Euro-Asian Transport Linkages
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Implementation Plan
CORRIDOR INFORMATION DOCUMENT Implementation Plan TT 2021/2022 0 Version Control Version Summary Date Draft GA Approval 07.10.2019. Final ExBo Approval 13.01.2020. 1 Table of Content 1. Introduction ................................................................................................... 3 2. Corridor Description ...................................................................................... 8 2.1. Key Parameters of Corridor Lines ............................................................... 9 2.2. Corridor Terminals .................................................................................... 32 2.3. Bottlenecks ............................................................................................... 35 2.4. AWB RFC Governance ............................................................................. 40 3. Market Analysis Study ................................................................................ 49 3.1. Introduction ............................................................................................... 49 3.2. Objective of Transport Market Study ........................................................ 50 3.3. Methodology of TMS preparation .............................................................. 50 3.4. Analysis of transport and traffic indicators ................................................ 84 3.5. AWB RFC – Rail transport analysis .......................................................... 98 3.6. Rail Carrier demands ............................................................................. -
BULGARIA and HUNGARY in the FIRST WORLD WAR: a VIEW from the 21ST CENTURY 21St -Century Studies in Humanities
BULGARIA AND HUNGARY IN THE FIRST WORLD WAR: A VIEW FROM THE 21ST CENTURY 21st -Century Studies in Humanities Editor: Pál Fodor Research Centre for the Humanities Budapest–Sofia, 2020 BULGARIA AND HUNGARY IN THE FIRST WORLD WAR: A VIEW FROM THE 21ST CENTURY Editors GÁBOR DEMETER CSABA KATONA PENKA PEYKOVSKA Research Centre for the Humanities Budapest–Sofia, 2020 Technical editor: Judit Lakatos Language editor: David Robert Evans Translated by: Jason Vincz, Bálint Radó, Péter Szőnyi, and Gábor Demeter Lectored by László Bíró (HAS RCH, senior research fellow) The volume was supported by theBulgarian–Hungarian History Commission and realized within the framework of the project entitled “Peripheries of Empires and Nation States in the 17th–20th Century Central and Southeast Europe. Power, Institutions, Society, Adaptation”. Supported by the Hungarian Academy of Sciences NKFI-EPR K 113004, East-Central European Nationalisms During the First World War NKFI FK 128 978 Knowledge, Lanscape, Nation and Empire ISBN: 978-963-416-198-1 (Institute of History – Research Center for the Humanities) ISBN: 978-954-2903-36-9 (Institute for Historical Studies – BAS) HU ISSN 2630-8827 Cover: “A Momentary View of Europe”. German caricature propaganda map, 1915. Published by the Research Centre for the Humanities Responsible editor: Pál Fodor Prepress preparation: Institute of History, RCH, Research Assistance Team Leader: Éva Kovács Cover design: Bence Marafkó Page layout: Bence Marafkó Printed in Hungary by Prime Rate Kft., Budapest CONTENTS INTRODUCTION .................................... 9 Zoltán Oszkár Szőts and Gábor Demeter THE CAUSES OF THE OUTBREAK OF WORLD WAR I AND THEIR REPRESENTATION IN SERBIAN HISTORIOGRAPHY .................................. 25 Krisztián Csaplár-Degovics ISTVÁN TISZA’S POLICY TOWARDS THE GERMAN ALLIANCE AND AGAINST GERMAN INFLUENCE IN THE YEARS OF THE GREAT WAR................................ -
Annex REPORT for 2019 UNDER the “HEALTH CARE” PRIORITY of the NATIONAL ROMA INTEGRATION STRATEGY of the REPUBLIC of BULGAR
Annex REPORT FOR 2019 UNDER THE “HEALTH CARE” PRIORITY of the NATIONAL ROMA INTEGRATION STRATEGY OF THE REPUBLIC OF BULGARIA 2012 - 2020 Operational objective: A national monitoring progress report has been prepared for implementation of Measure 1.1.2. “Performing obstetric and gynaecological examinations with mobile offices in settlements with compact Roma population”. During the period 01.07—20.11.2019, a total of 2,261 prophylactic medical examinations were carried out with the four mobile gynaecological offices to uninsured persons of Roma origin and to persons with difficult access to medical facilities, as 951 women were diagnosed with diseases. The implementation of the activity for each Regional Health Inspectorate is in accordance with an order of the Minister of Health to carry out not less than 500 examinations with each mobile gynaecological office. Financial resources of BGN 12,500 were allocated for each mobile unit, totalling BGN 50,000 for the four units. During the reporting period, the mobile gynecological offices were divided into four areas: Varna (the city of Varna, the village of Kamenar, the town of Ignatievo, the village of Staro Oryahovo, the village of Sindel, the village of Dubravino, the town of Provadia, the town of Devnya, the town of Suvorovo, the village of Chernevo, the town of Valchi Dol); Silistra (Tutrakan Municipality– the town of Tutrakan, the village of Tsar Samuel, the village of Nova Cherna, the village of Staro Selo, the village of Belitsa, the village of Preslavtsi, the village of Tarnovtsi, -
1 I. ANNEXES 1 Annex 6. Map and List of Rural Municipalities in Bulgaria
I. ANNEXES 1 Annex 6. Map and list of rural municipalities in Bulgaria (according to statistical definition). 1 List of rural municipalities in Bulgaria District District District District District District /Municipality /Municipality /Municipality /Municipality /Municipality /Municipality Blagoevgrad Vidin Lovech Plovdiv Smolyan Targovishte Bansko Belogradchik Apriltsi Brezovo Banite Antonovo Belitsa Boynitsa Letnitsa Kaloyanovo Borino Omurtag Gotse Delchev Bregovo Lukovit Karlovo Devin Opaka Garmen Gramada Teteven Krichim Dospat Popovo Kresna Dimovo Troyan Kuklen Zlatograd Haskovo Petrich Kula Ugarchin Laki Madan Ivaylovgrad Razlog Makresh Yablanitsa Maritsa Nedelino Lyubimets Sandanski Novo Selo Montana Perushtitsa Rudozem Madzharovo Satovcha Ruzhintsi Berkovitsa Parvomay Chepelare Mineralni bani Simitli Chuprene Boychinovtsi Rakovski Sofia - district Svilengrad Strumyani Vratsa Brusartsi Rodopi Anton Simeonovgrad Hadzhidimovo Borovan Varshets Sadovo Bozhurishte Stambolovo Yakoruda Byala Slatina Valchedram Sopot Botevgrad Topolovgrad Burgas Knezha Georgi Damyanovo Stamboliyski Godech Harmanli Aitos Kozloduy Lom Saedinenie Gorna Malina Shumen Kameno Krivodol Medkovets Hisarya Dolna banya Veliki Preslav Karnobat Mezdra Chiprovtsi Razgrad Dragoman Venets Malko Tarnovo Mizia Yakimovo Zavet Elin Pelin Varbitsa Nesebar Oryahovo Pazardzhik Isperih Etropole Kaolinovo Pomorie Roman Batak Kubrat Zlatitsa Kaspichan Primorsko Hayredin Belovo Loznitsa Ihtiman Nikola Kozlevo Ruen Gabrovo Bratsigovo Samuil Koprivshtitsa Novi Pazar Sozopol Dryanovo -
Roads for Asian Integration: Measuring ADB's Contribution to the Asian Highway Network
ADB Working Paper Series on Regional Economic Integration Roads for Asian Integration: Measuring ADB’s Contribution to the Asian Highway Network Srinivasa Madhur, Ganeshan Wignaraja, and Peter Darjes No. 37 | November 2009 ADB Working Paper Series on Regional Economic Integration Roads for Asian Integration: Measuring ADB’s Contribution to the Asian Highway Network Srinivasa Madhur+, Ganeshan The authors would like to thank Rafaelita Aldaba and Wignaraja++, and Peter Darjes+++ Ivan de Leon for their invaluable contributions to the preparation of this paper. The views expressed in this paper are those of the authors and do not necessarily No. 37 November 2009 reflect the views or policies of ADB, its Board of Directors, or the governments they represent. +Srinivasa Madhur is the Senior Director, Office of Regional Economic Integration, Asian Development Bank, 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines. Tel +632 632 5744, Fax +632 636 2183, [email protected] ++Ganeshan Wignaraja is Principal Economist, Office of Regional Economic Integration, Asian Development Bank, 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines. Tel +632 632 6116, Fax +632 636 2183, [email protected] +++Peter Darjes is consultant, Office of Regional Economic Integration, Asian Development Bank, 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines. The ADB Working Paper Series on Regional Economic Integration focuses on topics relating to regional cooperation and integration in the areas of infrastructure and software, trade and investment, money and finance, and regional public goods. The Series is a quick-disseminating, informal publication that seeks to provide information, generate discussion, and elicit comments. Working papers published under this Series may subsequently be published elsewhere. -
Healthcare Institutions
HEALTHCARE INSTITUTIONS TYPE OF LOCATION NAME HEALTHCARE ADDRESS INSTITUTION A MC (Medical ASENOVGRAD MC (Medical Centre) 1 ASENOVGRAD Centre) 28, ALEKSANDAR STAMBOLIYSKI STR. MDL (Medical GERMAN-BULGARIAN SMDL (Specialized Medical diagnostic laboratory) ZINVEST-K OOD diagnostic ASENOVGRAD (LLC) laboratory) 66, OBORISHTE STR. SHR (Specialized B hospital for BALCHIK SHR - TUZLATA EOOD (Solely-owned LLC) rehabilitation) TUZLATA AREA MC (Medical BANSKO MC (Medical Centre) SV. BLAGOVESHTENIE Centre) 1, LOUIS PASTEUR STR. ET (Sole trader) DR VIKTORIA BARZACHKA IPOSMC (Individual practice for outpatient IP (Individual BLAGOEVGRAD specialized medical care) IN EYE DISEASES Practice) 66,SLAVYANSKA STR. MC (Medical BLAGOEVGRAD MEDITSINSKI TSENTAR PULS AD (MEDICAL CENTRE PULS PLC) Centre) 62,SLAVYANSKA STR. MPHAT (Multi- profile hospital for BLAGOEVGRAD MPHAT (Multi-profile hospital for active treatment) PULS AD (PLC) active treatment) 62,SLAVYANSKA STR. MDC (Medical and BLAGOEVGRAD MDC (Medical and dental center) RUBIDENT MEDICA EOOD (Solely-owned LLC) dental center) 42, TRETI MART STR. MC (Medical BOBOV DOL MC (Medical Centre) 1 EOOD (Solely-owned LLC) town of BOBOV DOL Centre) 16, DIMITAR BLAGOEV STR. MPHAT (Multi- profile hospital for BOBOV DOL MPHAT (Multi-profile hospital for active treatment) DR. STOYAN SANTEV EOOD active treatment) 16, DIMITAR BLAGOEV STR. MPHAT (Multi- MPHAT (Multi-profile hospital for active treatment) BOTEVГGRAD EOOD (Solely-owned profile hospital for BOTEVGRAD LLC) active treatment) 1,BOZHKO BOZHILOV STR. DCC (Diagnostic Consultative BURGAS DCC (Diagnostic Consultative Center) 1 BURGAS EOOD (Solely-owned LLC) Center) 73, ST. STAMBOLOV BLVD. MPHAT (Multi- profile hospital for BURGAS MPHAT (Multi-profile hospital for active treatment) BURGAS active treatment) BURGAS 8000, 73, ST. STAMBOLOV BLVD. -
Development of Strategies to Promote and Facilitate the Implementation of the Asian Highway Design Standards
` DEVELOPMENT OF STRATEGIES TO PROMOTE AND FACILITATE THE IMPLEMENTATION OF THE ASIAN HIGHWAY DESIGN STANDARDS Bangkok DECEMBER 2017 1 The views expressed in this publication are those of the authors and do not necessarily reflect the views of the United Nations Secretariat. The opinions, figures and estimates set forth in this publication are the responsibility of the authors, and should not necessarily be considered as reflecting the views or carrying the endorsement of the United Nations. The designations employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area, or of its authorities, or concerning the delimitation of its frontiers or boundaries. Mention of firm names and commercial products does not imply the endorsement of the United Nations. This publication is issued without formal editing. 2 Acknowledgements This document was prepared by Mr. Ishtiaque Ahmed, Economic Affairs Officer, Transport Infrastructure Section, Transport Division as the project manager. Valuable advices were extended by Mr. Pierre Chartier, Section Chief, Transport Infrastructure Section and Mr. Yuwei Li, Director, Transport Division of ESCAP. This study report was prepared with the generous support of the Korean Expressway Corporation (KEC) under the direction of Dr Sung-Min Cho, Director of R&D Planning Office. Fourteen Asian Highway member countries participated in the survey prepared and conducted by the secretariat and provided information on the Asian Highway in their respective territories. Experts and delegates from member countries of the Asian Highway Network have offered valuable comments on the development of this document. -
L-G-0008366837-0017086142.Pdf
Nuh Bilgin Hanifi Copur Cemal Balci TBM Excavation in Difficult Ground Conditions TBM Excavation in Difficult Ground Conditions Case Studies from Turkey Nuh Bilgin Hanifi Copur Cemal Balci Prof. Dr. Nuh Bilgin Prof. Dr. Hanifi Copur Prof. Dr. Cemal Balci Istanbul Technical University Faculty of Mines, Mining Engineering Department 34469 Maslak/Istanbul Turkey Cover: Methane Explosion in the Pressure Chamber of a Tunnel Boring Machine Photo: Bilgin/Copur Library of Congress Card No.: applied for British Library Cataloguing-in-Publication Data A catalogue record for this book is available from the British Library. Bibliographic information published by the Deutsche Nationalbibliothek The Deutsche Nationalbibliothek lists this publication in the Deutsche Nationalbibliografie; detailed bibliographic data are available on the Internet at <http://dnb.d-nb.de>. © 2016 Wilhelm Ernst & Sohn, Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Rotherstraße 21, 10245 Berlin, Germany All rights reserved (including those of translation into other languages). No part of this book may be reproduced in any form – by photoprinting, microfilm, or any other means – nor transmitted or translated into a machine language without written permission from the publishers. Registered names, trademarks, etc. used in this book, even when not specifically marked as such, are not to be considered unprotected by law. Coverdesign: Sonja Frank, Berlin Production Management: pp030 – Produktionsbüro Heike Praetor, Berlin Typesetting: Reemers Publishing Services -
First Investment Bank AD Points for Servicing Customers of the 'Corporate Commercial Bank'
First Investment Bank AD Points for servicing customers of the 'Corporate Commercial Bank' Points for Type of Customers Name of Business hours (Monday servicing Address servicecash/ Individual/ branch/office through Friday) customers non-cash Corporate Asenovgrad Asenovgrad Asenovgrad 4230, 3, Nickolay Haytov Sq. 9:00 - 17:30 cash/ non- cash ind./ corp. Balchik Balchik Balchik 9600, 25, Primorska St. 9:00 - 17:30 cash/ non- cash ind./ corp. Bansko Bansko Bansko 2770, 68, Tzar Simeon St. 9:00 - 17:30 cash/ non- cash ind./ corp. Bansko Bansko Municipality Bansko 2770, 12, Demokratziya Sq. 9:00 - 12:00 + 13:00 - 17:30 cash/ non- cash ind./ corp. Bansko Strazhite Bansko 2770, 7, Glazne St. 9:00 - 22:00 (15.12-30.03), cash/ non- cash ind./ corp. 9:00 – 17:30 (01.12-14.12 и 31.03-15.04), 9:00 - 13:00 + 14:00 - 17:30 (16.04-30.11) Belene Belene Belene 5930, 2, Ivan Vazov St. 9:00 - 17:30 cash/ non- cash ind./ corp. Blagoevgrad Blagoevgrad Blagoevgrad 2700, 11, Kiril i Metodiy Blvd. 9:00 - 17:30 cash/ non- cash ind./ corp. Blagoevgrad GUM Blagoevgrad 2700, 6, Trakia St. 9:00 - 17:30 cash/ non- cash ind./ corp. Borovets Rila Hotel Borovets 2010, Rila Hotel 9:00 –19:00 cash/ non- cash ind./ corp. Botevgrad Botevgrad Botevgrad 2140, 5, Osvobozhdenie Sq. 9:00 - 17:30 cash/ non- cash ind./ corp. Burgas Bratya Miladinovi Burgas 8000, Zh. k. (Quarter) Bratya 9:00 - 17:30 cash/ non- cash ind./ corp. Miladinovi, bl. 117, entr. 5 Burgas Burgas Burgas 8000, 58, Alexandrovska St. -
Copyrighted Material
333 16 Index A Complex geology VII, XII, 1 f., 69 f., 73, Abrasive ring wear 228, 269 75, 77, 86 f., 91, 93, 99, 106 f., 131, 140, Abrasivity of soil 231 154, 159 f., 163, 165, 175, 186, 293, Alpide orogeny 3 295, 316, 318 f., 329 Anatolide-Taurides 4 Cone penetrometer test 198 Ancient water wells 6, 91 Conical cutter 109, 115 Andesitic and diabasic dykes 6 Consistency index 190, 201 Anti-clay agent 1, 192, 199, 200, 201, Continent-continent collision 4 206 f. Creep behavior 167 f. Arabian Platform 4 Cukurcesme Formation 15 f. Arcose 6, 44 f., 47, 50, 52, 97 Cutter blockage 228, 251, 258 ff., 269 Ayas Tunnel XII, 126 Cutter consumption VII, XIV, 1 f., 90, Aydos Formation 10 f., 39, 241 222, 225, 232 f., 235, 237 ff., 241, B 243 ff., 247, 249, 250, 251, 253, 255, 257, 259 ff., 263, 265, 269, 271 f. Bakirkoy Formation 8, 15 f., 201 Cutter cost 82, 255, 260 Baltalimani Formation 13 f., 159 Cutter replacement 99, 130, 225, 243 f., Baltalimani Tunnel XI, 1, 73 f., 90, 108 251, 255, 258, 267 Basaksehir–Bagcilar metro tunnel 65 Cutter wear and damage 3, 112, 171, Basaksehir–Ikitelli metro tunnel 7 226, 228 f., 264, 267, 269, 271 f. Belgrad Formation 7, 65 Beykoz Sewerage Tunnel XIII f., 1 f., 84, D 143, 145, 147, 149 ff., 211, 261 f. Dogancay Energy Tunnel XII, 1, 120 f. Blocky ground VII, XIII, 2, 99, 129–132, Dolayoba Formation 20, 27, 32, 52, 138, 134, 136 ff., 140, 167, 187, 295, 319, 146, 216 322, 327 f. -
Asian Highway Network
G e o r g i a Dear Chairman, Dear Colleagues, Dear Ladies and Gentlemen, First, let me thank the Government of Kazakhstan, the UNECE and the UNESCAP for the organization of the meeting on the high level. I avail myself of the opportunity and express my thanks to the UN, as well as to the other international organizations and financial institutions that support and show great interest in developing of the infrastructure in Georgia and in whole Caucasus Region. By means of my presentation, I will try to highlight the progress achieved in the sphere of Georgian infrastructure, as well as the prospects of Eurasian Transport links and existing problems. Briefly About Georgia 1. Georgia’s favorable geopolitical location determined obtaining the role of transit country connecting Europe to Asia, for centuries. This has become more important for recent years, strengthened the mentioned function and achieved the worldwide fame. At present, we can name many examples of successful regional and sub- regional cooperation that highlight and identify the great strategic importance of Georgia. Asian Highway Network 2. Georgia became the UNESCAP member on July 25, 2000. Our country actively participates in Asian Highway (AH) Network Project aim of which is to stimulate international cargo transportation, develop it and make perfect. Signing of Intergovernmental Agreement on Asian Highway Network is planned in April this year. At present, domestic procedures concerning the Agreement are underway. Inter-regional route AH-5 passes through Georgia that takes its start from Shanghai (China) and ends at the border of Bulgaria. 3. As well as, two Intra-regional routes of Asian Highway AH-81 and AH-82. -
The Effect of Road Upgrading to Overland Trade in Asian Highway Network Ziyodullo PARPIEV ∗ Jamshid SODIKOV **
Eurasian Journal of Business and Economics 2008, 1 (2), 85-101. The Effect of Road Upgrading to Overland Trade in Asian Highway Network Ziyodullo PARPIEV ∗ Jamshid SODIKOV ** Abstract This paper investigates an impact of road upgrading and improvement on overland trade in 18 out of 32 Asian Highway Network member countries. A regression based cost model was developed. The results indicate that approximately 6.5 billion US dollars is required to upgrade and improve surface condition of the selected roads with total length of 15,842 km. The gravity model approach was adopted to quantitatively evaluate overland trade expansion assuming pessimistic and optimistic scenarios: improvements in road quality indices up to 50 and up to 75, respectively. The results suggests that in the first scenario total intra-regional trade will increase by about 20 percent or 48.7 billion US dollars annually, while second scenario predicts that trade will increase by about 35 percent or 89.5 billion US dollars annually. Keywords: Asian Highway Network, road transport, gravity model. Jel Classification: F12, F15, F17. ∗ Advisor-Economist, UNDP Uzbekistan Country Office, Email: [email protected] ** Chief Engineer, Road Research Institute, Tashkent, Uzbekistan The views expressed in this paper are those of the author(s) and do not necessarily represent those of organizations the authors are associated with. Ziyodullo PARPIEV & Jamshid SODIKOV 1. Introduction In 1992, the United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) endorsed the Asian Land Transport Infrastructure Development (ALTID) project comprising of the Asian Highway and the Trans-Asian Railway network. The formalization of the Asian Highway, through the Intergovernmental Agreement on Asian Highway Network (AHN), was adopted in November 2003.