Search Results Recreational Trails Program Project Database

Your search for projects in State: ME, Total Results : 765

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Withdrawn Turner Village Park Trail Withdrawn $35,000 $8,750 $43,750

ME 2011 Withdrawn Motorized Trail Layer It continued the BPLs mapping project that Withdrawn $22,600 $5,650 $28,250

was started with 2008 RTP funds. There was

an intern who worked in the field collecting

GIS data with a GPS, brought this data into

the office with attributes and continued to put

more motorized layers...

ME 2011 Withdrawn Dead River Scenic Trail Withdrawn $30,000 $7,500 $37,500

ME 2011 Withdrawn Environmental Educator The Georges River Land Trust utilized the Withdrawn $5,000 $1,250 $6,250

services of an AmeriCorps Environmental

Educator to complete various works for their

trails. The project work included, assisting in

construction of a new three mile section of

trail in Searsmont, assisting...

ME 2012 Withdrawn Withdrawn $60,000 $15,000 $75,000

ME 2012 Withdrawn Trail improvement Projects Withdrawn $1,500 $375 $1,875

ME 2012 Withdrawn Withdrawn $1,200 $300 $1,500

ME 2012 Withdrawn Withdrawn $2,468 $617 $3,085

ME 2012 Withdrawn Withdrawn $13,141 $2,385 $15,526

ME 2013 Withdrawn Powerline Trail Withdrawn $8,000 $2,000 $10,000

ME 2014 Williams Stream Bridge Williams Stream Bridge Williams Stream Bridge Unspecified/Unidentifi $30,000 $7,500 $37,500

able

ME 2015 Scopan Unspecified/Unidentifi $20,000 $5,000 $25,000

able

ME 2015 Various ATV Trails Trail Rehab Project Rehabilitation Washington $35,000 $8,750 $43,750

ME 2015 Various ATV Trails Re-decking and Multiple Counties $82,470 $20,617 $103,087

maintenance of bridges

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2015 Wilton Trestle Bridge Re-deck and widen Wilton Franklin $30,000 $7,500 $37,500

Trestle Bridge

ME 2003 Southern Region Parks Trail Improvements Improvements Multiple Counties $89,800 $32,900 $122,700

Trails

ME 2018 Readfield Trail System Readfield Trail Infrastructure Infrastructure improvements 1 Kennebec $30,517 $13,839 $44,356

Improvements

ME 2018 Riverside Ski Trails Signage at Riverside Ski Signage 1 Cumberland $5,000 $1,250 $6,250

Trails

ME 1993 Stroudwater Crossing Bridge Installation Bridge 1 Cumberland $11,985 $34,500 $46,485

ME 1996 Vaughan Woods Trails Trail Improvements Improvements 1 York $4,760 $4,760 $9,520

ME 1996 Bradbury Mountain State 1 Cumberland $5,925 $5,925 $11,850

Park Trails

ME 1996 Augusta Walk Bike Trail Trail Construction Urban Walk/Bike Trail 1 Kennebec $42,000 $42,000 $84,000

ME 1997 Lincolnville Nature Trail Trail Construction Nature/Interpretive Trail 1 Waldo $4,500 $4,500 $9,000

ME 1997 Ferry Beach Trails Trail Improvements Trail Resurfacing 1 York $4,000 $4,840 $8,840

ME 1997 Bradbury Mountain State Trail Improvements Improvements to Park Trails 1 Cumberland $6,620 $6,620 $13,240

Park Trails

ME 1997 Mount Apatite Park Trails 1 Androscoggin $7,500 $7,500 $15,000

ME 1997 Dillenback Trails Paved Trail 1 Cumberland $16,000 $16,000 $32,000

ME 1997 Pools of Simeon Trails 1 Androscoggin $16,176 $16,176 $32,352

ME 1998 Rehabilitate 1 Knox $2,000 $2,000 $4,000

ME 1998 Route 17 Rockport Trailhead Improvements Parking Area 1 Knox $5,995 $5,995 $11,990

ME 1998 Eastern Trail 1 York $5,800 $9,040 $14,840

ME 1998 Pennessewassee Park Trail 1 Oxford $7,500 $26,550 $34,050

ME 1999 Horsemen's Trail Equestrian Trail Equestrian Trail 1 Knox $5,207 $1,310 $6,517

ME 1999 Salt Bay Heritage Trail 1 Lincoln $6,999 $1,770 $8,769

ME 1999 Trail 1 Waldo $4,000 $4,000 $8,000

ME 1999 Lincolnville Trail Improvements Improvements 1 Waldo $18,440 $4,610 $23,050

ME 1999 Augusta Trails Trail Improvements Trail Repairs 1 Kennebec $22,000 $5,500 $27,500

ME 1999 Lombard/Gorham Land Acquisition Acquisition 1 Cumberland $25,000 $6,250 $31,250

ME 1999 Agamenticus Trail Multi-Use Trails 1 York $25,000 $8,872 $33,872

ME 1999 Gorham Loop Trail Winter Trail Improvements 1 Cumberland, York $25,000 $13,000 $38,000

ME 1999 Various State Parks Trail Improvements Work at 6 State Parks 1 Multiple Counties $59,400 $14,850 $74,250

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2000 Jamies Pond Trail Construct Trail 1 Kennebec $11,100 $3,350 $14,450

ME 2000 Pine Tree Arboretum Trail Trail Improvements 1 Kennebec $14,000 $4,180 $18,180

ME 2000 Wildlife Sanctuary Trail Construct Trail 1 Cumberland $19,500 $5,500 $25,000

ME 2000 Crystal Spring Farm Trails Construct Trail 1 Cumberland $26,500 $34,607 $61,107

ME 2001 Salt Bay Heritage Trail Trail Improvement, Bridge 1 Lincoln $7,900 $1,060 $8,960

ME 2001 Lowell Preserve Trail Construct Trail 1 Cumberland $7,040 $1,760 $8,800

ME 2001 Nature Trail Construct Trail 1 Sagadahoc $8,880 $2,220 $11,100

ME 2001 Waterfront Trail Construct Trail 1 Kennebec $30,000 $12,200 $42,200

ME 2001 Agamenticus Trail Trail Improvements 1 York $28,000 $12,701 $40,701

ME 2002 Smithfield Pltn Rec Trail Construct Trail 1 Kennebec $6,600 $4,948 $11,548

ME 2002 Pleasant River Bridge Bridge 1 Cumberland $30,000 $7,500 $37,500

ME 2002 Marginal Way Renovation 1 York $30,000 $7,500 $37,500

ME 2002 South Region Parks Trails Maintenance, Renovation 1 Cumberland, York $35,400 $8,850 $44,250

ME 2002 Boston and Rail Bed Renovation 1 York $27,500 $13,000 $40,500

Trail

ME 2002 Mount Agamenticus Trails Improvements, Maintenance 1 York $25,575 $15,418 $40,993

ME 2003 Dodge Point Ravine Trail Construct Trail 1 Lincoln $2,300 $700 $3,000

ME 2003 Wells Reserve Boardwalk Boardwalk 1 York $3,300 $910 $4,210

ME 2003 Duck Trap Bridge 1 Waldo $5,300 $1,325 $6,625

ME 2003 Torsi Pond Trail Construct Trail 1 Kennebec $13,700 $3,672 $17,372

ME 2003 Boston and Maine Rail Bed Construct Trail 1 York $15,000 $9,505 $24,505

Trail

ME 2003 Fuller Farm Trail Parking, Bridge 1 Cumberland $20,000 $10,000 $30,000

ME 2003 Heritage Trail Construct Trail 1 Aroostook $25,000 $11,505 $36,505

ME 2003 Mount Agamenticus Trail Maintenance 1 York $20,000 $11,700 $31,700

ME 2003 North St. Recreation Trail Construct Trail 1 Kennebec $20,000 $37,000 $57,000

ME 2003 Walton Park ADA Trail Construct Trail, Parking 1 Cumberland $20,000 $91,500 $111,500

ME 2004 Various ATV Trails ATV Trail Work Project Motorized 1 Sagadahoc $9,066 $2,267 $11,333

ME 2004 Greenbelt Walkway Greenbelt Walkway Non-motorized 1 Cumberland $25,090 $6,273 $31,363

Extension Extension

ME 2004 Various State Parks South Region Parks Diverse 1 Cumberland $71,200 $17,800 $89,000

ME 2004 Fifteen Mile Stream Bridge Fifteen Mile Stream Bridge Motorized 1 Kennebec $30,000 $7,500 $37,500

Replacement

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2004 State Administration Administration Administration 1 Kennebec $19,277 $4,819 $24,096

ME 2004 Camden Hills State Park Maine Conservation Corps Diverse 1 Knox $30,000 $7,500 $37,500

Trail Project

ME 2004 Mount Agamenticus Trail Mount Agamenticus Trail Diverse 1 York $30,000 $7,500 $37,500

Remediation

ME 2005 Riverwalk Trail Non-motorized 1 Cumberland $20,000 $5,000 $25,000

ME 2005 Gull Crest Gull Crest Master Plan Motorized 1 Cumberland $15,000 $3,750 $18,750

Implementation

ME 2005 Unspecified/Unidentifiable Unspecified/Unidentifiable Non-motorized 1 Cumberland $15,000 $3,750 $18,750

ME 2005 Unspecified/Unidentifiable Unspecified/Unidentifiable Motorized 1 Cumberland $20,000 $5,000 $25,000

ME 2005 Crooked River Bridge Crooked River Bridge Motorized 1 Cumberland $29,992 $7,498 $37,490

ME 2005 Pine Tree Trail Pine Tree Trail 2005 Non-motorized 1 Kennebec $14,500 $3,625 $18,125

ME 2005 Apple Farm Crossing Non-motorized 1 Kennebec $15,000 $3,750 $18,750

Community Trail

ME 2005 State Administration Administration Administration 1 Kennebec $38,800 $9,700 $48,500

ME 2005 Camden Hills State Park Camden Hills Non-motorized 1 Knox $46,404 $11,601 $58,005

ME 2005 The Eaton Farm Coastal Non-motorized 1 Lincoln $20,000 $5,000 $25,000

Trail

ME 2005 Penny Lake Trail Non-motorized 1 Lincoln $15,000 $3,750 $18,750

ME 2005 Boothbay Educational/Interpretive Trail Safety and Environmental Education 1 Lincoln $5,000 $1,250 $6,250

Brochures

ME 2005 River Walk Trail River Walk Trail Non-motorized 1 York $15,000 $3,750 $18,750

ME 2005 Box Factory Trail Box Factory Trail Project Non-motorized 1 York $20,000 $5,000 $25,000

ME 2005 Saco Spirit River Walk Saco Spirit River Walk Safety and Environmental Education 1 York $2,000 $500 $2,500

Safety and Environmental

Education Project

ME 2006 Safety and Education Birding Trail Project Safety and Environmental Education 1 Androscoggin $4,000 $1,000 $5,000

ME 2006 Brunswick Town Commons Connecting Neighborhoods Non-motorized 1 Cumberland $27,500 $6,875 $34,375

to the Commons

ME 2006 Fuller Farm Trail Fuller Farm Trail Project Motorized 1 Cumberland $30,000 $7,500 $37,500

ME 2006 Various State Park Trails Diverse Trails Rehabilitation Diverse 1 Cumberland $0 Unknown $0

Projects

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2006 Chaffin Pond Interpretive Chaffin Pond Interpretive Safety and Environmental Education 1 Cumberland $3,592 $898 $4,490

Trail Trail Project

ME 2006 Safety and Education Trail Signs for Lyme Disease Safety and Environmental Education 1 Cumberland $4,352 $1,088 $5,440

Risk Project

ME 2006 Safety and Education Sanctuary Project Safety and Environmental Education 1 Cumberland $4,692 $1,173 $5,865

ME 2006 Augusta Nature Center Trail Augusta Nature Center Trail Non-motorized 1 Kennebec $27,500 $6,875 $34,375

Project Project

ME 2006 State Administration Contingency Funds Motorized 1 Kennebec $20,840 $5,210 $26,050

ME 2006 Various State Trails ORV Bulldozer Motorized 1 Kennebec $50,000 $12,500 $62,500

ME 2006 Public Information GIS Layering - Phase II Safety and Environmental Education 1 Kennebec $8,000 $2,000 $10,000

ME 2006 Camden Hills State Park Camden Hills State Park Non-motorized 1 Knox $28,279 $7,070 $35,349

Trail Renovation

ME 2006 Georges River Georges Land Trust Safety and Environmental Education 1 Knox $4,500 $1,125 $5,625

ME 2006 Bristol Recreation Trail Bristol Recreation Trail Diverse 1 Lincoln $7,000 $1,750 $8,750

Project

ME 2006 Shoreland Trail Shoreland Trail Education Safety and Environmental Education 1 Lincoln $4,693 $1,173 $5,866

Project

ME 2006 Sprague Pond Trail Motorized 1 Sagadahoc $9,359 $2,340 $11,699

ME 2007 Fore Riverwalk Project Fore Riverwalk Project Diverse 1 Cumberland $30,000 $7,500 $37,500

ME 2007 YMCA Cousins River Trail YMCA Cousins River Trail Non-motorized 1 Cumberland $30,000 $7,500 $37,500

Project

ME 2007 Trails Pleasant Mountain Trails Diverse 1 Cumberland $29,000 $7,250 $36,250

Project

ME 2007 Various State Park Trails Park South Non-motorized 1 Cumberland $15,700 $3,925 $19,625

ME 2007 Bradbury Mountain State Bradbury Mountain/Mount Diverse 1 Cumberland $52,500 $13,125 $65,625

Park Trails, Blue/Sebago Trail

State Park Trails, Sebag Improvements

Lake State Park Trail

ME 2007 Pondicherry Park Pondicherry Park Acquisition Diverse 1 Cumberland $30,000 $7,500 $37,500

Project

ME 2007 State Administration Administration Administration 1 Kennebec $50,000 $12,500 $62,500

ME 2007 Hatchet Mountain Trail Hatchet Mountain Non-motorized 1 Knox $30,000 $7,500 $37,500

Acquisition/Trail Project

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2007 Camden Hills State Park Camden Hills State Park Non-motorized 1 Knox $47,291 $11,823 $59,114

Project

ME 2007 Camden Hills State Park Trail Improvements Diverse 1 Knox $4,761 $1,190 $5,951

ME 2007 Clough Point Town Preserve Clough Point Town Preserve Non-motorized 1 Lincoln $7,810 $1,953 $9,763

ME 2007 Center Pond Preserve Trails Center Pond Preserve Trails Diverse 1 Sagadahoc $9,200 $2,300 $11,500

Project Project

ME 2007 Marginal Way Marginal Way Restoration Non-motorized 1 York $30,000 $7,500 $37,500

ME 2008 Giant Stairs Trail Giant Stairs Trail Project Non-motorized 1 Cumberland $20,000 $5,000 $25,000

ME 2008 Ecomaine Ecomaine Trail Construction Non-motorized 1 Cumberland $27,000 $6,750 $33,750

Project

ME 2008 Various State Park Trails South Park Non-motorized Non-motorized 1 Cumberland $16,930 $4,233 $21,163

ME 2008 Various State Park Trails South Park Diverse 1 Cumberland $36,074 $9,019 $45,093

ME 2008 Safety and Education Project Paths Safety and Environmental Education 1 Cumberland $4,200 $1,050 $5,250

ME 2008 China School China School Community Non-motorized 1 Kennebec $23,000 $5,750 $28,750

Project

ME 2008 Bond Brook Trail Bond Brook Trail Project Diverse 1 Kennebec $29,000 $7,250 $36,250

ME 2008 Statewide Bureau of Parks and Land Non-motorized 1 Kennebec $9,000 $2,250 $11,250

Map

ME 2008 Statewide Bureau of Parks and Land Diverse 1 Kennebec $12,000 $3,000 $15,000

Map

ME 2008 Statewide Bureau of Parks and Land Motorized 1 Kennebec $9,000 $2,250 $11,250

Motor Map

ME 2008 Safety and Education Trailhead Education Project Safety and Environmental Education 1 Kennebec $3,150 $788 $3,938

ME 2008 Camden Hills State Park Camden Diverse 1 Knox $48,000 $12,000 $60,000

ME 2008 River Trail Walk River Trail Walk Project Non-motorized 1 York $20,000 $5,000 $25,000

ME 2008 Mount Agamenticus Trail Mount Agamenticus Trail Diverse 1 York $29,000 $7,250 $36,250

Remediation Project

ME 2008 Boston and Maine Rail Bed Boston and Maine Rail Bed Diverse 1 York $29,000 $7,250 $36,250

Trail Trail Project - Phase III

ME 2008 Bridge Mousam River Bridge Motorized 1 York $45,000 $11,250 $56,250

ME 2008 Ferry Beach Interpretive Trail Ferry Beach Interpretive Trail Safety and Environmental Education 1 York $15,507 $3,877 $19,384

Project

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2008 Mount Agamenticus Mount Agamenticus Safety and Environmental Education 1 York $5,000 $1,250 $6,250

Environmental Education

Project

ME 2009 New Trails New Trails Trails on town property including bridge 1 Cumberland $22,055 $5,514 $27,569

ME 2009 Quarry Woods Trail Quarry Woods Trail Project 431' of bog bridging, re-route a steep section 1 Cumberland $9,241 $2,310 $11,551

of trail, and create navigational signage.

ME 2009 Lobster Cove Trail Lobster Cove Trail Rehab 800 feet on trail on Monhegan 1 Lincoln $10,452 $2,613 $13,065

Reconstruction Project Reconstruction Project

ME 2009 Cross Country Trail Cross-Country Trail 1.0 mile trail on the grounds of Noble High 1 York $7,925 $1,981 $9,906

School

ME 2009 Rehabilitate Trails Rehabilitate Trails Rehab a trail that connects with town's multi 1 York $4,184 $1,046 $5,230

use trail - a 600' section of the Mousam Way

footpath - 10' wide.

ME 2009 Fort Allen Trail Fort Allen Trail Improvement Rock staircase and improvements at Ft. Allan 1 Cumberland $25,000 $6,250 $31,250

Project Park

ME 2009 Connector Trail Trail and Bridge Construction 8 miles of multi-use trail and bridge 1 Cumberland $121,250 $30,313 $151,563

construction associated with the Bradbury Mt.

State Park-Pineland Lands Unit project

ME 2009 Camden Hills State Park Camden Hills Rehabilitation Camden Hills and . 1 Knox $103,585 $25,896 $129,481

Project Funds for a dozer to be used at Camden

ME 2011 Falmouth Community Trails Falmouth Community Trails Constructed an additional 6.8 miles of new 1 Cumberland $25,826 $6,456 $32,282

non-motorized trails and upgraded another

13.5 miles of existing trail. Allowable uses

include hiking, mountain biking,

snowshoeing, nature study, geo-caching,

cross-country skiing and some equestrian

use.

ME 2011 PownalBorough Courthouse PownalBorough Courthouse This project involved installing 1.6 miles of 1 Lincoln $9,660 $2,415 $12,075

Trails Trails new trail within the Associations 89 acres.

The work included; three wood bridges, 120

feet of bog bridging, a kiosk, and the creation

of maps and signs.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Mount Agamenticus Trail Mount Agamenticus Trail Approximately 4.5 miles of trail restoration 1 York $35,000 $8,750 $43,750

are involved with this project. The areas

seasonal Conservation Crew will do the work

required here and they conduct trail

stewardship ...

ME 2011 ADA Trail Work ADA Trail Work The land trust completed work on 20,000 1 York $25,000 $6,250 $31,250

square feet of land. Construction of a 24

space parking area and a universal trail to

provide public access to a series of

recreational trails located on Highland Farm

and adjacent conservation lands. The 300...

ME 2011 Beach Access Trail ADA Trail Work This project called for replacement of 1 Sagadahoc $39,524 $9,881 $49,405

deteriorating boardwalk that will enable safe

and convenient public ADA access to the

Griffith Head end of Mile Beach. Also, paved

an existing access footpath to the boardwalk,

and replaced gravel to maintain...

ME 2011 Mousam Way Trail Mousam Way South Constructed an approximate .5 mile footpath 1 York $34,800 $8,700 $43,500

with 300 feet of boardwalk through a scenic

wooded area that links to an existing paved

bike path and eventually continuous trail

network through downtown Sanford.

ME 2011 Whiskeag Trail Whiskeag Trail Kennebec Estuary Land Trust was looking to 1 Sagadahoc $34,650 $8,663 $43,313

complete major improvements at their Thorne

Head Preserve in Bath. The work included:

construction of a new technical trail,

rehabilitation of a waterfront trail, and

improvements to trail access and use by...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Augusta Greenway Trail River to Arboretum Trail This created a new trail from the existing 1 Kennebec $15,000 $3,750 $18,750

state trail on the east side of the Kennebec

River through the woods to the existing

Augusta East Side Campus. The trail goes

from the East Side Campus to the Vile

Arboretum. Work included signage, new...

ME 2011 Tupelo Trail Bridge Repair/Acquisition The focus of this project was to remove and 1 York $200,261 $50,065 $250,326

replace structural supports on three

footbridges, and adding a third stringer where

there are currently two. There was also some

fill and ...

ME 2011 River Trail Trail Work/Intern 2 projects: 1. Hired an AmeriCorps 1 York $16,000 $40,000 $56,000

Environmental Educator Intern, Vaughn

Woods 2. The park made needed

improvements to their 3 miles of trails. The

work included, ...

ME 2011 Ledge Trail Androscoggin Riverlands Rehabilitation work on the existing 12 + miles 1 Androscoggin $18,903 $4,726 $23,629

of shared use trail at the Androscoggin

Riverlands. Work included resurfacing,

replacing decking on bridges, ditching, some

of the trails, ...

ME 2011 Public Information Web page/brochures This project will educate people about their 1 Cumberland $5,000 $1,250 $6,250

trail system, naturalized areas and the habitat

and wildlife that exist within Portlands premier

park. The education included, printed

materials, and video that will increase

awareness of the parks...

ME 2012 Wolfe's Neck Trail Trail improvement Project Put in rock walkways, improve draining, 1 Cumberland $12,081 $3,020 $15,101

Improvement Project resurface sections of the trail and develop a

new interpretive panel

ME 2012 Pier Trail Mackworth Island Trail Improve walkway along the pier that has 1 Cumberland $5,340 $1,335 $6,675

eroded and needs material and drainage for

water

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2012 Bridle Path Project Bridge Project The Bridle Path is a historic path that runs 3 1 York $35,000 $8,750 $43,750

+/- miles from Sea Road to the Kennebunk

beaches. It is an old railbed shared with

multiple users including horse, hikers, and

bikers. The project proposed to build a 60

long, 5 wide timber bridge over...

ME 2012 South Loop Trail Powerline Connector Trail The focus of this project is to improve the trail 1 Cumberland $36,806 $9,201 $46,007

system at the Pineland Public Land unit in

New Gloucester. Upgrades to the 3.2 mile

trail system would include putting water

diversions in some sections of trail, putting

new bog bridging in over...

ME 2012 Tannery Trail Project Tannery Trail Project Construct a new ADA shared use trail along 1 Knox $18,427 $4,607 $23,034

the river at site of old Tannery

ME 2012 Single Track Trails Trail improvements Project Make improvements along recently 1 Cumberland $10,000 $2,500 $12,500

constructed bridges and new connector trail

that goes to Pineland

ME 2012 Messalonskee Trail System Outdoor classroom Project The project will include signage, safety 1 Kennebec $4,800 $1,200 $6,000

awareness and seating along the

Messalonskee Trail System.

ME 2013 Railbed Phase IV Project Railbed Phase IV This project entails the rehabilitation of 1 York $33,500 $8,375 $41,875

approximately .5 miles of former railroad bed

into crushed gravel multi-purpose trail and

the construction of a parking lot with trailhead

facilities. Improvements are part of a larger

park development...

ME 2013 Pisgah Hill Parking lot Pisgah Hill Parking lot This project entails the construction of the 1 Cumberland $10,000 $2,500 $12,500

Pisgah Hill Preserve South Trail Head,

consisting of an off-road, surfaced, plowed

parking lot with driveway access for four

vehicles (1250 square feet), along with

associated trail head infrastructure.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2013 Wolfe's Neck Harrasseket Harraseeket This project involves the construction of a 16 1 Cumberland $16,235 $4,059 $20,294

Trail/EE Trail Project Trail/Environmental ft wooden bridge on the Haraseeket Trail, as

Education well as cutting and filling side slope and

installing rock edging along 20 ft of the trail

and construction of a 16 ft wooden stairway.

Additional aspects...

ME 2013 Shell Middens Project Shell Middens Project This project entails restoring the existing trail 1 Knox $4,000 $1,000 $5,000

down to the shore and putting up a swinging

bench along the shore of the shell heaps.

ME 2013 Trail Expansion Project Trail Expansion Project This project entails the construction of 5.1 1 Cumberland $22,700 $5,675 $28,375

miles of new trail in the Woods Road

Community Forest, including a parking area

at the trailhead. This project will also involve

the construction of a nature trail within the

Suckfish Brook Conservation...

ME 2013 West Side Trail West Side Trail This project, which once complete will be a 1 Cumberland $18,155 $4,539 $22,694

12 mile multiuse trail system along CMP

power lines in Yarmouth, entails the

construction of 4 miles of trail as part of the

first phase of the project.

ME 2013 Mount Agamenticus Trail Mt Agamenticus Trail Project This project includes mitigation of current or 1 York $35,000 $8,750 $43,750

eventual trail and habitat degradation,

insurance of visitor safety, and provision of

additional recreational capacity within the

11,000 acre parcel of land. This project

includes 2.2 miles of trail...

ME 2013 Lily Pond Trail Lily Pond Trail This project entails the maintenance and 1 Sagadahoc $20,850 $5,213 $26,063

restoration of over 2.9 miles of trails on 146

acres, the design of trails system footpaths

and multi-use trails, the retirement of trails in

sensitive habitat areas, and the prioritization

of trail sections...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2013 Bradbury Mountain State Trail This project entails funding a 900 hour 1 Cumberland $41,000 $10,250 $51,250

Park Trails Improvement/Environmental AmeriCorps Environmental Steward to be

Education shared between Bradbury Mountain and

Mackworth Island State Parks; the purchase

of materials to replace 3 bridges, construct 2

new bridges, resurface 2 miles of trail and...

ME 2013 State Park Environmental Safety Improvements to the trails system at Sebago 1 Cumberland $10,000 $2,500 $12,500

Lake State park and funding an

environmental educator to assist with this

work and help with interpretive aspects of

trail.

ME 2013 Jewell Island Trail Jewell Island Trail Project Improvements to the trail system at Jewell 1 Cumberland $4,800 $1,200 $6,000

Island.

ME 2013 Kennebunkport Trust in our Trails Safety and Education Project at land trust's 1 York $5,000 $1,250 $6,250

property. Proper signage, Kiosk and

informational Materials

ME 2013 Mount Agamenticus Mount A Safety and New Trail Brochure and two new kiosks on 1 York $5,000 $1,250 $6,250

Outreach trail

ME 2013 KELT properties Signage and Kiosks Signage and kiosks at KELT trail systems 1 Sagadahoc $5,000 $1,250 $6,250

ME 2014 Four Seasons Trails Four Seasons Trails Project Four Seasons Trails Project 1 Aroostook $35,000 $8,750 $43,750

ME 2014 Gorham Trails Connector Trail Project Connector Trail Project 1 Cumberland $11,246 $2,812 $14,058

ME 2014 Lippman Park Trails Lippman Park Trails Lippman Park Trails 1 Cumberland $35,000 $8,750 $43,750

ME 2014 Aroostook State Park Trail Improvement Project Trail Improvement Project 1 Aroostook $23,357 $5,839 $29,196

ME 2014 Rockland Trails Connector Trail Project Connector Trail Project 1 Knox $35,000 $8,750 $43,750

ME 2014 Biddeford Town Trail Town Trail Project Town Trail Project 1 York $18,491 $4,623 $23,114

ME 2014 Damariscotta Lake State Trail Upgrade Project Trail Upgrade Project 1 Lincoln $900 $225 $1,125

Park

ME 2015 Thurston Park Trails Thurston Park Trail Projects 1 Kennebec $5,000 $1,250 $6,250

ME 2015 Camden Riverwalk Camden Riverwalk 1 Knox $26,144 $6,536 $32,680

ME 2015 Gray Village Loop Trail Gray Village Loop Trail 1 Cumberland $31,088 $7,772 $38,860

ME 2015 Deering Pond Deering Pond Connector 1 York $23,336 $5,834 $29,170

ME 2015 Bradbury Mountain State 900 Hour Environmental 1 Cumberland $11,687 $2,922 $14,609

Park Trails Steward

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2015 900 Hour MCC 1 Cumberland $16,362 $4,091 $20,453

Environmental Steward

ME 2015 VWSP MCC ES 1 York $16,362 $4,091 $20,453

ME 2015 Kennebec Highlands Kennebec Highlands 1 Kennebec $2,500 $625 $3,125

ME 2015 Kennebec Highlands Hike Kennebec Highlands Hike / 1 Kennebec $18,532 $4,633 $23,165

Bike Trails Bike Trails

ME 2015 Bradbury-Pineland Corridor Bradbury-Pineland Corridor 1 Cumberland $14,312 $3,578 $17,890

Trail, South Ridge Trail Trail / South Ridge Trail

ME 2015 Wolfe's Neck Woods Trail Wolfe's Neck Woods Trail 1 Cumberland $11,687 $2,922 $14,609

improvement

ME 2015 Wolfe's Neck Woods State 900-hour MCC ES 1 Cumberland $11,687 $2,922 $14,609

Park

ME 2015 Topsham Landing Trail Topsham Landing Trail 1 Sagadahoc $35,000 $8,750 $43,750

ME 2015 Marginal Way Eroded Embankment on Eroded Embankment on Marginal Way 1 York $34,935 $8,734 $43,669

Marginal Way

ME 2015 Fogg Island, French Fogg Island and French 1 Kennebec $16,964 $4,241 $21,205

Mountain Mountain

ME 2015 Falmouth Community Trails Falmouth Community Trails 1 Cumberland $8,041 $2,010 $10,051

ME 2015 Wolfe's Neck Woods State 1,700 hour MCC ES 1,700 hour MCC ES 1 Cumberland $16,362 $4,091 $20,453

Park

ME 2015 Camden Hills State Park Camden Hills State Park Trail Rehabilitation 1 Knox $17,408 $4,352 $21,760

Trail Rehabilitation

ME 2016 Big A Trail Mt Agamenticus ADA Trail Completes the final 1077 feet of accessible 1 York $35,000 $27,690 $62,690

trail

ME 2016 Moussam River Bike Trail Moussam River Bike Trail Construct nonmotorized bike path on existing 1 York $34,260 $12,600 $46,860

sewer line right of way

ME 2016 Pismire Mountain Trails Pismire Mountain Trails Construct trail system in newly transitioned 1 Cumberland $32,180 $8,045 $40,225

conservation area

ME 2016 Messalonskee High School Messalonskee High School Rehabilitate existing trail network within the 1 Kennebec $19,272 $4,818 $24,090

Trail Trail Messalonskee Schools campus

ME 2016 Vaughn Woods State Park Bridge and Trail Maine Bridge replacement, trail rehabilitation, trail 1 York $31,533 $7,883 $39,416

Conservation Corp and resurfacing

Environmental Steward

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2016 Wolfe's Neck Woods State Maine Conservation Corp Trail rehabilitation 1 Cumberland $17,238 $4,310 $21,548

Park and Environmental Steward

ME 2016 Sebago Lake State Park Maine Conservation Corp Trail maintenance 1 Cumberland $17,112 $4,278 $21,390

and Environmental Steward

ME 2016 Kennebec Highlands Bike Single Track Trail Construct mountain bike trail 1 Kennebec $2,000 $500 $2,500

Trails

ME 2016 Viles Arboretum Boardwalk Boardwalk Rehab wildlife viewing boardwalk 1 Kennebec $14,271 $12,425 $26,696

ME 2017 Wolfe's Neck Woods State Maine Conservation Corps The grant will fund two Maine Conservation 1 Cumberland $30,259 $7,565 $37,824

Park Environmental Steward Corps Environmental Stewards, one 900 hour

placement and one 1700 hour placement.

The MCC Environmental Stewards' primary

responsibility will be to research, develop,

and present trail-based environmental...

ME 2017 West Side Trail West Side Trail Phase 2 Phase 2 of the West Side Trail (WST) is a 2.6 1 Cumberland $50,000 $38,190 $88,190

mile long section of trail being built on a CMP

transmission line right-of-way that was

recently altered for installation of new

transmission lines. This grant focuses on

construction of the first 1.8...

ME 2017 Sewall Woods Preserve Trailhead Access Project The Kennebec Estuary Land Trust (KELT) is 1 Sagadahoc, Lincoln $18,500 $8,000 $26,500

Trailhead, Squam Creek seeking financial assistance from the

Property Trailhead Recreational Trails Program for its Trailhead

Access Project. The objective is to improve

public access to two KELT locations and their

associated trail systems. At...

ME 2017 Langlais Sculpture Preserve Langlais Sculpture Preserve Georges River Land Trust (GRLT) is asking 1 Knox $38,000 $12,200 $50,200

ADA Trail ADA Trail for RTP funding to assist in the construction

of an approximately 1000 foot long ADA trail

in and amongst the large sculptures, fields,

and forests at the Langlais Sculpture

Preserve, a 90 acre preserve owned...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2017 Bradbury Mountain State Bradbury Mountain State The project sponsor will contract with the 1 Cumberland $49,760 $18,305 $68,065

Park Trails Park Trails Rehabilitation Maine Conservation Corps for a 900 hour

Environmental Steward and 12 weeks of

MCC trail crew work to perform routine

maintenance and trail rehabilitation on up to

25 miles of trails within this popular trail...

ME 2017 Camden Hills State Park Camden Hills State Park Camden Hills State Park will rehabilitate up to 1 Knox, Waldo $40,000 $8,000 $48,000

Trails Trails 6 miles of multi use trails within the park. The

trails noted have settled since last worked on

(2008) and heavy use and horse traffic has

caused the once crowned trails to become

flat or lower in the...

ME 2017 Megunticook Riverwalk Megunticook Riverwalk Construction of a stone dust recreational trail 1 Knox $50,000 $14,810 $64,810

Phase 3 along the through a

natural area abutting urban development. It

will be a 6 foot wide trail designed for

walking, running, biking, fishing access, and

dog walking during the non-winter...

ME 2017 Pollack Brook Bridge Pollack Brook Bridge The project will replace a deteriorating 51' 1 Cumberland $35,000 $13,475 $48,475

Restoration wooden bridge with a 60' long aluminum

bridge to cross Pollack Brook. Restoration of

600' of trail and installation of 1,600' of new

trail is included in this work.

ME 2017 Sebago Lake State Park Maine Conservation Corp This project will perform maintenance and 1 Cumberland $17,063 $5,702 $22,765

and Environmental Steward rehabilitation work along many portions of the

park's 5.75 miles of trails and at the 13 trail

head locations. Work will include trail surface

retread with gravel, bog bridging, wood and

rock water bars,...

ME 2018 Round The Mountain Trail Round The Mountain Trail 1 Knox $120,000 $2,258,185 $2,378,185

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2018 Bradbury Mountain State Bradbury Mountain State The project sponsor will contract with the 1 Cumberland $68,400 $13,680 $82,080

Park Trails Park Trails Rehabilitation Maine Conservation Corps for a 900 hour

Environmental Steward and 12 weeks of

MCC trail crew work to perform routine

maintenance and trail rehabilitation on up to

25 miles of trails within this popular trail...

ME 2018 Sebago Lake State Park Sebago Lake State Park This project will perform maintenance and 1 Cumberland $17,056 $3,410 $20,466

Trails Rehabilitation rehabilitation work along many portions of the

park's 5.75 miles of trails and at the 13 trail

head locations. Work will include trail surface

retread with gravel, bog bridging, wood and

rock water bars,...

ME 2018 Upper Brook Trail Trail Work Restore Vaughan Woods Upper Brook Trail 1 Kennebec $117,479 $39,160 $156,639

ME 2018 Wolfe's Neck Woods State Maine Conservation Corp Trail rehabilitation 1 Cumberland $18,510 $3,925 $22,435

Park and Environmental Steward

ME 2019 Public Information Maps and Guides The Bureau will update, print and distribute 1 Kennebec $18,856 $5,000 $23,856

maps / guides for the following parks:

Androscoggin Riverlands, Bradbury

Mountain, Camden, Cobscook, Ferry Beach,

Lakd St George, Lamoine, Peaks Kenny,

Sebago, Shackford, and Warren Island.

ME 2019 Bradbury Mountain State Bradbury Mountain State Trail improvements include providing general 1 Cumberland $43,380 $10,306 $53,686

Park Trails Park Trails Maintenance and maintenance on 22 miles of park trails to

Rehabilitation include cutting blowdowns and removing

debris, cleaning water bars, ditches, side

cutting vegetation, plant blazes, repair

wooden bike/foot traffic bridges, and...

ME 2019 Mount Blue State Park Trail Repair, upgrade and restore sections of the 1 Franklin $16,175 $10,000 $26,175

Maintenance and state park's trail system. The stewards will

Rehabilitation be responsible for the maintenance and

restoration of several park trails including the

Swett brook trail, Center hill and Webb Beach

nature trails, Arboretum...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2019 Vaughn Woods State Park Bridge and Trail Maine This project will engage a Maine 1 York $1,927 $4,148 $6,075

Conservation Corp and Conservation Corps Environmental Steward

Environmental Steward to accomplish trail maintenance objectives

within the park that includes improving the

trial tread, replacement of a 16' bridge,

widening trail sections, installing water bars...

ME 2019 Wolfe's Neck Woods State Maine Conservation Corp The grant will fund one 1700-hour Maine 1 Cumberland $19 $7,975 $7,994

Park and Environmental Steward Conservation Corps Environmental Steward

and one 900-hour MCC Environmental

Steward. The MCC Environmental Stewards

will make improvements on trails to protect

wet areas, improve drainage, prune the trail...

ME 2019 Memorial Park Walking Trail Memorial Park Walking Trail The project request is for a 1625 feet (.31 1 Cumberland $47,500 $15,000 $62,500

mile) perimeter walking trail, located at the

Casco Memorial Park and Recreation Facility

at 877 Poland Spring Road (Route 11) in

Casco. The 7.25 acre parcel, owned by the

town, is the former site of an...

ME 2019 Deboullie Whitman Mountain Deboullie Whitman Mountain This project will engage the Maine 1 Aroostook $47,809 $11,870 $59,679

Trail Trail Maintenance Conservation Corps Trail Crews to provide

trail maintenance and rehabilitation on the

Whitman Mountain Trail network within this

public reserved land unit.

ME 2019 Sebago Lake State Park Park Trail Maintenance Work will include trail surface retread with 1 Cumberland $16,513 $5,000 $21,513

gravel, bridging, wood and rock water bars,

cutting switchbacks, erosion control

measures, sign placement, trail blazing.

Trails such as the Lookout Trail will have

overgrown view sheds cut and re-opened....

ME 2018 Safety and Education Trail Safety Training Trail safety training 1, 2 Statewide $8,734 $2,300 $11,034

ME 2018 Maps and Guides Park Maps and Guides Park maps and guides 1, 2 Statewide $23,400 $53,779 $77,179

ME 2018 State Administration RTP Administration Administer the RTP Program 1, 2 Statewide $78,557 $15,711 $94,268

ME 2018 Safety and Education Off Road Bicycle Education Instructor training and technical assistance 1, 2 Statewide $5,000 $1,500 $6,500

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2000 Various State Parks Trail Improvements and Trail Improvements and Renovations 1, 2 Androscoggin, $77,640 $19,410 $97,050

Renovations Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2001 South Maine Regional Parks Trail Improvements Improvements 1, 2 Statewide $57,582 $14,396 $71,978

Trails

ME 2004 Safety and Education Bicycle Safety Awareness Safety and Environmental Education 1, 2 Androscoggin, $4,250 $1,063 $5,313

Project Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2007 Safety and Education Island Trail Education Safety and Environmental Education 1, 2 Androscoggin, $5,000 $1,250 $6,250

Project Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2007 Winter Recreation Trails Groomer Safety Training Safety and Environmental Education 1, 2 Androscoggin, $5,000 $1,250 $6,250

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2008 Winter Recreation Trails Snowmobile Safety Safety and Environmental Education 1, 2 Statewide $4,500 $1,125 $5,625

Awareness Grant

ME 2008 State Administration Administration Administration 1, 2 Androscoggin, $50,000 $12,500 $62,500

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2009 Jay-Farmington Rail-Trail Jay-Farmington Rail-Trail Cut back brush on 14+ miles of trail and 1, 2 Androscoggin, $85,000 $21,250 $106,250

Project improvements to other sections Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2009 Landowner Liability Brochure Landowner Liability Brochure Upgrade liability brochure-IF&W 1, 2 Androscoggin, $5,000 $1,250 $6,250

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2009 State Administration Project Administration Administration 1, 2 Androscoggin, $108,083 $27,021 $135,104

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2009 Safety and Education Kiosks Safety and Environmental Education 1, 2 Androscoggin, $5,000 $1,250 $6,250

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2009 Northern Region State Parks BPL - Northern Region Parks Trail work in Northern Region Parks 1, 2 Androscoggin, $33,800 $8,450 $42,250

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2009 Public Information Maps and Brochures Maps and Brochures for several parks and 1, 2 Statewide $40,202 $10,051 $50,253

lands units

ME 2009 Safety and Education Chain Saw Training Chain Saw Safety Training 1, 2 Androscoggin, $5,000 $1,250 $6,250

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2009 Trail Construction Project Trail Construction and 5 miles of hiking trail 1, 2 Aroostook $42,700 $10,675 $53,375

Improvements construction/improvement at the Deboullie

Unit

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2009 Western Mountains Plan Signage and Kiosks Improved signage and kiosks in the Western 1, 2 Androscoggin, $7,100 $1,775 $8,875

Area Mts. Plan Area (several Lands Division Aroostook,

properties in western Maine.) Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2010 Public Information Complete GIS Trails For an intern to complete gaps in the GIS 1, 2 Androscoggin, $6,253 $1,563 $7,816

Information trails layer Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2011 Safety and Education Landing Zone Training on This project worked to establish a network of 1, 2 Androscoggin, $5,000 $1,250 $6,250

Trails helicopter landing zones that can be quickly Aroostook,

accessed when there is an emergency. The Cumberland, Franklin,

plans of the project included, purchase of Hancock, Kennebec,

signs for landing zones, creation of a Knox, Lincoln, Oxford,

promotional brochure, and create a... Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Public Information Map and Guide Phase II This project allowed the Division of Parks and 1, 2 Androscoggin, $13,278 $3,320 $16,598

Public Lands to print and design more Map Aroostook,

and Guides for their properties and make this Cumberland, Franklin,

available to the public in an up-to-date Hancock, Kennebec,

format. Most maps were outdated and this Knox, Lincoln, Oxford,

provided the most current data... Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2011 Public Information Maine Trail Finder This was part of phase III of the Map and 1, 2 Androscoggin, $25,000 $6,250 $31,250

Guide project. It took some of the GIS Aroostook,

information that was done in the field, some Cumberland, Franklin,

of the descriptions in our Map and Guides Hancock, Kennebec,

and put this on to a website called Maine Knox, Lincoln, Oxford,

Trail Finder. This will allow users... Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2011 Safety and Education Environmental Educator This project was for an environmental 1, 2 Androscoggin, $14,000 $3,500 $17,500

educator to work in assisting the Recreational Aroostook,

Trails Program Coordinator and the Outdoor Cumberland, Franklin,

Recreation Planner. The position involved ... Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Public Information Our Maine Lands Printing of a brochure with information of our 1, 2 Androscoggin, $5,425 $1,356 $6,781

trails and amnesties on our public land units. Aroostook,

The information we had was outdated and Cumberland, Franklin,

this will update this information in one Hancock, Kennebec,

brochure, which we do not have for Lands. Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2011 Public Information Interpretive Panels The project included design and installations 1, 2 Androscoggin, $14,833 $3,708 $18,541

at several of our state parks and public land Aroostook,

units along the trails. This will give Cumberland, Franklin,

information such as the flora and fauna along Hancock, Kennebec,

the trail, the unique ecosystems of some of Knox, Lincoln, Oxford,

the areas, maps of the trails... Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2011 State Administration Administration These funds were for the Administration of 1, 2 Androscoggin, $136,430 $34,108 $170,538

the 2011 Recreation Trails Program. Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2012 Thurston Park Trails Thurston Park Project Improvements to the trail system at the town 1, 2 Kennebec $35,000 $8,750 $43,750

owned Thurston Park. Trails are all types

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2012 Shedd Pond Trail Shedd Pond Trail Improvements to the trail system on Land 1, 2 Kennebec $18,240 $4,560 $22,800

Trust Property.

ME 2012 Withdrawn Trail Head Construction 1, 2 Kennebec $11,877 $2,969 $14,846

Project

ME 2012 Public Information Natural History Map and Have natural History information on Maine 1, 2 Androscoggin, $10,151 $2,538 $12,689

Guide Project Trail Finder for several Bureau properties Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2013 Safety and Education Off Road Bicycle Education Bike safety program given to different 1, 2 Androscoggin, $5,000 $1,250 $6,250

communities Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2013 River Trail Sign Project Kiosks at portages along the Androscoggin 1, 2 Androscoggin $4,993 $1,248 $6,241

River

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2013 Safety and Education Chain Saw Training Chain Saw Safety Training 1, 2 Androscoggin, $5,000 $1,250 $6,250

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2013 State Administration Administration Administration of program 1, 2 Androscoggin, $86,564 $21,641 $108,205

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2014 Shedd Pond Trails Shedd Pond Trails Shedd Pond Trails 1, 2 Kennebec $11,280 $2,820 $14,100

ME 2014 Quarry Road Trails Quarry Road Trails Quarry Road Trails 1, 2 Kennebec $29,952 $7,488 $37,440

ME 2014 Camden Hills State Park Trail Improvement Project Trail Improvement Project 1, 2 Knox, Waldo $13,500 $3,375 $16,875

ME 2014 Kennebec Highlands Bike Bike Trail Project Bike Trail Project 1, 2 Kennebec $2,000 $500 $2,500

Trails

ME 2014 Rotary Park Trail Rotary Park Trail Project Rotary Park Trail Project 1, 2 Kennebec $35,000 $8,750 $43,750

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2014 Public Information Map and Guides Map and Guides 1, 2 Androscoggin, $24,997 $6,249 $31,246

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2015 State Administration RTP Administration RTP Administration 1, 2 Statewide $65,601 $16,400 $82,001

ME 2015 Safety and Education Trail Safety and Trail Safety and Environmental Education 1, 2 Statewide $3,993 $998 $4,991

Environmental Education

ME 2015 Safety and Education Off Road Bicycle Education Off Road Bicycle Education Program 1, 2 Statewide $5,000 $1,250 $6,250

Program

ME 2015 Safety and Education Environmental Education Environmental Education 1, 2 Statewide $5,000 $1,250 $6,250

ME 2015 Northern Public Lands Map and Guide Map and Guide 1, 2 Multiple Counties $11,869 $2,967 $14,836

ME 2015 Various Statewide Trails Environmental Steward Environmental Steward 1, 2 Multiple Counties $7,869 $1,967 $9,836

ME 2016 State Administration RTP Administration Administer the RTP Program 1, 2 Androscoggin, $100,992 $25,248 $126,240

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2016 Safety and Education Off Road Bicycle Education Instructor training and technical assistance 1, 2 Androscoggin, $5,000 $1,250 $6,250

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2016 Public Information Maps and Guides for Various Update and revise maps for state parks 1, 2 Androscoggin, $28,089 $7,022 $35,111

Parks and/or public lands Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2016 Public Information Data Displays Purchase electronic message boards for 3 1, 2 Androscoggin, $2,550 $1,850 $4,400

pilot campground registration booths Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2017 State Administration RTP Administration Administer the RTP Program 1, 2 Androscoggin, $79,351 $15,870 $95,221

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2017 Safety and Education Off Road Bicycle Education Instructor training and technical assistance 1, 2 Androscoggin, $5,000 $1,500 $6,500

Aroostook,

Cumberland, Franklin,

Hancock, Kennebec,

Knox, Lincoln, Oxford,

Penobscot,

Piscataquis,

Sagadahoc,

Somerset, Waldo,

Washington, York

ME 2017 Public Information Develop "Natural Heritage The Maine Natural Areas Program will 1, 2 Statewide $5,759 $1,250 $7,009

Hikes" develop science based natural history

narratives for some of Maine's premier trails

for listing on and dissemination by Maine trail

related websites. Links to Natural Heritage

Hikes will be hosted on relevant...

ME 2017 Maps and Guides Park Maps and Guides Project is to develop and print a color Guide 1, 2 Statewide $17,450 $13,045 $30,495

and Maps for Bradbury Mt., Camden Hills,

Cobscook Bay, Quoddy Head, Shackford

Head, Peaks-Kenny, Ferry Beach, Sebago

Lake, Lamoine, Warren Island and Lake

George State Parks. This work builds on

work...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2017 State Tools and Equipment Maine Conservation Corp The equipment requested in this application 1, 2 Statewide $11,293 $2,833 $14,126

and Environmental Steward will improve the efficiency of MCC operations,

while reducing environmental impacts, by

outfitting teams with lighter weight gear,

power equipment, and improved tools for trail

planning, construction and...

ME 2018 Various Statewide Trails Trail Construction and Trail Construction and maintenance 1, 2 Multiple Counties $3,000 $750 $3,750

maintenance equipment equipment utilizing Maine Conservation Corp

ME 2019 State Administration RTP Administration Administration of the RTP program for the 1, 2 Statewide $100,992 $25,000 $125,992

State of Maine. 2019 will see the beginning of

an additional initiative to inventory and

assess all trails on state owned / controlled

lands, a project that is anticipated to take at

least two years to...

ME 2019 Safety and Education Off Road Bicycle Education The Bicycle Coalition of Maine's Off Road 1, 2 Statewide $5,000 $1,500 $6,500

Bicycling Education (ORBE) Program has

two components. The ORBE Program 1.

Provides instruction in basic off-road bicycle

riding as requested at events across the

state, and 2. provides technical assistance...

ME 2019 Natural Heritage Hikes Natural Heritage Hikes The objective of this project is to promote 1, 2 Statewide $5,000 $1,697 $6,697

hiking and environmental education by

creating science based natural history

narratives for some of Maine's premier trails.

The Maine Natural Areas Program will

complete five new Natural Heritage Hikes

to...

ME 2018 Hillside Trail Hillside Trail Rehabilitation Hillside Trail rehabilitation 2 Hancock $43,150 $13,935 $57,085

ME 2018 Appalachian National Scenic AT Ridgerunners Caretaker and Ridgerunners will provide 2 Piscataquis, $5,000 $50,133 $55,133

Trail environmental education and promote public Somerset, Franklin

safety along busy Maine sections of the

2,220-mile Appalachian National Scenic Trail.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 1993 Washington County Winter Trail Renovation Renovation On Multi-Use Trails 2 Washington $4,840 $1,210 $6,050

Trails

ME 1993 Madrid Winter Trails, Trail Renovation Renovation of Trails 2 Franklin $3,694 $2,536 $6,230

Freeman Winter Trails

ME 1993 Wilton Winter Trails Trail Improvements Trail Improvements 2 Franklin $11,760 $3,192 $14,952

ME 1993 Pine Tree State Arboretum Trail Improvements Trail Improvements 2 Kennebec $3,150 $3,600 $6,750

ME 1993 Newport to Dover-Foxcroft 2 Kennebec $15,400 $3,872 $19,272

ME 1993 Mount Blue State Park Trail Improvements Trail Improvements 2 Kennebec $15,400 $4,754 $20,154

ME 1993 , Milo Bridge Installation 200 foot suspension bridge 2 Piscataquis $15,400 $5,388 $20,788

ME 1993 Aroostook Valley Trail Trail Construction Construct Multi-Purpose Trail 2 Aroostook $23,877 $6,040 $29,917

ME 1993 Jackman Trail Bridge and Trail Bridge, Trail Improvements 2 Somerset $15,400 $10,025 $25,425

Improvements

ME 1993 Bangor Trail System Trail Improvements Two Sites On City Park Property 2 Penobscot $15,400 $13,680 $29,080

ME 1996 Split Cedar Trail 2 Aroostook $2,425 $2,425 $4,850

ME 1996 Monticello Trails 2 Aroostook $3,865 $3,865 $7,730

ME 1996 Jackman Trails Trail Renovation Renovation 2 Somerset $3,970 $3,970 $7,940

ME 1996 Rogue Bluffs Trail 2 Washington $4,500 $4,500 $9,000

ME 1996 Quoddy Head Trail 2 Washington $5,950 $5,950 $11,900

ME 1996 Hersey Town Township Bridge Installation 80' bridge 2 Aroostook $7,270 $7,270 $14,540

ME 1996 Guerette Trail Improvements Improvements 2 Aroostook $8,523 $8,523 $17,046

ME 1996 Farmington Trail Renovation Renovation 2 Franklin $10,040 $10,040 $20,080

ME 1996 Carrabassett Valley Trails Trail Renovation Renovation 2 Franklin $11,000 $11,000 $22,000

ME 1996 Ski Area Winter Trail Improvements Maintenance and Restoration of Trails 2 Aroostook $14,000 $14,000 $28,000

ME 1996 Lewiston Jay Trail Trail Maintenance Maintenance 2 Androscoggin $56,452 $56,452 $112,904

ME 1997 Narraguagus Bridge Bridge Installation Cooperative project with Maine Department 2 Washington $2,636 $2,636 $5,272

of Transportation

ME 1997 Woodland Nature Trail Trail Construction Nature/Interpretive Trail 2 Aroostook $4,000 $4,000 $8,000

ME 1997 Meduxnekeag Bridge Bridge Improvements Repairs to Bridge 2 Aroostook $5,744 $5,744 $11,488

ME 1997 Little Squaw Trails 2 Kennebec $6,000 $6,000 $12,000

ME 1997 Rangeley Winter Trails Trail Construction Trail Expansion 2 Franklin $7,500 $7,500 $15,000

ME 1997 Acadian Wood Trail 2 Hancock $8,500 $8,500 $17,000

ME 1997 Austin Stream Bridge Bridge Installation Bridge 2 Somerset $8,500 $8,500 $17,000

ME 1997 Main Stream Bridge Bridge Installation Bridge 2 Somerset $10,000 $10,000 $20,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 1997 Squa Pan Trail Trail Improvements Improvements. 2 Aroostook $12,000 $12,000 $24,000

ME 1997 Goose Eye/Speck Pond Trail Trail Improvements 2 Cumberland $13,000 $13,000 $26,000

ME 1997 Black Mountain Trail Trail Renovation Renovation 2 Oxford $15,500 $15,500 $31,000

ME 1997 Dover-Foxcroft, Dexter, Trail Improvements 2 Piscataquis $15,500 $15,500 $31,000

Corrinna, Newport

ME 1997 Kingfield Winter Trails Winter Trail Improvements 2 Franklin $16,000 $16,000 $32,000

ME 1998 Alexander Winter Trails Winter Trail Improvements Renovation 2 Washington $3,000 $3,000 $6,000

ME 1998 Big Squaw Mountain Trail Trail Renovation Rehabilitation 2 Kennebec $3,900 $5,000 $8,900

ME 1998 Skowhegan Trails 2 Somerset $5,000 $6,800 $11,800

ME 1998 Lexington Plantation Bridge Installation 2 Somerset $7,231 $7,231 $14,462

Snowmobile Bridge

ME 1998 Rangeley Winter Trails Trail Improvements Improvements 2 Franklin $7,240 $7,240 $14,480

ME 1998 Old Town Waterfront Path Paved Pathway 2 Penobscot $7,500 $7,500 $15,000

ME 1998 Colby Trail Renovation 2 Somerset $5,000 $7,550 $12,550

ME 1998 St. Albans Winter Trails Winter Trail Improvements 2 Somerset $7,500 $10,624 $18,124

ME 1998 Presque Isle Land Acquisition Acquisition 2 Aroostook $15,000 $15,000 $30,000

ME 1998 Wyman Township Trails Trail Improvements Trail Side Amenities 2 Franklin $4,100 $16,500 $20,600

ME 1998 Meduxnekeag Bridge Trail Improvements Trail Side Amenities 2 Kennebec $4,100 $16,500 $20,600

ME 1999 Nicatous Trailhead Land Acquisition Acquisition 2 Hancock $7,259 $1,815 $9,074

ME 1999 ITS 82/Dover-Foxcroft Bridge Installation Bridge 2 Piscataquis $8,280 $2,070 $10,350

Winter Bridge

ME 1999 Bigelow Preserve Trails Trail Construction New Trail 2 Franklin $7,580 $2,968 $10,548

ME 1999 Oxbow Plantation Land Acquisition Acquisition 2 Aroostook $12,000 $3,000 $15,000

ME 1999 Rangeley Winter Trails Trail Improvements Improvements 2 Franklin $16,632 $4,148 $20,780

ME 1999 Squa Pan Trail Trail and Drainage Erosion Control 2 Aroostook $19,336 $4,834 $24,170

Improvements

ME 1999 Megalloway Bridge Bridge Installation 100' Bridge 2 Franklin $24,258 $6,065 $30,323

ME 1999 Heritage Trail 2 Aroostook $25,000 $8,580 $33,580

ME 1999 Pathway Land Acquisition Acquisition 2 Cumberland $25,000 $8,629 $33,629

ME 1999 Greenland Point Trails Accessible Trail Includes Handicapped Access Trail 2 Washington $23,435 $12,290 $35,725

Improvements

ME 1999 Little Squaw Township Trails Trail Renovation Restoration of Trail 2 Kennebec $14,000 $12,350 $26,350

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 1999 Persque Isle Purchase Snow Trail Groomer Purchase 2 Kennebec $56,000 $14,000 $70,000

Equipment

ME 1999 Little Squaw Trail Trail Renovation Restoration of Trails 2 Kennebec $18,000 $18,000 $36,000

ME 1999 Old Town Riverfront 2 Penobscot $17,500 $32,500 $50,000

Pathway

ME 1999 Trail and Bridge Construction Bridge and Trail Construction 2 Franklin $25,000 $68,910 $93,910

ME 1999 Presque Isle Land Acquisition Acquisition 2 Kennebec $39,000 $70,000 $109,000

ME 2000 Fishing Access Trail ADA 2 Piscataquis $4,500 $1,500 $6,000

ME 2000 Alexander Trails Trail Improvements, Culverts 2 Washington $12,500 $3,482 $15,982

ME 2000 Great Meadow Loop Trail Construct 2 Hancock $12,000 $4,080 $16,080

ME 2000 Bridge Trail Bridge 2 Penobscot $15,500 $4,500 $20,000

ME 2000 Trail Construct Trail 2 Aroostook $15,000 $4,506 $19,506

ME 2000 Green Community Trail Construct and Repair Trails 2 Androscoggin $12,000 $4,625 $16,625

ME 2000 Presque Isle Stream Trail Bridge 2 Aroostook $20,000 $5,530 $25,530

ME 2000 Millinocket Trail Bridge Bridge 2 Penobscot $27,000 $7,096 $34,096

ME 2000 Farmington Cross Country Trail Renovations 2 Franklin $29,000 $8,425 $37,425

Ski Trails

ME 2000 Grafton Loop Trail Construct Trail 2 Oxford $29,000 $9,050 $38,050

ME 2000 Heritage Trail Trail Renovations 2 Aroostook $28,000 $9,358 $37,358

ME 2000 Mountain Trail Trail Renovation 2 Piscataquis $24,000 $10,200 $34,200

ME 2000 Riverside Park Trail Bridge 2 Washington $26,000 $11,500 $37,500

ME 2000 Bald Mountain Perimeter Construct Trail 2 Franklin $9,500 $12,400 $21,900

Trail

ME 2000 Appalachian National Scenic Trail Renovations 2 Piscataquis, $16,500 $12,477 $28,977

Trail Somerset, Franklin,

Oxford

ME 2000 Appalachian National Scenic Trail Renovations 2 Piscataquis, $17,500 $12,477 $29,977

Trail Somerset, Franklin,

Oxford

ME 2000 Forest Trail Loop Trail Construction and Renovation 2 Penobscot $29,000 $13,959 $42,959

ME 2000 Bangor and Aroostook Parking Area 2 Aroostook $26,000 $14,061 $40,061

Rail-Trail

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2000 Debsconeag Backcountry Trail Renovation 2 Piscataquis $33,000 $31,500 $64,500

Trail

ME 2000 Trail Bridge Work 2 Aroostook $20,000 $50,000 $70,000

ME 2001 Easton Trail Parking Area, Picnic Facility 2 Aroostook $10,450 $3,100 $13,550

ME 2001 Club House Trail Trail Renovations 2 Washington $13,600 $3,400 $17,000

ME 2001 Spruce Mountain Trail Renovations, Bridges, Culverts 2 Augusta $21,000 $5,250 $26,250

ME 2001 Moosehead Trail Construct Trail 2 Somerset $15,000 $7,000 $22,000

ME 2001 Madawaska River Trail Bridge 2 Aroostook $29,600 $7,400 $37,000

ME 2001 Mill Island Trail Trailhead, Renovations 2 Somerset $10,000 $7,655 $17,655

ME 2001 Split Cedar Trail Improvements, Renovation 2 Aroostook $18,000 $8,678 $26,678

ME 2001 Houlton Trail Acquire Land 2 Aroostook $30,000 $10,000 $40,000

ME 2001 Multi-Purpose Trail Maintenance, Bridge 2 Aroostook $25,000 $13,500 $38,500

ME 2001 Squa Pan Trail Trail Improvements 2 Aroostook $25,000 $14,350 $39,350

ME 2001 Ski Trails Construct Trail 2 Aroostook $30,000 $14,522 $44,522

ME 2001 Railbed Trail Trail and Drainage Maintenance, Culverts 2 Franklin $24,000 $17,000 $41,000

Improvements

ME 2001 Big Moose Trail Renovate and Construct Trail 2 Piscataquis $13,582 $17,918 $31,500

ME 2001 Heritage Trail Improvements, Purchase Equipment 2 Aroostook $25,000 $23,242 $48,242

ME 2001 Grafton Loop Construct Trail, Renovations 2 Oxford $50,000 $29,426 $79,426

ME 2002 Debsconeag Trail Construct Trail 2 Piscataquis $44,000 $38,500 $82,500

ME 2001 Lake George Park East Trail Construct Trail, Renovation 2 Somerset $11,500 $2,925 $14,425

ME 2002 Franklin County Rail-Trail Construct Trail 2 Franklin $7,200 $3,600 $10,800

ME 2002 Appalachian National Scenic Bridge 2 Oxford $5,267 $5,990 $11,257

Trail

ME 2002 Bridge Bridge 2 Penobscot $24,000 $6,000 $30,000

ME 2002 Little Bridge Bridge 2 Aroostook $27,200 $6,800 $34,000

ME 2002 Long Lake Recreation Trail Improvements, Paving 2 Aroostook $18,075 $6,925 $25,000

ME 2002 Multi-Use Trails Construct Trail, Maintenance 2 Washington $25,600 $7,400 $33,000

ME 2002 Trail Renovation 2 Piscataquis $25,500 $8,614 $34,114

ME 2002 Big Moose Trail Renovation 2 Piscataquis $33,055 $9,000 $42,055

ME 2002 Unity Trail Construct Trail 2 Waldo $30,000 $9,039 $39,039

ME 2002 Nordic Heritage Center Trail Construct Trail 2 Aroostook $30,000 $9,381 $39,381

ME 2002 Androscoggin Canoe Trail Trailhead Access Sites 2 Oxford $20,500 $10,005 $30,505

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2002 Grafton Loop Trail Construct Trail 2 Oxford $25,575 $12,702 $38,277

ME 2002 Appalachian National Scenic Maintenance 2 Piscataquis, $18,075 $14,525 $32,600

Trail Somerset, Franklin,

Oxford

ME 2002 Camden Hills State Park Renovation, Erosion Control 2 Waldo $28,000 $23,575 $51,575

ME 2002 Washburn Trestle Bridge Renovation 2 Aroostook $100,000 $40,000 $140,000

ME 2002 Orono Bog Boardwalk Construct Trail Boardwalk 2 Penobscott $30,000 $45,453 $75,453

ME 2003 Bog Boardwalk Boardwalk 2 Penobscot $11,500 $2,900 $14,400

ME 2003 Farmington Ski Club Trails Improvements 2 Franklin $16,900 $3,975 $20,875

ME 2003 Camden Hills State Park Improvements 2 Knox, Waldo $7,000 $4,100 $11,100

ME 2003 Goodwill-Hinckley Trail Maintenance 2 Somerset $3,950 $4,106 $8,056

ME 2003 Aroostook State Park Improvements 2 Aroostook $16,900 $4,202 $21,102

ME 2003 Bigelow Preserve Improvements 2 Franklin, Somerset $11,000 $4,650 $15,650

Firewarden Trail

ME 2003 Meduxnekeag River Bridge Bridge 2 Aroostook $20,555 $5,630 $26,185

ME 2003 Mettawamkeeg River Bridge 2 Aroostook $30,000 $7,500 $37,500

ME 2003 Nordic Heritage Trail Construct Trail 2 Aroostook $20,000 $8,950 $28,950

ME 2003 Big Moose Trail Improvements 2 Somerset $23,000 $9,500 $32,500

ME 2003 Ryders ATV Trail Construct Trail 2 Aroostook $25,000 $11,866 $36,866

ME 2003 St. Croix Stream Bridge 2 Aroostook $55,000 $13,750 $68,750

ME 2003 Appalachian National Scenic Maintenance 2 Piscataquis, $20,000 $14,400 $34,400

Trail Somerset, Franklin,

Oxford

ME 2003 Grafton Loop Construct Trail 2 Oxford $41,000 $15,000 $56,000

ME 2003 Devil's Head Trail Construct Trail 2 Washington $23,000 $15,500 $38,500

ME 2003 Bridge 2 Somerset $25,000 $18,059 $43,059

ME 2003 Blue Hill Mountain Trail Improvements 2 Hancock $20,000 $19,400 $39,400

ME 2003 Corinna Walking Trail Construct Trail 2 Penobscot $20,000 $34,000 $54,000

ME 2003 Grafton Loop Construct Trail 2 Oxford $20,000 $36,794 $56,794

ME 2003 International Friendship Trail Improvements, Bridges 2 Franklin $25,000 $53,474 $78,474

ME 2004 Wheeler Stream Bridge Wheeler Stream Bridge Motorized 2 Oxford $25,373 $6,343 $31,716

Replacement

ME 2004 Frenchville Recreational Trail Non-motorized 2 Aroostook $30,000 $7,500 $37,500

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2004 Aroostook State Park Aroostook State Park Non-motorized 2 Aroostook $5,000 $1,250 $6,250

ME 2004 Firetower Lands Firetower Lands Non-motorized 2 Aroostook $44,000 $11,000 $55,000

ME 2004 KI Acquisition KI Acquisition Diverse 2 Aroostook $80,000 $20,000 $100,000

ME 2004 Bangor and Aroostook Diverse 2 Aroostook $20,000 $50,000 $70,000

Rail-Trail

ME 2004 Jay-Farmington Rail-Trail Diverse 2 Franklin $8,700 $2,175 $10,875

ME 2004 Jay Farmington Trail Motorized 2 Franklin $39,747 $9,937 $49,684

ME 2004 Kennebec Messalonskee Diverse 2 Kennebec $30,000 $7,500 $37,500

Trails

ME 2004 Messalonskee Stream Trail Messalonskee Stream Trail Diverse 2 Kennebec $30,000 $7,500 $37,500

Project

ME 2004 Appalachian National Scenic Non-motorized 2 Piscataquis, $42,217 $10,554 $52,771

Trail Rehabilitation: 8 locations Somerset, Franklin,

Oxford

ME 2004 Grafton Loop Trail Grafton Loop Trail - Phase Non-motorized 2 Oxford $30,000 $7,500 $37,500

VI

ME 2004 Grafton Notch Grafton Notch, Bigelow Non-motorized 2 Oxford $15,000 $3,750 $18,750

Preserve

ME 2004 Holden Community Learning Non-motorized 2 Penobscot $15,189 $3,797 $18,986

Nature Trails

ME 2004 Orono Boardwalk Orono Boardwalk Safety and Environmental Education 2 Penobscot $4,250 $1,063 $5,313

ME 2004 Newport-Dover Trail Diverse 2 Penobscot $37,887 $9,472 $47,359

ME 2004 Newport-Dover Trail Diverse 2 Piscataquis $37,887 $9,472 $47,359

ME 2004 KI Trail KI Trail Improvements Diverse 2 Piscataquis $41,100 $10,275 $51,375

ME 2004 KI Trail KI Trail Improvements Diverse 2 Piscataquis $41,100 $10,275 $51,375

ME 2004 Forks Area Scenic Trail Diverse 2 Somerset $30,000 $7,500 $37,500

ME 2004 Unity Shared Use Path Unity Shared Use Path Non-motorized 2 Waldo $25,900 $6,475 $32,375

Parking Lot Parking Lot

ME 2004 Trail Improvements Non-motorized 2 Washington $4,000 $1,000 $5,000

ME 2005 Lewiston-Auburn Trails Lewiston-Auburn Trails Safety and Environmental Education 2 Androscoggin $4,000 $1,000 $5,000

Mapping Project

ME 2005 Violette Settlement Trail Violette Settlement Trail Non-motorized 2 Aroostook $25,000 $6,250 $31,250

System System Acquisition

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2005 Nordic Heritage Center Nordic Heritage Center Non-motorized 2 Aroostook $20,000 $5,000 $25,000

Mountain Bike & Foot Trails Mountain Bike & Foot Trails

ME 2005 Eagle Lake ATV Trails ATV Trail Project Motorized 2 Aroostook $20,000 $5,000 $25,000

ME 2005 Aroostook State Park Aroostook State Park Diverse 2 Aroostook $14,000 $3,500 $17,500

ME 2005 Bangor and Aroostook Motorized 2 Aroostook $20,000 $5,000 $25,000

Rail-Trail

ME 2005 KI Trail KI Trail Improvements Motorized 2 Aroostook $25,000 $6,250 $31,250

ME 2005 Winter Recreation Trails Trail Expansion & Non-motorized 2 Franklin $20,000 $5,000 $25,000

Development

ME 2005 Rangeley Lake Heritage Non-motorized 2 Franklin $15,000 $3,750 $18,750

Trust Recreational Trail

ME 2005 Various State Park Trails Parks South Non-motorized 2 Franklin $30,458 $7,615 $38,073

ME 2005 Jay-Farmington Rail-Trail Motorized 2 Franklin $55,000 $13,750 $68,750

ME 2005 Safety and Education Master of "Leave No Trace" Safety and Environmental Education 2 Hancock $5,000 $1,250 $6,250

Training : Outfit Leaders

ME 2005 Mill Pond Trail Mill Pond Trail Project Non-motorized 2 Kennebec $20,000 $5,000 $25,000

ME 2005 Grafton Loop Trail Non-motorized 2 Oxford $63,100 $15,775 $78,875

ME 2005 Oxford Hills Map and Sign Project Safety and Environmental Education 2 Oxford $4,800 $1,200 $6,000

ME 2005 Oxford Hills Map and Sign Project Safety and Environmental Education 2 Oxford $4,800 $1,200 $6,000

ME 2005 Kenduskeag Stream Kenduskeag Stream Non-motorized 2 Penobscot $21,000 $5,250 $26,250

Gateway Park Trailhead Gateway Park Trailhead

Facilities Facilities

ME 2005 Hermon Trail Hermon Trail Project Non-motorized 2 Penobscot $15,000 $3,750 $18,750

ME 2005 Four Seasons Adventure Motorized 2 Penobscot $10,000 $2,500 $12,500

Trail

ME 2005 Moose River Bridge Moose River Bridge Motorized 2 Somerset $59,622 $14,906 $74,528

ME 2005 Smokey's Dream Bridge Smokey's Dream Bridge Motorized 2 Somerset $14,175 $3,544 $17,719

ME 2005 Safety and Education Trail and Safety Safety and Environmental Education 2 Somerset $3,654 $914 $4,568

Map/Brochures

ME 2005 Belfast Trail System Development/Fitness Trail Non-motorized 2 Waldo $15,000 $3,750 $18,750

Project in City Park

ME 2005 Trail Upper Ducktrap River Trail Non-motorized 2 Waldo $18,000 $4,500 $22,500

and Bridge Project

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2006 Minot Recreational Trails Diverse 2 Androscoggin $29,000 $7,250 $36,250

ME 2006 Various State Park Trails Non-motorized Trails Non-motorized 2 Androscoggin $38,529 $9,632 $48,161

Rehabilitation Projects

ME 2006 Cove Corner Trails Diverse 2 Aroostook $27,400 $6,850 $34,250

ME 2006 Meduxnekeag Stream Bridge Meduxnekeag Stream Bridge Motorized 2 Aroostook $24,840 $6,210 $31,050

Project Project

ME 2006 Prestile Stream Bridge Prestile Stream Bridge Motorized 2 Aroostook $14,400 $3,600 $18,000

Project Project

ME 2006 Bridge Molunkus Stream Bridge Motorized 2 Aroostook $35,640 $8,910 $44,550

Project Project

ME 2006 Split Cedar Trail Motorized 2 Aroostook $30,000 $7,500 $37,500

ME 2006 Four Seasons Trail Project Four Seasons Trail Project Diverse 2 Aroostook $29,000 $7,250 $36,250

ME 2006 Cove Corner Wood Trails Diverse 2 Aroostook $29,000 $7,250 $36,250

ME 2006 Aroostook State Park Aroostook State Park Trails Diverse 2 Aroostook $9,000 $2,250 $11,250

Enhancement

ME 2006 Statewide Trail Maintenance BARR Trail Renovation Motorized 2 Aroostook $27,258 $6,815 $34,073

ME 2006 Crouseville Trestle Crouseville Trestle Diverse 2 Aroostook $58,827 $14,707 $73,534

ME 2006 Safety and Education Trail Interpretive Signage Safety and Environmental Education 2 Aroostook $4,000 $1,000 $5,000

Project

ME 2006 Jay-Farmington Rail-Trail Jay-Farmington Rail-Trail Diverse 2 Franklin $20,000 $5,000 $25,000

Project

ME 2006 Miles Lane Trail Non-motorized 2 Hancock $11,500 $2,875 $14,375

ME 2006 Thomas College Trails Thomas College Trails Diverse 2 Kennebec $29,000 $7,250 $36,250

Project

ME 2006 Kennebec Messalonskee Rotary Centennial Trail Safety and Environmental Education 2 Kennebec $3,864 $966 $4,830

Trails Education Project

ME 2006 Bethel Pathway Bethel Pathway Diverse 2 Oxford $29,000 $7,250 $36,250

ME 2006 Goulds Landing Trail Goulds Landing Trail Project Non-motorized 2 Penobscot $3,000 $750 $3,750

ME 2006 Debsconeag Lakes Debsconeag Lakes Diverse 2 Piscataquis $29,000 $7,250 $36,250

Wilderness Area Wilderness Area Trail Project

ME 2006 Nahmakanta Nahmakanta Non-motorized 2 Piscataquis $8,000 $2,000 $10,000

ME 2006 Little Moose ATV Trails Little Moose ATV Trails Diverse 2 Piscataquis $24,785 $6,196 $30,981

ME 2006 Heselton Street Park Heselton Street Park Non-motorized 2 Somerset $20,400 $5,100 $25,500

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2006 Trail Rehabilitation Project Non-motorized 2 Waldo $1,560 $390 $1,950

ME 2006 Mowry Beach Mowry Beach Project Non-motorized 2 Washington $27,500 $6,875 $34,375

ME 2006 Safety and Education Trail Safety/Environmental Safety and Environmental Education 2 Washington $2,208 $552 $2,760

Education Project

ME 2006 State Administration Administration Administration 2 Androscoggin $30,010 $7,503 $37,513

ME 2007 Thorncrag Nature Sanctuary Thorncrag Nature Sanctuary Diverse 2 Androscoggin $20,000 $5,000 $25,000

Project Project

ME 2007 Turner Cove Turner Cove Acquisition Motorized 2 Androscoggin $143,000 $35,750 $178,750

ME 2007 Castle Hill Castle Hill Non-motorized 2 Aroostook $3,439 $860 $4,299

ME 2007 Deboullie Hiking Trails Deboullie Non-motorized 2 Aroostook $26,000 $6,500 $32,500

ME 2007 Squa Pan ATV and Sno Trail Motorized 2 Aroostook $26,681 $6,670 $33,351

ME 2007 Stockholm Trestle Stockholm Trestle Motorized 2 Aroostook $75,000 $18,750 $93,750

Renovation

ME 2007 Meduxnekeag River Meduxnekeag River Non-motorized 2 Aroostook $90,900 $22,725 $113,625

Suspension Bridge Suspension Bridge

ME 2007 Winter Recreation Trails Trail Development/ Diverse 2 Franklin $15,000 $3,750 $18,750

Improvement Project

ME 2007 Rangeley Winter Trails Trail Development Project Diverse 2 Franklin $20,000 $5,000 $25,000

ME 2007 Rangeley Lake Heritage Trails and Water Access Diverse 2 Franklin $27,658 $6,915 $34,573

Trust Recreational Trail Project

ME 2007 Sugar Island, Farm Island Sugar Island/Farm Island Diverse 2 Hancock $4,035 $1,009 $5,044

Campsites

ME 2007 Winslow Community Trails Community Trails Project Non-motorized 2 Kennebec $30,000 $7,500 $37,500

ME 2007 Safety and Education Source to the Sea Trek Safety and Environmental Education 2 Oxford $4,800 $1,200 $6,000

Project

ME 2007 Borestone Mountain Base Borestone Mountain Base Non-motorized 2 Piscataquis $14,560 $3,640 $18,200

Trail Trail Project

ME 2007 Appalachian National Scenic Caretaker & Ridgerunner Safety and Environmental Education 2 Piscataquis, $5,000 $1,250 $6,250

Trail Project Somerset, Franklin,

Oxford

ME 2007 Appalachian National Scenic Trail Restoration Project Non-motorized 2 Piscataquis, $30,000 $7,500 $37,500

Trail Somerset, Franklin,

Oxford

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2007 Forks Scenic Trail Diverse 2 Somerset $30,000 $7,500 $37,500

ME 2007 Georges River Expanding Public Access in Safety and Environmental Education 2 Waldo $2,286 $572 $2,858

Searsmont Project

ME 2008 North Auburn Road North Auburn Road Non-motorized 2 Androscoggin $9,000 $2,250 $11,250

Multi-Use Lake Trail Multi-Use Lake Trail Project

ME 2008 Turner Riverlands State Park Turner Riverlands State Park Motorized 2 Androscoggin $70,902 $17,726 $88,628

ME 2008 Deboullie Tower Trail Deboullie Tower Trail Non-motorized 2 Aroostook $58,000 $14,500 $72,500

Restoration

ME 2008 Salmon Brook Salmon Brook Land Unit Diverse 2 Aroostook $12,500 $3,125 $15,625

ME 2008 Winter Recreation Trails Trail Development and Non-motorized 2 Franklin $30,000 $7,500 $37,500

Expansion Project

ME 2008 North Jay White Granite North Jay White Granite Non-motorized 2 Franklin $11,470 $2,868 $14,338

Park Park Expansion

ME 2008 Onion Valley Trail Onion Valley Trail Diverse 2 Franklin $21,000 $5,250 $26,250

Restoration

ME 2008 Kennebec Messalonskee Kennebec Messalonskee Non-motorized 2 Kennebec $30,000 $7,500 $37,500

Trails Trails

ME 2008 Quarry Woods Trail Diverse 2 Kennebec $29,000 $7,250 $36,250

ME 2008 Canton Trails Canton Trail Project Diverse 2 Oxford $7,300 $1,825 $9,125

ME 2008 Winter Recreation Trails Trail Relocation Project Motorized 2 Oxford $3,885 $971 $4,856

ME 2008 Millinocket Bridge Bridge Construction Motorized 2 Penobscot $39,643 $9,911 $49,554

ME 2008 Orono Orono Land Trust Map Safety and Environmental Education 2 Penobscot $4,543 $1,136 $5,679

Project

ME 2008 Portage Canoe Trail Portage Canoe Trail Project Non-motorized 2 Piscataquis $12,000 $3,000 $15,000

ME 2008 Appalachian National Scenic Appalachian Trails Non-motorized 2 Piscataquis, $30,000 $7,500 $37,500

Trail Restoration Somerset, Franklin,

Oxford

ME 2008 Debsconeag Trail Debscogneag Trail Project Non-motorized 2 Piscataquis $29,000 $7,250 $36,250

ME 2008 Debsconeag Trail Debsconeag Trail Project Non-motorized 2 Piscataquis $29,000 $7,250 $36,250

ME 2008 Demonstration Forest Trail Demonstration Forest Trail Non-motorized 2 Piscataquis $18,096 $4,524 $22,620

Overlook Project

ME 2008 Four Seasons Recreational Four Seasons Recreational Diverse 2 Piscataquis $7,800 $1,950 $9,750

Trails Trails Project

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2008 Moose River Valley Nature Moose River Valley Nature Non-motorized 2 Somerset $6,600 $1,650 $8,250

Trail Trail Project

ME 2008 Moose Bridge construction Motorized 2 Somerset $95,000 $23,750 $118,750

ME 2009 Minot School Trails New Trails Trails at Recreation Area near town's ball 2 Androscoggin $27,840 $6,960 $34,800

fields

ME 2009 Rehabilitate Trails Rehabilitate Trails Construction of a bridge for snowmobile club 2 Aroostook $12,565 $3,141 $15,706

ME 2009 Rehabilitate Trails Rehabilitate Trails Restore 3.8 miles of trail. 2 Hancock $27,240 $6,810 $34,050

ME 2009 Quarry Road Trails New Trails Constructing ski loop (5 km) on land off from 2 Kennebec $30,000 $7,500 $37,500

Quarry Road. Had meeting with ATV and

Snowmobile Club who were told Quarry Rd.

would be closed to motorized use. City will

write letter stating it will not be closed.

ME 2009 Bridge Bridge Construction Replacement of a Bridge over the Ellis River 2 Oxford $87,643 $21,911 $109,554

that fell in 2007

ME 2009 Appalachian National Scenic Rehabilitate Trails Improvements on AT from 2 Piscataquis, $24,000 $6,000 $30,000

Trail border Somerset, Franklin,

Oxford

ME 2009 New Trails New Trails Construction of 1.1 km barrier free trail, 5.7 2 Oxford $30,000 $7,500 $37,500

km 14' wide trail, and 2.2 km hiking trail

ME 2009 Rehabilitate Trails Rehabilitate Trails Town is improving trail (2053') from center of 2 Oxford $29,602 $7,401 $37,003

town to Telstar School for shared use

ME 2009 Rehabilitate Trails Rehabilitate Trails Put in bog bridging, waterbars and 2 Penobscot $19,139 $4,785 $23,924

improvements to trail on BLT properties

ME 2009 Rail-Trail Project ORV Trails Cutting back brush along 30+ miles of trail 2 Penobscot $60,000 $15,000 $75,000

and improvements to a short section that has

washed out

ME 2009 School Trails Rehabilitate Trails Rehab of loop located at high school 2 Piscataquis $9,966 $2,492 $12,458

ME 2009 Trail relocation Project Nahmakanta Reroute trail due to logging. Replace 2 2 Piscataquis $97,163 $24,291 $121,454

bridges.

ME 2009 Flagstaff Trailhead Project Rehabilitate Trails Trail head facility (40 cars) access to hut on 2 Somerset $14,198 $3,550 $17,748

Flagstaff Lake, with ADA outhouse & solar

lights.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2009 Rehabilitate Trails Rehabilitate Trails Trail improvements to snowmobile/hiker/biker 2 Somerset $30,000 $7,500 $37,500

trail in Rockwood

ME 2009 Land Acquisition Turner Acquisition Diverse 2 Androscoggin $42,151 $10,538 $52,689

ME 2009 Androscoggin Riverlands Trail Equipment ATV Mule of use at Turner 2 Androscoggin $11,000 $2,750 $13,750

State Park Trails

ME 2009 Trail Intern Trail Intern Intern to help with trail work, interview people 2 Androscoggin $7,500 $1,875 $9,375

as they arrive and help with the new

management plan

ME 2009 Salmon Bog Brook Trail Trail Construction 1.3 miles of hiking trail construction in the 2 Aroostook $25,000 $6,250 $31,250

Salmon Brook Lake Unit

ME 2009 Scopan Multi-use Trail OHV Trail Renovation 6.7 miles of ATV trail work at the Squapan 2 Aroostook $65,258 $16,315 $81,573

Unit

ME 2009 Multi-Use Trails Northern Region Parks Kineo, Roque Bluffs, Holbrook, Damariscotta, 2 Hancock $17,900 $4,475 $22,375

Non-motorized Project Moose Point and Lamoine trail improvements

ME 2009 Wright Trail Wright Trail Rehab 10 weeks of MCC for trail improvements. 2 Oxford $30,000 $7,500 $37,500

First phase of many for trail

ME 2009 Trail Brochure Safety and Environmental Brochure of trails constructed last year 2 Oxford $2,150 $538 $2,688

Education

ME 2009 Public Information Trail map/signage Trail signs and maps for trails at UMO 2 Penobscot $4,250 $1,063 $5,313

ME 2009 Pollywog Trail Trail Construction A multi-use trail project at the Nahmakanta 2 Piscataquis $25,838 $6,459 $32,297

Unit

ME 2009 Appalachian National Scenic Trail Project at several different areas of state on 2 Piscataquis, $30,000 $7,500 $37,500

Trail Renovation/Rehabilitation AT. Work includes 140 rock steps, 50 Somerset, Franklin,

stepping stones, 20 waterbars and much Oxford

more work

ME 2009 Bigelow Preserve Trails Trail and Trailhead 1.25 miles of hiking trail work in the Bigelow 2 Somerset $11,000 $2,750 $13,750

Improvements Preserve

ME 2009 Multi-Use Trails Trail Construction Multi-use trail construction and gate removal 2 Piscataquis $95,000 $23,750 $118,750

at the Seboomook Unit

ME 2009 Warren Island Interpretive Interpretive Project Educational Panel 2 Waldo $1,000 $250 $1,250

Project

ME 2009 Coast Guard Trail North Park Construction of a new Trail at Quoddy Head 2 Washington $34,999 $8,750 $43,749

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2010 Trails Trail Improvements on For continued work on Tumbledown 2 Franklin $30,000 $7,500 $37,500

Tumbledown Mountain Mountain Hiking Trails

ME 2010 Big Spencer Trail Trail Improvements on Big For improvement to the hiking trail up Big 2 Piscataquis $10,000 $2,500 $12,500

Spencer Mountain Spencer Mountain in the Moosehead region

ME 2010 Coastal Trail Trail Improvements and For 3 miles of hiking trail improvements on 2 Washington $23,000 $5,750 $28,750

Construction the Cutler Unit, and construction of a new

trailhead and hiking trail on the Donnell Unit

on Caribou Mountain

ME 2010 Tumbledown Dick Trail Trail Construction For a hiking and multi-use trail project at the 2 Piscataquis $22,500 $5,625 $28,125

Nahmakanta Unit (Tumbledown Dick Trail)

ME 2010 AmeriCorps Intern Environmental Educator For an Environmental Educator (AmeriCorps) 2 Washington $8,000 $2,000 $10,000

(AmeriCorps) to assist in recreation management on the

Cutler and Donnell Units

ME 2010 Trail Construction Project Trail Improvements and For 2 miles of improvements to hiking trails 2 Aroostook $20,000 $5,000 $25,000

Construction construction of a new 3 mile trail and on the

Deboullie Unit

ME 2010 Owls Head Trail Trail Improvements on For improvements to 2.5 miles of hiking trail 2 Penobscot $22,500 $5,625 $28,125

Scraggly Lake Unit on the Scraggly Lake Unit

ME 2010 Multi-Use Trails Trail Improvements on For improvements to 2 miles of a multi-use 2 Aroostook $50,000 $12,500 $62,500

Scopan Unit trail on the Scopan Unit

ME 2010 Bigelow Preserve Trails Environmental Educator For an Environmental Educator (AmeriCorps) 2 Franklin $8,000 $2,000 $10,000

(AmeriCorps) to assist in recreation management on the

Bigelow Preserve

ME 2010 Little Bigelow Mountain Trail Trailhead and Parking Area Provide an improved trailhead and parking 2 Franklin $11,550 $2,888 $14,438

area for the Little Bigelow Mountain Trail

ME 2010 Summit Trail Trail Improvements on Bald For improvements to 1.5 miles of hiking trail 2 Franklin $16,817 $4,204 $21,021

Mountain Unit on the Bald Mountain Unit in Rangeley,

Maine

ME 2010 Wright Trail Trail Improvements 3 miles of trail improvement work on the 2 Oxford $20,000 $5,000 $25,000

Wright Trail in the Mahoosuc Unit

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Connector Trail Bridge Project This project involved building a motorized, 2 Franklin $100,000 $25,000 $125,000

multi-use bridge across the Carrabassett

River. The bridge spans 110 feet across the

river and is 12 feet wide. The bridge is

located directly behind the Towns regional

airport. The intended use is for...

ME 2011 School Link Trail School Shared Use Trail The Town of Hermon proposed a 1,900 foot 2 Penobscot $21,519 $5,380 $26,899

long multi-use non-motorized nature trail that

connected the towns Middle and High

Schools. The towns Public Works

Department construct...

ME 2011 River Trail River Trail The Town of Skowhegan constructed a state 2 Somerset $29,629 $7,407 $37,036

of the art ADA trail along the Kennebec

River/Gorge, which is approximately 3,000

feet long. This trail connects the walking

bridge across the river to the downtown and

Philbrick Trail.

ME 2011 Lighthouse Trail Lighthouse Trail The town constructed 1 mile of new trail and 2 Hancock $25,725 $6,431 $32,156

improved parking within the 18 acre town

park. The project work included sanitary

facilities and improving parking for trail

access.

ME 2011 Appalachian National Scenic Appalachian Trail These projects rehabilitated seven sections 2 Piscataquis, $35,000 $8,750 $43,750

Trail Rehabilitation of the Appalachian Trail in Maine. They were Somerset, Franklin,

at West Baldpate, Old Blue Mt., Saddleback Oxford

Mt., Pleasant Pond Mt., West Peak of White

Cap Mountain, Nahmakanta Stream, and

Katahdin. The work involved, stone...

ME 2011 Morong Cove Trail Project Morong Cove This project entailed 3.25 miles of trail. This 2 Washington $32,175 $5,044 $37,219

year?s work included construction of 2.25

miles of new trail to expand and improve an

existing 1 mile of managed road/hiking trail.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Blue Hill Trail Project Blue Hill Trail Project The total trail distance covered by this project 2 Hancock $11,915 $2,979 $14,894

was 3.25 miles and parking construction

covered about 0.5 acres. The project created

two loop trails within a mile of an elementary

school. The work included; clearing trail

corridor, and trail...

ME 2011 Mahoosuc Trail (Appalachian Mahoosuc Trail Work A professional trail crew improved 1.5 miles 2 Oxford $26,500 $6,625 $33,125

National Scenic Trail) of trail, installing and replacing bog bridging

in muddy areas to prevent trail widening and

trampling of vegetation. The project was on

the Mahoosuc Trail, a section of the

Appalachian Trail, between Mt....

ME 2011 Trails Baxter State Park Trail Work This project included work on 5 trails within 2 Penobscot $35,000 $8,750 $43,750

Baxter State Park. The work was done by an

MCC crew along with Baxter State Park trail

supervisors and included work on the Abol

Trail, the Saddle Trail, Helon Taylor Trail,

Chimney Pond Trail, and the...

ME 2011 Tramway Project Tramway Project This project included placing gravel in wet 2 Piscataquis $11,450 $2,863 $14,313

spots along the 3,000 foot portage trail

between Chamberlain and Eagle Lakes. This

trail is within the Allagash Wilderness

Waterway.

ME 2011 Tower Trail Tower Trail The goal of this project was to create a new 2 Washington $20,340 $5,085 $25,425

series of trail loops that will take park visitors

through varied terrain and ecosystems, while

highlighting points of interest. New trails

expanded an existing 2-mile trail network to

the extent that the...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Eyebrow Trail Eyebrow Trail Work The plans for this project were to hire a 2 Oxford $12,000 $3,000 $15,000

Maine Conservation Corps Crew for four

weeks to address erosion issues on steep

sections of the popular Eyebrow Trail. The

crew constructed ...

ME 2011 Shackford Trails Trail Rehabilitation This was a restoration project of an existing 2 Washington $16,000 $4,000 $20,000

trail system, and the work was completed by

a crew from the Maine Conservation Corps;

which included installing bog bridging,

ditching, rock steps, waterbars, and widening

some trails. A significant...

ME 2011 Loop Trail Cutler Trails The focus here was to continue the 2 Washington $24,860 $6,215 $31,075

restoration project on coastal trails. The

Cutler trails have over 3,000 foot of bog

bridging and this year?s goal is to add to that

total and to continue needed restoration

work.

ME 2011 Summit Trail Tunk Trails The project in this parcel was to adopt and 2 Hancock $22,500 $5,625 $28,125

upgrade the informal Tunk Mountain/Hidden

Pond Trail network and to establish a

trailhead and parking area. The upper section

of the Tunk Mountain Trail required a

significant amount of labor intensive,...

ME 2011 Owls Head Trail Scraggly Trail Work Construction of a new hiking trail from the 2 Penobscot $25,000 $6,250 $31,250

unit access road to the Owl?s Head Trail

which currently can only be accessed by

boat; also included in the plans is the

maintenance of the Owl?s Head Trail.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Flora & Fauna Bog Flora and Fauna Bog Construction of a 420 trail leading to a 160 2 Piscataquis $13,878 $3,470 $17,348

Observation Observation square foot bog observation deck which is

located on 115 acres of historical farm land.

The project consisted of clearing the trail;

stump removal; distribution of gravel along

the trail; and the...

ME 2011 Highland Path Georges' Highland Path This project constructed a new three-mile 2 Waldo $9,585 $2,396 $11,981

section of trail that connects the Gibson

Preserve to an existing section of the

Georges Highland Path called the Canal

Path. This new Ridge to River Trail, together

with two existing recreational...

ME 2011 Snowy Mountain Trail Snow Mountain Trails Extended and widened the multi-use, 2 Aroostook $24,840 $6,210 $31,050

non-motorized trail system in Stockholm. It

extended the current trail .4 miles. The entire

trail system was widened to make them more

accessible to those with some disabilities and

user friendly.

ME 2011 Powderhouse Trails Powderhouse Trails Construction of a new hiking trail from the 2 Franklin $33,561 $8,390 $41,951

unit access road to the Owl?s Head Trail

which currently can only be accessed by

boat; also included in the plans is the

maintenance of the Owl?s Head Trail.

ME 2011 Fly Rod Crosby Trail Fly Rod Crosby Trail This project involved the creation of 9 miles 2 Franklin $11,724 $2,931 $14,655

of trail. The Southern tip of the trail is in

Strong and continues north to Phillips, then

on to Rangeley, and ends in Oquossoc. The

work included, clearing corridor, waterbars,

and construction of...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 School Trails Town Trail Addition The purpose of this project was to extend the 2 Hancock $9,577 $2,394 $11,971

trail by .513 mile. The Miles Long Trail is 2.9

miles long located on town owned property

within the Village District of Bucksport. The

trail was ...

ME 2011 Shared Use Trail Shared Use Trail This proposal aimed to increase accessibility, 2 Aroostook $35,000 $8,750 $43,750

quality, and distances of the NHC trails.

Improvements included, upgrading of

signage, adding 2km to the lighted loop, and

the creation of 450m of new trail and

widening 350m to better accommodate...

ME 2011 Roberts Farm Trail Roberts Farm Trail The objective was to complete the remaining 2 Oxford $35,000 $8,750 $43,750

2.7k of 9-foot wide non-motorized multi-use

trails which are a part of the 12k Roberts

Farm Preserve Trail System in Norway. In

addition, work was done on the 3k Shavey

Noyes Trail with the addition of 3...

ME 2011 Dead River Trail Dead River Trail Project The project plans here were to construct 2 Franklin $35,000 $8,750 $43,750

approximately 13.5 miles of backcountry

recreational trail needed to complete a

cross-country system starting at the Grand

Falls, continuing along the Dead River

corridor, and ending at a proposed trail

head...

ME 2011 Intern Intern This funding provided assistance of an 2 Hancock $8,000 $2,000 $10,000

Environmental Educator intern to help with

stewardship tasks on the Donnell Pond

Public Lands. The interns duties included:

providing safety ...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Canoose & Little Falls Trail Repair The focus of this project was to remove and 2 Washington $11,300 $2,825 $14,125

Portage replace structural supports on three

footbridges, and adding a third stringer where

there are currently two. There was also some

fill and drainage work on sections of trail. The

Division is also hoping to...

ME 2011 Multi-Use Trails Trail Rebuild This project reopened 6 miles of trail that 2 Waldo $22,000 $5,500 $27,500

were constructed mainly for skiers in the

1990s. These trails are located on the north

side of the park on 350 acres of property that

is underutilized. Phase I of this project was

completed in 2010. This...

ME 2011 Amherst Acquisition /Trail Amherst Acquisition /Trail This 80 acre parcel includes portions of the 2 Hancock $90,000 $22,500 $112,500

work work 22-00-0 road, which provides recreational

access to the eastern portion of the 5,000

acre Amherst Mountains Community Forest

Unit and its ponds, forestlands, and hiking,

ATV, and snowmobile trails. The...

ME 2011 Sunrise Trail Trailhead/signs/improvement The Sunrise trail, an 85 mile multi use trail on 2 Washington $45,550 $11,388 $56,938

s an old railbed was completed last year. Most

of the work done was just for the tread way.

The trail was in desperate need of many

signs, trail head kiosks, interpretive panels

and also some touch up...

ME 2011 Multi-Use Trails Bridge Project The project aimed to restore approximately 1 2 Aroostook $21,200 $5,300 $26,500

mile of existing ATV/Snowmobile trail. The

trail is located between Hughes Brook and

Presque Isle Stream, off of East Chapman

Road in the Town of Chapman. The club

hired a contractor to rebuild this...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2011 Deer Hill Trail Deer Hill Restoration The project called for restoration of trail 2 Oxford $22,600 $5,650 $28,250

surfaces along an existing snowmobile trail at

Evergreen Mountain. The work included,

surfacing sections of the trail, ditch

reclamation, rock and stump removal,

widening grown in sections and marking the...

ME 2011 Bangor and Aroostook Bangor and Aroostook Trail This project involved the restoration of the 2 Aroostook $56,500 $14,125 $70,625

Rail-Trail Bangor and Aroostook Trail (BAT). The work

included, gravel surface restoration, ditch

reclamation, culvert replacement, and small

bridge deck replacements.

ME 2011 Seboeis South Seboeis South The Bureau purchased property that abuts 2 Penobscot $134,726 $33,682 $168,408

Acquisition/Trail work Acquisition/Trail work the Seboeis Land Unit. The Acquisition will

not only expand the existing land unit but will

provide snowmobile and ATV access from

Millinocket to the south.

ME 2011 Saddleback Trail Saddleback Trail Connector Repaired an existing shared use motorized 2 Franklin $50,000 $12,500 $62,500

trail in the Saddleback Mountain Area. This

trail had been neglected over the years and

was in need of extensive work. There had

been a conflict with one of the landowners

that has been resolved. Work...

ME 2011 Jay-Farmington Rail-Trail Jay-Farmington This project involved continued work along 2 Oxford $60,049 $15,012 $75,061

the Jay to Farmington Rail-Trail. This trail is

used by ATVs, Snowmobiles, Hikers, and

bikers and it runs along an abandoned rail

bed. Work included: construction of

waterbars, and some brush...

ME 2011 Safety and Education First Aid/CPR training MATC provided first-aid/CPR training, 2 Piscataquis, $3,092 $773 $3,865

chainsaw training, and wilderness first-aid Somerset, Franklin,

training for their Trail Volunteers. Oxford

ME 2012 Canton Snowmobile Trail Snowmobile Bridge Project Construction of bridge over abandoned dam 2 Oxford $12,500 $3,125 $15,625

abutments

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2012 Horseshoe Brook Trail Horseshoe Brook Trail Restore a 5.0 mile section of trail used by 2 Oxford $15,000 $3,750 $18,750

Project Project multiple users and is used mainly by

snowmobiles in the winter. Three bridges

sustained damage during hurricane Irene

along with washouts along this trail from the

highwater. Costs includes renting an...

ME 2012 Greenville Loop Trail Greenville Loop Improvements to several sections of trail 2 Piscataquis $10,384 $2,596 $12,980

recommended with the Seboomook Regional

Plan

ME 2012 Old Blue Trail (Appalachian Trail improvement Projects Improvements to 4 areas of the AT 2 Piscataquis, $18,400 $4,600 $23,000

National Scenic Trail) Somerset, Franklin,

Oxford

ME 2012 Orono Bog Boardwalk Oromo bog boardwalk Small portion of entire boardwalk project to 2 Penobscot $33,386 $8,346 $41,732

replace aging wood with composite

ME 2012 Haystack Mountain Trail Haystack Mtn. Trail work Constructing Rock Staircase to summit of 2 Aroostook $25,000 $6,250 $31,250

Haystack

ME 2012 OJI Trail Baxter State Park Trail Work Reroute of OJI Trail 2 Penobscot $33,000 $8,250 $41,250

ME 2012 Whitecap/Black Mountain Whitecap/Black Mountain Construct a new trail connecting Black 2 Oxford $18,750 $4,688 $23,438

Trail Trail Mountain with Whitecap Mountain

ME 2012 AMC Single Track Trail New Trail Construction This project involves the creation of 15.4 2 Piscataquis $31,250 $7,813 $39,063

miles of mountain bike trails constructed on

property owned by the Appalachian Mountain

Club in Shawtown Township. It will be the

first phase of a 30+ mile trail network . Most

of the work would be for...

ME 2012 Black Mountain Trail Black Mountain Trail Trail improvements along ski/bike trails on 2 Oxford $34,999 $8,750 $43,749

Improvement Project Black Mountain. Widen trails and improve

drainage

ME 2012 Owls Head Trail Trail construction Project Completion of the Owl's Head Trail at 2 Penobscot $10,000 $2,500 $12,500

Scraggly

ME 2012 Piscataquis County Waterfall SEE project Brochures and web applications for directions 2 Piscataquis $5,000 $1,250 $6,250

Waterfalls to different waterfalls in Piscataquis County

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2012 Carrabassett Valley Outdoor Bike Safety Information Information on bike safety and also signage 2 Franklin $4,808 $1,202 $6,010

Center and kiosks at town's recreation center. Safety

video and brochures done

ME 2012 Lighthouse Trail Lighthouse Trail Education Provide signage for newly constructed 2 Hancock $3,862 $966 $4,828

Project Lighthouse trail on the Island

ME 2013 Missing Link Trails Missing Link Trails This project involves construction of a 2 Piscataquis $34,209 $8,552 $42,761

Moosehead Snowmobile/ATV Connector trail

project which will link the western and

northern side of Greenville to the eastern and

southern side, allowing snowmobile riders a

complete loop trail around Moosehead...

ME 2013 Allen Stream Bridge Allen Stream Bridge This project involves the removal of 109 ft of 2 Androscoggin $70,000 $1,750 $71,750

existing wood and flatbed deck bridge, 45 ft

flatbed deck bridge and 32 ft wooden ramps,

replaced by the construction of a new 180 ft

steel, wood and gravel bridge, 4 80 ft

weathering steel I-beam and...

ME 2013 Whistle Stop Trail ORV Trail Work This project involves approximately 5 miles of 2 Franklin $25,000 $6,250 $31,250

trail restoration, including the grading and

mowing of the Whistle Stop Trail in the Wilton

area. The trail has developed potholes and

ruts where water runs or accumulates, so the

trail needs to be...

ME 2013 Heritage Trail Heritage Trail Project This project is designed to stabilize a section 2 Aroostook $30,000 $7,500 $37,500

of banking at the Factory Brook box culvert

on the St. John Heritage trail in St. John

Plantation. A bridge will be installed over the

existing failing box culvert in order to

minimize soil disturbance...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2013 Greenville -Motorized Trail Motorized Trail Connection - This Project includes 15 miles of restoration 2 Piscataquis $46,701 $11,675 $58,376

Connection Project Phase II and maintenance on existing snowmobile and

eventually ATV trails. In addition, there will be

25 miles of new construction in the

Moosehead Lake Region on private and

public lands.

ME 2013 Lighthouse Trail Lighthouse Trails This project involves the continued 2 Hancock $5,935 $1,484 $7,419

development of hiking trails and associated

facilities on Hockamock Head. This will

include work on 1.8 miles of trail, including

installation of 27 stone steps, 2 water bars,

and the installation of an...

ME 2013 Appalachian National Scenic Appalachian Trail This project involves the reconstruction of ten 2 Piscataquis, $35,000 $8,750 $43,750

Trail Improvements trail sections at backcountry locations on the Somerset, Franklin,

Appalachian Trail in Maine, totaling 45 crew Oxford

weeks.

ME 2013 Messalonskee Trail Messalonskee Trail This project involves resurfacing the 1.5 mile 2 Kennebec $13,405 $3,351 $16,756

Messalonskee Stream Trail up to the CMP

power line with Erosion Control Mix.

ME 2013 Black and White Trail Black and White Trail II Phase II of the Black and White Trail project 2 Oxford $15,000 $3,750 $18,750

(which connects existing trails near the

summits of Whitecap Mountain and Black

Mountain in Rumford) involves constructing

water bars and sidehilling to prevent erosion

on 2.8 miles of newly constructed...

ME 2013 Ecotat Trail Ecotat Trail Expansion This project entails constructing information 2 Penobscot $31,375 $7,844 $39,219

stations, as well as the construction of a 2500

ft trail, 500 ft of which will be a bog walk

allowing users to experience Maine bog plant

life.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2013 Maine Huts and Trails Maine Huts and Trails, This project involves upgrading 28 miles of 2 Franklin $21,000 $5,250 $26,250

Phase I trail to include tread for mountain biking and

hiking, eliminating water and mud spots along

52 trail miles, and completing work on the 7

mile trail loop around Stratton Brook Hut.

ME 2013 Carlo Col Trail Carlo Col Trail This project involves a professional trail crew 2 Oxford $27,600 $6,900 $34,500

to relocate a .25 mile section of trail that is

currently a stream bed and install trail

structures on the remaining ~1.0 mile of trail

to reduce and control erosion and make the

trail safer for hiker...

ME 2013 Little Jackson Tumbledown Trail Project This project includes continuation of ongoing 2 Franklin $20,000 $5,000 $25,000

improvement projects to the Tumbledown trail

system including erosion control, stone step

work and improved signage on the Parker

Ridge, Loop and Little Jackson Mountain

Trails.

ME 2013 Deboullie Trail Project Deboullie Trail Project This project includes the maintenance of 2 Aroostook $20,000 $5,000 $25,000

existing hiking trails, trail reroutes and the

construction of a 1.5 mile section of new trail

connecting to an existing trail.

ME 2013 Cutler Trail Project Trail Upgrade This project will involve continued repair and 2 Washington $22,500 $5,625 $28,125

replacement of several thousand feet of bog

walks on the 10-mile Cutler Coast Trail.

There will also be rock work for wet areas to

be used as stepping stones.

ME 2013 Maranacook Fairground Trail Maranacook Fairground Trail This project involves the construction of two 2 Kennebec $29,555 $7,389 $36,944

Project pedestrian/biking trail segments, the Link

Trail (.4 miles) and the North Trail (.2 miles)

which will connect the existing Fairgrounds

Trail system with the newly constructed

sidewalk and path at...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2013 Moose Bog Loop Moose Bog Loop Trail This project involves the construction of a 2 Franklin $35,000 $8,750 $43,750

Project non-motorized, hand built beginner mountain

bike trail located at the Sugarloaf Outdoor

Center. The trail is of a mile in length and

runs within trail #7 of the Nordic Ski Trail

Network. Other aspects...

ME 2013 Virgil Paris Forest Virgil Paris Forest Project This project entails the completion of the 2 Oxford $24,000 $6,000 $30,000

construction of the non-motorized Packard

Trail, as well as to install trailhead signage

and entry gates on a new ATV linkage trail in

the Virgil Parris forest. Approximately 1/3 of

the 2 mile 4 ft wide...

ME 2013 Centennial Trail Centennial Trail This project provides for the reconstruction of 2 Kennebec $17,082 $4,271 $21,353

a ramp that connects the parking area to the

trail that will, for the first time, provide

wheelchair access

ME 2013 Aroostook State Park, Haystack/Aroostook Trail This project involves restoration and 2 Aroostook $28,000 $7,000 $35,000

Haystack State Park Work maintenance of 8 miles of trails and includes

finishing 45 yards of steps in the steep

portion of the Haystack Mountain Trail, as

well as improvements to North and South

Peak hiking trails, which would include...

ME 2013 Bigelow Preserve Education Environmental Education This project involves the maintenance of 2 Piscataquis $12,000 $3,000 $15,000

existing hiking trails and an MCC

Environmental Educator to work on the trail

during the season at the Division of Parks

and Public Lands Bigelow Preserve.

ME 2013 Turtle Ridge Loop Trail Trail This project entails the completion of a 2 Piscataquis $31,738 $7,935 $39,673

improvement/Environmental project which will link the Turtle Ridge Loop

Education Trail (9 miles) to the Debsconeag Wilderness

Loop trail (10 miles). This will involve .5 miles

of new trail construction.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2013 Kennebec Messalonskee Mapping and Publicity New Trail Maps and webpage improvements 2 Kennebec $4,588 $1,147 $5,735

Trails Project related to trail

ME 2013 Good Will Hinckley School Trails Side Forest Panels and trail related materials for users of 2 Somerset $1,813 $453 $2,266

Understory trail at school

ME 2013 Allagash Wilderness Video Produce a video for safety along the AWW 2 Aroostook $10,463 $2,616 $13,079

Waterway water trail

ME 2014 Monroe Elementary School Monroe Elementary School Monroe Elementary School Community Trail 2 Waldo $10,250 $2,563 $12,813

Community Trail Community Trail

ME 2014 Bethel Bikeways Bikeway Trail Project Bikeway Trail Project 2 Rumford $35,000 $8,750 $43,750

ME 2014 Lake Auburn Watershed Recreation Trail Project Recreation Trail Project 2 Androscoggin $10,800 $2,700 $13,500

Trails

ME 2014 RSU 67 Trail RSU 67 Trail Project RSU 67 Trail Project 2 Penobscot $34,995 $8,749 $43,744

ME 2014 Crabtree Trail Crabtree Trail Construction Crabtree Trail Construction Project 2 Hancock $16,000 $4,000 $20,000

Project

ME 2014 Beaver Cove Trails Multi-Use Connector Trail Multi-Use Connector Trail 2 Piscataquis $35,000 $8,750 $43,750

ME 2014 Microburst Trail Microburst Trail Cleanup Microburst Trail Cleanup Project 2 Waldo $8,500 $2,125 $10,625

Project

ME 2014 Ledge Trail Ledge Trail Project Ledge Trail Project 2 Androscoggin $18,000 $4,500 $22,500

ME 2014 Lamoine Conservation Trail Lamoine Conservation Trail Lamoine Conservation Trail Project 2 Hancock $5,000 $1,250 $6,250

Project

ME 2014 Appalachian National Scenic AT Improvement Project Appalachian Trail Improvement Project 2 Piscataquis, $35,000 $8,750 $43,750

Trail Somerset, Franklin,

Oxford

ME 2014 Baxter State Park Trails Baxter Re-Route Trail Baxter Re-route Trail Project 2 Piscataquis $34,000 $8,500 $42,500

Project

ME 2014 Loop Trail Loop Trail Improvement Loop Trail Improvement Project 2 Piscataquis $28,000 $7,000 $35,000

Project

ME 2014 Little Jackson Trail Little Jackson Trail Project Little Jackson Trail Project 2 Piscataquis $30,000 $7,500 $37,500

ME 2014 Deboullie Public Reserved Trail Construction Project Trail Construction Project 2 Aroostook $26,019 $6,505 $32,524

Land

ME 2014 Pit Trail Pit Trail Bridge Pit Trail Bridge 2 Washington $100,000 $25,000 $125,000

ME 2014 B-Stream Bridge B-Stream Bridge B-Stream Bridge 2 Aroostook $79,250 $19,813 $99,063

ME 2014 Sandy Stream Bridge Sandy Stream Bridge Sandy Stream Bridge 2 Waldo $30,159 $7,540 $37,699

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2014 Chesuncook Trail Chesuncook Trail Project Chesuncook Trail Project 2 Piscataquis $8,000 $2,000 $10,000

ME 2014 Greenway Fish River Greenway SEE Fish River Greenway SEE Project 2 Aroostook $4,634 $1,159 $5,793

Project

ME 2014 Public Information Leave no Trace Trail Project Leave no Trace Trail Project 2 Piscataquis, $5,000 $1,250 $6,250

Somerset, Franklin,

Oxford

ME 2014 Allagash Wilderness Map/Brochure Project Map/Brochure Project 2 Aroostook, $12,227 $3,057 $15,284

Waterway Piscataquis

ME 2015 100 Miles Wilderness 100 Miles Wilderness 2 Multiple Counties $5,000 $1,250 $6,250

ME 2015 Cobscook Bay State Park 2 Washington $3,128 $782 $3,910

Area Trail Map

ME 2015 10th Mountain Trails 10th Mountain Trails 2 Aroostook $35,000 $8,750 $43,750

ME 2015 Passay Rail Trail Passay Rail Trail 2 Waldo $35,000 $8,750 $43,750

ME 2015 Carrabassett Valley Trails Carrabassett Valley 2 Franklin $35,000 $8,750 $43,750

Connector Trails

ME 2015 Barker Mill Greenway Barker Mill Greenway 2 Androscoggin $34,190 $8,547 $42,737

ME 2015 Wilton Trestle Bridge Re-deck and widen the Re-deck and widen the Wilton Trestle Bridge 2 Franklin $54,023 $13,506 $67,529

Wilton Trestle Bridge

ME 2015 Mount Blue State Park Mt Blue MCC ES 2 Franklin $11,687 $2,922 $14,609

ME 2015 Mount Blue Ski Trails Mount Blue Ski Trails 2 Franklin $8,766 $2,192 $10,958

ME 2015 Androscoggin Riverlands ARSP Trail Repair 2 Androscoggin $9,350 $2,337 $11,687

State Park Trail

ME 2015 Snow Shoe Trail Snow Shoe Trail 2 Androscoggin $13,148 $3,287 $16,435

Development

ME 2015 Grafton Notch Eyebrow Trail Grafton Notch Eyebrow Trail 2 Oxford $17,530 $4,383 $21,913

ME 2015 Appalachian National Scenic AT Trail Improvements Trail Improvements 2 Piscataquis, $35,000 $8,750 $43,750

Trail Somerset, Franklin,

Oxford

ME 2015 Abol Trail Abol Trail Relocation Trail Relocation 2 Piscataquis $35,000 $8,750 $43,750

ME 2015 Portage Trail Portage Trail Restoration Trail Restoration 2 Aroostook $12,400 $3,100 $15,500

ME 2015 Coast Guard Trail Coast Guard Trail Phase 2 Washington $24,000 $6,000 $30,000

Two

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2015 RLSP Shore Path and RLSP Shore Path and 2 Franklin $12,300 $3,075 $15,375

Moose Corridor Trail Moose Corridor Trail

ME 2015 Deboullie Hiking Trails Deboullie Hiking Trails 2 Aroostook $45,000 $11,250 $56,250

ME 2015 Little Moose Trail Little Moose Trail 2 Piscataquis $31,310 $7,828 $39,138

ME 2015 Perham Stream Bridge Perham Stream Multi Use 2 Hancock $100,000 $25,000 $125,000

Bridge

ME 2015 Caribou Trails Connector Trail 2 Aroostook $29,940 $7,485 $37,425

ME 2015 Mount Blue Multi-User Trail Mount Blue Multi-Use Trail 2 Franklin $37,400 $9,350 $46,750

System System

ME 2016 Fogg Island Preserve Kiosk Construction Construct informational kiosk 2 Kennebec $4,570 $1,143 $5,713

ME 2016 Stratton Brook Hut Trail Stratton Brook Hut Trail and Construct wood bridge connecting Stratton 2 Franklin $32,500 $32,500 $65,000

Bigelow Preserve Trail and Brook Hut with Bigelow Preserve and

Single Track purpose built single track

ME 2016 Rainbow Loop Trail Rainbow Loop Trail Construct new 2.5 mile trail connecting 2 Piscataquis $35,000 $10,000 $45,000

Horserace Pond and Blue Trail

ME 2016 St. Lawrence Junior High Maine School Administrative Connect schools by constructing a 70 foot 2 Somerset $25,160 $6,300 $31,460

Bridge District 49 Bog Bridge boardwalk through the wetlands

ME 2016 Branch Lake State Park Parking and Trailhead Construct trailhead parking, construct 2 Hancock $25,000 $6,250 $31,250

accessible trail

ME 2016 Mount Blue State Park Maine Conservation Corp Trail maintenance 2 Franklin $7,766 $1,942 $9,708

and Environmental Steward

ME 2016 Pine Loop Trail Pine Loop Trail Maine Trail and bridge maintenance 2 Androscoggin $4,699 $1,175 $5,874

Conservation Corp

ME 2016 Witt Swamp Connector Trail Witt Swamp Connector Trail Construct trail connector 2 Oxford $34,976 $9,428 $44,404

ME 2016 Mahoosuc Trail Mahoosuc Trail Work Replace bog bridges, trail maintenance 2 Oxford $25,572 $8,000 $33,572

ME 2016 Glassface Trail Glassface Trail Trail Construction 2 Oxford $30,050 $9,050 $39,100

ME 2016 Harrington Elementary School Nature Trail Replace bog bridging 2 Washington $29,555 $7,389 $36,944

School

ME 2016 Piscataquis Primary School Trail and Outdoor Classroom Construct accessible trail 2 Piscataquis $25,604 $6,821 $32,425

ME 2016 Eyebrow Trail Eyebrow Trail Maine Trail maintenance 2 Oxford $31,079 $7,770 $38,849

Conservation Corp and

Environmental Steward

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2016 Whitman Mountain Trailhead Trail Rehab and Trail maintenance 2 Aroostook $32,132 $8,033 $40,165

Maintenance

ME 2016 Little Moose Unit Maine Conservation Corp Trail maintenance 2 Piscataquis $15,800 $3,950 $19,750

and Environmental Steward

ME 2016 Indian Hill Bridge and Trail Bridge and Trail Maintenance 2 Piscataquis $99,965 $53,485 $153,450

Rehabilitation

ME 2016 Souadabscook Brook 65 ft Bridge Replacement Replace existing bridge 2 Penobscot $60,064 $18,797 $78,861

Enhancement

ME 2016 Dover Foxcroft Trestle Dover Foxcroft Bridge Replace existing bridge 2 Piscataquis $79,011 $23,510 $102,521

Redeck and Trail Rehab

ME 2017 Maps and Guides Maps and Guides Augusta Trails intends to leverage funding 2 Kennebec $4,500 $5,000 $9,500

from the Sewall Foundation to develop, print

and disseminate map products that combine

existing trail resources from a wide range of

trail systems and land owners, all maintaining

public access, to provide a...

ME 2017 Trail of the Senses Trail of the Senses The University of Maine Department of 2 Penobscot $4,196 $1,770 $5,966

Interpretation Engineering and Technology will complete

and install interpretive / educational features

for a "Trail of the Senses" (ToS) currently

under construction at the 2,400 acres

Hirundo Wildlife Refuge. This initial...

ME 2017 Appalachian National Scenic AT Ridgerunners Caretaker and Ridgerunners will provide 2 Piscataquis, $5,000 $55,554 $60,554

Trail environmental education and promote public Somerset, Franklin

safety along busy Maine sections of the

2,220-mile Appalachian National Scenic Trail.

ME 2017 Quarry Road Trail Quarry Road Trail NEMBA and its local chapters propose to 2 Kennebec $13,400 $6,000 $19,400

Construction construct an approximately 1.75 natural

surface singletrack trail on the slopes of the

former Colby College Ski Area at the Quarry

Road Recreation Area (QRRA), owned and

managed by the City of Waterville Parks...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2017 Valentine Trail Valentine Trail Construction Mahoosuc Land Trust proposes to construct 2 Oxford $41,438 $15,000 $56,438

a universally accessible walking trail

comprised of two short loops around the

Valentine Farm property. The trail will be

approximately 1.1 miles in length. There will

be ample opportunities for nature...

ME 2017 YMCA Outdoor Education & YMCA Outdoor Education & The project sponsor proposed to develop 2 Androscoggin $48,339 $462,710 $511,049

Learning Centers Trails Learning Centers Trails trails for hiking, snowshoeing, mountain

biking, Nordic skiing and running with

associated trailside and trailhead amenities

within their 93 acre wooded property in

Auburn. The project is part of a larger...

ME 2017 Mount Blue State Park Mount Blue State Park Trail This park will contract with the Maine 2 Franklin $15,108 $10,000 $25,108

Rehabilitation Conservation Corps to provide two

Environmental Stewards to perform trail

rehabilitation and maintenance work within

the wide range of diverse use trails. Specific

work will include: upgrading trails in the...

ME 2017 Appalachian National Scenic Appalachian National Scenic During the summer of 2017, over 21 2 Piscataquis $50,000 $106,800 $156,800

Trail Trail Rehab crew-weeks, the Maine Trail Crew will

improve the A.T. to control erosion, protect a

wetland, improve access and safeguard

public safety. Sections addressed during this

season of work are; Little Wilson Falls,

Long...

ME 2017 Florida Lake Trail Florida Lake Trail The town of Freeport will repair sections of 2 Cumberland $11,000 $4,800 $15,800

Rehabilitation Project their +/-2.8mi of trails at the Florida Lake

Park on the outskirts of town. The project will

include the installation of +/-856ft of bog

bridges and 25 new sign posts within the trail

corridor.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2017 Chisholm Brook, Long Lake Chisholm Brook and Long At Chisholm Brook Campsite, the trail to the 2 Arrostook $10,000 $2,500 $12,500

Trail Lake Trail Rehab campsite will be stabilized, stone steps and

rip-rap will be used to harden the tread. At

the Long Lake Dam site the portage trail will

be rehabilitated via tread hardening, with the

use of stone steps...

ME 2017 Eyebrow Trail Maine Conservation Corp The park will contract with the Maine 2 Oxford $54,400 $13,507 $67,907

and Environmental Steward Conservation Corps for a 12 week

commitment of a six person team to address

erosion issues on steep sections of the

popular Eyebrow Trail. Work will include

constructing stone staircases, water bars,

ditching,...

ME 2017 Lily Bay, Mt Kineo Maine Conservation Corp The RTP Grant will be used to rebuild 2 Piscataquis $80,000 $20,000 $100,000

and Environmental Steward existing trails at Mt Kineo, Lily Bay and the

Penobscot River Corridor (PRC). Trail

lengths to be improved at the sites are 4

miles, 3 miles and 27 miles respectively. An

MCC crew and environmental steward will...

ME 2017 Down East Sunrise Trail Down East Parking The project site is currently undeveloped land 2 Washington $18,450 $13,000 $31,450

Parking Improvements owned by the town of Whitneyville with typical

brushy second growth vegetation. The

proposed project is to build a 100 ft x 150 ft

parking lot adjacent to the 90-mile long Down

East Sunrise Trail and...

ME 2017 Four Seasons Adventure Four Seasons Adventure Resurface approx. 3 miles of Four Seasons 2 Piscataquis $54,000 $13,879 $67,879

Trail Trail Rehab Adventure Multi Use Rail trail from the Silver

Mills Road in Sangerville to the Starbird

Siding Road in Dover- Foxcroft. The trail

surface is rough with excessive pot holes.

Resurfacing this trail will...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2017 Lagrange-Medford Rail Trail Lagrange Medford Cold Re-deck and replace railings on the trestle 2 Piscataquis $15,000 $3,750 $18,750

Brook Bridge over Cold Stream in Lagrange on the

Lagrange/Medford Rail Trail; rehabilitation of

trail sections leading to and from this bridge.

This is a major connector trail for both ATV

and snowmobile use in the...

ME 2017 Little Moose Unit Little Moose Unit This project will rehabilitate a heavily used 2 Piscataquis $10,000 $2,517 $12,517

trail between Greenville, Rockwood and The

Forks all of which is suffering from washouts,

exposed rocks, and erosion issues. For the

safety of trail users, the trail needs

resurfacing, ditching, grading,...

ME 2017 Bangor and Aroostook Bangor & Aroostook Trail Work with this project will focus on two 2 Aroostook $34,000 $9,957 $43,957

Rail-Trail Rehabilitation sections of this motorized trail, Stockholm

Bridge over Snake Brook and the Hines

Street section of trail in Washburn.

Stockholm section will Re-deck a bridge over

Snake Brook which is currently in dire need...

ME 2017 Whistle Stop Trail Whistle Stop Trail The first part of this two pronged project will 2 Franklin $104,503 $22,829 $127,332

Rehabilitation resurface 2 +/- miles of Whistle Stop Multi

Use Rail trail from the Old Jay Road (east

end) to the Old Jay Road (west end) in Jay.

Resurfacing this trail with gravel will bring the

surface up to the...

ME 2018 Coe Park Connector Coe Park Connection Connector 2 Penobscot $18,000 $10,650 $28,650

Switchback

ME 2018 Eyebrow Trail Eyebrow Trail Maine Eyebrow Trail rehabilitation 2 Oxford $27,800 $5,560 $33,360

Conservation Corp and

Environmental Steward

ME 2018 Appalachian National Scenic Appalachian Trail Trail Improvements 2 Piscataquis, $44,728 $93,751 $138,479

Trail Improvements Somerset, Franklin,

Oxford

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2018 Mount Blue State Park Mount Blue State Park Trail This park will contract with the Maine 2 Franklin $9,200 $8,209 $17,409

Rehabilitation Conservation Corps to provide two

Environmental Stewards to perform trail

rehabilitation and maintenance work within

the wide range of diverse use trails. Specific

work will include: upgrading trails in the...

ME 2018 Spruce Mountain Cove Spruce Mountain Cove Spruce Mountain Cove Campsite 2 Washington $22,900 $5,842 $28,742

Campsite Rehabilitation Rehabilitation

ME 2018 Whitman Mountain Trail Whitman Mountain Trail Whitman Mountain Trail Rehabilitation 2 Aroostook $19,225 $9,256 $28,481

Rehabilitation

ME 2018 Allagash Falls Portage Trail Allagash Falls Portage Trail Allagash Falls Portage Trail Rehabilitation 2 Aroostook $8,650 $3,071 $11,721

Rehabilitation

ME 2018 Rangeley River Bridge Bridge 2 Franklin $33,300 $10,510 $43,810

ME 2018 Heritage Park Trailhead Heritage Park Trailhead Heritage Park Trailhead 2 Aroostook $40,000 $47,000 $87,000

ME 2018 Heritage Trail Fish River Heritage Trail Fish River Heritage Trail Fish River Bridge 2 Aroostook $65,000 $20,000 $85,000

Bridge Bridge

ME 2018 Bangor and Aroostook Bangor & Aroostook Trail Bangor & Aroostook Trail Rehabilitation 2 Aroostook $47,732 $14,480 $62,212

Rail-Trail Rehabilitation

ME 2018 Allagash Allagash ADA Retrofit Allagash ADA Retrofit 2 $20,381 $5,750 $26,131

ME 2018 Androscoggin Riverlands Androscoggin Riverlands Androscoggin Riverlands State Park Trail 2 Androscoggin $37,280 $9,320 $46,600

State Park Trail State Park Trail Rehabilitation

Rehabilitation

ME 2019 Signage Aroostook Coordinated This project will create signage that will Unify 2 Aroostook $5,000 $1,250 $6,250

Signage Project the Aroostook County ITS System creating a

safer riding environment. All County Clubs

will have access to 3 sets of signs that will be

created with their respective information. Now

Entering Signs, AK...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2019 Appalachian National Scenic AT Ridgerunners The Ridgerunners will be trained as Leave 2 Piscataquis, $5,000 $51,000 $56,000

Trail No Trace educators and interact with all hiker Somerset, Franklin

types but focus on youth groups and AT

thru-hikers. They will manage campsites,

patrol alpine summits, teach hikers to

minimize fire impacts, stay on durable...

ME 2019 Safety and Education Map and Signage Project ARWC coordinates the Androscoggin River 2 Oxford, Franklin, $2,550 $1,250 $3,800

Trail which has 23 access sites between Androscoggin

Gilead and Durham. Sixteen of the sites

have kiosks with trail maps. Seven sites

have only a sign, and two of those have a

trail map. We plan to install an additional...

ME 2019 Safety and Education Trail Training Workshops The Maine Conservation Corps seeks 2 Kennebec $6,060 $1,212 $7,272

funding to execute a variety technical trail

workshops for MCC staff. The training will be

carried out by trail professionals, such as

Professional Trail Builder Association

members or individuals/organizations with...

ME 2019 Snow Pond Trail Snow Pond Trail The proposed project includes adding a new 2 Kennebec $30,000 $8,800 $38,800

Improvements 6-feet wide trail of 7,168 ft (1.36 miles) in

length. This trail links to an existing logging

trail system (used for walking) that is .53

miles in length, also on the same property,

and is presently...

ME 2019 Norway Branch Rail Trail Norway Branch Rail Trail The Norway Branch Rail Trail will transform 2 Kennebec $76,500 $25,000 $101,500

the abandoned, overgrown, underutilized,

difficult-to-traverse Norway Branch Railroad

bed into an inviting, beautiful, six-foot wide,

universally accessible, non-motorized

recreation and active...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2019 Witt's End Loop Trail Witt's End Loop Trail The Trust is requesting support for a .5 mile, 2 Oxford $28,135 $5,626 $33,761

Connector Connector non-motorized diverse use trail which will

create a 2-mile loop at the eastern end of the

Trust's Witt's End Trail, in Norway. The loop

trail, to be built on top of an historic raised

road bed, the Old...

ME 2019 Parker Point - South Street Parker Point - South Street The vision for the Parker Point-South Street 2 Hancock $31,692 $9,400 $41,092

Trail Trail Trail project is to significantly improve 2,665

of an existing highly rooted and eroded trail

that serves as substantial link in overall

pedestrian connectivity between the heart of

Blue Hill and the...

ME 2019 Tools and Equipment Trail Tools and Equipment The Maine Conservation Corps is expanding 2 Kennebec $41,406 $8,450 $49,856

the number of teams in the field by two and

needs to outfit these teams with all of the

equipment and tools necessary which

encompass a variety of Hand Tools: axes,

saws, mattocks, McCleods, shovels, rakes,...

ME 2019 Harbor Walk Trail Harbor Walk Trail This project will extend an existing walkway 2 Hancock $50,000 $30,716 $80,716

Connection Connection at Harbor Park in Ellsworth along the Union

River and unify the whole property. The trail

extension will link the portion of the park

nearest the municipal docks with the portion

of the property formerly...

ME 2019 Grafton Loop Trail Grafton Loop Trail Work will traverse across 6.7 miles along the 2 Oxford $37,502 $12,000 $49,502

Rehabilitation Grafton Loop Trail, starting near the summit

of Sunday River White Cap heading south to

the trailhead on Rte. 26. Work will consist of

replacing 54 tamarack stringers that sit along

the ridge and summit...

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

ME 2019 Eyebrow Trail, Table Rock Eyebrow & Table Rock Trail The Eyebrow Trail is a loop that is over two 2 Oxford $37,539 $9,385 $46,924

Trail Maintenance miles in length. The primary project area will

focus on a .5 mile section of the Eyebrow

Trail. The project consists of 8 weeks of a

six-person Maine Conservation Corps trail

crew to address erosion...

ME 2019 Sherman to Patten Rail Trail Sherman to Patten Rail Trail This initiative will grade, crown, resurface, 2 Aroostook, Penobscot $20,862 $5,216 $26,078

Maintenance and perform other trail maintenance on a six

mile portion of this public ATV and

snowmobile trail.

ME 2019 Four Seasons Adventure Newport Motorized Vehicle Acquisition of 3.8+/- acres of land for trail 2 Kennebec $216,000 $54,600 $270,600

Trail Trailhead Acquisition head parking on the Four Seasons Adventure

Trail in the Town of Newport. The lot is

currently privately owned.The State has

leased this property for 4 years in order to

provide parking and access to the...

ME 2013 Goodell Falls Trail Goodell Falls Trail This project involves establishing a 526 ft 3 Piscataquis $5,360 $1,340 $6,700

walking trail linking the Appalachian Trail

near the Monson Appalachian Trailhead to a

viewing area for the Goodell Stream Falls.

Grand $18,989,540 $9,559,602 $28,549,142

Totals

(all results)