Approx. 20 Acres at Great Connell

Total Page:16

File Type:pdf, Size:1020Kb

Approx. 20 Acres at Great Connell FOR SALE BY PRIVATE TREATY Approx. 20 acres at Great Connell NEWBRIDGE, CO. KILDARE FOR SALE BY PRIVATE TREATY C. 8.09 HECTARES (20 ACRES) SUPERB RESIDENTIAL DEVELOPMENT OPPORTUNITY Close to town centre, M7/M9 Motorways, train station & with frontage to the River Liffey + 353 0 45 433550 M7 TOWN CENTRE The property is easily accessible to the M7 & M9 Motorways and is short distance from the train station. Aerial for identification purposes only. Location The lands are located to the Major local employers in the area include southeast of Newbridge Town Pfizer Ireland, Oral B, Bord na Mona, Lidl, Murphy International, Aldi, Kerry Group and the bloodstock Centre, close to the R445 Naas road industry. In addition to this there is good (1.8km) and with frontage onto the accessibility to surrounding Industrial Parks/ Business Campuses including Naas Enterprise Park, Great Connell road. M7 Business Park, Millenium and Citywest. Newbridge is an important and established The Sallins Bypass and Third Lane from Naas commercial town located approximately 48km South to the Waterford turn off/M9 which has from Dublin, 10km from Kildare, 39km from recently commenced construction will further Celbridge and 38km from Maynooth, all of which benefit accessibility from Newbridge. are important commuter towns surrounding Dublin City and County. In addition to the above, Newbridge has an excellent retail & commercial offering including Newbridge is the largest town in County Kildare the Whitewater Shopping Centre which is one with a population in excess of 22,700 per the 2016 of the largest provincial Shopping Centres in Census and is regarded as the commercial capital Ireland. Newbridge Silverware and The Courtyard enjoying excellent transport links including Mainline Shopping Centre are also nearby and Kildare & Commuter Rail services, Public and Private Bus Village is within a 10 minute drive. networks and excellent road infrastructure. Description The site is topographically level, bounded by the River Liffey to the west and surrounded by mature trees and hedgerows. The lands are currently laid in grass and adjoin Great Connell & Baroda Stud’s in addition to a number of existing residential developments including Baroda Court, Connell Drive and Old Abbey Manor. The site extends to approximately 8.09 ha (20 Acres). Site Plan for identification purposes only. Town Planning The subject lands enjoy two zonings under the Planning Permission was previously granted in Newbridge Local Area Plan 2013–2019. The majority January 2009 on the site for 198 units by Kildare of the lands (approx 7.3 hectares - 18.05 acres) are County Council (ref: 05/2162) but this was zoned as objective C, which is to ‘to provide for new subsequently appealed and refused by An Bord residential development’ with the remaining lands Pleanala in December 2009 (ref: 232672). (approx 0.79 hectares - 1.95 acres) zoned as Objective The Newbridge South Orbital Relief road has been F, which is ‘to protect and provide for open space, partly constructed and on completion it will further amenity and recreational provision’. improve accessibility and movement within the town. Zoning Map for identification purposes only. R415 BARRETSTOWN Park Newbridge Naas MILLTOWN R445 M7 R415 Pfizer Whitewater Lands at Great Connell NEWBRIDGE R401 G r e a t R C i o v n e n r e Racecourse L ll iff ey M9 R413 M7 K R412 R445 Kildare Village ATHGARVAN R413 MADDENSTOWN Further Information Method of Sale Clive Kavanagh The subject site will be offered for sale by t +353 0 45 433550 e [email protected] Private Treaty. Edward Street Services Newbridge Co. Kildare Interested parties are requested to com- Paddy Jordan www.jordancs.ie plete their own due diligence on adequacy t + 353 0 45 433550 of same. PSRA: 001536 e [email protected] Title We are advised that the property is freehold. Price On application BER Exempt The agents and the Vendor/Lessor give note that the particulars and information contained in this brochure do not form any part of any offer or contract and are for guidance only. The particulars, descriptions, dimensions, references to condition, permissions or licences for use or occupation, access and any other details, such as prices, rents or any other outgoings are for guidance only and are subject to change. Maps and plans are not to scale and measurements are approximate. Whilst care has been taken in the preparation of this brochure intending purchasers, Lessees or any third party should not rely on particulars and information contained in this brochure as statements of fact but must satisfy themselves as to the accuracy of details given to them. Neither Jordan’s Estate Agents nor any of their employees have any authority to make or give any representation or warranty (express or implied) in relation to the property and neitherJordan’s Estate Agents nor any of their employees nor the vendor or lessor shall be liable for any loss suffered by an intending purchaser/lessees or any third party arising from the particulars or information contained in this brochure. Prices quoted are exclusive of VAT (unless otherwise stated) and all negotiations are conducted on the basis that the purchasers/lessees shall be liable for any VAT arising on the transaction. .
Recommended publications
  • College Road, Clane, Co. Kildare
    College Road, Clane, Co. Kildare Spacious 4 Bedroom Family Homes Specialising in High Grade Developments www.aughamore.com Clane The charming North Kildare village of Clane, Developed by the highly regarded Westar on the banks of the river Liffey, is becoming Group, Aughamore offers a range of four an ever more popular choice with bedroomed family homes. homebuyers. This is due to its exceptional range of amenities, fantastic location as well Generously proportioned and finished to the as its easy access to Dublin. highest standards with A Rating BER. Home buyers can choose from four bedroom semi- While still retaining its attractive village detached and four bedroom detached character, Clane has been enhanced in houses. Some homes come with an recent years with a host of new amenities. additional second floor study/playroom. These include Scoil Mhuire Secondary School, Boys National School, Girls Primary Clane enjoys close proximity to Dublin City School, five major supermarkets, restaurants, which can be accessed via the M4 or the M7 coffee shops, tea rooms and bars to health motorways, both being only 10 minutes and leisure centres, children’s playground, away. The nearby Arrow rail link from Sallins and the Westgrove Hotel and Conference station and frequent bus services to Dublin Centre. There is a hospital, nursing homes, as well as the other major Kildare towns of primary care centre, medical centre, Naas, Maynooth and Celbridge make Clane churches, along with a wide variety of sports an ideal family location. clubs with GAA, Rugby, Soccer, Tennis, two Scout troops and Equestrian centres, fishing and four golf courses with the magnificent K Club and Carton House on your doorstep.
    [Show full text]
  • Inspector's Report
    Inspector’s Report ABP-301220-18 ABP-301223-18 ABP-301245-18 Development Development of a multi-use shared leisure route (Blueway), on the existing navigation towpath of the Barrow line of Grand Canal and the River Barrow, which is a National Waymarked Way. The route runs from Lowtown in Co. Kildare to St Mullins in Co. Kilkenny. Location The Barrow Navigation (Grand Canal - Barrow Line) commencing in Lowtown, (near Robertstown) and running south via Rathangan, Monasterevin, Athy, Carlow, Leighlinbridge, Bagenalstown, Goresbridge, Graiguenamanagh and St. Mullins. The total length of the route from Lowtown to St Mullins is approximately 115.7 km. The length of the section within Co. Kildare comprises c.47km, that within Co. Carlow comprises c.52km and c.16km is within Co. Laois. ABP-301223-18 Inspector’s Report Page 1 of 275 Planning Authorities Kildare, Carlow and Laois County Councils. Planning Authority Reg. Ref. Nos. Kildare (Ref.17/81), Carlow (Ref. 17/18) and Laois (Ref. 17/37). Applicant(s) Waterways Ireland Type of Applications Permission Planning Authority Decisions Kildare Co. Co. - Grant permission subject to conditions; Laois Co. Co. – Split decision; Carlow Co. Co. – Refuse Permission. Type of Appeals First and Third Party Appellants Waterways Ireland (First party) Rosalind Murray (Kildare Co. Co.) Cyclist.ie; c/o Colm Ryder (Kildare Co. Co.) Save the Barrow Line (Kildare, Carlow and Laois Co. Cos.) Mary White (Carlow Co. Co.) Paul O’Connell (Laois Co. Co.) Art Mooney (Laois Co. Co.) Observers Roger Goodwillie (Kildare Co. Co.) Jerry and Mary Carbery (Kildare Co. Co.) Theresa Brown (Carlow Co.
    [Show full text]
  • Route 817 Kilkenny - Castlecomer - Athy - Kilcullen - Naas - Dublin City
    Route 817 Kilkenny - Castlecomer - Athy - Kilcullen - Naas - Dublin City DAILY M-F Kilkenny Ormond House, Ormond Road 10:30 xxxx Castlecomer Church, Kilkenny Street 10:50 13:20 Moneenroe Railyard Junction 10:54 13:24 Crettyard Northbound 10:55 13:25 Newtown Cross Opp Flemings Pub 11:00 13:30 Ballylynan Cross Jct Village Estate 11:05 13:35 Athy C Bar Leinster Street 11:15 13:45 Kilmead CMC Energy 11:21 13:51 Ballyshannon Kildare Eastbound 11:28 13:58 Kilcullen Opp Frasers Garage 11:35 14:05 Kilcullen Lui Nia Greine 11:37 14:07 Carnalway Northbound 11:40 14:10 Two Mile House Northbound 11:43 14:13 Kilashee Opp. Kilashee Hotel 11:45 14:15 Naas Hospital Ballymore Road 11:50 14:20 Naas Post Office 11:55 14:25 Connect to BE Route 126 in Naas Newlands Cross Northbound 12:20 xxxx Dublin Heuston Heuston Station 12:40 xxxx Dublin City Eden Quay 12:50 15:35 Arrival time at O'Connell Bridge DAILY Mondays to Sundays including Bank Holidays M-F Mondays to Fridays excluding Bank Holidays Route 817 Dublin City - Naas - Kilcullen - Athy - Castlecomer - Kilkenny M-F DAILY Dublin City Georges Quay 09:30 BE Route 126 Connolly Luas Stop 16:00 Dublin City Halfpenny Bridge xxxx 16:05 Dublin Heuston Heuston Station xxxx 16:10 Newlands Cross Southbound xxxx 16:30 Naas Opp. Post Office 10:40 Connection from Dublin 16:55 Naas Hospital Ballymore Road 10:45 17:00 Kilashee Kilashee Hotel 10:50 17:05 Two Mile House Southbound 10:52 17:07 Carnalway Southbound 10:55 17:10 Kilcullen Opp.
    [Show full text]
  • Grand Canal Storm Water Outfall Extension Project Presented by Niall Armstrong
    Grand Canal Storm Water Outfall Extension Project Presented by Niall Armstrong- DCC Project Manager to the South East Area Committee on 12th October 2020 Introduction • Grand Canal Tunnel Constructed in the 1970s,Two sections – foul and storm. Foul section conveys flows to Ringsend Wastewater Treatment Plant. • The Storm Section of the Tunnel discharges to the Inner Basin of the Grand Canal Dock. • This project involves extending this Existing Outfall pipe to the River Liffey. • A joint project between Irish Water and DCC. Aerial View of Basin Project Details • At this stage, IW and DCC have agreed to jointly fund the project through the planning permission process. • Application to be made by Dublin City Council to An Bord Pleanala under Section 175 of the Planning and Development Act 2000. Programme: • Apply for planning permission Q4 2021. • Decision Q1 2022. Overview of Pipeline Phase 1 was Completed in 2002 – Construction of a Culvert along Asgard Road. Proposed Works – Connection of existing outfall to previously constructed culvert and construction of an outfall at the River Liffey at Sir John Rogerson’s Quay. Proposed Layout 450m of Pipeline within Basin and 100m along existing road and pedestrian infrastructure on Hanover Quay. Need for Project • Improve Water Quality in Basin Grand Canal Basin is regularly impacted by microbiological pollution, after heavy rainfall events. IW,DCC and Waterways Ireland established working group in 2017 to determine cause of ongoing pollution. It has been determined that the primary source of pollution is the discharge from the surface water section of the Grand Canal Tunnel. By removing Pipeline from the Basin this will greatly reduce pollution within it.
    [Show full text]
  • 3 Record of Protected Structures
    APPENDIX 3 RECORD OF PROTECTED STRUCTURES Record of Protected Structures (RPS) incorporating the Naas and Athy RPS 56 Kildare County Development Plan 2017-2023 Kildare County Development Plan 2017-2023 57 RECORD OF PROTECTED STRUCTURES PROPOSED PROTECTED STRUCTURES Record of Protected Structures (RPS) Each Development Plan must include objectives for A ‘proposed protected structure’ is a structure whose the protection of structures or parts of structures owner or occupier has received notification of the Table A3.1 CountyKildare Record of Protected Structures (excluding Naas and Athy) of special interest. The primary means of achieving intention of the planning authority to include it on these objectives is for the planning authority the RPS. Most of the protective mechanisms under RPS No. NIAH Structure Name Townland Description 6” to compile and maintain a record of protected the Planning and Development Acts and Regulations Ref. Map structures (RPS) for its functional area and which apply equally to protected structures and proposed B01-01 Ballynakill Rath Ballynakill Rath 1 is included in the plan. A planning authority is protected structures. obliged to include in the RPS structures which, in B01-02 11900102 Ballyonan Corn Mill Ballyonan Corn Mill 1 Once a planning authority notifies an owner or its opinion, are of special architectural, historical, B01-03 11900101 Leinster Bridge, Co. Kildare Clonard New Bridge 1 archaeological, artistic, cultural, scientific, social or occupier of the proposal to add a particular structure B02-01 Carrick Castle Carrick Castle 2 technical interest. This responsibility will involve to the RPS, protection applies to that proposed the planning authority reviewing its RPS from time protected structure during the consultation period, B02-02 Brackagh Holy Well - “Lady Well” Brackagh Holy Well 2 to time (normally during the review of the County pending the final decision of the planning authority.
    [Show full text]
  • A N N U a L Repo Rt 2017
    AN NUAL RE PO R T 2 0 1 7 Annual Report 2017 Croí Laighean Credit Union Limited Credit Union Invocation LORD, make me an instrument of Thy peace; where there is hatred, let me sow love; where there is injury, pardon; where there is doubt, faith; where there is despair, hope; where there is darkness, light; where there is sadness, joy. O DIVINE MASTER, grant that I may not so much seek to be consoled as to console; to be understood as to understand; to be loved as to love; for it is in giving that we receive, it is in pardoning that we are pardoned, and it is in dying that we are born to eternal life. b Contents Agenda 1 General Information 2 Chairman’s Report 3 CEO’s Report 5 Directors’ Responsibilities Statement 12 Board Oversight Committee Report 13 Independent Auditors’ Report to the Members of Croí Laighean Credit Union Limited 14 Audit, Risk & Compliance Committee Report 19 Community Committee Report 21 Nominations Committee Report 24 Income and Expenditure Account 26 Statement of Comprehensive Income 26 Balance Sheet 27 Statement of Changes in Reserves 28 Cash Flow Statement 29 Notes to the Financial Statements 30 Model Standing Orders 45 Motions and Rule Amendments 47 Members Draw Report 49 Annual Report 2017 Croí Laighean Credit Union Limited Agenda Notice is hereby given that the AGM of Croí Laighean Credit Union will take place on Monday, December 18th, 2017 at 7.30pm, in Westgrove Hotel, Clane, Co. Kildare. The agenda for the AGM is as follows: • Acceptance by the Board of Directors of the authorised representatives of clubs/
    [Show full text]
  • River Liffey Hydro-Electric Stations X Thetwol 5Megawatt Generatorsinthepower House Below
    X River Liffey Hydro-Electric Stations X thetwol 5megawatt generatorsinthepower house below. River Liffey The first of these sets was commissioned in 1944 and the second in 1947. The power, generated at 10/11 kV., is raised Hydro-Electric to 110 kV at the outdoor transformer station before being fed into the national network. The output of the station Development is generally confined to peak load periods. The Golden Falls Power House The mile-long stretch of water between the power house at Pollaphuca and the smaller station at Golden Falls is used as a compensation reservoir, for the purpose of equalising the flow in the lower river, when the first station is in operation. The dam at Golden Falls develops a 60-ft. head of water to operate a 4 megawatt turbo-alternator. The hydro-electric development of the River Liffey comprises three stations, Pollaphuca, Golden Falls and Leixlip, each located at a point in the river where the The Leixlip Station natural falls provide suitable sites for the stations. After passing through Golden Falls the river flows35mlies The River Liffey, which rises in the Dublin Mountains, is through Co. Kildare to Leixlip,aboutl2milesfromDublin. 55 miles from source to Leixlip and drains an area of over A dam impounds the water and forms a reservoir of about 300sq. miles.The erection of the 100 ft.dam at Pollaphuca 100 acres with a capacity of 160 million gallons of water serves a dual purpose. In addition to developing a 150 and provides a 60 foot head. The plant comprises a 4 foot head of water for the generation of electricity, the dam megawatt turbo-alternator.
    [Show full text]
  • Archaeological Heritage Report for Development Site at Kill Hill, Kill County Kildare
    ARCHAEOLOGICAL HERITAGE REPORT FOR DEVELOPMENT SITE AT KILL HILL, KILL COUNTY KILDARE On Behalf of J F O C Architects Ltd 11A Greenmount House, Harold’s Cross, Dublin 6W December, 2017 Kill, Co. Kildare __________________ Archaeological Assessment Report Abstract This report contains the results of a revised pre-planning heritage report carried out on behalf of the architectural consultancy; JFOC Architects for a housing development in Kill, County Kildare. The proposed residential development plan was revised following consultation with Kildare County Council and An Bord Pleanala. The development site lies outside the zone of archaeological potential of the historic village of Kill (SMR 19:8) and the Motte and Bailey (SMR 19:56) but close to the zone of archaeological potential of an enclosure site to the south (SMR 19:10). Table of Contents 1 Introduction ............................................................................................................... 4 2 Planning & Development Background ....................................................................... 6 3 Historical Background ............................................................................................. 10 4 Archaeological Background .................................................................................... 12 5 Site Topography and Development ......................................................................... 18 6 Development Montage ............................................................................................ 20 7
    [Show full text]
  • Liffey Estuary (Upper and Lower) Report 2010
    ACKNOWLEDGEMENTS The authors wish to gratefully acknowledge the help and co -operation of the Director Mr. William Walsh and staff from IFI Blackrock as well as various other offices throughout the region. The authors also gratefully acknowledge the help and cooperation of their colleagues in IFI Swords . We would like to thank the landowners and angling clubs that granted us access to their land and respective fisheries. We would also like to thank Dr. Martin O’ Grady (IFI) and No. 3 Operational Wing, Irish Air Corps (Aer Chór na hÉireann) for the aerial photographs. PROJECT STAFF Project Director/Senior Research officer: Dr. Fiona Kelly Project Manager: Dr. Andrew Harrison Research Officer: Dr. Ronan Matson Research Officer: Ms. Lynda Connor Technician: Ms. Roisín O’Callaghan Technician Mr. Rory Feeney Technician: Ms. Emma Morrissey Technician: Mrs. Ciara Wögerbauer GIS Officer: Mr. Kieran Rocks Fisheries Assistant: Ms. Gráinne Hanna (Oct 2010 – Dec 2010) Fisheries Assistant: Mr. Kevin Gallagher (Oct 2010 – Dec 2010) The authors would also like to acknowledge the funding provided for the project from the Department of Communications Energy and Natural Resources for 2010. The report includes Ordnance Survey Ireland data reproduced under OS I Copyright Permit No. MP 007508. Unauthorised reproduction infringes Ordnance Survey Ireland and Government of Ireland copyright. © Ordnance Survey Ireland , 2010 TABLE OF CONTENTS 1. INTRODUCTION ................................ ................................ ................................ .............................
    [Show full text]
  • Archaeological Assessment at Naas Town Hall, Main Street, Naas County Kildare
    ARCHAEOLOGICAL ASSESSMENT AT NAAS TOWN HALL, MAIN STREET, NAAS COUNTY KILDARE LICENCE NUMBER: 18E0515 FOR: KILDARE COUNTY COUNCIL I.T.M.: 689221/719481 LICENCEE: DAVE BAYLEY NOVEMBER 2018 Naas Town Hall, Main Street, Archaeological Testing Naas, Co. Kildare Licence Number: 18E0515 ABSTRACT Irish Archaeological Consultancy Ltd has prepared this report on behalf of Kildare County Council, to study the impact, if any, on the archaeological and historical resource of the proposed redevelopment of the Naas Town Hall, which is located on Main Street, Naas, Co. Kildare (ITM 689221/719481). The testing was undertaken by David Bayley and Muireann Ní Cheallacháin of IAC Ltd under licence 18E0515. The proposed development area is located in the townland of Naas West, parish of Naas, and barony of Naas North. The eastern boundary of the site is on the townland boundary with Naas East, Main Street North. The proposed development area is within the zone of potential for the historic town of Naas (RMP KD019-030). The proposed development area contains the site of a recorded monument, the site of White Castle (KD019-030018). The existing town hall, which was formerly a gaol, is also listed within the Record of Protected Structures for Kildare (RPS NS 19-047) and the NIAH building survey (NIAH 11814041). Four site investigation test pits were excavated in the rear yard during June 2018, which were archaeologically monitored. One test trench and one test pit were excavated within the rear yard in October 2018. The works confirmed the presence of an overburden layer within the yard area and identified the footing of a stone and mortar wall to the immediate west of the town hall structure.
    [Show full text]
  • FILE NUMBER Kildare County Council
    DATE : 04/12/2020 Kildare County Council TIME : 10:03:57 PAGE : 1 P L A N N I N G A P P L I C A T I O N S PLANNING APPLICATIONS RECEIVED FROM 25/11/20 TO 01/12/20 under section 34 of the Act the applications for permission may be granted permission, subject to or without conditions, or refused; The use of the personal details of planning applicants, including for marketing purposes, maybe unlawful under the Data Protection Acts 1988 - 2003 and may result in action by the Data Protection Commissioner, against the sender, including prosecution FILE APP. DATE DEVELOPMENT DESCRIPTION AND LOCATION EIS PROT. IPC WASTE NUMBER APPLICANTS NAME TYPE RECEIVED RECD. STRU LIC. LIC. 20/1420 Michael and Grainne Forde, P 25/11/2020 extensions and alterations to the existing detached single storey dwelling to include: (a) Extension to front of the dwelling to provide revised kitchen/living space. (b) Extension to rear of dwelling to include new garage, relocated bedroom and en-suite bathroom and new dining area. (c) Internal alterations and modification to the elevational treatment of the dwelling, all at ground floor level, to the front, side and rear of the existing dwelling, along with all associated site development and facilitating works Newtown, Naas, Co. Kildare. 20/1421 Alan Cunniffe, P 25/11/2020 sub-dividing the existing site and constructing a two and a half storey end of terrace maisonette unit consisting of a 2 bed apartment at ground floor level and a 2 bed apartment on the upper floors, alterations to existing footpath and road to front of house to incorporate a new car parking space and all ancillary site works in lieu of Planning Reference 13/1049 74 Millfield Manor, Newbridge, Co.
    [Show full text]
  • 2. Core Strategy 2
    2. CORE STRATEGY 2 AIM To respond in a coherent sustainable, spatial fashion to the challenges facing the county, while building on its strengths and providing a more focused approach to planning for future growth. The Core Strategy facilitates a more consolidated compact urban form, maintenance and improvement of a sustainable economic base, and the creation of sustainable and integrated communities, together with the balancing of our natural and built environment with sustainable and appropriate development. 30 Kildare County Development Plan 2017-2023 Kildare County Development Plan 2017-2023 31 2.1 STATUTORY CONTEXT AND BACKGROUND It is recognised that, as Kildare is part of the Greater 2.3 KILDARE IN CONTEXT 2.3.1 Population Growth Trends Dublin Area (GDA) it will be influenced by and The population of the county has increased from The Planning and Development (Amendment) Act have influence over future economic, social and Kildare has an area of 169,426 hectares. Its topography 186,335 in 2006 to 210,312 in 2011, representing a 2010 introduced a requirement for an evidence based environmental trends in the region. The RPGs (and consists of a large fertile plain broken only by a growth of 13%, the second highest in the State. Over “Core Strategy” to form part of all Development Plans. forthcoming Regional Spatial and Economic Strategy) few hills such as Dunmurray Hill and the Hill of a 20 year period (1991-2011), Kildare experienced The purpose of the Core Strategy is to articulate a provide a broad planning framework giving an overall Allen, with upland areas mainly on the eastern a 71.5% increase in its population.
    [Show full text]