IMPROVES-RE Improving Economic and Social impact of Rural Electrification Co-funded by EUROPEAN COMMISSION COOPENER INTERIM TECHNICAL IMPLEMENTATION REPORT PERIOD: 1st April 2005 – 31st July 2006 Contract N° EIE/04/133/S07.40682 IED ETC Foundation RISOE European coordination Innovation Energie Développement, 2 chemin de la chauderaie 69340 Francheville – France Tel. +33 4 72 59 13 20 – Fax : +33 4 72 5913 39 Email :
[email protected] IMPROVES-RE EIE/04/133/S07.40682 - Interiim techniicall iimpllementatiion report CONTENTS 1 INTRODUCTION 3 1.1 Global situation 3 1.2 Reminder on Work Packages arrangement and Project Schedule 4 1.3 Content of report 6 2 STATUS OF IMPLEMENTATION PER WORK PACKAGE 8 2.1 WP1: Review of planning approaches and institutional framework, and multi- sector data collection 8 WP1.1: Review of context (D2) 8 WP1.2: Cross sectorial partnerships 8 WP 1.3: Multi-sector data GIS (D3) 9 2.2 WP2: Integrating cross sectorial and geographic aspects in Rural Electrification Plans 9 WP2.1: Methodology of integrated cross-sectorial rural electrification planning 9 WP2.2: Integrating cross sectorial dimension in Rural Electrification Plans (D5) 16 2.3 WP3: Development of local Rural Electrification and multi-sectorial plans 21 WP3.1: The GIS Master planning tool GEOSIM© 21 WP3.2: Selection of pilot area 21 WP3.3: Elaboration of local Rural Electrification and multi-sector plans 23 2.4 WP 4: Local stakeholders mobilization 24 First results of the planning 24 WP4.1 and 4.2: Identification of local stakeholders and discussion of different