Appendix P. Upper Hutt City Council District Plan Rule Assessment

Total Page:16

File Type:pdf, Size:1020Kb

Appendix P. Upper Hutt City Council District Plan Rule Assessment Resource Consent Application and Notice of Requirement Appendix P. Upper Hutt City Council District Plan Rule Assessment Ref. Rule / Standard Assessment Chapter 18 Residential Zone Rules Land Use Activities Status Activities Residential Activities Table 18.2 Removal of a building from a site P The removal of access bridges and other accessory buildings and structures is permitted under this rule. Non-Residential Activities Work affecting indigenous or exotic trees in the P The only work affecting trees is Residential Conservation and Residential Hill Sub- related to the bridge at 4 Blue zones Mountains Road, which is not located within the Residential Conservation and Residential Hill Sub-zones. Activities which are not listed in this Table unless D The bridge at 4 Blue Mountains otherwise covered in the City-wide provisions of the Road will be within the front Plan boundary setback and therefore would not comply with 18.17. The bridge is not accessory to a permitted or controlled activity. Bridges over Pinehaven Stream are addressed by Chapter 33, and as such this would be considered under those provisions rather than under Chapter 18. Standards for Permitted and Controlled Activities 18.9 Access standards for subdivision and land use activities The proposed private way • Where vehicle access points are shared by three or more serving 30 to 36 Blue Mountains dwelling units, for all rear lots and for all sites fronting Road would meet these arterial, or distributor/collector streets (identified in Chapter standards. 37) there must be provision for turning a vehicle on site in order that vehicles do not reverse into the street. • All accessways and manoeuvring areas shall be formed and surfaced in accordance with the Code of Practice for Civil Engineering Works. The required surfacing must be completed prior to certification of the survey plan. Exemption – the requirement for accessways serving sites solely occupied by unstaffed utilities shall be that the accessway shall be surfaced with permanent all weather surfacing for a minimum length of 5m from the edge of the road carriageway seal. • All sites shall have practical vehicle access to car parking and loading spaces, in accordance with the Code of Practice for Civil Engineering Works. This requirement does not apply to sites solely occupied by unstaffed utilities, provided that vehicles associated with utilities shall not obstruct the footpath or create a traffic hazard on the road. • Vehicular access to a corner lot shall be located no closer than 8m from the street corner. Where a site is located on an IZ089000-ANZ--EP-RPT-0001 Resource Consent Application and Notice of Requirement Ref. Rule / Standard Assessment intersection of a primary or secondary arterial traffic route (identified in Chapter 37) the siting of the vehicular access shall be located as far as practicable from the corner of the street. The 8 metre setback shall be measured from where the two front boundaries of the site (refer to the definition of a corner lot) join, or in accordance with the diagram below. • Where a corner lot is located at an intersection of a national, primary or secondary arterial traffic route, as identified in Chapter 37, no building, fence or other structure is to be erected and no vegetation allowed to grow so as to obstruct a traffic sight line. • At the intersection of a road or rail level crossing, no building, fence or other obstructions which block sight lines for trains shall be erected, placed or grown in the hatched area marked in Diagram A in Chapter 38. • Subdivision and land use activities with direct access to a State Highway shall comply with the access and visibility standards set out in Diagrams B to E in Chapter 38. • There shall be no private vehicle access to or egress from Alexander Road for any site contained within Area B of the Wallaceville Structure Plan Area. • There shall be no new private vehicle access to or egress from Alexander Road to land identified as Lot 2 DP 471766, Pt Section 102B Hutt District Wellington or Pt Section 618 Hutt District. • In relation to the land identified in Appendix Residential 3: NA 18.12 Setbacks from boundaries The proposed replacement The setback distance for residential and non-residential buildings bridges providing access to lots (excluding accessory buildings) shall not be less than: within the Residential zone are considered to be ‘accessory buildings’ under the definition in Chapter 2, and therefore are not subject to the boundary setback. 18.13 Outdoor living court These standards are not One outdoor living court capable of containing a 6m diameter circle anticipated to be breached due shall be provided for each dwelling and be located at its northern to the proposed works. aspect, or directly accessible from a living area. 18.15 Building height The maximum height of any building shall not exceed 8m. 18.16 Sunlight access Height control planes apply to all buildings: • In, or adjacent to, a Residential Zone. • On sites smaller than 1500m2 in a Rural Zone. Buildings shall be designed so that they fit within the height control planes defined below: 18.17 Accessory buildings The proposed replacement • Accessory buildings shall not be erected within the front bridges providing access to lots boundary setback. within the Residential zone are • Any wall closer than 1m from a boundary shall be no longer considered to be ‘accessory than 8m, except in a Residential (Centres Overlay) Area on a buildings’ under the definition in IZ089000-ANZ--EP-RPT-0001 Resource Consent Application and Notice of Requirement Ref. Rule / Standard Assessment site with a net site area of less than 400m2, where any wall Chapter 2. The bridge at 4 Blue closer than 1m from a boundary shall be no longer than 6m. Mountains Road will be within • The distance between an accessory building and any point of the front boundary setback. the main window of a habitable room on an adjoining site, measured at right angles to the plane of the window, shall be not less than 3m. For garages and other accessory buildings which form a part of a dwelling, the standards for accessory buildings shall apply to that dwelling, but only to the area of the dwelling which is an accessory building. 18.18 Water supply, stormwater and wastewater Any relocation of utility services All activities shall comply with the water supply, stormwater and will be undertaken to comply with wastewater standards in the Code of Practice for Civil Engineering the Code of Practice for Civil Works. Engineering Works. 18.20 Dust The management of construction Activities shall not create a dust nuisance. A dust nuisance may occur activities will ensure compliance if: with this standard during construction works. • There is visible evidence of suspended solids in the air beyond the site boundary. • There is visible evidence of suspended solids, traceable from a dust source, settling on the ground, building or structure on a neighbouring property or on water. Chapter 21 Open Space Zone Rules Land Use Activities Status Activities Passive recreation activities (unless otherwise P Willow Park will continue to be Table 21.3 specified in this table) used for passive recreation following the proposed works. Removal of a building from a site P The removal of the existing bridge within Willow Park will be permitted under this rule. Buildings accessory to a permitted activity P The proposed bridge within Willow Park is considered to be an accessory building to the passive recreation activities undertaken on the site, and therefore permitted under this rule. The proposed low wall within Willow Park is not considered to be a ‘building’ under the definition in Chapter 2. Zone-wide provisions (including Speedway Area) 21.9 Dust The management of construction Activities shall not create a dust nuisance. A dust nuisance may occur activities will ensure compliance if: with this standard during construction works. • There is visible evidence of suspended solids in the air beyond the site boundary. • There is visible evidence of suspended solids, traceable from a dust source, settling on the ground, building or structure on a neighbouring property or on water. IZ089000-ANZ--EP-RPT-0001 Resource Consent Application and Notice of Requirement Ref. Rule / Standard Assessment Zone wide provisions (outside Speedway Area only) 21.18 Setbacks from boundaries The proposed low wall within Willow Park is not considered to be a ‘building’ under the definition in Chapter 2, and therefore is not subject to the boundary setback. 21.19 Building height The proposed replacement The maximum height of any building shall not exceed 8m. bridge within Willow Park will not breach any of these standards. 21.20 Sunlight access All buildings shall comply with the height control planes defined in rule 18.16. 21.21 Floor area The gross floor area for any building shall not exceed: Principal buildings - 200m² Accessory buildings - 100m² 21.24 Landscaping All sites shall be landscaped according to the following: • If a building is required to be set back from the road boundary, the set back area between the road boundary and the building shall be landscaped unless it is used for access or car parking purposes. If car parking or accessways are provided between the road boundary and the building, a landscape strip with a minimum width of 0.6m shall be provided within the site along the road boundary. • Where a site adjoins a site outside the Open Space Zone (excluding road boundaries), a landscape buffer with a minimum width of 0.6m shall be provided between the zone boundary and the building. Chapter 23 Rules for Earthworks Activities Activities All Zones Table 23.1 Earthworks which meet the standards under rules P The Pinehaven Flood Hazard 23.2 – 23.17 Extent by definition excludes land within that area where the flood depth is not anticipated to exceed 100mm.
Recommended publications
  • Pinehaven Community Emergency Hub Guide
    REVIEWED JANUARY 2017 Pinehaven Community Emergency Hub Guide This Hub is a place for the community to coordinate your efforts to help each other during and after a disaster. Objectives of the Community Emergency Hub are to: › Provide information so that your community knows how to help each other and stay safe. › Understand what is happening. Wellington Region › Solve problems using what your community has available. Emergency Managment Office › Provide a safe gathering place for members of the Logo Specificationscommunity to support one another. Single colour reproduction WELLINGTON REGION Whenever possible, the logo should be reproduced EMERGENCY MANAGEMENT in full colour. When producing the logo in one colour, OFFICE the Wellington Region Emergency Managment may be in either black or white. WELLINGTON REGION Community Emergency Hub Guide a EMERGENCY MANAGEMENT OFFICE Colour reproduction It is preferred that the logo appear in it PMS colours. When this is not possible, the logo should be printed using the specified process colours. WELLINGTON REGION EMERGENCY MANAGEMENT OFFICE PANTONE PMS 294 PMS Process Yellow WELLINGTON REGION EMERGENCY MANAGEMENT OFFICE PROCESS C100%, M58%, Y0%, K21% C0%, M0%, Y100%, K0% Typeface and minimum size restrictions The typeface for the logo cannot be altered in any way. The minimum size for reproduction of the logo is 40mm wide. It is important that the proportions of 40mm the logo remain at all times. Provision of files All required logo files will be provided by WREMO. Available file formats include .eps, .jpeg and .png About this guide This guide provides information to help you set up and run the Community Emergency Hub.
    [Show full text]
  • Battle of the Bus Shelter
    Be in to win GGreatreat TToyotaoyota a Toyota Yaris GGiveawayiveaway P19-27 Upper Hutt Leader Wednesday, November 2, 2016 SERVING YOUR COMMUNITY SINCE 1939 ‘‘I’ve hit a dead end with the Greater Wellington Regional Council Battle of and Paul Swain, our representative here’’ Dean Chandler-Mills the bus shelter COLIN WILLIAMS Dean Chandler-Mills is taking to the tools. A several year battle to have a bus shelter built at the terminus stop of the 110 service in Gemstone Rd, Birchville, has left the 70-year-old frustrated. A 100-signature petItion was delivered to the regional council in 2013 and plenty of letter writing and submission-making since has produced nothing. ‘‘I’ve hit a dead end with the Greater Wellington Regional Council and Paul Swain, our representative here, ’’ he said. Chandler-Mills said residents were looking at building their own shelter in an effort to highlight the issue. ‘‘There are a lot of people really angry about this. Patronage on the service is increasing and this is not going to go away. ‘‘The next step will be to form a group and build our own shelter. That’ll embarrass the regional council.’’ The Gemstone Rd terminus is next to an open paddock, the width of several sections. ‘‘It services more than 110 households but it is in one of the most exposed commuter areas in the Hutt Valley,’’ Chandler-Mills said. The former Public Service Association organiser recently took his issue to Upper Hutt mayor Wayne Guppy. ‘‘Wayne has expressed an interest in getting some movement on this.
    [Show full text]
  • Heretaungasummaryreport.Pdf
    1 Neal Swindells Practical & Principled Independent Educational Consultant Email: [email protected] 1 July 2021 Report to the Ministry of Education on the Community Consultation Regarding Proposed Changes to the Heretaunga College Enrolment Scheme: May - June 2021 Summary Following a meeting with Shelley Govier, Lead Adviser Network, and Jeena Baines, Network Analyst, at the Ministry of Education Wellington Regional Office and meeting with the Principal of Heretaunga College, Fiona Craven, I launched the consultation on the proposed changes to the Enrolment Scheme for Heretaunga College on May 24th, 2021. The consultation took the form of a letter emailed to both the Presiding Chairs and Principals of 16 state and state integrated schools in the Upper Hutt area. These schools included the two state secondary schools; Heretaunga College and Upper Hutt College; the two Intermediate Schools, Maidstone Intermediate and Fergusson Intermediate; and all the state primaries as well as the two Catholic State Integrated primary schools in the area. The letter had links to the proposed changes to the Enrolment Scheme and maps showing the proposed changes. I then offered Heretaunga College, Upper Hutt College, the two Intermediate schools and St Joseph’s School a short communique designed to be sent to parents / whanau and asked them to send these out to their community to try to ensure all Year 8 parents in the district were aware of the proposed changes and the consultation process. I had a number of conversations with the acting Principal at Maidstone Intermediate whose pupils were likely to be the most directly affected group. Both Maidstone Intermediate and Heretaunga College published the proposed changes to their whole community.
    [Show full text]
  • 115 Bus Time Schedule & Line Map
    115 bus time schedule & line map 115 Silverstream Station - Gard Street →Upper Hutt View In Website Mode Station - Stop B The 115 bus line (Silverstream Station - Gard Street →Upper Hutt Station - Stop B) has 3 routes. For regular weekdays, their operation hours are: (1) Silverstream Station - Gard Street →Upper Hutt Station - Stop B: 6:25 AM - 6:45 AM (2) Upper Hutt Station - Stop B →Pinehaven Road (Near 67) (Temporary Stop): 5:45 PM - 6:05 PM (3) Upper Hutt Station - Stop B →Upper Hutt Station - Stop B: 7:10 AM - 5:00 PM Use the Moovit App to ƒnd the closest 115 bus station near you and ƒnd out when is the next 115 bus arriving. Direction: Silverstream Station - Gard 115 bus Time Schedule Street →Upper Hutt Station - Stop B Silverstream Station - Gard Street →Upper Hutt 42 stops Station - Stop B Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday Not Operational Silverstream Station - Gard Street 27 Whitemans Road, Upper Hutt Tuesday Not Operational Blue Mountains Road - Fendalton Crescent Wednesday 6:25 AM - 6:45 AM 69 Blue Mountains Road, New Zealand Thursday 6:25 AM - 6:45 AM Blue Mountains Road at Chichester Drive Friday 6:25 AM - 6:45 AM 84 Blue Mountains Road, New Zealand Saturday Not Operational Forest Road at Elmslie Road 20 Forest Road, New Zealand Pinehaven Road at Forest Road 93 Pinehaven Road, New Zealand 115 bus Info Direction: Silverstream Station - Gard Street →Upper Jocelyn Crescent at Pinehaven Road Hutt Station - Stop B 58 Jocelyn Crescent, New Zealand Stops: 42 Trip Duration: 37 min Jocelyn Crescent
    [Show full text]
  • Pinehaven Stream Improvements Archaeological Assessment of Pinehaven Stream Floodplain Management
    Pinehaven Stream Improvements Archaeological assessment of Pinehaven Stream Floodplain Management July 2017 Archaeological assessment of Pinehaven Stream Floodplain Management for Jacobs Ltd Kevin L. Jones Kevin L. Jones Archaeologist Ltd 6/13 Leeds Street WELLINGTON 6011 [email protected] Wellington 15 July 2017 Caption frontispiece: Pinehaven c. 1969 viewed from the north. Trentham camp mid-left, St Patricks (Silverstream) College at right. Pinehaven Stream runs across the centre of the photograph. Source: Hutt City Library. 2 EXECUTIVE SUMMARY This assessment reviews the risk of there being archaeological sites as defined in the Heritage NZ Pouhere Taonga Act 2014 in the vicinity of the works proposed for the Pinehaven Stream. The geomorphology of the area has been reviewed to determine whether there are older land surfaces that would have been suitable for pre-European or 19th C settlement. Remnant forest trees indicate several areas of older but low-lying (flood-prone) surfaces but field inspections indicate no archaeological sites. A review of earlier (1943) aerial photographs and 19th C survey plans indicate no reasonable cause to suspect that there will be archaeological sites. A settlement established in 1837 by Te Kaeaea of Ngati Tama in the general area of St Patricks College Silverstream is more or less on the outwash plain of the Pinehaven Stream. The fan north of the college is heavily cut into by the edge of the Hutt valley flood plain. This is the only historically documented 19th C Maori settlement on the Pinehaven Stream fan but it is outside the area of proposed works. Another broad class of archaeological site may be earlier forms of infrastructure on the stream such as dams, mills, races, bridges, abutments, and logging and rail infrastructure.
    [Show full text]
  • On the Day Results 2021 Final 16Th May 2021.Xlsx
    2021 Upper Valley Primary Schools XC Championships Year 3 and Under Girls Year Name School Place 3 Maia Henderson Oxford Crescent 1 3 Taylah Nightingale Upper Hutt 2 3 Hazel Roos Oxford Crescent 3 3 Lucy Mclea Totara Park 4 3 Faith Hilton Pinehaven 5 3 Alice Pickering Pinehaven 6 2 Hazel Steel-Baker Pinehaven 7 3 Emily Pearce Upper Hutt 8 2 Ruby-Rose Hepi St Josephs 9 3 Frankie McGlinchey Pinehaven 10 2 Kaia Wilkes St Brendans 11 3 Lily Karena Fraser Crescent 12 3 London Cork Silverstream 13 3 Morgan Maia Pinehaven 14 3 Georgie Kingsbeer Oxford Crescent 15 3 Rosemary Carson Silverstream 16 3 Bonnie Jennings St Brendans 17 2 Eliska Smith Trentham 18 2 Skye O’Brien Trentham 19 1 Isla Burns Totara Park 20 1 Maya Collins St Brendans 21 2 Danni Lee Stewart Plateau 22 3 Nancy Whiting Hau Karetu (formally Māoribank) 23 2 Hazel Jahnke Trentham 24 2 Molly Robins Pinehaven 25 1 Daniela Grout St Brendans 26 2 Millie Flutey Trentham 27 2 Mia Alcock Trentham 28 2 Aria Chatley Plateau 29 3 Ashlee Poeira Mangaroa 30 3 Pippa McKinnel Trentham 31 2 Michelle Jacomb Upper Hutt 32 3 Aven Walkinshaw St Josephs 33 3 Adelyn Broughton Totara Park 34 2 Harper SMith Mangaroa 35 3 Rian Priestly Upper Hutt 36 3 Harmony Pairama Taliu Plateau 37 1 Jessa Blundell St Brendans 38 1 Faith Schutte Totara Park 39 3 Olivia Fisher van der Veen Hau Karetu (formally Māoribank) 40 2 Leah McKinnel Trentham 41 2 Patricia-Lee Whiting Hau Karetu (formally Māoribank) 42 1 Hadley Hewitt Oxford Crescent 43 2 Ariana October Trentham 44 1 Harper Erin Cann Pinehaven 45 3 Paige Duncan
    [Show full text]
  • Flood Hazard Information Sheet 4 Pinehaven Stream
    Flood Hazard Information Sheet 4 Pinehaven Stream What you can do if you intend to develop, What you need to do if you live in build or renovate? this area Consider the following actions if you are building or Know your risk: Find your property on the flood hazard map. renovating in a flood or erosion-prone area. The Hutt Valley Emergency Management Office can give you information about how to reduce the effects of flooding. This ฀ Always speak to Upper Hutt City Council information could cover evacuation plans, how to protect (Telephone 04 527 2169 - ask for environmental consents) items in your home by raising them above floor level, and before you start building. how you can reduce the risk of future flooding to your home. Flood Hazard Information Sheet 4 JUNE 2010 ฀ Development should avoid the area affected by flood or erosion as a first choice. However if this is not possible, Be prepared: You will need to have: Pinehaven Stream such as for an existing dwelling, Upper Hutt City Council ฀ A Household Emergency Plan that will help you and your or Greater Wellington can provide you with site-specific household plan for when disaster strikes. advice. ฀ Emergency Survival Items such as food, water, clothing This information sheet covers the current flood hazard extent for the Pinehaven Stream Catchment that was identified in ฀ Raise your building platform or floor level. We recommend and medical supplies for you and your family. You will Phase 1 of the joint Upper Hutt City Council and Greater Wellington study. These maps may potentially change in the future, the underside of the floor joists or concrete slab should be need enough for at least 3 days.
    [Show full text]
  • Pinehaven Stream Flood Hazard Assessment
    Pinehaven Stream Flood Hazard Assessment FLOOD HAZARD INVESTIGATION REPORT: VOLUME 1 Revision E 25 May 2010 Pinehaven Stream Flood Hazard Assessment FLOOD HAZARD INVESTIGATION REPORT: VOLUME 1 Revision E 25 May 2010 Sinclair Knight Merz Level 12, Mayfair House 54 The Terrace PO Box 10-283 Wellington New Zealand Tel: +64 4 473 4265 Fax: +64 4 473 3369 Web: www.skmconsulting.com COPYRIGHT: The concepts and information contained in this document are the property of Sinclair Knight Merz Limited. Use or copying of this document in whole or in part without the written permission of Sinclair Knight Merz constitutes an infringement of copyright. LIMITATION: This report has been prepared on behalf of and for the exclusive use of Sinclair Knight Merz Limited’s Client, and is subject to and issued in connection with the provisions of the agreement between Sinclair Knight Merz and its Client. Sinclair Knight Merz accepts no liability or responsibility whatsoever for or in respect of any use of or reliance upon this report by any third party. The SKM logo trade mark is a registered trade mark of Sinclair Knight Merz Pty Ltd. Pinehaven Stream Hydraulic Modelling Report: Volume 1 Executive Summary This report details the first phase of the Pinehaven Stream flood hazard investigation undertaken by Sinclair Knight Merz (SKM) for the Greater Wellington Regional Council (GWRC) and Upper Hutt City Council (UHCC). The investigation sought to identify the flooding issues related to the Pinehaven Stream through hydraulic modelling, flood hazard mapping, flood damage assessment, erosion hazard assessment and a planning review. As the primary analysis tool a combined 1D and 2D hydraulic model was constructed of the Pinehaven Stream to assist in the development of flood hazard maps and to further understand the hydraulics contributing to the flood hazard.
    [Show full text]
  • New Zealand Gazette 907
    18 MARCH NEW ZEALAND GAZETTE 907 Column 1 Column 2 Column 3 Name Address Date of Registration Turner Charles Peter Owen BE DIC MIPENZ Downer & Company Limited, P.O. Box 1292, Wellington 24/ 11 /58 Turner Daniel John BE P.O. Box 15·268, New Lynn, Auckland 27 /06179 Turner Kevin Francis BE P.O. Box 9056, Palmerston North 21111179 Turner Keith Sharman BE(HONS) ME PHD 121 Muri Road, Pukerua Bay, Wellington 01112176 Turner Paul Michael BE 180 Nile Road, Milford, Auckland 21111179 Turner Raymond John BE MICE MIPENZ 43 Wapiti Avenue, Epsom, Auckland 3 30107/62 Turner Steven BE (CIVIL) Whangarei District Council, Private Bag, Whangarei 22112186 Turner William Jeremy BE MIPENZ Gisborne District Council, P.O. Box 747, Gisborne 15/ 12175 Tweeddale Kenneth Alan BE (CIVIL) MIPENZ 136 Onslow Road, Wellington 23/07171 Twiname Roger James BE(CIVIL) 123 Parau Street, Mount Eden, Auckland 17/ 10/89 Twinn John Robert MIERE MIPENZ Care of Oliver, Hey Road RD 6, West Melton, Christchurch 25/ 11170 Twomey Peter Brian BE(HONS)(CIVIL) 31B Waimarie Street, St Heliers, Auckland 5 20112/88 Tylee Michael Palmer BE(ELECT) 30 George Street, Napier 05/05/88 Tyler David Ivan MIPENZ P.O. Box 66-024, Beachhaven, Auckland 10 05/05/69 Tyndall Arthur Edward BE MIPENZ P.O. Box 13-117, Christchurch 03/04/62 Underhill Michael Charles BE MCOM(HONS) MIPENZ Hutt Valley Energy Board, Private Bag, Lower Hutt 13/08175 Underwood Brian Howard BE FlPENZ Murray-North Ltd., P.O. Box 821, Auckland 17112165 Undrill David Nicholas BE MIPENZ 18 Hathaway Avenue, Lower Hutt 25/06/68 Upritchard Graeme John BE CENG MIMECHE MIPENZ Powell Fenwick Consultants Ltd.
    [Show full text]
  • Upper Hutt Local Services STANDARD & TARGETED LOCAL BUS ROUTES
    Effective from 25 October 2020 Upper Hutt Local services STANDARD & TARGETED LOCAL BUS ROUTES 111 112 114 115 113 Te Marua Totara Park Upper Hutt Riverstone Terraces Thanks for travelling with Metlink. Trentham Connect with Metlink for timetables Silverstream and information about bus, train and ferry services in the Wellington region. Pinehaven metlink.org.nz 0800 801 700 [email protected] Printed with mineral-oil-free, soy-based vegetable inks on paper produced using Forestry Stewardship Council® (FSC®) certified mixed-source pulp that complies with environmentally responsible practices and principles. Please recycle and reuse if possible. Before taking a printed timetable, check our timetables online or use the Metlink commuter app. GW/PT-G-20/50 October 2020 October GW/PT-G-20/50 THE PLATEAU FARE UPPER HUTT PARKDALE ZONE TE MARUA 112 State Highway 2 between 112 Emerald Hill and Te Marua 112 orth d N MOUNT MARUA oa R in BROWN Ma TOTARA PARK OWL TIMBERLEA Cannon Point Walkway Dr rnia ive lifo Ca 111 TIMBERLEA Kirton Dr TULSA PARK MAORIBANK Mo o 113 sman C Totara Park Road n in r s K h y RIVERSTONE TOTARA PARK in c e r H e 111 P TERRACES il RIVERSTONE SHOPS l Rd MAYMORN TERRACES River Kirton Dr Hutt River Road 112 M Gibbons St o o n Riverstone Drive s h in 111 e 113 Whakatiki St H Golders Rd i l l Fraser Cres R d River Rd 114 Kirton Dr MANGAROA Longfellow Street KINGSLEY 113 ROYAL STREET 111 Moonshine Rd 114 112 HEIGHTS Milton St UPPER HUTT 113 COLLEGE Thackeray Street 113 115 UPPER HUTT Martin Street STATION 111 112 113 114 115 Merton
    [Show full text]
  • On the Day Results 2020 Entrants
    2020 Upper Valley Primary Schools XC Championships Year 3 & Under Girls Year Name School Place 3 Zoe Tebbutt Silverstream 1 3 Skylar Fourt-wells St Joseph's 2 2 Taylah Nightingale Upper Hutt 3 3 Hannah Burns Silverstream 4 2 Faith Hilton Pinehaven 5 3 Lutzie Zandi Pinehaven 6 3 Jessica Hall Silverstream 7 2 Morgan Maia Pinehaven 8 3 Ivy-Jade Brickell Birchville 9 2 Maia Henderson Oxford Crescent 10 2 Skylah Priday Pinehaven 11 2 Molly Chard St Brendans 12 2 Georgia Kingsbeer Oxford Crescent 13 3 Scarlett Lister Oxford Crescent 14 2 Ashley Poeira Mangaroa 15 2 Frankie McGlinchey Pinehaven 16 2 Georgia Campbell Trentham 17 3 Ella Morgan Mangaroa 18 3 Serena Elvin St Joseph's 19 3 Indey Watkins St Joseph's 20 3 Iza Muringathery St Brendans 21 3 Chloe Optis Pinehaven 22 3 Madeline Wilson Plateau 23 2 Amelia Barry Pinehaven 24 3 Lynette Treviranus-Tuiletufuga Fraser Crescent 25 2 Miley Marlow Totara Park 26 3 Lucinda Freeman St Brendans 27 2 Rian Priestly Upper Hutt 28 3 Morgan Kruger Trentham 29 3 Tahliya Dinnan Pinehaven 30 3 Giavani September Upper Hutt 31 3 Mabel Coghlan-Wechter Pinehaven 32 2 Emma Reid Birchville 33 3 Caitlin Baird Birchville 34 1 Millie Flutey Trentham 35 2 Paige Duncan Oxford Crescent 36 3 Vaidehi sandhu Upper Hutt 37 2 Alice Pickering Pinehaven 38 2 Minay van der Lith Pinehaven 39 2 Aria Chartly Plateau 40 2 Chloe Bailey Birchville 41 2 Lara D’Shea Pinehaven 42 3 Jaine Rose Jithin St Brendans 43 1 Elizabeth Skelton Trentham 44 1 Emily Whiteside Oxford Crescent 45 3 Isabella Malcolm Trentham 46 1 Mia Alcock Trentham
    [Show full text]
  • Floodplain Management Plan Implementation: Annual Progress Report to June 2016 1
    Report 16.397 Date 16 August 2016 File CCAB-10-188 Committee Environment Committee Author Alistair Allan, Team Leader, FMP Implementation Floodplain Management Plan Implementation: Annual Progress Report to June 2016 1. Purpose To advise the Environment Committee of progress made to June 2016, in implementing the Hutt, Otaki and Waikanae Floodplain Management Plans, and the Lower Wairarapa Valley Development Scheme (LWVDS) upgrade. 2. Background This is the fourteenth annual report on the implementation of the Western Floodplain Management Plans and the ninth annual report on the Wairarapa capital works. 2.1 Western Floodplain Management Plans The Hutt, Otaki and Waikanae Floodplain Management Plans (western FMPs) were completed in 2001, 1998 and 1997 respectively. They recommend structural, non-structural and environmental measures to reduce the flood risk to the respective floodplains and improve the environment. Greater Wellington Regional Council (GWRC) has adopted a 40-year time frame to fully implement the three FMPs. Implementation of the FMPs commenced in 2000 and $55 million has been spent up to the end of June 2016. The Flood Protection Department’s 2015-2025 Operating Plan (the Plan) provides a further $82 million for implementing the three FMPs. 2.2 Pinehaven FMP The FMP development for the Pinehaven Stream was completed in June 2016. The total estimated cost of the FMP works is $10 million and the implementation is now programmed to commence in 2016/17. This is a joint GWRC/Upper Hutt City Council (UHCC) project with UHCC leading the implementation. GWRC will fund 50% of these works through the normal General and Targeted rates and UHCC will fund the other 50% through their own rates.
    [Show full text]