Previous Experience Serving Canadian Construction Industry Since 1939 © 2015 Voice Construction OPCO ULC | All rights reserved. Voice Construction OPCO ULC

Decades of Experience Equipment With over seven decades of experience in With an equipment fleet with over 275 our field, Voice has developed significant pieces worth over $55 Million, Voice has all expertise and a wealth of operational the specific tools necessary to complete any knowledge in all aspects of heavy civil project in Western . construction. Professional engineers, construction managers, site superintendents Our philosophy is to tailor every project’s and field coordinators lead an innovative equipment fleet to the specific geotechnical team of employees through the safe and conditions, physical geometry, schedule timely completion of diverse projects. Our constraints, site safety concerns, that are clients rely on the best-in-class quality we key factors in arriving at these decisions. bring to every project, and they trust in our This process means Voice will mobilize a people, their skills, and the vast range of customized team that has been molded to capabilities that we offer. provide the most efficient field execution process available. Diverse Service Offering Voices extensive, owned equipment fleet is Voice offers a range of Civil Services for the optimally located to support rapid and cost- Industrial Market. Capabilities span from effective deployment. We also maintain a Constructability and Pre-Construction, skilled workforce of experienced operators. through to the whole project LiveCycle. All new operators will be put through Voice’s rigorous training and development program prior to starting any new project.

HSE QA/QC At Voice Construction, safety is the one critical component that governs every Voice Construction have developed various aspect of our operations. We are committed Quality Procedures/Forms/Checklists to an all-encompassing safety culture etc. That seek to verify conformance that protects the health and safety of our and improve product quality without employees, clients, the public and the compromising the Code, regulations or the environment. client specifications. Voice has continually strived to establish The Quality Management Program has safety as a true value system, undertaking the full support of senior management a “zero incident” paradigm, ensuring who will ensure that adequate resources, that safety is every employee’s and including trained personnel, are provided in subcontractors primary concern and order to effectively implement the quality responsibility. requirements.

1 © 2015 Voice Construction OPCO ULC | All rights reserved. Deep Underground Installations

Underground utility installation has been a Deep Underground Services: core service of Voice Construction for over fifty years. The Company’s superintendents • Sewer & Storm Water Systems implement the latest methods of excavation, pipe placement and backfill operations for • Electrical Conduit System every industrial or municipal project. Voice maintains a substantial fleet of state-of-the- • Underground cable placement and art excavation equipment and continually Removal upgrades as more efficient models become available. Expertise in: Numerous recent projects have allowed Large Diameter HDPE, Fiberglass, the Company to work extensively with High PVC, Stainless Steel Piping, Working Density Polyethylene piping for underground with existing Underground Utilities systems and they have completed the ASME B13.3 Quality Control Program for butt fusion and installation of H.D.P.E piping that have become as industry standard.

2 © 2015 Voice Construction OPCO ULC | All rights reserved. RELATED DEEP UNDERGROUNDS EXPERIENCE Client Project Description Conoco Philips Project Scope: T Rough grading, roads, muskeg removal, underground mechanical, culverts, Surmont II Project concrete foundations Project Value: $180 Million Location: Wood Buffalo,

Northwest Redwater Part- Project Scope: Deep Underground mechanical Installation, roads and ditches nership Project Value: $211 Million (Total Project Value) Location: Redwater, Alberta

Petro Canada Project Scope: Underground piping installations 1200 LF, Case boring road crossing 1100 LF, Refinery Civil Supply and install 36” electrical conduit 320 LF and Installation of Concrete Pile Retaining Wall Works 230 LF. Project Value: $7.5 Million Location: Edmonton, Alberta

Suncor Energy Project Scope: Deep Undergrounds, Site Grading, and Utility Repair and New Construction. Millenium Coker Project, Project Value: $55 Million Extration Infrastructure, and Location: Tar Sand, Alberta Maintenance Air Products Project Scope: Undergrounds and rough and finish grading. Project Value: $5.3 Million Location: , Alberta Shell Canada Energy Project Scope: Underground utilities,, roads, paving, parking lot construction. Upgrader Project Value: $9.7 Million Location: Fort Saskatchewan, Alberta Husky Canada Project Scope: Tank Cell, Grading and Installation of MilePost Concrete Containment Walls, Lin- ers and Cathodic Protection and Surface Drainage. Project Value: $6.3 Million Location: Hardisty, Alberta Trans Canada Pipelines Project Scope: 3 - 350,000 barrel tank foundations, roads and site grading, 700m MSE wall 7m Hardisty Terminal in height, stormwater pond and related facilities. Project Value: $15 Million Location: Hardisty, Alberta Services Project Scope: Voyageur Upgrader - Tank foundations, berms, roads and u/g mechanical, storm Voyageur Upgrader pond Project Value: $75 Million Location: Wood Buffalo, Alberta Suncor - Fort Hills Project Project Scope: Tank foundations, berms, roads and u/g mechanical, Project Value: $50 Million (Total Contract Value) Location: Wood Buffalo, Alberta Enbridge Pipelines Project Scope: Tank Foundations U/G mech, site prep, berms & roads. Edmonton Terminal South Project Value: $14 Million Location: , Alberta Shell Canada Energy Project Scope: Installation of tank foundations and berms, oily water sewer, manholes, roads, Shell AOSD Upgrader U&O ditches and final grading. Earthworks Project Value: $14 Million Location: Scotford, Alberta

3 © 2015 Voice Construction OPCO ULC | All rights reserved. Site Preparation & Final Grading

Today’s fast-track projects demand new Site Preparation and Development Services: and well-maintained equipment to ensure schedules are met and early completion is a reality, not a concept. It is crucial that • Clearing/ Grubbing the site preparations on Industrial Plant • Cut/ Fill Excavation Projects are completed on time, so that the mechanical, structural and electrical phases • Overburden Removal of construction can move forward. • Reclamation and Demolition Voice Construction recognizes the • Hauling importance of this phase and can quickly • Removal of Muskeg field a fleet of scrapers, dozers , graders, compactors, articulated trucks and • Drainage / Dewatering hydraulic excavators that has been • Ditching continually upgraded and is second to none. • Levelling Our planners, supervisors and crews focus • Trenching on delivering value-added grading and paving solutions to all projects, backed by • Tree Clearing competent well-trained personnel and state- • Trenching of-the-art equipment. • Regrading • Site grading / Stripping • Excavation and fills for sites and buildings • Construction equipment fleet of haul trucks, excavators, dozers graders and loaders

4 © 2015 Voice Construction OPCO ULC | All rights reserved. RELATED SITE PREPARATION &F. FINAL GRADING EXPERIENCE Client Project Description Conoco Phillips Project Scope : 600,000 tonnes gravel placed, 15 km of underground piping, installed and Surmont II Project tested (FW, PW, NG), 27 gravel and concrete tank foundations constructed Project Value: $180 Million Location: Wood Buffalo, Alberta

Enbridge Pipelines Project Scope: Stripping, Rough Grading - cut to fill, Borrow excavation, haul, place borrow fill, (Athabasca) Inc. Build subgrade for site roads , Supply and place road gravels, Rough grade tank Foundations Cheecham Pipeline area, Partially construct some tank containment earth berms Terminal Project Value: $15 Million Location: Fort McMurray, Alberta

Northwest Redwater Project Scope : 3 million m3 of topsoil / mass/cut fil moved, site development including roads/ Partnership ditches/culverts, Northwest Upgrader Installed and tested (POWS, FW, PW, SS, NG, RW, Process Lines) Project • Over 1 Million mhrs with no lost time • Achieved all schedule milestones (with increased scope) • Managed over 400 employees in total with 30 staff directly Project Value: $196 Million Location: Redwater, Alberta

Suncor -Fort Hills, Project Scope: Mass Excavation 861,092 M3, Gravel, Sand & Rip Rap 194,308 M3, U/G Piping PCOSI Earth Moving 8,599 M, Hydrants Placed 115 Project Value: $5 million Location: Fort McMurray, Alberta

Suncor Energy Project Scope: 289,000 CY of material moved, 30,000 CY of granular placed, 6,600 lf of under- MVU- Site Preparation ground installations including 48 valves, hydrants, monitors and 60 Catch basins and Manholes. and Deep Undergrounds 36,700 direct hire man-hours expended on the project. Project Value: $5 Million Location: Fort McMurray, Alberta

Enbridge Pipelines Inc. Project Scope: Project consisted of 4 Pump Stations, rough grading, site grading, ponds and Enbridge Waupisoo access roads Pipeline Expansion Project Value: $21 Million Location: Fort Saskatchewan, Alberta

EPCOR Corporation Project Scope: Site Preparation, Installation of sanitary and storm sewers, firewater, potable Genesee Phase 3 - Site water, cooling water and site preparation, paving and site finishing. Preparation Contract Project Value: $18 Million Location: Genesee, Alberta

Shell Canada Ltd. Project Scope: Construction of roads, parking lots, rail beds, final site grading, cut/fill/subgrade Shell AOSD Upgrader: preparation, installation of bollards and parking posts, storm sewers and manholes/catchbasins. U&O Eathworks to Final Install cast in place Stormwater Diversion Chamber, overflow piping, concrete pads and ramps. Grade. Excavate for street lighting, fibre-optic cable, gas and oxygen piping. Project Value: $15 Million Location: Scotford, Alberta

5 © 2015 Voice Construction OPCO ULC | All rights reserved.

Tank Foundations

The construction of Tank Foundations and Tank Foundation Services: berms has been a fundamental aspect of Voice Construction’s operations for the • Concrete Ring wall Foundations past 75 years. Voice has many years of experience with the construction of tank • Crushed Aggregate Ring wall farms, positioning Voice as an Industry Foundations leader in this field. • Concrete Basins The construction of tank foundations and containment berms has been a fundamental • Slab Foundations aspect of our operations since oil was first discovered in the Northern Alberta • Manage HDPE Liner Installation region. Voice offers years of experience in the construction of tank farms, including • Manage GeoMembrane Liner cathodic protection, geosynthetic liners, Installation concrete ring walls and concrete or earth berm containment. Today we are one of the • Manage Clay Liner Installation leading builders of these systems in North America. • Leak Detection Systems The development of tank farms also includes • Retaining Walls and Floors the intricate installation of underground firewater systems, process piping and • Installation of Cathodic Protection electrical power supplies. Our expertise Systems with tank farm construction makes us a valuable partner when new facilities are • Foundation Retrofitting of Existing being designed or existing facilities are being Storage Tanks expanded. • Tank Demolition

7 © 2015 Voice Construction OPCO ULC | All rights reserved. RELATED TANK FOUNDATION EXPERIENCE Client Project Description

Kinder Morgan Project Scope : Addition of 15 new tank foundations and assorted civil construction. Edmonton Terminal Project Value: $70 Million Location: Edmonton, Alberta

Kinder Morgan Canada Project Scope: Tank foundations, MilePost concrete retaining walls, concrete ring walls & roads Tank Farm North 40 Project Value: $9.5 Million Location: Edmonton, Alberta

Statoil Hydro Project Scope: Tank Foundations and berms, grading and roads. Tank Farm Project Value: $10.5 Million Location: Cheecham, AB

Enbridge Pipelines Project Scope: Tank Foundations, berms, grading and roads Tank Farm Project Value: $15 Million Location: Round Hill, Stonefell, & Leismer

Shell Canada Energy Project Scope: Tank Foundations, berms, concrete ring wall, site prep, ponds and parking lot. Upgrader 1 Project Value: $115 Million Location: Fort Saskatchewan, Alberta

Husky Canada Project Scope: Tank Cell, Grading and Installation of MilePost Concrete Containment Walls, Lin- Hardisty Project ers and Cathodic Protection and Surface Drainage. Project Value: $6.3 Million Location: Hardisty, Alberta Trans Canada Pipelines Project Scope: 3 - 350,000 barrel tank foundations, roads and site grading, 700m MSE wall 7m Hardisty Terminal in height, stormwater pond and related facilities. Project Value: $15 Million Location: Hardisty, Alberta Suncor Energy Services Project Scope: Voyageur Upgrader - Tank foundations, berms, roads and u/g mechanical, storm Voyageur Upgrader pond Project Value: $75 Million Location: Wood Buffalo, Alberta

Suncor Energy Services Project Scope: Tank foundations, berms, roads and u/g mechanical, Fort Hills Project Project Value: $50 Million (Total Contract Value) Location: Wood Buffalo, Alberta

Enbridge Pipelines Project Scope: Tank Foundations U/G mech, site prep, berms & roads. Edmonton Terminal South Project Value: $14 Million Location: Sherwood Park, Alberta

Shell Canada Energy Project Scope: Installation of tank foundations and berms, oily water sewer, manholes, roads, Shell AOSD Upgrader U&O ditches and final grading. Earthworks Project Value: $14 Million Location: Scotford, Alberta

8 © 2015 Voice Construction OPCO ULC | All rights reserved.

Landfills & Ponds

Voice Construction uses the latest high-tech Landfill & Pond Services: materials and techniques to build holding ponds, sewer lagoons and landfills for both the private and public sector. • Pond Construction Voice possesses the necessary equipment • Landfill Construction and personnel to construct these often specialized projects to meet and exceed the • Embankment Walls high standards that environmental awareness • Clay Liners demands. • Sub-Drain Piping Voice has the expertise and experience in completing all aspects of pond/ landfill liner • Geo-Synthetic Liner installation including HSPE, RPE and PVC. • Leachate Collection Piping For over 76 years, Voice has worked all over • Slurry Walls Western Canada including remote locations on Landfills and Pond Construction Projects. When necessary, Voice can provide custom project solutions by becoming involved in the front end and providing constructability support.

10 © 2015 Voice Construction OPCO ULC | All rights reserved. RELATED LANDFILLS & PONDS EXPERIENCE Client Project Description Alberta Pacific Project Scope: Alberta Pacific Land Fill Cell Expansion Landfill Expansion Project Project Value: 2.7 Million Location: Boyle, Alberta

Conoco Phillips Project Scope: Enbridge Waupisoo Capacity Expansion- Four Pump Stations- with Containment Surmont II Civil Works Ponds Project Value: $30.5 Million Location: Round Hill, Stonefell, Abee & Leismer Trans Canada Pipelines Project Scope: Includes Pond & Earthworks, Tank Foundations, MSE Wall Project Value: $14 Million Location: Hardisty Terminal B Enbridge Pipelines Project Scope: Earthworks, Undergrounds, Roads, Tank Foundations and Containment & Ponds Project Value: $180 Million Location: Highway 881, Wood Buffalo, Alberta Petro Canada Project Scope: Refinery Conversion Project (RCP 1.1) General Civil for Facilities & Infrastructure. Bechtel U/G Utilities, Roads, Ditches and Final Grading, Pond Construction and Liner, Firewater Systems, Concrete Foundations and Structural Excavations & Sheet Piling. Project Value: $42 Million Location: Sherwood Park, Alberta Suncor Energy Services Project Scope: Voyageur Upgrader - Tank foundations, berms, roads and u/g mechanical, storm Voyageur Upgrader pond Project Value: $75 Million Location: Wood Buffalo, Alberta Keyera Energy Project Scope: Brine Storage Facilities - Construct brine pond & drainage piping. (Associated Engineering) Project Value: $4 Million Location: Fort Saskatchewan, Alberta Shell Canada Energy Project Scope: Shell AOSD Upgrader: U&O Earthworks to Final Grade Shell AOSD Upgrader: Construction of roads, parking lots, rail beds, final site grading, cut/fill/subgrade preparation, installation of bollards and parking posts, storm sewers and manholes/catchbasins. Install cast in place Stormwater Diversion Chamber, overflow piping, concrete pads and ramps. Excavate for street lighting, fibre-optic cable, gas and oxygen piping. Project Value: $12 Million Location: Fort Saskatchewan, Alberta Shell Canada Energy Project Scope: Upgrader 1 U/G Utilities, tank foundations and berms, site prep, ponds and park- Upgrader Project ing lots Project Value: $115 Million Location: Fort Saskatchewan, Alberta Alberta Transportation Project Scope: Anthony Henday Drive (Highway 216) Grading and Storm Sewer Engineer: ESR Team (EBA Common excavation of road grade and storm ponds 2,300,000 m3, topsoil placement 800,000 Engineering, Stantec Con- m2, seeding and harrowing, fencing, 2,500 lm storm sewers, 2,600 lm culverts, manholes, sulting, Earth Tech Canada) control structures, stormceptors, erosion gabion mattresses, asphalt stabilized base coarse and 2,900 bench subdrains. Project Value: $13 Million Location: Edmonton, Alberta

11 © 2015 Voice Construction OPCO ULC | All rights reserved. Storm Water Retention Pond Roads & Railways

The Voice Company was founded in the Roads & Railway Services: 1930’s on their road building expertise. That division has grown steadily to encompass • Access Roads the construction of hundreds of miles of plant roads, streets and highways all • Rail Corridor over Western Canada. In addition, Voice Construction has also gained a wealth of • Transportation Corridors experience constructing rail spurs and rail storage yards for major clients in the • Realignments refining and petrochemical industries. • Road Widening With years of planning and building roads and plant rail installations, Voice has • Ramp Construction and Improvements gained a vast knowledge of the intricate requirements to complete these types of projects under tight schedules and in various soil conditions. We have acquired decades of experience constructing both rail spurs and rail storage yards for major clients in the refining and petrochemical industries throughout Northern Alberta and bring a level of skill and expertise to every project that is second to none.

13 © 2015 Voice Construction OPCO ULC | All rights reserved. RELATED ROADS AND RAILWAYS EXPERIENCE Client Project Description

Kinder Morgan Canada Project Scope : Rail Loading Terminal • Remove wet land areas for new construction • Install erosion control devices • Clearing and Grubbing • Topsoil stripping • Stockpile remediation and site seeding • Cut / Fill • Cut to Excess • Road construction • Rail Grade Construction including sub ballast placement • Install underground storm sewer system • Install sanitary sewer system • Excavate and backfill for pipeline bypass and relocation work • Case bore and install sewer piping under the existing pipeline alley • Work in close proximity to live high voltage overhead power to install rail spurs. • Work with CN and CP rail reps to coordinate rail scope. Project Value: $40 Million Location: Edmonton, Alberta

Agrium Inc. Fertilizer Plant Project Scope: Various earthworks around rail yard. Rail Yard Construction Project Value: $ 2 Million Location: Redwater, Alberta

Union Carbide Corporation Project Scope: Underground utility installation, roads ditches and final grading of the rail yard. LP7 Railyard Construction Project Value: $11 Million Location: Prentiss, Alberta Dow Chemical Canada Inc. Project Scope: Moved and placed 100,000 m3 of on-site material and 111,000 m3 of import- Competitive Rail Access to Fort ed material. Placed 116,000 m2 of woven geotextile covered with sub ballast gravel with an Saskatchewan and Prentiss average daily gravel installation rate of 6000 tonne per day. Project Value: $4.5 Million Location: Fort Saskatchewan, Alberta

Petro Canada Project Scope: U/G Utilities, Roads, Ditches and Final Grading, Pond Construction and Liner, Refinery Conversion Project Firewater Systems, Concrete Foundations and Structural Excavations & Sheet Piling. (RCP 1.1) General Civil for Fa- Project Value: $42 Million cilities & Infrastructure. Location: Sherwood Park, Alberta

Opti/Nexen Project Scope: Civil Earthwork, U/G utilities, Road and Ditches Long Lake Project Project Value: $ 7 Million Location: Long Lake, Alberta

14 © 2015 Voice Construction OPCO ULC | All rights reserved. RELATED ROADS AND RAILWAYS EXPERIENCE Client Project Description Concrete Services Kinder Morgan Canada Project Scope : Rail Loading Terminal • Remove wet land areas for new construction • Install erosion control devices • Clearing and Grubbing • Topsoil stripping • Stockpile remediation and site seeding • Cut / Fill • Cut to Excess • Road construction • Rail Grade Construction including sub ballast placement • Install underground storm sewer system • Install sanitary sewer system • Excavate and backfill for pipeline bypass and relocation work • Case bore and install sewer piping under the existing pipeline alley • Work in close proximity to live high voltage overhead power to install rail spurs. • Work with CN and CP rail reps to coordinate rail scope. Project Value: $40 Million Location: Edmonton, Alberta Voice has been self-performing and managing • Standard light forming systems to heavy Agrium Inc. Fertilizer Plant Project Scope: Various earthworks around rail yard. concrete services for over 30 years. Voice duty forms Rail Yard Construction Project Value: $ 2 Million started a concrete division which has allowed Location: Redwater, Alberta us to self-execute 90% of the concrete works • Place concrete: ordinary; mass; silica on our job sites. Voice’s concrete division fume; latex modified; fiber reinforced Union Carbide Corporation Project Scope: Underground utility installation, roads ditches and final grading of the rail team brings over 100 years of combined yard. LP7 Railyard Construction experience managing concrete projects • Hoisting forms and concrete Project Value: $11 Million throughout Canada. Rehabilitation and strengthening of Location: Prentiss, Alberta Voice’s team of concrete experts pride existing structures Dow Chemical Canada Inc. themselves on technical project delivery Project Scope: Moved and placed 100,000 m3 of on-site material and 111,000 m3 of import- • Experienced crews; quality workmanship Competitive Rail Access to Fort and industry leading services performed by ed material. Placed 116,000 m2 of woven geotextile covered with sub ballast gravel with an recognized personnel. Saskatchewan and Prentiss average daily gravel installation rate of 6000 tonne per day. Project Value: $4.5 Million Upon project award, Voice begins Location: Fort Saskatchewan, Alberta Constructibility and Front End Planning with the project team which has proven Petro Canada Project Scope: U/G Utilities, Roads, Ditches and Final Grading, Pond Construction and Liner, to minimize interferences and allow early Refinery Conversion Project Firewater Systems, Concrete Foundations and Structural Excavations & Sheet Piling. project completion, under budget. (RCP 1.1) General Civil for Fa- Project Value: $42 Million On all our Concrete projects, Voice cilities & Infrastructure. Location: Sherwood Park, Alberta assigns experienced staff members with consistent and effective project control, cost management, scheduling, administration and Opti/Nexen Project Scope: Civil Earthwork, U/G utilities, Road and Ditches quality assurance skills. Long Lake Project Project Value: $ 7 Million Location: Long Lake, Alberta

15 © 2015 Voice Construction OPCO ULC | All rights reserved. RELATED CONCRETE EXPERIENCE Client Project Description

Northwest Redwater Project Scope: Pile Caps Partnership Project Value: $5 Million Pile Caps Project Location: Redwater, Alberta

Suncor Energy Services Project Scope: Various Concrete Projects including, Concrete Repair Plt. 10 (10C-11/19 Sour Various Concrete Projects Water Surge Drum), Concrete Repair Plt.8 (8E-3/8E-4), Concrete Repair Plt.8 (8D-13), Concrete Repair Plt.5 & 25, Plt. 38 Slab Demolition, TRO Maintenance Tent Concrete Slab (50’x110’x), TRO Maintenance Tent Concrete Slab (50’x70’), Constructed curbs & traffic circle, Foundation for new scales/ slabs for new scales formed, Poured duct banks & poured bollards, Poured road crossings. Project Value: $20 Million Location: Base Plant Operations Wood Buffalo, AB Kinder Morgan Canada Project Scope: Tank Foundation Granular, Tank Foundation Leak detection and monitoring, Tank Edmonton Terminal Foundation Sand, Tank Foundation Liner 53 m diameter, Remote impoundment intake structure, Wet land intake structure, Mile Post Wall Installation Project Value: $70 Million (Total Project Value) Location: Edmonton, AB Kinder Morgan Canada Project Scope: Rail Weigh Scale Foundation, Gate Foundations, Firewater Building Foundation, Rail Loading Terminal Nitrogen Equipment Pad Foundation and surrounding bollards, Generator Equipment Concrete Slab Foundation, Parking Receptacle Footing, MSE Wall Concrete Drainage Channel Project Value: $40 Million Location: Edmonton, AB Northwest Redwater Project Scope: Form and Pour Collars Concrete Sewer Manhole / Managed Supply and self Partnership executed pipe install (Potentially Oily Water Sewer), Form and Pour Collars Concrete Manhole / Managed Supply and self executed, PVC Pipe install (Sanitary Sewer), Form & Pour thrust blocks for FW/PW Project Value: $211 Million (Total Project Value) Location: Redwater, AB Client: Conoco Phillips Project Scope: Tank Foundations and Berms, Poured Collars for PW HDPE Installation, Poured Surmont 2 Collars for FW HDPE installation of pipe, hydrants, monitors, valves, Form and Pour Thrust Blocks, Installed Mile Post Walls Project Value: $160 Million (Total Project Vlaue) Location: Edmonton, Alberta IOL Strathcona Refinery Project Scope: Voice has been working at the Edmonton Strathcona Refinery for over 20 years Maintenance Projects on various types of projects. Voice’s dedication to by providing cost savings initia- tives every year and quality work is the reason Voice has been so successful on this site. To date the largest concrete pour on this site was the S-2 Foundation at 960 m3. Project Value: $16 Million Location: Fort Saskatchewan, Alberta Esso Project Scope: This project was performed incident free for IOL on time and budget. The proj- Rainwater Impoundment ect consisted of supplying, and installing a Rain Water Impoundment Basion at the Strathcona Basin Project Refinery. This project consisted of Supply and installation of concrete underground piping, manholes, pipe insulation. The separator scope of this project was over 950 m3 and the Junction Box was over 175 m3 of concrete. Project Value: $ 6.4 Million Location: Edmonton, Alberta

16 © 2015 Voice Construction OPCO ULC | All rights reserved. Environmental Remediation

Voice Construction has long made Environmental Remediation Services: environmental concerns a priority. Their involvement with environmental projects has • Site Evaluation Consulting Including resulted in the transportation of hazardous Mobilization materials, the removal and installation of • Soil Excavation underground storage tanks and removal of contaminated soil. • Material Evaluation and Preparation Voice’s safety personnel are expertly trained • Remedial Services and they have many years of experience • Reclamation in the use of selecting the appropriate equipment and proper handling of any type • Decommissioning of contaminate. Voice has assisted in the • Well and Pipe Inspections clean-up of hydrocarbon spills throughout Northern Alberta in collaboration with environmental engineers and Industrial Hygienists. Voice Construction has facilitated the cleanup of Arsenic, Vinyl Chloride Monomer, Mercury, Sulphur, Brine and Caustic Soda as well as various herbicides and hydrocarbon products. Voice has also worked with phosphogypsum and has completed many major projects working on Gypsum Stack locations.

17 © 2015 Voice Construction OPCO ULC | All rights reserved. RELATED ENVIRONMENTAL REMEDIATION EXPERIENCE

Viridian Project Scope: (EBA Consulting) • Excavation and stockpile of unusable surface material Redwater Plant Gypsum • Excavate suitable clay material, haul and compact to construct 700m long starter dike Stack Expansion Project • Install a dewatering and drainage system to remove excess water from excavation (Phase 1) • Prepare, place and compact 50,000 m3 suitable clay fill material for base liner and cover • Supply and place gravel for dike dewatering system and access ramps • Clean-up and distribute topsoil disturbed area and seed to grass Project Value: $2.5 Million Location: Redwater, Alberta Shell Chemicals Project Scope: Environmental remediation and site restoration Archaeological Project Value: $200,000 Excavation Support Location: Fort Saskatchewan, Alberta

Nova Gas Project Scope: Environmental site remediation and restoration Flat Creek Erosion Project Value: $800,000 Control Project Location: Boyle, Alberta

City of Edmonton Project Scope: Voice Construction Drained lake in Hawrelak Park, removed contaminated muck World Triathlon 2001 from bottom of lake and relined the lake with imported clay. Environmental Project Project Value: $1 Million Location: Edmonton, Alberta

Dow Chemical Project Scope: Cleaned up contaminated area on site and hauled material to secure landfill Landfill Project Project Value: $450,000 Location: Alberta

City of Edmonton Project Scope: Repaired various slide and washout areas in various locations. Site Repair and Misc. Project Value: $250,000 Work Location: Edmonton, Alberta

Imperial Oil Ltd. Environmental Project Scope: Voice Construction ran land farm for Imperial Oil Strathcona Refinery Compliance Project Project Value: $350,000 Location: Edmonton, Alberta

Domtar Inc. Project Scope: Excavated contaminated areas in residential area and replaced with clean clay Site Remediation Project and topsoil. Project Value: $380,000

Nova Gas Project Scope: Environmental site remediation & restoration, install PVC perforated sub-drains (EBA Engineering) Project Value: $870,000 Athabasca River, Island Location: Athabasca, Alberta Lake Lateral Slide Repair

18 © 2015 Voice Construction OPCO ULC | All rights reserved. 19 © 2015 Voice Construction OPCO ULC | All rights reserved. © 2015 Voice Construction OPCO ULC | All rights reserved. © 2015 Voice Construction OPCO ULC | All rights reserved. Locations

V V V V

Head Office Fort McMurray British Columbia

Edmonton 200, MacDonald Crescent Prince Rupert

7545 52 Street Fort McMurray, AB T9H 4B2 716 Fraser Street

Edmonton, AB T6B 2G2 Phone: 780-790-0990 Prince Rupert, BC V8J 1P9

Phone: 780-469-1351 Fax: 780-790-0988 Phone: 250-627-7662

Fax: 780-466-9376 Fax: 250-790-0988