To,

Subject:. Application for suitable effective position for contribution in social development.

Sir,

It has been learnt from reliable sources that your premier organization is in search of a few trained and experienced Civil Engineer for execution of a prestigious major development projects of our country. My qualification and experience of construction of major hydro-power projects makes me a suitable candidate for a senior level post, in a leading management and construction organization of mega projects involving major plant and machinery and heavy earth moving equipments on Hydro Power Projects works of Rockfill/Concrete Structures, Hill Slope Stabilization and Underground (Tunnel/Power House) works, Water Conductor System etc.

I am a Bachelor of Technology (Hons.) in Civil Engineering from I.I.T Kharagpur. Since my graduation in 1979, I have been associated for more than thirty years in execution of large hydro- power project construction involving infrastructure development in addition to construction of major under ground and other important component of hydro-power project (, Tunnel, Spillways and Power House works etc.).

Details of my association of various projects stages and levels with National Hydro Power Corporation Limited and Tehri Hydro Development Corporation Limited (both Government undertaking) at different project location in India (Salal, Dul-Hasti, Tanakpur, Tehri, Koteshwar Hydro Electric Project and Vishnugad Pipalkoti Project) are enclosed for your kind consideration and perusal.

At present, I have completed my service terms as, Additional General Manager (PSP) with THDC Ltd. Engineer-in-charge 1000 MW, Tehri PSP Project,Executing Rs.1850crs EPC contract with Alstom-HCC consortium agency.I have dealt with project survey and investigation works, preparation of feasibility and detailed project report, preliminary activities of river diversion schemes and infrastructure for taking up further construction activities of Dam, Barrages, Spillways, Tunnels and Power House works in addition to cost evaluation and control system of major construction activities. After, THDC India Ltd, I joined as Executive Vice President(Project) for Implementation of small Hydro Projects with UBHP Pvt.Ltd in ,India. Major Civil,HM & EM erection and commissioning works are at an advanced stage of completion and my assignment stands completed with commissioning of Project. Subsequently in 2014, I joined Consortium of CCCL & Stucky Inc for major Penstock rectification works of 100 MW Sorang HE Projects for TAQA Powers (UAE) in Himachal Pradesh

I Anil Prasad , would now prefer to be associated with various major/ minor project development on accelerated mode of execution for our society, which is in urgent need of basic needs and important Infra- structure essentially required for developing society. My experience and abilities with skill of professional project management acquired shall practically help to enhance my contribution towards evolving practical mode of implementation . In consideration of my past experience of major Hydro-Power Project Planning and Implementation at all following stages-

1: Investigation & Feasibility: Topographic , Geological, and Hydrological survey, investigation and Power potential studies for Feasibility studies . 2: Pre-Construction : Subsequent detail project report and infrastructure planning and development in addition to detail man power , equipment , planning and scheduling with estimation of all major components of project. 3: Construction : Infrastructural development involving Roads, Bridges, Non-residential, Residential colonies, with Banking and educational facilities at project location. Tender preparation and award of major contracts as per suitable terms and condition for quality and timely execution of project . But now lately after realization of in-ordinate delay and painful slow pace of such mega project execution due to various intricate and complex problems of techno- economic consideration and Govt. clearances ( Environmental, Forest, Land transfer, Rehabilitation, etc) is seriously affecting on ground social development of our present generation/ society . In view of the above , I would prefer to contribute towards Integrated Infrastructural development of various sectors (i:e Road network, Pilgrimage, Hill station, Medical Tourism , Health care, Communication etc.) in the state to meet aspirations of local , National, and International Public/ tourists. In addition to above , I would also prefer to contribute towards Community Shelters ,Toilets and Foods joints for poorest of our weaker section of society, irrespective of their cast , creed and religion , who are actually deprived of essential basic needs of human life . May I add here that , I am a hard working experienced civil engineer with necessary aptitude , knowledge and concept to evolve practical methodology for project implementation of projects with participation of larger section of our society ( Public / Privates ) including local stake holders. I hope my application will receive your valuable consideration and be given the opportunity to serve, our nation through our social structural development of backward Areas. Thanking you, in anticipation,

Yours truly,

(Anil Prasad) Address for communication Additional General Manager (Civil) 144, Old Nehru Colony THDC Ltd. Dehradun, Uttranchal PIN 248001 Hello : (0135) 2676822 Mob. 9412077680 BIO – DATA

Name : Anil Prasad ([email protected]) Father’s Name : Late Sh. Jagdish Prasad Address (Present/Office) : Additional General Manager T.H.D.C.INDIA Ltd. RISHIKESH (Residential/Communication) : 144, Old Nehru Colony Dehradun 248001 (U.A.) Contact No. : Mob. 9412077680 Res. 0135 – 2676822 Qualification/Institute/Year : Bachelor of Technology (Hons) in Civil Engineering from I.I.T. Kharagpur in 1979 Present posting : Executive Vice President)project) UBHP &AGM ( Engr-In-Charge) for Tehri Pump Storage project (1000MW), EPCfor Civil ,HM & EM works Brief background/Experience:After graduating (B. Tech. (Hons) in 1979, the undersigned have been associated mostly in Hydro Power Project implementation/development since last+33 years with N.H.P.C. & T.H.D.C. Ltd. Execution of mega Hydro Power Projects components (Dam, Tunnels, Power Channels, Power House etc.) in addition to detailed planning, scheduling, cost estimation, resources planning for development of Hydro Power Project. Survey & investigation and preparation of feasibility report, detailed project report etc. have also been dealt during association with THDC Ltd. till April’2013 and Executive V.P.(Project) UBHP,India and Consortium of CCCL & Stucky Inc. for smaller H E Projects in INDIA. Area of Interest/Strength (Implementation co-ordination) : In addition to execution of large projects (Salal, Dulhasti, Tanakpur, & Koteshwar Dam), the undersigned had been associated in detailed interaction & deliberation with Design Engineers, consultants and executing agencies for proper appreciation and appraisal of Project field conditions. Appropriate planning, scheduling, infrastructure, resources planning & development, tendering and fixing of agencies with effective cost engineering etc. have been part of above project execution, development/implementation. Survey and investigation also of New Projects for preparation of feasibility and detailed project report for Govt approval involving Stage I & II (Preliminarily & Detailed), Topographical, Geological, Hydrological, Power Potential and environmental studies in association with Design Engineer, consultant, of premier institutions like UBHPP,TAQA Power,CCCL,Stucky Inc. in addition to Survey of India, Geological Survey of India and other expert agencies.

Language Known : Hindi, Bengali, English and other North Indian Languages.

(Anil Prasad) Additional General Manager( Tehri PSP.) T.H.D.C.INDIA Ltd.POST HELD AND WORK EXPERIENCE IN N.H.P.C. & T.H.D.C. Ltd.

S.N. Post held Deptt Hydro Elect. Work Responsibilities Pay Scale Project State From To 1 Engineer(Civil) SALAL H.E. June 80 Oct. 84 Concrete Dam works N.H.P.C. Project J&K a) Planning, Mix design and production of quality concrete for placement in concrete dam. b) Drilling & Grouting, Stripping & concreting work of concrete dam bases & foundation. c) Abutment stabilization work of concrete dam side hill slope. d) Planning, scheduling and execution of plunge pool works (Energy dissipation). 2 Asstt.Mgr.(Civil) TANAKPUR Oct.84 Jul. 87 a) Control survey and quality N.H.P.C. H.E. Project control works of all the major U.P. component of project. b) Planning scheduling estimation and tender preparation of power channel & silt ejector works of project. c) Construction of infrastructure work, project office complex, guest house, colony works and high storage sheds for generating plant equipments. 3 Dy. Mgr. (Civil) DUL-HASTI Jul. 87 Jan. 91 a) Construction management, N.H.P.C. H.E. Project planning and scheduling of J&K project works. b) Cost control, budgeting, Personnel and administration works of project. c) Execution of underground works of pilot tunnel for head race tunnel works-departmental works. d) Power house construction works of the project through French consortium (DSB). 4 Manager (Civil) TEHRI Jan. 91 Aug.92 a) Road construction & T.H.D.C. DAM maintenance of all the roads of Project Tehri Dam Project. U.P./U.A. b) Realigned roads above submergence area through UPPWD & DGBR.

c) Project and colony roads, planning, scheduling & execution works. d) Planning, estimation and tendering of various nature of road works (i.e. village, approach, alternate roads etc).

5 Manager (Civil) TEHRI Aug.92 Jul.94 a) Coffer Dam excavation and T.H.D.C. DAM Project impermeable core treatment U.A. work through M/S JIL. b) Planning, scheduling and stockpiling of impervious clay core material through Deptt. resources. c) Excavation in Dam base (coffer dam) through deptt. resources. d) Planning & protection of Rip- Rap material (Dobata), mining lease permission from U.P. Govt. e) Coffer Dam construction works through Lanco Construction Company. f) Spillway excavation work through deptt. resources/ major agencies. 6 Sr. Manager TEHRI Jul. 94 Jun. 97 a) Planning, estimation & T.H.D.C. DAM Project execution of balance coffer dam U.A. & spillway works. b) Raising of coffer dam from El. 615m to El. 667m through M/S Lanco Construction Company. c) Excavation & slope stabilization part work in chute spillway – Approx. 20.0 lacs cum excavation completed in one year through M/S JIL. d) Estiamtion and tender preparation for main chute & shaft spillway works – package. e) Excavation & stabilization in right bank shaft spillway – Approx. 6.0 lacs cum of excavation completed. 7 Dy. General TEHRI Jul. 97 May 99 a) Excavation & stabilization of Manager T.H.D.C. DAM Project shaft spillway work area from U.A. El. 840.0 m to El. 1000.0 m b) Detailed planning estimation & scheduling & tender preparation of main chute & shaft spillway package works.

c) Preparation of revised project cost estimate of Tehri Dam project stage-1 along with essential and emergent works of pump storage scheme (stage- II)and Koteshwar Dam Project. d) Construction of main chute & shaft spillway works under main works package. 8 Dy. General Koteshwar May 99 Nov.01 a) Construction of diversion Manager H.E. Project tunnel works for Koteshwar T.H.D.C. U.A. Dam Project diversion scheme. b) Planning & execution of infrastructural work at Koteshwar Dam Project for taking up major construction work. c) Tender preparation for Dam, Spillways & Power House of Koteshwar Dam Project. 9 Dy. General Cost Engg. Nov.01 Apr.02 a) Construction, planning, Manager Deptt. methodology & estimation of T.H.D.C. T.H.D.C. Koteshwar H.E. Project (civil 18500-23500 works). b)Planning & detailed project report (cost estimate) of Pump Storage Scheme of Tehri H.E. Power Comples. 10 Addl. General Cost Engg. Apr.02 Apr. 03 a) Cost updation of Tehri Hydro Manager Deptt Power Plant, Koteshwar H.E. T.H.D.C. Project & Tehri pumped storage plant and revised cost estimate. b) Cost control measures for Hydro Power of major structure.

11 Addl. General Cost Engg. Apr.03 Sept 07 a) Project survey & investigation Manager & FR & on works for Vishnugad- T.H.D.C. DPR Pipalkoti Hydro Electric preparation Project. of VPHEP & b) Survey & investigation & New Projects preparation of feasibility report of the project completed and clearance for implementation by Govt. of U.A c)Topography, Geology, Hydrology & environmental studies along with FR & DPR preparation of New Projects through SOI, GSI, Expert Agencies, Consultants & Design Engineers.

Administration Hospitality along 12 Addl. General Services Sept 07 Apr-09 with Infrastructure planning, Manager deptt. development and maintenance. T.H.D.C. T.H.D.C

13 Addl. General Cost Engg. May- July-11 a) Cost up gradation of Manager & FR & 09 Koteshwar Hydroelectric T.H.D.C. DPR project b) Cost up gradation of Peepal koti Hydroelectric project c) DPR of various upcoming HydroProjects of THDC 14 Addl. General Tehri Pump Aug-11 Apr-13 Working as Engr-In_charge Manager Storage for Tehri Pump Storage T.H.D.C. project project (EPC project ) Four units of 250 MW each with Tehri Dam as upper and koteshwar Dam as lower reservoir. The project involves construction of underground 15 Execive Vice Small Hydro Till power house,surge shafts, President,UBHP Project- date TRT and reversible type Francis turbines to work in generation and pumping mode. ANIL PRASAD