Newsletter 2019 Winter

Total Page:16

File Type:pdf, Size:1020Kb

Newsletter 2019 Winter WENDOVER ARM NEWS Newsletter of the Wendover Arm Trust 2019 Issue 3 Winter 2019 Wendover Arm News, 201 Contents Chairman’s Report 4 Balsam Bash 12 AGM 5 Work Party Schedules 13 Operations Report 6 Family Camp 14 Tidy Friday 10 The Last Cargo by Water from 16 Heygates Mill? Membership/ 11 100 Club Your contacts on the Trust Chairman Chris Sargeant Sales Director Bob Wheal [email protected] [email protected] Leanda Vice-Chairman Webmaster Clive Johnson Richardson [email protected] [email protected] Minutes Secretary and Hon. Secretary John Rowe Jenny Brice IWA Nominee [email protected] [email protected] Treasurer Clive Wilson Newsletter Editor Carol Williams [email protected] [email protected] Operations Director Tony Bardwell Purchasing Director Peter Lockett [email protected] [email protected] Publicity Director Nigel Williams Social Media Director Ben Grinsted [email protected] [email protected] Membership Leanda Katherine Deaney Fundraising Director Secretary Richardson [email protected] [email protected] Page 2 Wendover Arm News, Winter 2019 Trust Vacancies - Urgent Membership Secretary This entails maintaining and updating the database and records. Also receiving subscriptions. This can be done from your own home in just a few hours a week. Full training and handover will be given. Please contact Katherine Deaney for more information: [email protected] Council members 2019-20 Chris Sargeant – Chairman Leanda Richardson – Vice Chair & Fundraising Clive Wilson – Treasurer Tony Bardwell – Operations Director John Rowe – Honorary Secretary Katherine Deaney – Membership Bob Wheal – Sales Peter Lockett – Purchasing Clive Johnson – Website Carol Williams – Newsletter Nigel William - Publicity Ben Grinsted – IT and Social Media Jenny Brice – IWA Nominee & Minutes Secretary Page 3 Wendover Arm News, Winter 2019 Chairman’s Column Its been a busy time down at the canal - Grateful thanks restoration has now reached bridge 4 to Alex Melson and plans for canal bed works to of WRG and complete Whitehouses are now agreed our own Jenny with CRT ready for work to take place Brice for next spring once ground conditions are organizing. favourable, Everyone had a fabulous Works to preserve the old swing bridge time. abutments by bridge 4 and to build stop plank grooves are also agreed right down to the colour of the bricks and I now need to ask for your help – we will start immediately. still urgently need a new Membership Secretary to take over from Katherine Huge thanks to Tony Bardwell and our who has done a magnificent job for the volunteers for all that is being achieved last ten years – frankly we cannot run and to Mikk Bradley and CRT for the trust without this position so do getting plans completed. please help us. The role can be done from home and needs just basic We are mindful of our responsibilities computer skills and requires just a few to protect and develop the hours per week. environment and natural habitats along the arm. Katherine will be pleased to give more details so please do get in touch at To this end for example the offside [email protected] bank area including Whitehouses visitor or ring 0757 181 857. area and along to bridge 4 is being developed as a nature area for visitors Thank you to enjoy with over 120 new trees due to be planted in November. Clearance and landscaping is largely done with levelling and application of top soil completed. Chris Sargeant, Chairman A family camp took place at the end of October in conjunction with WRG Email: when youngsters enthusiastically got [email protected] involved with making and installing Mobile: 07547 181 857 bird & insect boxes, planting 2000 snow drops and cutting up branches for a bonfire – not an iPad in sight ! Page 4 Wendover Arm News, Winter 2019 WAT AGM Oct 30th 2019 Our AGM on Wednesday afternoon restoration. Following a unanimous October 30th attracted possibly a record vote in Council, Roger was given the attendance with over 70 packed in to title of Honorary Vice President in the Anthony Hall in Aston Clinton. recognition of his service. The full report and accounts can be viewed on our website at Roger’s greatest achievement was the re www.wendoverarmttrust.co.uk -building of Little Tring bridge without which the canal would have been This was our 30th AGM, the Trust forever severed and restoration having been founded in 1989 impossible. superseding the earlier Wendover Arm Group. In a second ceremony Dave Chapman, Chairman IWA Chiltern and now an We were pleased to welcome Sam IWA Trustee presented Roger with the Anderson Brown, CRT’s Partnership Christopher Power Prize recognizing his and external relations manager who outstanding contribution to the spoke about their recent reorganisation restoration, and moves towards making waterways a “well being charity”, providing added value and public benefit to a much wider community outside of boaters and waterway users. Sam commended our support and enthusiasm. As part of the award the Trust also received a cash donation for which we are grateful to IWA. During the afternoon we were pleased to honour Roger Leishman who retired from the role of Restoration Director at the end of the financial year aged 87 Chris Sargeant, Chairman having devoted over 20 years to the Page 5 Wendover Arm News, Winter 2019 Operations Report - October 2019 Health and Safety We had two incidents this month that I witnessed. The first was a “near miss” involving solid concrete blocks falling whilst we were unloading them from a dumper bucket. This process has also been identified as a working at height hazard and we need to change how we do this. It is possible to have “crash mats” around the working area to cushion any persons falling but the amount of mud in the work area would soon cover them plus they would be another thing to walk round when carrying a block. Any further ideas on transporting and unloading blocks would be welcomed. We do load the blocks onto the transport using a hydraulic grab on an excavator. Once they are in the transport the blocks generally move and are no longer in neat piles that a grab can lift. The second incident was a simple cement splash into an eye when using the concrete poker. No lasting harm done. This should serve as a reminder to all volunteers that we do have new safety glasses and appropriate face masks in the Green Hut. We can’t make you wear them, but the Team Leaders may ask you not to perform various tasks unless you are wearing the correct safety equipment. Construction (Design and Management) 2015 I am pleased to announce that WAT have been issued with a Certificate of Appointment that makes the Trust a “Principal Contractor”. The certificate covers the whole of the restoration activity for a financial year. The Canal and River Trust has appointed itself as the “Client” for the restoration activity. Without going into a lot of detail, this brings both WAT and CRT in line with the Legislation relating to the restoration work that we do. We have had several of our volunteers attend CDM training courses provided by CRT, and we are grateful to them for spending their time to train on our behalf. The more people we have trained (even to a rudimentary level) the better WAT will be at understanding its responsibilities and required actions. This is about keeping our members and volunteers safe on the worksite and being seen to do so. Page 6 Wendover Arm News, Winter 2019 Pumping out It has been raining! There was water in front of the mooring bay wall. First job on Friday was to pump it out. This took most of the day but whilst that was going on three more Bentomat bank mats were cut and the bank vegetation from the length between bridge 4 and Little Tring was further cleared. The rain did do some good as well! This is the view from the mooring wall looking towards Whitehouses. Apparently, there was a third “incident” when Peter Bird’s phone was found underwater. This picture survived from his wet phone but a new (waterproofed?) phone has been purchased. During the rest of the week the last part of the mooring wall blocking was completed (with reinforced concrete strip beam) , the last part of the offside bank was hollow blocked, concreted and solid blocked and then the join between the bank and mooring wall was finished off with a concrete infill. Last part of Mooring wall, Bentomat being tailored to fit (Photo Tony Borrill) The last part of the concrete join infill. (not much more to do Peter!) Page 7 Wendover Arm News, Winter 2019 After all that excitement we carried on with uncovering the bed Bentomat that was already in the bed from some months ago and starting a new roll with a concrete policeman. This area was backfilled with spoil, the mat gradually unrolled more and so on. At this point we were able to backfill the offside bank with spoil. The backfilling frame being moved to the next section. Early morning sun not helping! (Photo Tony Borrill) Shortly after that was completed, another 40m Bentomat roll was brought to the work site and connected to the existing bed mat. This mat join coincided with the start of the mooring wall blockwork so was an ideal point to make our first reinforced concrete policeman. The bank formwork was used to hold the side planks at 45 degrees. Note the three reinforcing rods. As can be seen in the picture, we were able to cut two planks to fit between the bank blocks and support them with the formwork we generally use on the bank hollow block concreting.
Recommended publications
  • South West Hertfordshire Level 1 Strategic Flood Risk Assessment
    South West Hertfordshire Level 1 Strategic Flood Risk Assessment Final Report March 2019 www.jbaconsulting.com SWH Strategic Flood Risk Assessment Stage 1 i Fiona Hartland 8A Castle Street Wallingford Oxfordshire OX10 8DL Revision history Revision Amendments Issued to Ref/Date 2018s0161 SW Draft Report Three Rivers Hertfordshire District Council L1 SFRA v1.0 / Dacorum Borough 27/03/2018 Council St. Albans City and District Council Watford Borough Council Hertfordshire County Council Thames Water Canal and River Trust 2018s0161 SW Draft Report –DBC, SADC, Environment Hertfordshire TDC, WBC, CRT comments Agency L1 SFRA v2.0 / incorporated 20/03/2018 2018s0161 SW Final Draft Report – HCC Three Rivers Hertfordshire comments incorporated. District Council L1 SFRA v3.0 / Dacorum Borough 02/05/2018 Council St. Albans City and District Council Watford Borough Council Hertfordshire County Council Canal and River Trust 2018s0161 SW Final Report – Cumulative Three Rivers Hertfordshire Impacts Assessment District Council L1 SFRA v4.0 / (incorporating comments SWH Strategic Flood Risk Assessment Stage 1 i Revision Amendments Issued to Ref/Date from HCC and EA) and Dacorum Borough London Colney model Council outputs included St. Albans City and District Council Watford Borough Council Contract This report describes work commissioned by Claire May, on behalf of Three Rivers District Council, by an email dated 31 January 2018. Nathan Chapman, Emily Jones and Fiona Hartland of JBA Consulting carried out this work. Prepared by .............................
    [Show full text]
  • Neolithic to Early Bronze Age Buckinghamshire: a Resource Assessment
    Neolithic to Early Bronze Age Buckinghamshire: a resource assessment Inheritance Mobility Although Neolithic populations are thought to have had continued mobility, more and more evidence for Neolithic settlement has come to light. In Buckinghamshire the most important evidence comes from excavations in advance of the construction of Eton Rowing Course (ERC) and the Maidenhead to Windsor and Eton Flood Alleviation Scheme (MWEFAS), mainly in the parish of Dorney in South Bucks on the Thames. The evidence points to intensive use of the area by people in the Early Neolithic but it is not certain that it represents year-round sedentary occupation rather than seasonal re-use (Allen et al 2004). Other evidence does point to continued mobility, such as the artefact scatters at Scotsgrove Mill, Haddenham (Mitchell 2004) and East Street, Chesham (Collard 1990) for example, reflecting visits over a long period of time. Persistent places Mesolithic persistent places continue to have meaning for Early and later Neolithic populations. These persistent places include East Street, Chesham (Collard 1990, 18) and Late Neolithic to Early Bronze Age activity at Chessvale Bowling Club nearby (Halsted 2006, 23-8). Another persistent place seems to have been the lower reaches of the River Colne. Recent excavations at the Sanderson Site, Denham (Halsey 2005) continued the activity from nearby Three Ways Wharf, Uxbridge (Lewis 1991). Other persistent places include the attractive river valley location at Bancroft in Milton Keynes (Williams 1993, 5), and Scotsgrove Mill, Haddenham, where the River Thame meets one of its tributaries (Mitchell 2004, 1). These persistent places may have been the basis of evolving ideas about land tenure.
    [Show full text]
  • Thame Valley Viaduct Engagement Event
    24/7 Freephone Community Helpline 08081 434 434 Thame Valley Viaduct Engagement Event February 2020 1MC06-CEK-IN-PRE-CS04_CL19-000001 1 2 24/7 Freephone Community Helpline 08081 434 434 Introduction High Speed Two (HS2) is the new high speed railway for Britain. Welcome to the HS2 and Eiffage Kier engagement event for the design of the Thame Valley Viaduct. This structure is known as a ‘key design element’, and in this booklet we will share our current designs with you to keep you informed of progress. HS2 – Our part in the bigger picture Who is Eiffage Kier? HS2 is a new high speed railway that will form the Eiffage Kier is a Joint Venture between the two major backbone of Britain’s transport network. It will civil engineering and construction companies, Eiffage connect eight of Britain’s ten largest cities and their and Kier. regions. Faster, easier and more reliable travel will Eiffage is a French civil engineering company that put more opportunities within reach for millions of employs over 70,400 people worldwide, with large people for work, business and leisure. scale projects across the globe including Canada, By increasing rail capacity, HS2 will free up space South Africa, Japan, and across Europe. Kier, the on existing lines for more commuter, regional and second largest construction company in the UK, freight services. This will relieve overcrowding has 90 years of experience in a range of specialities and improve reliability for millions of people using including infrastructure and civil engineering, Britain’s railways. housebuilding and land development. Read more about HS2 at www.hs2.org.uk Both partners bring specialist expertise in the design, Eiffage Kier is proud to have been appointed by construction, operation, financing and maintenance HS2 Ltd to deliver an 80km section of the new high of railway networks, including the construction of one speed rail link between the Chiltern Tunnel and Long of Europe’s latest high speed rail projects.
    [Show full text]
  • Haddenham to Aylesbury (Via Gibraltar and Ford)
    Haddenham to Aylesbury (via Gibraltar and Ford) 1st walk check 2nd walk check 3rd walk check 26th October 2013 25th March 2016 18th August 2021 Current status Document last updated Thursday, 19th August 2021 This document and information herein are copyrighted to Saturday Walkers’ Club. If you are interested in printing or displaying any of this material, Saturday Walkers’ Club grants permission to use, copy, and distribute this document delivered from this World Wide Web server with the following conditions: • The document will not be edited or abridged, and the material will be produced exactly as it appears. Modification of the material or use of it for any other purpose is a violation of our copyright and other proprietary rights. • Reproduction of this document is for free distribution and will not be sold. • This permission is granted for a one-time distribution. • All copies, links, or pages of the documents must carry the following copyright notice and this permission notice: Saturday Walkers’ Club, Copyright © 2013-2021, used with permission. All rights reserved. www.walkingclub.org.uk This walk has been checked as noted above, however the publisher cannot accept responsibility for any problems encountered by readers. Haddenham to Aylesbury (via Gibraltar and Ford) Start: Haddenham & Thame Parkway station Finish: Aylesbury station Haddenham & Thame Parkway station, map reference SP 731 085, is 10 km south west of Aylesbury, 22km east of Oxford, and 81m above sea level. Aylesbury Station, map reference SP 817 134, is 78m above sea level. Both are in Buckinghamshire. Length: 23.4 km (14.6 mi), of which 5.8 km (3.6 mi) on roads or pavements.
    [Show full text]
  • Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013
    PHASE ONE DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report 10 | Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013 ENGINE FOR GROWTH DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report ENGINE FOR GROWTH 10 I Dunsmore, Wendover and Halton High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place, London SW1E 5DU Telephone 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk © Crown copyright, 2013, except where otherwise stated Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. To order further copies contact: DfT Publications Tel: 0300 123 1102 Web: www.dft.gov.uk/orderingpublications Product code: ES/10 Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Dunsmore, Wendover and Halton/No 10 I Contents Contents Draft Volume 2: Community Forum Area Report – Dunsmore, Wendover and Halton/No 10 5 Structure of the HS2 draft Environmental Statement 5 Part A: Introduction 6 1 Introduction 7 1.1 Introduction to HS2
    [Show full text]
  • Late Medieval Buckinghamshire
    SOLENT THAMES HISTORIC ENVIRONMENT RESEARCH FRAMEWORK RESOURCE ASSESSMENT MEDIEVAL BUCKINGHAMSHIRE (AD 1066 - 1540) Kim Taylor-Moore with contributions by Chris Dyer July 2007 1. Inheritance Domesday Book shows that by 1086 the social and economic frameworks that underlay much of medieval England were already largely in place. The great Anglo Saxon estates had fragmented into the more compact units of the manorial system and smaller parishes had probably formed out of the large parochia of the minster churches. The Norman Conquest had resulted in the almost complete replacement of the Anglo Saxon aristocracy with one of Norman origin but the social structure remained that of an aristocratic elite supported by the labours of the peasantry. Open-field farming, and probably the nucleated villages usually associated with it, had become the norm over large parts of the country, including much of the northern part of Buckinghamshire, the most heavily populated part of the county. The Chilterns and the south of the county remained for the most part areas of dispersed settlement. The county of Buckinghamshire seems to have been an entirely artificial creation with its borders reflecting no known earlier tribal or political boundaries. It had come into existence by the beginning of the eleventh century when it was defined as the area providing support to the burh at Buckingham, one of a chain of such burhs built to defend Wessex from Viking attack (Blair 1994, 102-5). Buckingham lay in the far north of the newly created county and the disadvantages associated with this position quickly became apparent as its strategic importance declined.
    [Show full text]
  • Aylesbury Vale Parkway to Aylesbury (Full Walk) Aylesbury Vale Parkway to Aylesbury (Short Walk)
    Aylesbury Vale Parkway to Aylesbury (Full Walk) Aylesbury Vale Parkway to Aylesbury (Short Walk) 1st walk check 2nd walk check 3rd walk check 1st walk check 2nd walk check 3rd walk check 11th August 2013 2nd October 2016 8th July 2021 22nd Febr. 2015 Current status Document last updated Friday, 09th July 2021 This document and information herein are copyrighted to Saturday Walkers’ Club. If you are interested in printing or displaying any of this material, Saturday Walkers’ Club grants permission to use, copy, and distribute this document delivered from this World Wide Web server with the following conditions: • The document will not be edited or abridged, and the material will be produced exactly as it appears. Modification of the material or use of it for any other purpose is a violation of our copyright and other proprietary rights. • Reproduction of this document is for free distribution and will not be sold. • This permission is granted for a one-time distribution. • All copies, links, or pages of the documents must carry the following copyright notice and this permission notice: Saturday Walkers’ Club, Copyright © 2013-2021, used with permission. All rights reserved. www.walkingclub.org.uk This walk has been checked as noted above, however the publisher cannot accept responsibility for any problems encountered by readers. Aylesbury Vale Parkway to Aylesbury Start: Aylesbury Vale Parkway Station Finish: Aylesbury Station Aylesbury Vale Parkway station, map reference SP 786 153, is 3.6 km northwest of Aylesbury and 75m above sea level. Aylesbury Station, map reference SP 817 134, is 76m above sea level.
    [Show full text]
  • The Cotswolds Berkshire Downs North Wessex Downs
    THE THAMES THROUGH TIME The Archaeology of the Gravel Terraces of the Upper and Middle Thames: The Thames Valley in the Medieval and Post-Medieval Periods AD 1000-2000 River Evenlode River Glyme River Cherwell The Cotswolds River Ray River Windrush River Churn Eynsham River Leach " River Thame River Coln " OXFORD Chilterns FAIRFORD " CIRENCESTER " River Chess " LECHLADE e ABINGDON" River Misbourn " DORCHESTER " River Ock R River Wye CRICKLADE i v e r e T River Lea or Le h a m e s River Ray WALLINGFORD Marlow " Cookham " Colne Brook Henley-on-Thames " MAIDENHEAD LONDON " " " Goring mes Berkshire Downs ETON Tha " r River Lambourn e v " i R WINDSOR " River Pang READING " STAINES River Kennet " KINGSTON UPON THAMES " River Loddon CHERTSEY River Mole River Hart Blackwater River North Wessex Downs North Downs Guildford " River Wey 0 20 km Figure 1: The Thames Valley and surrounding region showing topography, rivers and main historic settlements (map courtesy of the British Geological Survey) THE THAMES THROUGH TIME The Archaeology of the Gravel Terraces of the Upper and Middle Thames: The Thames Valley in the Medieval and Post-Medieval Periods AD 1000-2000 Figure 2: 14th-century watermill and eel trap from the Luttrell Psalter (©British Library) THE THAMES THROUGH TIME The Archaeology of the Gravel Terraces of the Upper and Middle Thames: The Thames Valley in the Medieval and Post-Medieval Periods AD 1000-2000 Figure 3: The London Stone, Staines, Surrey (©Historic England) THE THAMES THROUGH TIME The Archaeology of the Gravel Terraces of the Upper and Middle Thames: The Thames Valley in the Medieval and Post-Medieval Periods AD 1000-2000 Figure 4: Abbey Mills, Chertsey, Surrey, c 1870 (©Historic England) THE THAMES THROUGH TIME The Archaeology of the Gravel Terraces of the Upper and Middle Thames: The Thames Valley in the Medieval and Post-Medieval Periods AD 1000-2000 Figure 5: Artist’s impression of Blackfriars ship 3 (after Marsden 1996, 88, fig.
    [Show full text]
  • The Hurst and Old Bridge Meadow: a History of Two Water Meadows in Dorchester-On-Thames, Oxfordshire
    The Hurst and Old Bridge Meadow: A history of two water meadows in Dorchester-on-Thames, Oxfordshire Karen Selway Richards BA (Hons), MSt Oxon, MSc Oxon Landscape Historian Published by the Hurst Water Meadow Trust 2011 Contents Acknowledgements ................................................................................................................ ii The History of the Hurst Water Meadow ............................................................................. 1 1. Introduction – location and geology .......................................................................... 1 2. Early history ............................................................................................................... 5 3. Medieval history ........................................................................................................ 8 4. The Hurst after the Dissolution ................................................................................ 18 5. Agricultural activities on the Hurst, 12th–19th centuries ....................................... 19 6. Families associated with Overy and the Hurst ........................................................ 25 7. The 19th century ...................................................................................................... 27 8. The 20th century ...................................................................................................... 30 9. The Hurst Water Meadow Trust .............................................................................. 31 Old Bridge
    [Show full text]
  • Thebigg Issue
    www.dinton.org www.dintonwithfor dandupton.org THE BIGG ISSUE PARISH NEWSLETTER OF DINTON with FORD & UPTON PARISH COUNCIL CHRISTMAS ISSUE 2014 Merry IN THIS ISSUE: Christmas Carol Singing & Wind Turbine Happy New Year Dinton Village Hall Parish Fete Cuddington Tennis Club Broadband Update Patient Group Dinton Carol Singing Christmas Eve School News Join us for Carol singing around the village for approximately one hour on Christmas Eve. Meet outside the Seven Stars Pub at 6pm. Wrap up Cricket Club News warmly and bring a torch with you. (All children welcome but must be accompanied by an adult). Mulled wine and mince pies afterwards in pub. Library News All proceeds will go to the Florence Nightingale Hospice. Volunteers needed for collections.– please contact Trevor or Sara on 748055. Fundraising Event News, News, News Wind Turbine Appeal Public Inquiry The date for the inquiry to start is Tuesday 13th January, 2015 lasting up to 6 days. It will be held at Aylesbury Vale District Council offices in The Gateway, Gatehouse Road, Aylesbury. We would encourage a good attendance from parishioners to demonstrate the level of our opposition to the planned wind turbine at Ford. Should you wish to speak at the inquiry please could you let the Parish Council know by contacting Cllr Martin Usherwood on 01296 748129. Merry Christmas School News September 2014 The autumn and winter term at Cuddington and Dinton School has been busier than ever with so much going on for both infants and juniors. Mrs Price has been absent for a few weeks undergoing significant surgery but she has started a phased return to work and has already dropped in on a number of occasions.
    [Show full text]
  • Water for Life and Livelihoods Part 1: Thames River Basin District River Basin Management Plan
    Water for life and livelihoods Part 1: Thames river basin district River basin management plan Updated: December 2015 LIT 10319 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife. We operate at the place where environmental change has its greatest impact on people’s lives. We reduce the risks to people and properties from flooding; make sure there is enough water for people and wildlife; protect and improve air, land and water quality and apply the environmental standards within which industry can operate. Acting to reduce climate change and helping people and wildlife adapt to its consequences are at the heart of all that we do. We cannot do this alone. We work closely with a wide range of partners including government, business, local councils, other agencies, civil society groups and the communities we serve. Contacts For more details about river basin management plans contact: Caroline Douglass, Area Manager Email: [email protected] You can also call the National Customer Contact Centre: Thames River Basin Management Plan Bradmarsh Business Park, PO Box 544 Rotherham, S60 1BY 03708 506506 (local rate) Monday to Friday 8am to 6pm Published by: Further copies of this report are available Environment Agency on the river basin management plan web pages Horizon House https://www.gov.uk/government/collections/river- Deanery Road ( Bristol basin-management-plans-2015). BS1 5AH and via our National Customer Contact Centre: www.gov.uk/environment-agency T: 03708 506506 Email: [email protected]. © Environment Agency 2016 All rights reserved.
    [Show full text]
  • 5.11 Thame Valley
    Aylesbury Vale District Council & Buckinghamshire County Council Aylesbury Vale Landscape Character Assessment LCA 5.11 Thame Valley Landscape Character Type: LCT 5 Shallow Valleys B0404200/LAND/01 Aylesbury Vale District Council & Buckinghamshire County Council Aylesbury Vale Landscape Character Assessment LCA 5.11 Thame Valley (LCT 5) Key Characteristics Location The Thame Valley is a narrow valley to the west of Aylesbury, divided from the town by LCA 9.4 Waddesdon-Eythrope. It runs roughly Shallow valley from northeast to southwest. landform Meandering river Landscape character This is a small river valley with gently sloping Meadows ground where the landscape is contained by the surrounding higher ground Predominantly pastoral of ridges. The landscape is predominantly pastoral with a scattering of small woodlands. There are some areas of prairie farming on the edges of the Low density of th woodland cover area but the historic pre 18 century landscape pattern has been retained in Small scattered most of the area and the meadows adjacent to the river are of particular woodlands note. The area of greatest visual appeal is generally close to the meandering river Distinctive Features where the bank side vegetation, historic buildings such as mills and bridges, and a range of habitats create a rich and lively landscape. Mature pollarded Pollarded willows willows are a consistent landscape feature along most of the river. Away adjacent to the Thame from the river the landscape quality is more varied. th Pre 18 century The villages which border the area have retained the link between the meadows adjacent to historic settlement and the river valley.
    [Show full text]