Document Control Sheet

Total Page:16

File Type:pdf, Size:1020Kb

Document Control Sheet Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL Eastern CFRAM Study HA09 Hydraulics Report Leixlip Model DOCUMENT CONTROL SHEET Client OPW Project Title Eastern CFRAM Study Document Title IBE0600Rp0027_HA09 Hydraulics Report Model Name Leixlip Rev Status Author(s) Modeller Reviewed by Approved By Office of Origin Issue Date . D01 Draft Various S. Patterson M. Brian G. Glasgow Belfast/Limerick 10/07/14 F01 Draft Various S. Patterson M. Brian G. Glasgow Belfast/Limerick 23/01/15 Final F02 Draft Various S. Patterson M. Brian G. Glasgow Belfast/Limerick 13/08/15 Final IBE0600Rp0027 4.16-1 Rev F02 Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL Table of Reference Reports Report Issue Date Report Reference Relevant Section(s) Eastern CFRAM Study Flood December IBE0600Rp0001_Flood Risk Review_F02 3.5.12 Risk Review 2011 Eastern CFRAM Study August 2012 IBE0600Rp0008_HA09 Inception 4.3.2 Inception Report UoM09 Report_F02 Eastern CFRAM Study September IBE0600Rp0016_HA09_Hydrology 4.7 Hydrology Report UoM09 2013 Report_F01 CFRAM Survey Contract 2 - January 2013 2011s4884_SC2 Survey Report v3 1.2, 1.7, 1.8 Liffey Survey Report IBE0600Rp0027 4.16-2 Rev F02 Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL 4 HYDRAULIC MODEL DETAILS 4.16 LEIXLIP 4.16.1 General Hydraulic Model Information (1) Introduction: The Eastern CFRAM Flood Risk Review (IBE0600 Rp0001_Flood Risk Review_F02) highlighted Leixlip as an Area for Further Assessment for fluvial flooding based on a review of historic flooding and the extents of flood risk determined during the PFRA. The Leixlip model encompasses the middle and lower reaches of the Liffey. The Maynooth model and Celbridge Hazelhatch model are located immediately upstream (on the Rye Water and River Liffey respectively) with this model connected to the Lucan to Chapelizod model at its downstream extent. The total contributing catchment area of the model to the downstream extents is 730 km2 (excluding the upper catchment, upstream of Golden Falls dam). Included within this area is the Rye Water (or River Rye) catchment which joins the River Liffey at Leixlip and accounts for 209 km2. The Leixlip AFA is affected by a number of small tributaries - the Sion and Moor of Meath (River) are tributaries of the Rye Water and the Moor of Meath watercourse is a tributary of the River Liffey, which has two tributaries of its own - Walterstown and Leavalley (Figure 4.16.2). The remaining modelled watercourse is the Ryvale which is a short millrace adjacent to the Rye Water. There are four gauging stations within the model extents, two of which are hydrometric gauging stations with both water level and flow information. One is located on the Rye Water approximately 1 km upstream of its confluence with the River Liffey (09001) and also one on the River Liffey at the Leixlip power generation plant (09022 - Figure 4.16.2). The Rye Water station is named Leixlip (09001 – OPW) and was given an A1 classification under FSU and a long record period with data received covering the complete hydrological years of 1956 – 2009 (A1 applies to 1980 onwards). Therefore the Qmed flow of 33.7 m3/s derived from the AMAX series at the Leixlip gauging station representing the Rye Water catchment can be considered to have a high degree of confidence. The gauging station located at the Leixlip hydro-electric power generation station on the Liffey main 3 channel is owned and operated by ESB (09022). The Qmed derived from the AMAX series of 61.64 m /s (catchment area of 510km2) can be considered to have a low degree of statistical confidence. There is a further historic gauging station located on the main channel of the Liffey just upstream of the model extents called Celbridge (09006 – ESB) representing a catchment area of 479 km2 which has continuous flow data available for the periods of 1967 – 1986 and from 1995 - 1997. This gauging station was not given a classification under FSU but data provided by ESB indicates that there is confidence in the rating 3 at the Qmed value from the extracted AMAX series of 56.5m /s. Although there is some uncertainty in the Qmed value this figure is in good agreement with observed value at the dam at Leixlip from the later, shorter period. IBE0600Rp0027 4.16-3 Rev F02 Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL The other two gauging stations (09012 and 09050) have insufficient data to be of any benefit during model calibration. As the Leixlip Power Station Gauging Station (09022) is located close to the upstream extent of this model on the River Liffey, there is gauged information (see Section 4.16.5 (4)) available to base design flow estimates for the inflows to the model (see Section 4.16.3 (5)). Similarly, the Leixlip Gauging Station (09022) provides gauged information on which to base design flow estimates for the inflows to the model on the Rye Water. The downstream boundary condition is a water level - time relationship, extracted from the draft final (F01) Lucan to Chapelizod model (Chapter 4.17) located immediately downstream of this model (see Section 4.16.3 (6)). All of the modelled watercourses are high priority in this area and so have been modelled as 1D-2D. Channel markers have been located at the right and left banks of all cross sections. Flow within these markers is calculated by the 1D model component; however when the water level rises sufficiently to meet the bank markers flow can enter the 2D domain which represents the floodplain. (2) Model Reference: HA09_LEIX3A (3) AFAs included in the model: LEIXLIP (4) Primary Watercourses / Water Bodies (including local names): LIFFEY MOOR OF MEATH LEAVALLEY RYE WATER SION RYVALE WALTERSTOWN MOOR OF MEATH (RIVER) (5) Software Type (and version): (a) 1D Domain: (b) 2D Domain: (c) Other model elements: MIKE 11 (2011) MIKE 21 - Rectangular Mesh MIKE FLOOD (2011) (2011) 4.16.2 Hydraulic Model Schematisation (1) Map of Model Extents: IBE0600Rp0027 4.16-4 Rev F02 Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL Figure 4.16.1: Map of Model Extents within HA09 Figure 4.16.2: Map of Model Extents in AFA vicinity IBE0600Rp0027 4.16-5 Rev F02 Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL Figure 4.16.1 and Figure 4.16.2 illustrate the extent of the modelled catchment, river centre line, HEP locations and AFA extents as applicable. The Leixlip model contains 6 Upstream Limit HEPs, 1 Downstream Limit HEP and 5 Trib HEPs. It also contains 2 Gauging Station HEPs but no Intermediate HEPs. (2) x-y Coordinates of River (Upstream extent): River Name x y 09LIFF LIFFEY 300544 235560 09RYEW RYE WATER 296824 237795 09RYVA RYVALE 300503 236446 09SION SION 298702 238640 09MEAT MOOR OF MEATH 300398 238287 09WALT WALTERSTOWN 301358 238186 09LEAV LEAV 301375 237280 09MOOR MOOR OF MEATH (RIVER) 300037 238251 (3) Total Modelled Watercourse Length: 16.6 km (4) 1D Domain only Watercourse Length: 0 km (5) 1D-2D Domain 16.6 km Watercourse Length: (6) 2D Domain Mesh Type / Resolution / Area: Rectangular / 5 metres / 21.9 km2 (7) 2D Domain Model Extent: Figure 4.16.3 represents the general topography of the catchment within the 2D model domain. The river centre-line is shown in black with white areas representing blocked cells i.e. river centre lines, buildings or the area beyond the 2D model domain. There was no further post processing of the data contained within the mesh required. Changes in the vertical scale of this map are outlined by the index, all levels have been set to OD Malin (metres). IBE0600Rp0027 4.16-6 Rev F02 Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL Figure 4.16.3: 2D Domain Model Extent Figure 4.16.4 provides an overview drawing of the model schematisation. This covers the model extents, showing the surveyed cross-section locations, AFA boundary and river centre line. It also shows the area covered by the 2D model domain. Figure 4.16.5 includes the surveyed cross-section locations, AFA boundary and river centre. They also show the location of the critical structures as discussed in Section 4.16.3, along with the location and extent of the links between the 1D and 2D models. For clarity in viewing cross-section locations, the model schematisation diagrams show the full extent of the surveyed cross-sections. Note that the 1D model considers only the cross-section between the 1D-2D links. The upstream extent of the model on the River Rye Water commences approximately 500 metres upstream of the structure at Ch. 14503 m (to allow accurate representation of flows through the bridge). The flood mapping commences at this location (as flood mapping upstream of this location is covered by the Maynooth model). On the River Liffey, flood mapping covers the modelled reach from the upstream extent to Ch. 52207 m, as the remainder of the modelled extent is covered by the Lucan to Chapelizod flood maps. IBE0600Rp0027 4.16-7 Rev F02 Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL Figure 4.166.4: Overview of Model Schematisation Figure 4.166.5: Model Schematisation of the lower Rye Water, Liffey and Moor of Meath. IBE0600Rp0027 4.16-8 Rev F02 Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL (8) Survey Information (a) Survey Folder Structure: First Level Folder Second Level Folder Third Level Folder Murphy_E09_M03A_WP5_120801_09LEA V0_09LEAV_GIS and Structure_Register V Floodplain Photos Surveyed_Cross_Section_Lines Leixlip V1_09LEAV_Ascii Murphy: Surveyor Name V0_09LEAV_Videos E09: Eastern CFRAM Study Area, Hydrometric Area 09 V2_09LEAV_XS Drawings & PDFs M03A: Model Number 3A 09LEAV: River Reference
Recommended publications
  • College Road, Clane, Co. Kildare
    College Road, Clane, Co. Kildare Spacious 4 Bedroom Family Homes Specialising in High Grade Developments www.aughamore.com Clane The charming North Kildare village of Clane, Developed by the highly regarded Westar on the banks of the river Liffey, is becoming Group, Aughamore offers a range of four an ever more popular choice with bedroomed family homes. homebuyers. This is due to its exceptional range of amenities, fantastic location as well Generously proportioned and finished to the as its easy access to Dublin. highest standards with A Rating BER. Home buyers can choose from four bedroom semi- While still retaining its attractive village detached and four bedroom detached character, Clane has been enhanced in houses. Some homes come with an recent years with a host of new amenities. additional second floor study/playroom. These include Scoil Mhuire Secondary School, Boys National School, Girls Primary Clane enjoys close proximity to Dublin City School, five major supermarkets, restaurants, which can be accessed via the M4 or the M7 coffee shops, tea rooms and bars to health motorways, both being only 10 minutes and leisure centres, children’s playground, away. The nearby Arrow rail link from Sallins and the Westgrove Hotel and Conference station and frequent bus services to Dublin Centre. There is a hospital, nursing homes, as well as the other major Kildare towns of primary care centre, medical centre, Naas, Maynooth and Celbridge make Clane churches, along with a wide variety of sports an ideal family location. clubs with GAA, Rugby, Soccer, Tennis, two Scout troops and Equestrian centres, fishing and four golf courses with the magnificent K Club and Carton House on your doorstep.
    [Show full text]
  • Minutes of the Celbridge-Leixlip Municipal District Meeting Held at 10:00Am on Friday 18 November 2016 in the Council Chamber, Áras Chill Dara, Naas
    Kildare County Council Minutes of the Celbridge-Leixlip Municipal District Meeting held at 10:00am on Friday 18 November 2016 in the Council Chamber, Áras Chill Dara, Naas Members Present : Councillor B. Caldwell (Cathaoirleach) Councillors K. Byrne, M. Coleman, I. Cussen, A. Larkin, J. Neville, B. Young. Present: Mr P. Minnock (District Manager), Ms E. Wright (Senior Executive Officer), Ms K. Kenny (Senior Executive Planner), Mr C. Buggie (Municipal District Engineer), Ms V. Cooke (Administrative Officer), Ms A. Corbett (Senior Community Worker), Ms M. Dalton (Meetings Administrator), Ms A. M. Campbell (Secretary). CL01/1611 Draft Celbridge Local Area Plan A copy of the Draft Leixlip Local Area Plan 2017 – 2023 was circulated to the members and it was agreed by the members to hold a special meeting to discuss the Draft Celbridge Local Area Plan 2017-2023 on 28 November 2016 at 11:00 a.m. It was agreed by the members to meet informally to discuss a broad outline of the breakdown of spend for the Local Property Tax funding and to submit this breakdown to Mr Minnock in advance of a meeting with him to discuss this funding. CL02/1611 Minutes and progress report The members considered the minutes of the budget and monthly meetings of the Celbridge- Leixlip Municipal District held on the 21 October 2016, together with the progress report. The minutes of the budget meeting were approved and the minutes of the monthly meeting were approved subject to an addition, with agreement of the members, to items CL21,22,24/1607 "Councillor Young made the point that during the meetings in 2010, organised along the lines specified by Kildare County Council and attended to monitor voting by an officer of Kildare County Council, no issue or objection to partitioning of the backlots Page 1 of 16 Kildare County Council on grounds of a supposed right of way was raised, either by residents or Kildare County Council.
    [Show full text]
  • Grand Canal Storm Water Outfall Extension Project Presented by Niall Armstrong
    Grand Canal Storm Water Outfall Extension Project Presented by Niall Armstrong- DCC Project Manager to the South East Area Committee on 12th October 2020 Introduction • Grand Canal Tunnel Constructed in the 1970s,Two sections – foul and storm. Foul section conveys flows to Ringsend Wastewater Treatment Plant. • The Storm Section of the Tunnel discharges to the Inner Basin of the Grand Canal Dock. • This project involves extending this Existing Outfall pipe to the River Liffey. • A joint project between Irish Water and DCC. Aerial View of Basin Project Details • At this stage, IW and DCC have agreed to jointly fund the project through the planning permission process. • Application to be made by Dublin City Council to An Bord Pleanala under Section 175 of the Planning and Development Act 2000. Programme: • Apply for planning permission Q4 2021. • Decision Q1 2022. Overview of Pipeline Phase 1 was Completed in 2002 – Construction of a Culvert along Asgard Road. Proposed Works – Connection of existing outfall to previously constructed culvert and construction of an outfall at the River Liffey at Sir John Rogerson’s Quay. Proposed Layout 450m of Pipeline within Basin and 100m along existing road and pedestrian infrastructure on Hanover Quay. Need for Project • Improve Water Quality in Basin Grand Canal Basin is regularly impacted by microbiological pollution, after heavy rainfall events. IW,DCC and Waterways Ireland established working group in 2017 to determine cause of ongoing pollution. It has been determined that the primary source of pollution is the discharge from the surface water section of the Grand Canal Tunnel. By removing Pipeline from the Basin this will greatly reduce pollution within it.
    [Show full text]
  • River Liffey Hydro-Electric Stations X Thetwol 5Megawatt Generatorsinthepower House Below
    X River Liffey Hydro-Electric Stations X thetwol 5megawatt generatorsinthepower house below. River Liffey The first of these sets was commissioned in 1944 and the second in 1947. The power, generated at 10/11 kV., is raised Hydro-Electric to 110 kV at the outdoor transformer station before being fed into the national network. The output of the station Development is generally confined to peak load periods. The Golden Falls Power House The mile-long stretch of water between the power house at Pollaphuca and the smaller station at Golden Falls is used as a compensation reservoir, for the purpose of equalising the flow in the lower river, when the first station is in operation. The dam at Golden Falls develops a 60-ft. head of water to operate a 4 megawatt turbo-alternator. The hydro-electric development of the River Liffey comprises three stations, Pollaphuca, Golden Falls and Leixlip, each located at a point in the river where the The Leixlip Station natural falls provide suitable sites for the stations. After passing through Golden Falls the river flows35mlies The River Liffey, which rises in the Dublin Mountains, is through Co. Kildare to Leixlip,aboutl2milesfromDublin. 55 miles from source to Leixlip and drains an area of over A dam impounds the water and forms a reservoir of about 300sq. miles.The erection of the 100 ft.dam at Pollaphuca 100 acres with a capacity of 160 million gallons of water serves a dual purpose. In addition to developing a 150 and provides a 60 foot head. The plant comprises a 4 foot head of water for the generation of electricity, the dam megawatt turbo-alternator.
    [Show full text]
  • Liffey Estuary (Upper and Lower) Report 2010
    ACKNOWLEDGEMENTS The authors wish to gratefully acknowledge the help and co -operation of the Director Mr. William Walsh and staff from IFI Blackrock as well as various other offices throughout the region. The authors also gratefully acknowledge the help and cooperation of their colleagues in IFI Swords . We would like to thank the landowners and angling clubs that granted us access to their land and respective fisheries. We would also like to thank Dr. Martin O’ Grady (IFI) and No. 3 Operational Wing, Irish Air Corps (Aer Chór na hÉireann) for the aerial photographs. PROJECT STAFF Project Director/Senior Research officer: Dr. Fiona Kelly Project Manager: Dr. Andrew Harrison Research Officer: Dr. Ronan Matson Research Officer: Ms. Lynda Connor Technician: Ms. Roisín O’Callaghan Technician Mr. Rory Feeney Technician: Ms. Emma Morrissey Technician: Mrs. Ciara Wögerbauer GIS Officer: Mr. Kieran Rocks Fisheries Assistant: Ms. Gráinne Hanna (Oct 2010 – Dec 2010) Fisheries Assistant: Mr. Kevin Gallagher (Oct 2010 – Dec 2010) The authors would also like to acknowledge the funding provided for the project from the Department of Communications Energy and Natural Resources for 2010. The report includes Ordnance Survey Ireland data reproduced under OS I Copyright Permit No. MP 007508. Unauthorised reproduction infringes Ordnance Survey Ireland and Government of Ireland copyright. © Ordnance Survey Ireland , 2010 TABLE OF CONTENTS 1. INTRODUCTION ................................ ................................ ................................ .............................
    [Show full text]
  • Archive Fact Sheet: Guinness Liffey Barges
    Archive Fact Sheet: Guinness Liffey Barges Guinness barges at Victoria Quay Jetty c. 1910 GDB/DB05/0055 In the 1870’s the Guinness site expanded northwards to bound the river Liffey and in 1873, the Company built their own jetty on the river Liffey. This enabled barges to load and unload wooden casks of GUINNESS directly at the gates of the Guinness Brewery for the first time. The first Liffey barges used by Guinness, which were steam operated, were built at this time. These early barges were all named after rivers around Ireland eg Lagan, Shannon, Slaney, Foyle, Moy. The first barge, the Lagan, was built by Harland and Wolfe at their Belfast shipyard. The Dublin engineering foundry, Ross and Walpole, built all other barges. If you have any further questions about Guinness history please contact us at: Guinness Archive, GUINNESS STOREHOUSE®, St. James's Gate, Dublin 8. Telephone: +353 1 471 4557. E-mail: [email protected] Opening Hours: Mon –Fri 09:30 to 17.00 by appointment. The GUINNESS® and GUINNESS STOREHOUSE® words and associated logos are trade marks In 1927 Guinness introduced a new type of barge known as the ‘Farmleigh’ type barge. These second evolution of barges were named after placenames around Dublin eg Farmleigh, Castleknock, Killiney. The barges were built by Vickers (Ireland) Ltd in the Liffey Dockyard, with design input from the Guinness engineers. These new type barges could carry 87 tons of cargo, roughly three hundred hogsheads of GUINNESS. The one mile journey from the Brewery’s jetty to Dublin Port took approx.
    [Show full text]
  • Archaeological Assessment of Lands in the Townlands of Commons West, Boycetown and Kilcock (Adjacent to the Existing Brayton Park Estate), Kilcock, County Kildare
    ARCHAEOLOGICAL ASSESSMENT OF LANDS IN THE TOWNLANDS OF COMMONS WEST, BOYCETOWN AND KILCOCK (ADJACENT TO THE EXISTING BRAYTON PARK ESTATE), KILCOCK, COUNTY KILDARE ON BEHALF OF: RYCROFT HOMES LIMITED CASE REF.: ABP-302746-18 AUTHOR: ROSS WATERS DECEMBER 2019 IAC PROJECT REF.: J3417 Kilcock SHD, Archaeological Assessment Co. Kildare DOCUMENT CONTROL SHEET DATE DOCUMENT TITLE REV. PREPARED BY REVIEWED BY APPROVED BY Archaeological Assessment of 16.12.19 1 Ross Waters Grace Corbett Faith Bailey Kilcock SHD Co. Kildare i IRISH ARCHAEOLOGICAL CONSULTANCY LTD Kilcock SHD, Archaeological Assessment Co. Kildare ABSTRACT Irish Archaeological Consultancy Ltd has prepared this report on behalf of Rycroft Homes Limited, to study the impact, if any, on the archaeological and historical resource of the proposed strategic housing development at lands in the townlands of Commons West, Boycetown and Kilcock (adjacent to the existing Brayton Park estate), Kilcock, County Kildare (ITM 687736/739821). The report was undertaken by Ross Waters of IAC Ltd. There are no recorded monuments within the proposed development, the closest is a bawn (KD005-019) situated c. 440m to the southwest. The Pale ditch is thought to have traversed the landscape to the south, west and northwest of the town of Kilcock. Although its route is unconfirmed, there is potential that it may have crossed the north east side of the site. The only archaeological discovery from previous investigations in the surrounding area was of two pits, one of which contained burnt bone, c. 285m to the north. The proposed development lay across a series of open fields throughout the post-medieval period, situated in a rural landscape on the periphery of Kilcock.
    [Show full text]
  • The Grand Canal
    ENVIROKIDS WORKSHOPS OUR CANAL SYSTEMS Our Canal systems – Ireland once had a canal network of 25 canals and combining the rivers that connected these canals, nearly every part of Ireland could be reached. Today in Ireland we have 7active canals and 18 that are not in use. Canals were built to transport goods in bulk from one part of the country to another. The construction of the first canal started in 1731 in co Tyrone in the north of Ireland. In this part of Co Tyrone there was a huge coal mine called Coalisland, so to transport coal to Dublin by using the road system, a horse and cart could only carry 1 ton but the same horse could pull a Barge full of coal weighing 70 tonnes. The Newry canal was finished in 1742 and was 18 miles long, and with 14 loughs climbing through a mountain, this was a huge engineering task for the time. This new canal proved to be a huge success and opened the door for the construction of more canals throughout the country. In this issue we will take a look at 2 canals in particular, the Grand and the Royal canal and their construction, that changed Ireland and helped one company to expand. We will also look at the canals today and what has happened to some of them, we will look at the Lough systems, and why canals are so important to our wildlife and the people that use them. 1 B Barge A Working Barge Horse drawn Barge The Grand Canal After the success of the Newry canal system the Irish government were looking to link Dublin with the River Shannon to open what is called a trade route.
    [Show full text]
  • Fisheries Assessment of the River Liffey, Co. Kildare
    Fisheries assessment of the River Liffey, Co. Kildare Prepared by Triturus Environmental Ltd. for North Kildare Trout & Salmon Anglers Association December 2020 ________________________________________ Please cite as: Triturus (2020). Fisheries assessment of the River Liffey, Co. Kildare. Unpublished report prepared by Triturus Environmental Ltd. North Kildare Trout & Salmon Anglers Association. December 2020. Liffey fisheries report 2020 1 Table of contents 1. Introduction 3 2. Methodology 5 3. Site descriptions 10 4. Results 19 5. Discussion & recommendations 31 5.2 Recommendations 33 6. Acknowledgements 34 7. References 35 8. Appendix A – additional survey images 38 Liffey fisheries report 2020 2 1. Introduction 1.1 Background Triturus Environmental Ltd. were contracted by North Kildare Trout & Salmon Anglers Association (NKTSAA) to undertake a baseline fisheries assessment of numerous sites on the River Liffey (EPA code: 09L01) within NKTSAA club jurisdiction throughout Co. Kildare. The project was financed through the Community Water Development Fund with support from the Local Authorities Water Programme (LAWPRO). The surveys were completed to provide a baseline of fish stocks and associated fisheries habitat along the River Liffey, which would allow for future comparative studies, thus informing more effective management and conservation efforts by the club, in conjunction with other stakeholders. Triturus Environmental Ltd. made an application under Section 14 of the Fisheries (Consolidation) Act, 1959 as substituted by Section 4 of the Fisheries (Amendment) Act, 1962, to undertake electro-fishing surveys of the River Liffey at six sites in Co. Kildare (Kilcullen Bridge, Athgarvan Bridge, Newbridge, Barretstown Cemetery, Caragh Bridge and downstream of Liffey Bridge). The surveys were completed in September 2020.
    [Show full text]
  • Approx. 20 Acres at Great Connell
    FOR SALE BY PRIVATE TREATY Approx. 20 acres at Great Connell NEWBRIDGE, CO. KILDARE FOR SALE BY PRIVATE TREATY C. 8.09 HECTARES (20 ACRES) SUPERB RESIDENTIAL DEVELOPMENT OPPORTUNITY Close to town centre, M7/M9 Motorways, train station & with frontage to the River Liffey + 353 0 45 433550 M7 TOWN CENTRE The property is easily accessible to the M7 & M9 Motorways and is short distance from the train station. Aerial for identification purposes only. Location The lands are located to the Major local employers in the area include southeast of Newbridge Town Pfizer Ireland, Oral B, Bord na Mona, Lidl, Murphy International, Aldi, Kerry Group and the bloodstock Centre, close to the R445 Naas road industry. In addition to this there is good (1.8km) and with frontage onto the accessibility to surrounding Industrial Parks/ Business Campuses including Naas Enterprise Park, Great Connell road. M7 Business Park, Millenium and Citywest. Newbridge is an important and established The Sallins Bypass and Third Lane from Naas commercial town located approximately 48km South to the Waterford turn off/M9 which has from Dublin, 10km from Kildare, 39km from recently commenced construction will further Celbridge and 38km from Maynooth, all of which benefit accessibility from Newbridge. are important commuter towns surrounding Dublin City and County. In addition to the above, Newbridge has an excellent retail & commercial offering including Newbridge is the largest town in County Kildare the Whitewater Shopping Centre which is one with a population in excess of 22,700 per the 2016 of the largest provincial Shopping Centres in Census and is regarded as the commercial capital Ireland.
    [Show full text]
  • Embracing Biodiversity at Intel Ireland
    Intel Ireland has a long history of the Orchard on site, planting a butterfly CONTENTS supporting biodiversity at our campus bed in the community and supporting our in Leixlip. 2016 has been for us a year Tidy Towns and schools with additional 1. INTRODUCTION ��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������4 of renewed focus on biodiversity environmental projects. I would also like both here on our site and in the local to acknowledge the importance of the 2. CONTEXT FOR ACTION �������������������������������������������������������������������������������������������������������������������������������������������������������������������6 community. We are honoured to be the strong relationships we have built with our 2.1. SCIENCE ��������������������������������������������������������������������������������������������������������������������������������������������������������������� 6 first company in Ireland to use Business surrounding communities and to thank in the Community Ireland’s innovative them for their ongoing support. 2.2. GOVERNANCE & POLICY �������������������������������������������������������������������������������������������������������������������������������������� 7 Biodiversity Framework to shape our approach to biodiversity management. Intel has a long history of commitment 3. INTEL IRELand’s BIODIVERSITY SUPPORTS ���������������������������������������������������������������������������������������������������������������������������10
    [Show full text]
  • 2011 Development Plan Liffey Valley Park, Newbridge
    Liffey Valley Park Newbridge September 2011 Table of Contents Page 1. Background 3 2. Legislative and Policy Context 3 2.1 County Development Plan 3 2.2 Liffey Valley Strategy 4 2.3 Newbridge Local Area Plan 4 2.4 Open Space Strategy 5 2.5 Previous Studies 5 3. SWOT Analysis 7 3.1 Strengths 3.2 Weaknesses 3.3 Opportunities 3.4 Threats 4. Geographic Scope 9 4.1 General Objectives 9 4.2 Tankardstown to Newbridge College 10 4.2.1 Description 4.2.2 Objectives 4.3 Newbridge College to Bridge 12 4.3.1 Description 4.3.2 Objectives 4.4 Bridge to Kilbelan House 15 4.4.1 Description 4.4.2 Objectives 4.5 Kilbelan House to Walshestown M7 Motorway 18 4.5.1 Description 4.5.2 Objectives 4.6 M7 Motorway to Athgarvan 21 4.6.1 Description 4.6.2 Objectives 2 1. Background In 2010 Newbridge Town Council requested a development plan for the future development of a linear Park along the Liffey in Newbridge. The purpose of this strategy is to review the objectives set out in the previous development plan for the Park and to unite the development of a linear park through Newbridge with objectives already contained in the County Development Plan 2011, Newbridge Local Area Plan, the Liffey Valley Strategy and County Open Space. Previous plans developed for the Linear Park mainly concentrated on The Strand area but in order to fulfil the objectives of the Liffey Valley Strategy and to achieve a linear park the area contained in the Local Area Plan needs to be addressed.
    [Show full text]