Coalburn, Douglas and Glespin Community Action Plans
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Woodhead Farm Blackwood Estate • Lesmahagow • Lanark
WOODHEAD FARM BLACKWOOD ESTATE • LESMAHAGOW • LANARK SPACIOUS EARLY VICTORIAN FARMHOUSE WITH FLEXIBLE LAYOUT AND 2 ACRES OF GARDEN. WOODHEAD FARM BLACKWOOD ESTATE • LESMAHAGOW LANARK • ML11 0JG ENTRANCE HALL DRAWING ROOM / LIVING ROOM SITTING ROOM DINING ROOM CONSERVATORY 2 KITCHENS UTILITY ROOM OFFICE STUDIO BEDROOM WITH EN SUITE 3 FURTHER BEDROOMS FAMILY BATHROOM 2 SHOWER ROOMS LOFT ROOM / BEDROOM FLOORED ATTIC DOUBLE GARAGE TOOL STORE BYRE APPROX 2 ACRES Glasgow city centre: 23.5 miles Glasgow Airport: 30 miles Edinburgh Airport: 44 miles DIRECTIONS From Glasgow continue south on the M74 taking the Junction 9 exit and follow signs into Kirkmuirhill and Blackwood. Continue into the village of Blackwood and turn left onto Thornton Road (B7086) towards Strathaven. Continue onto Strathaven Road and beyond the village of Boghead take a right turn; Woodhead Farm is the first house on the right hand side. SITUATION Woodhead Farm sits in a picturesque semi rural location overlooking surrounding farmland, yet is conveniently placed for the towns of Lesmahagow, Strathaven and Hamilton. The farmhouse, which sits close to the village of Boghead, has beautiful open aspects. There is local primary schooling at Bent Primary School and secondary schooling at Blackwood. DESCRIPTION Occupying a peaceful semi rural position within the picturesque Blackwood estate, Woodhead Farm is an elegant, traditionally built detached farmhouse built circa 1840 which is surrounded by carefully maintained mature gardens which extend to approximately 2 acres. The property is surrounded by farmland and has beautiful open aspects. The accommodation within the farmhouse is all on one level and would be ideal for two separate families or multi generational living, as there are two separate entrances, two hallways and two kitchens. -
South Lanarkshire Landscape Capacity Study for Wind Energy
South Lanarkshire Landscape Capacity Study for Wind Energy Report by IronsideFarrar 7948 / February 2016 South Lanarkshire Council Landscape Capacity Study for Wind Energy __________________________________________________________________________________________________________________________________________________________________________________________________________ CONTENTS 3.3 Landscape Designations 11 3.3.1 National Designations 11 EXECUTIVE SUMMARY Page No 3.3.2 Local and Regional Designations 11 1.0 INTRODUCTION 1 3.4 Other Designations 12 1.1 Background 1 3.4.1 Natural Heritage designations 12 1.2 National and Local Policy 2 3.4.2 Historic and cultural designations 12 1.3 The Capacity Study 2 3.4.3 Tourism and recreational interests 12 1.4 Landscape Capacity and Cumulative Impacts 2 4.0 VISUAL BASELINE 13 2.0 CUMULATIVE IMPACT AND CAPACITY METHODOLOGY 3 4.1 Visual Receptors 13 2.1 Purpose of Methodology 3 4.2 Visibility Analysis 15 2.2 Study Stages 3 4.2.1 Settlements 15 2.3 Scope of Assessment 4 4.2.2 Routes 15 2.3.1 Area Covered 4 4.2.3 Viewpoints 15 2.3.2 Wind Energy Development Types 4 4.2.4 Analysis of Visibility 15 2.3.3 Use of Geographical Information Systems 4 5.0 WIND TURBINES IN THE STUDY AREA 17 2.4 Landscape and Visual Baseline 4 5.1 Turbine Numbers and Distribution 17 2.5 Method for Determining Landscape Sensitivity and Capacity 4 5.1.1 Operating and Consented Wind Turbines 17 2.6 Defining Landscape Change and Cumulative Capacity 5 5.1.2 Proposed Windfarms and Turbines (at March 2015) 18 2.6.1 Cumulative Change -
Carluke Lanark Law Lesmahagow
Key Please note: Not all of the Key elements will be present on each map South Lanarkshire Boundary Local Neighbourhood Centre River Clyde Out of Centre Commercial Location Settlement Boundary Retail / Comm Proposal Outwith Centres Strategic Economic Investment Location Priority Greenspace Community Growth Area Green Network Structural Planting within CGA New Lanark World Heritage Site Development Framework Site New Lanark World Heritage Site Buffer Lanark Residential Masterplan Site Scheduled Ancient Monument ² Primary School Modernisation Listed Building ² Secondary School Conservation Area Air Quality Management Area Morgan Glen Local Nature Reserve ±³d Electric Vehicle Charging Point (43kW) Quiet Area ±³d Electric Vehicle Charging Point (7kW) Railway Station Green Belt Bus Station Rural Area Park and Ride / Rail Interchange General Urban Area Park & Ride / Rail and Bus Interchange Core Industrial and Business Area New Road Infrastructure Other Employment Land Use Area Recycling Centre 2014 Housing Land Supply Waste Management Site Strategic Town Centre New Lanark Lesmahagow ÅN Scheduled Monuments and Listed Building information © Historic Scotland. © Crown copyright and database rights 2015. Ordnance Survey 100020730 0 0.125 0.25 0.5 Miles 0 0.2 0.4 0.8 Kilometers Scheduled Monuments, and Listed Building information © Historic Scotland. © Crown copyright and database rights 2015. Carluke Ordnance Survey 100020730 Scheduled Monuments, and Listed Building information © Historic Scotland. © Crown copyright and database rights 2015. Ordnance Survey 100020730 Law Upper Braidwood Lower Braidwood South Lanarkshire Local Development Plan Settlements Maps Carluke Lanark Scheduled Monuments, and Listed Building information © Historic Scotland. © Crown copyright and database rights 2015. Ordnance Survey 100020730 Law Lesmahagow Larkhall, Hamilton, Blantyre, Uddingston, Bothwell, on reverse. -
South Lanarkshire Council – Scotland Date (August, 2010)
South Lanarkshire Council – Scotland Date (August, 2010) 2010 Air Quality Progress Report for South Lanarkshire Council In fulfillment of Part IV of the Environment Act 1995 Local Air Quality Management Date (August, 2010) Progress Report i Date (August, 2010) South Lanarkshire Council - Scotland ii Progress Report South Lanarkshire Council – Scotland Date (August, 2010) Local Ann Crossar Authority Officer Department Community Resources, Environmental Services Address 1st Floor Atholl House, East Kilbride, G74 1LU Telephone 01355 806509 e-mail [email protected]. uk Report G_SLC_006_Progress Report Reference number Date July 2010 Progress Report iii Date (August, 2010) South Lanarkshire Council - Scotland Executive Summary A review of new pollutant monitoring data and atmospheric emission sources within the South Lanarkshire Council area has been undertaken. The assessment compared the available monitoring data to national air quality standards in order to identify any existing exceedences of the standards. Data was gathered from various national and local sources with regard to atmospheric emissions from: road traffic; rail; aircraft; shipping; industrial processes; intensive farming operations; domestic properties; biomass plants; and dusty processes. The screening methods outlined in the technical guidance were used to determine the likelihood that a particular source would result in an exceedence of national air quality standards. The review of new and changed emission sources identified no sources that were likely to -
09/03/2012 Community and Enterprise Resources
Community and Enterprise Resources Planning and Building Standards Weekly List of Planning Applications List of planning applications registered by the Council for the week ending From : - 05/03/2012 To : 09/03/2012 Note to Members: Applications identified as 'Delegated' shall be dealt with under these powers unless more than 5 objections are received. In such cases the application will be referred to the appropriate area committee. Any queries on any of the applications contained in the list or requests to refer an application to committee should be directed to the area manager/team leader at the appropriate area office. A Member should only request that a team leader or manager consider referring a delegated application to committee if the Member still has concerns about an application after having discussed the matter with the team leader/manager. Note for Community Councils and members of the public: Further information If you wish further information on any application included in the list, please contact the case officer dealing with application. Officers can be contacted by phone on 0845 7406080 or by email [email protected]. Alternatively, you can view the application and associated documents on the Council's website at www.southlanarkshire.gov.uk Commenting on a planning application If you wish to comment on a planning application, you can do so by email [email protected], or in writing to Planning and Building Standards Services, Montrose House, 154 Montrose Cresent, Hamilton ML3 6LB or on the Council's website at www.southlanarkshire.gov.uk where there is an online form to submit comments. -
Douglas West & Dalquhandy DP Renewable Energy
Douglas West & Dalquhandy DP Renewable Energy Project NON-TECHNICAL SUMMARY July 2015 Non-Technical Summary Contents 1. Background 1 2. Purpose of the Proposed Development Environmental Statement (ES) 1 3. Availability of the Proposed Development ES 1 4. Representations to the Application 2 5. Site Location and Description 2 6. Site Selection and Design 4 7. Description of the Proposed Development 6 8. Programme 11 9. Consultation 12 10. Environmental Impact Assessment (EIA) 13 11. Benefits of the Proposed Development 21 12. Conclusion 22 DOUGLAS WEST & DALQUHANDY DP i NON-TECHNICAL SUMMARY RENEWABLE ENERGY PROJECT This page is intentionally blank. DOUGLAS WEST & DALQUHANDY DP ii NON-TECHNICAL SUMMARY RENEWABLE ENERGY PROJECT 1. Background 1.1 This document is a Non-Technical Summary of the Environmental Statement which accompanies an application by 3R Energy Solutions Limited (the Applicant), for consent under the Town and Country Planning (Scotland) Act 1997 (as amended), for the construction and operation of the Douglas West and Dalquhandy DP Renewable Energy Project (the Proposed Development), comprising 15 wind turbines and an associated Wood Fuel Drying Facility between Douglas and Coalburn, 11 km south west of Lanark, in rural South Lanarkshire. 2. Purpose of the Proposed Development Environmental Statement (ES) 2.1 Energised Environments Limited was appointed by the Applicant to undertake an Environmental Impact Assessment (EIA) of the Proposed Development in accordance with Schedule 2 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulation 2011. 2.2 The EIA process is reported in the ES, which describes the methods used to assess the beneficial and adverse environmental impacts predicted to result from the construction and operation of the Proposed Development. -
Planning Committee
Council Offices, Almada Street Hamilton, ML3 0AA Monday, 23 November 2020 Dear Councillor Planning Committee The Members listed below are requested to attend a meeting of the above Committee to be held as follows:- Date: Tuesday, 01 December 2020 Time: 10:00 Venue: By Microsoft Teams, The business to be considered at the meeting is listed overleaf. Yours sincerely Cleland Sneddon Chief Executive Members Isobel Dorman (Chair), Mark Horsham (Depute Chair), John Ross (ex officio), Alex Allison, John Bradley, Archie Buchanan, Stephanie Callaghan, Margaret Cowie, Peter Craig, Maureen Devlin, Mary Donnelly, Fiona Dryburgh, Lynsey Hamilton, Ian Harrow, Ann Le Blond, Martin Lennon, Richard Lockhart, Joe Lowe, Davie McLachlan, Lynne Nailon, Carol Nugent, Graham Scott, David Shearer, Collette Stevenson, Bert Thomson, Jim Wardhaugh Substitutes John Anderson, Walter Brogan, Janine Calikes, Gerry Convery, Margaret Cooper, Allan Falconer, Ian McAllan, Catherine McClymont, Kenny McCreary, Colin McGavigan, Mark McGeever, Richard Nelson, Jared Wark, Josh Wilson 1 BUSINESS 1 Declaration of Interests 2 Minutes of Previous Meeting 5 - 12 Minutes of the meeting of the Planning Committee held on 3 November 2020 submitted for approval as a correct record. (Copy attached) Item(s) for Decision 3 South Lanarkshire Local Development Plan 2 Examination Report - 13 - 62 Statement of Decisions and Pre-Adoption Modifications – Notification of Intention to Adopt Report dated 20 November 2020 by the Executive Director (Community and Enterprise Resources). (Copy attached) 4 Application EK/17/0350 for Erection of 24 Flats Comprising 5 Double 63 - 76 Blocks with Associated Car Parking and Landscaping at Vacant Land Adjacent to Eaglesham Road, Jackton Report dated 20 November 2020 by the Executive Director (Community and Enterprise Resources). -
Occupation of a Road Form
Application/permission to occupy a portion of a road in connection with building Community and Enterprise Resources operations Roads (Scotland) Act 1984, Section 58 Transport (Scotland) Act 2005, Section 19 1. Completing and returning the form You can complete this form in Adobe Acrobat and print it out, or print it out and complete it by hand, using capital letters. Part A of the form should be returned to the appropriate area office, detailed below. • If granted, this will become the permit and will be returned to you with a permit number and any additional conditions attached. Note: A separate application is required where a skip is to be placed on the road. Part B is to be returned to the relevant area office within two days of the erection of scaffolding where this forms part of the application. Part C is to be returned to the relevant office within two days of all materials (including scaffolding) being removed. 2. Further information For more information or if you want this information in a different format or language, please phone 0303 123 1015 or email [email protected] 3. Addresses and phone numbers Roads and Transportation Services operate on an area basis. Clydesdale area (Lanark, Carluke, Forth, Law, Biggar, Coalburn, Crossford, Douglas, Leadhills, Carnwarth, Lesmahagow, Carstairs) Council Offices, South Vennel, Lanark, ML11 7JT Phone: 0303 123 1015 Email: [email protected] Hamilton area (Hamilton, Larkhall, Stonehouse, Ashgill, Blantyre, Bothwell, Uddingston, Rosebank) Council Offices, Montrose House, 154 Montrose Crescent, Hamilton, ML3 6LB Phone: 0303 123 1015 Email: [email protected] East Kilbride and Cambuslang/Rutherglen area (East Kilbride, Strathaven, Glassford, Chapelton, Sandford, Drumclog, Jackton, Thorntonhall, Cambuslang, Rutherglen, Shawfield, Newton, Hallside, Halfway) Council Offices, Andrew Street, East Kilbride, G74 1AB Phone: 0303 123 1015 Email: [email protected] 4. -
School Transport Consultation Report
Outcome of the Statutory Consultation on the proposal to increase the qualification of entitlement to free secondary school mainstream transport to pupils residing more than 3 miles from their school July 2015 This report has been issued by South Lanarkshire Council in response to the consultation undertaken in terms of the Schools (Consultation) (Scotland) Act 2010. This report includes recommendations of the outcome of the consultation which will be presented to the Executive Committee of South Lanarkshire Council. If you need this information in another language or format, please contact us to discuss how we can best meet your needs. Phone: 01698 454545 Email: [email protected] Contents 1. Purpose of the report 2. Recommendations 3. Background on the consultation process 4. Summary of written responses and Council response 5. Summary of oral responses and Council response 6. Notification of an inaccuracy/omission 7. Summary of issues raised by Education Scotland (formerly HMIe) and Education Resources response 8. Review of proposals by South Lanarkshire Council 9. Resource, risk and policy implications Appendices 1. List of consultees 2. Consultee response form 3. Comments made and Council responses made to the main areas of concern expressed 4. Note of oral questions from the public meetings and Council responses made 5. Council response to notification of omission from consultation proposal 6. Report from Education Scotland 1. Purpose of the report 1.1 The purpose of this report is to advise all stakeholders on the outcome of the statutory consultation exercise undertaken in respect of the proposal to increase the qualification of entitlement to free secondary school mainstream transport to pupils residing more than 3 miles from their school. -
Best Value Assurance Report: South Lanarkshire Council | 3
Best Value Assurance Report South Lanarkshire Council Prepared by Audit Scotland March 2019 The Accounts Commission The Accounts Commission is the public spending watchdog for local government. We hold councils in Scotland to account and help them improve. We operate impartially and independently of councils and of the Scottish Government, and we meet and report in public. We expect councils to achieve the highest standards of governance and financial stewardship, and value for money in how they use their resources and provide their services. Our work includes: • securing and acting upon the external audit of Scotland’s councils and various joint boards and committees • assessing the performance of councils in relation to Best Value and community planning • carrying out national performance audits to help councils improve their services • requiring councils to publish information to help the public assess their performance. You can find out more about the work of the Accounts Commission on our website: www.audit-scotland.gov.uk/about-us/accounts-commission Audit Scotland is a statutory body set up in April 2000 under the Public Finance and Accountability (Scotland) Act 2000. We help the Auditor General for Scotland and the Accounts Commission check that organisations spending public money use it properly, efficiently and effectively. Best Value Assurance Report: South Lanarkshire Council | 3 Contents Key facts 4 Commission findings 5 Audit approach 6 Key messages 8 Part 1. Does the council have clear strategic direction? 9 Part 2. How well is the council performing? 15 Part 3. Is the council using its resources effectively? 24 Part 4. Is the council working well with its partners? 34 Part 5. -
1 Education and Skills Committee Teacher Workforce Planning Inquiry Secondary School Teacher Questionnaires ALAN BARR
Education and Skills Committee Teacher Workforce Planning Inquiry Secondary school teacher questionnaires SECONDARY SCHOOLS TEACHERS NAMED SUBMISSIONS ........................................... 6 ALAN BARR ........................................................................................................ 6 VICTORIA BARR ................................................................................................ 8 CHARLES BULLOCH ....................................................................................... 10 GRAEME CAMPBELL ...................................................................................... 11 ALEX CLOWES ................................................................................................ 13 PAUL COCHRANE ........................................................................................... 15 ANDY CRUIKSHANK ........................................................................................ 17 DANIEL DAVIS ................................................................................................. 19 LIZ DIGHTON ................................................................................................... 21 JEAN DOCHERTY ............................................................................................ 24 C DORIAN ........................................................................................................ 26 AMANDA ELVINES ........................................................................................... 29 RACHEL GARRETT ........................................................................................ -
Routeing Strategy Consultation Document Dalquhandy Wind Farm to Coalburn Substation 132Kv Overhead Line
Intended for SP Energy Networks On behalf of SP Transmission Plc Date April 2017 Project Number UK12-23096 ROUTEING STRATEGY CONSULTATION DOCUMENT DALQUHANDY WIND FARM TO COALBURN SUBSTATION 132KV OVERHEAD LINE ROUTEING STRATEGY CONSULTATION DOCUMENT DALQUHANDY WIND FARM TO COALBURN SUBSTATION 132KV OVERHEAD LINE Project No. UK12-23096 Issue No. 4 Date 28/04/2017 Made by Kate Lyon Checked by Kate Lyon Approved by Peter Bruce Made by: Checked/Approved by: This report has been prepared by Ramboll Environ with all reasonable skill, care and diligence, and taking account of the Services and the Terms agreed between Ramboll Environ and the Client. This report is confidential to the Client, and Ramboll Environ accepts no responsibility whatsoever to third parties to whom this report, or any part thereof, is made known, unless formally agreed by Ramboll Environ beforehand. Any such party relies upon the report at their own risk. Ramboll Environ disclaims any responsibility to the Client and others in respect of any matters outside the agreed scope of the Services. Version Control Log Revision Date Made by Checked by Approved by Description 4 28/04/17 KL KL PB Final Ramboll Environ 5th Floor 7 Castle Street Edinburgh EH2 3AH United Kingdom T +44 131 297 2650 www.ramboll-environ.com DALQUHANDY WIND FARM TO COALBURN SUBSTATION 132KV OVERHEAD LINE ROUTEING STRATEGY CONSULTATION DOCUMENT CONTENTS EXECUTIVE SUMMARY I 1. INTRODUCTION 1 1.1 Purpose of Document 1 1.2 Background 1 1.3 Project Need 1 1.4 Legislation and Planning Policy Context 1 1.5 Project Scope 2 1.6 The Development and Consenting Process 3 1.7 Structure of this Document 5 2.