CENTRAL BEDFORDSHIRE ANNUAL PLAN 2020-21 ID Workstream Task Name Stages Scheme Road Name Parish Ward Area Scheme Description Allocation Month LA Start Finish Status expected in 1 ANNUAL PLAN 2020-21 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
2 CAPITAL PROGRAMME Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
3 STRUCTURAL STRUCTURAL Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 MAINTENANCE MAINTENANCE
4 C/W RESURFACING C/W RESURFACING Q1,2,3 Q1,2,3 Wed 01/04/20 Mon 03/08/20
5 C/W Resurfacing Station road CONSTRUCTION Station road Langford Stotfold & Langford 1 Whole Road RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
6 C/W Resurfacing HIGH STREET CONSTRUCTION HIGH STREET Langford Stotfold & Langford 1 O/S 41A to joint Mini Rabt RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
7 C/W Resurfacing Fildyke Road CONSTRUCTION Fildyke Road Meppershall Shefford 1 Full length RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
8 C/W Resurfacing Bedford Road CONSTRUCTION Bedford Road Moggerhanger Northill 1 From Bedford Boundary To Red Panel RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 30MPH 9 C/W Resurfacing Ickwell Road CONSTRUCTION Ickwell Road Northill Northill 1 second half RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
10 C/W Resurfacing Campton Road CONSTRUCTION Campton Road Shefford Shefford 1 Cemetery entrance RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
11 C/W Resurfacing Bedford Road CONSTRUCTION Bedford Road Shefford Shefford 1 Mini roundabout Stanford Road to RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 Shefford Hardwick 12 C/W Resurfacing Hanscombe End Road CONSTRUCTION Hanscombe End Shillington Silsoe & Shillington 1 From bend to O/S 36 RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 Road 13 C/W Resurfacing High Road CONSTRUCTION High Road Southill Northill 1 T junction Sandy Lane Chicksands RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
15 C/W Resurfacing Rook Tree Lane CONSTRUCTION Rook Tree Lane Stotfold Stotfold & Langford 1 The Green to Brayes Manor RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
16 C/W Resurfacing Park Street CONSTRUCTION Park Street Ampthill Ampthill 2 Whole of road RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
17 C/W Resurfacing Orchard Estate CONSTRUCTION Orchard Estate Eggington Heath & Reach 2 Leighton Road to High Street RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
18 C/W Resurfacing Leighton Road CONSTRUCTION Leighton Road Eggington Heath & Reach 2 O/S 12 to O/S 16 resurfacing, patching RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 and SD A4012 to O/S 12 19 C/W Resurfacing A5120 Ampthill Road CONSTRUCTION A5120 Ampthill Flitwick Flitwick 2 A507 to Williams Way including junction RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 Road 20 C/W Resurfacing Plantation Road CONSTRUCTION Plantation Road Leighton Buzzard Leighton Buzzard North 2 Deer Walk to Sandy Lane (inlcuding Jct RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 Sandy Lane) 21 C/W Resurfacing Finch Crescent CONSTRUCTION Finch Crescent Leighton Buzzard Linslade 2 Full length RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
22 C/W Resurfacing Heath Road CONSTRUCTION Heath Road Leighton Buzzard Leighton Buzzard North 2 Shenley Hill Junc incl to Heath Park Rd RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 including Jct 23 C/W Resurfacing Sandhill Close CONSTRUCTION Sandhill Close Millbrook Cranfield & Marston 2 Whole length RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 Moretaine 24 C/W Resurfacing Speedwell CONSTRUCTION Speedwell Woburn Aspley & Woburn 2 Whole of road Speedwell junction RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
25 C/W Resurfacing Church Walk CONSTRUCTION Church Walk Cranfield Cranfield & Marston 2 Full length RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 Moretaine 26 C/W Resurfacing Bedford Road / Hexton Road / CONSTRUCTION Bedford Road / Barton-Le-Clay Barton-Le-Clay 3 T Junction Resurfacing RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 Luton Road Hexton Road / Luton 27 C/W Resurfacing Spinney Crescent CONSTRUCTION SpinneyRoad Crescent Dunstable Dunstable Northfields 3 Full Length RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
28 C/W Resurfacing Jeansway CONSTRUCTION Jeansway Dunstable Dunstable Icknield 3 Liscombe Road to Kingsbury Gardens RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
29 C/W Resurfacing High Street CONSTRUCTION High Street Eaton Bray Eaton Bray 3 Whole RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
30 C/W Resurfacing Barton Road CONSTRUCTION Barton Road Harlington Toddington 3 From O/S 101 joint at T Junct RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 resurfacing to O/S 13. 31 C/W Resurfacing Sharpenhoe Road CONSTRUCTION Sharpenhoe Road Streatley Toddington 3 from Church Road joint to Sundon Road RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 joint (inlcuding junction at Church Road) 32 C/W Resurfacing Mount Pleasant CONSTRUCTION Mount Pleasant Aspley Guise Aspley & Woburn 2 C/W Resurfacing RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
33 C/W Resurfacing Salford Road CONSTRUCTION Salford Road Aspley Guise Aspley & Woburn 2 C/W Resurfacing RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20
34 C/W Resurfacing Bedford Road T Junction CONSTRUCTION Bedford Road T Aspley Guise Aspley & Woburn 2 C/W Resurfacing RJ Q1,2,3 Wed 01/04/20 Mon 03/08/20 Junction 35 F/W RESURFACING F/W RESURFACING Q1,2,3,4 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
36 F/W RESURFACING Cedar Avenue CONSTRUCTION Cedar Avenue Biggleswade Biggleswade North 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
37 F/W RESURFACING Bilberry Road CONSTRUCTION Bilberry Road Clifton Arlesey 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
39 F/W RESURFACING High Street CONSTRUCTION High Street Henlow Arlesey 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
40 F/W RESURFACING Station Road CONSTRUCTION Station Road Langford Stotfold & Langford 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
42 F/W RESURFACING Orchard Close CONSTRUCTION Orchard Close Meppershall Shefford 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
43 F/W RESURFACING Victoria Road CONSTRUCTION Victoria Road Shefford Shefford 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
45 F/W RESURFACING Elm Road CONSTRUCTION Elm Road Shefford Shefford 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
46 F/W RESURFACING Hillside Close CONSTRUCTION Hillside Close Shillington Silsoe & Shillington 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
47 F/W RESURFACING Church View Avenue CONSTRUCTION Church View Avenue Shillington Silsoe & Shillington 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
48 F/W RESURFACING The Green CONSTRUCTION The Green Stotfold Stotfold & Langford 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
49 F/W RESURFACING Church Street CONSTRUCTION Church Street Tempsford Potton 1 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
50 F/W RESURFACING Queen's Road CONSTRUCTION Queen's Road Ampthill Ampthill 2 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
51 F/W RESURFACING Saunders Piece CONSTRUCTION Saunders Piece Ampthill Ampthill 2 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
52 F/W RESURFACING Orchard Way CONSTRUCTION Orchard Way Flitwick Flitwick 2 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
53 F/W RESURFACING Bluebell Close CONSTRUCTION Bluebell Close Flitwick Flitwick 2 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
54 F/W RESURFACING Waterloo Road CONSTRUCTION Waterloo Road Leighton Buzzard Linslade 2 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
55 F/W RESURFACING Tamar Walk CONSTRUCTION Tamar Walk Leighton Buzzard Leighton Buzzard North 2 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
56 F/W RESURFACING Avon Walk CONSTRUCTION Avon Walk Leighton Buzzard Leighton Buzzard North 2 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
57 F/W RESURFACING Meadow Way CONSTRUCTION Meadow Way Leighton Buzzard Leighton Buzzard North 2 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
58 F/W RESURFACING Dunstall Road CONSTRUCTION Dunstall Road Barton-Le-Clay Barton-Le-Clay 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
59 F/W RESURFACING Leighton Road CONSTRUCTION Leighton Road Billington Eaton Bray 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
60 F/W RESURFACING Lockington Crescent CONSTRUCTION Lockington Crescent Dunstable Dunstable Icknield 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
61 F/W RESURFACING Markham Crescent CONSTRUCTION Markham Crescent Dunstable Dunstable Icknield 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
62 F/W RESURFACING Downs Road CONSTRUCTION Downs Road Dunstable Dunstable Manshead 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
63 F/W RESURFACING Hillyfields CONSTRUCTION Hillyfields Dunstable Dunstable Watling 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
64 F/W RESURFACING Borough Road CONSTRUCTION Borough Road Dunstable Dunstable Manshead 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
65 F/W RESURFACING Clifton Road CONSTRUCTION Clifton Road Dunstable Dunstable Northfields 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
66 F/W RESURFACING Appleby Gardens CONSTRUCTION Appleby Gardens Dunstable Dunstable Central 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
67 F/W RESURFACING Medley Close CONSTRUCTION Medley Close Eaton Bray Eaton Bray 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
68 F/W RESURFACING Enfield Close CONSTRUCTION Enfield Close Houghton Regis Parkside 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
69 F/W RESURFACING Watling Place CONSTRUCTION Watling Place Houghton Regis Houghton Hall 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
70 F/W RESURFACING Bradford Road CONSTRUCTION Bradford Road Toddington Toddington 3 Footway Resurfacing RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
71 C/W SURFACE C/W SURFACE DRESSING 2020 Q2 Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 72 C/W SURFACE Astwick Road CONSTRUCTION Astwick Road Astwick Stotfold & Langford 1 From Fen End to the A1 RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 73 C/W SURFACE Dunton Lane CONSTRUCTION Dunton Lane Biggleswade Biggleswade South 1 From Saxon Drive Rbt to Sutton Lane RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Rbt 74 C/W SURFACE C136 Greenways CONSTRUCTION C136 Greenways Campton and Chicksands Shefford 1 from A507 red panel to O/S 18 RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 75 C/W SURFACE Sutton Road CONSTRUCTION Sutton Road Dunton Potton 1 From Biggleswade Rd Rbt to Sutton - RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 High St Xrds 76 C/W SURFACE C184 CONSTRUCTION C184 Edworth Potton 1 From last left hand turn before A1 to RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 30mph at Millow 77 C/W SURFACE Hinxworth Road CONSTRUCTION Hinxworth Road Edworth Potton 1 From C184 to county boundary RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 78 C/W SURFACE Tempsford Road CONSTRUCTION Tempsford Road Everton Potton 1 From Sandy Road junc to Little Barford RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Road junc 79 C/W SURFACE Thrupp End CONSTRUCTION Thrupp End Lidlington Cranfield & Marston 1 Full Length Sheeptick to Woburn Road RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Moretaine 80 C/W SURFACE Thorncote Road CONSTRUCTION Thorncote Road Northill Northill 1 Junction of Budna Road to junction with RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Bedford Road 81 C/W SURFACE Sutton Road CONSTRUCTION Sutton Road Potton Potton 1 Sutton - High St Xrds to Junc Bury Hill RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 82 C/W SURFACE B658 Stanford Road CONSTRUCTION B658 Stanford Road Shefford Shefford 1 Roundabout to Shefford Road Stanford RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 83 C/W SURFACE Shefford Road CONSTRUCTION Shefford Road Southill Northill 1 From junction with Bedford Road to RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 junction with UC147 Yew Tree Lodge 84 C/W SURFACE Clifton Road CONSTRUCTION Clifton Road Stanford Northill 1 From 30mph to The Crescent - Stanford RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 85 C/W SURFACE B658 Shefford Road CONSTRUCTION B658 Shefford Road Stanford Northill 1 Stanford Road Shefford to Stanford RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Road Southill Junction 86 C/W SURFACE A507 Stotfold Bypass CONSTRUCTION A507 Stotfold Stotfold Stotfold & Langford 1 From Norton Road rbt to Hitchin Road RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Bypass rbt 87 C/W SURFACE Astwick Road CONSTRUCTION Astwick Road Stotfold Stotfold & Langford 1 From Astwick Rd,Astwick to Fen End, RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Stotfold 88 C/W SURFACE Bourne End Road CONSTRUCTION Bourne End Road Cranfield Cranfield & Marston 2 Astwood Road to Partridge Piece RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Moretaine 89 C/W SURFACE Mill Road CONSTRUCTION Mill Road Eggington Heath & Reach 2 From A4012 to High Street including RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 High Street (bend resurfacing) 90 C/W SURFACE Church Road CONSTRUCTION Church Road Flitwick Flitwick 2 Manor Way to End Jcn UC106 RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 91 C/W SURFACE Harlington Road CONSTRUCTION Harlington Road Harlington Toddington 2 From Barton Road to Harlington Road RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Sharpenhoe 92 C/W SURFACE Station Lane CONSTRUCTION Station Lane Millbrook Cranfield & Marston 2 Prooving Ground to Joint new surface RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Moretaine Railway Crossing 93 C/W SURFACE Harlington Road CONSTRUCTION Harlington Road Sharpenhoe Toddington 2 Harlington Road Harlington to RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Sharpenhoe 30MPH 94 C/W SURFACE Pedley Hill CONSTRUCTION Pedley Hill Studham Caddington 3 From junc. Clements End Road to RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Leighton Road 95 C/W SURFACE Dunstable Road CONSTRUCTION Dunstable Road Studham Caddington 2 From junc. Buckwood Lane to start of RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 30mph for village 96 C/W SURFACE B5120 Dunstable Road CONSTRUCTION B5120 Dunstable Chalgrave Heath & Reach 3 From Tebworth Road Junction to RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Road Dunstable Road Toddington
Page 1 CENTRAL BEDFORDSHIRE ANNUAL PLAN 2020-21 ID Workstream Task Name Stages Scheme Road Name Parish Ward Area Scheme Description Allocation Month LA Start Finish Status expected in 97 C/W SURFACE Sharpenhoe Road CONSTRUCTION Sharpenhoe Road Streatley Toddington 3 From junc. Sundon Road to Sharpenhoe RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 98 C/W SURFACE Byslips Road CONSTRUCTION Byslips Road Studham Caddington 3 From junc. Buckwood Road to Clements RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 End Road 99 C/W SURFACE Kensworth Road CONSTRUCTION Kensworth Road Studham Caddington 3 From junc. Dunstable Road to junc. RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Byslips Road 100 C/W SURFACE B5120 Dunstable Road CONSTRUCTION B5120 Dunstable Toddington Toddington 3 From Dunstable Road Chalgrave to RJ Q2 Wed 01/07/20 Wed 30/09/20 DRESSING 2020 Road 30MPH including the red panel 101 C/W RETEXTURING C/W RETEXTURING Q3 Q3 Tue 04/08/20 Fri 30/10/20
102 C/W RETEXTURING Everton Road/Potton Road CONSTRUCTION Everton Road/Potton Potton Potton 1 From Everton Road join with Myers RJ Q3 Tue 04/08/20 Tue 03/11/20 Road Road, Potton to Potton Road Join with 103 C/W RETEXTURING Northill Road/Warden Road CONSTRUCTION Northill Ickwell Northill 1 FromSandy Ickwell Road, RoadEverton through Ickwell to Hill RJ Q3 Tue 04/08/20 Tue 03/11/20 Road/Warden Road Lane Junction 105 C/W RETEXTURING Biggleswade Road CONSTRUCTION Biggleswade Road Northill Northill 1 From Junction with Hitchin Road to RJ Q3 Tue 04/08/20 Tue 03/11/20 national speed limit signs/red panel 106 C/W RETEXTURING High Street CONSTRUCTION High Street Southill Northill 1 From High Street join with Howards RJ Q3 Tue 04/08/20 Tue 03/11/20 Close to B658 107 C/W RETEXTURING Southill Road CONSTRUCTION Southill Road Biggleswade Biggleswade South 1 From B658 to Jordans Mill RJ Q3 Tue 04/08/20 Tue 03/11/20 Northill 109 C/W RETEXTURING B1042 potton Road CONSTRUCTION B1042 potton Road Potton Potton 2 Potton to High Street Wrestlingworth RJ Q3 Tue 04/08/20 Tue 03/11/20
110 C/W RETEXTURING Station Road CONSTRUCTION Station Road Temspford Potton 2 Kier Entrance to Level Crossing RJ Q3 Tue 04/08/20 Tue 03/11/20
111 C/W RETEXTURING Chalgrave Road CONSTRUCTION Chalgrave Road Tebworth Heath & Reach 3 Sections along Chalgrave Road from RJ Q3 Tue 04/08/20 Tue 03/11/20 B5120 to Toddington Road 112 C/W RETEXTURING Tebworth Road CONSTRUCTION Tebworth Road Tebworth Heath & Reach 3 Sections along Tebworth Road from RJ Q3 Tue 04/08/20 Tue 03/11/20 B5120 to Wingfield Road 113 C/W RETEXTURING Eaton Bray Road CONSTRUCTION Eaton Bray Road Totternhoe Eaton Bray 3 EATON BRAY ROAD RJ Q3 Tue 04/08/20 Tue 03/11/20
114 C/W RETEXTURING B4540 Dunstable Road CONSTRUCTION B4540 Dunstable Eaton Bray Eaton Bray 3 From B4540 to county border RJ Q3 Tue 04/08/20 Tue 03/11/20 Road 115 C/W RETEXTURING B4540 CONSTRUCTION B4540 Kensworth Caddington 3 Sections along B4540 from Dagnall RJ Q3 Tue 04/08/20 Tue 03/11/20 Road to Common Road 116 C/W RETEXTURING Byslips Road CONSTRUCTION Byslips Road Studham Caddington 3 From Kensworth Road to the crossroads RJ Q3 Tue 04/08/20 Tue 03/11/20 of Buckwood Lane and Buckwood Road 117 C/W RETEXTURING Common Road CONSTRUCTION Common Road Studham Caddington 3 From Valley Road to crossroads of RJ Q3 Tue 04/08/20 Tue 03/11/20 Clements End Road and Byslips Road 118 C/W RETEXTURING Clements End Road CONSTRUCTION Clements End Road Studham Caddington 3 From Dunstable Road to county border RJ Q3 Tue 04/08/20 Tue 03/11/20
119 C/W RETEXTURING Chiltern Green Road CONSTRUCTION Chiltern Green Road Hyde Caddington 3 From B653 to Chiltern Green RJ Q3 Tue 04/08/20 Tue 03/11/20
120 C/W RETEXTURING Icknield Way CONSTRUCTION Icknield Way Eaton Bray Eaton Bray 3 From Roundabout to County Border RJ Q3 Tue 04/08/20 Tue 03/11/20
121 C/W RETEXTURING West Hyde Road CONSTRUCTION West Hyde Road Hyde Caddington 3 A1081 to B653 RJ Q3 Tue 04/08/20 Tue 03/11/20
122 C/W REGEN C/W REGEN Q2 Q2 Mon 03/08/20 Mon 30/11/20
123 C/W REGEN Woodcock Lane CONSTRUCTION Woodcock Lane Hockliffe Heath & Reach 2 From Leighton Road To End Of Road RJ Q2 Mon 03/08/20 Mon 30/11/20
124 C/W REGEN Zuc192 From Hockliffe Road CONSTRUCTION Zuc192 From Battlesden Aspley & Woburn 2 Zuc192 From Hockliffe Road Near RJ Q2 Mon 03/08/20 Mon 30/11/20 Near Watergate Farm To Hockliffe Road Near Watergate Farm To Hockliffe Road Via 125 C/W REGEN ChurchHockliffe Lane Road Via Battlesden CONSTRUCTION ChurchWatergate Lane Farm To Battlesden Aspley & Woburn 2 FromBattlesden Zuc192 From Hockliffe Road Near RJ Q2 Mon 03/08/20 Mon 30/11/20 Watergate Farm To Hockliffe Road Via 126 C/W REGEN Sandhouse Lane CONSTRUCTION Sandhouse Lane Heath And Reach Heath & Reach 2 FromBattlesdon Woburn To RoadEnd Of To Road Watling Street RJ Q2 Mon 03/08/20 Mon 30/11/20
127 C/W REGEN Copt Hall Road CONSTRUCTION Copt Hall Road Hyde Caddington 3 Full Length RJ Q2 Mon 03/08/20 Mon 30/11/20
128 C/W REGEN Causeway CONSTRUCTION Causeway Clophill Ampthill 2 High Street to A507 RJ Q2 Mon 03/08/20 Mon 30/11/20
129 C/W REGEN How End Road CONSTRUCTION How End Road Houghton Conquest Houghton Conquest & 1 Full length RJ Q2 Mon 03/08/20 Mon 30/11/20 Haynes 130 C/W REGEN Sand lane CONSTRUCTION Sand lane Sandy Sandy 1 From Swaden to end RJ Q2 Mon 03/08/20 Mon 30/11/20
131 C/W REGEN Northfield Road CONSTRUCTION Northfield Road Eyeworth Potton 1 High Street to County Border RJ Q2 Mon 03/08/20 Mon 30/11/20
132 C/W REGEN Wood End CONSTRUCTION Wood End Marston Moretaine Cranfield & Marston 2 From Marston Thrift Car Park to jctn with RJ Q2 Mon 03/08/20 Mon 30/11/20 Moretaine old A421 133 C/W PRE-PATCHING C/W PRE-PATCHING FOR SD SC to provide data by Q3 Q2 Wed 01/04/20 Wed 01/04/20 FOR SD 2021 2021 end of March 134 C/W Pre-patching for SD 2021 CONSTRUCTION RJ Q2 Wed 01/04/20 Wed 01/04/20
135 STRUCTURAL County Wide County Wide CBC Q1 Mon 13/04/20 Mon 13/04/20 MAINTENANCE 136 SM TRIAL HOLES / CORRING DESIGN County Wide CBC Q1 Mon 13/04/20 Mon 13/04/20
137 STRUCTURAL RESERVE LIST 2020-21 Mon 03/08/20 Thu 31/12/20 MAINTENANCE
138 C/W RESURFACING Bedford Road CONSTRUCTION Bedford Road Moggerhanger Northill 1 From Bedford Boundary To Red Panel RJ Dates tbc once Mon 03/08/20 Thu 31/12/20 30MPH funding is 139 C/W RESURFACING Drove Road CONSTRUCTION Drove Road Biggleswade Biggleswade North 1 From London Road To Edward Rd Jct RJ Dates tbc once Mon 03/08/20 Thu 31/12/20 incl Jct funding is 140 C/W RESURFACING Stewartby Way CONSTRUCTION Stewartby Way Houghton Conquest Houghton Conquest & 1 T Junction with B530 RJ Dates tbc once Mon 03/08/20 Thu 31/12/20 Haynes funding is 141 C/W RESURFACING Norton Road CONSTRUCTION Norton Road Stotfold Stotfold & Langford 1 A507 Roundabout join to county border RJ Datesdetermined tbc once Mon 03/08/20 Thu 31/12/20 funding is 142 C/W RESURFACING High Street CONSTRUCTION High Street Stotfold Stotfold & Langford 1 From Baldock Road before the RJ Datesdetermined tbc once Mon 03/08/20 Thu 31/12/20 roundabout to table by The Avenue funding is 143 C/W RESURFACING Myers Road CONSTRUCTION Myers Road Potton Potton 1 Everton Road to Everton Road RJ Datesdetermined tbc once Mon 03/08/20 Thu 31/12/20 funding is 144 C/W RESURFACING Hatley Road / Sutton Road CONSTRUCTION Hatley Road / Sutton Potton Potton 1 T Junction RJ Datesdetermined tbc once Mon 03/08/20 Thu 31/12/20 Road funding is 145 C/W RESURFACING Potton Road / High Street CONSTRUCTION Potton Road / High Wrestlingworth Potton 1 T Junction RJ Datesdetermined tbc once Mon 03/08/20 Thu 31/12/20 Street funding is 146 C/W RESURFACING West Hill CONSTRUCTION West Hill Aspley Guise Aspley & Woburn 2 Woodside to Bedford Road RJ Datesdetermined tbc once Mon 03/08/20 Thu 31/12/20 funding is 147 C/W RESURFACING High Street CONSTRUCTION High Street Cranfield Cranfield & Marston 2 From Lodde Road Rabt to Court Road RJ Datesdetermined tbc once Mon 03/08/20 Thu 31/12/20 Moretaine funding is 148 C/W RESURFACING Dunstable Road CONSTRUCTION Dunstable Road Flitwick Flitwick 2 From joint at roundabout to before RJ Datesdetermined tbc once Mon 03/08/20 Thu 31/12/20 junction at temple way funding is 149 C/W RESURFACING Hillside Road CONSTRUCTION Hillside Road Dunstable Dunstable Manshead 3 Full Length RJ Datesdetermined tbc once Mon 03/08/20 Thu 31/12/20 funding is 150 C/W RESURFACING CARRY OVER SCHEMES FROM Datesdetermined tbc once Mon 03/08/20 Mon 03/08/20 2019-20 funding is 151 C/W RESURFACING TBC-Jan-Feb 2020 Datesdetermined tbc once Mon 03/08/20 Mon 03/08/20 funding is 152 DRAINAGE DRAINAGE Q1,2,3,4determined Wed 01/04/20 Wed 31/03/21
153 DRAINAGE Langdale Road SuDS (Possibly CONSTRUCTION UNDER Langdale Road Dunstable Dunstable Watling 3 Construction of 19/20 design. Verge External Q1,2 Wed 01/04/20 Tue 04/08/20 funded by AW) REVIEW SuDs scheme as part of Dunstable 154 DRAINAGE Westfield Road SuDS (Possibly CONSTRUCTION UNDER Westfield Road Dunstable Dunstable Northfields 3 ConstructionFlood Study measures of 19/20 design. Verge External Q1,2 Wed 01/04/20 Tue 04/08/20 funded by AW) REVIEW SuDs scheme as part of Dunstable 155 DRAINAGE W&T Drainage Package W&T C/ OVER Bedford Road, Husborne Crawley, Heath 1 ConstructionFlood Study measures of 19/20 design RJ Q1,2 Fri 01/05/20 Thu 03/09/20 SCHEME Glebe Avenue, & Reach, Henlow Eastern Way, Brook Close, Chiltern 156 DRAINAGE 5 Bells Stanbridge MillClose Road Stanbridge Heath & Reach 2 Construction of 19/20 design - flood RJ Q1,2 Wed 01/04/20 Tue 08/12/20 alleviation 157 DRAINAGE 5 Bells Stanbridge DESIGN/ Mill Road Stanbridge Heath & Reach 2 Construction of 19/20 design - flood RJ Q1,2,3 Wed 01/04/20 Tue 30/06/20 INVESTIGATION alleviation 158 DRAINAGE 5 Bells Stanbridge CONSTRUCTION Mill Road Stanbridge Heath & Reach 2 Construction of 19/20 design - flood RJ Q1 Wed 05/08/20 Tue 08/12/20 alleviation 159 DRAINAGE A507 Ampthill-Maulden Bypass - CONSTRUCTION ON HOLD Ampthill to Maulden Ampthill Ampthill 2 Ditch Maintenance, Arb works. RJ Q2,3 Wed 01/04/20 Tue 04/08/20 Pennyfathers Moor Bypass 160 DRAINAGE Hornes End Road Flitwick CONSTRUCTION Hornes End Road Flitwick Flitwick 2 Construction of 19/20 design - replace RJ Q1,2 Wed 01/04/20 Tue 04/08/20 broken pipe causing flooding on private 161 DRAINAGE Pipers Croft CONSTRUCTION Pipers Croft Dunstable Dunstable Watling 3 Constructionland of 19/20 design. Design to RJ Q1,2 Wed 01/04/20 Tue 04/08/20 be completed on the 17th Jan. 162 DRAINAGE High Street, Henlow High Street Henlow Arlesey Q1,2 Wed 01/04/20 Tue 04/08/20
163 DRAINAGE High Street Henlow CONSTRUCTION High Street Henlow Arlesey 1 Pipe works into a stream. Related to a RJ Q1,2 Wed 01/04/20 Tue 04/08/20 new run. Design due by end of Jan 20 164 DRAINAGE High Street, Blunham High Street Blunham Sandy Q1,2,3,4 Wed 01/04/20 Mon 07/12/20
165 DRAINAGE High Street, Blunham DESIGN/ High Street Blunham Sandy 1 Design/ Investigation RJ Q1,2,3 Wed 01/04/20 Tue 04/08/20 INVESTIGATION 166 DRAINAGE High Street, Blunham CONSTRUCTION High Street Blunham Sandy 1 Construction RJ Q3,4 Tue 01/09/20 Mon 04/01/21
167 DRAINAGE Lower Shelton road Marston Lower Shelton Marston Moretaine Cranfield & Marston Q1,2 Fri 01/05/20 Wed 06/01/21 Road Moretaine 168 DRAINAGE Lower Shelton road Marston DESIGN/ Lower Shelton Road Marston Moretaine Cranfield & Marston 2 Design /Investigation Capacity, and RJ Q1,2 Mon 04/05/20 Fri 04/09/20 INVESTIGATION Moretaine washout of road foundation 169 DRAINAGE Lower Shelton road Marston CONSTRUCTION Lower Shelton Road Marston Moretaine Cranfield & Marston 2 Construction RJ Q3,4 Mon 05/10/20 Fri 05/02/21 Moretaine 170 DRAINAGE Rook Tree Lane Stotfold Rook Tree Lane Stotfold Stotfold & Langford Q1,2,3,4 Mon 01/06/20 Thu 04/02/21
171 DRAINAGE Rook Tree Lane Stotfold DESIGN/ Rook Tree Lane Stotfold Stotfold & Langford 1 Design/Investigation - reported ponding RJ Q1,2,3 Mon 01/06/20 Fri 02/10/20 INVESTIGATION 173 DRAINAGE Dunstable verge SuDS ph2 Town-wide Dunstable Dunstable Design/Investigation for future Q2,3 Wed 01/07/20 Tue 03/11/20 programme based on 174 DRAINAGE Dunstable verge SuDS DESIGN Town-wide Dunstable Dunstable 3 Design/Investigationrecommendations of for Jacobs future Study RJ Q2,3 Wed 01/07/20 Tue 03/11/20 ph2-site 1 programme based on recommendations 175 DRAINAGE Dunstable verge SuDS DESIGN Town-wide Dunstable Dunstable 3 Design/Investigationof Jacobs Study - site for 1 future RJ Q2,3 Wed 01/07/20 Tue 03/11/20 ph2-site 2 programme based on recommendations 176 DRAINAGE Dunstable verge SuDS DESIGN Town-wide Dunstable Dunstable 3 Design/of Jacobs Investigation Study - site for 2 future RJ Q2,3 Wed 01/07/20 Tue 03/11/20 ph2-site 3 programme based on recommendations 177 DRAINAGE Dunstable verge SuDS DESIGN Town-wide Dunstable Dunstable 3 Design/Investigationof Jacobs Study - site for 3 future RJ Q2,3 Wed 01/07/20 Tue 03/11/20 ph2-site 4 programme based on recommendations 178 DRAINAGE Ampthill soakaway system Town-wide Ampthill Ampthill Investigationof Jacobs Study and - site Design 4 Q1,2,3,4 Wed 01/04/20 Mon 07/12/20 improvements 179 DRAINAGE Ampthill soakaway system DESIGN/ Town-wide Ampthill Ampthill 2 Investigation and Design Q1,2 Wed 01/04/20 Tue 04/08/20 improvements INVESTIGATION 180 DRAINAGE Ampthill soakaway system CONSTRUCTION Town-wide Ampthill Ampthill 2 Construction RJ Q2,3,4 Tue 01/09/20 Mon 04/01/21 improvements 181 DRAINAGE Aspley Guise Flood Mitigation- Village wide Aspley Guise Aspley & Woburn Investigation and Design Q2,3 Fri 01/05/20 Wed 06/01/21 Flood Risk Team 182 DRAINAGE Aspley Guise Flood Mitigation- DESIGN/ Village wide Aspley Guise Aspley & Woburn 2 Design RJ Q2,3 Mon 03/08/20 Fri 04/12/20 Flood Risk Team INVESTIGATION 183 DRAINAGE Aspley Guise Flood Mitigation- CONSTRUCTION Village wide Aspley Guise Aspley & Woburn 2 Construction RJ Q2,3 Fri 01/01/21 Wed 31/03/21 Flood Risk Team 184 DRAINAGE Broken Gully Connections INVESTIGATION Countywide Countywide Countywide 1,2,3 Improvements recommended by cyclic RJ Q1,2 Wed 01/04/20 Tue 04/08/20 gully reports 185 DRAINAGE Grips/Offlets improvements CONSTRUCTION Countywide Countywide Countywide 1,2,3 Ongoing asset maintenance/upgrade External Q1,2 Mon 06/04/20 Fri 07/08/20
186 DRAINAGE Survey and Inventory Work SURVEY Countywide Countywide Countywide 1,2,3 Inventory updates for asset RJ Q2,3,4 Wed 01/07/20 Wed 31/03/21 management work 187 DRAINAGE Engineering Input / Ad Hoc CONSTRUCTION Countywide Countywide Countywide 1,2,3 To assist flood risk team and other RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 council departments 188 DRAINAGE Blackburn Road DESIGN ADDED Houghton Regis Countywide 3 To assist flood risk team and other RJ Q1 Wed 01/04/20 Wed 31/03/21 council departments 189 DRAINAGE CARRY OVER SCHEMES Q1 Wed 01/04/20 Wed 01/04/20 2019-20 190 DRAINAGE TBC-Jan-Feb 2020 Q1 Wed 01/04/20 Wed 01/04/20
Page 2 CENTRAL BEDFORDSHIRE ANNUAL PLAN 2020-21 ID Workstream Task Name Stages Scheme Road Name Parish Ward Area Scheme Description Allocation Month LA Start Finish Status expected in 191 STREET LIGHTING STREET LIGHTING Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
192 STREET LIGHTING Structural & Electrical Testing SURVEY Various locations Countywide Countywide Countywide Testing Surveys External Q1 Wed 01/04/20 Tue 30/06/20 20/21 193 STREET LIGHTING Private Cable Network Survey SURVEY Various locations Countywide Countywide Countywide Cable Surveys External Q1 Wed 01/04/20 Tue 30/06/20
194 STREET LIGHTING Structural Column Various locations Countywide Countywide Countywide Column Replacements. RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Replacements Following 19/20 Results 1000 Cols 195 STREET LIGHTING Structural Column CONSTRUCTION Various locations Countywide Countywide Countywide Column Replacements. RJ Q1,2,3,4 Wed 01/04/20 Tue 01/09/20 Replacements Following 19/20 196 STREET LIGHTING StructuralResults 1000 Column Cols MATERIALS Various locations Countywide Countywide Countywide Lanterns RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Replacements Following 19/20 197 STREET LIGHTING StructuralResults 1000 Column Cols MATERIALS Various locations Countywide Countywide Countywide Columns External Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Replacements Following 19/20 Results 1000 Cols 198 STREET LIGHTING New Schemes CONSTRUCTION Various locations Countywide Countywide RJ Q1,2,3,4 Wed 01/04/20 Tue 30/06/20
199 STREET LIGHTING Porz Avenue CONSTRUCTION Porz Avenue Countywide Countywide Countywide New Lighting Scheme RJ Q1 Wed 01/07/20 Tue 29/09/20
200 STREET LIGHTING Husborne Crawley, jctn 13 CONSTRUCTION Bedford Road Husborne Crawley Aspley & Woburn 2 LRP - Lantern Replacement Programme TBC Q1 Wed 01/04/20 Tue 30/06/20 truck stop 201 STREET LIGHTING Leighton Buzzard Town Centre CONSTRUCTION High Street Leighton Buzzard Leighton Buzzard 2 LRP - Lantern Replacement Programme TBC Q1 Wed 01/04/20 Tue 30/06/20 South 202 STREET LIGHTING Leighton Buzzard Induction CONSTRUCTION Lake Street Leighton Buzzard Leighton Buzzard 2 LRP - Lantern Replacement Programme TBC Q1 Wed 01/04/20 Tue 30/06/20 South 203 STREET LIGHTING Shefford, North & South Bridge CONSTRUCTION North & South Shefford Shefford 1 LRP - Lantern Replacement Programme TBC Q1 Wed 01/04/20 Tue 30/06/20 Street Bridge Street 204 STREET LIGHTING Leighton Buzzard, Heritage CONSTRUCTION Mkt Square, High Leighton Buzzard Leighton Buzzard 2 LRP - Lantern Replacement Programme TBC Q1 Wed 01/04/20 Tue 30/06/20 Street, Church South Square
205 STREET LIGHTING A6 CONSTRUCTION Whole of A6. From Houghton Conquest Houghton Conquest & 2,3 LRP - Lantern Replacement Programme TBC Q2,3 Wed 01/04/20 Tue 30/06/20 Bedford Road to Luton Haynes, Ampthill, Silsoe & Shillington, Barton-Le-Clay, Toddington 206 CRSF CO-ORDINATED Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 REPLACEMENT STREET 207 STREET LIGHTING FURNITURECRSF Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
208 STREET LIGHTING Co-ordinated Replacement CONSTRUCTION Various locations Countywide Countywide Emergency disconnections & removal of RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Street Furniture columns/lanterns 209 STREET LIGHTING CARRY OVER SCHEMES Q1 Wed 01/04/20 Fri 01/05/20 2019-20 210 STREET LIGHTING Structural Column CONSTRUCTION C/ OVER Various locations Countywide Countywide Countywide Column Replacements. RJ Q1 Wed 01/04/20 Fri 01/05/20 Replacement Scheme to SCHEME replace 877 column that have been identified following the Structural Testing Programme 211 STREET LIGHTING TBC-Jan-Feb 2020 Q1 Wed 01/04/20 Wed 01/04/20
212 STREET LIGHTING CMS Works Q2,3 Wed 01/07/20 Thu 31/12/20
213 STREET LIGHTING CMS Base Stations/Nodes CONSTRUCTION Various locations Countywide Countywide Countywide External Q2,3 Wed 01/07/20 Thu 31/12/20
214 A5 De- Trunking A5 De-Trunking Q1 Wed 01/04/20 Wed 24/06/20
215 STREET LIGHTING A5 De-Trunking CONSTRUCTION A5 Dunstable Dunstable Watling 3 Replacement of Columns, Lanterns & External Q1 Wed 01/04/20 Wed 01/04/20 signs 216 STRUCTURAL A5 De-Trunking CONSTRUCTION A5 Dunstable Dunstable Watling 3 Re-instatement of kerbs, repairs of RJ Q1 Wed 01/04/20 Wed 31/03/21 MAINTENANCE several defects to bring the road to 217 INTEGRATED INTEGRATED TRANSPORT adoptable standard. Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT 218 INTEGRATED RMF Small Schemes Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT 219 INTEGRATED Bedford Road CONSTRUCTION Bedford Road Old Warden Northill 1 Gateways and lining etc at various roads RJ Q1,2 Wed 01/04/20 Wed 30/09/20 TRANSPORT surrounding village 220 INTEGRATED Church Road CONSTRUCTION Church Road Totternhoe Eaton Bray 3 Lining and signing works, o/s School. To RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT be done in school holidays 222 INTEGRATED Norton Road CONSTRUCTION Norton Road Stotfold Stotfold & Langford 1 Table and associated works RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT 223 INTEGRATED Woodside Road CONSTRUCTION Woodside Road Woodside Caddington 3 Calming feature- subject to TM mid RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT March Confirmation 224 INTEGRATED Station Road CONSTRUCTION Station Road Tempsford Potton 1 Surfacing to provide parking area. W&T Q2,3 Tue 01/09/20 Mon 30/11/20 TRANSPORT to advise on scope and BOQ's to 225 INTEGRATED The Green DESIGN The Green Clophill Ampthill 2 Designhappen. to alter the current layout to RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT enabke buses to pass. 226 INTEGRATED Dunstable Rd Dunstable Road Tilsworth Heath & Reach 2 Gateway treatment RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT 227 INTEGRATED Dunstable Rd DETAILED DESIGN Dunstable Road Tilsworth Heath & Reach 2 Gateway treatment RJ Q1,2,3,4 Wed 01/04/20 Tue 30/06/20 TRANSPORT 228 INTEGRATED Dunstable Rd CONSTRUCTION Dunstable Road Tilsworth Heath & Reach 2 Gateway treatment RJ Q1,2,3,4 Thu 01/10/20 Wed 31/03/21 TRANSPORT 229 INTEGRATED Local Safety Schemes Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT 230 INTEGRATED Marston Bypass Marston Marston Moretaine Cranfield & Marston 2 Overshooting of roundabout, signage Q1,2,3,4 Wed 01/04/20 Mon 01/03/21 TRANSPORT Moretaine improvements in surrounding area 231 INTEGRATED Marston Bypass DESIGN Marston Marston Moretaine Cranfield & Marston 2 Overshooting of roundabout, signage RJ Q1 Wed 01/04/20 Fri 19/06/20 TRANSPORT Moretaine improvements in surrounding area 232 INTEGRATED Marston Bypass CONSTRUCTION Marston Marston Moretaine Cranfield & Marston 2 Overshooting of roundabout, signage Q2,3,4 Fri 17/07/20 Mon 01/03/21 TRANSPORT Moretaine improvements in surrounding area 233 INTEGRATED Sheep Lane CONSTRUCTION Sheep Lane Woburn Aspley & Woburn 2 Lining and signing works. HIGH RJ Q1,2 Wed 01/04/20 Fri 31/07/20 TRANSPORT PRIORITY 234 INTEGRATED Langford Road CONSTRUCTION Langford Road Langford Stotfold & Langford 1 Speed management, pair of cushions. RJ Q2,3 Wed 01/07/20 Mon 30/11/20 TRANSPORT TM required. 238 INTEGRATED Cedars Way DESIGN Wing Road/ Cedars Leighton Buzzard Linslade 2 Collision reduction RJ Q1,2,3 Wed 01/04/20 Thu 31/12/20 TRANSPORT Way junction 239 INTEGRATED High Street South DESIGN A5183 Kensworth Caddington 3 Collision reduction RJ Q1,2,3 Wed 01/04/20 Thu 31/12/20 TRANSPORT 240 INTEGRATED Broughton Road Broughton Road Salford Cranfield & Marston 2 40mph limit signage RJ Q1 Wed 01/04/20 Thu 30/04/20 TRANSPORT Moretaine 241 INTEGRATED Broughton Road DETAILED DESIGN C/ OVER Broughton Road Salford Cranfield & Marston 2 40mph limit signage RJ Q1 Wed 01/04/20 Thu 30/04/20 TRANSPORT SCHEME Moretaine 242 INTEGRATED Broughton Road CONSTRUCTION Broughton Road Salford Cranfield & Marston 2 40mph limit signage External Q1 Mon 03/08/20 Tue 05/01/21 TRANSPORT Moretaine 243 INTEGRATED Ampthill Road High Street Clophill Ampthill 1 WARREN LANE JUNCT TO PRIORY RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT RD RBT- 244 INTEGRATED Ampthill Road FEE PROPOSAL High Street Clophill Ampthill 1 WARREN LANE JUNCT TO PRIORY RJ Q1 Wed 01/04/20 Fri 17/04/20 TRANSPORT RD RBT 245 INTEGRATED Ampthill Road OUTLINE DESIGN High Street Clophill Ampthill 1 WARREN LANE JUNCT TO PRIORY RJ Q1,2 Wed 01/04/20 Wed 30/09/20 TRANSPORT RD RBT 246 INTEGRATED Ampthill Road DETAILED DESIGN High Street Clophill Ampthill 1 WARREN LANE JUNCT TO PRIORY RJ Q4 Mon 15/03/21 Wed 31/03/21 TRANSPORT RD RBT 247 INTEGRATED Fancott Bridleway Luton Road Toddington Toddington 2 Speed reduction, speed limit change, RJ Q1,2,3,4 Mon 03/08/20 Wed 31/03/21 TRANSPORT HGV prevention measures 248 INTEGRATED Fancott Bridleway DETAILED DESIGN Luton Road Toddington Toddington 2 Speed reduction, speed limit change, RJ Q1 Mon 03/08/20 Mon 30/11/20 TRANSPORT HGV prevention measures 249 INTEGRATED Fancott Bridleway CONSTRUCTION Luton Road Toddington Toddington 2 Speed reduction, speed limit change, RJ Q2,3 Fri 01/01/21 Wed 31/03/21 TRANSPORT HGV prevention measures 250 INTEGRATED Public Transport Q1,2,3 Wed 01/04/20 Fri 04/09/20 TRANSPORT 252 INTEGRATED Ampthill Road CONSTRUCTION Ampthill Road Ampthill / Flitwick Ampthill / Flitwick 2 Bus Stop Improvements RJ Q1,2 Wed 01/04/20 Fri 04/09/20 TRANSPORT 253 INTEGRATED Highways Capacity & Traffic Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT Management 254 INTEGRATED Leighton Road DESIGN Leighton Road Heath & Reach Heath & Reach 2 Traffic calming & review speed limits RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT from Shenley Hill Rd to Woburn Rd/ 255 INTEGRATED Byslips Road CONSTRUCTION Byslips Road Studham Caddington 2 Rd-Brickhill Brckill Jctn. road Bus junction Stop upgrades to be RJ Q1,2 Fri 01/05/20 Wed 30/09/20 TRANSPORT 256 INTEGRATED Beech Road CONSTRUCTION Beech Road Dunstable Dunstable Watling, 3 any upgrades to bus stops also-cd to RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT Caddington confirm with public transport re future of 257 INTEGRATED Bedford Road CONSTRUCTION Bedford Rd Marston Moretaine Cranfield & Marston 2 90services deg parking here area, raised kerbing RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT Moretaine works. 258 INTEGRATED A507/Sandhill's Junction CONSTRUCTION A507 junction with Millbrook Cranfield & Marston 2 Junction changes RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT Sandhill Close Moretaine 259 INTEGRATED Bideford Green CONSTRUCTION Bideford Green Leighton Buzzard Linslade 2 20mph works outside of school. Raised EHA Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT tables, and cycle ways. To be done in 260 INTEGRATED Friars Walk CONSTRUCTION Friars Walk Dunstable Dunstable Central 3 Trafficschool Calmingsummer &holidays. footway works, to be RJ Q1,2 Wed 01/04/20 Fri 07/08/20 TRANSPORT done in school holidays. Subject to 261 INTEGRATED Harlington Road (To be CONSTRUCTION Harlington Road Sharpenhoe Toddington 3 TrafficTMM. LiaisonCalming with & footway SP required works, to be RJ Q2,3,4 Wed 01/07/20 Wed 31/03/21 TRANSPORT Patched in 19/20 FY and SD in combined w/ SM works. Lighting & 262 INTEGRATED CliftonQ2 20/21) Rd CONSTRUCTION Mill Road Stanford Northill 1 SpeedSignage Limit works Change also to happen. 30K RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT 263 INTEGRATED Heath Road DESIGN Heath Road Leighton Buzzard Leighton Buzzard North 2 From Shenley Hill to North Court F/W RJ Q1,2 Wed 01/04/20 Fri 31/07/20 TRANSPORT widening 264 INTEGRATED Lowther Road Lowther Road Dunstable Dunstable Watling 3 Calming RJ Q1,2,3,4 Wed 01/04/20 Fri 29/01/21 TRANSPORT 265 INTEGRATED Lowther Road FEE PROPOSAL Lowther Road Dunstable Dunstable Watling 3 Calming RJ Q1,2,3,4 Wed 01/04/20 Fri 29/01/21 TRANSPORT 266 INTEGRATED Common Road DETAILED DESIGN Common Road Kensworth Caddington 3 Speed Management. Outside school. RJ Q1,2,3,4 Wed 01/04/20 Fri 29/01/21 TRANSPORT 267 INTEGRATED Old Hill OUTLINE DESIGN Old Hill Dunstable Dunstable Watling 3 Traffic Calming measures RJ Q1 Wed 01/04/20 Fri 12/06/20 TRANSPORT 268 INTEGRATED Old Hill CONSULTATION Old Hill Dunstable Dunstable Watling Traffic Calming measures RJ Q1 Wed 01/04/20 Fri 12/06/20 TRANSPORT 269 INTEGRATED Drovers Way/Brewers Hill OUTLINE DESIGN C/ OVER Drovers Way / Dunstable Dunstable Northfields 3 Speed limit review RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT SCHEME Brewers Hill Road / 270 INTEGRATED Drovers Way/Brewers Hill CONSULTATION C/ OVER Drovers Way / Dunstable Dunstable Northfields 3 Speed limit review RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT SCHEME Brewers Hill Road / 271 INTEGRATED Linslade Road DESIGN Linslade Road Heath & Reach Heath & Reach 3 Traffic Calming and speed limit review. RJ Q1,2,3 Wed 01/04/20 Thu 31/12/20 TRANSPORT 272 INTEGRATED Windsor Drive OUTLINE DESIGN Windsor Drive Houghton Regis Houghton Hall 3 Traffic Calming RJ Q1,2 Wed 01/04/20 Fri 17/07/20 TRANSPORT 273 INTEGRATED Windsor Drive CONSULTATION Windsor Drive Houghton Regis Houghton Hall 3 Traffic Calming RJ Q1,2 Wed 01/04/20 Fri 17/07/20 TRANSPORT 274 INTEGRATED Boscombe Road OUTLINE DESIGN Boscombe Road Dunstable Dunstable Icknield 3 Junction capacity improvement RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT 275 INTEGRATED Boscombe Road CONSULTATION Boscombe Road Dunstable Dunstable Icknield 3 Junction capacity improvement RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT 276 INTEGRATED Grovebury Road, Leighton OUTLINE DESIGN Grovebury Road Leighton Buzzard Leighton Buzzard 2 Junction capacity improvement RJ Q1,2 Wed 01/04/20 Fri 24/07/20 TRANSPORT Buzzard (retail park) South 277 INTEGRATED Shenley Hill Road DESIGN Shenley Hill Road Dunstable Leighton Buzzard North 3 Traffic calming & Possible speed limit RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT alteration 278 INTEGRATED Mill Road CONSTRUCTION Mill Road Stanbridge Heath & Reach 2 Traffic Calming measures. – RJ Q1,2 Wed 01/04/20 Fri 31/07/20 TRANSPORT construction to be aligned with Structural 279 INTEGRATED Church Road CONSTRUCTION Church Road Studham Caddington 3 WorksMaintenance in school resurfacing, area to build Silv footwayis to (to RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT be carried out in holidays.)
Page 3 CENTRAL BEDFORDSHIRE ANNUAL PLAN 2020-21 ID Workstream Task Name Stages Scheme Road Name Parish Ward Area Scheme Description Allocation Month LA Start Finish Status expected in 280 INTEGRATED Hitchin Road (Henlow Camp) DESIGN Hitchin Road Stondon Arlesey 1 Measures to deter HGV/traffic from rat RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT running (past the RAF Base) Design 281 INTEGRATED Brewers Hill Road DESIGN Brewers Hill Road Leighton Buzzard Leighton Buzzard North 3 designorder issued of traffic April calming – end date per rough RJ Q3,4 Thu 01/10/20 Wed 31/03/21 TRANSPORT 283 INTEGRATED Ad Hoc advice DESIGN Thorn Road various 3 300 hrs RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT 284 INTEGRATED ATC: Various DESIGN Thorn Road various Numerous ATC counts as listed in box RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT throughout the year. 285 INTEGRATED Active Travel (Walking & Q1,2 Wed 01/04/20 Wed 30/09/20 TRANSPORT Cycling inc. Safer Routes to 287 INTEGRATED Schools)Dunton Lane CONSTRUCTION Dunton Lane Biggleswade Biggleswade South 1 Uncontrolled crossing Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT 289 INTEGRATED Dunton Lane CONSTRUCTION Dunton Lane Biggleswade Biggleswade South 1 Uncontrolled crossing Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT 291 INTEGRATED College Road CONSTRUCTION College Road Cranfield Cranfield & Marston 2 Raised junction- To be constructed in Q2 Wed 01/07/20 Wed 30/09/20 TRANSPORT Moretaine spring/ summer when University is not 292 INTEGRATED Church Road CONSTRUCTION Church Road Studham Caddington 3 Footwaysfunctioning construction close to school. Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT Road closure needed. To be done on 293 INTEGRATED Clayhall Road CONSTRUCTION C/ OVER Clayhall Road Kensworth Caddington 3 LiningSummer and hols.Subject signing works to consultation& speed limit RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT SCHEME change. To be programmed for school 294 INTEGRATED Potton Road DESIGN Potton Road Sandy Sandy 1 Constructionholidays. of Cycle Innovation RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT scheme, signing and lining along route 295 INTEGRATED Potton Road CONSTRUCTION Potton Road Sandy Sandy 1 Construction of Cycle Innovation RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT scheme, signing and lining along route 296 INTEGRATED Grovebury Road Footpath Grovebury Road Leighton Buzzard Leighton Buzzard New footway connecting to Retail Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT South Park 297 INTEGRATED Grovebury Road Footpath CONSTRUCTION Grovebury Road Leighton Buzzard Leighton Buzzard 2 New footway connecting to Retail Park Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT South 298 INTEGRATED Tottenhoe Road Dunstable ON HOLD Totternhoe Road Dunstable Dunstable Watling 3 Construction of crossing - TO BE IN Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT SCHOOL HOLIDAYS. Awaiting school 299 INTEGRATED Tottenhoe Road Dunstable DETAILED DESIGN ON HOLD Totternhoe Road Dunstable Dunstable Watling 3 ConstructionTravel Plans. of crossing - TO BE IN Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT SCHOOL HOLIDAYS. Awaiting school 300 INTEGRATED Tottenhoe Road Dunstable CONSTRUCTION ON HOLD Totternhoe Road Dunstable Dunstable Watling 3 ConstructionTravel Plans. of crossing - TO BE IN Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT SCHOOL HOLIDAYS. Awaiting school 301 INTEGRATED A5120 Park Road A5120 Westoning Westoning, Flitton & 2 ConstructionTravel Plans. of Zebra Xing Q1,2,3,4 Wed 01/04/20 Fri 29/01/21 TRANSPORT Greenfield 302 INTEGRATED A5120 Park Road CONCEPT DESIGN A5120 Westoning Westoning, Flitton & 2 Construction of Zebra Xing Q1,2,3 Wed 01/04/20 Fri 29/01/21 TRANSPORT Greenfield 303 INTEGRATED A5120 Park Road CONSTRUCTION A5120 Westoning Westoning, Flitton & 2 Construction of Zebra Xing Q4 Wed 01/04/20 Fri 29/01/21 TRANSPORT Greenfield 304 INTEGRATED Hexton Road Hexton Road Barton-Le-Clay Barton-Le-Clay 2 alterations to junction - crosisng RJ Q1,2,3,4 Wed 01/04/20 Fri 29/01/21 TRANSPORT point 305 INTEGRATED Hexton Road DESIGN Hexton Road Barton-Le-Clay Barton-Le-Clay 2 alterations to junction - crossing point RJ Q1 Wed 01/04/20 Fri 19/06/20 TRANSPORT 306 INTEGRATED Hexton Road CONSTRUCTION Hexton Road Barton-Le-Clay Barton-Le-Clay 2 alterations to junction - crossing point. RJ Q1,2,3,4 Wed 01/04/20 Fri 29/01/21 TRANSPORT Site construction to be co-ordinated with 309 INTEGRATED Sandy Road DESIGN Sandy Road Potton Potton 1 (sectionjunction resurfacingfrom Sandy into 2020. RSPB) RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT completion of f/w widening at various 310 INTEGRATED Meadow Way DESIGN Meadow Way Leighton Buzzard Leighton Buzzard North 2 design/siteareas to +/- clearance 2.5m. Design for footway order issued from RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT Danes Field - Appenine Way some 311 INTEGRATED Woodman Close DESIGN Woodman Close Leighton Buzzard Leighton Buzzard 2 Woodmanworks are offClose highway (alongside brook then RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT South across greenspace and in front of 312 INTEGRATED Leopold Road DESIGN Leopold Road Linslade Linslade 2 Cyclesubstation contraflow with pedestrian in Leopold route Road behind RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT widening of alleyway to be shared use 313 ROW Half Moon Lane. (Company CONSTRUCTION Half Moon Lane Dunstable Dunstable Manshead 3 3-4mdesign wide to be footway 2020/21 to be installed on RJ Q1 Wed 01/04/20 Tue 30/06/20 doing vegetation clearance ROW route. Requested by Police. 314 INTEGRATED Trafficaspires Managementto deliver the scheme. Provision for lighting to be included in Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT Implementation 315 INTEGRATED Scheme 1 DESIGN TBC TBC TBC Schemes to be added as per TMM RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT outcome 316 INTEGRATED Scheme 2 DESIGN TBC TBC TBC Schemes to be added as per TMM RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT outcome 317 CARRY OVER SCHEMES Q1,2 Wed 01/04/20 Mon 31/08/20 2019-20 318 INTEGRATED Bedford Road DESIGN C/ OVER Bedford Road Brogborough Cranfield & Marston 2 937127 BEDFORD ROAD RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT SCHEME Moretaine BROGBOROUGH completion of 319 INTEGRATED Bedford Road CONSTRUCTION C/ OVER Bedford Road Barton Le-Clay Barton Le-Clay 2 A6scheme Speed from the 19/20Plough AgreedJucntion Target RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT SCHEME Constrction of scheme as per designs, lining signing and wescotec signs (electronic) 320 INTEGRATED Everton Road DETAILED DESIGN C/ OVER Everton Road Potton Potton 1 RJ Q1 Wed 01/04/20 Tue 30/06/20 TRANSPORT SCHEME
321 INTEGRATED RESERVE LIST 2020-21 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRANSPORT 322 INTEGRATED Sunderland Road CONSTRUCTION Sunderland Road Sandy Sandy 1 Construction of footway widening in RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT sundeland road value to be increased 323 INTEGRATED Everton Road CONSTRUCTION C/ OVER Everton Road Potton Potton 1 1xonce Cushions target agreed. as calming. Dates Outside to be RJ Q1,2,3 Wed 01/04/20 Thu 24/12/20 TRANSPORT SCHEME School. To be done uin summer hols. 324 INTEGRATED Wrestlingworth Road CONSTRUCTION Wrestlingworth Road Potton Potton 1 Lining works RJ Q1,2,3 Wed 01/04/20 Mon 30/11/20 TRANSPORT 325 INTEGRATED Woburn Road CONSTRUCTION Woburn Road Millbrook Cranfield & Marston 2 938296 Woburn Road Amphthill RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT Moretaine Construction of 2x bus laybys on A507 326 INTEGRATED South Street DESIGN South Street / Leighton Buzzard Leighton Buzzard 2 One-Waynear roundabout @ Millbrook TO was RJ Q2,3,4 Wed 01/07/20 Mon 01/03/21 TRANSPORT Brooklands Avenue South 327 INTEGRATED Regent Street DESIGN Regent Street / Leighton Buzzard Leighton Buzzard North 2 One-Way RJ Q2,3,4 Wed 01/07/20 Mon 01/03/21 TRANSPORT George Street 328 INTEGRATED Lowther Road DETAILED DESIGN Lowther Road Dunstable Dunstable Watling 3 Calming RJ Q1,2,3,4 Wed 01/04/20 Fri 29/01/21 TRANSPORT 329 INTEGRATED Langdale Road DETAILED DESIGN Langdale Road Dunstable Dunstable Watling 3 Concept Design of speed measures on RJ Q3,4 Thu 01/10/20 Wed 31/03/21 TRANSPORT Langdale Road Dunstable in anticipation 330 INTEGRATED Clophill Road CONSTRUCTION Clophill Road Gravenhurst Silsoe & Shillington 1 Buildof speed out cameraand lining removal. works for gateways RJ Q1,2 Wed 01/04/20 Mon 31/08/20 TRANSPORT 331 INTEGRATED Hillside Road CONSTRUCTION Hillside Road Dunstable Dunstable Manshead 3 Speed management, construction of no RJ Q2,3,4 Fri 21/08/20 Mon 01/03/21 TRANSPORT through route. Consultation to be carried out.
332 INTEGRATED Bridge End Road CONSTRUCTION Arlesey Station Arlesey Arlesey 1 Cycle / Pedestrian Access RJ Q1,2,3 Wed 01/04/20 Mon 30/11/20 TRANSPORT Improvements. May need night work.
333 BRIDGES & BRIDGES & STRUCTURES Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 STRUCTURES 336 BRIDGES & Abbey Farm Railway Bridge CONSTRUCTION Old Warden Old Warden Northill 1 Strengthening RJ Q1 Mon 27/04/20 Fri 12/06/20 STRUCTURES 337 BRIDGES & Blunham Railway Ret. Walls DESIGN Station Road Blunham Sandy 1 Design for Demolition & regrading of RJ Q2,3 Mon 05/10/20 Fri 06/11/20 STRUCTURES (UC020) embankments 338 BRIDGES & Blunham Railway Ret. Walls DESIGN Station Road Blunham Sandy 1 Design for Demolition & regrading of RJ Q2,3 Mon 05/10/20 Fri 06/11/20 STRUCTURES (UC020) embankments 339 BRIDGES & A507 Armco Culverts Q1 Mon 20/04/20 Fri 15/05/20 STRUCTURES 341 BRIDGES & CARRY OVER SCHEMES Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 STRUCTURES 2019-20 342 BRIDGES & Hulcote Mill Culvert (478) DETAILED DESIGN C/ OVER Mill Lane Hulcote & Salford Cranfield & Marston 2 Strengthening RJ Q1 Mon 13/04/20 Fri 08/05/20 STRUCTURES SCHEME Moretaine 343 BRIDGES & Bridge Farm Culvert (103) CONSTRUCTION C/ OVER Bedford Road Moggerhanger Northill 1 Strengthening RJ/ External Q1 Mon 27/04/20 Fri 22/05/20 STRUCTURES SCHEME 344 BRIDGES & Bridge Farm Cul CONSTRUCTION C/ OVER Bedford Road Sandy Sandy 1 Construction of brick Parapet and wing Q1 Wed 01/04/20 Wed 01/04/20 STRUCTURES A603,(103)(Construction) SCHEME walls & foundations and any ancillary 345 BRIDGES & Bridge Farm Cul A603,(103)( CONSTRUCTION C/ OVER Bedford Road Sandy Sandy Investigateassociated works.for backing & re-assess. If Q1 Wed 01/04/20 Fri 01/05/20 STRUCTURES Civils) SCHEME NO backing found then Strengthen brick 347 BRIDGES & Hollington Basin Bridge (268)- CONSTRUCTION C/ OVER Ampthill Road Flitton Westoning, Flitton & 2 Hollingtonarch carrying Basin the Bridgec/way &(268)- east Designverge Q1 Wed 01/04/20 Wed 01/04/20 STRUCTURES Construction SCHEME Greenfield -Strengthening of the structure in 348 BRIDGES & Hollington Basin Bridge (268)- CONSTRUCTION C/ OVER Ampthill Road Flitton Westoning, Flitton & 2 Hollingtonaccordance Basin with theBr, Ampthillagreed Target Road, Cost Q1 Wed 01/04/20 Wed 01/04/20 STRUCTURES Civils SCHEME Greenfield Flitton: (See notes) 350 BRIDGES & Abbey Farm Railway Bridge SURVEY C/ OVER Northill Northill 1 Carry out Environmental surveys to the Q1 Mon 27/04/20 Fri 12/06/20 STRUCTURES (HIB23) U148 (9023) SCHEME agreed Target Cost including relocation 354 ROW Mardle Road CONSTRUCTION Mardle Road Linslade Linslade 2 Addof badger non slip setts. surface to both Black RJ/ External Q2,3,4 Wed 01/07/20 Wed 31/03/21 bridge on cycleway off Grovebury Road 355 ROW Park Avenue CONSTRUCTION Park Avenue Silsoe Silsoe & Shillington 1 Replaceand White Parapets Bridge at end of Mardle RJ Q1,2,3 Wed 01/04/20 Fri 13/11/20
356 BRIDGES & RESERVE LIST 2020-21 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 STRUCTURES 357 BRIDGES & Church End Farm (135) CONSTRUCTION ON HOLD School Lane Husborne Crawley Aspley & Woburn 2 Replacement RJ/ External Q2,3 Mon 20/07/20 Fri 09/10/20 STRUCTURES 358 BRIDGES & Flitwick Mill Br (262) CONSTRUCTION ON HOLD Greenfield Road Flitwick Flitwick 2 Civils/Brick work/ Strenghtning RJ/ External Q2 Mon 08/06/20 Fri 17/07/20 STRUCTURES
359 BRIDGES & Flitwick Mill Br (262) CONSTRUCTION ON HOLD Greenfield Road Flitwick Flitwick 2 Lining RJ/ External Q2 Mon 20/07/20 Fri 28/08/20 STRUCTURES
360 BRIDGES & Hulcote Mill Culvert (478) CONSTRUCTION ON HOLD Mill Lane Hulcote & Salford Cranfield & Marston 2 Strengthening External Q3 Mon 05/10/20 Fri 30/10/20 STRUCTURES Moretaine
361 BRIDGES & A507 Armco Culverts CONSTRUCTION ON HOLD A507 - Maulden - Clophill/Ampthill Ampthill 2 Design/ const. (2 Structures) RJ Q2 Mon 31/08/20 Fri 25/09/20 STRUCTURES Ampthill 362 BRIDGES & Blunham Railway Ret. Walls CONSTRUCTION ON HOLD Station Road Blunham Sandy 1 Construction for Demolition & regrading RJ Q4 Mon 11/01/21 Fri 19/02/21 STRUCTURES (UC020) of embankments 363 ROW ROW 2020-21 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
364 ROW ROW Capital budget CONSTRUCTION 1,2,3,4 RJ Q1,2 Fri 01/05/20 Fri 28/08/20
365 ROW Green Lane CONSTRUCTION Green Lane Stewartby Cranfield & Marston 2 Construction works as per Design LA RJ Q1,2,3 Wed 01/04/20 Fri 27/11/20 Moretaine 223065 366 ROW New Road CONSTRUCTION New Road Maulden Ampthill 2 Build bank stabilization along Footpath 4 External Q1,2,3,4 Fri 01/05/20 Thu 28/01/21 off New Road Maulden. The bank is 367 ROW ROW: OTHER FUNDING 25m long behind a brick building and Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
368 ROW High Street High Street Cranfield Cranfield & Marston 2 50x2 m of DBM overlay RJ Q1,2,3,4 Fri 01/05/20 Fri 29/01/21 Moretaine 369 ROW High Street W&T High Street Cranfield Cranfield & Marston 2 50x2 m of DBM overlay RJ Q1 Fri 01/05/20 Mon 01/06/20 Moretaine 370 ROW High Street CONSTRUCTION High Street Cranfield Cranfield & Marston 2 50x2 m of DBM overlay RJ Q1,2,3,4 Fri 01/05/20 Fri 29/01/21 Moretaine 371 ROW Potton Road (Around Edward CONSTRUCTION Potton Road Biggleswade Biggleswade North 1 Installation of Light Columns RJ Q1,2,3 Fri 01/05/20 Wed 04/11/20 Peake School -S106) 372 ROW Potton Road (Around Edward CONSTRUCTION Potton Road Biggleswade Biggleswade North 1 Construction based on Walk, Talk to RJ Q1 Wed 01/04/20 Tue 30/06/20 Peake School -S106) agree specification. 413m x 2m wide of footway surfacing Excavate and tip existing material to half construction depth Option 1 footway DBM spec Option 2 Screened road arising blinded with limestone 6mm to dust
374 ROW Dunton Lane (Ph2) Biggleswade Biggleswade South 1 Q1,2,3 Wed 01/04/20 Fri 23/10/20
375 ROW Dunton Lane (Ph1&2) W&T Dunton Lane Biggleswade Biggleswade South 1 Section2 to be completed with a RJ Q1 Wed 01/04/20 Thu 02/04/20 separate LA Code and in 2020… See 376 ROW Dunton Lane (Ph2) CONSTRUCTION Dunton Lane Biggleswade Biggleswade South 1 Section2Notes for tofull be description completed with a RJ Q1,2 Wed 01/04/20 Mon 31/08/20 separate LA Code and in 2020… See 377 ROW Dunton Lane (Ph1) CONSTRUCTION Dunton Lane Biggleswade Biggleswade South 1 Section2Notes for tofull be description completed with a RJ Q1,2,3 Fri 01/05/20 Fri 23/10/20 separate LA Code and in 2020… See Notes for full description
Page 4 CENTRAL BEDFORDSHIRE ANNUAL PLAN 2020-21 ID Workstream Task Name Stages Scheme Road Name Parish Ward Area Scheme Description Allocation Month LA Start Finish Status expected in 378 ROW Froghall Road/ Fordefield Road CONSTRUCTION Froghall Road Ampthill Ampthill 2 1.1km x 2.5m of public cycleway to be RJ Q1,2,3 Fri 01/05/20 Fri 23/10/20 created. Excavate 75mm depth and put 379 ROW Mill Lane CONSTRUCTION Mill Lane Flitton & Greenfield Westoning, Flitton & 2 Replaceto both sides.Lay existing bridgeand compact with new 150mm External Q1 Wed 01/04/20 Tue 23/06/20 Greenfield bridleway Bridge 380 ROW Curlew Croft CONSTRUCTION Curlew Croft Leighton Buzzard Leighton Buzzard 2 Replace existing bridge with new External Q1,2,3,4 Fri 01/05/20 Thu 28/01/21 South bridleway Bridge 381 ROW Park Road CONSTRUCTION Park Road Westoning Westoning, Flitton & 2 Replace Bridge External Q4 Thu 05/11/20 Fri 04/12/20 Greenfield 382 ROW Bedford Road CONSTRUCTION C/ OVER Bedford Road Silsoe Silsoe & Shillington 1 Supply and install 6m long x 1.5m External Q1 Fri 01/05/20 Mon 01/06/20 SCHEME pedestrian kit bridge galvanised steel 383 ROW Baden Powell Way CONSTRUCTION C/ OVER Baden Powell Way Biggleswade Biggleswade North 1 Supplybeam with and timber install deck.5m long x 1.5m External Q1 Fri 01/05/20 Mon 01/06/20 SCHEME Biggleswade South pedestrian kit bridge galvanised steel 384 ROW Gypsy Lane CONSTRUCTION C/ OVER Gypsy Lane Old Warden Northill 1 Supplybeam with and timber install deck.8m long x 1.2m External Q1 Fri 01/05/20 Mon 01/06/20 SCHEME pedestrian kit bridge galvanised steel 385 ROW Girtford Bridge Slip Road CONSTRUCTION A603 Slip Road Sandy Sandy 1 Deliverybeam with of timbera surfaced deck cycleway 2m x RJ Q1,2,3,4 Fri 01/05/20 Thu 28/01/21 1.5km long from Girtford Bridge to the 386 ROW Watling Street Houghton Regis Houghton Hall 3 Q1,2 Wed 01/04/20 Tue 04/08/20 387 ROW Half Moon Lane. (Company doing W&T ADDED Half Moon Lane Dunstable Dunstable Manshead 3 WT for screened plannings surfacing RJ Q1 Wed 01/04/20 Tue 30/06/20 vegetation clearance aspires to 388 ROW Parkdeliver Avenue the scheme. TBC) W&T ADDED Park Avenue Silsoe Silsoe & Shillington 1 Replace Parapets RJ Q1,2,3 Wed 01/04/20 Fri 13/11/20
389 ROW Mardle Road W&T ADDED Mardle Road Linslade Linslade 2 Add non slip surface to both Black RJ/ External Q2,3,4 Wed 01/07/20 Wed 31/03/21 bridge on cycleway off Grovebury Road 390 ROW High Street W&T ADDED High Street Arlesey Arlesey 1 DBMand White repair Bridge 80x4m at Arlesey end of Mardlefootpath 1. RJ Q1,2 Mon 01/06/20 Fri 21/08/20 Near School, preferrably during school 391 ROW Church Road W&T ADDED Church Road Stotfold Stotfold & Langford 1 36m2hols. of new footway construction. RJ Q1 Mon 06/04/20 Fri 17/04/20 105m2 of Overlay. Paths around St 392 ROW Hitchin Street W&T ADDED Hitchin Street Biggleswade Biggleswade South 1 InstallationMarys Church of x6 Light Columns RJ Q2 Mon 03/08/20 Fri 07/08/20
393 ROW Sundon Road W&T ADDED Sundon Road Chalton Toddington 3 Flight of steps RJ Q1 Fri 01/05/20 Tue 30/06/20
394 ROW Hollicks Lane W&T ADDED Hollicks Lane Kensworth Caddington 3 Flight of steps RJ Q1,2 Fri 01/05/20 Mon 31/08/20
395 ROW Watling Street W&T ADDED BUT Watling Street Houghton Regis Houghton Hall 3 The walk, talk build of three sets of RJ Q4 Fri 29/01/21 Thu 29/04/21 ON HOLD steps in Houghton Regis. Two steps on 396 ROW Woburn Road CONSTRUCTION Woburn Road Lidlington Cranfield & Marston 2 1500m2Watling StreetPlacement South of of normal the roundabout aggregate RJ Q1,2 Wed 01/04/20 Fri 28/08/20 Moretaine and recycling material (plannings) & 397 ROW RESERVE LIST 2020-21 granite dust. Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
398 ROW Mill Lane CONSTRUCTION ON HOLD Mill Lane Biggleswade Biggleswade South 1 Rebuild, Refurb or replacement of External Q3 Thu 05/11/20 Wed 18/11/20 motorway crash barrier bridge 399 ROW Church Road CONSTRUCTION ON HOLD Church Road Flitwick Flitwick 2 Replace Bridge External Q3 Thu 05/11/20 Fri 04/12/20
400 ROW Steppingley Road (Opp Jctn w/ CONSTRUCTION ON HOLD Steppingley Road Flitwick Flitwick 2 1000x2m Screen planning surfacing RJ Q1,2 Tue 23/06/20 Fri 21/08/20 Windmill Rd) 401 ROW The Ridgeway (Girtford Bridge CONSTRUCTION ON HOLD The Ridgeway Moggerhanger Northill 1 Construction of a 1.5km x 2m cycleway RJ Q1,2,3,4 Fri 01/05/20 Thu 28/01/21 Main Section) over an existing footpath from The 402 ROW Greenfields CONSTRUCTION ON HOLD Greenfields Shillington Silsoe & Shillington 1 18x3mRidgeway, slope Moggerhanger to be surfaced. to GirtfordPossible RJ Q1,2,3,4 Fri 01/05/20 Thu 28/01/21 brusheed concrete finished. 403 ROW Kimberwell Close (path off) CONSTRUCTION ON HOLD Kimberwell Close Toddington Toddington 3 40mx3m of concrete slabs RJ Q1,2,3,4 Fri 01/05/20 Fri 29/01/21
404 ROW Girtford Bridge Cycleway Culvert DESIGN ON HOLD The Ridgeway Moggerhanger Northill 1 Deliver the widening of an existing RJ Q2,3,4 Mon 31/08/20 Thu 28/01/21 culvert close to the DS Smith Packaging 405 ROW Girtford Bridge Cycleway Culvert CONSTRUCTION ON HOLD The Ridgeway Moggerhanger Northill 1 Deliverfactory the widening of an existing RJ Q1 Fri 01/05/20 Fri 28/05/21 culvert close to the DS Smith Packaging 406 ROW Watling Street FEE PROPOSAL ON HOLD Watling Street Houghton Regis Houghton Hall 3 Feefactory Proposal for a design scheme for a RJ Q1,2,3 Thu 04/06/20 Wed 07/10/20 pegasus Xing. Near Sewell Lane 407 ROW Watling Street DESIGN ON HOLD Watling Street Houghton Regis Houghton Hall 3 Design scheme for a pegasus Xing. RJ Q1,2,3 Thu 04/06/20 Wed 07/10/20 Near Sewell Lane 408 ROW Watling Street CONSTRUCTION ON HOLD Watling Street Houghton Regis Houghton Hall 3 Construction scheme for a pegasus RJ Q1,2,3,4 Fri 01/05/20 Thu 28/01/21 Xing. Near Sewell Lane 409 ROW High Street CONSTRUCTION ON HOLD High Street Cranfield Cranfield & Marston 2 See notes for further description. RJ Q4 Fri 01/01/21 Wed 31/03/21 Moretaine 410 ROW Woburn Road W&T ON HOLD Woburn Road Lidlington Cranfield & Marston 2 Walk, Talk to be repeated with sub RJ Q2,3 Wed 01/07/20 Fri 27/11/20 Moretaine contractor WT Screened road plannings surfacing 411 ROW Woburn Road CONSTRUCTION ON HOLD Woburn Road Lidlington Cranfield & Marston 2 1500m2 Placement of normal aggregate RJ Q1,2,3 Wed 01/04/20 Fri 27/11/20 Moretaine and recycling material (plannings) & 412 ROW Mill Lane CONSTRUCTION Mill Lane Biggleswade Biggleswade South 1 Constructiongranite dust. of Stage 1a Concept RJ Q1,2,3,4 Fri 01/05/20 Fri 29/01/21 Design of a series of discrete bank 413 HIGHWAYS HIGHWAYS PLANNED repairs along Footpath Biggleswade 21 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 PLANNED MAINTENANCE 414 MAINTENANCEHIGHWAYS PLANNED Highways Planned Maintenance REACTIVE various locations various locations various locations 1,2,3 Reactive works. A single budget line Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 MAINTENANCE Area 1 is required per areas 1,2,3 415 ROW Hitchin Street CONSTRUCTION Hitchin Street Biggleswade Biggleswade South 1 Installation of x6 Light Columns RJ Q2 Mon 03/08/20 Fri 07/08/20
416 ROW High Street CONSTRUCTION High Street Arlesey Arlesey 1 DBM repair 80x4m Arlesey footpath 1. RJ Q1,2 Mon 01/06/20 Fri 21/08/20 Near School, preferrably during school 417 ROW Warden Road CONSTRUCTION Warden Road Northill Northill 1 Vegetationhols. clearance; (Trees) External Q1,2,3,4 Fri 01/05/20 Thu 28/01/21
418 HIGHWAYS PLANNED Highways Planned Maintenance REACTIVE various locations various locations various locations 1,2,3 Reactive works. A single budget line is Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 MAINTENANCE Area 2 required per areas 1,2,3 419 HIGHWAYS PLANNED Highways Planned Maintenance REACTIVE various locations various locations various locations 1,2,3 Reactive works. A single budget line Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 MAINTENANCE Area 3 is required per areas 1,2,3 420 ROW Harlington 1 DBM Wingate Road Harlington Toddington 3 RJ Q1 Wed 01/04/20 Tue 30/06/20
421 ROW Harlington 1 DBM W&T Wingate Road Harlington Toddington 3 repair the surface of existing DBM RJ Q1 Wed 01/04/20 Tue 05/05/20 footway between Robinson Crescent 422 ROW Harlington 1 DBM CONSTRUCTION Wingate Road Harlington Toddington 3 repairand Churchills the surface passing of existing across DBM Wingate RJ Q1 Mon 27/04/20 Tue 30/06/20 footway between Robinson Crescent 423 ROW Half Moon Lane. (Company doing CONSTRUCTION Half Moon Lane Dunstable Dunstable Manshead 3 Fencingand Churchills works. passing across Wingate RJ Q1,2 Mon 01/06/20 Fri 28/08/20 vegetation clearance aspires to deliver the scheme. TBC) 424 ROW Hillyfields CONSTRUCTION Hillyfields Dunstable Dunstable Watling 3 DBM surfacing on Dunstable 11 RJ Q1 Wed 01/04/20 Mon 01/06/20
425 POTHOLE ACTION POTHOLE ACTION FUND Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 FUND
426 POTHOLE ACTION PAF Area 1 REACTIVE various locations various locations various locations 1,2,3 Budget to be confirmed Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 FUND 427 POTHOLE ACTION PAF Area 2 REACTIVE various locations various locations various locations 1,2,3 Budget to be confirmed Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 FUND 428 POTHOLE ACTION PAF Area 3 REACTIVE various locations various locations various locations 1,2,3 Budget to be confirmed Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 FUND 429 HIGHWAYS HIGHWAYS TRAFFIC Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TRAFFIC SIGNALS SIGNALS 430 REVENUE REVENUE PROGRAMME Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
431 REVENUE MISCELLANEOUS various locations various locations Central Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Beds 432 REVENUE Crown Damage Repairs REACTIVE various locations various locations various locations Central Beds Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
433 REVENUE Private Vehicle Crossovers REACTIVE various locations various locations various locations Central Beds Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
434 REVENUE Fixed Cost Services REACTIVE various locations various locations various locations Central Beds Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
435 REVENUE Busway Maint. Of Segregated REACTIVE various locations various locations various locations Central Beds Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Sections 436 REVENUE Commuted Sums REACTIVE various locations various locations various locations Central Beds Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
437 REVENUE Rechargeable works REACTIVE various locations various locations various locations Central Beds Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
438 REVENUE Emergency Response REACTIVE various locations various locations various locations Central Beds Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
439 REVENUE Drainage works REACTIVE various locations various locations various locations Central Beds Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
440 REVENUE WINTER MAINTENANCE various locations various locations Central Q2,3,4 Tue 01/09/20 Wed 31/03/21 Beds 441 REVENUE Winter Maintenance-lump sum REACTIVE various locations Winter Maintenance Works Q2,3,4 Tue 01/09/20 Wed 31/03/21
442 REVENUE Winter Maintenance-ad-hoc REACTIVE various locations Winter Maintenance Works; Ad Hoc/ Q2,3,4 Tue 01/09/20 Wed 31/03/21 Reactive 443 REVENUE HIGHWAYS AREA TEAM various locations various locations Central Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Beds 444 HIGHWAYS AREA Highways Area Team 1 REACTIVE various locations various locations various locations Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TEAMS 445 HIGHWAYS AREA Highways Area Team 2 REACTIVE various locations various locations various locations Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TEAMS 446 HIGHWAYS AREA Highways Area Team 3 REACTIVE various locations various locations various locations Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 TEAMS 447 REVENUE Highways Traffic Signals REACTIVE various locations various locations various locations Central Beds Ad hoc, reactive works Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
448 REVENUE HIGHWAYS BRIDGES various locations various locations Central Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Beds 449 Safety Fencing (Structures & County Wide CBC Wide CBC Wide Central Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Highways) Beds 450 INSPECTIONS & Safety Barriers – replacement/ CONSTRUCTION Central Beds Budget dependant Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 APPRAISALS removal 451 BRIDGE Bridge Joints Replacements County Wide CBC Wide CBC Wide 1 Budget dependant Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 STRENGTHENING 452 BRIDGE Sandy Bridge A603 (120) CONSTRUCTION Sandy Road Sandy Sandy 1 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 STRENGTHENING 453 BRIDGE Braystone House Culver C70 Braystone 2 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 STRENGTHENING 454 BRIDGE Braystone House Culver C70 CONSTRUCTION Central Beds Braystone 2 External Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 STRENGTHENING 455 BRIDGE Braystone House Culver C70 CONSTRUCTION Central Beds Braystone 2 External Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 STRENGTHENING 456 BRIDGES & Assessments & Reports County Wide CBC Wide Q1 Mon 06/04/20 Thu 28/05/20 STRUCTURES 457 BRIDGES & Stanbridgeford Cul (312) Stanbridgeford Stanbridge/ Totternhoe Heath & Reach/ Eaton 3 Assessment & Reports RJ Q1 Mon 06/04/20 Fri 24/04/20 STRUCTURES Road Bray 458 BRIDGES & Stanbridgeford Cul (312) DESIGN Stanbridgeford Road Stanbridge/ Totternhoe Heath & Reach/ Eaton 3 Assessment & Reports for Parapet RJ Q1 Mon 06/04/20 Fri 24/04/20 STRUCTURES Bray Design 459 BRIDGES & Stanbridgeford Cul (312) CONSTRUCTION Stanbridgeford Road Stanbridge/ Totternhoe Heath & Reach/ Eaton 3 Assessment & Reports RJ Q1 Mon 06/04/20 Fri 24/04/20 STRUCTURES Bray 460 BRIDGES & Holwelbury Culvert DESIGN A600 Stondon Arlesey 1 Assessment & Reports RJ Q1 Mon 18/05/20 Thu 28/05/20 STRUCTURES 462 BRIDGES & Park Bridge DESIGN Hill Lane (U158) Old Warden Northill 1 Assessment (Skew End) RJ Q1 Mon 18/05/20 Thu 28/05/20 STRUCTURES 463 BRIDGES & Inspections County Wide County Wide Q1 Wed 01/04/20 Fri 15/05/20 STRUCTURES 464 BRIDGES & General Inspections Conty Wide County Wide 3 cyclic schemes carried out throughout RJ Q1 Wed 01/04/20 Tue 21/04/20 STRUCTURES the year on a Rolling Programme 465 BRIDGES & Principle Inspections Conty Wide County Wide 3 cyclic schemes carried out throughout RJ Q1 Mon 06/04/20 Fri 24/04/20 STRUCTURES the year on a Rolling Programme 467 BRIDGES & Confined Space Inspections Conty Wide County Wide 3 cyclic schemes carried out throughout RJ Q1 Mon 06/04/20 Fri 24/04/20 STRUCTURES the year on a Rolling Programme 468 BRIDGES & Harlington Rd. Embankment - CONSTRUCTION ON HOLD Harlington Road Toddington Toddington 2 Embankment Stabilisation & Footpath External Q1 Mon 20/04/20 Fri 15/05/20 STRUCTURES Stabilisation- to stay in capital (B5120) reconstruction - (provisional), budget although works are to be done by dependant Page 5 CENTRAL BEDFORDSHIRE ANNUAL PLAN 2020-21 ID Workstream Task Name Stages Scheme Road Name Parish Ward Area Scheme Description Allocation Month LA Start Finish Status expected in 469 STRUCTURES General Ad-Hoc advice County Wide County Wide Q1 Wed 01/04/20 Thu 07/05/20 470 HIGHWAYS STREET HIGHWAYS STREET LIGHTING County Wide County Wide Central Inspect & Repair various locations Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 LIGHTING Beds 471 CAR PARK CAR PARK MAINTENANCE Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 MAINTENANCE 472 Car Park Maintenance REACTIVE Various 1,2,3 Inspect & Repair various locations RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
473 Car Park Lines REACTIVE Various 1,2,3 Inspect & Repair various locations RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
474 Car Park Schemes REACTIVE Various 1,2,3 Inspect & Repair various locations RJ Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
475 EXTERNALLY FUNDED Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 SCHEMES 476 INTERDEPARTMENTAL INTERDEPARTMENTAL FUNDING Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 FUNDING 478 INTERDEPARTMENTAL St Andrew's (West) Biggleswade Biggleswade North 1 Shotmead street. School expansion. Q1,2,3,4 Tue 01/12/20 Wed 31/03/21 FUNDING Signs and lines and crossing points. 479 INTERDEPARTMENTAL Lancot Challenger Academy Dunstable Dunstable Watling 3 move to school programme Q3 Thu 01/10/20 Thu 31/12/20 FUNDING 480 INTERDEPARTMENTAL Lancot Challenger Academy DESIGN Lancot Drive Dunstable Dunstable Watling 3 Parking on verges outside school which RJ Q3 Thu 01/10/20 Thu 31/12/20 FUNDING is causing blocking access to Lancot 481 INTERDEPARTMENTAL New Fairfield Park Lower CONSTRUCTION Dickens Boulevard Stotfold Stotfold & Langford 1 MeasuresPlace - Extend to mitigate SKCs the+TRO. impact Budget of the will RJ Q3 Thu 01/10/20 Thu 31/12/20 FUNDING school expansion. Possibility of 482 INTERDEPARTMENTAL Church End Lower New Site (Forrest DESIGN Church Walk Marston Moretaine Cranfield & Marston 2 Measuresintegration toin mitigatethe Schools the impactfor the ofFuture the RJ Q3 Thu 01/10/20 Thu 31/12/20 FUNDING End) Moretaine school expansion. Possibility of 483 INTERDEPARTMENTAL Snow Hill CONSTRUCTION Snow Hill Maulden Ampthill 2 Lightingintegration and in or the footway Schools widening for the Futureon RJ Q1,2 Wed 01/04/20 Fri 31/07/20 FUNDING snow hill btween Ampthill and Maulden 484 INTERDEPARTMENTAL Engayne Avenue DETAILED DESIGN C/ OVER Engayne Avenue Sandy Sandy 2 design(upgrades) costs to for help carry with over children scheme walking for RJ Q1 Thu 23/04/20 Mon 25/05/20 FUNDING SCHEME cbc external 485 INTERDEPARTMENTAL Housing Parking Schemes Q2,3,4 Wed 01/07/20 Thu 31/12/20 FUNDING 486 INTERDEPARTMENTAL Benetts Close DESIGN Benetts Close Dunstable Dunstable Central 3 Creation of adaptions for housing RJ Q2,3,4 Wed 01/07/20 Thu 31/12/20 FUNDING parking area 487 INTERDEPARTMENTAL Priory Road DESIGN Priory Road Dunstable Dunstable Central 3 Creation of adaptions for housing RJ Q2,3,4 Wed 01/07/20 Thu 31/12/20 FUNDING parking area 488 INTERDEPARTMENTAL Park Avenue DESIGN Park Avenue Totternhoe Eaton Bray 3 Creation of adaptions for housing RJ Q2,3,4 Wed 01/07/20 Thu 31/12/20 FUNDING parking area 489 INTERDEPARTMENTAL Chartmoor Road CONSTRUCTION Chartmoor Road Leighton Buzzard Leighton Buzzard 3 300 linear mtrs footways widening RJ Q1,2,3 Wed 01/04/20 Fri 30/10/20 FUNDING South 490 INTERDEPARTMENTAL Sunderland Road CONSTRUCTION Sunderland Road Sandy Sandy 1 Shared use path Q1,2 Wed 01/04/20 Mon 31/08/20 FUNDING 491 INTERDEPARTMENTAL A 507 Millbrook CONSTRUCTION Woburn Aspley & Woburn 2 Bus Stop works. RJ Q1,2,3 Wed 01/04/20 Fri 30/10/20 FUNDING 492 INTERDEPARTMENTAL RESERVE LIST 2020-21 Wed 01/04/20 Wed 31/03/21 FUNDING 493 INTERDEPARTMENTAL St Andrew's (West) DESIGN ON HOLD Shortmead Street Biggleswade Biggleswade North 1 RJ Q1,2,3 Wed 01/04/20 Thu 30/07/20 FUNDING 494 INTERDEPARTMENTAL Spinney Crescent DESIGN ON HOLD Spinney Crescent Dunstable Dunstable Northfields 3 Creation of adaptions for housing RJ Q1,2,3 Wed 01/04/20 Thu 01/10/20 FUNDING parking area 495 INTERDEPARTMENTAL Housing Parking Schemes 5 DESIGN ON HOLD Ad hoc 2,3 More information available once CO Q1,2,3 Wed 01/04/20 Thu 01/10/20 FUNDING receives data from third party 496 INTERDEPARTMENTAL Old Oak Close CONSTRUCTION ON HOLD Arlesey Station Arlesey Arlesey 1 Interchange Facilities Q1,2,3 Wed 01/07/20 Fri 30/10/20 FUNDING 497 S106 S106 PROGRAMME Wed 01/04/20 Wed 31/03/21
498 S106 Taylors & Astwick Roads, Stotfold Astwick Road Stotfold Stotfold & Langford 1 Junction improvements - Astwick Q2 Fri 07/08/20 Wed 30/09/20 Road j/w The Green and Taylors Road j/w Astwick Road 499 S106 Taylors & Astwick Roads, CONSTRUCTION Astwick Road Stotfold Stotfold & Langford 1 Junction improvements - Astwick Road Q2 Fri 07/08/20 Wed 30/09/20 Stotfold j/w The Green and Taylors Road j/w 500 S106 Orchard Close j/w Hitchmead Rd, Orchard Close Biggleswade Biggleswade North 1 JunctionAstwick Road improvements incl. new Q2 Mon 24/08/20 Fri 11/09/20 Biggleswade Biggleswade South crossing and DYLs 501 S106 Orchard Close j/w Hitchmead Rd, CONSTRUCTION Orchard Close Biggleswade Biggleswade North 1 Junction improvements incl. new Q2 Mon 24/08/20 Fri 11/09/20 Biggleswade Biggleswade South crossing and DYLs 502 S106 Potton Road Crossing ON HOLD Potton Road Biggleswade Biggleswade North 1 Toucan crossing Q1,3,4 Mon 06/04/20 Fri 11/12/20
503 S106 Potton Road Crossing DETAILED DESIGN ON HOLD Potton Road Biggleswade Biggleswade North 1 Toucan crossing Q1 Mon 06/04/20 Fri 26/06/20
504 S106 Potton Road Crossing CONSTRUCTION ON HOLD Potton Road Biggleswade Biggleswade North 1 Toucan crossing Q3,4 Mon 05/10/20 Fri 11/12/20
505 S106 Dunstable Road, Caddington Dunstable Road Dunstable Caddington 3 Footway widening Q2,4 Mon 10/08/20 Wed 31/03/21
506 S106 Dunstable Road, Caddington DETAILED DESIGN Dunstable Road Caddington Caddington 3 Footway widening Q2,3 Mon 10/08/20 Fri 30/10/20
507 S106 Dunstable Road, Caddington CONSTRUCTION Dunstable Road Caddington Caddington 3 Footway widening Q4 Mon 08/02/21 Wed 31/03/21
508 S106 Crab Lane jw Lawrence Road Crab Lane Biggleswade Biggleswade North 1 Shared use footpath and signage, Q1,2 Mon 15/06/20 Fri 21/08/20 and uncontrolled crossing. 513 S106 Stanford Lane, Clifton New Road Clifton Arlesey 1 New shared use footway, crossing Q2,3 Mon 20/07/20 Fri 05/02/21 and traffic calming measures. 514 S106 Stanford Lane, Clifton DETAILED DESIGN New Road Clifton Arlesey 1 New shared use footway, crossing and Q2,3 Mon 20/07/20 Fri 09/10/20 traffic calming measures. 515 S106 Stanford Lane, Clifton CONSTRUCTION New Road Clifton Arlesey 1 New shared use footway, crossing and Q4 Mon 04/01/21 Fri 05/02/21 traffic calming measures. 516 S106 Millbrook Station Cycle Hangar Station Road Marston Moretaine Cranfield & Marston 2 New cycle hangar Q2 Mon 27/07/20 Fri 07/08/20 Moretaine 517 S106 Millbrook Station Cycle Hangar CONSTRUCTION Station Road Marston Moretaine Cranfield & Marston 2 New cycle hangar Q2 Mon 27/07/20 Fri 07/08/20 Moretaine 518 S106 Drakes Avenue Lighting Columns Drakes Avenue Leighton Buzzard Leighton Buzzard 2 Installation of lighting columns Q1,3 Mon 29/06/20 Fri 21/08/20 North 519 S106 Drakes Avenue Lighting Columns CONSTRUCTION Drakes Avenue Leighton Buzzard Leighton Buzzard North 2 Installation of lighting columns Q1,3 Mon 29/06/20 Fri 21/08/20
520 S106 Grovebury Road Vehicle Grovebury Road Leighton Buzzard Leighton Buzzard 2 Footway and vehicle crossover Q3,4 Mon 14/09/20 Fri 13/11/20 Accesses South improvements
521 S106 Grovebury Road Vehicle CONSTRUCTION Grovebury Road Leighton Buzzard Leighton Buzzard 2 Footway and vehicle crossover Q3,4 Mon 14/09/20 Fri 13/11/20 Accesses South improvements
522 S106 High Street Crossing, High Street Biggleswade Biggleswade North 1 Footway improvements, buildouts Q2,3 Mon 03/08/20 Fri 02/10/20 Biggleswade Biggleswade South and zebra crossing 523 S106 High Street Crossing, CONSTRUCTION High Street Biggleswade Biggleswade North 1 Footway improvements, buildouts and Q2,3 Mon 03/08/20 Fri 02/10/20 Biggleswade Biggleswade South zebra crossing 524 S106 French's Avenue, Dunstable Frenchs Avenue Dunstable Dunstable Northfields 3 Improvements to cycle and Q1 Mon 27/04/20 Fri 19/06/20 pedestrain routes and poublic 525 S106 French's Avenue, Dunstable CONSTRUCTION Frenchs Avenue Dunstable Dunstable Northfields 3 Improvementstransport including: to cycle buildout and pedestrain at Q1 Mon 27/04/20 Fri 19/06/20 routes and poublic transport including: 526 S106 Vimy Road, Linslade Vimy Road Leighton Buzzard Linslade 2 Solarbuildout floor-level at southern lighting footway, and pedestrian Q1,2 Mon 08/06/20 Fri 10/07/20 post&rail fencing along river footpath 527 S106 Vimy Road, Linslade CONSTRUCTION ON HOLD Vimy Road Leighton Buzzard Linslade 2 Solar floor-level lighting and post&rail Q1,2 Mon 08/06/20 Fri 10/07/20 fencing along river footpath 528 S106 Land off Swaffield Close, Ampthill Woburn Road Ampthill Ampthill 2 Shared-use footpath along verge of Q2,3,4 Mon 22/06/20 Fri 12/02/21 Woburn Road 529 S106 Land off Swaffield Close, Ampthill DETAILED DESIGN Woburn Road Ampthill Ampthill 2 Shared-use footpath along verge of Q2 Mon 22/06/20 Fri 11/09/20 Woburn Road 530 S106 Land off Swaffield Close, Ampthill CONSTRUCTION Woburn Road Ampthill Ampthill 2 Shared-use footpath along verge of Q4 Mon 25/01/21 Fri 12/02/21 Woburn Road 531 S106 Red Lion Close, Cranfield Red Lion Close Cranfield Cranfield & Marston 2 Buildout, bollards and road markings Q2 Mon 14/09/20 Fri 16/10/20 Moretaine 532 S106 Red Lion Close, Cranfield CONSTRUCTION Red Lion Close Cranfield Cranfield & Marston Buildout, bollards and road markings Q2 Mon 14/09/20 Fri 16/10/20 Moretaine 533 S106 Church Lane Church Lane Arlesey Arlesey 1 Crossing Installation Q2 Wed 01/07/20 Wed 30/09/20
534 S106 Church Lane CONSTRUCTION Church Lane Arlesey Arlesey 1 Crossing Installation Q2 Wed 01/07/20 Wed 30/09/20
535 S106 Windmill Road Phase 3 Windmill Road Flitwick Flitwick 1 Footpath 15 culvert and approaches Q2 Wed 01/07/20 Wed 30/09/20
536 S106 Windmill Road Phase 3 CONSTRUCTION Windmill Road Flitwick Flitwick 1 Footpath 15 culvert and approaches Q2 Wed 01/07/20 Wed 30/09/20
537 INTEGRATED High Street CONSTRUCTION High Street Langford Stotfold & Langford 1 Bus Stop Improvements RJ Q1,2 Wed 01/04/20 Wed 30/09/20 TRANSPORT 538 MAJORS MAJORS PROGRAMME Wed 01/04/20 Wed 31/03/21
539 MAJORS MAJOR ROAD SCHEMES Steve Lakin to submit data Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
540 MAJORS A421 Dualling M1 J13 to Milton CONSTRUCTION C/ OVER A 421 Aspley Guise 2 The existing A421 is to be upgraded to a Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Keynes -Construction to continue SCHEME dual 2-lane carriageway from M1 541 MAJORS M1-A6-J11ainto next year. to To Sundon be completed Park Rd M1-A6 Chalton, Sundon 3 Junction 13 to Milton Keynes Magna Q1,2,3,4 Wed 01/04/20 Wed 31/03/21
542 MAJORS M1-A6-J11a to Sundon Park DESIGN C/ OVER M1-A6 Chalton, Sundon, 3 New bypass. Bid submitted to Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Rd -Design to continue into SCHEME Sundon, Streatley DfT/LEP.TO issued in 2018/19 543 MAJORS M1-A6next year. Link To Rd be Scheme completed by C/ OVER M1-A6 Chalton, Sundon 3 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Development SCHEME 544 MAJORS M1-A6 Link Rd Transport C/ OVER M1-A6 Chalton, Sundon 3 Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 Planning SCHEME 545 MAJORS A 507 Junction capacity OUTLINE DESIGN A507 Various Junction capacity assessments Q1,2,3,4 Wed 01/04/20 Wed 31/03/21 assessments 546 MAJORS Dunstable High Street( Ph2 a to CONSTRUCTION Dunstable 3 Q2 Wed 01/07/20 Fri 29/10/21 e) 547 MAJORS Dunstable High Street( Ph2 a) CONSTRUCTION High Street South Dunstable Dunstable Watling 3 Construction for the DUNSTABLE HIGH External Q2,3 Wed 01/07/20 Fri 29/10/21 Dunstable Central STREET SOUTH PHASE 2A Bus stand 548 MAJORS Dunstable High Street( Ph2 b) CONSTRUCTION Queensway Dunstable Dunstable Icknield 3 Queenswayarea. & Northern Gateway External Q2,3 Wed 01/07/20 Fri 29/10/21
549 MAJORS Dunstable High Street( Ph2 c) CONSTRUCTION Dog Kennel Path Houghton Regis Houghton Hall 3 Dog Kennel Path External Q2,3 Wed 01/07/20 Fri 29/10/21
550 MAJORS Dunstable High Street( Ph2 d) CONSTRUCTION Court Drive Dunstable Dunstable Icknield 3 Court Drive External Q2,3 Wed 01/07/20 Fri 29/10/21
551 MAJORS Dunstable High Street( Ph2 e) CONSTRUCTION Dukeminster Road Dunstable Dunstable Icknield 3 Luton & Dunstable Busway Lighting External Q2,3 Wed 01/07/20 Fri 29/10/21
552 THIRD PARTY SCHEMES Wed 01/04/20 Wed 31/03/21
553 S38/278 Wed 01/04/20 Wed 31/03/21