Draft San Luis Reservoir Expansion Appraisal Report San Luis Reservoir Expansion Draft Appraisal Report Central Valley Project, California Mid-Pacific Region U.S. Department of the Interior Bureau of Reclamation December 2013 Mid-Pacific Region - Planning Division U.S. Department of the Interior Bureau of Reclamation December 2013 Mid-Pacific Region - Planning Division Mission Statements The mission of the Department of the Interior is to protect and provide access to our Nation’s natural and cultural heritage and honor our trust responsibilities to Indian Tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Cover Image: Aerial view, looking west, of B.F. Sisk Dam and San Luis Reservoir. Image courtesy of DWR. San Luis Reservoir Expansion Draft Appraisal Report Central Valley Project, California Mid-Pacific Region U.S. Department of the Interior Bureau of Reclamation Mid-Pacific Region - Planning Division San Luis Reservoir Expansion - Appraisal Report December 2013 Table of Contents 1.0 EXECUTIVE SUMMARY ............................................................................................... 1 2.0 INTRODUCTION.............................................................................................................. 4 2.1 Purpose of the Appraisal Study ........................................................................................ 4 2.2 Need for the Appraisal Study ........................................................................................... 5 2.3 Authorization for Appraisal Study ................................................................................... 5 2.4 Study Area ........................................................................................................................ 6 3.0 PROBLEMS AND OPPORTUNITIES ........................................................................... 8 3.1 Problems ........................................................................................................................... 8 3.2 Opportunities .................................................................................................................. 10 3.3 Objectives ....................................................................................................................... 11 3.4 Constraints ...................................................................................................................... 11 4.0 EXISTING CONDITIONS ............................................................................................. 13 4.1 Facilities ......................................................................................................................... 13 4.1.1 Dam Embankment .................................................................................................. 13 4.1.2 Gianelli Pumping-Generating Plant ........................................................................ 15 4.1.3 Intake Towers / Trashrack Structures ..................................................................... 15 4.1.4 Trashrack Structure Access Bridge ......................................................................... 17 4.1.5 Spillway .................................................................................................................. 17 4.2 Reservoir Area-Capacity ................................................................................................ 18 4.3 Related Projects .............................................................................................................. 19 4.4 Previous Studies ............................................................................................................. 22 4.5 Influencing Contracts, Agreements, and Conditions ..................................................... 24 5.0 MANAGEMENT MEASURES ...................................................................................... 27 5.1 Non-Structural Measures................................................................................................ 27 5.2 Structural Measures ........................................................................................................ 28 5.3 Alternatives .................................................................................................................... 30 5.3.1 No Action Alternative ............................................................................................. 30 5.3.2 Conceptual Dam Raise Alternative ......................................................................... 30 ______________________________________________________________________________ i San Luis Reservoir Expansion - Appraisal Report December 2013 6.0 CONSIDERATIONS FOR STRUCTURAL MODIFICATIONS............................... 32 6.1 Intake Towers/Trashrack Structures............................................................................... 32 6.2 Trashrack Structure Access Bridge ................................................................................ 32 6.3 Spillway .......................................................................................................................... 32 7.0 WATER OPERATIONS AND BENEFITS FORECAST ............................................ 34 7.1 Existing Operations ........................................................................................................ 34 7.2 Water Supply Forecast ................................................................................................... 35 7.2.1 Method 1: Spreadsheet Analysis of CalSim-II Results .......................................... 35 7.2.2 Method 2: CalLite Modeling Analysis .................................................................. 37 7.3 Summary of Results ....................................................................................................... 39 8.0 ENVIRONMENTAL ....................................................................................................... 40 9.0 COST ESTIMATES ........................................................................................................ 41 10.0 FINDINGS AND RECOMMENDATIONS .................................................................. 43 10.1 Findings .......................................................................................................................... 43 10.2 Recommendations .......................................................................................................... 44 11.0 REFERENCES ................................................................................................................. 45 ATTACHMENT A B.F. Sisk Dam Increased Storage Alternatives, Appraisal Level Study: Technical Memorandum No. VB-86-68313-25 ATTACHMENT B Sisk Enlargement Appraisal Level Modeling Analysis ______________________________________________________________________________ ii San Luis Reservoir Expansion - Appraisal Report December 2013 Figures Figure 1. Major facilities of the San Luis Unit and the appraisal study area. ................................ 7 Figure 2. Typical Section of B.F. Sisk Dam ................................................................................ 14 Figure 3. Close-up of B.F. Sisk Dam and Gianelli Pumping-Generating Plant .......................... 14 Figure 4. Outlet works intake towers and access bridge .............................................................. 16 Figure 5. Overview of B.F. Sisk inlet and outlet structures ......................................................... 17 Figure 6. Area-Capacity curves for San Luis Reservoir and O'Neill Forebay ............................ 18 Figure 7. Locations of CALFED surface storage investigations relative to the Sisk study area. 23 Figure 8. Typical section of the conceptual modification alternative .......................................... 31 Figure 9. Approximate limits of spillway demolition .................................................................. 33 Figure 10. A 10 year plot of long-term San Luis reservoir volume ............................................. 34 Tables Table 1. Maximum additional annual export opportunities by water year type* ......................... 36 Table 2. Additional export opportunities stored by various capacity increases* ........................ 37 Table 3. Average Annual Additional Deliveries of CVP and SWP (TAF/yr)* ........................... 38 Table 4. Change in North-of-Delta Average End of September Storage (TAF) ......................... 38 Table 5. Summary of maximum and minimum estimated water supply benefits ....................... 39 Table 6. Summary of appraisal level field cost estimates ............................................................ 42 ______________________________________________________________________________ iii San Luis Reservoir Expansion - Appraisal Report December 2013 Acronyms and Abbreviations AF acre-feet BA Biological Assessment BDCP Bay-Delta Conservation Plan BO Biological Opinion CALFED CALFED Bay-Delta Program CA California Aqueduct CAS Corrective Action Study CEQA California Environmental Quality Act COA CVP/SWP Coordinated Operations Agreement cfs cubic-feet per second (ft3/s) CVOO Reclamation Central Valley Operations Office CVP Central Valley Project CVPIA Central Valley Project Improvement Act D-1641 SWRCB Water Right Decision 1641 DMC Delta-Mendota Canal DWR California Department of Water Resources Delta Sacramento-San Joaquin
Recommended publications
  • Folsom50booklet 1 5/10/2006, 10:22 AM This Booklet Was Printed in Cooperation With
    U.S. Department of the Interior Bureau of Reclamation Mid-Pacific Region Folsom50Booklet 1 5/10/2006, 10:22 AM This booklet was printed in cooperation with Folsom50Booklet 2 5/10/2006, 10:22 AM U.S. Department of the Interior Bureau of Reclamation Mid-Pacific Region Folsom50Booklet 3 5/10/2006, 10:22 AM Dedication I am pleased to offer my congratulations as Folsom Dam celebrates its 50th Anniversary. For half a century, through drought and flood, Folsom Dam has managed American River flows for the benefit of people, farms, industry, and the environment. Since its completion in 1956, it has effectively controlled flooding. Even several months before its final William E. Rinne completion, Folsom Dam prevented flood Acting Commissioner damage when a major tropical storm Bureau of Reclamation triggered rapid snowmelt. The dam impounded so much runoff that Folsom Lake filled in one week rather than the one year anticipated by engineers. It is estimated that this magnificent dam has prevented more than $5 billion in flood damage to downstream agricultural and urban areas, a testament to the foresight of the men and women who envisioned and built it. Today, Folsom Dam provides 500,000 acre-feet of water for irrigation and urban uses annually. It plays an important role in fisheries enhancement and water quality improvement in the San Francisco Bay-Delta. The dam also provides clean, renewable electricity. In 2005, it produced more than 690 million kilowatt hours. As a recreational facility, Folsom Lake is one of the most visited recreation areas operated by the California Department of Parks and Recreation.
    [Show full text]
  • Central Valley Project Integrated Resource Plan
    Summary Report Central Valley Project Integrated Resource Plan U.S. Department of the Interior Bureau of Reclamation Mid-Pacific Region TABLE OF CONTENTS TABLE OF CONTENTS BACKGROUND ..........................................................................................................................................................5 STUDY APPROACH ...................................................................................................................................................7 CLIMATE IMPACTS ON WATER SUPPLIES AND DEMANDS ...............................................................................11 COMPARISON OF PROJECTED WATER SUPPLIES AND DEMANDS .................................................................21 PERFORMANCE OF POTENTIAL FUTURE WATER MANAGEMENT ACTIONS .................................................27 PORTFOLIO TRADEOFFS .......................................................................................................................................37 CVP IRP STUDY LIMITATIONS ................................................................................................................................39 ACRONYMS AND ABBREVIATIONS USED IN FIGURES ......................................................................................41 Tables Table 1. Simulation Suites and Assumptions Inlcuded in Each Portfolio .............................................................27 Figures Figure 1a. Projected changes in Temperature in Ensemble-Informed Transient Climate Scenarios between 2012
    [Show full text]
  • News Release
    CALIFORNIA DEPARTMENT OF PARKS AND RECREATION Divisions of Boating and Waterways, Historic Preservation and Off-Highway Vehicles News Release For Immediate Release Contact: Apr. 5, 2017 Aaron Wright Sector Superintendent [email protected] (530) 538-2200 Summer Recreation at Lake Oroville State Recreation Area OROVILLE, Calif. -- The emergency effort to repair the Lake Oroville spillways will not interfere with most outdoor recreation this summer at the lake, and with the exception of the Spillway Boat Launch Ramp, all boat launch ramps are open, announced California State Parks (DPR) and the Department of Water Resources. All campgrounds also are open and floating campsites are back on the lake and available for rental. Some areas near the dam will continue to be off-limits to visitors as crews work to repair or replace spillways damaged in February during high runoff. Outdoor activities available at Lake Oroville this summer include: Campgrounds: All campgrounds are now open with site-specific reservations available at Bidwell Canyon, Loafer Creek and Lime Saddle. Campers without reservations are still welcome on a day-to-day basis to any campsites that have not been previously reserved. Campground showers have been equipped with token machines. Each site will have a unique, collectable token which can also be used at other participating state parks. Trails: Lake Oroville has a number of trails for hiking, biking and equestrian use. Trails around the Diversion Pool and Hyatt Power Plant likely will be closed throughout the summer, although DPR may make changes to other trails to accommodate more hikers and help compensate for the closures.
    [Show full text]
  • KEY to ENDSHEET MAP (Continued)
    KEY TO ENDSHEET MAP (continued) RESERVOIRS AND LAKES (AUTHORIZED) 181.Butler Valley Res. 185. Dixie Refuge Res. 189. County Line Res. 182.Knights Valley Res. 186. Abbey Bridge Res. 190. Buchanan Res. 183.Lakeport Res. 187. Marysville Res. 191. Hidden Res. 184.Indian Valley Res. 188. Sugar Pine Res. 192. ButtesRes. RESERVOIRS AND LAKES 51BLE FUTURE) 193.Helena Res. 207. Sites-Funks Res. 221. Owen Mountain Res. 194.Schneiders Bar Res. 208. Ranchería Res. 222. Yokohl Res. 195.Eltapom Res. 209. Newville-Paskenta Res. 223. Hungry Hollow Res. 196. New Rugh Res. 210. Tehama Res. 224. Kellogg Res. 197.Anderson Ford Res. 211. Dutch Gulch Res. 225. Los Banos Res. 198.Dinsmore Res. 212. Allen Camp Res. 226. Jack Res. 199. English Ridge Res. 213. Millville Res. 227. Santa Rita Res. 200.Dos Rios Res. 214. Tuscan Buttes Res. 228. Sunflower Res. 201.Yellowjacket Res. 215. Aukum Res. 229. Lompoc Res. 202.Cahto Res. 216. Nashville Res. 230. Cold Springs Res. 203.Panther Res. 217. Irish Hill Res. 231. Topatopa Res. 204.Walker Res. 218. Cooperstown Res. 232. Fallbrook Res. 205.Blue Ridge Res. 219. Figarden Res. 233. De Luz Res. 206.Oat Res. 220. Little Dry Creek Res. AQUEDUCTS AND TUNNELS (EXISTING OR UNDER CONSTRUCTION) Clear Creek Tunnel 12. South Bay Aqueduct 23. Los Angeles Aqueduct 1. Whiskeytown-Keswick 13. Hetch Hetchy Aqueduct 24. South Coast Conduit 2.Tunnel 14. Delta Mendota Canal 25. Colorado River Aqueduct 3. Bella Vista Conduit 15. California Aqueduct 26. San Diego Aqueduct 4.Muletown Conduit 16. Pleasant Valley Canal 27. Coachella Canal 5.
    [Show full text]
  • 3A.12 Parks and Recreation - Land
    3A.12 PARKS AND RECREATION - LAND The two local roadway connections from the Folsom Heights property off-site into El Dorado Hills would not generate direct increases in population that could result in additional demand for parkland facilities in El Dorado County. Therefore, the “Affected Environment” does not contain a discussion of conditions in El Dorado County related to parks and recreation. 3A.12.1 AFFECTED ENVIRONMENT REGIONAL ENVIRONMENT Folsom Lake Folsom Lake State Recreation Area (SRA), located approximately 5 miles north of the SPA, serves the greater Sacramento area for recreation in the form of camping, hiking, biking, boating, and other outdoor recreation activities. The lake also hosts bass fishing tournaments that frequently draw fishermen from throughout the state. California State Parks manages the Folsom Lake SRA, which includes Folsom Lake and the surrounding facilities. The lake features approximately 75 miles of shoreline and 80 miles of trails that provide opportunities for hiking, horseback riding, nature studies, camping, and picnicking. There are seven major recreation areas with facilities located around the lake. The Folsom Lake SRA, including Folsom Lake, is one of the most heavily used recreational facilities in the California State Park system, with 2 to 3 million visitor days per year. Approximately 75% of the annual visitations to the Folsom Lake SRA occur during the spring and summer, and many (85%) of the Folsom Lake SRA activities are water dependent. The Lake Natoma sub-unit of the Folsom Lake SRA is located adjacent to the City of Folsom, between Hazel Avenue and Folsom Dam, upstream from the Sacramento County-operated portion of the American River Parkway.
    [Show full text]
  • Insights Into the Oroville Dam 2017 Spillway Incident
    geosciences Communication Insights into the Oroville Dam 2017 Spillway Incident Aristotelis Koskinas 1, Aristoteles Tegos 1,2,*, Penelope Tsira 1, Panayiotis Dimitriadis 1 , Theano Iliopoulou 1, Panos Papanicolaou 1, Demetris Koutsoyiannis 1 and Tracey Williamson 3 1 Department of Water Resources and Environmental Engineering, National Technical University of Athens, Heroon Polytechniou 9, Zografou, GR-15780 Zographou Athens, Greece; [email protected] (A.K.); [email protected] (P.T.); [email protected] (P.D.); [email protected] (T.I.); [email protected] (P.P.); [email protected] (D.K.) 2 Arup Group Limited, 50 Ringsend Rd, Grand Canal Dock, D04 T6X0 Dublin 4, Ireland 3 Arup, 4 Pierhead Street, Cardiff CF10 4QP, UK; [email protected] * Correspondence: [email protected] Received: 9 December 2018; Accepted: 7 January 2019; Published: 11 January 2019 Abstract: In February 2017, a failure occurring in Oroville Dam’s main spillway risked causing severe damages downstream. A unique aspect of this incident was the fact that it happened during a flood scenario well within its design and operational procedures, prompting research into its causes and determining methods to prevent similar events from reoccurring. In this study, a hydroclimatic analysis of Oroville Dam’s catchment is conducted, along with a review of related design and operational manuals. The data available allows for the comparison of older flood-frequency analyses to new alternative methods proposed in this paper and relevant literature. Based on summary characteristics
    [Show full text]
  • San Luis Unit Project History
    San Luis Unit West San Joaquin Division Central Valley Project Robert Autobee Bureau of Reclamation Table of Contents The San Luis Unit .............................................................2 Project Location.........................................................2 Historic Setting .........................................................4 Project Authorization.....................................................7 Construction History .....................................................9 Post Construction History ................................................19 Settlement of the Project .................................................24 Uses of Project Water ...................................................25 1992 Crop Production Report/Westlands ....................................27 Conclusion............................................................28 Suggested Readings ...........................................................28 Index ......................................................................29 1 The West San Joaquin Division The San Luis Unit Approximately 300 miles, and 30 years, separate Shasta Dam in northern California from the San Luis Dam on the west side of the San Joaquin Valley. The Central Valley Project, launched in the 1930s, ascended toward its zenith in the 1960s a few miles outside of the town of Los Banos. There, one of the world's largest dams rose across one of California's smallest creeks. The American mantra of "bigger is better" captured the spirit of the times when the San Luis Unit
    [Show full text]
  • April 21, 2021
    ITEM NO. 15d ORIGINATING SECTION: Integrated Planning CONTACT: Sal Segura/Amparo Flores AGENDA DATE: August 18, 2021 SUBJECT: Monthly Water Inventory and Water Budget Update SUMMARY: In support of Zone 7’s mission to “deliver safe, reliable, efficient, and sustainable water…services,” for Strategic Plan Goal A – “Reliable Water Supply and Infrastructure;” this report summarizes water supply, usage and storage conditions as of the end of July 2021. An overall analysis of the annual water supply takes place in April of each year with the Annual Review of Sustainable Water Supply. Long-term water supply planning is summarized in the Urban Water Management Plan, which is updated every five years and assesses water supply reliability on a 20-year horizon. The report considers the various sources of supply and storage available to Zone 7 locally and in State Water Project facilities, as well as in remote groundwater storage banks. Figure ES 1: At-a-Glance Summaries of Water Supplies, Deliveries, and Available Water (as of July 2021) Annual Yield: Imported and Local Water Supplies vs. Delivered Water Year-To- 400,000 50,000 Date Yield 300,000 feet) - 0 Annual Imported Local Average feet - (acre 200,000 Annual Yield Water Water Yield acre Water Deliveries: 100,000 2021 feet) - 10,000 0 5,000 2013 2017 2018 2019 2020 2021 (acre 0 Water Deliveries Total Water Treated Untreated 2021 Projected Deliveries Delivered Water Water Actual Water Deliveries Water Storage Treated Water Deliveries: Treated Water Deliveries: Imported Water (via Delta) 11% 0% Surface Water 43% Local Water (Lake Del Valle) Groundwater 57% Imported Water (Stored As Groundwater) 89% JULY 2021 Zone 7 Water Inventory and Water Budget Supply and Demand (See Table 1, Table 2, Figure 1, Figure 2, Figure 3, and Figure 4) • Monthly totals: 5,150 AF delivered to customers (4,150 AF treated, 1,000 AF untreated) • The total treated water production increased by 6% compared to last month.
    [Show full text]
  • Shasta Dam Fish Passage Evaluation
    Mission Statements The mission of the Department of the Interior is to protect and provide access to our Nation’s natural and cultural heritage and honor our trust responsibilities to Indian Tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Contents Contents Page Chapter 1 Introduction ................................................................................ 1-1 Project Background ........................................................................................ 1-3 Central Valley Salmon and Steelhead Recovery Plan ............................. 1-4 2009 NMFS Biological Opinion .............................................................. 1-5 Shasta Dam Fish Passage Evaluation ...................................................... 1-6 Purpose and Need .......................................................................................... 1-7 Objectives ...................................................................................................... 1-7 Study Area ..................................................................................................... 1-8 River Selection Process............................................................................ 1-9 Shasta Lake ............................................................................................ 1-10 Upper Sacramento River Watershed .....................................................
    [Show full text]
  • RK Ranch 5732 +/- Acres Los Banos, CA Merced County
    FARMS | RANCHES | RECREATIONAL PROPERTIES | LAND | LUXURY ESTATES RK Ranch 5732 +/- acres Los Banos, CA Merced County 707 Merchant Street | Suite 100 | Vacaville, CA 95688 707-455-4444 Office | 707-455-0455 Fax | californiaoutdoorproperties.com CalBRE# 01838294 FARMS | RANCHES | RECREATIONAL PROPERTIES | LAND | LUXURY ESTATES Introduction This expansive 5732 acre ranch is ideal for hunting, fishing, your favorite recreational activities, a family compound, agriculture, or cattle grazing. Located in Merced County, just an hour and a half from the San Francisco Bay Area, infinite recreational opportunities await with elk, trophy black tail deer, pigs, quail, and doves. The angler will be busy with catfish, bluegill, and outstanding bass fish- ing from the stock ponds. The South Fork of the Los Banos Creek flows through the property. This property is currently leased for cattle, but the recreational uses are only limited by your imagination. Location The property is located in Merced County, 17 miles from the town of Los Banos, 26 miles from Merced, and 8 miles from the San Luis Reservior. With all the benefits of seclusion, and the conveniences of major metropolitan areas close by, this property is just a 1.5 hour drive to Silicon Valley. Air service is provided by Fresno-Yosemite International Airport, 78 miles from the property, or Norman Y. Mi- neta San Jose International Airport, 83 miles from the property. Los Banos Municipal Airport is lo- cated 17 miles away. The closest schools would be 17 miles away in Los Banos. From the north, take Highway 101 South to CA-152 East, right onto Basalt Road, left onto Gonzaga Road.
    [Show full text]
  • Exchange Agreement for Water in San Luis Reservoir and Millerton Lake Between Reclamation and Westlands Water District to Facili
    Draft FINDING OF NO SIGNIFICANT IMPACT Exchange Agreement for Water in San Luis Reservoir and Millerton Lake between Reclamation and Westlands Water District to Facilitate Water Supply for the Exchange Contractors and Friant Division Contractors FONSI-15-034 U.S. Department of the Interior Bureau of Reclamation June 2015 Mission Statements The mission of the Department of the Interior is to protect and manage the Nation’s natural resources and cultural heritage; provide scientific and other information about those resources; and honor its trust responsibilities or special commitments to American Indians, Alaska Natives, and affiliated island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. BUREAU OF RECLAMATION South-Central California Area Office, Fresno, California FONSI-15-034 Exchange Agreement for Water in San Luis Reservoir and Millerton Lake between Reclamation and Westlands Water District to Facilitate Water Supply for the Exchange Contractors and Friant Division Contractors _____________ Prepared by: Rain L. Emerson Date Supervisory Natural Resources Specialist _____________ Concurred by: Shauna McDonald Date Wildlife Biologist _____________ Approved by: Michael Jackson, P.E. Date Area Manager FONSI-15-034 Introduction In accordance with section 102(2)(c) of the National Environmental Policy Act of 1969, as amended, the South-Central California Area Office of the Bureau of Reclamation (Reclamation), has determined that an environmental impact statement is not required for the facilitation of an exchange of 13,195 acre-feet (AF) between Westlands Water District (Westlands) and the San Joaquin River Exchange Contractors (Exchange Contractors).
    [Show full text]
  • Simulation of Flows and Water Quality in the California Aqueduct Using DSM2
    Simulation of Flows and Water Quality in the California Aqueduct Using DSM2 Siqing Liu, Bob Suits DWR, Bay Delta Office, Modeling Support Branch 2011 CWEMF Annual Meeting, February 28 –March 2 1 Topics • Project objectives • Aqueduct System modeled • Assumptions / issues with modeling • Model results –Flows / Storage, EC, Bromide 2 Objectives Simulate Aqueduct hydraulics and water quality • 1990 – 2010 period • DSM2 Aqueduct version calibrated by CH2Mhill Achieve 1st step in enabling forecasting Physical System Canals simulated • South Bay Aqueduct (42 miles) • California Aqueduct (444 miles) • East Branch to Silverwood Lake • West Branch to Pyramid Lake (40 miles) • Delta‐Mendota Canal (117 miles) 4 Physical System, cont Pumping Plants Banks Pumping Plant Buena Vista (Check 30) Jones Pumping Plant Teerink (Check 35) South Bay Chrisman (Check 36) O’Neill Pumping-Generating Edmonston (Check 40) Gianelli Pumping-Generating Alamo (Check 42) Dos Amigos (Check 13) Oso (West Branch) Las Perillas (Costal branch) Pearblossom (Check 58) 5 Physical System, cont Check structures and gates • Pools separated by check structures throughout the aqueduct system (SWP: 66, DMC: 21 ) • Gates at check structures regulate flow rates and water surface elevation 6 Physical System, cont Turnout and diversion structures • Water delivered to agricultural and municipal contractors through diversion structures • Over 270 diversion structures on SWP • Over 200 turnouts on DMC 7 Physical System, cont Reservoirs / Lakes Represented as complete mixing of water body •
    [Show full text]