Powered by Speed

Total Page:16

File Type:pdf, Size:1020Kb

Powered by Speed THE OFFICIAL SURFACE OF THE PENN RELAYS SINCE 1988 “I MADE THREE OLYMPIC TEAMS ALL WHILE TRAINING ON REKORTAN SURFACES. INJURY FREE MY ENTIRE CAREER!” Harvey Glance, Olympic Gold Medal Medalist, ‘08 Assistant Olympic Coach, and Coach of ‘12 Olympic 400m champion POWERED BY SPEED [email protected] APT USA 724.452.1330 www.rekortanspurtan.com 109 Conica Lane www.sportsbyapt.com PO Box 160, Harmony, PA 16037 USA Rekortan® is a registered trademark of APT Corporation @aptworldwide Rekortan M99 is a 15mm, impermeable, full- pour system featuring 3 specialized layers: a self-leveling fluid applied polyurethane coat, an innovative central force-reduction layer, and a fluid applied polyurethane topcoat with a dense matrix of broadcast EPDM rubber granules with no solvents or filler added. World-Class Surfacing Rekortan M99: Fast for sprinters and kind to endurance athletes 4 mm top layer consisting of Qualipur 5050 and EPDM rubber granules 8 mm middle layer consisting of SBR rubber and Qualipur 5050 SA 3 mm base layer consisting of SBR rubber and Qualipur 5050 * Encapsulation option available Highlights OLYMPIC GAMES AND OLYMPIC TRAINING FACILITIES • IAAF approved system • Olympic Stadium, Berlin Germany • Olympic Games, Munich Germany • Olympic Stadium, Caracas Venezuela • Olympic Stadium, Melbourne Australia • Featuring APT’s unique polyurethane micro-foam that • Olympic Games, Los Angeles CA • Olympic Park, Homebush significantly increases force reduction Bay NSW Australia • Olympic Park, Sydney Australia • Olympic Stadium Luzhniki Russia • Volos Stadium, Olympic Games, Athens Greece • Formulated to resist UV degradation in the world’s • Bishan Stadium, Youth Olympics, Singapore • Bislett Olympic Stadium, • 100% solid polyurethanes Oslo Norway (IAAF Diamond League event track) • Top layer poured-in place installation for a seamless finish HIGH PROFILE EVENTS AND/OR TRACKS • Embedded surface ensures excellent all-weather • World Championships, Stuttgart Germany • Goodwill Games, Brisbane Australia • Penn Relays, University of Pennsylvania, Philadelphia PA (Official surface performance and spike resistance since 1988) • Varsity Stadium, Univ. of Toronto, Toronto, ON Canada • Fast Track since 1969 • University of Texas, Arlington • International Stadium, Beijing China • Indiana University, Bloomington IN • Premium colors available upon request USA 724.452.1330 109 Conica Lane PO Box 160, Harmony, PA 16037 USA [email protected] • www.sportsbyapt.com @aptworldwide Rekortan® is a registered trademark of APT Corporation.
Recommended publications
  • London 2012 Venues Guide
    Olympic Delivery Authority London 2012 venues factfi le July 2012 Venuesguide Contents Introduction 05 Permanent non-competition Horse Guards Parade 58 Setting new standards 84 facilities 32 Hyde Park 59 Accessibility 86 Olympic Park venues 06 Art in the Park 34 Lord’s Cricket Ground 60 Diversity 87 Olympic Park 08 Connections 36 The Mall 61 Businesses 88 Olympic Park by numbers 10 Energy Centre 38 North Greenwich Arena 62 Funding 90 Olympic Park map 12 Legacy 92 International Broadcast The Royal Artillery Aquatics Centre 14 Centre/Main Press Centre Barracks 63 Sustainability 94 (IBC/MPC) Complex 40 Basketball Arena 16 Wembley Arena 64 Workforce 96 BMX Track 18 Olympic and Wembley Stadium 65 Venue contractors 98 Copper Box 20 Paralympic Village 42 Wimbledon 66 Eton Manor 22 Parklands 44 Media contacts 103 Olympic Stadium 24 Primary Substation 46 Out of London venues 68 Riverbank Arena 26 Pumping Station 47 Map of out of Velodrome 28 Transport 48 London venues 70 Water Polo Arena 30 Box Hill 72 London venues 50 Brands Hatch 73 Map of London venues 52 Eton Dorney 74 Earls Court 54 Regional Football stadia 76 ExCeL 55 Hadleigh Farm 78 Greenwich Park 56 Lee Valley White Hampton Court Palace 57 Water Centre 80 Weymouth and Portland 82 2 3 Introduction Everyone seems to have their Londoners or fi rst-time favourite bit of London – visitors – to the Olympic whether that is a place they Park, the centrepiece of a know well or a centuries-old transformed corner of our building they have only ever capital. Built on sporting seen on television.
    [Show full text]
  • The Impact of the 2004 Olympic Games on the Greek Economy 3
    Ι∆ΡΥΜΑ ΟΙΚΟΝΟΜΙΚΩΝ & ΒΙΟΜΗΧΑΝΙΚΩΝ ΕΡΕΥΝΩΝ FOUNDATION FOR ECONOMIC & INDUSTRIAL RESEARCH 11 Tsami Karatassou, 117 42 Athens, Greece, Tel.: +30 210-9211 200-10, Fax: +30210-9233 977 The impact of the 2004 Olympic Games on the Greek economy January 2015 2 The research for this study was conducted by N. Zonzilos, E. Demian, E. Papadakis, N. Paratsiokas and S. Danchev, under the supervision of the Director General of IOBE, Professor N. Vettas. The researchers would like to thank C. Katsiardis for his research assistance and all the individuals who offered their assistance with data and insight on the Games. IOBE would like to thank Gianna Angelopoulos-Daskalaki for the financial support of this study. The judgments on policy issues and the proposals contained in this study express the opinions of the researchers and do not necessarily reflect the opinion of the members or the management of IOBE. The Foundation for Economic & Industrial Research (IOBE) is a private, non-profit, public-benefit research organisation. It was established in 1975 with the dual purpose of promoting research on current problems and prospects of the Greek economy and its sectors and of generating reliable information, analysis and proposals for action that can be of high value in economic policy making. ISBN 978-960-7536-61-7 Copyright 2015 Foundation for Economic & Industrial Research This study may not be reproduced in any form or for any purpose without the prior knowledge and consent of the publisher. Foundation for Economic and Industrial Research (IOBE) 11, Tsami Karatassou St, 117 42 Athens, Tel. (+30210 9211200-10), Fax:(+30210 9233977) E-mail: [email protected] – URL: http://www.iobe.gr Foundation for Economic & Industrial Research IOBE The impact of the 2004 Olympic Games on the Greek economy 3 FOREWORD Without a doubt, the 2004 Olympic Games in Athens and in the other four Olympic cities had a multiple impact on the Greek economy, on many levels and at various time periods.
    [Show full text]
  • Olympic Official Report Montreal 1976 Volume
    Games of the Official Report Volume II XXI Olympiad Facilities Montréal 1976 ©Copyright COJO 76, Ottawa 1978 All rights reserved Printed and bound in Canada Legal Deposit Quebec National Library 2nd Quarter, 1978 2 Table of contents 3 Introduction 9 Abbreviations and Symbols 10 1 The project in general 10 Scope of Installations 13 Organization Chart of the Construction Directorate 14 Chronology of Construction Activity 32 2 The Olympic City 34 The Olympic Park 42 Olympic Stadium 66 Olympic Pool 76 Olympic Velodrome 86 Maurice Richard Arena 90 Pierre Charbonneau Centre 94 Olympic Village 106 International Centre Olympic Village 110 3 Facilities in Greater Montréal 112 Olympic Basin, Notre Dame Island 118 Claude Robillard Centre 124 Étienne Desmarteau Centre 130 St. Michel Arena 134 Paul Sauvé Centre 138 The Forum 144 Winter Stadium University of Montréal 150 Molson Stadium McGill University 156 Road Courses for Cycling and Athletics 164 Training Sites 172 Press Centre 180 COJO Headquarters 184 4 Facilities outside Montréal 186 Olympic Shooting Range, L'Acadie 190 Olympic Archery Field, Joliette 194 Olympic Equestrian Centre, Bromont 202 Le Pavilion d'éducation physique et des sports de I'Université Laval 208 Sherbrooke Stadium 212 Sherbrooke Sports Palace 216 Olympic Yachting Centre, Kingston 226 Varsity Stadium, Toronto 230 Lansdowne Park, Ottawa 235 Appendice 239 Personnel Official Report 7 Olympic Village In 1969, at the time of Montréal's The city then had second thoughts initial bid to host the Games of the XXI and submitted to the International Olympiad, the city had agreed to ob- Olympic Committee (IOC) a project for serve the long-standing tradition of a village consisting of five different locating athletes' living quarters in one buildings, spread over a radius of sev- location close to the main competition eral kilometres from the Olympic Park.
    [Show full text]
  • The Australia Stadium
    THE AUSTRALIA STADIUM SYDNEY’S OLYMPIC STADIUM HAS BEEN THE LARGEST Stadium Australia FACILITY IN THE HISTORY OF THE GAMES. TODAY, FOLLOWING A RE-STRUCTURING, IT IS THE ONLY ONE IN THE Capacity: 83,500, 81,500 (Oval) WORLD THAT CAN HOST FIVE DIFFERENT SPORTS AND STILL Opening: March 1999 IS AN EXAMPLE OF HOW HIGH QUALITY DESIGN AND Capacity during the Olympics: 110,000 RESPECT FOR THE ENVIRONMENT CAN HAPPILY CO-EXIST. Cost: $ 690 million Australian Start of work construction: September 1996 Restructuring: From October 2001 to October 2003 Owner: Stadium Australia Group Project: Populous (Bligh Lobb Sports Architects) Hosted sports: Australian Rules football, rugby 13, rugby 15, football, cricket (Australia) THE LARGEST OLYMPIC STADIUM TO DATE Stadium Australia was built to host the 2000 Sydney Olympic and Paralympic Games. The facility is located in Sydney’s suburb of Homebush, in the middle of the Olympic Park of the Australian city. When it was inaugurated, due to its 110,000 seats, it immediately conquered the “largest Olympic stadium in the world” title and at the same time it is the largest in Australia. The structure was designed and built with the intent of respecting demanding environmental conditions: compared to other Olympic stadiums (Athens and Beijing), as an example, less steel was used. The construction was started in September 1996 and completed just two and a half years later: on March 6, 1999, Sydney’s Olympic Stadium saw its first sport event: two rugby13 matches watched by 104,583 spectators. From October 2001 to October 2003, Stadium Australia was refurbished to make it the only stadium in the world capable of hosting five different professional sports: Rugby13 league, Rugby15 (Union), Australian Football, Soccer and Cricket.
    [Show full text]
  • Jonathan C. Got Berlin Perspectives on Architecture 1 Olympiastadion
    Jonathan C. Got Berlin Perspectives on Architecture Olympiastadion – Germania and Beyond My personal interest with the Olymiastadion began the first week I arrived in Berlin. Having only heard about Adolf Hitler’s plans for a European Capital from documentaries and seen pictures of Jesse Owen’s legendary victories in the ill-timed 1936 Summer Olympics, I decided to make a visit myself. As soon as I saw the heavy stone colonnade from the car park I knew it could only have been built for one purpose – propaganda for the Third Reich beyond Germania. Remodelled for the 1936 Summer Olympics in Berlin by Hitler’s favorite architects Werner March (whose father, Otto March, designed the original 1913 stadium) and Albert Speer, the Olympiastadion was a symbol of power for the National Socialist party and an opportunity to present propaganda in the form of architecture. Being the westernmost structure on Hitler’s ‘capital city of the world’, the stadium was designed to present the then National Socialist Germany to the rest of the world as a power to be reckoned with. Any visitor to the stadium doesn’t only see the gigantic stadium, but also experiences the whole Olympic complex. Visitors would arrive at a 10-platform S-Bahn station able to serve at high frequencies for large events and then walk several hundred meters with a clear view of the huge imposing stone stadium as soon as visitors reached the car park. Though some might argue that neither the U- nor S-Bahn stations named after the stadium provided convenient access to the sports grounds, one has to consider the scale of the event.
    [Show full text]
  • The Beijing National Stadium
    THE BEIJING NATIONAL STADIUM THERE ARE MANY REASONS TO REMEMBER THE 2008 Area: 254,600 square meters OLYMPIC GAMES, AND ONE OF THESE IS UNDOUBTEDLY THE Track Provider: Mondo Spa IMPRESSIVE EVENTS BROADCASTED TO AUDIENCES Height: 69,2 meters AROUND THE WORLD FROM THE OLYMPIC STADIUM IN Start date of construction: December 24, 2003 BEIJING, A BUILDING UNIVERSALLY DUBBED WITH THE Cost of project: $423 million NICKNAME "THE BIRD'S NEST". Structural engineering: Arup Number of workers: 17,000 Steel used: 44,000 tons Capacity: 80,000/91,000 (2008 Olympic games) Olympic Editions (China) AN ARCHITECTURAL MIRACLE The reason for the name immediately strikes the eye : an intricate system of ties and a complex steel structure makes the building look like a huge nest, that can hold up to 91,000 spectators and has one of the world's fastest athletic tracks. The history of this architectural miracle began with an annoucement issued on December 19, 2002. On March 26, 2003 a team of international experts examined the proposals coming from all over the world. In April, the winner was announced: the swiss Herzog & De Meuron firm, which along with Arup Sport and the China Architecture Design & Research Group would deliver the full project in December 2007. Everything was perfect, up to the last details. On June 28, 2008 a grand opening ceremony drew the curtain on this colossal stage that would for about a month put the Chinese dragon under the worlds’ astonished eyes. THE MYTH Creating a building of this magnitude was not an easy task. In China everything is a symbol and a reference to the past and the National Stadium in Beijing was no different.
    [Show full text]
  • The Helsinki Olympic Stadium in Transition Docomomo 48 — 2013/1
    Documentation Issues of the other structures were extended or altered. The Helsinki Olympic After the Games, new offices and a youth hostel were built under the stands. The annexe houses a Stadium in Transition popular sports museum including trophies of the na- tional hockey team and trivia that once belonged to By Wessel de Jonge1 Finland’s sports legend, the distance runner Paavo — docomomo Nurmi whose outstanding performances in earlier any 20th century sports facilities are in need of upgrading accord- Olympics inspired the Finns to make the bid in the Ming to present standards and the 1938 (1952) Olympic Stadium of first place. Together with the stadium’s landmark Helsinki is no exception to the rule. The international sports federations tower that offers a breath taking view of down town increase their requirements and security issues become more prominent Helsinki, its harbours and the bay, the museum is a by the year. Finland’s largest stadium is mainly used in summer for soccer must–see for every tourist visiting the capital. matches, athletics, rock concerts and other events, and additional usage The arena involves a 400 metre athletic track throughout the year would be welcome in order to strengthen the venue’s and an athletics field that is used as well for soc- financial position and to pay for the extensive maintenance and renova- cer matches, accommodating 70.000 spectators tions. At the same time the stadium is a popular historic site that plays an on the surrounding stands at the time of the 1952 important role in the collective memory of the Finns and needs to retain its Olympics.
    [Show full text]
  • ST. VINCENT DE PAUL CATHOLIC SCHOOL 116 Fermanagh Ave
    ST. VINCENT DE PAUL CATHOLIC SCHOOL 116 Fermanagh Ave. Toronto Ontario M6R 1M2 Telephone: 416-393-5227 Fax: 416-393-5873 BULLETIN APRIL 22nd to 26h 2019 FOLLOW US ON TWITTER @SVdP_PRINCIPAL Monday - Easter Monday wishing everyone a Happy Easter Laura DiManno 416-393-5227 - Earth Day PRINCIPAL Tuesday John Wujek 416-222-8282 ext. 5371 - City Divisional Chess Tournament @ St. Helen’s (Ms. McInerney) - 6:30PM Presentation to parents by PC. J. Abramowitz on Social Media SUPERINTENDENT Awareness & Safety – all are welcome Teresa Lubinski 416-512-3404 Wednesday TRUSTEE - Casa Loma Trip (Ms. Pavesi, Ms. Moore, Ms. Pinto) St. Vincent de Paul Roman Catholic Church - Boys Basketball Tournament @Our Lady of Sorrow 416-535-7646 - Grad Photo Retake 263 Roncesv alles Av e. Toronto Ont. M 6R 2L9 Thursday PARISH - Grad Photo Retakes Jo-Ann Dav is and Alessand ra D’ Ambrosio - Girls Basketball Tournament @Pope Francis 416-222 -8282 ext. 88227 - Ms. Kairys’ Retirement Party CSPC CHAIR Friday www.tcdsb.org/cpic - Dance-a-Thon CPIC (PA R EN T EN GA GEM EN T - TC D SB ) - Pizza Lunch www.tcdsb. or g/ oapce-t oront o - Chess & Math OAPC E TORONTO ( PR O VI N CI A L V OI C E F OR P A R EN T S) - Creative Club Gr.2 416-393-5227 9 AM – 3:30 PM 11:45 AM – 12:45 PM DATES TO REMEMBER EN R OLLM EN T HOU RS OF OPERA TION LU NC H H OU R th April 29 – Eco Team - Toronto School Clean Up @ Sorauren Park (Ms.
    [Show full text]
  • Summer Olympic Games Offical Report London 2012
    The London Organising Committee of the Olympic Games and Paralympic Games Limited London 2012 London 2012 Olympic Games Official Report Volume 3 Contents EXECUTIVE SUMMARY 5 SECTION 1: BUILDING A WORLD-CLASS ORGANISATION 13 Introduction 14 Governance, structure and legal support 15 Finance 16 Building the team 18 Workforce Planning and Operations 19 Games Maker volunteers 20 Diversity and inclusion 23 Embedding sustainability 25 Commercial 28 − Procurement 28 − Commercial negotiations and the domestic partner programme 29 − Licensing and retail 30 − Ticketing 31 Brand management and protection 34 SECTION 2: STAGING A GREAT GAMES 35 Introduction 36 Venues 40 − Venue Planning 41 − Venue Development 42 Sport 44 − Sport Competition 44 − Sport Presentation 46 − NOC Services 47 Anti-Doping 48 Medical Services 49 Villages 50 Look 53 Motto 54 Spectator experience 56 Event Services 57 Technology 58 Broadcast 61 Press Operations 62 Games Services 65 − Arrivals and Departures 65 − Accommodation 65 − Logistics 66 − Catering, Cleaning and Waste 67 Health and Safety 68 International Relations 69 Readiness 70 Test events 71 The London Organising Committee of the Olympic Games and Paralympic Games Limited 2 SECTION 3: EVERYONE’s GamES 74 Introduction 75 Communications 78 − Public Relations and Media 80 − Government Relations 81 − Community Relations 82 − Editorial Services 83 − Web and New Media 84 Brand and Marketing 86 − Games emblems 86 − Research and relationships 87 − Mascots 88 Nations and Regions 89 Inspire 90 Education 91 Ceremonies 93 Olympic
    [Show full text]
  • U of T Twilight Meet #1 2017
    University of Toronto Hy-Tek's MEET MANAGER 10:11 PM 23/05/2017 Page 1 U of T Twilight Meet #1 2017 - 23/05/2017 Varsity Stadium Results Women 100 Meter Dash ================================================================================= Name Year Team Seed Prelims Wind H# ================================================================================= Preliminaries 1 Brandys, Lindsay University O 12.00 12.47q -1.4 2 2 Simon-Tucker, Moni York Univers 12.50 13.00q -1.4 2 3 Goudros, Izzy Bullets Track Club 12.72 13.14q -1.4 2 4 Mouana, Zelia University O 13.30 13.58q -0.7 1 5 Pedrero, Claudia University O 14.00 14.00q -0.7 1 6 Garfunkel, Violeta University O 13.63 14.05q -1.4 2 7 Papaconstantinou, Phoenix Athl 13.72 14.14q -0.7 1 8 Zinman, Debbie University O 15.00 14.22q -0.7 1 9 Tinney, Jessica Nemean Lions 24.61 26.29 NWI 3 Women 100 Meter Dash ================================================================================= Name Year Team Prelims Finals Wind H# ================================================================================= Finals 1 Brandys, Lindsay University O 12.47 12.36 -1.3 1 2 Goudros, Izzy Bullets Track Club 13.14 13.32 -1.3 1 3 Mouana, Zelia University O 13.58 13.49 -1.3 1 4 Garfunkel, Violeta University O 14.05 13.99 -1.3 1 5 Pedrero, Claudia University O 14.00 14.21 -1.3 1 6 Zinman, Debbie University O 14.22 14.42 -1.3 1 7 Tinney, Jessica Nemean Lions 26.29 25.83 -0.6 2 Women 200 Meter Run ================================================================================= Name Year Team Seed Finals Wind
    [Show full text]
  • Greece After the Gold Rush - Land Development Impact Analysis and Sustainability of the 2004 Olympic Infrastructure
    Greece after the Gold Rush - Land Development Impact Analysis and Sustainability of the 2004 Olympic Infrastructure Chryssy A. POTSIOU and Panagiotis ZENTELIS, Greece Key words: Land development, land management, Olympic Games, Urban Regeneration SUMMARY Organizing and hosting the 2004 Olympic Games (OG) has proved to be a challenge not only for Greece’s capital city but also for the entire national administration. The success of the Games shows that Greece has the potential to achieve its goals. Looking ahead, as mentioned by several key players, Athens has a strong potential for redevelopment in its role as a functioning metropolitan region of the eastern part of the enlarged European Union and the Middle East. While the Games may have generated short-term economic gains, such as more jobs and increased revenue, the real gold is in the long-term changes to the urban fabric of the city. Achieving this result required strategic planning by the government and the local authorities of Athens and Attica, linking economic, social, environmental and planning objectives to land policies. This paper investigates the general benefits of hosting the OG, and makes a research on the impact of the OG on land development on previous host cities. The 2004 major impact of OG on redevelopment strategy and land management aspects, such as urban regeneration, infrastructure improvement, and environmental protection are examined. As good land management is considered to be the key for a general economic growth, a brief research and an initial economic assessment of the OG impact is also made. The gained experience in aspects relevant to land management, such as: cooperation between public and private sectors and examples of successful public-private partnerships; the need for good land administration and land management; the need for compulsory land expropriation for the acquisition of land necessary for the Olympic Infrastructure; and the necessary land policy initiatives for the post-Olympic sustainability of the constructed Olympic venues are analyzed.
    [Show full text]
  • Explanatory Guide
    Football Explanatory Guide About the Explanatory Guides Published in July 2015, the Explanatory Guides offer a detailed introduction to each sport at the Rio 2016 Olympic Games, as well as providing information on a variety of other fundamental topics that may be of importance to teams as they continue their planning and preparations. This guide is divided into several sections: • A general introduction to Rio de Janeiro and to the Games; • Sport-specific information on subjects such as the competition format, schedule and venue; rules; training; and qualification criteria; • General information touching on accreditation, ticketing, accommodation, medical services, doping control and transport; • A directory that contains contact details, maps and a daily competition schedule for all sports. All information provided in this Explanatory Guide was correct at the time of publication in July 2015; however, please note that these details may change between this date and the Games. NOCs are advised to check the IOC’s NOCnet (http://extranet.olympic.org/nocnet) and Rio 2016’s Rio Exchange (https://rioexchange.rio2016.com) for important updates on topics, such as to the competition schedule. Detailed Team Leaders’ Guides, covering Games-time plans for every Olympic sport, will be distributed to NOCs in June 2016. Welcome to the Football Explanatory Guide for the Rio 2016 Olympic Games. On behalf of Rio 2016, I am pleased to present this document, the content of which has been produced in close collaboration with the International Federation of Association Football and IOC Sport. As a commitment to sustainability, these guides are being presented in an electronic-only format.
    [Show full text]