Your search for projects in State: ME, Total Results : 765
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Withdrawn Turner Village Park Trail Withdrawn $35,000 $8,750 $43,750
ME 2011 Withdrawn Motorized Trail Layer It continued the BPLs mapping project that Withdrawn $22,600 $5,650 $28,250
was started with 2008 RTP funds. There was
an intern who worked in the field collecting
GIS data with a GPS, brought this data into
the office with attributes and continued to put
more motorized layers...
ME 2011 Withdrawn Dead River Scenic Trail Withdrawn $30,000 $7,500 $37,500
ME 2011 Withdrawn Environmental Educator The Georges River Land Trust utilized the Withdrawn $5,000 $1,250 $6,250
services of an AmeriCorps Environmental
Educator to complete various works for their
trails. The project work included, assisting in
construction of a new three mile section of
trail in Searsmont, assisting...
ME 2012 Withdrawn Withdrawn $60,000 $15,000 $75,000
ME 2012 Withdrawn Trail improvement Projects Withdrawn $1,500 $375 $1,875
ME 2012 Withdrawn Withdrawn $1,200 $300 $1,500
ME 2012 Withdrawn Withdrawn $2,468 $617 $3,085
ME 2012 Withdrawn Withdrawn $13,141 $2,385 $15,526
ME 2013 Withdrawn Powerline Trail Withdrawn $8,000 $2,000 $10,000
ME 2014 Williams Stream Bridge Williams Stream Bridge Williams Stream Bridge Unspecified/Unidentifi $30,000 $7,500 $37,500
able
ME 2015 Scopan Unspecified/Unidentifi $20,000 $5,000 $25,000
able
ME 2015 Various ATV Trails Trail Rehab Project Rehabilitation Washington $35,000 $8,750 $43,750
ME 2015 Various ATV Trails Re-decking and Multiple Counties $82,470 $20,617 $103,087
maintenance of bridges
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2015 Wilton Trestle Bridge Re-deck and widen Wilton Franklin $30,000 $7,500 $37,500
Trestle Bridge
ME 2003 Southern Region Parks Trail Improvements Improvements Multiple Counties $89,800 $32,900 $122,700
Trails
ME 2018 Readfield Trail System Readfield Trail Infrastructure Infrastructure improvements 1 Kennebec $30,517 $13,839 $44,356
Improvements
ME 2018 Riverside Ski Trails Signage at Riverside Ski Signage 1 Cumberland $5,000 $1,250 $6,250
Trails
ME 1993 Stroudwater Crossing Bridge Installation Bridge 1 Cumberland $11,985 $34,500 $46,485
ME 1996 Vaughan Woods Trails Trail Improvements Improvements 1 York $4,760 $4,760 $9,520
ME 1996 Bradbury Mountain State 1 Cumberland $5,925 $5,925 $11,850
Park Trails
ME 1996 Augusta Walk Bike Trail Trail Construction Urban Walk/Bike Trail 1 Kennebec $42,000 $42,000 $84,000
ME 1997 Lincolnville Nature Trail Trail Construction Nature/Interpretive Trail 1 Waldo $4,500 $4,500 $9,000
ME 1997 Ferry Beach Trails Trail Improvements Trail Resurfacing 1 York $4,000 $4,840 $8,840
ME 1997 Bradbury Mountain State Trail Improvements Improvements to Park Trails 1 Cumberland $6,620 $6,620 $13,240
Park Trails
ME 1997 Mount Apatite Park Trails 1 Androscoggin $7,500 $7,500 $15,000
ME 1997 Dillenback Trails Paved Trail 1 Cumberland $16,000 $16,000 $32,000
ME 1997 Pools of Simeon Trails 1 Androscoggin $16,176 $16,176 $32,352
ME 1998 Camden Hills State Park Rehabilitate 1 Knox $2,000 $2,000 $4,000
ME 1998 Route 17 Rockport Trailhead Improvements Parking Area 1 Knox $5,995 $5,995 $11,990
ME 1998 Eastern Trail 1 York $5,800 $9,040 $14,840
ME 1998 Pennessewassee Park Trail 1 Oxford $7,500 $26,550 $34,050
ME 1999 Horsemen's Trail Equestrian Trail Equestrian Trail 1 Knox $5,207 $1,310 $6,517
ME 1999 Salt Bay Heritage Trail 1 Lincoln $6,999 $1,770 $8,769
ME 1999 Fort Knox Trail 1 Waldo $4,000 $4,000 $8,000
ME 1999 Lincolnville Trail Improvements Improvements 1 Waldo $18,440 $4,610 $23,050
ME 1999 Augusta Trails Trail Improvements Trail Repairs 1 Kennebec $22,000 $5,500 $27,500
ME 1999 Lombard/Gorham Land Acquisition Acquisition 1 Cumberland $25,000 $6,250 $31,250
ME 1999 Agamenticus Trail Multi-Use Trails 1 York $25,000 $8,872 $33,872
ME 1999 Gorham Loop Trail Winter Trail Improvements 1 Cumberland, York $25,000 $13,000 $38,000
ME 1999 Various State Parks Trail Improvements Work at 6 State Parks 1 Multiple Counties $59,400 $14,850 $74,250
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2000 Jamies Pond Trail Construct Trail 1 Kennebec $11,100 $3,350 $14,450
ME 2000 Pine Tree Arboretum Trail Trail Improvements 1 Kennebec $14,000 $4,180 $18,180
ME 2000 Wildlife Sanctuary Trail Construct Trail 1 Cumberland $19,500 $5,500 $25,000
ME 2000 Crystal Spring Farm Trails Construct Trail 1 Cumberland $26,500 $34,607 $61,107
ME 2001 Salt Bay Heritage Trail Trail Improvement, Bridge 1 Lincoln $7,900 $1,060 $8,960
ME 2001 Lowell Preserve Trail Construct Trail 1 Cumberland $7,040 $1,760 $8,800
ME 2001 Nature Trail Construct Trail 1 Sagadahoc $8,880 $2,220 $11,100
ME 2001 Waterfront Trail Construct Trail 1 Kennebec $30,000 $12,200 $42,200
ME 2001 Agamenticus Trail Trail Improvements 1 York $28,000 $12,701 $40,701
ME 2002 Smithfield Pltn Rec Trail Construct Trail 1 Kennebec $6,600 $4,948 $11,548
ME 2002 Pleasant River Bridge Bridge 1 Cumberland $30,000 $7,500 $37,500
ME 2002 Marginal Way Renovation 1 York $30,000 $7,500 $37,500
ME 2002 South Region Parks Trails Maintenance, Renovation 1 Cumberland, York $35,400 $8,850 $44,250
ME 2002 Boston and Maine Rail Bed Renovation 1 York $27,500 $13,000 $40,500
Trail
ME 2002 Mount Agamenticus Trails Improvements, Maintenance 1 York $25,575 $15,418 $40,993
ME 2003 Dodge Point Ravine Trail Construct Trail 1 Lincoln $2,300 $700 $3,000
ME 2003 Wells Reserve Boardwalk Boardwalk 1 York $3,300 $910 $4,210
ME 2003 Duck Trap Bridge 1 Waldo $5,300 $1,325 $6,625
ME 2003 Torsi Pond Trail Construct Trail 1 Kennebec $13,700 $3,672 $17,372
ME 2003 Boston and Maine Rail Bed Construct Trail 1 York $15,000 $9,505 $24,505
Trail
ME 2003 Fuller Farm Trail Parking, Bridge 1 Cumberland $20,000 $10,000 $30,000
ME 2003 Heritage Trail Construct Trail 1 Aroostook $25,000 $11,505 $36,505
ME 2003 Mount Agamenticus Trail Maintenance 1 York $20,000 $11,700 $31,700
ME 2003 North St. Recreation Trail Construct Trail 1 Kennebec $20,000 $37,000 $57,000
ME 2003 Walton Park ADA Trail Construct Trail, Parking 1 Cumberland $20,000 $91,500 $111,500
ME 2004 Various ATV Trails ATV Trail Work Project Motorized 1 Sagadahoc $9,066 $2,267 $11,333
ME 2004 Greenbelt Walkway Greenbelt Walkway Non-motorized 1 Cumberland $25,090 $6,273 $31,363
Extension Extension
ME 2004 Various State Parks South Region Parks Diverse 1 Cumberland $71,200 $17,800 $89,000
ME 2004 Fifteen Mile Stream Bridge Fifteen Mile Stream Bridge Motorized 1 Kennebec $30,000 $7,500 $37,500
Replacement
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2004 State Administration Administration Administration 1 Kennebec $19,277 $4,819 $24,096
ME 2004 Camden Hills State Park Maine Conservation Corps Diverse 1 Knox $30,000 $7,500 $37,500
Trail Project
ME 2004 Mount Agamenticus Trail Mount Agamenticus Trail Diverse 1 York $30,000 $7,500 $37,500
Remediation
ME 2005 Fore River Riverwalk Trail Non-motorized 1 Cumberland $20,000 $5,000 $25,000
ME 2005 Gull Crest Gull Crest Master Plan Motorized 1 Cumberland $15,000 $3,750 $18,750
Implementation
ME 2005 Unspecified/Unidentifiable Unspecified/Unidentifiable Non-motorized 1 Cumberland $15,000 $3,750 $18,750
ME 2005 Unspecified/Unidentifiable Unspecified/Unidentifiable Motorized 1 Cumberland $20,000 $5,000 $25,000
ME 2005 Crooked River Bridge Crooked River Bridge Motorized 1 Cumberland $29,992 $7,498 $37,490
ME 2005 Pine Tree Trail Pine Tree Trail 2005 Non-motorized 1 Kennebec $14,500 $3,625 $18,125
ME 2005 Apple Farm Crossing Non-motorized 1 Kennebec $15,000 $3,750 $18,750
Community Trail
ME 2005 State Administration Administration Administration 1 Kennebec $38,800 $9,700 $48,500
ME 2005 Camden Hills State Park Camden Hills Non-motorized 1 Knox $46,404 $11,601 $58,005
ME 2005 The Eaton Farm Coastal Non-motorized 1 Lincoln $20,000 $5,000 $25,000
Trail
ME 2005 Penny Lake Trail Non-motorized 1 Lincoln $15,000 $3,750 $18,750
ME 2005 Boothbay Educational/Interpretive Trail Safety and Environmental Education 1 Lincoln $5,000 $1,250 $6,250
Brochures
ME 2005 River Walk Trail River Walk Trail Non-motorized 1 York $15,000 $3,750 $18,750
ME 2005 Box Factory Trail Box Factory Trail Project Non-motorized 1 York $20,000 $5,000 $25,000
ME 2005 Saco Spirit River Walk Saco Spirit River Walk Safety and Environmental Education 1 York $2,000 $500 $2,500
Safety and Environmental
Education Project
ME 2006 Safety and Education Birding Trail Project Safety and Environmental Education 1 Androscoggin $4,000 $1,000 $5,000
ME 2006 Brunswick Town Commons Connecting Neighborhoods Non-motorized 1 Cumberland $27,500 $6,875 $34,375
to the Commons
ME 2006 Fuller Farm Trail Fuller Farm Trail Project Motorized 1 Cumberland $30,000 $7,500 $37,500
ME 2006 Various State Park Trails Diverse Trails Rehabilitation Diverse 1 Cumberland $0 Unknown $0
Projects
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2006 Chaffin Pond Interpretive Chaffin Pond Interpretive Safety and Environmental Education 1 Cumberland $3,592 $898 $4,490
Trail Trail Project
ME 2006 Safety and Education Trail Signs for Lyme Disease Safety and Environmental Education 1 Cumberland $4,352 $1,088 $5,440
Risk Project
ME 2006 Safety and Education Sanctuary Project Safety and Environmental Education 1 Cumberland $4,692 $1,173 $5,865
ME 2006 Augusta Nature Center Trail Augusta Nature Center Trail Non-motorized 1 Kennebec $27,500 $6,875 $34,375
Project Project
ME 2006 State Administration Contingency Funds Motorized 1 Kennebec $20,840 $5,210 $26,050
ME 2006 Various State Trails ORV Bulldozer Motorized 1 Kennebec $50,000 $12,500 $62,500
ME 2006 Public Information GIS Layering - Phase II Safety and Environmental Education 1 Kennebec $8,000 $2,000 $10,000
ME 2006 Camden Hills State Park Camden Hills State Park Non-motorized 1 Knox $28,279 $7,070 $35,349
Trail Renovation
ME 2006 Georges River Georges Land Trust Safety and Environmental Education 1 Knox $4,500 $1,125 $5,625
ME 2006 Bristol Recreation Trail Bristol Recreation Trail Diverse 1 Lincoln $7,000 $1,750 $8,750
Project
ME 2006 Shoreland Trail Shoreland Trail Education Safety and Environmental Education 1 Lincoln $4,693 $1,173 $5,866
Project
ME 2006 Sprague Pond Trail Motorized 1 Sagadahoc $9,359 $2,340 $11,699
ME 2007 Fore Riverwalk Project Fore Riverwalk Project Diverse 1 Cumberland $30,000 $7,500 $37,500
ME 2007 YMCA Cousins River Trail YMCA Cousins River Trail Non-motorized 1 Cumberland $30,000 $7,500 $37,500
Project
ME 2007 Pleasant Mountain Trails Pleasant Mountain Trails Diverse 1 Cumberland $29,000 $7,250 $36,250
Project
ME 2007 Various State Park Trails Park South Non-motorized 1 Cumberland $15,700 $3,925 $19,625
ME 2007 Bradbury Mountain State Bradbury Mountain/Mount Diverse 1 Cumberland $52,500 $13,125 $65,625
Park Trails, Mount Blue Blue/Sebago Trail
State Park Trails, Sebag Improvements
Lake State Park Trail
ME 2007 Pondicherry Park Pondicherry Park Acquisition Diverse 1 Cumberland $30,000 $7,500 $37,500
Project
ME 2007 State Administration Administration Administration 1 Kennebec $50,000 $12,500 $62,500
ME 2007 Hatchet Mountain Trail Hatchet Mountain Non-motorized 1 Knox $30,000 $7,500 $37,500
Acquisition/Trail Project
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2007 Camden Hills State Park Camden Hills State Park Non-motorized 1 Knox $47,291 $11,823 $59,114
Project
ME 2007 Camden Hills State Park Trail Improvements Diverse 1 Knox $4,761 $1,190 $5,951
ME 2007 Clough Point Town Preserve Clough Point Town Preserve Non-motorized 1 Lincoln $7,810 $1,953 $9,763
ME 2007 Center Pond Preserve Trails Center Pond Preserve Trails Diverse 1 Sagadahoc $9,200 $2,300 $11,500
Project Project
ME 2007 Marginal Way Marginal Way Restoration Non-motorized 1 York $30,000 $7,500 $37,500
ME 2008 Giant Stairs Trail Giant Stairs Trail Project Non-motorized 1 Cumberland $20,000 $5,000 $25,000
ME 2008 Ecomaine Ecomaine Trail Construction Non-motorized 1 Cumberland $27,000 $6,750 $33,750
Project
ME 2008 Various State Park Trails South Park Non-motorized Non-motorized 1 Cumberland $16,930 $4,233 $21,163
ME 2008 Various State Park Trails South Park Diverse 1 Cumberland $36,074 $9,019 $45,093
ME 2008 Safety and Education Project Paths Safety and Environmental Education 1 Cumberland $4,200 $1,050 $5,250
ME 2008 China School China School Community Non-motorized 1 Kennebec $23,000 $5,750 $28,750
Project
ME 2008 Bond Brook Trail Bond Brook Trail Project Diverse 1 Kennebec $29,000 $7,250 $36,250
ME 2008 Statewide Bureau of Parks and Land Non-motorized 1 Kennebec $9,000 $2,250 $11,250
Map
ME 2008 Statewide Bureau of Parks and Land Diverse 1 Kennebec $12,000 $3,000 $15,000
Map
ME 2008 Statewide Bureau of Parks and Land Motorized 1 Kennebec $9,000 $2,250 $11,250
Motor Map
ME 2008 Safety and Education Trailhead Education Project Safety and Environmental Education 1 Kennebec $3,150 $788 $3,938
ME 2008 Camden Hills State Park Camden Diverse 1 Knox $48,000 $12,000 $60,000
ME 2008 River Trail Walk River Trail Walk Project Non-motorized 1 York $20,000 $5,000 $25,000
ME 2008 Mount Agamenticus Trail Mount Agamenticus Trail Diverse 1 York $29,000 $7,250 $36,250
Remediation Project
ME 2008 Boston and Maine Rail Bed Boston and Maine Rail Bed Diverse 1 York $29,000 $7,250 $36,250
Trail Trail Project - Phase III
ME 2008 Mousam River Bridge Mousam River Bridge Motorized 1 York $45,000 $11,250 $56,250
ME 2008 Ferry Beach Interpretive Trail Ferry Beach Interpretive Trail Safety and Environmental Education 1 York $15,507 $3,877 $19,384
Project
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2008 Mount Agamenticus Mount Agamenticus Safety and Environmental Education 1 York $5,000 $1,250 $6,250
Environmental Education
Project
ME 2009 New Trails New Trails Trails on town property including bridge 1 Cumberland $22,055 $5,514 $27,569
ME 2009 Quarry Woods Trail Quarry Woods Trail Project 431' of bog bridging, re-route a steep section 1 Cumberland $9,241 $2,310 $11,551
of trail, and create navigational signage.
ME 2009 Lobster Cove Trail Lobster Cove Trail Rehab 800 feet on trail on Monhegan 1 Lincoln $10,452 $2,613 $13,065
Reconstruction Project Reconstruction Project
ME 2009 Cross Country Trail Cross-Country Trail 1.0 mile trail on the grounds of Noble High 1 York $7,925 $1,981 $9,906
School
ME 2009 Rehabilitate Trails Rehabilitate Trails Rehab a trail that connects with town's multi 1 York $4,184 $1,046 $5,230
use trail - a 600' section of the Mousam Way
footpath - 10' wide.
ME 2009 Fort Allen Trail Fort Allen Trail Improvement Rock staircase and improvements at Ft. Allan 1 Cumberland $25,000 $6,250 $31,250
Project Park
ME 2009 Connector Trail Trail and Bridge Construction 8 miles of multi-use trail and bridge 1 Cumberland $121,250 $30,313 $151,563
construction associated with the Bradbury Mt.
State Park-Pineland Lands Unit project
ME 2009 Camden Hills State Park Camden Hills Rehabilitation Camden Hills and Aroostook State Park. 1 Knox $103,585 $25,896 $129,481
Project Funds for a dozer to be used at Camden
ME 2011 Falmouth Community Trails Falmouth Community Trails Constructed an additional 6.8 miles of new 1 Cumberland $25,826 $6,456 $32,282
non-motorized trails and upgraded another
13.5 miles of existing trail. Allowable uses
include hiking, mountain biking,
snowshoeing, nature study, geo-caching,
cross-country skiing and some equestrian
use.
ME 2011 PownalBorough Courthouse PownalBorough Courthouse This project involved installing 1.6 miles of 1 Lincoln $9,660 $2,415 $12,075
Trails Trails new trail within the Associations 89 acres.
The work included; three wood bridges, 120
feet of bog bridging, a kiosk, and the creation
of maps and signs.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Mount Agamenticus Trail Mount Agamenticus Trail Approximately 4.5 miles of trail restoration 1 York $35,000 $8,750 $43,750
are involved with this project. The areas
seasonal Conservation Crew will do the work
required here and they conduct trail
stewardship ...
ME 2011 ADA Trail Work ADA Trail Work The land trust completed work on 20,000 1 York $25,000 $6,250 $31,250
square feet of land. Construction of a 24
space parking area and a universal trail to
provide public access to a series of
recreational trails located on Highland Farm
and adjacent conservation lands. The 300...
ME 2011 Beach Access Trail ADA Trail Work This project called for replacement of 1 Sagadahoc $39,524 $9,881 $49,405
deteriorating boardwalk that will enable safe
and convenient public ADA access to the
Griffith Head end of Mile Beach. Also, paved
an existing access footpath to the boardwalk,
and replaced gravel to maintain...
ME 2011 Mousam Way Trail Mousam Way South Constructed an approximate .5 mile footpath 1 York $34,800 $8,700 $43,500
with 300 feet of boardwalk through a scenic
wooded area that links to an existing paved
bike path and eventually continuous trail
network through downtown Sanford.
ME 2011 Whiskeag Trail Whiskeag Trail Kennebec Estuary Land Trust was looking to 1 Sagadahoc $34,650 $8,663 $43,313
complete major improvements at their Thorne
Head Preserve in Bath. The work included:
construction of a new technical trail,
rehabilitation of a waterfront trail, and
improvements to trail access and use by...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Augusta Greenway Trail River to Arboretum Trail This created a new trail from the existing 1 Kennebec $15,000 $3,750 $18,750
state trail on the east side of the Kennebec
River through the woods to the existing
Augusta East Side Campus. The trail goes
from the East Side Campus to the Vile
Arboretum. Work included signage, new...
ME 2011 Tupelo Trail Bridge Repair/Acquisition The focus of this project was to remove and 1 York $200,261 $50,065 $250,326
replace structural supports on three
footbridges, and adding a third stringer where
there are currently two. There was also some
fill and ...
ME 2011 River Trail Trail Work/Intern 2 projects: 1. Hired an AmeriCorps 1 York $16,000 $40,000 $56,000
Environmental Educator Intern, Vaughn
Woods 2. The park made needed
improvements to their 3 miles of trails. The
work included, ...
ME 2011 Ledge Trail Androscoggin Riverlands Rehabilitation work on the existing 12 + miles 1 Androscoggin $18,903 $4,726 $23,629
of shared use trail at the Androscoggin
Riverlands. Work included resurfacing,
replacing decking on bridges, ditching, some
of the trails, ...
ME 2011 Public Information Web page/brochures This project will educate people about their 1 Cumberland $5,000 $1,250 $6,250
trail system, naturalized areas and the habitat
and wildlife that exist within Portlands premier
park. The education included, printed
materials, and video that will increase
awareness of the parks...
ME 2012 Wolfe's Neck Trail Trail improvement Project Put in rock walkways, improve draining, 1 Cumberland $12,081 $3,020 $15,101
Improvement Project resurface sections of the trail and develop a
new interpretive panel
ME 2012 Pier Trail Mackworth Island Trail Improve walkway along the pier that has 1 Cumberland $5,340 $1,335 $6,675
eroded and needs material and drainage for
water
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2012 Bridle Path Project Bridge Project The Bridle Path is a historic path that runs 3 1 York $35,000 $8,750 $43,750
+/- miles from Sea Road to the Kennebunk
beaches. It is an old railbed shared with
multiple users including horse, hikers, and
bikers. The project proposed to build a 60
long, 5 wide timber bridge over...
ME 2012 South Loop Trail Powerline Connector Trail The focus of this project is to improve the trail 1 Cumberland $36,806 $9,201 $46,007
system at the Pineland Public Land unit in
New Gloucester. Upgrades to the 3.2 mile
trail system would include putting water
diversions in some sections of trail, putting
new bog bridging in over...
ME 2012 Tannery Trail Project Tannery Trail Project Construct a new ADA shared use trail along 1 Knox $18,427 $4,607 $23,034
the river at site of old Tannery
ME 2012 Single Track Trails Trail improvements Project Make improvements along recently 1 Cumberland $10,000 $2,500 $12,500
constructed bridges and new connector trail
that goes to Pineland
ME 2012 Messalonskee Trail System Outdoor classroom Project The project will include signage, safety 1 Kennebec $4,800 $1,200 $6,000
awareness and seating along the
Messalonskee Trail System.
ME 2013 Railbed Phase IV Project Railbed Phase IV This project entails the rehabilitation of 1 York $33,500 $8,375 $41,875
approximately .5 miles of former railroad bed
into crushed gravel multi-purpose trail and
the construction of a parking lot with trailhead
facilities. Improvements are part of a larger
park development...
ME 2013 Pisgah Hill Parking lot Pisgah Hill Parking lot This project entails the construction of the 1 Cumberland $10,000 $2,500 $12,500
Pisgah Hill Preserve South Trail Head,
consisting of an off-road, surfaced, plowed
parking lot with driveway access for four
vehicles (1250 square feet), along with
associated trail head infrastructure.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2013 Wolfe's Neck Harrasseket Harraseeket This project involves the construction of a 16 1 Cumberland $16,235 $4,059 $20,294
Trail/EE Trail Project Trail/Environmental ft wooden bridge on the Haraseeket Trail, as
Education well as cutting and filling side slope and
installing rock edging along 20 ft of the trail
and construction of a 16 ft wooden stairway.
Additional aspects...
ME 2013 Shell Middens Project Shell Middens Project This project entails restoring the existing trail 1 Knox $4,000 $1,000 $5,000
down to the shore and putting up a swinging
bench along the shore of the shell heaps.
ME 2013 Trail Expansion Project Trail Expansion Project This project entails the construction of 5.1 1 Cumberland $22,700 $5,675 $28,375
miles of new trail in the Woods Road
Community Forest, including a parking area
at the trailhead. This project will also involve
the construction of a nature trail within the
Suckfish Brook Conservation...
ME 2013 West Side Trail West Side Trail This project, which once complete will be a 1 Cumberland $18,155 $4,539 $22,694
12 mile multiuse trail system along CMP
power lines in Yarmouth, entails the
construction of 4 miles of trail as part of the
first phase of the project.
ME 2013 Mount Agamenticus Trail Mt Agamenticus Trail Project This project includes mitigation of current or 1 York $35,000 $8,750 $43,750
eventual trail and habitat degradation,
insurance of visitor safety, and provision of
additional recreational capacity within the
11,000 acre parcel of land. This project
includes 2.2 miles of trail...
ME 2013 Lily Pond Trail Lily Pond Trail This project entails the maintenance and 1 Sagadahoc $20,850 $5,213 $26,063
restoration of over 2.9 miles of trails on 146
acres, the design of trails system footpaths
and multi-use trails, the retirement of trails in
sensitive habitat areas, and the prioritization
of trail sections...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2013 Bradbury Mountain State Trail This project entails funding a 900 hour 1 Cumberland $41,000 $10,250 $51,250
Park Trails Improvement/Environmental AmeriCorps Environmental Steward to be
Education shared between Bradbury Mountain and
Mackworth Island State Parks; the purchase
of materials to replace 3 bridges, construct 2
new bridges, resurface 2 miles of trail and...
ME 2013 Sebago Lake State Park Environmental Safety Improvements to the trails system at Sebago 1 Cumberland $10,000 $2,500 $12,500
Lake State park and funding an
environmental educator to assist with this
work and help with interpretive aspects of
trail.
ME 2013 Jewell Island Trail Jewell Island Trail Project Improvements to the trail system at Jewell 1 Cumberland $4,800 $1,200 $6,000
Island.
ME 2013 Kennebunkport Trust in our Trails Safety and Education Project at land trust's 1 York $5,000 $1,250 $6,250
property. Proper signage, Kiosk and
informational Materials
ME 2013 Mount Agamenticus Mount A Safety and New Trail Brochure and two new kiosks on 1 York $5,000 $1,250 $6,250
Outreach trail
ME 2013 KELT properties Signage and Kiosks Signage and kiosks at KELT trail systems 1 Sagadahoc $5,000 $1,250 $6,250
ME 2014 Four Seasons Trails Four Seasons Trails Project Four Seasons Trails Project 1 Aroostook $35,000 $8,750 $43,750
ME 2014 Gorham Trails Connector Trail Project Connector Trail Project 1 Cumberland $11,246 $2,812 $14,058
ME 2014 Lippman Park Trails Lippman Park Trails Lippman Park Trails 1 Cumberland $35,000 $8,750 $43,750
ME 2014 Aroostook State Park Trail Improvement Project Trail Improvement Project 1 Aroostook $23,357 $5,839 $29,196
ME 2014 Rockland Trails Connector Trail Project Connector Trail Project 1 Knox $35,000 $8,750 $43,750
ME 2014 Biddeford Town Trail Town Trail Project Town Trail Project 1 York $18,491 $4,623 $23,114
ME 2014 Damariscotta Lake State Trail Upgrade Project Trail Upgrade Project 1 Lincoln $900 $225 $1,125
Park
ME 2015 Thurston Park Trails Thurston Park Trail Projects 1 Kennebec $5,000 $1,250 $6,250
ME 2015 Camden Riverwalk Camden Riverwalk 1 Knox $26,144 $6,536 $32,680
ME 2015 Gray Village Loop Trail Gray Village Loop Trail 1 Cumberland $31,088 $7,772 $38,860
ME 2015 Deering Pond Deering Pond Connector 1 York $23,336 $5,834 $29,170
ME 2015 Bradbury Mountain State 900 Hour Environmental 1 Cumberland $11,687 $2,922 $14,609
Park Trails Steward
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2015 Sebago Lake State Park 900 Hour MCC 1 Cumberland $16,362 $4,091 $20,453
Environmental Steward
ME 2015 Vaughan Woods State Park VWSP MCC ES 1 York $16,362 $4,091 $20,453
ME 2015 Kennebec Highlands Kennebec Highlands 1 Kennebec $2,500 $625 $3,125
ME 2015 Kennebec Highlands Hike Kennebec Highlands Hike / 1 Kennebec $18,532 $4,633 $23,165
Bike Trails Bike Trails
ME 2015 Bradbury-Pineland Corridor Bradbury-Pineland Corridor 1 Cumberland $14,312 $3,578 $17,890
Trail, South Ridge Trail Trail / South Ridge Trail
ME 2015 Wolfe's Neck Woods Trail Wolfe's Neck Woods Trail 1 Cumberland $11,687 $2,922 $14,609
improvement
ME 2015 Wolfe's Neck Woods State 900-hour MCC ES 1 Cumberland $11,687 $2,922 $14,609
Park
ME 2015 Topsham Landing Trail Topsham Landing Trail 1 Sagadahoc $35,000 $8,750 $43,750
ME 2015 Marginal Way Eroded Embankment on Eroded Embankment on Marginal Way 1 York $34,935 $8,734 $43,669
Marginal Way
ME 2015 Fogg Island, French Fogg Island and French 1 Kennebec $16,964 $4,241 $21,205
Mountain Mountain
ME 2015 Falmouth Community Trails Falmouth Community Trails 1 Cumberland $8,041 $2,010 $10,051
ME 2015 Wolfe's Neck Woods State 1,700 hour MCC ES 1,700 hour MCC ES 1 Cumberland $16,362 $4,091 $20,453
Park
ME 2015 Camden Hills State Park Camden Hills State Park Trail Rehabilitation 1 Knox $17,408 $4,352 $21,760
Trail Rehabilitation
ME 2016 Big A Trail Mt Agamenticus ADA Trail Completes the final 1077 feet of accessible 1 York $35,000 $27,690 $62,690
trail
ME 2016 Moussam River Bike Trail Moussam River Bike Trail Construct nonmotorized bike path on existing 1 York $34,260 $12,600 $46,860
sewer line right of way
ME 2016 Pismire Mountain Trails Pismire Mountain Trails Construct trail system in newly transitioned 1 Cumberland $32,180 $8,045 $40,225
conservation area
ME 2016 Messalonskee High School Messalonskee High School Rehabilitate existing trail network within the 1 Kennebec $19,272 $4,818 $24,090
Trail Trail Messalonskee Schools campus
ME 2016 Vaughn Woods State Park Bridge and Trail Maine Bridge replacement, trail rehabilitation, trail 1 York $31,533 $7,883 $39,416
Conservation Corp and resurfacing
Environmental Steward
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2016 Wolfe's Neck Woods State Maine Conservation Corp Trail rehabilitation 1 Cumberland $17,238 $4,310 $21,548
Park and Environmental Steward
ME 2016 Sebago Lake State Park Maine Conservation Corp Trail maintenance 1 Cumberland $17,112 $4,278 $21,390
and Environmental Steward
ME 2016 Kennebec Highlands Bike Single Track Trail Construct mountain bike trail 1 Kennebec $2,000 $500 $2,500
Trails
ME 2016 Viles Arboretum Boardwalk Boardwalk Rehab wildlife viewing boardwalk 1 Kennebec $14,271 $12,425 $26,696
ME 2017 Wolfe's Neck Woods State Maine Conservation Corps The grant will fund two Maine Conservation 1 Cumberland $30,259 $7,565 $37,824
Park Environmental Steward Corps Environmental Stewards, one 900 hour
placement and one 1700 hour placement.
The MCC Environmental Stewards' primary
responsibility will be to research, develop,
and present trail-based environmental...
ME 2017 West Side Trail West Side Trail Phase 2 Phase 2 of the West Side Trail (WST) is a 2.6 1 Cumberland $50,000 $38,190 $88,190
mile long section of trail being built on a CMP
transmission line right-of-way that was
recently altered for installation of new
transmission lines. This grant focuses on
construction of the first 1.8...
ME 2017 Sewall Woods Preserve Trailhead Access Project The Kennebec Estuary Land Trust (KELT) is 1 Sagadahoc, Lincoln $18,500 $8,000 $26,500
Trailhead, Squam Creek seeking financial assistance from the
Property Trailhead Recreational Trails Program for its Trailhead
Access Project. The objective is to improve
public access to two KELT locations and their
associated trail systems. At...
ME 2017 Langlais Sculpture Preserve Langlais Sculpture Preserve Georges River Land Trust (GRLT) is asking 1 Knox $38,000 $12,200 $50,200
ADA Trail ADA Trail for RTP funding to assist in the construction
of an approximately 1000 foot long ADA trail
in and amongst the large sculptures, fields,
and forests at the Langlais Sculpture
Preserve, a 90 acre preserve owned...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2017 Bradbury Mountain State Bradbury Mountain State The project sponsor will contract with the 1 Cumberland $49,760 $18,305 $68,065
Park Trails Park Trails Rehabilitation Maine Conservation Corps for a 900 hour
Environmental Steward and 12 weeks of
MCC trail crew work to perform routine
maintenance and trail rehabilitation on up to
25 miles of trails within this popular trail...
ME 2017 Camden Hills State Park Camden Hills State Park Camden Hills State Park will rehabilitate up to 1 Knox, Waldo $40,000 $8,000 $48,000
Trails Trails 6 miles of multi use trails within the park. The
trails noted have settled since last worked on
(2008) and heavy use and horse traffic has
caused the once crowned trails to become
flat or lower in the...
ME 2017 Megunticook Riverwalk Megunticook Riverwalk Construction of a stone dust recreational trail 1 Knox $50,000 $14,810 $64,810
Phase 3 along the Megunticook River through a
natural area abutting urban development. It
will be a 6 foot wide trail designed for
walking, running, biking, fishing access, and
dog walking during the non-winter...
ME 2017 Pollack Brook Bridge Pollack Brook Bridge The project will replace a deteriorating 51' 1 Cumberland $35,000 $13,475 $48,475
Restoration wooden bridge with a 60' long aluminum
bridge to cross Pollack Brook. Restoration of
600' of trail and installation of 1,600' of new
trail is included in this work.
ME 2017 Sebago Lake State Park Maine Conservation Corp This project will perform maintenance and 1 Cumberland $17,063 $5,702 $22,765
and Environmental Steward rehabilitation work along many portions of the
park's 5.75 miles of trails and at the 13 trail
head locations. Work will include trail surface
retread with gravel, bog bridging, wood and
rock water bars,...
ME 2018 Round The Mountain Trail Round The Mountain Trail 1 Knox $120,000 $2,258,185 $2,378,185
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2018 Bradbury Mountain State Bradbury Mountain State The project sponsor will contract with the 1 Cumberland $68,400 $13,680 $82,080
Park Trails Park Trails Rehabilitation Maine Conservation Corps for a 900 hour
Environmental Steward and 12 weeks of
MCC trail crew work to perform routine
maintenance and trail rehabilitation on up to
25 miles of trails within this popular trail...
ME 2018 Sebago Lake State Park Sebago Lake State Park This project will perform maintenance and 1 Cumberland $17,056 $3,410 $20,466
Trails Rehabilitation rehabilitation work along many portions of the
park's 5.75 miles of trails and at the 13 trail
head locations. Work will include trail surface
retread with gravel, bog bridging, wood and
rock water bars,...
ME 2018 Upper Brook Trail Trail Work Restore Vaughan Woods Upper Brook Trail 1 Kennebec $117,479 $39,160 $156,639
ME 2018 Wolfe's Neck Woods State Maine Conservation Corp Trail rehabilitation 1 Cumberland $18,510 $3,925 $22,435
Park and Environmental Steward
ME 2019 Public Information Maps and Guides The Bureau will update, print and distribute 1 Kennebec $18,856 $5,000 $23,856
maps / guides for the following parks:
Androscoggin Riverlands, Bradbury
Mountain, Camden, Cobscook, Ferry Beach,
Lakd St George, Lamoine, Peaks Kenny,
Sebago, Shackford, and Warren Island.
ME 2019 Bradbury Mountain State Bradbury Mountain State Trail improvements include providing general 1 Cumberland $43,380 $10,306 $53,686
Park Trails Park Trails Maintenance and maintenance on 22 miles of park trails to
Rehabilitation include cutting blowdowns and removing
debris, cleaning water bars, ditches, side
cutting vegetation, plant blazes, repair
wooden bike/foot traffic bridges, and...
ME 2019 Mount Blue State Park Mount Blue State Park Trail Repair, upgrade and restore sections of the 1 Franklin $16,175 $10,000 $26,175
Maintenance and state park's trail system. The stewards will
Rehabilitation be responsible for the maintenance and
restoration of several park trails including the
Swett brook trail, Center hill and Webb Beach
nature trails, Arboretum...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2019 Vaughn Woods State Park Bridge and Trail Maine This project will engage a Maine 1 York $1,927 $4,148 $6,075
Conservation Corp and Conservation Corps Environmental Steward
Environmental Steward to accomplish trail maintenance objectives
within the park that includes improving the
trial tread, replacement of a 16' bridge,
widening trail sections, installing water bars...
ME 2019 Wolfe's Neck Woods State Maine Conservation Corp The grant will fund one 1700-hour Maine 1 Cumberland $19 $7,975 $7,994
Park and Environmental Steward Conservation Corps Environmental Steward
and one 900-hour MCC Environmental
Steward. The MCC Environmental Stewards
will make improvements on trails to protect
wet areas, improve drainage, prune the trail...
ME 2019 Memorial Park Walking Trail Memorial Park Walking Trail The project request is for a 1625 feet (.31 1 Cumberland $47,500 $15,000 $62,500
mile) perimeter walking trail, located at the
Casco Memorial Park and Recreation Facility
at 877 Poland Spring Road (Route 11) in
Casco. The 7.25 acre parcel, owned by the
town, is the former site of an...
ME 2019 Deboullie Whitman Mountain Deboullie Whitman Mountain This project will engage the Maine 1 Aroostook $47,809 $11,870 $59,679
Trail Trail Maintenance Conservation Corps Trail Crews to provide
trail maintenance and rehabilitation on the
Whitman Mountain Trail network within this
public reserved land unit.
ME 2019 Sebago Lake State Park Park Trail Maintenance Work will include trail surface retread with 1 Cumberland $16,513 $5,000 $21,513
gravel, bridging, wood and rock water bars,
cutting switchbacks, erosion control
measures, sign placement, trail blazing.
Trails such as the Lookout Trail will have
overgrown view sheds cut and re-opened....
ME 2018 Safety and Education Trail Safety Training Trail safety training 1, 2 Statewide $8,734 $2,300 $11,034
ME 2018 Maps and Guides Park Maps and Guides Park maps and guides 1, 2 Statewide $23,400 $53,779 $77,179
ME 2018 State Administration RTP Administration Administer the RTP Program 1, 2 Statewide $78,557 $15,711 $94,268
ME 2018 Safety and Education Off Road Bicycle Education Instructor training and technical assistance 1, 2 Statewide $5,000 $1,500 $6,500
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2000 Various State Parks Trail Improvements and Trail Improvements and Renovations 1, 2 Androscoggin, $77,640 $19,410 $97,050
Renovations Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2001 South Maine Regional Parks Trail Improvements Improvements 1, 2 Statewide $57,582 $14,396 $71,978
Trails
ME 2004 Safety and Education Bicycle Safety Awareness Safety and Environmental Education 1, 2 Androscoggin, $4,250 $1,063 $5,313
Project Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2007 Safety and Education Island Trail Education Safety and Environmental Education 1, 2 Androscoggin, $5,000 $1,250 $6,250
Project Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2007 Winter Recreation Trails Groomer Safety Training Safety and Environmental Education 1, 2 Androscoggin, $5,000 $1,250 $6,250
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2008 Winter Recreation Trails Snowmobile Safety Safety and Environmental Education 1, 2 Statewide $4,500 $1,125 $5,625
Awareness Grant
ME 2008 State Administration Administration Administration 1, 2 Androscoggin, $50,000 $12,500 $62,500
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2009 Jay-Farmington Rail-Trail Jay-Farmington Rail-Trail Cut back brush on 14+ miles of trail and 1, 2 Androscoggin, $85,000 $21,250 $106,250
Project improvements to other sections Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2009 Landowner Liability Brochure Landowner Liability Brochure Upgrade liability brochure-IF&W 1, 2 Androscoggin, $5,000 $1,250 $6,250
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2009 State Administration Project Administration Administration 1, 2 Androscoggin, $108,083 $27,021 $135,104
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2009 Safety and Education Kiosks Safety and Environmental Education 1, 2 Androscoggin, $5,000 $1,250 $6,250
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2009 Northern Region State Parks BPL - Northern Region Parks Trail work in Northern Region Parks 1, 2 Androscoggin, $33,800 $8,450 $42,250
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2009 Public Information Maps and Brochures Maps and Brochures for several parks and 1, 2 Statewide $40,202 $10,051 $50,253
lands units
ME 2009 Safety and Education Chain Saw Training Chain Saw Safety Training 1, 2 Androscoggin, $5,000 $1,250 $6,250
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2009 Trail Construction Project Trail Construction and 5 miles of hiking trail 1, 2 Aroostook $42,700 $10,675 $53,375
Improvements construction/improvement at the Deboullie
Unit
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2009 Western Mountains Plan Signage and Kiosks Improved signage and kiosks in the Western 1, 2 Androscoggin, $7,100 $1,775 $8,875
Area Mts. Plan Area (several Lands Division Aroostook,
properties in western Maine.) Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2010 Public Information Complete GIS Trails For an intern to complete gaps in the GIS 1, 2 Androscoggin, $6,253 $1,563 $7,816
Information trails layer Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2011 Safety and Education Landing Zone Training on This project worked to establish a network of 1, 2 Androscoggin, $5,000 $1,250 $6,250
Trails helicopter landing zones that can be quickly Aroostook,
accessed when there is an emergency. The Cumberland, Franklin,
plans of the project included, purchase of Hancock, Kennebec,
signs for landing zones, creation of a Knox, Lincoln, Oxford,
promotional brochure, and create a... Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Public Information Map and Guide Phase II This project allowed the Division of Parks and 1, 2 Androscoggin, $13,278 $3,320 $16,598
Public Lands to print and design more Map Aroostook,
and Guides for their properties and make this Cumberland, Franklin,
available to the public in an up-to-date Hancock, Kennebec,
format. Most maps were outdated and this Knox, Lincoln, Oxford,
provided the most current data... Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2011 Public Information Maine Trail Finder This was part of phase III of the Map and 1, 2 Androscoggin, $25,000 $6,250 $31,250
Guide project. It took some of the GIS Aroostook,
information that was done in the field, some Cumberland, Franklin,
of the descriptions in our Map and Guides Hancock, Kennebec,
and put this on to a website called Maine Knox, Lincoln, Oxford,
Trail Finder. This will allow users... Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2011 Safety and Education Environmental Educator This project was for an environmental 1, 2 Androscoggin, $14,000 $3,500 $17,500
educator to work in assisting the Recreational Aroostook,
Trails Program Coordinator and the Outdoor Cumberland, Franklin,
Recreation Planner. The position involved ... Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Public Information Our Maine Lands Printing of a brochure with information of our 1, 2 Androscoggin, $5,425 $1,356 $6,781
trails and amnesties on our public land units. Aroostook,
The information we had was outdated and Cumberland, Franklin,
this will update this information in one Hancock, Kennebec,
brochure, which we do not have for Lands. Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2011 Public Information Interpretive Panels The project included design and installations 1, 2 Androscoggin, $14,833 $3,708 $18,541
at several of our state parks and public land Aroostook,
units along the trails. This will give Cumberland, Franklin,
information such as the flora and fauna along Hancock, Kennebec,
the trail, the unique ecosystems of some of Knox, Lincoln, Oxford,
the areas, maps of the trails... Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2011 State Administration Administration These funds were for the Administration of 1, 2 Androscoggin, $136,430 $34,108 $170,538
the 2011 Recreation Trails Program. Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2012 Thurston Park Trails Thurston Park Project Improvements to the trail system at the town 1, 2 Kennebec $35,000 $8,750 $43,750
owned Thurston Park. Trails are all types
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2012 Shedd Pond Trail Shedd Pond Trail Improvements to the trail system on Land 1, 2 Kennebec $18,240 $4,560 $22,800
Trust Property.
ME 2012 Withdrawn Trail Head Construction 1, 2 Kennebec $11,877 $2,969 $14,846
Project
ME 2012 Public Information Natural History Map and Have natural History information on Maine 1, 2 Androscoggin, $10,151 $2,538 $12,689
Guide Project Trail Finder for several Bureau properties Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2013 Safety and Education Off Road Bicycle Education Bike safety program given to different 1, 2 Androscoggin, $5,000 $1,250 $6,250
communities Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2013 Androscoggin River River Trail Sign Project Kiosks at portages along the Androscoggin 1, 2 Androscoggin $4,993 $1,248 $6,241
River
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2013 Safety and Education Chain Saw Training Chain Saw Safety Training 1, 2 Androscoggin, $5,000 $1,250 $6,250
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2013 State Administration Administration Administration of program 1, 2 Androscoggin, $86,564 $21,641 $108,205
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2014 Shedd Pond Trails Shedd Pond Trails Shedd Pond Trails 1, 2 Kennebec $11,280 $2,820 $14,100
ME 2014 Quarry Road Trails Quarry Road Trails Quarry Road Trails 1, 2 Kennebec $29,952 $7,488 $37,440
ME 2014 Camden Hills State Park Trail Improvement Project Trail Improvement Project 1, 2 Knox, Waldo $13,500 $3,375 $16,875
ME 2014 Kennebec Highlands Bike Bike Trail Project Bike Trail Project 1, 2 Kennebec $2,000 $500 $2,500
Trails
ME 2014 Rotary Park Trail Rotary Park Trail Project Rotary Park Trail Project 1, 2 Kennebec $35,000 $8,750 $43,750
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2014 Public Information Map and Guides Map and Guides 1, 2 Androscoggin, $24,997 $6,249 $31,246
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2015 State Administration RTP Administration RTP Administration 1, 2 Statewide $65,601 $16,400 $82,001
ME 2015 Safety and Education Trail Safety and Trail Safety and Environmental Education 1, 2 Statewide $3,993 $998 $4,991
Environmental Education
ME 2015 Safety and Education Off Road Bicycle Education Off Road Bicycle Education Program 1, 2 Statewide $5,000 $1,250 $6,250
Program
ME 2015 Safety and Education Environmental Education Environmental Education 1, 2 Statewide $5,000 $1,250 $6,250
ME 2015 Northern Public Lands Map and Guide Map and Guide 1, 2 Multiple Counties $11,869 $2,967 $14,836
ME 2015 Various Statewide Trails Environmental Steward Environmental Steward 1, 2 Multiple Counties $7,869 $1,967 $9,836
ME 2016 State Administration RTP Administration Administer the RTP Program 1, 2 Androscoggin, $100,992 $25,248 $126,240
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2016 Safety and Education Off Road Bicycle Education Instructor training and technical assistance 1, 2 Androscoggin, $5,000 $1,250 $6,250
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2016 Public Information Maps and Guides for Various Update and revise maps for state parks 1, 2 Androscoggin, $28,089 $7,022 $35,111
Parks and/or public lands Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2016 Public Information Data Displays Purchase electronic message boards for 3 1, 2 Androscoggin, $2,550 $1,850 $4,400
pilot campground registration booths Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2017 State Administration RTP Administration Administer the RTP Program 1, 2 Androscoggin, $79,351 $15,870 $95,221
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2017 Safety and Education Off Road Bicycle Education Instructor training and technical assistance 1, 2 Androscoggin, $5,000 $1,500 $6,500
Aroostook,
Cumberland, Franklin,
Hancock, Kennebec,
Knox, Lincoln, Oxford,
Penobscot,
Piscataquis,
Sagadahoc,
Somerset, Waldo,
Washington, York
ME 2017 Public Information Develop "Natural Heritage The Maine Natural Areas Program will 1, 2 Statewide $5,759 $1,250 $7,009
Hikes" develop science based natural history
narratives for some of Maine's premier trails
for listing on and dissemination by Maine trail
related websites. Links to Natural Heritage
Hikes will be hosted on relevant...
ME 2017 Maps and Guides Park Maps and Guides Project is to develop and print a color Guide 1, 2 Statewide $17,450 $13,045 $30,495
and Maps for Bradbury Mt., Camden Hills,
Cobscook Bay, Quoddy Head, Shackford
Head, Peaks-Kenny, Ferry Beach, Sebago
Lake, Lamoine, Warren Island and Lake
George State Parks. This work builds on
work...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2017 State Tools and Equipment Maine Conservation Corp The equipment requested in this application 1, 2 Statewide $11,293 $2,833 $14,126
and Environmental Steward will improve the efficiency of MCC operations,
while reducing environmental impacts, by
outfitting teams with lighter weight gear,
power equipment, and improved tools for trail
planning, construction and...
ME 2018 Various Statewide Trails Trail Construction and Trail Construction and maintenance 1, 2 Multiple Counties $3,000 $750 $3,750
maintenance equipment equipment utilizing Maine Conservation Corp
ME 2019 State Administration RTP Administration Administration of the RTP program for the 1, 2 Statewide $100,992 $25,000 $125,992
State of Maine. 2019 will see the beginning of
an additional initiative to inventory and
assess all trails on state owned / controlled
lands, a project that is anticipated to take at
least two years to...
ME 2019 Safety and Education Off Road Bicycle Education The Bicycle Coalition of Maine's Off Road 1, 2 Statewide $5,000 $1,500 $6,500
Bicycling Education (ORBE) Program has
two components. The ORBE Program 1.
Provides instruction in basic off-road bicycle
riding as requested at events across the
state, and 2. provides technical assistance...
ME 2019 Natural Heritage Hikes Natural Heritage Hikes The objective of this project is to promote 1, 2 Statewide $5,000 $1,697 $6,697
hiking and environmental education by
creating science based natural history
narratives for some of Maine's premier trails.
The Maine Natural Areas Program will
complete five new Natural Heritage Hikes
to...
ME 2018 Hillside Trail Hillside Trail Rehabilitation Hillside Trail rehabilitation 2 Hancock $43,150 $13,935 $57,085
ME 2018 Appalachian National Scenic AT Ridgerunners Caretaker and Ridgerunners will provide 2 Piscataquis, $5,000 $50,133 $55,133
Trail environmental education and promote public Somerset, Franklin
safety along busy Maine sections of the
2,220-mile Appalachian National Scenic Trail.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 1993 Washington County Winter Trail Renovation Renovation On Multi-Use Trails 2 Washington $4,840 $1,210 $6,050
Trails
ME 1993 Madrid Winter Trails, Trail Renovation Renovation of Trails 2 Franklin $3,694 $2,536 $6,230
Freeman Winter Trails
ME 1993 Wilton Winter Trails Trail Improvements Trail Improvements 2 Franklin $11,760 $3,192 $14,952
ME 1993 Pine Tree State Arboretum Trail Improvements Trail Improvements 2 Kennebec $3,150 $3,600 $6,750
ME 1993 Newport to Dover-Foxcroft 2 Kennebec $15,400 $3,872 $19,272
ME 1993 Mount Blue State Park Trail Improvements Trail Improvements 2 Kennebec $15,400 $4,754 $20,154
ME 1993 Sebec River, Milo Bridge Installation 200 foot suspension bridge 2 Piscataquis $15,400 $5,388 $20,788
ME 1993 Aroostook Valley Trail Trail Construction Construct Multi-Purpose Trail 2 Aroostook $23,877 $6,040 $29,917
ME 1993 Jackman Trail Bridge and Trail Bridge, Trail Improvements 2 Somerset $15,400 $10,025 $25,425
Improvements
ME 1993 Bangor Trail System Trail Improvements Two Sites On City Park Property 2 Penobscot $15,400 $13,680 $29,080
ME 1996 Split Cedar Trail 2 Aroostook $2,425 $2,425 $4,850
ME 1996 Monticello Trails 2 Aroostook $3,865 $3,865 $7,730
ME 1996 Jackman Trails Trail Renovation Renovation 2 Somerset $3,970 $3,970 $7,940
ME 1996 Rogue Bluffs Trail 2 Washington $4,500 $4,500 $9,000
ME 1996 Quoddy Head Trail 2 Washington $5,950 $5,950 $11,900
ME 1996 Hersey Town Township Bridge Installation 80' bridge 2 Aroostook $7,270 $7,270 $14,540
ME 1996 Guerette Trail Improvements Improvements 2 Aroostook $8,523 $8,523 $17,046
ME 1996 Farmington Trail Renovation Renovation 2 Franklin $10,040 $10,040 $20,080
ME 1996 Carrabassett Valley Trails Trail Renovation Renovation 2 Franklin $11,000 $11,000 $22,000
ME 1996 Fort Kent Ski Area Winter Trail Improvements Maintenance and Restoration of Trails 2 Aroostook $14,000 $14,000 $28,000
ME 1996 Lewiston Jay Trail Trail Maintenance Maintenance 2 Androscoggin $56,452 $56,452 $112,904
ME 1997 Narraguagus Bridge Bridge Installation Cooperative project with Maine Department 2 Washington $2,636 $2,636 $5,272
of Transportation
ME 1997 Woodland Nature Trail Trail Construction Nature/Interpretive Trail 2 Aroostook $4,000 $4,000 $8,000
ME 1997 Meduxnekeag Bridge Bridge Improvements Repairs to Bridge 2 Aroostook $5,744 $5,744 $11,488
ME 1997 Little Squaw Trails 2 Kennebec $6,000 $6,000 $12,000
ME 1997 Rangeley Winter Trails Trail Construction Trail Expansion 2 Franklin $7,500 $7,500 $15,000
ME 1997 Acadian Wood Trail 2 Hancock $8,500 $8,500 $17,000
ME 1997 Austin Stream Bridge Bridge Installation Bridge 2 Somerset $8,500 $8,500 $17,000
ME 1997 Main Stream Bridge Bridge Installation Bridge 2 Somerset $10,000 $10,000 $20,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 1997 Squa Pan Trail Trail Improvements Improvements. 2 Aroostook $12,000 $12,000 $24,000
ME 1997 Goose Eye/Speck Pond Trail Trail Improvements 2 Cumberland $13,000 $13,000 $26,000
ME 1997 Black Mountain Trail Trail Renovation Renovation 2 Oxford $15,500 $15,500 $31,000
ME 1997 Dover-Foxcroft, Dexter, Trail Improvements 2 Piscataquis $15,500 $15,500 $31,000
Corrinna, Newport
ME 1997 Kingfield Winter Trails Winter Trail Improvements 2 Franklin $16,000 $16,000 $32,000
ME 1998 Alexander Winter Trails Winter Trail Improvements Renovation 2 Washington $3,000 $3,000 $6,000
ME 1998 Big Squaw Mountain Trail Trail Renovation Rehabilitation 2 Kennebec $3,900 $5,000 $8,900
ME 1998 Skowhegan Trails 2 Somerset $5,000 $6,800 $11,800
ME 1998 Lexington Plantation Bridge Installation 2 Somerset $7,231 $7,231 $14,462
Snowmobile Bridge
ME 1998 Rangeley Winter Trails Trail Improvements Improvements 2 Franklin $7,240 $7,240 $14,480
ME 1998 Old Town Waterfront Path Paved Pathway 2 Penobscot $7,500 $7,500 $15,000
ME 1998 Colby Trail Renovation 2 Somerset $5,000 $7,550 $12,550
ME 1998 St. Albans Winter Trails Winter Trail Improvements 2 Somerset $7,500 $10,624 $18,124
ME 1998 Presque Isle Land Acquisition Acquisition 2 Aroostook $15,000 $15,000 $30,000
ME 1998 Wyman Township Trails Trail Improvements Trail Side Amenities 2 Franklin $4,100 $16,500 $20,600
ME 1998 Meduxnekeag Bridge Trail Improvements Trail Side Amenities 2 Kennebec $4,100 $16,500 $20,600
ME 1999 Nicatous Trailhead Land Acquisition Acquisition 2 Hancock $7,259 $1,815 $9,074
ME 1999 ITS 82/Dover-Foxcroft Bridge Installation Bridge 2 Piscataquis $8,280 $2,070 $10,350
Winter Bridge
ME 1999 Bigelow Preserve Trails Trail Construction New Trail 2 Franklin $7,580 $2,968 $10,548
ME 1999 Oxbow Plantation Land Acquisition Acquisition 2 Aroostook $12,000 $3,000 $15,000
ME 1999 Rangeley Winter Trails Trail Improvements Improvements 2 Franklin $16,632 $4,148 $20,780
ME 1999 Squa Pan Trail Trail and Drainage Erosion Control 2 Aroostook $19,336 $4,834 $24,170
Improvements
ME 1999 Megalloway Bridge Bridge Installation 100' Bridge 2 Franklin $24,258 $6,065 $30,323
ME 1999 Heritage Trail 2 Aroostook $25,000 $8,580 $33,580
ME 1999 Aroostook River Pathway Land Acquisition Acquisition 2 Cumberland $25,000 $8,629 $33,629
ME 1999 Greenland Point Trails Accessible Trail Includes Handicapped Access Trail 2 Washington $23,435 $12,290 $35,725
Improvements
ME 1999 Little Squaw Township Trails Trail Renovation Restoration of Trail 2 Kennebec $14,000 $12,350 $26,350
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 1999 Persque Isle Purchase Snow Trail Groomer Purchase 2 Kennebec $56,000 $14,000 $70,000
Equipment
ME 1999 Little Squaw Trail Trail Renovation Restoration of Trails 2 Kennebec $18,000 $18,000 $36,000
ME 1999 Old Town Riverfront 2 Penobscot $17,500 $32,500 $50,000
Pathway
ME 1999 Rangeley River Trail and Bridge Construction Bridge and Trail Construction 2 Franklin $25,000 $68,910 $93,910
ME 1999 Presque Isle Land Acquisition Acquisition 2 Kennebec $39,000 $70,000 $109,000
ME 2000 Fishing Access Trail ADA 2 Piscataquis $4,500 $1,500 $6,000
ME 2000 Alexander Trails Trail Improvements, Culverts 2 Washington $12,500 $3,482 $15,982
ME 2000 Great Meadow Loop Trail Construct 2 Hancock $12,000 $4,080 $16,080
ME 2000 Seboeis River Bridge Trail Bridge 2 Penobscot $15,500 $4,500 $20,000
ME 2000 Long Lake Trail Construct Trail 2 Aroostook $15,000 $4,506 $19,506
ME 2000 Green Community Trail Construct and Repair Trails 2 Androscoggin $12,000 $4,625 $16,625
ME 2000 Presque Isle Stream Trail Bridge 2 Aroostook $20,000 $5,530 $25,530
ME 2000 Millinocket Trail Bridge Bridge 2 Penobscot $27,000 $7,096 $34,096
ME 2000 Farmington Cross Country Trail Renovations 2 Franklin $29,000 $8,425 $37,425
Ski Trails
ME 2000 Grafton Loop Trail Construct Trail 2 Oxford $29,000 $9,050 $38,050
ME 2000 Heritage Trail Trail Renovations 2 Aroostook $28,000 $9,358 $37,358
ME 2000 Mountain Trail Trail Renovation 2 Piscataquis $24,000 $10,200 $34,200
ME 2000 Riverside Park Trail Bridge 2 Washington $26,000 $11,500 $37,500
ME 2000 Bald Mountain Perimeter Construct Trail 2 Franklin $9,500 $12,400 $21,900
Trail
ME 2000 Appalachian National Scenic Trail Renovations 2 Piscataquis, $16,500 $12,477 $28,977
Trail Somerset, Franklin,
Oxford
ME 2000 Appalachian National Scenic Trail Renovations 2 Piscataquis, $17,500 $12,477 $29,977
Trail Somerset, Franklin,
Oxford
ME 2000 Forest Trail Loop Trail Construction and Renovation 2 Penobscot $29,000 $13,959 $42,959
ME 2000 Bangor and Aroostook Parking Area 2 Aroostook $26,000 $14,061 $40,061
Rail-Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2000 Debsconeag Backcountry Trail Renovation 2 Piscataquis $33,000 $31,500 $64,500
Trail
ME 2000 Meduxnekeag River Trail Bridge Work 2 Aroostook $20,000 $50,000 $70,000
ME 2001 Easton Trail Parking Area, Picnic Facility 2 Aroostook $10,450 $3,100 $13,550
ME 2001 Club House Trail Trail Renovations 2 Washington $13,600 $3,400 $17,000
ME 2001 Spruce Mountain Trail Renovations, Bridges, Culverts 2 Augusta $21,000 $5,250 $26,250
ME 2001 Moosehead Trail Construct Trail 2 Somerset $15,000 $7,000 $22,000
ME 2001 Madawaska River Trail Bridge 2 Aroostook $29,600 $7,400 $37,000
ME 2001 Mill Island Trail Trailhead, Renovations 2 Somerset $10,000 $7,655 $17,655
ME 2001 Split Cedar Trail Improvements, Renovation 2 Aroostook $18,000 $8,678 $26,678
ME 2001 Houlton Trail Acquire Land 2 Aroostook $30,000 $10,000 $40,000
ME 2001 Multi-Purpose Trail Maintenance, Bridge 2 Aroostook $25,000 $13,500 $38,500
ME 2001 Squa Pan Trail Trail Improvements 2 Aroostook $25,000 $14,350 $39,350
ME 2001 Ski Trails Construct Trail 2 Aroostook $30,000 $14,522 $44,522
ME 2001 Railbed Trail Trail and Drainage Maintenance, Culverts 2 Franklin $24,000 $17,000 $41,000
Improvements
ME 2001 Big Moose Trail Renovate and Construct Trail 2 Piscataquis $13,582 $17,918 $31,500
ME 2001 Heritage Trail Improvements, Purchase Equipment 2 Aroostook $25,000 $23,242 $48,242
ME 2001 Grafton Loop Construct Trail, Renovations 2 Oxford $50,000 $29,426 $79,426
ME 2002 Debsconeag Trail Construct Trail 2 Piscataquis $44,000 $38,500 $82,500
ME 2001 Lake George Park East Trail Construct Trail, Renovation 2 Somerset $11,500 $2,925 $14,425
ME 2002 Franklin County Rail-Trail Construct Trail 2 Franklin $7,200 $3,600 $10,800
ME 2002 Appalachian National Scenic Bridge 2 Oxford $5,267 $5,990 $11,257
Trail
ME 2002 Kenduskeag Stream Bridge Bridge 2 Penobscot $24,000 $6,000 $30,000
ME 2002 Little Machias River Bridge Bridge 2 Aroostook $27,200 $6,800 $34,000
ME 2002 Long Lake Recreation Trail Improvements, Paving 2 Aroostook $18,075 $6,925 $25,000
ME 2002 Multi-Use Trails Construct Trail, Maintenance 2 Washington $25,600 $7,400 $33,000
ME 2002 Borestone Mountain Trail Renovation 2 Piscataquis $25,500 $8,614 $34,114
ME 2002 Big Moose Trail Renovation 2 Piscataquis $33,055 $9,000 $42,055
ME 2002 Unity Trail Construct Trail 2 Waldo $30,000 $9,039 $39,039
ME 2002 Nordic Heritage Center Trail Construct Trail 2 Aroostook $30,000 $9,381 $39,381
ME 2002 Androscoggin Canoe Trail Trailhead Access Sites 2 Oxford $20,500 $10,005 $30,505
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2002 Grafton Loop Trail Construct Trail 2 Oxford $25,575 $12,702 $38,277
ME 2002 Appalachian National Scenic Maintenance 2 Piscataquis, $18,075 $14,525 $32,600
Trail Somerset, Franklin,
Oxford
ME 2002 Camden Hills State Park Renovation, Erosion Control 2 Waldo $28,000 $23,575 $51,575
ME 2002 Washburn Trestle Bridge Renovation 2 Aroostook $100,000 $40,000 $140,000
ME 2002 Orono Bog Boardwalk Construct Trail Boardwalk 2 Penobscott $30,000 $45,453 $75,453
ME 2003 Bog Boardwalk Boardwalk 2 Penobscot $11,500 $2,900 $14,400
ME 2003 Farmington Ski Club Trails Improvements 2 Franklin $16,900 $3,975 $20,875
ME 2003 Camden Hills State Park Improvements 2 Knox, Waldo $7,000 $4,100 $11,100
ME 2003 Goodwill-Hinckley Trail Maintenance 2 Somerset $3,950 $4,106 $8,056
ME 2003 Aroostook State Park Improvements 2 Aroostook $16,900 $4,202 $21,102
ME 2003 Bigelow Preserve Improvements 2 Franklin, Somerset $11,000 $4,650 $15,650
Firewarden Trail
ME 2003 Meduxnekeag River Bridge Bridge 2 Aroostook $20,555 $5,630 $26,185
ME 2003 Mettawamkeeg River Bridge 2 Aroostook $30,000 $7,500 $37,500
ME 2003 Nordic Heritage Trail Construct Trail 2 Aroostook $20,000 $8,950 $28,950
ME 2003 Big Moose Trail Improvements 2 Somerset $23,000 $9,500 $32,500
ME 2003 Red River Ryders ATV Trail Construct Trail 2 Aroostook $25,000 $11,866 $36,866
ME 2003 St. Croix Stream Bridge 2 Aroostook $55,000 $13,750 $68,750
ME 2003 Appalachian National Scenic Maintenance 2 Piscataquis, $20,000 $14,400 $34,400
Trail Somerset, Franklin,
Oxford
ME 2003 Grafton Loop Construct Trail 2 Oxford $41,000 $15,000 $56,000
ME 2003 Devil's Head Trail Construct Trail 2 Washington $23,000 $15,500 $38,500
ME 2003 Moose River Bridge 2 Somerset $25,000 $18,059 $43,059
ME 2003 Blue Hill Mountain Trail Improvements 2 Hancock $20,000 $19,400 $39,400
ME 2003 Corinna Walking Trail Construct Trail 2 Penobscot $20,000 $34,000 $54,000
ME 2003 Grafton Loop Construct Trail 2 Oxford $20,000 $36,794 $56,794
ME 2003 International Friendship Trail Improvements, Bridges 2 Franklin $25,000 $53,474 $78,474
ME 2004 Wheeler Stream Bridge Wheeler Stream Bridge Motorized 2 Oxford $25,373 $6,343 $31,716
Replacement
ME 2004 Frenchville Recreational Trail Non-motorized 2 Aroostook $30,000 $7,500 $37,500
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2004 Aroostook State Park Aroostook State Park Non-motorized 2 Aroostook $5,000 $1,250 $6,250
ME 2004 Firetower Lands Firetower Lands Non-motorized 2 Aroostook $44,000 $11,000 $55,000
ME 2004 KI Acquisition KI Acquisition Diverse 2 Aroostook $80,000 $20,000 $100,000
ME 2004 Bangor and Aroostook Diverse 2 Aroostook $20,000 $50,000 $70,000
Rail-Trail
ME 2004 Jay-Farmington Rail-Trail Diverse 2 Franklin $8,700 $2,175 $10,875
ME 2004 Jay Farmington Trail Motorized 2 Franklin $39,747 $9,937 $49,684
ME 2004 Kennebec Messalonskee Diverse 2 Kennebec $30,000 $7,500 $37,500
Trails
ME 2004 Messalonskee Stream Trail Messalonskee Stream Trail Diverse 2 Kennebec $30,000 $7,500 $37,500
Project
ME 2004 Appalachian National Scenic Appalachian Trail Non-motorized 2 Piscataquis, $42,217 $10,554 $52,771
Trail Rehabilitation: 8 locations Somerset, Franklin,
Oxford
ME 2004 Grafton Loop Trail Grafton Loop Trail - Phase Non-motorized 2 Oxford $30,000 $7,500 $37,500
VI
ME 2004 Grafton Notch Grafton Notch, Bigelow Non-motorized 2 Oxford $15,000 $3,750 $18,750
Preserve
ME 2004 Holden Community Learning Non-motorized 2 Penobscot $15,189 $3,797 $18,986
Nature Trails
ME 2004 Orono Boardwalk Orono Boardwalk Safety and Environmental Education 2 Penobscot $4,250 $1,063 $5,313
ME 2004 Newport-Dover Trail Diverse 2 Penobscot $37,887 $9,472 $47,359
ME 2004 Newport-Dover Trail Diverse 2 Piscataquis $37,887 $9,472 $47,359
ME 2004 KI Trail KI Trail Improvements Diverse 2 Piscataquis $41,100 $10,275 $51,375
ME 2004 KI Trail KI Trail Improvements Diverse 2 Piscataquis $41,100 $10,275 $51,375
ME 2004 Forks Area Scenic Trail Diverse 2 Somerset $30,000 $7,500 $37,500
ME 2004 Unity Shared Use Path Unity Shared Use Path Non-motorized 2 Waldo $25,900 $6,475 $32,375
Parking Lot Parking Lot
ME 2004 Quoddy Head State Park Trail Improvements Non-motorized 2 Washington $4,000 $1,000 $5,000
ME 2005 Lewiston-Auburn Trails Lewiston-Auburn Trails Safety and Environmental Education 2 Androscoggin $4,000 $1,000 $5,000
Mapping Project
ME 2005 Violette Settlement Trail Violette Settlement Trail Non-motorized 2 Aroostook $25,000 $6,250 $31,250
System System Acquisition
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2005 Nordic Heritage Center Nordic Heritage Center Non-motorized 2 Aroostook $20,000 $5,000 $25,000
Mountain Bike & Foot Trails Mountain Bike & Foot Trails
ME 2005 Eagle Lake ATV Trails ATV Trail Project Motorized 2 Aroostook $20,000 $5,000 $25,000
ME 2005 Aroostook State Park Aroostook State Park Diverse 2 Aroostook $14,000 $3,500 $17,500
ME 2005 Bangor and Aroostook Motorized 2 Aroostook $20,000 $5,000 $25,000
Rail-Trail
ME 2005 KI Trail KI Trail Improvements Motorized 2 Aroostook $25,000 $6,250 $31,250
ME 2005 Winter Recreation Trails Trail Expansion & Non-motorized 2 Franklin $20,000 $5,000 $25,000
Development
ME 2005 Rangeley Lake Heritage Non-motorized 2 Franklin $15,000 $3,750 $18,750
Trust Recreational Trail
ME 2005 Various State Park Trails Parks South Non-motorized 2 Franklin $30,458 $7,615 $38,073
ME 2005 Jay-Farmington Rail-Trail Motorized 2 Franklin $55,000 $13,750 $68,750
ME 2005 Safety and Education Master of "Leave No Trace" Safety and Environmental Education 2 Hancock $5,000 $1,250 $6,250
Training : Outfit Leaders
ME 2005 Mill Pond Trail Mill Pond Trail Project Non-motorized 2 Kennebec $20,000 $5,000 $25,000
ME 2005 Grafton Loop Trail Non-motorized 2 Oxford $63,100 $15,775 $78,875
ME 2005 Oxford Hills Map and Sign Project Safety and Environmental Education 2 Oxford $4,800 $1,200 $6,000
ME 2005 Oxford Hills Map and Sign Project Safety and Environmental Education 2 Oxford $4,800 $1,200 $6,000
ME 2005 Kenduskeag Stream Kenduskeag Stream Non-motorized 2 Penobscot $21,000 $5,250 $26,250
Gateway Park Trailhead Gateway Park Trailhead
Facilities Facilities
ME 2005 Hermon Trail Hermon Trail Project Non-motorized 2 Penobscot $15,000 $3,750 $18,750
ME 2005 Four Seasons Adventure Motorized 2 Penobscot $10,000 $2,500 $12,500
Trail
ME 2005 Moose River Bridge Moose River Bridge Motorized 2 Somerset $59,622 $14,906 $74,528
ME 2005 Smokey's Dream Bridge Smokey's Dream Bridge Motorized 2 Somerset $14,175 $3,544 $17,719
ME 2005 Safety and Education Trail and Safety Safety and Environmental Education 2 Somerset $3,654 $914 $4,568
Map/Brochures
ME 2005 Belfast Trail System Development/Fitness Trail Non-motorized 2 Waldo $15,000 $3,750 $18,750
Project in City Park
ME 2005 Ducktrap River Trail Upper Ducktrap River Trail Non-motorized 2 Waldo $18,000 $4,500 $22,500
and Bridge Project
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2006 Minot Recreational Trails Diverse 2 Androscoggin $29,000 $7,250 $36,250
ME 2006 Various State Park Trails Non-motorized Trails Non-motorized 2 Androscoggin $38,529 $9,632 $48,161
Rehabilitation Projects
ME 2006 Cove Corner Trails Diverse 2 Aroostook $27,400 $6,850 $34,250
ME 2006 Meduxnekeag Stream Bridge Meduxnekeag Stream Bridge Motorized 2 Aroostook $24,840 $6,210 $31,050
Project Project
ME 2006 Prestile Stream Bridge Prestile Stream Bridge Motorized 2 Aroostook $14,400 $3,600 $18,000
Project Project
ME 2006 Molunkus Stream Bridge Molunkus Stream Bridge Motorized 2 Aroostook $35,640 $8,910 $44,550
Project Project
ME 2006 Split Cedar Trail Motorized 2 Aroostook $30,000 $7,500 $37,500
ME 2006 Four Seasons Trail Project Four Seasons Trail Project Diverse 2 Aroostook $29,000 $7,250 $36,250
ME 2006 Cove Corner Wood Trails Diverse 2 Aroostook $29,000 $7,250 $36,250
ME 2006 Aroostook State Park Aroostook State Park Trails Diverse 2 Aroostook $9,000 $2,250 $11,250
Enhancement
ME 2006 Statewide Trail Maintenance BARR Trail Renovation Motorized 2 Aroostook $27,258 $6,815 $34,073
ME 2006 Crouseville Trestle Crouseville Trestle Diverse 2 Aroostook $58,827 $14,707 $73,534
ME 2006 Safety and Education Trail Interpretive Signage Safety and Environmental Education 2 Aroostook $4,000 $1,000 $5,000
Project
ME 2006 Jay-Farmington Rail-Trail Jay-Farmington Rail-Trail Diverse 2 Franklin $20,000 $5,000 $25,000
Project
ME 2006 Miles Lane Trail Non-motorized 2 Hancock $11,500 $2,875 $14,375
ME 2006 Thomas College Trails Thomas College Trails Diverse 2 Kennebec $29,000 $7,250 $36,250
Project
ME 2006 Kennebec Messalonskee Rotary Centennial Trail Safety and Environmental Education 2 Kennebec $3,864 $966 $4,830
Trails Education Project
ME 2006 Bethel Pathway Bethel Pathway Diverse 2 Oxford $29,000 $7,250 $36,250
ME 2006 Goulds Landing Trail Goulds Landing Trail Project Non-motorized 2 Penobscot $3,000 $750 $3,750
ME 2006 Debsconeag Lakes Debsconeag Lakes Diverse 2 Piscataquis $29,000 $7,250 $36,250
Wilderness Area Wilderness Area Trail Project
ME 2006 Nahmakanta Nahmakanta Non-motorized 2 Piscataquis $8,000 $2,000 $10,000
ME 2006 Little Moose ATV Trails Little Moose ATV Trails Diverse 2 Piscataquis $24,785 $6,196 $30,981
ME 2006 Heselton Street Park Heselton Street Park Non-motorized 2 Somerset $20,400 $5,100 $25,500
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2006 Moose Point State Park Trail Rehabilitation Project Non-motorized 2 Waldo $1,560 $390 $1,950
ME 2006 Mowry Beach Mowry Beach Project Non-motorized 2 Washington $27,500 $6,875 $34,375
ME 2006 Safety and Education Trail Safety/Environmental Safety and Environmental Education 2 Washington $2,208 $552 $2,760
Education Project
ME 2006 State Administration Administration Administration 2 Androscoggin $30,010 $7,503 $37,513
ME 2007 Thorncrag Nature Sanctuary Thorncrag Nature Sanctuary Diverse 2 Androscoggin $20,000 $5,000 $25,000
Project Project
ME 2007 Turner Cove Turner Cove Acquisition Motorized 2 Androscoggin $143,000 $35,750 $178,750
ME 2007 Castle Hill Castle Hill Non-motorized 2 Aroostook $3,439 $860 $4,299
ME 2007 Deboullie Hiking Trails Deboullie Non-motorized 2 Aroostook $26,000 $6,500 $32,500
ME 2007 Squa Pan ATV and Sno Trail Motorized 2 Aroostook $26,681 $6,670 $33,351
ME 2007 Stockholm Trestle Stockholm Trestle Motorized 2 Aroostook $75,000 $18,750 $93,750
Renovation
ME 2007 Meduxnekeag River Meduxnekeag River Non-motorized 2 Aroostook $90,900 $22,725 $113,625
Suspension Bridge Suspension Bridge
ME 2007 Winter Recreation Trails Trail Development/ Diverse 2 Franklin $15,000 $3,750 $18,750
Improvement Project
ME 2007 Rangeley Winter Trails Trail Development Project Diverse 2 Franklin $20,000 $5,000 $25,000
ME 2007 Rangeley Lake Heritage Trails and Water Access Diverse 2 Franklin $27,658 $6,915 $34,573
Trust Recreational Trail Project
ME 2007 Sugar Island, Farm Island Sugar Island/Farm Island Diverse 2 Hancock $4,035 $1,009 $5,044
Campsites
ME 2007 Winslow Community Trails Community Trails Project Non-motorized 2 Kennebec $30,000 $7,500 $37,500
ME 2007 Safety and Education Source to the Sea Trek Safety and Environmental Education 2 Oxford $4,800 $1,200 $6,000
Project
ME 2007 Borestone Mountain Base Borestone Mountain Base Non-motorized 2 Piscataquis $14,560 $3,640 $18,200
Trail Trail Project
ME 2007 Appalachian National Scenic Caretaker & Ridgerunner Safety and Environmental Education 2 Piscataquis, $5,000 $1,250 $6,250
Trail Project Somerset, Franklin,
Oxford
ME 2007 Appalachian National Scenic Trail Restoration Project Non-motorized 2 Piscataquis, $30,000 $7,500 $37,500
Trail Somerset, Franklin,
Oxford
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2007 Forks Scenic Trail Diverse 2 Somerset $30,000 $7,500 $37,500
ME 2007 Georges River Expanding Public Access in Safety and Environmental Education 2 Waldo $2,286 $572 $2,858
Searsmont Project
ME 2008 North Auburn Road North Auburn Road Non-motorized 2 Androscoggin $9,000 $2,250 $11,250
Multi-Use Lake Trail Multi-Use Lake Trail Project
ME 2008 Turner Riverlands State Park Turner Riverlands State Park Motorized 2 Androscoggin $70,902 $17,726 $88,628
ME 2008 Deboullie Tower Trail Deboullie Tower Trail Non-motorized 2 Aroostook $58,000 $14,500 $72,500
Restoration
ME 2008 Salmon Brook Salmon Brook Land Unit Diverse 2 Aroostook $12,500 $3,125 $15,625
ME 2008 Winter Recreation Trails Trail Development and Non-motorized 2 Franklin $30,000 $7,500 $37,500
Expansion Project
ME 2008 North Jay White Granite North Jay White Granite Non-motorized 2 Franklin $11,470 $2,868 $14,338
Park Park Expansion
ME 2008 Onion Valley Trail Onion Valley Trail Diverse 2 Franklin $21,000 $5,250 $26,250
Restoration
ME 2008 Kennebec Messalonskee Kennebec Messalonskee Non-motorized 2 Kennebec $30,000 $7,500 $37,500
Trails Trails
ME 2008 Quarry Woods Trail Diverse 2 Kennebec $29,000 $7,250 $36,250
ME 2008 Canton Trails Canton Trail Project Diverse 2 Oxford $7,300 $1,825 $9,125
ME 2008 Winter Recreation Trails Trail Relocation Project Motorized 2 Oxford $3,885 $971 $4,856
ME 2008 Millinocket Bridge Bridge Construction Motorized 2 Penobscot $39,643 $9,911 $49,554
ME 2008 Orono Orono Land Trust Map Safety and Environmental Education 2 Penobscot $4,543 $1,136 $5,679
Project
ME 2008 Portage Canoe Trail Portage Canoe Trail Project Non-motorized 2 Piscataquis $12,000 $3,000 $15,000
ME 2008 Appalachian National Scenic Appalachian Trails Non-motorized 2 Piscataquis, $30,000 $7,500 $37,500
Trail Restoration Somerset, Franklin,
Oxford
ME 2008 Debsconeag Trail Debscogneag Trail Project Non-motorized 2 Piscataquis $29,000 $7,250 $36,250
ME 2008 Debsconeag Trail Debsconeag Trail Project Non-motorized 2 Piscataquis $29,000 $7,250 $36,250
ME 2008 Demonstration Forest Trail Demonstration Forest Trail Non-motorized 2 Piscataquis $18,096 $4,524 $22,620
Overlook Project
ME 2008 Four Seasons Recreational Four Seasons Recreational Diverse 2 Piscataquis $7,800 $1,950 $9,750
Trails Trails Project
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2008 Moose River Valley Nature Moose River Valley Nature Non-motorized 2 Somerset $6,600 $1,650 $8,250
Trail Trail Project
ME 2008 Moose Bridge construction Motorized 2 Somerset $95,000 $23,750 $118,750
ME 2009 Minot School Trails New Trails Trails at Recreation Area near town's ball 2 Androscoggin $27,840 $6,960 $34,800
fields
ME 2009 Rehabilitate Trails Rehabilitate Trails Construction of a bridge for snowmobile club 2 Aroostook $12,565 $3,141 $15,706
ME 2009 Rehabilitate Trails Rehabilitate Trails Restore 3.8 miles of trail. 2 Hancock $27,240 $6,810 $34,050
ME 2009 Quarry Road Trails New Trails Constructing ski loop (5 km) on land off from 2 Kennebec $30,000 $7,500 $37,500
Quarry Road. Had meeting with ATV and
Snowmobile Club who were told Quarry Rd.
would be closed to motorized use. City will
write letter stating it will not be closed.
ME 2009 Ellis River Bridge Bridge Construction Replacement of a Bridge over the Ellis River 2 Oxford $87,643 $21,911 $109,554
that fell in 2007
ME 2009 Appalachian National Scenic Rehabilitate Trails Improvements on AT from New Hampshire 2 Piscataquis, $24,000 $6,000 $30,000
Trail border Somerset, Franklin,
Oxford
ME 2009 New Trails New Trails Construction of 1.1 km barrier free trail, 5.7 2 Oxford $30,000 $7,500 $37,500
km 14' wide trail, and 2.2 km hiking trail
ME 2009 Rehabilitate Trails Rehabilitate Trails Town is improving trail (2053') from center of 2 Oxford $29,602 $7,401 $37,003
town to Telstar School for shared use
ME 2009 Rehabilitate Trails Rehabilitate Trails Put in bog bridging, waterbars and 2 Penobscot $19,139 $4,785 $23,924
improvements to trail on BLT properties
ME 2009 Rail-Trail Project ORV Trails Cutting back brush along 30+ miles of trail 2 Penobscot $60,000 $15,000 $75,000
and improvements to a short section that has
washed out
ME 2009 School Trails Rehabilitate Trails Rehab of loop located at high school 2 Piscataquis $9,966 $2,492 $12,458
ME 2009 Trail relocation Project Nahmakanta Reroute trail due to logging. Replace 2 2 Piscataquis $97,163 $24,291 $121,454
bridges.
ME 2009 Flagstaff Trailhead Project Rehabilitate Trails Trail head facility (40 cars) access to hut on 2 Somerset $14,198 $3,550 $17,748
Flagstaff Lake, with ADA outhouse & solar
lights.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2009 Rehabilitate Trails Rehabilitate Trails Trail improvements to snowmobile/hiker/biker 2 Somerset $30,000 $7,500 $37,500
trail in Rockwood
ME 2009 Land Acquisition Turner Acquisition Diverse 2 Androscoggin $42,151 $10,538 $52,689
ME 2009 Androscoggin Riverlands Trail Equipment ATV Mule of use at Turner 2 Androscoggin $11,000 $2,750 $13,750
State Park Trails
ME 2009 Trail Intern Trail Intern Intern to help with trail work, interview people 2 Androscoggin $7,500 $1,875 $9,375
as they arrive and help with the new
management plan
ME 2009 Salmon Bog Brook Trail Trail Construction 1.3 miles of hiking trail construction in the 2 Aroostook $25,000 $6,250 $31,250
Salmon Brook Lake Unit
ME 2009 Scopan Multi-use Trail OHV Trail Renovation 6.7 miles of ATV trail work at the Squapan 2 Aroostook $65,258 $16,315 $81,573
Unit
ME 2009 Multi-Use Trails Northern Region Parks Kineo, Roque Bluffs, Holbrook, Damariscotta, 2 Hancock $17,900 $4,475 $22,375
Non-motorized Project Moose Point and Lamoine trail improvements
ME 2009 Wright Trail Wright Trail Rehab 10 weeks of MCC for trail improvements. 2 Oxford $30,000 $7,500 $37,500
First phase of many for trail
ME 2009 Trail Brochure Safety and Environmental Brochure of trails constructed last year 2 Oxford $2,150 $538 $2,688
Education
ME 2009 Public Information Trail map/signage Trail signs and maps for trails at UMO 2 Penobscot $4,250 $1,063 $5,313
ME 2009 Pollywog Trail Trail Construction A multi-use trail project at the Nahmakanta 2 Piscataquis $25,838 $6,459 $32,297
Unit
ME 2009 Appalachian National Scenic Trail Project at several different areas of state on 2 Piscataquis, $30,000 $7,500 $37,500
Trail Renovation/Rehabilitation AT. Work includes 140 rock steps, 50 Somerset, Franklin,
stepping stones, 20 waterbars and much Oxford
more work
ME 2009 Bigelow Preserve Trails Trail and Trailhead 1.25 miles of hiking trail work in the Bigelow 2 Somerset $11,000 $2,750 $13,750
Improvements Preserve
ME 2009 Multi-Use Trails Trail Construction Multi-use trail construction and gate removal 2 Piscataquis $95,000 $23,750 $118,750
at the Seboomook Unit
ME 2009 Warren Island Interpretive Interpretive Project Educational Panel 2 Waldo $1,000 $250 $1,250
Project
ME 2009 Coast Guard Trail North Park Construction of a new Trail at Quoddy Head 2 Washington $34,999 $8,750 $43,749
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2010 Tumbledown Mountain Trails Trail Improvements on For continued work on Tumbledown 2 Franklin $30,000 $7,500 $37,500
Tumbledown Mountain Mountain Hiking Trails
ME 2010 Big Spencer Trail Trail Improvements on Big For improvement to the hiking trail up Big 2 Piscataquis $10,000 $2,500 $12,500
Spencer Mountain Spencer Mountain in the Moosehead region
ME 2010 Coastal Trail Trail Improvements and For 3 miles of hiking trail improvements on 2 Washington $23,000 $5,750 $28,750
Construction the Cutler Unit, and construction of a new
trailhead and hiking trail on the Donnell Unit
on Caribou Mountain
ME 2010 Tumbledown Dick Trail Trail Construction For a hiking and multi-use trail project at the 2 Piscataquis $22,500 $5,625 $28,125
Nahmakanta Unit (Tumbledown Dick Trail)
ME 2010 AmeriCorps Intern Environmental Educator For an Environmental Educator (AmeriCorps) 2 Washington $8,000 $2,000 $10,000
(AmeriCorps) to assist in recreation management on the
Cutler and Donnell Units
ME 2010 Trail Construction Project Trail Improvements and For 2 miles of improvements to hiking trails 2 Aroostook $20,000 $5,000 $25,000
Construction construction of a new 3 mile trail and on the
Deboullie Unit
ME 2010 Owls Head Trail Trail Improvements on For improvements to 2.5 miles of hiking trail 2 Penobscot $22,500 $5,625 $28,125
Scraggly Lake Unit on the Scraggly Lake Unit
ME 2010 Multi-Use Trails Trail Improvements on For improvements to 2 miles of a multi-use 2 Aroostook $50,000 $12,500 $62,500
Scopan Unit trail on the Scopan Unit
ME 2010 Bigelow Preserve Trails Environmental Educator For an Environmental Educator (AmeriCorps) 2 Franklin $8,000 $2,000 $10,000
(AmeriCorps) to assist in recreation management on the
Bigelow Preserve
ME 2010 Little Bigelow Mountain Trail Trailhead and Parking Area Provide an improved trailhead and parking 2 Franklin $11,550 $2,888 $14,438
area for the Little Bigelow Mountain Trail
ME 2010 Summit Trail Trail Improvements on Bald For improvements to 1.5 miles of hiking trail 2 Franklin $16,817 $4,204 $21,021
Mountain Unit on the Bald Mountain Unit in Rangeley,
Maine
ME 2010 Wright Trail Trail Improvements 3 miles of trail improvement work on the 2 Oxford $20,000 $5,000 $25,000
Wright Trail in the Mahoosuc Unit
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Connector Trail Bridge Project This project involved building a motorized, 2 Franklin $100,000 $25,000 $125,000
multi-use bridge across the Carrabassett
River. The bridge spans 110 feet across the
river and is 12 feet wide. The bridge is
located directly behind the Towns regional
airport. The intended use is for...
ME 2011 School Link Trail School Shared Use Trail The Town of Hermon proposed a 1,900 foot 2 Penobscot $21,519 $5,380 $26,899
long multi-use non-motorized nature trail that
connected the towns Middle and High
Schools. The towns Public Works
Department construct...
ME 2011 River Trail River Trail The Town of Skowhegan constructed a state 2 Somerset $29,629 $7,407 $37,036
of the art ADA trail along the Kennebec
River/Gorge, which is approximately 3,000
feet long. This trail connects the walking
bridge across the river to the downtown and
Philbrick Trail.
ME 2011 Lighthouse Trail Lighthouse Trail The town constructed 1 mile of new trail and 2 Hancock $25,725 $6,431 $32,156
improved parking within the 18 acre town
park. The project work included sanitary
facilities and improving parking for trail
access.
ME 2011 Appalachian National Scenic Appalachian Trail These projects rehabilitated seven sections 2 Piscataquis, $35,000 $8,750 $43,750
Trail Rehabilitation of the Appalachian Trail in Maine. They were Somerset, Franklin,
at West Baldpate, Old Blue Mt., Saddleback Oxford
Mt., Pleasant Pond Mt., West Peak of White
Cap Mountain, Nahmakanta Stream, and
Katahdin. The work involved, stone...
ME 2011 Morong Cove Trail Project Morong Cove This project entailed 3.25 miles of trail. This 2 Washington $32,175 $5,044 $37,219
year?s work included construction of 2.25
miles of new trail to expand and improve an
existing 1 mile of managed road/hiking trail.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Blue Hill Trail Project Blue Hill Trail Project The total trail distance covered by this project 2 Hancock $11,915 $2,979 $14,894
was 3.25 miles and parking construction
covered about 0.5 acres. The project created
two loop trails within a mile of an elementary
school. The work included; clearing trail
corridor, and trail...
ME 2011 Mahoosuc Trail (Appalachian Mahoosuc Trail Work A professional trail crew improved 1.5 miles 2 Oxford $26,500 $6,625 $33,125
National Scenic Trail) of trail, installing and replacing bog bridging
in muddy areas to prevent trail widening and
trampling of vegetation. The project was on
the Mahoosuc Trail, a section of the
Appalachian Trail, between Mt....
ME 2011 Baxter State Park Trails Baxter State Park Trail Work This project included work on 5 trails within 2 Penobscot $35,000 $8,750 $43,750
Baxter State Park. The work was done by an
MCC crew along with Baxter State Park trail
supervisors and included work on the Abol
Trail, the Saddle Trail, Helon Taylor Trail,
Chimney Pond Trail, and the...
ME 2011 Tramway Project Tramway Project This project included placing gravel in wet 2 Piscataquis $11,450 $2,863 $14,313
spots along the 3,000 foot portage trail
between Chamberlain and Eagle Lakes. This
trail is within the Allagash Wilderness
Waterway.
ME 2011 Tower Trail Tower Trail The goal of this project was to create a new 2 Washington $20,340 $5,085 $25,425
series of trail loops that will take park visitors
through varied terrain and ecosystems, while
highlighting points of interest. New trails
expanded an existing 2-mile trail network to
the extent that the...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Eyebrow Trail Eyebrow Trail Work The plans for this project were to hire a 2 Oxford $12,000 $3,000 $15,000
Maine Conservation Corps Crew for four
weeks to address erosion issues on steep
sections of the popular Eyebrow Trail. The
crew constructed ...
ME 2011 Shackford Trails Trail Rehabilitation This was a restoration project of an existing 2 Washington $16,000 $4,000 $20,000
trail system, and the work was completed by
a crew from the Maine Conservation Corps;
which included installing bog bridging,
ditching, rock steps, waterbars, and widening
some trails. A significant...
ME 2011 Loop Trail Cutler Trails The focus here was to continue the 2 Washington $24,860 $6,215 $31,075
restoration project on coastal trails. The
Cutler trails have over 3,000 foot of bog
bridging and this year?s goal is to add to that
total and to continue needed restoration
work.
ME 2011 Summit Trail Tunk Trails The project in this parcel was to adopt and 2 Hancock $22,500 $5,625 $28,125
upgrade the informal Tunk Mountain/Hidden
Pond Trail network and to establish a
trailhead and parking area. The upper section
of the Tunk Mountain Trail required a
significant amount of labor intensive,...
ME 2011 Owls Head Trail Scraggly Trail Work Construction of a new hiking trail from the 2 Penobscot $25,000 $6,250 $31,250
unit access road to the Owl?s Head Trail
which currently can only be accessed by
boat; also included in the plans is the
maintenance of the Owl?s Head Trail.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Flora & Fauna Bog Flora and Fauna Bog Construction of a 420 trail leading to a 160 2 Piscataquis $13,878 $3,470 $17,348
Observation Observation square foot bog observation deck which is
located on 115 acres of historical farm land.
The project consisted of clearing the trail;
stump removal; distribution of gravel along
the trail; and the...
ME 2011 Highland Path Georges' Highland Path This project constructed a new three-mile 2 Waldo $9,585 $2,396 $11,981
section of trail that connects the Gibson
Preserve to an existing section of the
Georges Highland Path called the Canal
Path. This new Ridge to River Trail, together
with two existing recreational...
ME 2011 Snowy Mountain Trail Snow Mountain Trails Extended and widened the multi-use, 2 Aroostook $24,840 $6,210 $31,050
non-motorized trail system in Stockholm. It
extended the current trail .4 miles. The entire
trail system was widened to make them more
accessible to those with some disabilities and
user friendly.
ME 2011 Powderhouse Trails Powderhouse Trails Construction of a new hiking trail from the 2 Franklin $33,561 $8,390 $41,951
unit access road to the Owl?s Head Trail
which currently can only be accessed by
boat; also included in the plans is the
maintenance of the Owl?s Head Trail.
ME 2011 Fly Rod Crosby Trail Fly Rod Crosby Trail This project involved the creation of 9 miles 2 Franklin $11,724 $2,931 $14,655
of trail. The Southern tip of the trail is in
Strong and continues north to Phillips, then
on to Rangeley, and ends in Oquossoc. The
work included, clearing corridor, waterbars,
and construction of...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 School Trails Town Trail Addition The purpose of this project was to extend the 2 Hancock $9,577 $2,394 $11,971
trail by .513 mile. The Miles Long Trail is 2.9
miles long located on town owned property
within the Village District of Bucksport. The
trail was ...
ME 2011 Shared Use Trail Shared Use Trail This proposal aimed to increase accessibility, 2 Aroostook $35,000 $8,750 $43,750
quality, and distances of the NHC trails.
Improvements included, upgrading of
signage, adding 2km to the lighted loop, and
the creation of 450m of new trail and
widening 350m to better accommodate...
ME 2011 Roberts Farm Trail Roberts Farm Trail The objective was to complete the remaining 2 Oxford $35,000 $8,750 $43,750
2.7k of 9-foot wide non-motorized multi-use
trails which are a part of the 12k Roberts
Farm Preserve Trail System in Norway. In
addition, work was done on the 3k Shavey
Noyes Trail with the addition of 3...
ME 2011 Dead River Trail Dead River Trail Project The project plans here were to construct 2 Franklin $35,000 $8,750 $43,750
approximately 13.5 miles of backcountry
recreational trail needed to complete a
cross-country system starting at the Grand
Falls, continuing along the Dead River
corridor, and ending at a proposed trail
head...
ME 2011 Intern Intern This funding provided assistance of an 2 Hancock $8,000 $2,000 $10,000
Environmental Educator intern to help with
stewardship tasks on the Donnell Pond
Public Lands. The interns duties included:
providing safety ...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Canoose & Little Falls Trail Repair The focus of this project was to remove and 2 Washington $11,300 $2,825 $14,125
Portage replace structural supports on three
footbridges, and adding a third stringer where
there are currently two. There was also some
fill and drainage work on sections of trail. The
Division is also hoping to...
ME 2011 Multi-Use Trails Trail Rebuild This project reopened 6 miles of trail that 2 Waldo $22,000 $5,500 $27,500
were constructed mainly for skiers in the
1990s. These trails are located on the north
side of the park on 350 acres of property that
is underutilized. Phase I of this project was
completed in 2010. This...
ME 2011 Amherst Acquisition /Trail Amherst Acquisition /Trail This 80 acre parcel includes portions of the 2 Hancock $90,000 $22,500 $112,500
work work 22-00-0 road, which provides recreational
access to the eastern portion of the 5,000
acre Amherst Mountains Community Forest
Unit and its ponds, forestlands, and hiking,
ATV, and snowmobile trails. The...
ME 2011 Sunrise Trail Trailhead/signs/improvement The Sunrise trail, an 85 mile multi use trail on 2 Washington $45,550 $11,388 $56,938
s an old railbed was completed last year. Most
of the work done was just for the tread way.
The trail was in desperate need of many
signs, trail head kiosks, interpretive panels
and also some touch up...
ME 2011 Multi-Use Trails Bridge Project The project aimed to restore approximately 1 2 Aroostook $21,200 $5,300 $26,500
mile of existing ATV/Snowmobile trail. The
trail is located between Hughes Brook and
Presque Isle Stream, off of East Chapman
Road in the Town of Chapman. The club
hired a contractor to rebuild this...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2011 Deer Hill Trail Deer Hill Restoration The project called for restoration of trail 2 Oxford $22,600 $5,650 $28,250
surfaces along an existing snowmobile trail at
Evergreen Mountain. The work included,
surfacing sections of the trail, ditch
reclamation, rock and stump removal,
widening grown in sections and marking the...
ME 2011 Bangor and Aroostook Bangor and Aroostook Trail This project involved the restoration of the 2 Aroostook $56,500 $14,125 $70,625
Rail-Trail Bangor and Aroostook Trail (BAT). The work
included, gravel surface restoration, ditch
reclamation, culvert replacement, and small
bridge deck replacements.
ME 2011 Seboeis South Seboeis South The Bureau purchased property that abuts 2 Penobscot $134,726 $33,682 $168,408
Acquisition/Trail work Acquisition/Trail work the Seboeis Land Unit. The Acquisition will
not only expand the existing land unit but will
provide snowmobile and ATV access from
Millinocket to the south.
ME 2011 Saddleback Trail Saddleback Trail Connector Repaired an existing shared use motorized 2 Franklin $50,000 $12,500 $62,500
trail in the Saddleback Mountain Area. This
trail had been neglected over the years and
was in need of extensive work. There had
been a conflict with one of the landowners
that has been resolved. Work...
ME 2011 Jay-Farmington Rail-Trail Jay-Farmington This project involved continued work along 2 Oxford $60,049 $15,012 $75,061
the Jay to Farmington Rail-Trail. This trail is
used by ATVs, Snowmobiles, Hikers, and
bikers and it runs along an abandoned rail
bed. Work included: construction of
waterbars, and some brush...
ME 2011 Safety and Education First Aid/CPR training MATC provided first-aid/CPR training, 2 Piscataquis, $3,092 $773 $3,865
chainsaw training, and wilderness first-aid Somerset, Franklin,
training for their Trail Volunteers. Oxford
ME 2012 Canton Snowmobile Trail Snowmobile Bridge Project Construction of bridge over abandoned dam 2 Oxford $12,500 $3,125 $15,625
abutments
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2012 Horseshoe Brook Trail Horseshoe Brook Trail Restore a 5.0 mile section of trail used by 2 Oxford $15,000 $3,750 $18,750
Project Project multiple users and is used mainly by
snowmobiles in the winter. Three bridges
sustained damage during hurricane Irene
along with washouts along this trail from the
highwater. Costs includes renting an...
ME 2012 Greenville Loop Trail Greenville Loop Improvements to several sections of trail 2 Piscataquis $10,384 $2,596 $12,980
recommended with the Seboomook Regional
Plan
ME 2012 Old Blue Trail (Appalachian Trail improvement Projects Improvements to 4 areas of the AT 2 Piscataquis, $18,400 $4,600 $23,000
National Scenic Trail) Somerset, Franklin,
Oxford
ME 2012 Orono Bog Boardwalk Oromo bog boardwalk Small portion of entire boardwalk project to 2 Penobscot $33,386 $8,346 $41,732
replace aging wood with composite
ME 2012 Haystack Mountain Trail Haystack Mtn. Trail work Constructing Rock Staircase to summit of 2 Aroostook $25,000 $6,250 $31,250
Haystack
ME 2012 OJI Trail Baxter State Park Trail Work Reroute of OJI Trail 2 Penobscot $33,000 $8,250 $41,250
ME 2012 Whitecap/Black Mountain Whitecap/Black Mountain Construct a new trail connecting Black 2 Oxford $18,750 $4,688 $23,438
Trail Trail Mountain with Whitecap Mountain
ME 2012 AMC Single Track Trail New Trail Construction This project involves the creation of 15.4 2 Piscataquis $31,250 $7,813 $39,063
miles of mountain bike trails constructed on
property owned by the Appalachian Mountain
Club in Shawtown Township. It will be the
first phase of a 30+ mile trail network . Most
of the work would be for...
ME 2012 Black Mountain Trail Black Mountain Trail Trail improvements along ski/bike trails on 2 Oxford $34,999 $8,750 $43,749
Improvement Project Black Mountain. Widen trails and improve
drainage
ME 2012 Owls Head Trail Trail construction Project Completion of the Owl's Head Trail at 2 Penobscot $10,000 $2,500 $12,500
Scraggly
ME 2012 Piscataquis County Waterfall SEE project Brochures and web applications for directions 2 Piscataquis $5,000 $1,250 $6,250
Waterfalls to different waterfalls in Piscataquis County
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2012 Carrabassett Valley Outdoor Bike Safety Information Information on bike safety and also signage 2 Franklin $4,808 $1,202 $6,010
Center and kiosks at town's recreation center. Safety
video and brochures done
ME 2012 Lighthouse Trail Lighthouse Trail Education Provide signage for newly constructed 2 Hancock $3,862 $966 $4,828
Project Lighthouse trail on the Island
ME 2013 Missing Link Trails Missing Link Trails This project involves construction of a 2 Piscataquis $34,209 $8,552 $42,761
Moosehead Snowmobile/ATV Connector trail
project which will link the western and
northern side of Greenville to the eastern and
southern side, allowing snowmobile riders a
complete loop trail around Moosehead...
ME 2013 Allen Stream Bridge Allen Stream Bridge This project involves the removal of 109 ft of 2 Androscoggin $70,000 $1,750 $71,750
existing wood and flatbed deck bridge, 45 ft
flatbed deck bridge and 32 ft wooden ramps,
replaced by the construction of a new 180 ft
steel, wood and gravel bridge, 4 80 ft
weathering steel I-beam and...
ME 2013 Whistle Stop Trail ORV Trail Work This project involves approximately 5 miles of 2 Franklin $25,000 $6,250 $31,250
trail restoration, including the grading and
mowing of the Whistle Stop Trail in the Wilton
area. The trail has developed potholes and
ruts where water runs or accumulates, so the
trail needs to be...
ME 2013 Heritage Trail Heritage Trail Project This project is designed to stabilize a section 2 Aroostook $30,000 $7,500 $37,500
of banking at the Factory Brook box culvert
on the St. John Heritage trail in St. John
Plantation. A bridge will be installed over the
existing failing box culvert in order to
minimize soil disturbance...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2013 Greenville -Motorized Trail Motorized Trail Connection - This Project includes 15 miles of restoration 2 Piscataquis $46,701 $11,675 $58,376
Connection Project Phase II and maintenance on existing snowmobile and
eventually ATV trails. In addition, there will be
25 miles of new construction in the
Moosehead Lake Region on private and
public lands.
ME 2013 Lighthouse Trail Lighthouse Trails This project involves the continued 2 Hancock $5,935 $1,484 $7,419
development of hiking trails and associated
facilities on Hockamock Head. This will
include work on 1.8 miles of trail, including
installation of 27 stone steps, 2 water bars,
and the installation of an...
ME 2013 Appalachian National Scenic Appalachian Trail This project involves the reconstruction of ten 2 Piscataquis, $35,000 $8,750 $43,750
Trail Improvements trail sections at backcountry locations on the Somerset, Franklin,
Appalachian Trail in Maine, totaling 45 crew Oxford
weeks.
ME 2013 Messalonskee Trail Messalonskee Trail This project involves resurfacing the 1.5 mile 2 Kennebec $13,405 $3,351 $16,756
Messalonskee Stream Trail up to the CMP
power line with Erosion Control Mix.
ME 2013 Black and White Trail Black and White Trail II Phase II of the Black and White Trail project 2 Oxford $15,000 $3,750 $18,750
(which connects existing trails near the
summits of Whitecap Mountain and Black
Mountain in Rumford) involves constructing
water bars and sidehilling to prevent erosion
on 2.8 miles of newly constructed...
ME 2013 Ecotat Trail Ecotat Trail Expansion This project entails constructing information 2 Penobscot $31,375 $7,844 $39,219
stations, as well as the construction of a 2500
ft trail, 500 ft of which will be a bog walk
allowing users to experience Maine bog plant
life.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2013 Maine Huts and Trails Maine Huts and Trails, This project involves upgrading 28 miles of 2 Franklin $21,000 $5,250 $26,250
Phase I trail to include tread for mountain biking and
hiking, eliminating water and mud spots along
52 trail miles, and completing work on the 7
mile trail loop around Stratton Brook Hut.
ME 2013 Carlo Col Trail Carlo Col Trail This project involves a professional trail crew 2 Oxford $27,600 $6,900 $34,500
to relocate a .25 mile section of trail that is
currently a stream bed and install trail
structures on the remaining ~1.0 mile of trail
to reduce and control erosion and make the
trail safer for hiker...
ME 2013 Little Jackson Tumbledown Trail Project This project includes continuation of ongoing 2 Franklin $20,000 $5,000 $25,000
improvement projects to the Tumbledown trail
system including erosion control, stone step
work and improved signage on the Parker
Ridge, Loop and Little Jackson Mountain
Trails.
ME 2013 Deboullie Trail Project Deboullie Trail Project This project includes the maintenance of 2 Aroostook $20,000 $5,000 $25,000
existing hiking trails, trail reroutes and the
construction of a 1.5 mile section of new trail
connecting to an existing trail.
ME 2013 Cutler Trail Project Trail Upgrade This project will involve continued repair and 2 Washington $22,500 $5,625 $28,125
replacement of several thousand feet of bog
walks on the 10-mile Cutler Coast Trail.
There will also be rock work for wet areas to
be used as stepping stones.
ME 2013 Maranacook Fairground Trail Maranacook Fairground Trail This project involves the construction of two 2 Kennebec $29,555 $7,389 $36,944
Project pedestrian/biking trail segments, the Link
Trail (.4 miles) and the North Trail (.2 miles)
which will connect the existing Fairgrounds
Trail system with the newly constructed
sidewalk and path at...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2013 Moose Bog Loop Moose Bog Loop Trail This project involves the construction of a 2 Franklin $35,000 $8,750 $43,750
Project non-motorized, hand built beginner mountain
bike trail located at the Sugarloaf Outdoor
Center. The trail is of a mile in length and
runs within trail #7 of the Nordic Ski Trail
Network. Other aspects...
ME 2013 Virgil Paris Forest Virgil Paris Forest Project This project entails the completion of the 2 Oxford $24,000 $6,000 $30,000
construction of the non-motorized Packard
Trail, as well as to install trailhead signage
and entry gates on a new ATV linkage trail in
the Virgil Parris forest. Approximately 1/3 of
the 2 mile 4 ft wide...
ME 2013 Centennial Trail Centennial Trail This project provides for the reconstruction of 2 Kennebec $17,082 $4,271 $21,353
a ramp that connects the parking area to the
trail that will, for the first time, provide
wheelchair access
ME 2013 Aroostook State Park, Haystack/Aroostook Trail This project involves restoration and 2 Aroostook $28,000 $7,000 $35,000
Haystack State Park Work maintenance of 8 miles of trails and includes
finishing 45 yards of steps in the steep
portion of the Haystack Mountain Trail, as
well as improvements to North and South
Peak hiking trails, which would include...
ME 2013 Bigelow Preserve Education Environmental Education This project involves the maintenance of 2 Piscataquis $12,000 $3,000 $15,000
existing hiking trails and an MCC
Environmental Educator to work on the trail
during the season at the Division of Parks
and Public Lands Bigelow Preserve.
ME 2013 Turtle Ridge Loop Trail Trail This project entails the completion of a 2 Piscataquis $31,738 $7,935 $39,673
improvement/Environmental project which will link the Turtle Ridge Loop
Education Trail (9 miles) to the Debsconeag Wilderness
Loop trail (10 miles). This will involve .5 miles
of new trail construction.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2013 Kennebec Messalonskee Mapping and Publicity New Trail Maps and webpage improvements 2 Kennebec $4,588 $1,147 $5,735
Trails Project related to trail
ME 2013 Good Will Hinckley School Trails Side Forest Panels and trail related materials for users of 2 Somerset $1,813 $453 $2,266
Understory trail at school
ME 2013 Allagash Wilderness Video Produce a video for safety along the AWW 2 Aroostook $10,463 $2,616 $13,079
Waterway water trail
ME 2014 Monroe Elementary School Monroe Elementary School Monroe Elementary School Community Trail 2 Waldo $10,250 $2,563 $12,813
Community Trail Community Trail
ME 2014 Bethel Bikeways Bikeway Trail Project Bikeway Trail Project 2 Rumford $35,000 $8,750 $43,750
ME 2014 Lake Auburn Watershed Recreation Trail Project Recreation Trail Project 2 Androscoggin $10,800 $2,700 $13,500
Trails
ME 2014 RSU 67 Trail RSU 67 Trail Project RSU 67 Trail Project 2 Penobscot $34,995 $8,749 $43,744
ME 2014 Crabtree Trail Crabtree Trail Construction Crabtree Trail Construction Project 2 Hancock $16,000 $4,000 $20,000
Project
ME 2014 Beaver Cove Trails Multi-Use Connector Trail Multi-Use Connector Trail 2 Piscataquis $35,000 $8,750 $43,750
ME 2014 Microburst Trail Microburst Trail Cleanup Microburst Trail Cleanup Project 2 Waldo $8,500 $2,125 $10,625
Project
ME 2014 Ledge Trail Ledge Trail Project Ledge Trail Project 2 Androscoggin $18,000 $4,500 $22,500
ME 2014 Lamoine Conservation Trail Lamoine Conservation Trail Lamoine Conservation Trail Project 2 Hancock $5,000 $1,250 $6,250
Project
ME 2014 Appalachian National Scenic AT Improvement Project Appalachian Trail Improvement Project 2 Piscataquis, $35,000 $8,750 $43,750
Trail Somerset, Franklin,
Oxford
ME 2014 Baxter State Park Trails Baxter Re-Route Trail Baxter Re-route Trail Project 2 Piscataquis $34,000 $8,500 $42,500
Project
ME 2014 Loop Trail Loop Trail Improvement Loop Trail Improvement Project 2 Piscataquis $28,000 $7,000 $35,000
Project
ME 2014 Little Jackson Trail Little Jackson Trail Project Little Jackson Trail Project 2 Piscataquis $30,000 $7,500 $37,500
ME 2014 Deboullie Public Reserved Trail Construction Project Trail Construction Project 2 Aroostook $26,019 $6,505 $32,524
Land
ME 2014 Pit Trail Pit Trail Bridge Pit Trail Bridge 2 Washington $100,000 $25,000 $125,000
ME 2014 B-Stream Bridge B-Stream Bridge B-Stream Bridge 2 Aroostook $79,250 $19,813 $99,063
ME 2014 Sandy Stream Bridge Sandy Stream Bridge Sandy Stream Bridge 2 Waldo $30,159 $7,540 $37,699
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2014 Chesuncook Trail Chesuncook Trail Project Chesuncook Trail Project 2 Piscataquis $8,000 $2,000 $10,000
ME 2014 Fish River Greenway Fish River Greenway SEE Fish River Greenway SEE Project 2 Aroostook $4,634 $1,159 $5,793
Project
ME 2014 Public Information Leave no Trace Trail Project Leave no Trace Trail Project 2 Piscataquis, $5,000 $1,250 $6,250
Somerset, Franklin,
Oxford
ME 2014 Allagash Wilderness Map/Brochure Project Map/Brochure Project 2 Aroostook, $12,227 $3,057 $15,284
Waterway Piscataquis
ME 2015 100 Miles Wilderness 100 Miles Wilderness 2 Multiple Counties $5,000 $1,250 $6,250
ME 2015 Cobscook Bay State Park Cobscook Bay State Park 2 Washington $3,128 $782 $3,910
Area Trail Map
ME 2015 10th Mountain Trails 10th Mountain Trails 2 Aroostook $35,000 $8,750 $43,750
ME 2015 Passay Rail Trail Passay Rail Trail 2 Waldo $35,000 $8,750 $43,750
ME 2015 Carrabassett Valley Trails Carrabassett Valley 2 Franklin $35,000 $8,750 $43,750
Connector Trails
ME 2015 Barker Mill Greenway Barker Mill Greenway 2 Androscoggin $34,190 $8,547 $42,737
ME 2015 Wilton Trestle Bridge Re-deck and widen the Re-deck and widen the Wilton Trestle Bridge 2 Franklin $54,023 $13,506 $67,529
Wilton Trestle Bridge
ME 2015 Mount Blue State Park Mt Blue MCC ES 2 Franklin $11,687 $2,922 $14,609
ME 2015 Mount Blue Ski Trails Mount Blue Ski Trails 2 Franklin $8,766 $2,192 $10,958
ME 2015 Androscoggin Riverlands ARSP Trail Repair 2 Androscoggin $9,350 $2,337 $11,687
State Park Trail
ME 2015 Snow Shoe Trail Snow Shoe Trail 2 Androscoggin $13,148 $3,287 $16,435
Development
ME 2015 Grafton Notch Eyebrow Trail Grafton Notch Eyebrow Trail 2 Oxford $17,530 $4,383 $21,913
ME 2015 Appalachian National Scenic AT Trail Improvements Trail Improvements 2 Piscataquis, $35,000 $8,750 $43,750
Trail Somerset, Franklin,
Oxford
ME 2015 Abol Trail Abol Trail Relocation Trail Relocation 2 Piscataquis $35,000 $8,750 $43,750
ME 2015 Portage Trail Portage Trail Restoration Trail Restoration 2 Aroostook $12,400 $3,100 $15,500
ME 2015 Coast Guard Trail Coast Guard Trail Phase 2 Washington $24,000 $6,000 $30,000
Two
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2015 RLSP Shore Path and RLSP Shore Path and 2 Franklin $12,300 $3,075 $15,375
Moose Corridor Trail Moose Corridor Trail
ME 2015 Deboullie Hiking Trails Deboullie Hiking Trails 2 Aroostook $45,000 $11,250 $56,250
ME 2015 Little Moose Trail Little Moose Trail 2 Piscataquis $31,310 $7,828 $39,138
ME 2015 Perham Stream Bridge Perham Stream Multi Use 2 Hancock $100,000 $25,000 $125,000
Bridge
ME 2015 Caribou Trails Connector Trail 2 Aroostook $29,940 $7,485 $37,425
ME 2015 Mount Blue Multi-User Trail Mount Blue Multi-Use Trail 2 Franklin $37,400 $9,350 $46,750
System System
ME 2016 Fogg Island Preserve Kiosk Construction Construct informational kiosk 2 Kennebec $4,570 $1,143 $5,713
ME 2016 Stratton Brook Hut Trail Stratton Brook Hut Trail and Construct wood bridge connecting Stratton 2 Franklin $32,500 $32,500 $65,000
Bigelow Preserve Trail and Brook Hut with Bigelow Preserve and
Single Track purpose built single track
ME 2016 Rainbow Loop Trail Rainbow Loop Trail Construct new 2.5 mile trail connecting 2 Piscataquis $35,000 $10,000 $45,000
Horserace Pond and Blue Trail
ME 2016 St. Lawrence Junior High Maine School Administrative Connect schools by constructing a 70 foot 2 Somerset $25,160 $6,300 $31,460
Bridge District 49 Bog Bridge boardwalk through the wetlands
ME 2016 Branch Lake State Park Parking and Trailhead Construct trailhead parking, construct 2 Hancock $25,000 $6,250 $31,250
accessible trail
ME 2016 Mount Blue State Park Maine Conservation Corp Trail maintenance 2 Franklin $7,766 $1,942 $9,708
and Environmental Steward
ME 2016 Pine Loop Trail Pine Loop Trail Maine Trail and bridge maintenance 2 Androscoggin $4,699 $1,175 $5,874
Conservation Corp
ME 2016 Witt Swamp Connector Trail Witt Swamp Connector Trail Construct trail connector 2 Oxford $34,976 $9,428 $44,404
ME 2016 Mahoosuc Trail Mahoosuc Trail Work Replace bog bridges, trail maintenance 2 Oxford $25,572 $8,000 $33,572
ME 2016 Glassface Trail Glassface Trail Trail Construction 2 Oxford $30,050 $9,050 $39,100
ME 2016 Harrington Elementary School Nature Trail Replace bog bridging 2 Washington $29,555 $7,389 $36,944
School
ME 2016 Piscataquis Primary School Trail and Outdoor Classroom Construct accessible trail 2 Piscataquis $25,604 $6,821 $32,425
ME 2016 Eyebrow Trail Eyebrow Trail Maine Trail maintenance 2 Oxford $31,079 $7,770 $38,849
Conservation Corp and
Environmental Steward
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2016 Whitman Mountain Trailhead Trail Rehab and Trail maintenance 2 Aroostook $32,132 $8,033 $40,165
Maintenance
ME 2016 Little Moose Unit Maine Conservation Corp Trail maintenance 2 Piscataquis $15,800 $3,950 $19,750
and Environmental Steward
ME 2016 Indian Hill Bridge and Trail Bridge and Trail Maintenance 2 Piscataquis $99,965 $53,485 $153,450
Rehabilitation
ME 2016 Souadabscook Brook 65 ft Bridge Replacement Replace existing bridge 2 Penobscot $60,064 $18,797 $78,861
Enhancement
ME 2016 Dover Foxcroft Trestle Dover Foxcroft Bridge Replace existing bridge 2 Piscataquis $79,011 $23,510 $102,521
Redeck and Trail Rehab
ME 2017 Maps and Guides Maps and Guides Augusta Trails intends to leverage funding 2 Kennebec $4,500 $5,000 $9,500
from the Sewall Foundation to develop, print
and disseminate map products that combine
existing trail resources from a wide range of
trail systems and land owners, all maintaining
public access, to provide a...
ME 2017 Trail of the Senses Trail of the Senses The University of Maine Department of 2 Penobscot $4,196 $1,770 $5,966
Interpretation Engineering and Technology will complete
and install interpretive / educational features
for a "Trail of the Senses" (ToS) currently
under construction at the 2,400 acres
Hirundo Wildlife Refuge. This initial...
ME 2017 Appalachian National Scenic AT Ridgerunners Caretaker and Ridgerunners will provide 2 Piscataquis, $5,000 $55,554 $60,554
Trail environmental education and promote public Somerset, Franklin
safety along busy Maine sections of the
2,220-mile Appalachian National Scenic Trail.
ME 2017 Quarry Road Trail Quarry Road Trail NEMBA and its local chapters propose to 2 Kennebec $13,400 $6,000 $19,400
Construction construct an approximately 1.75 natural
surface singletrack trail on the slopes of the
former Colby College Ski Area at the Quarry
Road Recreation Area (QRRA), owned and
managed by the City of Waterville Parks...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2017 Valentine Trail Valentine Trail Construction Mahoosuc Land Trust proposes to construct 2 Oxford $41,438 $15,000 $56,438
a universally accessible walking trail
comprised of two short loops around the
Valentine Farm property. The trail will be
approximately 1.1 miles in length. There will
be ample opportunities for nature...
ME 2017 YMCA Outdoor Education & YMCA Outdoor Education & The project sponsor proposed to develop 2 Androscoggin $48,339 $462,710 $511,049
Learning Centers Trails Learning Centers Trails trails for hiking, snowshoeing, mountain
biking, Nordic skiing and running with
associated trailside and trailhead amenities
within their 93 acre wooded property in
Auburn. The project is part of a larger...
ME 2017 Mount Blue State Park Mount Blue State Park Trail This park will contract with the Maine 2 Franklin $15,108 $10,000 $25,108
Rehabilitation Conservation Corps to provide two
Environmental Stewards to perform trail
rehabilitation and maintenance work within
the wide range of diverse use trails. Specific
work will include: upgrading trails in the...
ME 2017 Appalachian National Scenic Appalachian National Scenic During the summer of 2017, over 21 2 Piscataquis $50,000 $106,800 $156,800
Trail Trail Rehab crew-weeks, the Maine Trail Crew will
improve the A.T. to control erosion, protect a
wetland, improve access and safeguard
public safety. Sections addressed during this
season of work are; Little Wilson Falls,
Long...
ME 2017 Florida Lake Trail Florida Lake Trail The town of Freeport will repair sections of 2 Cumberland $11,000 $4,800 $15,800
Rehabilitation Project their +/-2.8mi of trails at the Florida Lake
Park on the outskirts of town. The project will
include the installation of +/-856ft of bog
bridges and 25 new sign posts within the trail
corridor.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2017 Chisholm Brook, Long Lake Chisholm Brook and Long At Chisholm Brook Campsite, the trail to the 2 Arrostook $10,000 $2,500 $12,500
Trail Lake Trail Rehab campsite will be stabilized, stone steps and
rip-rap will be used to harden the tread. At
the Long Lake Dam site the portage trail will
be rehabilitated via tread hardening, with the
use of stone steps...
ME 2017 Eyebrow Trail Maine Conservation Corp The park will contract with the Maine 2 Oxford $54,400 $13,507 $67,907
and Environmental Steward Conservation Corps for a 12 week
commitment of a six person team to address
erosion issues on steep sections of the
popular Eyebrow Trail. Work will include
constructing stone staircases, water bars,
ditching,...
ME 2017 Lily Bay, Mt Kineo Maine Conservation Corp The RTP Grant will be used to rebuild 2 Piscataquis $80,000 $20,000 $100,000
and Environmental Steward existing trails at Mt Kineo, Lily Bay and the
Penobscot River Corridor (PRC). Trail
lengths to be improved at the sites are 4
miles, 3 miles and 27 miles respectively. An
MCC crew and environmental steward will...
ME 2017 Down East Sunrise Trail Down East Parking The project site is currently undeveloped land 2 Washington $18,450 $13,000 $31,450
Parking Improvements owned by the town of Whitneyville with typical
brushy second growth vegetation. The
proposed project is to build a 100 ft x 150 ft
parking lot adjacent to the 90-mile long Down
East Sunrise Trail and...
ME 2017 Four Seasons Adventure Four Seasons Adventure Resurface approx. 3 miles of Four Seasons 2 Piscataquis $54,000 $13,879 $67,879
Trail Trail Rehab Adventure Multi Use Rail trail from the Silver
Mills Road in Sangerville to the Starbird
Siding Road in Dover- Foxcroft. The trail
surface is rough with excessive pot holes.
Resurfacing this trail will...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2017 Lagrange-Medford Rail Trail Lagrange Medford Cold Re-deck and replace railings on the trestle 2 Piscataquis $15,000 $3,750 $18,750
Brook Bridge over Cold Stream in Lagrange on the
Lagrange/Medford Rail Trail; rehabilitation of
trail sections leading to and from this bridge.
This is a major connector trail for both ATV
and snowmobile use in the...
ME 2017 Little Moose Unit Little Moose Unit This project will rehabilitate a heavily used 2 Piscataquis $10,000 $2,517 $12,517
trail between Greenville, Rockwood and The
Forks all of which is suffering from washouts,
exposed rocks, and erosion issues. For the
safety of trail users, the trail needs
resurfacing, ditching, grading,...
ME 2017 Bangor and Aroostook Bangor & Aroostook Trail Work with this project will focus on two 2 Aroostook $34,000 $9,957 $43,957
Rail-Trail Rehabilitation sections of this motorized trail, Stockholm
Bridge over Snake Brook and the Hines
Street section of trail in Washburn.
Stockholm section will Re-deck a bridge over
Snake Brook which is currently in dire need...
ME 2017 Whistle Stop Trail Whistle Stop Trail The first part of this two pronged project will 2 Franklin $104,503 $22,829 $127,332
Rehabilitation resurface 2 +/- miles of Whistle Stop Multi
Use Rail trail from the Old Jay Road (east
end) to the Old Jay Road (west end) in Jay.
Resurfacing this trail with gravel will bring the
surface up to the...
ME 2018 Coe Park Connector Coe Park Connection Connector 2 Penobscot $18,000 $10,650 $28,650
Switchback
ME 2018 Eyebrow Trail Eyebrow Trail Maine Eyebrow Trail rehabilitation 2 Oxford $27,800 $5,560 $33,360
Conservation Corp and
Environmental Steward
ME 2018 Appalachian National Scenic Appalachian Trail Trail Improvements 2 Piscataquis, $44,728 $93,751 $138,479
Trail Improvements Somerset, Franklin,
Oxford
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2018 Mount Blue State Park Mount Blue State Park Trail This park will contract with the Maine 2 Franklin $9,200 $8,209 $17,409
Rehabilitation Conservation Corps to provide two
Environmental Stewards to perform trail
rehabilitation and maintenance work within
the wide range of diverse use trails. Specific
work will include: upgrading trails in the...
ME 2018 Spruce Mountain Cove Spruce Mountain Cove Spruce Mountain Cove Campsite 2 Washington $22,900 $5,842 $28,742
Campsite Rehabilitation Rehabilitation
ME 2018 Whitman Mountain Trail Whitman Mountain Trail Whitman Mountain Trail Rehabilitation 2 Aroostook $19,225 $9,256 $28,481
Rehabilitation
ME 2018 Allagash Falls Portage Trail Allagash Falls Portage Trail Allagash Falls Portage Trail Rehabilitation 2 Aroostook $8,650 $3,071 $11,721
Rehabilitation
ME 2018 Rangeley River Bridge Bridge 2 Franklin $33,300 $10,510 $43,810
ME 2018 Heritage Park Trailhead Heritage Park Trailhead Heritage Park Trailhead 2 Aroostook $40,000 $47,000 $87,000
ME 2018 Heritage Trail Fish River Heritage Trail Fish River Heritage Trail Fish River Bridge 2 Aroostook $65,000 $20,000 $85,000
Bridge Bridge
ME 2018 Bangor and Aroostook Bangor & Aroostook Trail Bangor & Aroostook Trail Rehabilitation 2 Aroostook $47,732 $14,480 $62,212
Rail-Trail Rehabilitation
ME 2018 Allagash Allagash ADA Retrofit Allagash ADA Retrofit 2 $20,381 $5,750 $26,131
ME 2018 Androscoggin Riverlands Androscoggin Riverlands Androscoggin Riverlands State Park Trail 2 Androscoggin $37,280 $9,320 $46,600
State Park Trail State Park Trail Rehabilitation
Rehabilitation
ME 2019 Signage Aroostook Coordinated This project will create signage that will Unify 2 Aroostook $5,000 $1,250 $6,250
Signage Project the Aroostook County ITS System creating a
safer riding environment. All County Clubs
will have access to 3 sets of signs that will be
created with their respective information. Now
Entering Signs, AK...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2019 Appalachian National Scenic AT Ridgerunners The Ridgerunners will be trained as Leave 2 Piscataquis, $5,000 $51,000 $56,000
Trail No Trace educators and interact with all hiker Somerset, Franklin
types but focus on youth groups and AT
thru-hikers. They will manage campsites,
patrol alpine summits, teach hikers to
minimize fire impacts, stay on durable...
ME 2019 Safety and Education Map and Signage Project ARWC coordinates the Androscoggin River 2 Oxford, Franklin, $2,550 $1,250 $3,800
Trail which has 23 access sites between Androscoggin
Gilead and Durham. Sixteen of the sites
have kiosks with trail maps. Seven sites
have only a sign, and two of those have a
trail map. We plan to install an additional...
ME 2019 Safety and Education Trail Training Workshops The Maine Conservation Corps seeks 2 Kennebec $6,060 $1,212 $7,272
funding to execute a variety technical trail
workshops for MCC staff. The training will be
carried out by trail professionals, such as
Professional Trail Builder Association
members or individuals/organizations with...
ME 2019 Snow Pond Trail Snow Pond Trail The proposed project includes adding a new 2 Kennebec $30,000 $8,800 $38,800
Improvements 6-feet wide trail of 7,168 ft (1.36 miles) in
length. This trail links to an existing logging
trail system (used for walking) that is .53
miles in length, also on the same property,
and is presently...
ME 2019 Norway Branch Rail Trail Norway Branch Rail Trail The Norway Branch Rail Trail will transform 2 Kennebec $76,500 $25,000 $101,500
the abandoned, overgrown, underutilized,
difficult-to-traverse Norway Branch Railroad
bed into an inviting, beautiful, six-foot wide,
universally accessible, non-motorized
recreation and active...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2019 Witt's End Loop Trail Witt's End Loop Trail The Trust is requesting support for a .5 mile, 2 Oxford $28,135 $5,626 $33,761
Connector Connector non-motorized diverse use trail which will
create a 2-mile loop at the eastern end of the
Trust's Witt's End Trail, in Norway. The loop
trail, to be built on top of an historic raised
road bed, the Old...
ME 2019 Parker Point - South Street Parker Point - South Street The vision for the Parker Point-South Street 2 Hancock $31,692 $9,400 $41,092
Trail Trail Trail project is to significantly improve 2,665
of an existing highly rooted and eroded trail
that serves as substantial link in overall
pedestrian connectivity between the heart of
Blue Hill and the...
ME 2019 Tools and Equipment Trail Tools and Equipment The Maine Conservation Corps is expanding 2 Kennebec $41,406 $8,450 $49,856
the number of teams in the field by two and
needs to outfit these teams with all of the
equipment and tools necessary which
encompass a variety of Hand Tools: axes,
saws, mattocks, McCleods, shovels, rakes,...
ME 2019 Harbor Walk Trail Harbor Walk Trail This project will extend an existing walkway 2 Hancock $50,000 $30,716 $80,716
Connection Connection at Harbor Park in Ellsworth along the Union
River and unify the whole property. The trail
extension will link the portion of the park
nearest the municipal docks with the portion
of the property formerly...
ME 2019 Grafton Loop Trail Grafton Loop Trail Work will traverse across 6.7 miles along the 2 Oxford $37,502 $12,000 $49,502
Rehabilitation Grafton Loop Trail, starting near the summit
of Sunday River White Cap heading south to
the trailhead on Rte. 26. Work will consist of
replacing 54 tamarack stringers that sit along
the ridge and summit...
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
ME 2019 Eyebrow Trail, Table Rock Eyebrow & Table Rock Trail The Eyebrow Trail is a loop that is over two 2 Oxford $37,539 $9,385 $46,924
Trail Maintenance miles in length. The primary project area will
focus on a .5 mile section of the Eyebrow
Trail. The project consists of 8 weeks of a
six-person Maine Conservation Corps trail
crew to address erosion...
ME 2019 Sherman to Patten Rail Trail Sherman to Patten Rail Trail This initiative will grade, crown, resurface, 2 Aroostook, Penobscot $20,862 $5,216 $26,078
Maintenance and perform other trail maintenance on a six
mile portion of this public ATV and
snowmobile trail.
ME 2019 Four Seasons Adventure Newport Motorized Vehicle Acquisition of 3.8+/- acres of land for trail 2 Kennebec $216,000 $54,600 $270,600
Trail Trailhead Acquisition head parking on the Four Seasons Adventure
Trail in the Town of Newport. The lot is
currently privately owned.The State has
leased this property for 4 years in order to
provide parking and access to the...
ME 2013 Goodell Falls Trail Goodell Falls Trail This project involves establishing a 526 ft 3 Piscataquis $5,360 $1,340 $6,700
walking trail linking the Appalachian Trail
near the Monson Appalachian Trailhead to a
viewing area for the Goodell Stream Falls.
Grand $18,989,540 $9,559,602 $28,549,142
Totals
(all results)