The Preparatory Survey Report for Hurmen Wind Power Project in Mongolia (PPP Infrastructure Project) (Public Version) Mongolia The Preparatory Survey Report for Hurmen Wind Power Project in Mongolia (PPP Infrastructure Project) (Public Version) November 2015 Japan International Cooperation Agency (JICA) SB Energy, Mizuho Bank, Mizuho Research Institute and Mitsubishi Hitachi Power Systems Engineering OS JR(先) 15-103 < CONTENTS > 1. NEED FOR THE PROJECT AND BACKGROUND ............................................................ 1 1.1 ECONOMIC AND SOCIAL BACKGROUND IN MONGOLIA ........................................................ 1 1.1.1 Summary ................................................................................................................. 1 1.1.2 Politics ..................................................................................................................... 3 1.1.3 Economic situation ................................................................................................... 6 1.1.4 Social and economic situation in the project area ................................................. 16 1.2 STATUS OF MONGOLIAN POWER SECTOR AND CHALLENGES ............................................ 18 1.2.1 Brief overview ........................................................................................................ 18 1.2.2 Organizations of Mongolian power sector ............................................................. 18 1.2.3 Regional energy system ........................................................................................ 20 1.2.4 Power generation ................................................................................................... 22 1.2.5 Transmission ......................................................................................................... 30 1.2.6 Tariffs and its system ............................................................................................. 31 1.2.7 Problems and Challenges ..................................................................................... 36 1.3 POLICIES AND PLANS BY MONGOLIAN GOVERNMENT ...................................................... 39 1.3.1 Brief overview ........................................................................................................ 39 1.3.2 The Law on Renewable Energies .......................................................................... 40 1.3.3 The Law of Mongolia on Energy ............................................................................ 43 1.3.4 Mongolia Sustainable Energy Sector Development Strategy Plan 2002-2010 ..... 45 1.3.5 National Program on Renewable Energy (2005-2020/2030) ................................ 46 1.3.6 Program on Integrated Power Energy System 2007 (2007-2040) ........................ 46 1.4 LEGISLATIONS / REGULATIONS ....................................................................................... 50 1.4.1 Overview of Investment Climate in Mongolia ........................................................ 50 1.4.2 PPP/BOT Laws and Regulations ........................................................................ 50 1.4.3 Foreign Investment / Financing ............................................................................. 53 1.4.4 Exchange and Transfer of Foreign Currency ........................................................ 61 1.4.5 Land Use ............................................................................................................... 62 1.4.6 Corporate Income Tax / Custom Duty ................................................................... 62 1.4.7 Japan-Mongolia Bilateral Relation ......................................................................... 66 1.5 EXISTING INFRASTRUCTURE DEVELOPMENT THROUGH PPP/BOT ................................... 67 1.6 THE PROJECT IN NATIONAL PLANNING ............................................................................ 70 1.7 BILATERAL / MULTILATERAL AID PROJECTS IN POWER SECTOR IN MONGOLIA .................... 71 1.8 SIMILAR PROJECTS IN MONGOLIA AND THE COMPARISON WITH THIS PROJECT .................. 74 1.8.1 Summary of Similar projects in Mongolia .............................................................. 74 1.8.2 Challenges on and Lessons from the Similar Projects .......................................... 74 1.9 ELECTRICITY PURCHASE BY THE NEIGHBORING COUNTRIES (CHINA) ................................ 76 1.9.1 Feed-in Tariff scheme in China ............................................................................. 76 1.9.2 Regulations and restrictions on electricity export .................................................. 76 1.10 STATUS AND PROSPECTS OF JOINT CREDIT MECHANISM IN MONGOLIA ............................. 77 1.11 THE NEED AND OBJECTIVES OF THE PROJECT ................................................................. 80 2. ELECTRICITY DEMAND AND SUPPLY ........................................................................... 81 2.1 CURRENT SITUATION .................................................................................................... 81 2.2 OUTLOOK OF ELECTRICITY DEMAND AND SUPPLY ............................................................ 81 2.2.1 Demand ................................................................................................................. 81 2.2.2 Supply .................................................................................................................... 83 2.2.3 Gap between demand and supply ......................................................................... 84 2.2.4 Windpower plans which are operating or under development .............................. 85 2.2.5 Hydropower plans which are operating or under development ............................. 86 2.2.6 Solar power plans which are operating or under development ............................. 87 2.2.7 Outlook of operation start ...................................................................................... 87 3. TECHNOLOGY REVIEW ................................................................................................... 90 3.1 OVERVIEW ................................................................................................................... 90 3.2 WIND STUDY ................................................................................................................ 90 3.2.1 Introduction and Methodology ............................................................................... 90 3.2.2 Project Description ................................................................................................. 92 3.2.3 Available Met Masts and Location ......................................................................... 93 3.2.4 Site WTG Classification ......................................................................................... 94 3.2.5 Ambient Conditions ................................................................................................ 96 3.2.6 Preliminary Wind Turbine Technology Reviewed .................................................. 97 3.2.7 Selection of Five (5) WTGs ................................................................................... 98 3.2.8 Wind Farm Layout ................................................................................................. 98 3.3 SITE INFRASTRUCTURE ............................................................................................... 101 3.3.1 Introduction .......................................................................................................... 101 3.3.2 Site Reconnaissance ........................................................................................... 101 3.3.3 General Site Morphology and Geological Background ....................................... 101 3.3.4 Construction ......................................................................................................... 103 3.3.5 Access ................................................................................................................. 103 3.3.6 Electrical Infrastructure ........................................................................................ 105 3.3.7 WTG Transport .................................................................................................... 106 3.4 OUTLINE DESIGN ........................................................................................................ 107 3.4.1 Introduction .......................................................................................................... 107 3.4.2 Outline Design ..................................................................................................... 107 3.4.3 Geotechnical Investigation .................................................................................. 108 3.4.4 Considerations of Infrastructure Design .............................................................. 110 3.5 REVIEW OF PROPOSED TECHNOLOGY ......................................................................... 113 3.5.1 Introduction .......................................................................................................... 113 3.5.2 Key Findings ........................................................................................................ 113 3.6 TRANSMISSION INTERCONNECTION AND SYSTEM IMPACT .............................................. 114 3.6.1 Introduction .......................................................................................................... 114 3.6.2 Overview of Regional Power Supply/Demand .................................................... 115 3.6.3 Grid
Recommended publications
  • Fiscal Federalism and Decentralization in Mongolia
    Universität Potsdam Ariunaa Lkhagvadorj Fiscal federalism and decentralization in Mongolia Universitätsverlag Potsdam Ariunaa Lkhagvadorj Fiscal federalism and decentralization in Mongolia Ariunaa Lkhagvadorj Fiscal federalism and decentralization in Mongolia Universitätsverlag Potsdam Bibliografische Information der Deutschen Nationalbibliothek Die Deutsche Nationalbibliothek verzeichnet diese Publikation in der Deutschen Nationalbibliografie; detaillierte bibliografische Daten sind im Internet über http://dnb.d-nb.de abrufbar. Universitätsverlag Potsdam 2010 http://info.ub.uni-potsdam.de/verlag.htm Am Neuen Palais 10, 14469 Potsdam Tel.: +49 (0)331 977 4623 / Fax: 3474 E-Mail: [email protected] Das Manuskript ist urheberrechtlich geschützt. Zugl.: Potsdam, Univ., Diss., 2010 Online veröffentlicht auf dem Publikationsserver der Universität Potsdam URL http://pub.ub.uni-potsdam.de/volltexte/2010/4176/ URN urn:nbn:de:kobv:517-opus-41768 http://nbn-resolving.org/urn:nbn:de:kobv:517-opus-41768 Zugleich gedruckt erschienen im Universitätsverlag Potsdam ISBN 978-3-86956-053-3 Abstract Fiscal federalism has been an important topic among public finance theorists in the last four decades. There is a series of arguments that decentralization of governments enhances growth by improving allocation efficiency. However, the empirical studies have shown mixed results for industrialized and developing countries and some of them have demonstrated that there might be a threshold level of economic development below which decentralization is not effective. Developing and transition countries have developed a variety of forms of fiscal decentralization as a possible strategy to achieve effective and efficient governmental structures. A generalized principle of decentralization due to the country specific circumstances does not exist. Therefore, decentra- lization has taken place in different forms in various countries at different times, and even exactly the same extent of decentralization may have had different impacts under different conditions.
    [Show full text]
  • ESC Paper Style
    Organized by: BUILDING RESILIENCE OF MONGOLIAN RANGELANDS A TRANS-DISCIPLINARY RESEARCH CONFERENCE June 9-10, 2015 Sponsoråd by: -1- DDC 636.07845 M-691 Copyright © 2015 by Nutag Action and Research Institute All rights reserved. No part of this publication may be reproduced in any form or by any means. Subject to statutory exception and to the provisions of relevant collective licensing agreements, no reproduction of any part may take place without the written permission of the authors or publisher. Tsogt Print 2015. Printed in Ulaanbaatar, Mongolia ,6%1 ISBN 978-99962-971-7-5 Proceedings of Building Resilience of Mongolian Rangelands: A Trans-disciplinary Research Conference, Ulaanbaatar, Mongolia, June 9-10, 2015 Edited by: María E. Férnández-Giménez Department of Forest and Rangeland Stewardship, Colorado State University, USA Batkhishig Baival Nutag Action and Research Institute, Mongolia Steven R.Fassnacht Department of Ecosystem Science and Sustainability, Colorado State University, USA David Wilson Nutag Action and Research Institute, Mongolia Translated by: Chimgee Ganbold Dugermaa Vanluu Munkhzul Purevsuren Peace Bridge Training Center, Mongolia -2- Contents Acknowledgement of Conference and Proceedings Funders Proceedings Sponsors Statement Building Resilience of Mongolian Rangelands: A Trans‐disciplinary Research Conference – Preface Maria E. Fernandez‐Gimenez, Steven R. Fassnacht, Batkhishig Baival PART I Rangeland Ecology and Management 1 Mongolian Rangeland Ecological Capacity, and Results of Studying Opportunities of Using
    [Show full text]
  • Final Report Main Report
    NO. JAPAN INTERNATIONAL COOPERATION AGENCY MINISTRY OF INFRASTRUCTURE DEVELOPMENT MONGOLIA MASTER PLAN STUDY FOR RURAL POWER SUPPLY BY RENEWABLE ENERGY IN MONGOLIA FINAL REPORT MAIN REPORT SEPTEMBER 2000 NIPPON KOEI CO., LTD. TOKYO, JAPAN MPN JR 00-152 JAPAN INTERNATIONAL COOPERATION AGENCY MINISTRY OF INFRASTRUCTURE DEVELOPMENT MONGOLIA MASTER PLAN STUDY FOR RURAL POWER SUPPLY BY RENEWABLE ENERGY IN MONGOLIA FINAL REPORT MAIN REPORT SEPTEMBER 2000 NIPPON KOEI CO., LTD. TOKYO, JAPAN The framework of the Final Report Volume I SUMMARY Volume II MAIN REPORT Volume III DATA BOOK This Report is MAIN REPORT. 111313 108 149 107 Khatgal 112112 104 105 147 103 165 Ulaangom 146 74 9161 145 111111 114 Sukhbaatar 144 KHUVSGUL102 114 BAYAN-ULGII 143 128 9121 102 109 139 171 106 Ulgii 141 136 111010 76 170 UVS 140 142 137 101 100 Murun BULGAN Darkhan 169 75 99 83 168 148 133 132 SELENGE 164 135 163 124 125 138 127 98 123 131 Erdenet 80 8181 167 ZAVKHAN 97 79 78 73 71 122 96 Bulgan Khovd 120 126 KHENTII 121 ARKHANGAI Ulaanbaatar 9151 160 117117 90729072 72 Choibalsan 119119 111515 159 9122 Uliastai 159 64 DORNOD 28 130 9111 166 158 151 152 134 41 67 69 29 129 134 42 Tsetserleg 63 157 30 TUV Undurkhaan KHOVD 111818 46 50 156 25 19 Kharkhorin 43 Baruun-Urt 24 40 66 155 154 17 23 Altai 47 44 8787 90719071 6565 62 153 48 SUKHBAATAR 2626 93 Arvaikheer 52 22 Bayankhongor 27 94 86 20 21 38 DUNDGOVI 61 5958 16 37 95 Mandalgovi 5958 60 91 15 36 90 85 14 39 9083 9082 Sainshand UVURKHANGAI 8484 33 35 GOVI-ALTAI 5 55 51 32 34 89 51 1111 54 BAYANKHONGOR 3 6 DORNOGOVI 9041 13 53 9 Dalanzadgad 57 12 4 10 7 2 56 8 UMNUGOVI Legend (1/2) Target Sum Center Original No.
    [Show full text]
  • Climate Change
    This “Mongolia Second Assessment Report on Climate Change 2014” (MARCC 2014) has been developed and published by the Ministry of Environment and Green Development of Mongolia with financial support from the GIZ programme “Biodiversity and adaptation of key forest ecosystems to climate change”, which is being implemented in Mongolia on behalf of the German Federal Ministry for Economic Cooperation and Development. Copyright © 2014, Ministry of Environment and Green Development of Mongolia Editors-in-chief: Damdin Dagvadorj Zamba Batjargal Luvsan Natsagdorj Disclaimers This publication may be reproduced in whole or in part in any form for educational or non-profit services without special permission from the copyright holder, provided acknowledgement of the source is made. The Ministry of Environment and Green Development of Mongolia would appreciate receiving a copy of any publication that uses this publication as a source. No use of this publication may be made for resale or any other commercial purpose whatsoever without prior permission in writing from the Ministry of Environment and Green Development of Mongolia. TABLE OF CONTENTS List of Figures . 3 List of Tables . .. 12 Abbreviations . 14 Units . 17 Foreword . 19 Preface . 22 1. Introduction. Batjargal Z. 27 1.1 Background information about the country . 33 1.2 Introductory information on the second assessment report-MARCC 2014 . 31 2. Climate change: observed changes and future projection . 37 2.1 Global climate change and its regional and local implications. Batjargal Z. 39 2.1.1 Observed global climate change as estimated within IPCC AR5 . 40 2.1.2 Temporary slowing down of the warming . 43 2.1.3 Driving factors of the global climate change .
    [Show full text]
  • The Inspection Panel MONGOLIA
    Report No. 128497-MN The Inspection Panel Report and Recommendation on Requests for Inspection MONGOLIA Mining Infrastructure Investment Support Project (P118109) and Mining Infrastructure Investment Support Project - Additional Financing (P145439) Component 1 – Support for Infrastructure Investments (Baganuur Coal Mine Expansion Subproject) and Component 3 – Strengthening Ground Water Management July 23, 2018 The Inspection Panel Report and Recommendation on Requests for Inspection Mongolia: Mining Infrastructure Investment Support Project (P118109) and Mining Infrastructure Investment Support Project - Additional Financing (P145439) Component 1 – Support for Infrastructure Investments (Baganuur Coal Mine Expansion Subproject) and Component 3 – Strengthening Ground Water Management A. Introduction 1. On April 2, 2018, the Inspection Panel (“the Panel”) received two Requests for Inspection (“the Requests”) alleging potential harms from the activities financed under the “Mining Infrastructure Investment Support Project” (P118109) and the “Mining Infrastructure Investment Support Project – Additional Financing” (P145439) (hereinafter “MINIS” or “the Project”). 2. One Request (“the first Request”) was submitted by two non-governmental organizations, Oyu Tolgoi Watch and a local organization, on behalf of residents of the Baganuur district of Ulaanbaatar who asked for confidentiality. The Requesters claim potential harms from the Baganuur mine expansion feasibility study and cumulative impact assessment (CIA) financed by the Project, including
    [Show full text]
  • Pylons Reference Documentation Release 1.0.2
    Pylons Reference Documentation Release 1.0.2 Ben Bangert, Graham Higgins, James Gardner, Philip Jenvey January 12, 2018 Contents 1 Getting Started 1 1.1 Requirements...............................................1 1.2 Installing.................................................1 1.3 Creating a Pylons Project........................................3 1.4 Running the application.........................................4 1.5 Hello World...............................................4 2 Concepts of Pylons 7 2.1 The ‘Why’ of a Pylons Project......................................7 2.2 WSGI Applications...........................................8 2.3 WSGI Middleware............................................8 2.4 Controller Dispatch........................................... 10 2.5 Paster................................................... 10 2.6 Loading the Application......................................... 11 3 Controllers 13 3.1 Standard Controllers........................................... 14 3.2 Using the WSGI Controller to provide a WSGI service......................... 16 3.3 Using the REST Controller with a RESTful API............................ 17 3.4 Using the XML-RPC Controller for XML-RPC requests........................ 20 4 Views 23 4.1 Templates................................................. 24 4.2 Passing Variables to Templates...................................... 24 4.3 Default Template Variables....................................... 25 4.4 Configuring Template Engines...................................... 26 4.5 Custom
    [Show full text]
  • Experience, Prospects and Social Implications of Solar PV in Mongolia
    ERINA REPORT Vol. 50 Small-Scale Energy Development in Northeast Asia: Experience, Prospects and Social Implications of Solar PV in Mongolia D. Nachin Visiting Researcher, Research Division, ERINA The priority for small-energy development in many are under consideration. cases is economic growth and the alleviation of poverty. As Smaller 50W windmills manufactured by the domestic of today, one-third of the world's population has no access company Monmar Co., Ltd. are available for 167,000 to commercial energy. Many live in low-income developing togrog (MNT)2, for use in pastoral livestock farming, but countries, including some in Northeast Asia. not in sufficient quantity. 3-5 kW windmills have been Small-scale energy development may play a key role approved for use in activities involving greater in the eradication of disparities in standards of living, per consumption, such as water pumping and powering some capita electricity consumption, access to information and facilities at summer settlements. Winter settlements are modern communications, and medical and educational usually established on windless, sunny sites. The services. On the other hand, it is necessary to develop publication of the Wind Energy Atlas of Mongolia by the renewable energy resources. The development of small- National Renewable Energy Laboratory (2001) of the U.S. scale energy systems may play a part in increasing social Department of Energy will be very useful for designing stability. Government subsidies, incentives encouraging the wind power generators. utilization of renewable energy sources and the inclusion of Solar energy: Mongolia, the "Land of Blue Sky", these in the national energy policy portfolio are needed.
    [Show full text]
  • How to Create Efficient, Reliable and Clean Electricity Markets: a Regulatory Design for Mongolia and Northeast Asia
    MASTER’S THESIS HOW TO CREATE EFFICIENT, RELIABLE AND CLEAN ELECTRICITY MARKETS: A REGULATORY DESIGN FOR MONGOLIA AND NORTHEAST ASIA Working title: Beyond Mining: Barriers to Renewable Energy Investments in Mongolia Paul Maidowski International Relations (B.A.) University of Dresden, 2010 Thesis Advisor: Professor William Moomaw SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE: MASTER OF ARTS IN LAW AND DIPLOMACY THE FLETCHER SCHOOL OF LAW AND DIPLOMACY SEPTEMBER 13, 2012 Version history V 1. Original: September 13, 2012 V 2. Updated: December 7, 2012 V 2.1. Slightly edited: December 8, 2012 Abstract This paper develops a comprehensive proposal for how Mongolia’s domestic power sector could be made more efficient, reliable and sustainable. The analysis is based on inter- views in Ulaanbaatar. It reviews the literature on power sector reforms in small developing countries and regional electricity markets. In a second step, a framework is proposed for a re- gional electricity market between Mongolia, Russia and China. In principle, this framework is applicable also to South Korea and Japan. The findings include that inadequate regulation has contributed to performance prob- lems in every aspect of Mongolia’s power sector, which remains a horizontally integrated monopoly. A lack of generation capacity was ignored for decades; as a result, supply is ex- pected to fall critically short of demand for the coming 3 to 5 years. Mongolia possesses rich coal resources, but water scarcity, harmful emissions, high vulnerability to the effects of cli- mate change, social constraints and the need for economic diversification will limit the future role of conventional technologies.
    [Show full text]
  • The Annual Report 2016Of Mongolia
    MINERAL RESOURCES AND PETROLEUM AUTHORITY OF MONGOLIA MINERAL RESOURCES AND PETROLEUM AUTHORITY THE ANNUAL REPORT 2016OF MONGOLIA GEOLOGY MINING PETROLEUM HEAVY INDUSTRY 1 MINERAL RESOURCES AND PETROLEUM AUTHORITY MINERALOF MONGOLIA RESOURCES AND PETROLEUM AUTHORITY OF MONGOLIA Builders square-3, Government building XII Chingeltei district, Ulaanbaatar-15171, Mongolia. Tel: +(976-51) 263701 Fax: +(976-51) 263701 web: www.mrpam.gov.mn email: [email protected] Published in 2017 ABBREVIATIONS MRPAM Mineral Resources and Petroleum Authority of Mongolia AMEP Australia Mongolia Extractives Programme LOM Law on Minerals GIP Gross Industiral Products PSAs Production Sharing Agreements LP Law on Petroleum GMGPW Geological mapping and general prospecting work FDI Foreign Direct Investment GDP Gross Domestic Products GOM Government of Mongolia GAP Government Action Programme IMF International Monetary Fund SGP State Geological map PM Parliament of Mongolia MMHI Ministry of Mining and Heavy Industry OSH Occupational Safety and Health LI Law on Investment MRITC Mineral Resources Information and Technological Center Designed by The Mongolian Mining Journal NGM-200 National geology mapping GMGSW Geological map and general survey work 2 MINERAL RESOURCES AND PETROLEUM AUTHORITY OF MONGOLIA FOREWORD The Government Resolution No.4 of July 27, 2016 issued following the Resolution No.12 of 2016 of the Parliament of Mongolia has established The Mineral Resources and Petroleum Authority of Mongolia (MRPAM), Government Implementing Agency, with a new structure by merging the B.BAATARTSOGT, DIRECTOR OF former Mineral Resources Authority and The Petroleum MINERAL RESOURCES AND PETROLEUM Authority. AUTHORITY OF MONGOLIA The MRPAM provides support to development of state policy on geology, mining and petroleum, to deliver effective and efficient services to investors and increase competitiveness of the sector and its contribution to overall economic development of Mongolia by implementing state policies.
    [Show full text]
  • SEMI ANNUAL REPORT (Oct 1, 2017 - Mar 31, 2018)
    Mercy Corps LTS2 Semi-annual Report (October 1, 2017 to March 31, 2018) Leveraging Tradition and Science in Disaster Risk Reduction in Mongolia-2 (LTS2 - Mongolia) SEMI ANNUAL REPORT (Oct 1, 2017 - Mar 31, 2018) Agreement # AID-OFDA-G-15-00101 Submitted to: USAID Submitted by: Mercy Corps April 2018 COUNTRY CONTACT HEADQUARTERS CONTACT Ramesh Singh Denise Ledgerwood Country Director Senior Program Officer Mercy Corps Mercy Corps PO Box 761 45 SW Ankeny Street Ulaanbaatar 79, Mongolia Portland, OR 97204 Phone: +976 9911 4204 Phone: +1.503.896.5000 [email protected] [email protected] Mercy Corps LTS2 Semi-annual Report (Oct 1, 2017 – March 31, 2018) ACRONYMS AND TRANSLATIONS Aimag An administrative unit similar to a province or state APF Aimag Partnership Facilitator AWI Advanced Weather Information Service Bagh An administrative unit similar to a sub-county (sub-soum) CITA Communication Information and Technology Authority Dzud An environmental hazard that unfolds over several seasons and includes drought conditions in the summer leading to poor forage availability and low temperatures, heavy snows and/or ice in winter, which combine to exhaust animals, leading to death from starvation or exposure. ECHO European Civil Protection and Humanitarian Aid Operations ES engageSPARK EMA Emergency Management Agency FAO Food and Agriculture Organization of the United Nations Hural An elected decision-making body at the district, province and national level ICT Information and Communication Technology KEIO Keio University of Japan LEWS
    [Show full text]
  • Mongolia Master Plan Study for Coal Development and Utilization
    Ministry of Mining Mongolia Mongolia Master Plan Study for Coal Development and Utilization November 2013 Japan International Cooperation Agency (JICA) Japan Coal Energy Center IL JR 13-164 Table of contents Chapter 1 Introduction .................................................................................................................................... 1 1.1 Background of the study ....................................................................................................................... 1 1.1.1 Outline of Mongolia ....................................................................................................................... 1 1.1.2 Present condition of industry and economic growth of Mongolia ................................................. 2 1.2 Purpose of study .................................................................................................................................... 4 1.3 Flow of study ........................................................................................................................................ 4 1.4 Study system ......................................................................................................................................... 4 1.4.1 Counterpart mechanism ................................................................................................................. 4 1.4.2 Old and New Government organizations ....................................................................................... 6 1.4.3 Structure and allotment
    [Show full text]
  • 48030-001: Strategy for Northeast Asia Power System Interconnection
    Technical Assistance Consultant’s R eport Project Number: 48030-001 February 2020 Mongolia: S trategy for Northeast Asia Power S ystem Interconnection (Cofinanced by the Climate Change Fund, the People’s R epublic of China R egional Cooperation and Poverty R eduction Fund, and the R epublic of Korea e-Asia and Knowledge Partnership Fund) Prepared by E lectricite de France Paris, France For the Ministry of E nergy, Mongolia This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. TA 9001-MON: Strategy for Northeast Asia Power S ystem Interconnections EDF References: CIST – DCO – PhL – 18 - 208 This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. Module 4 report on Mongolia Energy Sector Profile and Projections FOREWORD The project Team would like to thank: - The Ministry of Energy of Mongolia for easing direct discussions with the National Dispatching Center, TRANSCO and Public Entities in Mongolia - The ADB’s Country Coordinators of Mongolia, People’s Republic of China, Republic of Korea, Japan for their support: Mongolia: Mr. Byambasaikhan PRC: Ms. Geng Dan (Danna) ROK: Mr. Jung-Hwan Kim Japan: Mr. Omatsu Ryo and Mr. Shota Ichimura Here is a reminder of the place of the Module 4 in the Project organization: 1 EDF ELECTRICITE DE FRANCE – with a capital of 1 006 625 696.50 euros – TA-9001 MON: Strategy for Northeast Asia Power System Interconnection 552 081 371 R.C.S.
    [Show full text]