac- the access roads, parking lots, soft less of the difficult conditions. Some the complete documentation con- ity requires the earnest professional landscaping and pedestrian zones. of the existing facilities do not have cerning the first phase of the subject and comprehensive engagement The first phase of technical doc- a building/occupancy permit, or we contract (the existing condition) in of all participants in the process, umentation drafting, i.e. the com- have subsequently ascertained that electronic form was handed over including the Purchaser and the plete documentation (the design they are under the special protec- to the Investor in December 2019. user, through the designer to the of existing condition) for the general tion of the Republic Institute for We give priority to the accelerat- contractor - via optimization and hospital in Kruševac was submitted protection of cultural heritage. The ed drafting of the Energy Efficiency balancing of the functional and to the Investor in printed and elec- fulfilment of conservation require- Study with the accompanying doc- financial requirements and available tronic form. We have invoiced and ments which has yet to be defined umentation for the local hospital for resources. charged this service. by the competent institution will lying patients. The team of designers The design specification The team of designers led by inevitably influence the dynamics of all professions led by Rajko Sević involves reconstruction of building Valentina Vučković Kiš continues to of drafting and approval obtaining develops the technology solution elements such as facades, roofs, work on the next phase - preparation for the Conceptual Design. and The Preliminary Design for the replacement of doors and win- of technology and The Preliminary For the needs of modernization Urban Construction Project.

January-March 2020 ENERGOPROJEKT | 7 Energoprojekt newsnews

INDUSTRIJA PLC – supervision over construction of control tower annexe building at the Nikola Tesla airport ACTIVATION OF THE CONTRACT WITH AIR TRAFFIC CONTROL OF SERBIA AND MONTENEGRO n the previous year, both parties signed Traffic Control Center annexe building with the AKL the business, and we plan accordingly to monitor I the contract for the supervision service for tower Belgrade. But it was only on January 8 when the dynamics of the works and the engagement of the works on the construction of the Air the investor introduced a responsible contractor into the appointed designers of Energoprojekt Industrija.

NISKOGRADNJA PLC –the realization of the by-pass road project around Zrenjanin THE BEGEJ RIVER SPANNED –THE BRIDGE STRUCTURE FINISHED t the end of January, the erection A pre-tensioned bridge girder was suc- cessfully completed. It was one of the most demanding positions in the construction of the Begej Bridge, the most significant facility for the development of the Zrenjanin bypass. The static bridge system is a continuous pre- stressed, reinforced-concrete girder in three fields, with a total length of 102 meters with a 2 meters high structure. The interior span of the bridge is 46 meters, while the spans to the shore scaffolding for the temporary spanning of the After the mentioned above, we implement piers are 2 x 28 meters. The total width of the river Begej and a special vehicle for the transport the following works: the continuation of the gird- bridge with pedestrian footpath is 11,60 meters. of the girders. The cranes with lower load-bearing ers, production of the transverse girders and a 20 The bridge has a foundation on 20 piles of a capacity were used to load the girders that were cm thick bridge deck, as well as the final cable diameter of Ф 1200, 25-30 meters long. The transported to the river scaffolding, and from tensioning, upon which the static system of the superstructure of the bridge consists of 18 pre- there, the cranes with the higher load-bearing superstructure is in the final stage of the contin- stressed bridge girders at a distance of 1,91 capacity lifted the girders to a height of 9 m. uous girders system. meters. The girders are interconnected at the top with the bridge deck cast on the spot, and the transverse girders (stiffening) in the fields, and above the abutments. The prefabrication of the girders (twelve of them are 28,25 m long, and six of them are 45,5 m long) was organized directly on the construction site. The first two of the five phases of prestressing were completed before the erection. Due to their great weight (85 and 49 tonnes), the equipment/ machinery specialized for this type of work was used for the elevation of the mentioned girders: two cranes with a capacity of 300 and 500 tonnes, two cranes with a capacity of 100 tonnes, river

NISKOGRADNJA PLC – current status of the works on the arrangement of the Sava quay and Karadjordjeva Street THE SAVA QUAY CONSTRUCTION STARTED he Karadjordjeva Street and Due to the untimely obtaining T Sava quay reconstruction of the building permit, the Sava quay project began on November arrangement started with a significant 21, 2018, with the implementation delay, i.e. on December 2, 2019. For deadline of 425 calendar days. that reason, the construction dead- Energoprojekt Niskogradnja met the line will be extended, approved to subsequent request of the Investor-to the contractor, respectively, since lay stress on the works related to pave- the cause of the delay is not within ment structure and tramway tracks his area of responsibility. We expect construction, and thus maximally the completion of these works before accelerated the related works. The said the officially approved new deadline, above resulted in the completion at the end of the year. The citizens before the scheduled deadline. The of Belgrade will get another land- facility was put into operation (open scaped promenade on the river bank to traffic) on September 1, 2019. The with the appurtenant infrastructure sidewalks were finalized and opened (parks, benches, bicycle paths and for pedestrian traffic on January 31, playgrounds) on the stretch from 2020, which is also before the deadline the Branko’s Bridge to the end of the set by the contract. Concrete Hall.

8 | ENERGOPROJEKT January-March 2020 newsEnergoprojekt news

NISKOGRADNJA PLC - construction works on the Belgrade traffic artery THE CONSTRUCTION OF PATRIJARH PAVLE ROAD STARTED n August 2, 2019, City Administration The existing road, Patrijarh Pavle Boulevard O of Belgrade, Secretariat for Utilities has one carriageway about 6.0 m wide and a and Housing Services and Belgrade two-track railroad intended for demolition, Land Development Public Agency signed the reconstruction and expansion. The widening of contract with Energoprojekt Niskogradnja Plc the cross-section includes the elevated traffic and members of the Consortium Bauwesen lane for public transport vehicles in the middle Ltd, GIP Konstruktor Ltd, ATM BG Ltd, and traffic lanes with sidewalks on both sides. Mašinokop Ltd and ELNOS BL Ltd. The deal The elements of the newly-designed involves the construction works on Patrijarh Patrijarh Pavle traffic artery are as follows: Pavle traffic artery. The total value of the pro- • two traffic lanes in each direction 2 x 7,00 m ject amounts to RSD 1.154.416.356,83 VAT - the replacement of roadbed d=50 cm excluded. We introduced the contractors to - crushed aggregate 0/63, d=20 cm work, and the construction began on - crushed aggregate 0/31, d=20 cm September 23, 2019. The deadline for com- - bitumen road base 22sA d= 2x6 cm pletion of contracted works is 540 days, i.e. - asphaltic concrete road surface 11s, March 16, 2021. d=5 cm The map of Patrijarh Pavle route Patrijarh Pavle road is the part of the • tram garden 2 x 3,75 = 7,50 m in the middle transport network of the City of Belgrade. In of the road a functional sense, it represents the trunk route - the centre-to-centre spacing of the rail- primarily intended for the transit traffic. The way 3,8 m road forms the link of the existing highway - the width of the railway 1,00 m through New Belgrade and the Ada Bridge, • sidewalks on both sides 2 x 2,50 m which are the part of the primary half-ring road Aside from the road of a total length of with Patrijarh Dimitrije Street and respectively 1.740 m’ with tramway tracks (3.775 m of the the Ring Road, Ibar Highway and the Belgrade railway), this project also includes the con- Bypass. This project covers Phase II of Stage II, struction of the appurtenant infrastructure: that is, the part of Patrijarh Pavle Street from - water supply systems - about 4,900 m’ - protection of power and telecommu- km 1+940,00 to km 3+680,00. At the beginning - faecal and rain sewage - approx. 4.300 m’ nication facilities and reconstruction of the of the section, the road profile is provided by - overhead contact system - about existing ones the plan, and at the end of the section, the 3,800 m’ - power supply newly designed street fits into the existing - cathodic protection - traffic equipment and signalling condition of Patrijarh Pavle Street. - public lighting - exterior decoration HIDROINŽENJERING PLC – exploration survey related to Komarnica water power plant GEOPHYSICAL AND GEODETIC SURVEYS IN THE EXTREME CONDITIONS OF THE KOMARNICA CANYON SUCCESSFULLY COMPLETED uccessfully completed Montenegro, at the altitude high- S geophysical and geodet- er than 800 m.a.s.l., in the extreme ic surveys carried out by weather and terrain conditions. geodesy and geophysics teams of We carried out the mentioned Energoprojekt Hidroinženjering surveys for the needs of the marked the end of 2019. The sur- Preliminary Design of Komarnica veys took place in the canyon of hydroelectric power plant. The the Komarnica River in aim was obtaining additional

Komarnica River Canyon – Komarnica River Canyon – arrival by boat crossing the river information on the physical and as seismic ventilation between mechanical properties of the rock the gallery and the terrain surface, mass in the zone of the dam axis. along two cross-sections by the For this purpose, the geodetic sur- method of seismic tomography. vey of the three profiles of seismic To perform the task efficiently Komarnica River Canyon – access paths refraction was carried out, as well and within the set deadline, it was,

January-March 2020 ENERGOPROJEKT | 9 Energoprojekt newsnews above all, necessary to implement phenomena found on the field at all measures related to occupation- the location of WPP Komarnica, we al health and safety. Thanks to the came across severe weather con- engagement of Jelena Stevanović- ditions for carrying out of these Ćorović, responsible officer for works (snow, rain, fog, low tem- occupational health and safety, perature). Along with the weather, the teams received adequate train- we also faced high-security risks ing. It included the theoretical and for human life and health. The practical professional qualification inapproachable worksite had the for safe moving along the moun- severely unfavourable terrain con- tain paths (via ferrata) and proper figuration, which required extreme use of fall protection equipment physical effort. provided for them. Team members A harmonious, dedicated and Nikola Radulović, B.Sc. in geodetic trained field team, through proper engineering, Petar Balanović B.Sc. coordination and planning of work in geodetic engineering (geodetic dynamics, was able to accomplish team), Milan Milošević B.Sc. in geo- the task without delay despite the physical engineering and Marko Komarnica River Canyon – Komarnica River Canyon – the aforementioned adverse factors. It Nikolić, an independent technician dangerous icicles approach to the surveying area was all possible thanks to the ded- (geophysical team) received certifi- and far-sighted approach to a suc- as was the case here, the impor- icated engagement of responsible cates of completed training. In this cessful business, at a time when tance of geodesy and geophysics officer for occupational health and way, Hidroinženjering has acquired the short-sighted majority orients is unfortunately often not recog- safety and the preventive meas- trained and qualified staff for work towards the quick and short-term nized in the construction compa- ures, such as specialised training, in extreme conditions. We want to profit, which inevitably leads to nies. We should not disregard the i.e. professional qualification for the point out that the Energoprojekt ultimate failure. fact that quality "preparation" is a use of previously provided special Group, as a responsible company, Even though they require, prerequisite for quality design and personal equipment, eagerly done has always put the concern for apart from knowledge and exper- construction. Jobs like this require identification and risk analysis.” the safety and health of employ- tise, extensive physical and psy- both courage and dedication to The beginning of the design ees in the first place. The above chological engagement as well the task, a love for the profession of WPP Komarnica facilities dates is a shining example of a proper as exposure to risky situations, and revealing nature's secrets. back to the 1950s. This fact shows

Komarnica River Canyon - engineering geological and geotechnical terrain model based on the previous surveys

Upon his return from the field, the importance and weight of the Marko Nikolić, an independent conducted surveys. Geophysical technician from the geophysical surveys have been carried out on team stated: “During the field task this ground, intermittently, since involving geophysical surveys in 1971, but for the first time in win- the field and geodetic marking of ter conditions. Occasional rock performed investigations, as well and icicle slump represented the as recording and geodetic survey particular danger from which we of geological and hydrogeological couldn't possibly protect. NON-WORKING DAYS DURING THE HOLIDAYS he employees of the Energoprojekt During the Labour Day, the employees of sidiaries will determine the working hours of the T Group are entitled to four non-working the Energoprojekt Group are entitled to three work units (construction sites, plants, services, days during the Easter holidays, starting non-working days, starting from Friday, May 1, etc.) in line with the needs of the production from Friday, April 17, 2020, ending on Monday, 2020, and ending on Sunday, May 3, 2020. The process. April 20, 2020. The first working day after the first working day will be Monday, May 4, 2020. The Energoprojekt office building will be Easter holidays will be Tuesday, April 21, 2020. The directors of the Energoprojekt Group sub- closed during the holidays.

10 | ENERGOPROJEKT January-March 2020 newsEnergoprojekt news

URBANIZAM I ARHITEKTURA PLC – An architectural solution as an opportunity for a new job CONCEPTUAL SOLUTION OF THE SPORTS COMPLEX OF 110,000 m2 IN ROSTOV-ON-DON ate last year, EP Urbanizam at the Hyatt Hotel in Rostov-on- tional sports facility, a sixty-room L i arhitektura drafted the Don. hotel with integrated office space architectural and concep- The 110,000 m2 big sports for rent, an accompanying under- tual design of the sports complex complex is located in the cen- ground garage with 1,030 parking in Rostov-on-Don. The conceptu- tral area of Rostov-on-Don and spaces, a supermarket, commercial al solution was developed at the occupies a plot of 5 ha. It has the facilities and about 200 business request of the Investor for whom following facilities: a handball hall suites. the EP UiA is designing, while EP with a capacity of 6,200 spectators, The creators of this architec- Visokogradnja is executing works a separate multifunctional recrea- tural solution are architects from EP Urbanizam i Arhitektura: author Žarko Cajić and co-author Darija Rašeta. Visualization and post-pro- duction were done in cooperation View of the hotel, office space and with UROBOT studio, architect supermarket within the sports Uroš Kovačević. complex

The layout of the whole sports complex, Rostov-on-Don (the area of newly designed facilities is 100,000 m2 on a 5 ha plot) Handball Hall with a capacity of 6,200 spectators

EP URBANIZAM I ARHITEKTURA / EP GHANA –the successful cooperation continues ARCHITECTURAL SOLUTIONS FOR NEW JOBS IN GHANA fter a successful collabo- East End Office Park: facility, appurtenant technical of South African architects, the A ration between Energo- At the request of the local rooms, adequate parking space provided solution took into con- projekt Ghana and Investor, who was not com- and areas landscaped with dense sideration the optimization and Urbanizam i arhitektura Plc in the pletely satisfied with the solu- greenery. rationality of the proposed spac- past period, marked by the con- tion delivered by the architects The solution proposes the es. As a result, the Investor got struction and design of the Cargo from the South African Republic, compact business buildings of 40% more rental space within Center in Accra and many other we have drafted the architectur- contemporary architectural form. the same dimensions of the facil- projects, last year was again a peri- al design of the East End Office They are based on the principles ity, 50 extra parking spaces, a sig- od of the intense activity. For the Park business complex. of self-sustainability, reflected in nificant reduction in the length needs of potential investors, sev- The mentioned business their position, orientation, design of roads and pedestrian circula- eral conceptual architectural solu- complex is located at the and materialization. The struc- tions, and more than 1,000 m2 of tions have been drafted, out of broader area of the airport and ture of the said solution consists additional green areas. which the following ones stand right along the Accra - Tema of the angular atrium spaces that The author of the solution out: East End Office Park, North motorway. It consists of 5 sep- have the function of shading and is Žarko Ćajić, associates Ivan Ridge Office Tower, North Ridge arate office buildings, with the natural ventilation and particu- Marković and Dejana Todorović. Office Building and Campus Plaza number of floors ground floor larly emphasize the exclusivity. Uroš Kovačević made post-pro- Shopping Mall, all in Accra. + 2, an independent catering Unlike the former solution duction and 3D visualization.

January-March 2020 ENERGOPROJEKT | 11 Energoprojekt newsnews

Following the shape of the land plot, the higher parts of the building have slanted sides, increasing the attractiveness of the object. The top floors with luxury apartments offer panoramic views towards the ocean and a central commercial area. The authors of this solution are Žarko Ćajić and Boris Vuković. Uroš Kovačević made post-production and 3D visualization. Campus Plaza Shopping Mall: After seeing the portfo- lio presentation of EP UA and the subsidiary based in Ghana late last year, the local Investor addressed the Energoprojekt, having in mind Design and Build model for the construction of a new shopping mall in the north North Rid ge Offi ce Tower North Rid ge Offi ce Buil ding part of the town. North Rid ge Offi ce Tower: zation of redistribution to smaller tial-business complex in central The first step was the devel- The North Ridge Office Tower and bigger lessees with maximum Accra. opment of the Preliminary Design is the office building in the central flexibility. Apart from the office The said facility occupies a for a hybrid type shopping mall 2 part of Accra. The Investor of this space, the exclusivity of the facility parcel placed on two parallel with 30,000 m of retail space. project was looking for the con- is in the covered car entrance and streets. The number of floors is Based on the terms of reference, ceptual architectural design of an two-storey entrance lobby with a ground floor + 10 in the lower two variants of solution were attractive office building suitable transparent facade and the sur- part, and ground floor + 12 in the made in December last year. for blue-chip companies, with roundings with dense greenery. part where the maximum height The proposed solution offers 5,000 m2 of classy rental space and The rooftop panoramic terrace, is. There is also an underground a luxury facility enriched with an adequate number of parking which offers a view of the coast- garage on two levels. Both build- green space with fountains, spaces. al part of the city and the ocean ings are mostly intended for busi- contributing to exclusivity and On a minimal land plot, we represents the additional quality ness purposes, while the last floors comfort. The spacious shaded proposed a building with an of the facility. contain the luxury apartments. area for external access to the underground garage with two lev- The authors of this solution are Given the duality of the approach, retail shops is very convenient. els. The number of floors is ground Žarko Ćajić and Boris Vuković. Uroš we proposed the two L-shaped The main focus of the solution floor + 7. Its design is based on Kovačević made post-production objects forming the green atrium concerns the attractiveness of the self-sustaining principles and rich and 3D visualization. in the middle. facility and its amenities that can draw the visitors. The Preliminary Design has met great acceptance from the investor and his team. This fact is especially important given the competition with the renowned French company that special- izes in the design of shopping malls. The authors of this solu- tion are Žarko Ćajić and Zoran Radojičić. Uroš Kovačević made post-production and 3D visual- ization. In the coming period, we expect further intensive work on acquisitions, as well as the development of projects for which the architectural solu- tions have been well accepted. greenery. The plot is facing a very North Rid ge Offi ce Buil ding: The subject complex has Listed activities confirm that the busy road with commercial facil- At the beginning of the a total of 15,000 m2 with a very quality of Energoprojekt system ities. This advantageous position last year, a local Investor, who high-efficiency degree of sales in the market of Ghana is fully is well used. The project explored previously received a concep- space in regards to circulations expressed through the coop- and implemented the possibility tual design of a local compa- (81% for the lower part of the eration between Ghana-based of modularity and transformation ny, hired EP UA to get a more building and 83% for the higher subsidiary and EP UA, as it was of office space as well as optimi- attractive concept of a residen- part of the building). the case in the previous years.

12 | ENERGOPROJEKT January-March 2020 newsEnergoprojekt news

HIDROINŽENJERING PLC – ongoing projects BENI SLIMANE DAM IN ALGERIA n 2012, Energoprojekt Hidroinženjering I signed a contract with the Algerian ANBT (National Agency for Dams and Transfers) to develop a detailed project for the implementation of the Beni Slimane Dam, to carry out the expert supervision over the con- struction and to provide technical assistance during the works. The realization of the contract started immediately after its signing. The total value of the contract with its annexes amounts to approximately EUR 4.1 million. The main contractor is the local Algerian company Hydro-Technique, and one of the subcontractors engaged in the construc- tion work was the Belgrade-based company Hidrotehnika-Hidroenergetika. The Beni Slimane Dam is located in Algeria, in the Medea wilayah (one of the 48 adminis- trative regions in Algeria) on the Mellah River about 7 km south of the town Beni Slimane. The dam aims to collect and regulate the inflows from the Mellah River, and the accumulated water will be used for irrigation. The entire Beni Slimane dam system involves the construction of several structures: a rock-fill dam, a water intake tower with an access footbridge, a grouting and derivation gallery, a spillway facility for the evacuation with the expected average annual inflow of The total amount of the material used for the of large amounts of water, a control plant, a 8,2 million m3 of water. dam body is about 2 million m3. bottom outlet valve and the access roads. EP From the engineering point of view, all Apart from the engineering elements, this Hidrinženjering has drafted detailed projects the objects in the system represent the very project, to some extent, was also marked by for the construction of all the above facilities, interesting and challenging facilities. Still, the the economic moment of the state of Algeria based on technical solutions developed in most complex for design and construction due to fluctuations in the oil and gas market. the previous phase of the project done by the are the water intake tower and the dam itself. For these two reasons, the initial deadlines for Portuguese company Coba, with some modifi- The water intake tower is a reinforced con- the implementation of the works have been cations and amendments introduced. Before the crete building with a total height of 75m. The extended. In February 2018, the filling of the drafting of the Design for Execution concerning lower part of the tower is a massive concrete impounding reservoir started, while the dam a spillway facility, its hydraulic model was made. block, which accommodates the bottom outlet filling and construction of individual structures EP Hidroinženjering entrusted the production intake. In contrast, the tower body is a slender were still in progress. At the moment, works of the said model to Jaroslav Černi Institute for cylindrical structure, with three water intakes on the construction of the facilities are in the the Development of Water Resources. arranged lengthwise. The body of the rock- final stages, and we expect their completion The crest of the dam is located at 719,00 fill dam is zoned with a central clay core. The in the current year. m.a.s.l. The volume of the impounding reservoir, maximum height of the dam, measuring from EP Hidroinženjering project team: the head with the level of water at normal backwater the lowest point of the foundation of the clay of the supervising team is Vilko Buntić, and the elevation (715,00 m.a.s.l.) is 28,7 million m3, core to the crown of the dam, is about 77 m. project manager is Ivo Jurić B.Sc.C.E.

January-March 2020 ENERGOPROJEKT | 13 Energoprojekt ini nfocus focus

INTERVIEW – NIKOLA PAVLOVIĆ Director of Marketing, Technical Preparation and Business Development at Energoprojekt Visokogradnja Plc WE PLAN TO KEEP THE FOCUS OF OUR BUSINESS ON CURRENTLY ACTIVE MARKETS FOR WHICH WE HAVE THE REFERENCES, LICENSES, LOGISTICS AND "KNOW-HOW"

What are the most significant projects abroad? Of all the currently ongoing overseas projects, I want to single out the projects implemented in the Russian Federation and Kazakhstan. In the Russian Federation, the completion of the first phase (Back of the House) of the contracted work on the Hyatt Regency project in Rostov-on-Don is underway. We are negotiating with the same Investor to contract a second phase of the project (Front of the House). In December 2019, we signed a significant contract involving the first stage of reconstruction of Syktyvkar Republic stadium, Komi Republic. The total value of the contracted works amounts to EUR 35 million and the deadline for realization is 12 months. In the territory of Kazakhstan, the most significant jobs involve designing. Visokogrdnja Plc possesses the licences needed for the designing work in Kazakhstan. Through designing work, we acquire the execution of new jobs. The project for Narhoz University in Alma Ata is currently in the final stage of realization. Are you satisfied with the pace of realization of current projects? Aside from the implementation of the Chinese Cultural Center project, significantly delayed due to problems with the project docu- mentation and the nomination of subcontractors by the Investors, the realization of other projects runs in line with the planned dynamics of works execution. Can you briefly describe the situation related to the markets ow would you evaluate the current business situation in which you operate? What is the current focus of marketing H of Your Company and the results achieved in 2019? activities? Are there any plans concerning the involvement in Apart from the numerous challenges we have faced in new markets? the past 2019, I find the achieved result satisfactory. A turbulent year For many years now, EP Visokogradnja has aimed the focus of in which we have completed the restructuring process is behind us. A its business operations mainly on foreign markets. However, in most positive business result and the realization of the plan for 2019 were overseas markets where EP Visokogradnja operates, a decline in invest- possible, first of all, thanks to the positive effects of the restructuring ment has been marked in recent years. In the Russian Federation, the process. The reduction in the number of employees with structural devaluation of the Russian ruble and the sanctions imposed on the reorganization has led to more rational use of resources. This measure Russian Federation by many countries reduced the investment activity significantly contributed to the optimization of business in the final over the past few years. The market in Kazakhstan has been stagnant outcome. Last year, we sold the machinery which created significant since 2017 when the cycle of investments related to the 2017 EXPO was losses over the past years due to its dormancy. We kept only the tower completed. It is only in the last few months that the Kazakhstan market cranes that EP Visokogradnja uses for almost every project. shows signs of recovery with the more significant private investments announced. The market in Ghana is also in stagnation due to the political In the previous year, we also narrowed the situation in the country. focus of business activities and adjusted the In recent years, in the overall realization of EP Visokogradnja projects, the portion of projects in the Serbian market had increased significantly, way we function to the current market situa- as opposed to the period when Serbia was the market with the least par- tion. All of the above gave visible results in the ticipation in project implementation. The current significant expansion of the real estate market in Serbia benefits the construction industry. last quarter of 2019, with real effects expected At the moment, the greatest challenge in the market is to ensure the qualified and high-grade workforce. For the time being, the fact that in 2020. EP Visokogradnja has a significant number of high-grade production What are the current most significant projects of Your workers is one of the most significant advantages in the market. Company in Serbia? Market diversification has always been the basis for the continu- In Serbia, we have three projects that are currently in the final phase ity of the operations of Energoprojekt Group. In this respect, one of of realization: Chinese Cultural Center, Navigator Business Center 2 and the prospective new markets is Uzbekistan, which is currently in the Park 11. Apart from these projects, in December 2019, we signed two stage of expansion after years of stagnation. EP Visokogradnja has new contracts for the execution of works in Serbia, namely: construction not been present in Uzbekistan for more than a decade. However, EP of a new office building of Delta Holding company "Delta Headquarters", Visokogradnja has many years of experience in this market concerning with the Investor "NBGP Properties Ltd" and construction of Air Traffic the implementation of the most demanding projects, out of which the Control Center building annexe with tower AKL Belgrade, with investor most famous is the reconstruction of the Senate building in Tashkent. "Air Traffic Control of Serbia and Montenegro SMATSA Ltd Beograd". At present, EP Visokogradnja is performing marketing activities aiming

14 | ENERGOPROJEKT January-March 2020 in focusEnergoprojekt in focus to re-establish the presence of Energoprojekt in this promising market. What is the personnel policy of the Company? Does the personnel structure follow the needs related to the imple- mentation of the contracted jobs, and the requirements for further develop- ment of key activities of the Company? Through the restructuring process com- pleted in the previous year, EP Visokogradnja reduced the number of employees to around 400. We contracted the three new projects in December 2019, and a need for additional staff emerged. We are currently recruiting the Reconstruction of Syktyvkar Republic stadium, Komi Republic new, mostly young, staff who will, along with more experienced colleagues, contribute to the charge of hiring under challenging circum- with the possibility of opening of the new mar- implementation of the said projects. By hiring stances since we did not advertise in the media kets, all depending on the investment climate new workers while retaining existing experi- in search of new staff. in existing and future markets. The Investors enced staff, we plan to significantly reduce the It turned out that our Company, despite recognize the EP Visokogradnja as a reliable average age structure of employees, which is intense competition, continues to attract partner who can provide quality services from over 45 years at the moment. engineers of different profiles. I am sure that design to project realization. We continue to insist on the quality of the the ones we have chosen will become the In the future, I see new people we employ, who, apart from good backbone of some new EP Visokogradnja we study results, must meet the other criteria of are striving to form. Visokogradnja as the leader professional selection - team spirit, initiative, What are the plans for the upcoming conscientiousness and communicativeness. period 2020-2024 – where do you see in the region on projects of We strive to find the ones who will best fit into the Company? the highest importance for the organizational culture of our Company. EP Visokogradnja plans to keep its focus Rada Anđelić, Head of Human Resources at on the currently active markets where it has both the state and the private EP Holding assists in this process. She was in references, licenses, logistics and know-how, Investors.

WE ARE HIRING: B.Sc. in C.E./ MS in C.E. POSITION FOREIGN ENTITY DIRECTOR Two executives CONDITIONS: researching economic trends in the overseas market and adver- - employed with Energoprojekt Group tising, informative and other business as ordered by the Executive Director of Plc; represents a foreign entity before all local authori- - graduated from technical faculty, university degree, minimum of ties under local regulations and powers arising from general acts 3 years of experience in the construction of investment facilities and decisions of the competent authorities of Plc; abroad • Maintains contacts with investors, designers and other institutions - exceptional level of responsibility towards the work and persons regarding the works performed by the foreign entity; - fluency in English / Russian language • Represents a foreign entity before all local authorities, in line with - organizational skills and positive evaluations of work on the local regulations and powers arising from general acts of Plc; previous jobs • Periodically, annually and at the end of particular jobs, submits - proficiency in business and issues related to the field of inter- reports and balances to the Director of the Company (Executive national trade Director) and Technical Director; - ability to deduce quickly and analytically • Responsible for coordination and functioning of the technical, - able to plan and organize work in a timely manner commercial, financial and general department in a foreign entity.

JOB DESCRIPTION: WE OFFER: • Organizes, manages, coordinates and controls the execution of - a responsible and challenging position all operations in a foreign entity; - an excellent opportunity for further professional development • Performs the acquisition and contracting of all jobs in the scope - work in a professional and dynamic environment of activities of foreign entity, within the available and approved capacities; If you have recognized yourself in the said above and can work in • Performs tasks related to market research, preliminary and pre- a team environment, prone to new knowledge and skills acquiring, paratory actions for concluding export contracts for goods and please send your application and CV to the following email address: services, business-technical cooperation and investing funds of foreign entities in the Republic of Serbia, monitoring and [email protected]

January-March 2020 ENERGOPROJEKT | 15 EEnergoprojektnergoprojekt mosaicmosaic

INTEGRATED MANAGEMENT SYSTEMS n the last quarter of 2019, in line with the plan, three Companies from Energoprojekt Group successfully carried out the audits I of the established integrated management systems according to the current ISO/OHSAS standards. More detailed information on companies is given below. INDUSTRIJA PLC THE SECOND RECERTIFICATION AUDIT OF FOUR IMS SYSTEMS SUCCESSFULLY CARRIED OUT n October 4, 2019, the second O Integrated Management System (IMS) recertification audit was successfully implemented in Industrija Plc. The five-member verification team of JUQS certification body performed the recertification audit of four systems: Quality management systems as required by the standard SRPS ISO 9001:2015, Environmental management systems according to SRPS OSO 14001:2015 standard, Occupational Health & Safety in line with SRPS OHSAS 18001: 2008 standard and Energy management systems as required by the SRPS ISO 50001:2012 standard. We point out that the scope of certification was expanded this year in line with changes in the business system of our organization. Based on the above, the graphics department was attached to Energoprojekt Industrija.

URBANIZAM I ARHITEKTURA PLC RECERTIFICATION AUDIT OF QMS, EMS И OHSAS WITHIN THE INTEGRATED MANAGEMENT SYSTEM COMPLETED n November 22, 2019, the external company SGS Beograd, a member of the SGS appropriate training, documentation prepa- O audit of Quality management systems Group - the world's largest verification, testing ration and system coordination, for which we (QMS) - according to ISO 9001: 2015, and certification company, carried out this have already initiated the necessary activities. the Environmental Management Systems (EMS) year’s audit. Let us remind you, the company has certi- - according to ISO 14001: 2015, as well as the Late this year, we plan to carry out the fied QMS since December 2005, and implemen- Occupational Health & Safety in line with recertification of QMS, second audit of EMS, tation of the Integrated Management System OHSAS 18001: 2007, was successfully complet- as well as the transition from OHSAS 18001: (IMS) was completed by EMS and OHSAS cer- ed, without any discrepancies. The renowned 2007 to ISO 45001: 2018, which involves the tification in November 2018.

VISOKOGRADNJA PLC RECERTIFICATION AUDIT OF INTEGRATED MANAGEMENT SYSTEM FINISHED WITH EXCEPTIONAL SUCCESS fter the completed reorganization Environmental Management Systems (EMS) - appropriate modifications to the documenta- A process and significant changes relat- according to ISO 14001: 2015, Occupational tion to transit from OHSAS 18001: 2007 to ISO ed to business procedures within Health & Safety in line with OHSAS 18001: 2007. 45001: 2018 within the next supervisory audit. Energoprojekt Visokogradnja, the external The result, accomplished only with the great Let us remind you, Energoprojekt recertification audit was successfully complet- effort of the employees, is even more significant Visokogradnja has a QMS certification ed. „SGS Beograd“ company carried out the given the extent of organizational and person- since December 2000, and the Integrated audit on December 16, 2019, including the nel changes within the company during the Management System (IMS) certification was following systems: Quality Management previous year. At the same time, Visokogradnja performed in 2012. Systems (QMS)- according to ISO 9001:2015, has started to organize the training as well as

16 | ENERGOPROJEKT January-March 2020 EEnergoprojektnergoprojekt mosaicmosaic

ENTEL PLC CELEBRATION OF THE STATEHOOD DAY OF THE REPUBLIC OF SERBIA IN THE UNITED ARAB EMIRATES his year, the Embassy of matic corps, as well as Serbian as evidenced during the previous the invitation of the Embassy of the T the Republic of Serbia in citizens living and working in the year by establishing a visa-free trav- Republic of Serbia to the UAE, tra- the United Arab Emirates UAE. His Excellency Stanimir el regime for Serbian citizens. The ditionally support the celebration (UAE) continued the practice estab- Vukićević, the Ambassador of said is very important for the 10,000 of the Statehood Day of Serbia. The lished in 2019 and organized a Serbia to the UAE and Lieutenant Serbian citizens currently residing said event contributes to Entel's solemn celebration to mark the Colonel Vladimir Tokalić, delegate and working in the UAE, including position consolidation, as a carrier Statehood Day of the Republic of of the Armed Forces of the the employees of Entel. In particu- of Serbian economic activity in the Serbia. The ceremony took place Republic of Serbia to the UAE were lar, they stated that the established UAE. It also facilitates the exchange at the Jumeirah Hotel in Abu Dhabi. the hosts of the event. In his open- travel facility would enable more of experiences and making new The event brought together the ing speech, Ambassador Vukicevic convenient visit of our citizens to connections with representatives senior UAE officials, ambassadors emphasized that the diplomatic the global EXPO 2020 event, which of state authorities and successful from many countries, members of relations between the UAE and will take place in Dubai this year. business people present in the the diplomatic and military-diplo- Serbia are at an extraordinary level, The representatives of Entel, at Middle East.

The atmosphere at Statehood Day celebration in the UAE NISKOGRADNJA PLC – established cooperation with the Spanish Company CAF ONE-DAY WORK MEETING WITH CAF'S HIGH REPRESENTATIVES HELD t the beginning of Operational Affairs of EP Holding, Arizkorreta, Aitor Moreno, Javier tinued with a consideration of the A February, EP Niskogradnja Miodrag Zecević, Member of Cano Gonzales, Carmen Heriz possibility of expanding cooper- organized a one-day EP Holding Supervisory Board, Sanchez, Cesar Ibanez, Rodrigo ation to other areas and projects work meeting with representatives Aleksandar Stanović, Director of Entero, Francisco Panos, Javier considering legal and economic of the large Spanish company CAF EP Niskogradnja, Vladimir Pirivatrić, Cabeza, Marco Torres and Dino frameworks of cooperation, pri- GROUP in the Energoprojekt office Director of EP Oprema, Jaroslav Tihić represented the CAF GROUP marily in the Serbian market. The building. Urošević, Executive Director and its companies CAF IMF, CAF participants agreed on the deci- In the previous period, EP of EP Entel, Representatives Signalling and TRIAS. sions of the work meeting and Niskogradnja signed a contract on of Marketing Functions from After detailed presentations defined the next steps for their cooperation with the CAF Group. EP Niskogradnja, EP Entel, EP of business opportunities of com- realization. The meeting ended It involves the implementation of Industrija and EP Visokogradnja panies from Energoprojekt Group with a cocktail party in the white the project for the construction attended the meeting. Txema and CAF GROUP, the meeting con- lounge. of a new passenger train station. At the request of the represent- atives of the Spanish group of companies, we organized a full- day work meeting in hall 3-4 on Wednesday, February 5, 2019. It aimed to get familiar with the two business systems, that of Energoprojekt and CAF. The rep- resentatives of top management of Energoprojekt Group-Bogdan Uzelac, Executive Director for

January-March 2020 ENERGOPROJEKT | 17 EEnergoprojektnergoprojekt mosaicmosaic

HIDROINŽENJERING PLC SIX DECADES SINCE HPP BISTRICA COMMISSIONING his year is the 60th anni- power were used in the electri- tric power plant uses levelled water mary purpose of the reservoir is T versary since the commis- fication process, and ambitious in the impounding reservoir of HPP electricity generation in the Bistrica sioning of the Bistrica plans for design and construction Kokin Brod. In hydraulic terms, HPP. For the last ten years, water hydroelectric power plant. The first were initiated. Construction of these two power plants represent from the Radoinja reservoir has kilowatts of electric power flowed HPP Bistrica began with the con- one energy system that exploits been used for the water supply of through the power grid on January struction of the Radoinja dam. The the water from river . The the town of Piboj. 23, 1960, from the first generator. dam and power plant were built Bistrica HPP was built on the right In the early 1950s, the engi- In July of the same year, the second between 1955 and 1960, and the bank of the Lim River, between neers of the Energoprojekt of that generator of the Bistrica hydroe- power plant itself between 1959 and . It was com- time started planning and design- lectric power plant was put into and 1960. During the construction missioned in 1960. It has two ing the entire system of hydropow- operation. It was then the largest of this hydroelectric power plant, Francis turbines with a total power er plants on the river Lim and Uvac, power plant in Serbia, with the for the first time in Serbia, we used of 104 MW and an annual output to which Bistrica also belongs. installed capacity of 104 MW. The new and for that time, innovative of 350 GWh. This power plant also Throughout this period, to this day, experts from Energoprojekt drafted methods of design and construc- has a 1 MVA household generator, Energoprojekt - Hidroinženjering the plans and projects for Lim tion of hydropower facilities. Many which serves as a reserve for the engineers have been attached to hydroelectric power plants energy brave builders have incorporated consumption of the whole system these hydroelectric power plants, system, to which Bistrica WPP their lives into this dam. During of Lim hydroelectric power plants. designed and built over the past belongs to. the construction 37 workers and It is a derivative plant, with decades. New generations of The history of hydroelectric miners were killed. a balancing reservoir supplied young colleagues are involved in power plants construction in Serbia The Bistrica hydroelectric with water from the Kokin Brod new plans for the revitalization of is long. It goes back to 1900, when power plant is the part of the Lim impounding reservoir. The Radoinja the existing and designing of the the first hydroelectric power plant hydroelectric power plant ener- Dam is located on the Uvac River new facilities of this system. in Serbia was put into operation gy system. Besides HPP Bistrica, near Radoinja village. It is a rock- The project for the revitaliza- on May 9 on the River hydroelectric power plants Kokin fill dam with upstream asphaltic tion of generating units and appur- near Valjevo. The first hydroelectric Brod and Uvac on the river Uvac concrete sealing shield, about 35 tenant equipment of HPP Bistrica, power plant with a system of three- and Potpeć on the river Lim also m high. The length of the dam at completed in 2015, involved the phase electric power Pod gradom belong to this energy system. HPP the crest is 361 m and with the replacement of outdated elec- on the river Djetinja was built very Bistrica is the third step in the sys- spillways 400 m. The total volume tro-mechanical equipment with an soon after the first one and was tem for hydropower utilization of of the dam body is 133.000 m3. It increase in the power of the gen- commissioned on August 2, 1900. water from the Uvac River. It is the forms an impounding reservoir erators from 52 MW to 57,5 MW, to After the Second World War, largest one in the system of Lim of 7.5 million m3. The length of provide new life for the generators engineering experiences and hydroelectric power plants. On its the reservoir is 12 km along Uvac and associated electro-mechanical knowledge in the field of hydro- own head, the Bistrica hydroelec- River to HPP Kokin Brod. The pri- power plant equipment.

HOLDING PLC, HIDROINŽENJERING PLC ENERGOPROJEKT AT THE HR CONFERENCE “ORIGINAL TALKS” he Original Talks confer- with human resources managers do young people want?”, “How to T ence, the project of Novak of 45 leading companies in the reach the top?”. Đokovic Foundation and country and the region, to get a After the program portion of Original magazine, took place for complete analysis of their pres- the conference, the simulations the third time in a row on February entations, as well as specific advice of job interviews followed. The 24, 2020, in Belgrade, at the and recommendations. Apart from colleagues Ivana Belićević from Crowne Plaza Hotel. Energoprojekt, Air Serbia, Atlantic Energoprojekt Hidroinženjering This HR conference is intend- Grupa, Coca-Cola HBC Serbia, and Rada Anđelić from ed for young people between Delhaize Serbia, Deloitte, Delta Energoprojekt Holding led the the ages of 22 and 33, students in Holding, Ernst & Young, Hemofarm talks on behalf of Energoprojekt. their final years of study and those PLC, Henkel Serbia Ltd, Hilton Our representatives have attend- preparing to start their business Belgrade, IKEA, L ' Oréal Balkan, ed the conference for the second careers. The goal of the conference Manpower Group, MediGroup, Nelt time. It undoubtedly represents an is to show young people how the Group, NIS, Nordeus, PharmaSwiss, opportunity to meet the potential job interview process runs, includ- Tarkett, Telenor Ltd and many oth- candidates for the needs of the ing how to write a CV, a motivation ers also supported this event. companies from EP Group, but letter, a recommendation, how to Within the panels attended also to promote Energoprojekt as prepare for the interview and pres- by HR managers and experienced a good employer and an organiza- ent oneself in the best light. professionals, the audience had the tion that operates in line with the The colleagues Ivana Belićević from Energoprojekt Hidroinženjering and Rada More than 250 young people opportunity to hear the lectures on principles of a socially responsible Anđelić from Energoprojekt Holding got a unique opportunity to talk “How to recognize a talent?”, “What company.

18 | ENERGOPROJEKT January-March 2020 In line with the current epidemiological situation caused by COVID 19 disease whose carrier is a new type of coronavirus - SARS CoV -2 (hereinafter: coronavirus) in Serbia and the measures and recommendations adopted so far by the Government and com- petent authorities of the Republic of Serbia, aiming at reducing the adverse effects on the health of Energoprojekt employees, limiting the coronavirus spreading, cutting down the circulation of semi-information and misinformation, and avoiding panic,

Executive Board of the Energoprojekt Holding Plc on the 282nd session held on March 13, 2020, passed the following RECOMMENDATIONS FOR PREVENTIVE MEASURES AND BEHAVIOUR OF EMPLOYEES IN ENERGOPROJEKT GROUP TO REDUCE THE NEGATIVE CONSEQUENCES ON THEIR HEALTH AND LIMIT THE CORONAVIRUS SPREADING All the Companies from Energoprojekt Group are required to implement the following recommendations:

• The management of all Companies is obliged to organize and possible use ICT technology –communication via conference call provide continuous communication with the employees to monitor and the like. the situation caused by a coronavirus, adverse effects on the health of employees of the Energoprojekt Group, as well as avoiding panic • The management of all the companies is advised to procure, in and circulation of semi-information and misinformation. line with the possibilities, temperature measuring instruments.

• The management of all the companies is advised to reduce business • All employees are advised to avoid physical contacts (handshaking, trips, taking into account the needs of the production process. hugging, and the like) with other persons and to stick to recom- mendations issued by the Ministry of Health of the Republic of • A temporary ban on business trips is introduced for countries/ Serbia. areas with the intensive transmission of coronavirus (Italy, People's Republic of China, South Korea, Islamic Republic of Iran, Swiss • We appeal to all employees and remind them of the importance of Confederation). The said list of countries may be amended from personal responsibility in situations like this. If you have symptoms time to time in line with the recommendations and decisions of of a cold (cough, shortness of breath, fever), stay at home and follow the competent authorities of the Republic of Serbia. the advice of your doctor.

• The entering into the office building of employees, partners, asso- • Coming to work and moving among people increases the possibility ciates and other visitors returning from work and/or coming from of virus spreading. Keep in mind that one person with symptoms countries/areas with intensive coronavirus transmission should be may have up to 50 contacts in such conditions, and by irresponsi- avoided and/or minimized and performed with increased control ble behaviour, you do not endanger your health only but also the and in line with recommendations of competent authorities of the health of others. Republic of Serbia. • We point out that it is of the utmost importance not to take for • The management of all the companies is advised to provide granted the professional advice and warnings on symptoms mon- increased control over the employees, partners, associates and itoring and responsible behaviour of each individual. other persons who enter all construction sites of Energoprojekt, in line with the recommendations of the competent authorities • The management of all companies is obliged to put these rec- of the Republic of Serbia. ommendations on all bulletin boards within the Energoprojekt office building premises and all construction sites and to send it • The management of all the companies is required to intensify via e-mail to all employees in the Energoprojekt office building the implementation of hygiene and sanitation activities by using and at all construction sites. additional disinfectants (cleaning of the common areas, toilets, all handrails, workrooms, equipment). There is also the need to devote The management of Energoprojekt Holding Plc will continue to special attention to the implementation of hygiene and sanitation monitor the situation on this issue and in line with the needs, pass activities in the kitchen premises and restaurants. the additional decisions.

• The management of Energoprojekt Visokogradnja Plc is advised to THE RECOMMENDATIONS ARE APPLICABLE UPON DOCUMENT consider, in line with the possibilities, the procurement of plastic RECEIPT AND EFFECTIVE UNTIL FURTHER NOTICE. cups and disposable cutlery, and/or additionally increase and control the kitchen equipment washing (in particular, cups, glasses, plates, CHIEF EXECUTIVE OFFICER dishes).

• Avoiding the organization of the meetings with a large number of people (maximum 5 to 6 persons) is recommended. Whenever Stojan Čolakov, B.Sc. C.E. Energoprojekt peoplepeople

A PORTRAIT OF AN EXCEPTIONAL CREATOR - ŽIVODAR ERČIĆ t the end of 2019, Živodar exploitation. Živodar Erčić was the reached its culmination, and when A Erčić, a distinguished project manager on the Preliminary we built in more than 40 countries, expert, experienced Design project involving the 100 m Ž. Erčić worked as a project man- designer, publicist and an outstand- high rock-fill dam and hydroelectric ager on some of the largest and ing colleague, a legend of power plant Maquarin (Jordan), with most complicated ones. The most Energopropjekt left us. the installed capacity of 40 MW. important of them, the one that is Živodar Erčić was born on In 1965, he became the head of until nowadays the pride of Serbian December 22, 1927, in Lazarevac. the design bureau engaged in the construction, one of the most sig- He graduated from the Grammar design of hydroelectric power plants nificant land reclamation projects School in Šabac. He graduated on and dam spillways, but he continues in the world, whose worth at the May 5, 1956, from the Hydrotechnical to work as a Project Manager and time exceeded USD 500 million, is Department of the Faculty of Civil Designer. Until 1971, while managing the Chira Piura project in Peru. The Engineering in Belgrade, with a grad- the bureau (this period is the 'golden project was carried out in several uation thesis in hydraulic structures, age' of Energoprojekt’s affirmation stages, including a series of dams under the mentorship of Professor and our design and contracting and headwater canals with appur- Vujica Jevđević. Immediately after economy in the world), several pro- tenant facilities. In the most delicate I graduation, he was employed with jects involving dams and hydroelec- phase of the project, Ž. Erčić was the treatment. He is one of the engineers Energoprojekt, in the design office for tric power plants were developed design director. In the period 1978- with the fullest and richest working hydroelectric power plants and spill- at the design bureau. For many of 1984, within phase III of this project, experience, both by type of facility ways for dams. From the very begin- them Ž. Erčić was the project manag- Ž. Erčić was the project manager and by their complexity and distri- ning, he participated in the design er or the responsible designer of the and worked on the Preliminary and bution worldwide. The Engineering of a series of Preliminary Designs of hydraulic parts of the projects. Most Main Designs of the Sullana Dam, Academy of Serbia noticed this hydroelectric power plants with rock- of the designed dams and hydro- irrigation canals and the associated quality and in 2011 Živodar Erčić was fill and arch dams, such as Zaton, electric power plants were imple- facilities. elected as a permanent member. , Buk Bijela and Višegrad. He was mented in line with the projects Between 1985 and 1993, Živodar Aside from remarkably fruit- the project manager of the project managed or under the responsibility Erčić worked as the Technical Director ful professional designing work, Ž. involving the Conceptual Design of Živodar Erčić. These are primarily for the organization and implemen- Erčić was always engaged in a very drafting for the dam and the hydroe- the following dams: Piva (complicat- tation of Hidroinženjering projects. notable publicistic work. He has lectric power plant Višegrad. In 1961, ed hydraulic calculations of spillways Simultaneously, he continued to participated in numerous scientific when the substantial breakthrough and stilling pools), Tikveš (shaft spill- work as a project development congresses, most often with papers of Energoprojekt into foreign mar- way and stilling pool), Glavočnica technical consultant for numerous related to the field of high dams, spill- ways and analysis of hydraulic relia- bility of facilities. His articles represent a synthesis of science, profession and extraordinary experience. His retirement in 1993 was only a formal, administrative act that did not interrupt this creator’s excep- tionally productive activity. Živodar continued to work as an advisor to the Director of Hidroinženjering and a member of the Expert Council. He was engaged as an expert on the Poechos Dam superelevation pro- ject, which was completed in late 2017 and implemented at the end of March 2019. It was the last job he actively participated in with EP Hidroinženjering. One of the important activities of The photo from the last project Ž. Erčić participated in: Poechos Dam superelevation and installation Živodar Erčić, throughout his working of 6 radial floodgates life, was the work on education and kets began and when Yugoslav (shaft spillway, chute and cut-off systems in the world. During this development of new engineering construction industry became one trench), the spillways at five dams period, Energoprojekt operated personnel of Hidroinženjering. After of the most respected in the world in Cyprus, as well as the conception at the same time in more than 60 retirement, he stayed in the compa- - he worked as a project manager of the drainage system in the foun- countries worldwide, on more than ny as a permanent member of the on a series of projects concerning dation zone of the Serbian part of the 20 dams and hydroelectric power Expert Council of Hidroinženjering. In dams and hydroelectric power plants Djerdap 1 dam. All of the mentioned plants with the power of 500-1,200 this way, Živodar Erćić performed the abroad. He was engaged on dam solutions were non-standard, innova- MW, with dams up to a height of 240 most valuable job of all - knowledge projects, especially their spillways tive and turned out to be excellent m. Apart from these projects, Živodar and experience transfer. All young in Cambodia, Jordan, Lebanon, and during exploitation. Erčić has organized and directed a Energoprojekt engineers used to Syria. The majority of these projects In the period 1971 - 1984, when large number of projects in the field come to Živodar to share with him was implemented, and they turned the expansion of Energoprojekt in of irrigation, drainage, water supply some of their own professional out to be outstanding during the world construction market and wastewater and potable water dilemmas.

20 | ENERGOPROJEKT January-March 2020 Apartments of all structures from 28 m2 to 170 m2 Offi ce/retail units from 42 m2 to 94 m2 Garage parking place

APARTMANT SALES IN VIŠNJIČKA Sales: Energoprojekt Office Building Modern residential and business complex 12 Mihaila Pupina Boulevard, 11070 Novi Beograd with a view on the Danube and cityscape Phone number +381 11 220 3444, +381 62 240 665 +381 62 240 824, +381 63 479 154, +381 63 479 149 [email protected] www.energoprojektsunnyville.rs

Partner bank: EEnergoprojektnergoprojekt spiritspirit

The traditional celebration of the New Year NEW YEAR'S COCKTAIL FOR EMPLOYEES AND CHILDREN'S NEW YEAR n the last week of restaurant. In short speeches, the traditional celebration of the their friends within the exhibition I December 2019, Dobrosav Bojović, the President children's New Year took place in of drawings of the Energoprojekt employees of Energo- of the Supervisory Board, and the office building in two terms, employees’ children themed projekt gathered to see off the Stojan Čolakov, Chief Executive from 11 AM and 2 PM. This time, „Santa, don't stray from the path“. old and welcome the New Year Officer, addressed the gathered the youngest – the Energoprojekt This year, we set up the exhibition 2020 together. The New Year's employees and wished a pros- employees’ children enjoyed the in the Energoprojekt gallery from cocktail party took place on the perous and happy New Year to attractive show of the famous December 20 to January 17, 2020. last business day of the year, on them and their families. magician Igor. During this mani- Like every year, after the show, Friday, December 27 at the A weekend before, on festation, the children could see the children were given the New Energoprojekt Gallery and in the Saturday, December 21, 2019, their own and the artworks of Year gifts.

INTERESTING FACTS THE YOUNGEST READER OF THE ENERGOPROJEKT NEWSPAPER e know that many people read Namely, our newspaper attracted W Energoprojekt newspaper, both in the attention of the youngest. Djordje the company-colleagues employed Cvejic (2,5 years old) was caught by at Energoprpjekt and outside the compa- his father's camera while reading the ny - our partners, investors, former col- New Year’s issue of "Energoprojekt leagues, retirees. However, the photo we Newspaper" with "interest and great received from a colleague Djordje Cvejić attention". We thank our colleague for from the EP Urbanizam and Architektura the material provided. surprised us.

22 | ENERGOPROJEKT January-March 2020 EEnergoprojektnergoprojekt spiritspirit

Trip organized by the Energoprojekt Entel Trade Union THE MAGIC OF ZLATIBOR nergoprojekt Entel Trade well as the height of snow cover E Union organized a trip to on the ski-run. Zlatibor for employees After a few hours ride, we and their families from February reached Zlatibor in a good mood, 15 to 17 this year. ready to make the most of our After the New Year and time for rest, walking, skiing and Christmas holidays, the well-co- other beautiful experiences on ordinated team of organizers, this trip. with the material support from After check-in at the Braća the management of the company, Sekulic lodging and other facilities efficiently completed all prepara- we rented, the organized depar- tions for the trip. The reservation of ture for Tornik followed, both for 500 dinars and payment of a part experienced skiers and also for the of the boarding house expenses beginners. Others, who were not were mandatory. interested in skiing, used the time Despite a mild winter this year to rest and walk around Zlatibor. and poor weather forecasts for ski- After walking and touring the ers, all the travellers were ready for local sights and ski resorts, many an adventure, eager to have some colleagues chose to warm up in fun in the snow and take some rest Zlatibor cafes with a cup of tea, hot tions for skiing and snowboarding on the previous days, the return after hard work on projects. chocolate or wine, beer and oth- on the slopes of Tornik. The others took place in a cheerful atmos- On the departure day, the er beverages. After dinner, young went for a walk, shopping at the phere while we were recounting first to arrive were, of course, the people had fun in cafes, parents Zlatibor market and enjoyed cafes the adventures from the ski-runs. bakers with prepared breakfast organized entertainment for their and restaurants. The weather was Upon arrival in Belgrade, sat- packages. Upon bus arrival, our children with social games at the nice, clear and without precipita- isfied, but also a little bit tired of

colleagues, with enthusiasm and hotel, and the most of them went tion, with very little snow on the sports activities and the trip, we haste, packed their neatly arranged to bed early, since the plan for the surrounding hills. Zlatibor was hurried to our homes to get ready belongings and took their seats on next day was to leave for Tornik full of tourists because it was a for the new working day. Another the bus and eagerly awaited the early in the morning to get the state holiday and also a student Entel’s journey, which has become departure. During the ride, some most out of skiing time. vacation. a tradition now, has ended. It is of them were checking the weath- For the next two days, the On the third day, after lunch, up to the organizers, of course, to er conditions at the ski resort as snow lovers also had stable condi- we headed back to Belgrade. Like plan a new trip and socialisation.

Humanity at Energoprojekt VOLUNTARY BLOOD DONATION CAMPAIGN he first campaign of volun- Energoprojekt. This time, 37 poten- Let us remind you, many decades now. The next cam- T tary blood donation in this tial donors signed up. Blood was Energoprojekt traditionally organ- paign of voluntary blood donation year took place on January given by 33 donors, while four of our ises the voluntary blood donation in Energoprojekt is planned for May 30, 2020, from 10 AM to 3 PM in colleagues were first-time donors. campaigns three times a year for 27, 2020.

January-March 2020 ENERGOPROJEKT | 23 ВАШ СТАН НА НОВОМ БЕОГРАДУ НА КОРАК ОД ДУНАВА!