FORM 1 I) Basic Information Sl. No Item
Total Page:16
File Type:pdf, Size:1020Kb
Expansion of Distillery from 90 KLPD to 300 KLPD under Form-I EBP at Hunshyal village, Belagavi District, Karnataka APPENDIX I (See paragraph – 6) FORM 1 I) Basic information Sl. No Item Details Expansion of the Existing Distillery from 90 KLPD to dual feed 300 KLPD under EBP Scheme [Project or Activity Schedule 5(g) under Category ‘B2’] as per MoEF&CC Notification No. S.O.980 (E) 1. Name of the project/s 02.03.2021 by M/s. Satish Sugars Limited (SSL) located at Sangankeri Yadwad Road, Hunshyal P.G., Gokak Taluk, Belgaum District, Karnataka State. Pin: 591 224. 2. S.No.in the schedule Category B2 of MoEF&CC with the activity 5(g) Proposed capacity /area /length / Expansion of Distillery from 90 KLPD (even though tonnage to be handled/command EC obtained for 120 KLPD) to dual feed 210 KLPD 3. area/lease area/ number of wells to totalling to 300 KLPD under Ethanol Blending be drilled Programme (EBP) of MOEF&CC. 4. New / Expansion / Modernization Expansion 1. M/s. Satish Sugars started their operation in 2002 as Khandasari Sugar Producing Unit by Open Pan Process. Subsequently increased the production capacity to 2500 TCD by Vacuum Pan Process. 2. EC obtained from MOEF&CC on 05.09.2007 for establishment of 60 KLPD Distillery Plant. 3. Expansion of sugar plant cane crushing capacity from 1250 TCD to 5000 TCD and Co-generation capacity 20 MW was done as per EC No. SEIAA: 11: IND: 2007 dt 23.06.2008 4. The industry was operating 4500 TCD sugar producing unit and 20 MW Cogeneration unit wherein the said capacities were not covered under the schedule of EIA Notification, 2006. 5. Existing Capacity/Area etc. 5. Subsequently, EC obtained from SEIAA on 17.12.2009 for Expansion of sugar factory capacity from 5,000 TCD to10,000 TCD and Co- generation capacity from 20 MW to 45 MW. 6. Further, the industry obtained EC from MOEF&CC on 16.10.2019 for expansion of molasses Based Distillery Unit from 60 KLPD TO 120 KLPD, Sugar cane crushing from 10,000 TCD to 15,000 TCD and Cogeneration Power Plant from 45 MW to 80 MW. 7. Even though the industry obtained EC for 120 KLPD, they have implemented 60 KLPD. Hence, as per MOEF&CC Notification Dt: 16.01.2020 on “No Increase in Pollution Load” with respect to change in raw material, the industry has M/s. Satish Sugars Limited 1 M/s. EHSCPL, Bangalore Expansion of Distillery from 90 KLPD to 300 KLPD under Form-I EBP at Hunshyal village, Belagavi District, Karnataka Sl. No Item Details obtained “No increase in Pollution Load” Certificate from KSPCB on 22.01.2021 for expansion of Distillery from 60 KLPD to 90 KLPD by replacing C- Molasses with B- Heavy Molasses Proposal submitted to MOEF&CC on 17.05.2021 for Amendment in EC Dt: 16.10.2019 seeking Raw spent wash shall be forwarded for bio-methanation followed by concentration in MEE & concentrated spent wash shall be dried to form powder in Dryer. The proposal was considered in the EAC Meeting held on 02.06.2021 and issued Amended EC vide F.No.J-11011/341/2012-IA II(I) dated 07.07.2021. Now, the industry is proposed to expand the Distillery from 90 KLPD (even though EC obtained for 120 KLPD) to 300 KLPD under EBP programme of MOEF&CC as B2 Category Project. Category B2 of MoEF&CC with the activity 5(g) for expansion of Distillery from 90 KLPD (even though 6. Category of Project i.e. ’A’ or ‘B’ EC obtained for 120 KLPD) to dual feed 210 KLPD totalling to 300 KLPD under Ethanol Blending Programme (EBP) of MOEF&CC. Does it attract the general condition? No 7. If yes, please specify. Does it attract the specific condition? No 8. If yes, please specify. Industrial Complex Survey Nos. 366, 367, 368, 369, 371, 372, 373, 374, 375, 376, 377, 378, 379, 380, 381, 382, 385, 389, 390, 391 & parts thereof of Beerangaddi Village and 85, 86/ 1+3/A, 86/ 1+3/B, 86/ 1+3/K, 86/2+4/A, 86/2+4/ B, 86/2+4/K, 86/2+4/D, 88/1/ABK/ 2AB, 90/ 1A, 90/ 1B, 90/ 1K, 90/ 2A, 90/ 2B, 90/3, 90/4A, 90/4B, 90/4K, 98/ Location Plot / Survey / Khasra No. 1A, 98/ 1B, 98/ 1K, 98/ 2+3A,98/ 2+3B,98/ 4,99/ 1,99/2,99/3,99/4, 100/2, 100/3, 100/4, 101/ 9. 1+2+3A, 101/4A, 101/4B, 101/5, 102/3+4A, 102/4B, 102/4K+5, 104, 109, 119, 120/ 1 & parts thereof Hunshyal PG Village, Gokak Taluk, Belagavi District, Karnataka State. Out of which, 7 acres 6 guntas is earmarked for Distillery. Village Beerangaddi & Hunshyal P.G. villages Tehsil Gokak Taluk District Belagavi District State Karnataka Nearest railway station / airport along Nearest railway station is Ghataprabha – 13.5 10. with distance in kms. Kms away in the W direction. M/s. Satish Sugars Limited 2 M/s. EHSCPL, Bangalore Expansion of Distillery from 90 KLPD to 300 KLPD under Form-I EBP at Hunshyal village, Belagavi District, Karnataka Sl. No Item Details Belagavi Airport is at a distance of 50.86 Kms in SW direction Vaderhatti village - 2 Kms North East Hunshyal village - 3.75 Kms South East Nearest Town, Nearest Major Beerangaddi village - 3.25 Kms South settlement, District Headquarters 11. Kalloli village - 2.75 Kms North West along with distance in kms. Ghataprabha Town Panchayat - 13 kms West Gokak town -10.25 Kms South West Belagavi- 72 Kms – South West Village Panchayats, Zilla Parishad, Belagavi Zilla Parishad, Belagavi Municipal Corporation, Local Body (0831) 2420171, 2407201 12. (Complete postal addresses with telephone nos. to be given) 13. Name of the applicant Shri. Siddharth. L Wadennavar, Managing Director. M/s. Satish Sugars Limited, Sangankeri Yadwad 14. Registered Address Road, Hunshyal P.G., Gokak Taluk, Belagavi District, Karnataka. Pin: 591224 M/s. Satish Sugars Limited, Sangankeri Yadwad Address for correspondence: Road, Hunshyal P.G., Gokak Taluk, Belagavi District, Karnataka. Pin: 591224 Name Shri. Siddharth. L Wadennavar Designation (Owner/Partner/CEO) Managing Director (MD) M/s. Satish Sugars Limited (SSL), Sangankeri 15. Address Yadwad Road, Hunshyal P.G., Gokak Taluk, Belagavi District, Karnataka State. Pin Code 591224 E-mail [email protected] Telephone No. (08332) 284550/1/2/3 Fax No. (08332) 284666 Details of alternative sites examined, 16. if any. Location of these sites should Not Applicable be shown on a topo sheet 17. Interlinked Projects Nil 18. Whether separate application of interlinked project has been Not Applicable submitted? 19. If Yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, Not Applicable 1980? Not Applicable (b) The Wildlife (Protection) Act, Not Applicable 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government Not Applicable M/s. Satish Sugars Limited 3 M/s. EHSCPL, Bangalore Expansion of Distillery from 90 KLPD to 300 KLPD under Form-I EBP at Hunshyal village, Belagavi District, Karnataka Sl. No Item Details Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the project & / or land in which the project is proposed to be setup? Not Applicable (a) Name of the court (b) Case No. (c) Orders / directions of the Court, if any & its relevance with the proposed project. (II) Activity: 1.Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities S. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data 1.1 Permanent or temporary change in land use, land cover or topography The total land area available is 159.30 Acres, out including increase in intensity of Yes of which 7 acres 6 guntas is earmarked for land use (with respect to local land Distillery for expansion activity. use plan) 1.2 Clearance of existing land, No -- vegetation and buildings? 1.3 Creation of new land uses? Yes The land is already converted to industrial land use. 1.4 Pre-construction investigations e.g. Yes Will be done bore houses, soil testing? 1.5 Construction works? Yes Buildings & foundations will be constructed for the project. 1.6 Demolition works? No No demolition work involved 1.7 Temporary sites used for Yes Temporary housing will be provided to construction works or housing of construction workers Labours will be hired from construction workers? the nearby villages 1.8 Above ground buildings, structures or Earthworks including linear No Not applicable structures, cut and fill or excavations? 1.9 Underground works including No Not applicable mining or tunnelling? 1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable M/s. Satish Sugars Limited 4 M/s. EHSCPL, Bangalore Expansion of Distillery from 90 KLPD to 300 KLPD under Form-I EBP at Hunshyal village, Belagavi District, Karnataka Details thereof (with approximate quantities S. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data 1.13 Production and manufacturing Yes Category B2 of MoEF&CC with the activity 5(g) processes? for expansion of Distillery from 90 KLPD (even though EC obtained for 120 KLPD) to dual feed 300 KLPD under Ethanol Blending Programme (EBP) of MOEF&CC by replacing C- Molasses with B- Heavy Molasses 1.14 Facilities for storage of goods or Yes Adequate storage facility (Sugar Cane yard) for materials? major raw material viz.