Brief summary of the project

M/s. MRN Cane Power Ltd., is a Public Limited Company established in the year 2011. The industry is located at Survey Nos. 64 to 70, 72, 73, 74 of Kallapur Village, Kulageri Hobli, Taluk, District, State - 587 155. The project promoters have good experience and are successfully running the sugar industry and distillery industry at Kallapur Village. The total plot area is 101.92 acres.

The industry has obtained Environmental clearance from MoEF & CC, vide letter No J – 11011/411/2014 - IA II (I) dated 29th August 2016 for Sugar unit of 5000 TCD, 65 KLPD Distillery and 35 MW co-gen power plant. They have obtained Consent for Establishment from Karnataka State Pollution Control Board (KSPCB) vide letter no CTE-304082 dated 2nd November 2017 valid up to 30th June 2021.

Construction works for distillery unit has not started so far. Now, the industry proposes to establish the distillery unit of 200 KLPD instead of 65 KLPD as envisaged earlier . The activity is covered under EIA Notification 2006, Schedule 5 (g) Category ‘A’. Hence the Pre- feasibility reports is prepared for seeking Terms of Reference for carrying out EIA study and seek Environmental Clearance.

Project highlights:

Sl No PARTICULARS INFORMATION M/s. MRN Cane Power India Ltd., Name & Location of the Survey Nos. 64 to 70, 72, 73, 74 of Kallapur Village, 1 Project Kulageri Hobli, Badami Taluk, , Karnataka State - 587 155. Project Category and type of Serial No. 5(g) – “A” Category in the schedule in EIA 2 the industry Notification – 2006 Public Limited Company Latitude - 150 55’ 54.38’’ N 3 Coordinates of project site Longitude - 750 29’58.52’’ E Existing capacity Permission is obtained for 65 KLPD distillery from MoEF. But the construction works for distillery unit has 4 not started so far. The industry all together proposes to establish 200 KLPD molasses based distillery. 5 Proposed capacity Proposed - 200 KLPD Molasses based distillery New/ Expansion/ Expansion 6 Modification 7 Land area 101.92 Acres 8 Project cost Rs. 207.05 Crores 9 Product Ethanol/RS/ENA – 200 KLPD 10 Raw materials Sl. No Raw Materials Quantity 1 Molasses, B & C class 600-800 MT/day 2 Urea 100 Kg/day 3 DAP 100 Kg/day 4 Sulphuric acid 40 L/day 5 Sodium meta bisulphate 20 Kg/day 6 Anti-foam agent 20 g/day

11 Manpower 119 Nos 12 No of working days 330 days Total water requirement - 2400 KLD. 13 Water requirement Fresh water requirement - 600 KLD Recycled water – 1800 KLD The entire spent wash generated from Distillery will be cooled, neutralized, contained in 5 days holding tank and concentrated in MEE and incinerated in proposed incineration Boilers. Condensate & spent lees will be treated in upgraded CPU and reused (excess if any will be 14 Effluent treatment system used for green belt within the factory) to achieve Zero liquid discharge. The RO reject from the CPU will be taken back to evaporator

Domestic sewage will be treated in septic tank and discharged to soak pits. Stack Stack Air pollution control attached to height measures m 70 TPH 82 Electro static 15 Air pollution sources boiler precipitator/bag filter (incineration and cogen) 1000 KVA 30 Acoustic enclosures DG set