The title of Environmental Impact Assessment (EIA) report for this project is “The Proposed 609.14 Hectares (1505.21 Acres) Oil Palm Plantation at Felcra Berhad , Bekok, District of , by FELCRA Berhad ”. FELCRA Berhad is land owner of 609.14 hectares (1505.21 acres) at Mukim Bekok, , Johor. In March 2010, FELCRA Berhad noticed the potential of Mukim Bekok in the Segamat District, Johor and proposed to develop the area via oil palm plantation. In order to proceed with the implementation, FELCRA Plantation Services Sdn Bhd is appointed as a subsidiary company of FELCRA Berhad, will then represent FELCRA Berhad to prepare any requirement by the authority in order to develop and manage the land for oil palm plantation purpose.

Project Description

The Proposed Project covers an oil palm plantation area of about 609.14 hectares (1505.21 acres) at FELCRA Berhad Bekok, Mukim Bekok, District of Segamat, Johor. The land is owned by FELCRA Berhad. This Proposed Project area will divide into two (2) stages during estate development phase, which is the Stage 1 for Plantation 1 and Stage 2 for Plantation 2. The oil palm plantation implementation schedule of the proposed project includes three (3) phases – Estate Development Phase, Estate Maintenance Phase, and Production Phase. The project estimates to plant approximately 87,000 trees of oil palm in the proposed development area.

During Phase 1 – Estate Development Phase, boundary demarcation and positioning will be conducted, along with the construction of accessible roads, site facilities, drainage system and silt trap. Once the site is cleared and vegetation waste properly disposed, cover crop seeding and palm oil tress planting will be carried out. This phase is estimated to be completed in one (1) year. Proper waste management at the project site will be enforced and carried out throughout the whole estate development phase.

The next phase is Phase 2 – Estate Maintenance Phase, which is planned to be three (3) years long. Palm oil trees cares and dead trees replacement will be carried out throughout the 2 nd

ES-1 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary quarter and 4 th quarter in the first year of this phase. Fertilizing work will be done throughout the first year and every two quarters in the subsequent years. The soil will then be tested in the last quarter at the end of this phase. Throughout the three years, weed maintenance and waste management will be carried out.

The last phase is the Production Phase. Phase 3 is planned from the 5 th year to the 25 th year of the Proposed Project. Weed maintenance, soil testing and fertilizing will be done one month once a year, while waste management will be carried out every single month. The yield from the oil palm trees will continuously be collected and sold throughout this phase.

Project Proponent

Project Proponent : FELCRA Berhad Contact person : Mr. Mohd Nawawi Bin Wahab Designation : Pengurus Besar Perancang Projek Mailing address : Aras 2A, Wisma FELCRA, Lot 4780, Jalan Rejang, Taman Setapak Jaya, 50772 . Tel : 03 – 4145 5000 Fax : 03 – 4142 8162

Technical Consultant : FELCRA Plantation Services Sdn Bhd Contact person : Mr. Mohd Fairus Bin Mohamad Yusuf Designation : Ketua Unit Khidmat Runding Dan Kejuruteraan Pertanian Mailing address : B-02-04, Jalan 3/4C, Desa Melawati, Mukim Setapak, 53100 Kuala Lumpur. Tel : 03 – 41613320 Fax : 03 – 41425020

ES-2 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

EIA Consultant

EIA Consultant : Enviro Pioneer Solutions EIA Team Leader : Assoc. Prof. Ir. Dr. Mohd Fadhil Md Din Contact person : Ir. Benny Tan Cheah Hee Designation : Manager Mailing address : 26, Jalan Storey, 80300 , Johor H/P : 019 – 885 8502 Email : [email protected]

Project Location

The proposed project will be sited at:

FELCRA Berhad Bekok, Mukim Bekok, District of Segamat, Johor

The proposed project is located within Segamat District with centre coordinates of Latitude N 2° 15’ 57.97” and Longitude E 103° 9’ 49.22” . Figure 1 and Figure 2 show the key plan and location plan of the project site respectively. Some sensitive receptors that are within 5km radius from the proposed project location are shown in Figure 3. The Table 1 show the existing land use profile within 5 km radius from the proposed project site.

The proposed project location is within Mukim Bekok, Segamat District, Johor State. At an area of 785km 2, Mukim Bekok is the largest mukim in Segamat District, located at the eastern side of Segamat, next to Mukim and connected to Mukim . Bekok is well-known especially among nature lovers, since Bekok is the western entrance to Rompin National Park, as well as having a refreshing waterfall known as Sungai Bantang Waterfall. Besides the waterfall and the entrance to the largest state park in Johor, Bekok also houses several aborigine settlements, such as Kampung Kudong and Kampung Kemidak. Mukim Bekok is considered as one of the remote towns in Johor, located roughly about 10km from the junction of the Federal Route 1 and later accessible via railway.

ES-3 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Figure 1 : Key plan of the proposed project site

ES-4 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Stage 1 (Plantation 1)

Stage 2 (Plantation 2)

Figure 2 : Location plan of the proposed project site

ES-5 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEE R SOLUTIONS Executive Summary

P1 N 2°17'8.80" E 103°10'5.73" P1 P2 N 2°16'11.93" E 103°8'42.03"

P3 N 2°15'50.12" E 103°8'50.88"

P4 N 2°15'47.19" E 103°9'25.05" Stage 1 (Plantation 1) P5 N 2°16'8.36" E 103°9'26.89" P7 P6 N 2°16'7.75" P2 E 103°9'33.35" P5 P6 P8 P7 N 2°16'11.04" E 103°9'33.65"

P3 P8 N 2°16'7.24" P4 E 103°10'17.15" P9 N 2°15'32.59" E 103°10'14.13" PROPOSED PROJECT SITE P9 P10 N 2°15'32.33" Stage 2 P10 E 103°10'17.36" (Plantation 2) P13 P11 N 2°14'54.28" E 103°10'14.07"

P12 N 2°14'52.62" E 103°10'28.79" P11 P12 P13 N 2°15'22.37" E 103°10'59.89"

Figure 3: Landsat satellite image showing the location of the proposed project site Source: Google Earth (31 January 2018)

ES-6 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Existing Landuse

The proposed project was deforested since of 31 st December 2016 and has been gazette to the agriculture activity. The existing landuse of the proposed project site consists a major portion of bushes and only small portion of small-sized trees as shown in Figure 4 due to the deforestation in the past years and left over. Figure 5 shows another typical view of the proposed project site bordering Sime Darby’s oil palm and Labis Tengah Forest Reserve.

Figure 4 : A typical view at the proposed Figure 5 : Another typical view of the proposed project site i.e. dominated by bushes. project site with bushes (foreground) bordering Sime Darby’s oil palm (mid background, left) and Labis Tengah Forest Reserve (mid background, right and hills in the far background).

The another oil palm plantation within 5 km radius are Ladang Kelebang and Ladang Chan Wing. The only entities within 5 km radius from the proposed project site are Kampung Bekok and Kampung Sri Tembayan. The forest within 5 km radius from the proposed project site are Hutan Simpan , Hutan Simpan Labis and Hutan Lipur Sungai Bantang. Figure 6 shown the landuse map within 5km radius surrounding the proposed project site. Table 1 show the existing land use profile within 5 km radius from the proposed project site.

ES-7 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Kampung Sri Tembayan (3.2km)

Kampung Bekok (3.0km)

Proposed Project Site (Existing a major portion of 1km bushes and a small portion of small trees) 2km 3km 4km 5km

Ladang Kempas (Malaya) Ladang Gunung Mas (1.5km) Klebang (1.5km)

Figure 6: Land use map within 5km radius surrounding the proposed project site Source: Google Earth (4 th June 2018)

Table 1 : Existing land use profile within 5 km radius from the proposed project site Displacement Sector Direction Land Use Profile (km) North Ladang Tong Lee 0.50 West Railway 0.0 0 – 1 km East Hutan Rizab Labis - South Ladang Kempas (Malaya) Klebang 0.9 North Ladang Kempas 1.1

1 – 2 km North Ladang Gunung Emas 1.50 East Hutan Rizab Labis -

ES-8 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

West Plantation - South Ladang Kempas (Malaya) 1.0 North Ladang Tay Chor 2.7 North Ladang Hock Lee 2.5 Northwest Kampung Bekok 3.0 2 – 3 km East Hutan Rizab Labis - West Plantation - South Ladang Beradin 2.9 North Kampung Sri Tembayan 3.20 3 – 4 km North Hutan Lipur Sungai Bantang - North Hutan Lipur Sungai Bantang - East Ladang Timor 4.1 4 – 5 km Southeast Ladang New Paloh 4.3 Southeast Ladang Kepong (Malay) 4.5

ES-9 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

SUMMARY OF POTENTIAL IMPACTS AND MITIGATING MEASURES

Magnitude of Significant significant P2M2 Reference Page potential impacts potential impacts Estate Development Phases (Site preparation to land clearing and land preparation, crop introduction and planting)

Air Pollution – Less significant · All transportation vehicles should be prevented Refer in chapter 7 on section From earthwork -to nearest from leaving site unless tires cleaned of mud 7.2.1 of page C7-3 for residential area is · Excessive vehicle movements should be avoided environmental impact located 5km away · Vehicle speed should be limited on unsurfaced from the project site tracks during estate · During dry weather, project site especially exposed Refer in chapter 8 on section development phase soil area shall be sprayed with water to reduce the 8.1.1 of page C8-2 for dispersion of air borne PM or fugitive dust pollution prevention and · Site clearing activities should be carried out mitigation measures (P2M2) according to the suggestions and instructions mentioned in LD-P2M2. · Heavy-duty vehicles such as trucks should be covered with tarpaulin to prevent flying PM during dry and windy weather.

ES-10 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant significant Mitigation measure Reference Page potential impacts potential impacts

The noise pollution Less significant · the selection and u sage of low sound power levels Refer in chapter 7 on section from the machinery -to nearest residential equipment and machinery; 7.2.2 of page C7-7 for and vehicle noise to area is located 5km · the provision if necessary, and appropriate use of environmental impact the nearest away from the project sound attenuators, acoustic plenum, and other residential area site during estate acoustic filtering devices; Refer in chapter 8 on section development phase · the provision if necessary, and appropriate use of 8.1.2 of page C8-3 for pollution screening barriers (man-made, natural or otherwise); prevention and mitigation · the proper conduct and adequate supervision of measures (P2M2) operation; and · regular and efficient maintenance of equipment and machinery; · the local community should also be consulted on the times when the noise generating activities could be carried out.

Water pollution from Significant · Diver t ‘clean’ storm water around large pits Refer in chapter 7 on section the soil eroded by the -the impact during excavations 7.2.3 of page C7-8 for surface runoffs site clearing and site · Minimize area disturbed environmental impact preparation · Construct stream crossings at right angles · Minimize number of crossings Refer in chapter 8 on section · Avoid seasonally marshy areas 8.1.3 of page C8-7 for pollution prevention and mitigation · Avoid bulldozing soil into rivers measures (P2M2) · Install culverts or construct concrete drifts · Prevent fuel and oil spillage · Provide separate covered, animal-proof bins for refuse and hazardous waste disposal · Empty bins on a regular basis at an approved disposal site ’

ES-11 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant significant Mitigation measure Reference Page potential impacts potential impacts

Ecology impact Significant Forest and habitat loss Refer in chapter 7 on - the impact during To save some species in situ (within the original section 7.2.4 of page C7-33 site clearing and land habitat), it’s strongly recommended that a minimum of for environmental impact preparation 50-metre buffer on each sides of rivers is preserved. Refer in chapter 8 on Fauna loss and displacement section 8.1.4 of page C8-9 Employ knowledgeable and experienced environmental for pollution prevention or wildlife officer to look into this matter. and mitigation measures The site clearing should be heading towards the (P2M2) remaining forest and habitats in the surroundings i.e. towards the east where Labis Tengah Forest Reserve is present.

Illegal Wildlife Hunting and Collecting Strictly prohibit any workers and outsiders from hunting in any part of the project or the surrounding areas. The signboard content showing the regulations related to wildlife that should be signposted at the site. Any non-adherence by workers and outsiders must be notified to the authority namely DWNP @ Jabatan PERHILITAN.

Human-wildlife conflict · The appointed environmental or wildlife officer. · Setting up and installing not harmful deterrent.

ES-12 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant significant Mitigation measure Reference Page potential impacts potential impacts

Open burning and forest fire to fauna · Strictly no burning and any source that could cause spark and fire such as machines must be monitored. · Workers especially foreigners must be briefed before any work commence that st rictly no burning is allowed.

The new drainage Refer in chapter 7 on Hydrology and Significant The new drainage manual (MASMA2) specifically section 7.2.5 of page C7-44 Hydrogeology impact -the impact during mentioned that the post-plantation flow at the outlet for environmental impact must be equal to or less than the pre-plantation level. site clearing and The proposed detention ponds intend to bring down Refer in chapter 8 on land preparation the post-plantation flow to the pre-plantation level. The section 8.1.5 of page C8-14 proposed pond will be located within the proposed for pollution prevention plantation near the outlet of the project site. The pond and mitigation measures should provide temporary storage for the excess runoff during storm event. Ample space should be provided at (P2M2) the proposed community pond for future expansion of the pond whenever it is necessary in the event of the plantation of the upstream area in the future. Detention pond normally consists of storage area, inlet to the pond and outlet out of the pond. The proposed pond in the study area is a dry pond. -

ES-13 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant significant Mitigation measure Reference Page potential impacts potential impacts

The detention pond

The estimated stora ge volume required for the detention pond is 33000 cubic meter. Assuming that the shape of the pond is rectangular and the depth of the pond not exceeding 3.0 meter , the proposed size of the pond. Based on this required storage volume, the outlet for the pond is designed in order to develop the Storage Indication Curve. The outlets need to be design appropriately so that the discharge would meet the storm water control objective (less than pre-plantation discharge). The proposed outlet from the ponds should either consist of a culvert or an orifice to regulate the storm water flow up to 50 year ARI (major storm). The outlet should also consist of abroad crested weir to cater for rare storm of 100 years. The trial size of the outlets (culvert and broad creste d weir) and pond size were used initially in order to determine the appropriate size. Using these trial data, the flow routing for the community pond is modeled using HEC-HMS. After a few model trial runs, the selected size of the pond size and outlet dime nsions for various detention ponds is listed in Table 8.1.5.1( k) and Table 8.1.5.1(l). The adopted detention ponds storage volume is about 80% more than the initial estimate. The results of the routed flow through the catchments and detention ponds are shown in Table 8.1.5.1(m). The result also clearly shows that the post-plantation with pond outflow is less than the pre-plantation flow.

ES-14 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant significant Mitigation measure Reference Page potential impacts potential impacts The result through the proposed design of the community pond. This will help authorities control flooding downstream of the project area.

The percentage of peak flow reduction is 32 percent. The detention ponds should also be designed to be able to withstand rarer flood (100 year ARI). The designed flood detention pond should be capable of draining the 100 year ARI peak flow from the ponds with its emergency spillway. The result of 100 year ARI discharge from the detention ponds is shown in Table 8.1.5.1(n). The outflow from the detention ponds is slightly more than the pre-plantation level . It is important that the spillway is capable to drain the 100 years flood flow in order to prevent it from overtopping the detention pond. The maximum water level is slightly below the crest level but higher than the free board level (2.9 m).

Land-Disturbing Significant Refer in chapter 7 on Pollution Prevention The site development plan for mitigation as below: section 7.2.6 of page C7-55 and Mitigation –the impact during for environmental impact Temporary Drain Measures (LD-P2M2) site clearing and Temporary drain shall be provided to channel Refer in chapter 8 on land preparation surface runoff from Project site to section 8.1.6 of page C8-24 sediment basins and to channel the discharge of the for pollution prevention and treated surface runoff to the receiving stream.

ES-15 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant significant Mitigation measure Reference Page potential impacts potential impacts

Check Dam mitigation measures Check dam will be constructed within temporary drain (P2M2) at interval of 100 m or based on the slope drain.

Sediment Basin A sediment basin is a temporary containment area that will collect all runoff from project site and attenuate surface runoff as well as to settle the sediments out and released into the receiving stream. The last sediment basin is proposed to be located in the detention pond area where the discharge will be released into the receiving stream.

Silt Fence A silt fence is a temporary linear sediment barrier of permeable fabric designed to intercept and slow the flow of sediment-laden sheet flow runoff. Silt fence allow sediment to settle from runoff before water leaves the Planting site. In addition, silt fence could also reduce the water flow rate d own slope. Silt fences are normally placed at the following location:- i. Below the toe of exposed and erodible slopes ii. Down-slope of exposed soil areas iii. Around temporary stockpiles iv. Along streams and channels

ES-16 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant potential significant Mitigation measure Reference Page impacts potential impacts

Refer in chapter 7 on Waste management to Less significant Solid Wastes Management Waste removal schedule will be adjusted to the intensity section 7.2.7 of page C7-66 landfills -the impact in of development activity. Waste storage area should be for environmental impact short terms. designed and constructed to limit wind dispersal of rubbish. If the waste can be recycle or reuse then it will Refer in chapter 8 on

be sent to recycle facility. section 8.1.7 of page C8-30 for pollution prevention Cut vegetation and mitigation measures composting at dumping areas or partly left on slope (P2M2) between terraces.

Excavated Materials No mitigation if the works is properly done with sedimentation ponds available on downstream of working areas to trap runoff before discharge to nearby streams.

General refuses General wastes must be kept segregated and reused or recycled whenever possible.

Hazardous Wastes Prior to disposal, these wastes shall be stored in drums, label and kept in structure bund with roof cover. Disposal of these wastes shall be made through contractors register ed with Department of Environment.

ES-17 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant potential significant Mitigation measure Reference Page impacts potential impacts

Less significant Labour forces Refer in chapter 7 on Socio-economy impact section 7.2.8 of page C7-64 -the impact · No mitigation due to the nearest residential area is located 5km away from the project site. for environmental impact

during estate · Employees need to have a full medical check-up Refer in chapter 8 on development Safety and Local Infrastructure section 8.1.8 of page C8-32 phase for pollution prevention · The installation of wash trough to ensure that no soil and mitigation measures will be transported outside the project site. (P2M2) · Haul trucks transporting earthwork should be covered with ta rpaulin to prevent accidental spillage of the load along the route. · Warning signs and traffic guides should be in place at about 50 m from the main construction access so that the road users are aware of it. · All public / access roads to the site used for the transportation of construction materials and equipment should be regularly maintained and cleaned by the developer. · The developer should promptly attend to damages to the roads that may cause inconveniences to other road users

Health No Mitigation if no longer be allowed to carry out open burning.

ES-18 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant significant Mitigation measure Reference Page potential impacts potential impacts

Estate Maintenance and Production Phase (Crop maintenance stage, harvest and replanting and crop process stage)

Refer in chapter 7 on Air Quality Insignificant · Good agricultural practice could mitigate the odor, - to odors by the and eutrophication prevention measures in design section 7.3.1 of page C7-69 decay of algal and parameters could minimize the nutrient input from for environmental impact macrophyte the catchment. Refer in chapter 8 on biomass · To reduce odor, the slurry could be covered with soil. section 8.2.1 of page C8- 33 for pollution prevention and mitigation measures (P2M2)

Refer in chapter 7 on Water Quality Insignificant Eutrophication prevention measures such as stated below - from the section 7.3.2 of page C7-70 can be carried out: excessive of for environmental impact pesticide and i) Check upstream land use to determine nutrient fertilisers to inputs (cattle, fertilizers) and control the inputs. Refer in chapter 8 on groundwater ii) Good management of chemicals and fertilizers. section 8.2.2 of page C8 - iii) Minimize che mical runoff into rivers and streams. 34 for pollution iv) Ensure proper catchment management. prevention and mitigation v) Ensure proper agricultural management. measures (P2M2) vi) Monitor water quality on a continuous basis.

ES-19 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Significant Magnitude of Mitigation measure potential impacts significant Reference Page potential impacts

Refer in chapter 7 on Socio-economy Significant – give No mitigation because give opportunities to the beneficial effect in nearest Palm Oil Mill factory to process the oil palm section 7.3.3 of page C7-70 long term to process bunch and give job opportunities to residences of this for environmental impact factory and project area to work at this oil palm plantation residences Refer in chapter 8 on section 8.2.3 of page C8-35 for pollution prevention and mitigation measures (P2M2)

Insignificant Good management of chemicals and fertilizers include Refer in chapter 8 on The application of - the impact to consideration of the following: section 8.2.4 of page C8-35 excessive pesticide and groundwater · The amount and time of fertilizer application for pollution prevention and fertilisers to the required. groundwater mitigation measures · The amount of pesticides and fertilizers used is also dependent on the time of application. (P2M2) · Application and preparation of chemicals should comply with the procedures stated on the product labels. · Training should be given to the personnel handling these materials so as to avoid unwanted accidents.

ES-20 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Magnitude of Significant potential significant Mitigation measure Reference Page impacts potential impacts

Refer in chapte r 7 Project abandonment Significant – the · Abandonment during estate development and estate impact in short maintenance and production phase would require the on section 7.4 of term proponent to remove the machinery and equipment page C7-70 for installed. environmental impact · Well-planned removal of equipment and plant ation

would need to be undertaken in order to minimise any Refer in chapter 8 adverse impacts on the physical environment. on section 8.3 of · Management of the adverse impact of retrenchment by retraining and redeployment of some of the affected page C8-36 for workforce would require to be undertaken by the pollution relevant Government authorities. prevention and mitigation measures (P2M2)

ES-21 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Monitoring Program

The project proponent shall undertake the above monitoring programme, as stated according to the DOE Environmental Impact Assessment (EIA) approval letter COAs as in sampling frequency, sampling stations and format of reporting to ensure compliance of all environmental standards and to avoid adverse environmental impacts. The above monitoring programmes will be initiated during the estate development phase and estate maintenance and production phase of the proposed project. The monitoring programmes proposed are subjected to the amendments and approvals by the DOE.

The proposed monitoring site shall be decided after consultation with DOE. However, as a guide, the monitoring stations which have been used in the baseline monitoring shall be made reference for future monitoring. The proposed monitoring is Compliance Monitoring (CM), Impact Monitoring (IM) and Performance Monitoring (PM) will be explain on below.

Performance Monitoring (PM) is the monitoring to ensure that the pollution control systems and other mitigation measures are perform in a good condition to reduce the adverse impacts from the proposed Project at a minimum level. This project not involve Performance Monitoring (PM) because this project is oil palm plantation only without industrial effluent treatment systems, sewage treatment systems or others to monitor.

Compliance Monitoring (CM) is the monitoring activities to be carried out to ensure that the EIA condition of approval (COAs) are complied. An environmental audit may also be carried out to assess the overall project compliance. An appointed Department of Standards accredited laboratory shall carry out on-site sampling and laboratory analysis. The Compliance Monitoring (CM) is also monitoring of Pollution Prevention and Mitigation Measures (P2M2) within this Project site such as silt trap monitoring and ecology monitoring.

Impact Monitoring (IM) is the monitoring activities will be conducted once the proposed Project is approved for implementation to verify that the findings of the EIA study of the potential impacts identified during EIA preparation stage are correct, appropriate mitigation and prevention measures are properly implemented and the measures are effective in mitigation the adverse impacts to the environment. An appointed Department of Standards accredited laboratory shall carry out on-site sampling and laboratory analysis. The Impact Monitoring (IM) is only required in

ES-22 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary cases where impacts may affect receptors outside of project boundary such as river water monitoring, ambient air monitoring and boundary noise monitoring.

The proposed monitoring programme during estate development phase is shown Table 2 while monitoring programme during estate maintenance and production phase is shown Table 3.

ES-23 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Table 2 : Proposed monitoring programme during estate development phase Compliance Monitoring Point Coordinates Description Parameters Standards Frequency Impact Monitoring (IM) River Water N 02°16'24.1" Downstream of Sungai W1 E 103°09'00.6" Temelehal N 02°16'53.9" Upstream of Sungai W2 Temelehal Temperature, pH, E 103°10'05.6" Conductivity, Turbidity, DO, TSS, Ammoniacal Nitrogen, N 02°15'32.7" Downstream of Sungai National Water W3 BOD, COD, TOC, Oil and E 103°10'20.9" Jagoh Kechil Quality Standards Grease, Total coliform, Faecal Monthly (NWQS) N 02°15'26.1" Upstream of Sungai Coliform, phenol, phosphate, W4 Class III E 103°11'03.1" Jagoh Kechil sulphate, chloride, fluoride, nitrite, nitrates, Cd, Cu, Ni, Fe, N 02°16'44.6" Upstream of Sungai W5 Pb, Mn, As, Hg, Zn E 103°08'24.2" Bekok N 02°14'23.4" Downstream of Sungai W6 E 103°08'33.2" Bekok Ambient Air N 2°17'8.80" North corner of the A1 E 103°10'5.73" project site N 2°16'11.93" Northwest corner of the A2 Malaysia Ambient Air E 103°8'42.03" project site SO , NO , PM10 Quality Standard, Monthly N 2°17'8.80" Air sensitive receptor X X A3 2013 E 103°10'17.15" (Kampung Bekok) N 2°15'22.37" Air sensitive receptor A4 E 103°10'59.89" (Kilang Gunung Mas)

ES-24 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Compliance Monitoring Point Coordinates Description Parameters Standards Frequency Noise Boundary N 2°17'8.80" North corner of the N1 E 103°10'5.73" project site

N 2°16'11.93" Northwest corner o f the N2 Planning Guidelines E 103°8'42.03" project site for Environmental Leq, Lmax, Lmin Monthly Noise Limits and N 2°17'8.80" Noise sensitive receptor N3 Control, 2007 E 103°10'17.15" (Kampung Bekok) N 2°15'22.37" Noise sensitive receptor N4 E 103°10'59.89" (Kilang Gunung Mas) Ecology (Biological Monitoring) BM - Labis Forest Fauna - Once per Year

ES-25 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Compliance Monitoring Point Coordinates Description Parameters Standards Frequency Compliance Monitoring (CM) Silt Trap ST1 - ST2 - ST3 - ST4 - ST5 - Turbidity < 250 NTU ST6 - Project Site Turbidity and TSS Weekly TSS < 50 mg/l ST7 - ST8 - ST9 - ST10 - ST11 -

ES-26 FELCRA Berhad – EIA For The Proposed Oil Palm Plantation

ENVIRO PIONEER SOLUTIONS Executive Summary

Table 3 : Proposed monitoring programme during estate maintenance and production phase Compliance Monitoring Point Coordinates Description Parameters Standards Frequency Impact Monitoring (IM) River Water N 02°16'24.1" Downstream of Sungai W1 E 103°09'00.6" Temelehal Temperature, pH, N 02°16'53.9" Upstream of Sungai W2 Conductivity, Turbidity, E 103°10'05.6" Temelehal DO, TSS, Ammoniacal Nitrogen, BOD, COD, N 02°15'32.7" Downstream of Sungai W3 TOC, Oil and Grease, Jagoh Kechil National Water Quality E 103°10'20.9" Total coliform, Faecal Standards (NWQS) Quarterly Coliform, phenol, N 02°15'26.1" Upstream of Sungai Malaysia Class III W4 phosphate, sulphate, Jagoh Kechil E 103°11'03.1" chloride, fluoride, N 02°16'44.6" Upstream of Sungai nitrite, nitrates, Cd, Cu, W5 Bekok Ni, Fe, Pb, Mn, As, Hg, E 103°08'24.2" Zn N 02°14'23.4" Downstream of Sungai W6 E 103°08'33.2" Bekok